1
|
IRIDP-2/SYL/DW-5
|
Improvement of Dattarial Eidgha - Salamgaon Road (Ch: 00-320m).
|
0.3200
|
16.810
|
Setu Enterprise
|
16.810
|
07/02/2016
|
20/12/2016
|
100
|
23/12/2018
|
|
2
|
IRIDP-2/SYL/DW-4
|
a) Improvement of Barkot- BNK Road (Ch: 244-765m). b) Construction of 1No. 625mmx600mm Drain Culvert at ch. 654m on the same road.
|
0.5210
|
29.520
|
Setu Enterprise
|
29.520
|
07/02/2016
|
20/12/2016
|
100
|
23/12/2018
|
|
3
|
IRIDP-2/SYL/DW-3
|
a) Improvement of Dharabohar Mian Jame Mosjid- Kawolipara- Shailghat Road (Ch: 00-500m). b) Construction of 2Nos. 625mmx600mm Drain Culvert at ch. 140m & 315m on the same road.
|
0.5000
|
25.120
|
Setu Enterprise
|
25.120
|
07/02/2016
|
20/12/2016
|
100
|
23/12/2018
|
|
4
|
IRIDP-2/SYL/DW-2
|
Improvement of Hazipur-Larifor road (Ch: 1465-1881m).
|
0.4160
|
23.260
|
Setu Enterprise
|
23.260
|
07/02/2016
|
30/05/2017
|
30
|
23/12/2018
|
|
5
|
IRIDP-2/SYL/DW-1
|
Improvement of Bhadeshwar- Maisbag- Hafizea Madrasha Road (Ch: 900-1400m).
|
0.5000
|
29.070
|
Setu Enterprise
|
29.070
|
07/02/2016
|
20/12/2016
|
100
|
23/12/2018
|
|