SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Gopalganj-s
1 GDIRIIP/VR/BC/Sadar/17-18/86 Const. of 98.20m RCC Slab & PC Girder Bridge on Urfi UPC-Ulpur Bazar Sokhiner More via Khagail Rahutkhamar Old Name Dumdia-Khagail-Rahutkhamar road at Ch. 8840m under Sadar Upazila District Gopalganj 793.016 Md Mahafuz Khan 793.016 26/08/2018 02/12/2019 30 28/01/2020
2 GDIRIIP/VR/Bridge/Sadar/16-17/67 Construction of 18.00m RCC Bridge on Dalnia-Baghajuri road at Ch. 300 under Sadar Upazila District Gopalganj 85.440 M/S Kamrul & Brothers 85.440 09/07/2017 16/05/2018 95 28/01/2020
3 GDIRIIP/VR/HBB/Sadar/16-17/52 Improvement of Kathi Teligati Mondol Market-Kathi- Talbari Bokul Member Bari road by HBB at Ch. 00-750m & Const. of 01 No U-drain at Ch. 630m under Sadar Upazila District Gopalganj 0.7500 34.250 M/S. Ohona Traders 34.250 21/05/2017 20/10/2017 80 28/01/2020 land problem
4 GDIRIIP/UZR/Brdg/Sadar/16-17/44 Construction of 200.00m PC Girder Bridge on Boultoli GC-Ghonapara-Fukra road over MBR khal at Ch. 50m under Sadar Upazila District Gopalganj 2562.217 MB-IT JV 2562.217 01/05/2017 10/09/2019 60 28/01/2020
5 GDIRIIP/VR/BR/Sadar/16-17/27 (a) Improvement of Manikhar-Urfi road by BC (Ch. 975-1775m) & (B) Const. of 625mmx600mm size U-drain culvert on the same road at Ch. 1585m under Sadar Upazila, District: Gopalganj 0.8000 34.600 Active Traders 34.600 22/11/2016 01/03/2019 60 28/01/2020
6 GDIRIIP/VR/HBB/Sadar/18-19/87 Improvement of Kolpur-Jadupur road ( Kolpur UZR-Jadupur Sadar Part) at Ch. 00-2300m by HBB & Const. of 3Nos U-drain culvert at Ch. 660m, 950m & 1420m on the same road (Road ID No: 335324235-New, 335325068-Old) [Salvage Materials Cost. Tk. 83,212.00] under Sadar Upazila, District: Gopalganj. 2.3000 157.380 s.m nurulislam 157.380 25/10/2019 13/03/2019 95 28/01/2020
7 GDIRIIP/Sadar/18-19/129 (A) Improvement of Road by HBB From Ch. 00-1980m Khatiagore GPS-Durgapur H/S & (B) Const. of 2-Nos 600mmx600mm zise U-drain at Ch. 97m & 1060m on the same road (Road ID No: 335324210) under Sadar Upazila District Gopalganj. 1.9800 116.752 M/S. Mahadi Enterprise 116.752 02/08/2019 06/07/2020 10 12/11/2019  
8 GDIRIIP/Sadar/18-19/128 (A) Improvement of Road by BC From Ch. 00-500m Gopinathpur Uttarpara Boalia Pucca Road-H/O Taib Mollah-H/O DG Mostafij & (B) Const. of 2-Nos 600mmx600mm zise U-drain at Ch. 60m & 342m on the same road (Road ID No: 335325421) under Sadar Upazila District Gopalganj. 0.5000 64.624 Shariful and Co. 64.624 25/08/2019 24/03/2020 10 12/11/2019
9 GDIRIIP/Sadar/18-19/124 Improvement of Road by HBB Chandradigholia RHD to Majbari road at Ch. 00-850m (Road ID No: 335325088) under Sadar Upazila District Gopalganj. 0.8500 47.835 M/S Shahalam Engineering workshop 47.835 21/08/2019 06/04/2020 20 12/11/2019  
10 GDIRIIP/Sadar/VR/BC/18-19/122 Improvement of Road by BC Bhatiapara Khulna RHD ( Shop of Nowad Ali) Tungipara RHD via Chair Boira Madrasha Road Ch. 00m-2120m (Road ID No: 335325006) under Sadar Upazila District Gopalganj [ Salvage Materials Cost Tk. 14,52,126.00]. 2.1200 152.642 Md. Jiaul Haque 152.642 21/07/2019 31/12/2020 55 12/11/2019  
11 GDIRIIP/Sadar/UNR/18-19/ Maint/13 Maintenence of Urfi UPC-Ulpur bazar Sokiner More via Khagail Rahuthkhamar road by BC at Ch. 1650-4550m Road ID No 335323015 under Sadar Upazila District Gopalganj. 2.9000 252.776 Masud & Jewel JV 252.776 03/06/2019 30/04/2019 20 12/11/2019  
12 GDIRIIP/Sadar/VR/BC/18-19/120 Improvement of Road by BC from Gopalganj Bolakoir Bazar-Bajunia RHD via Hakim Afsar GPS Panail GPS road at Ch. 2000-3980m (Road ID No: 335324112) under Sadar Upazila District Gopalganj 1.9800 179.189 M/S. Monir Traders 179.189 21/07/2019 02/06/2020 25 12/11/2019  
13 GDIRIIP/Sadar/UZR/BC/18-19/118 Improvement of Road by BC from Ch. 1920m-5290m Urfi UPC-Manikhar Hat via Gopalpur and Construction of 04 Nos 600mmx600mm size U Drain at Ch. 2690m (H/O Miraj Khan), Ch. 3855m (H/O Nur Alom), Ch. 4590m (Adorshorgram) & Ch. 5190m on the same road (Road ID No: 335323010) under Sadar Upazila District Gopalganj [ Salvage Materials Cost Tk. 38,01,008.00]. 3.3700 329.678 M/S Kamrul & Brothers 329.678 10/07/2019 01/11/2020 60 12/11/2019  
14 GDIRIIP/Sadar/VR/BC/18-19/115 Part-A: Improvement of Road by BC from ( Ch. 00-660m) Modho Satpar ( Satpar Petkelbari UZR) H/O Goyail Biswas-Modho Satpar ( H/O Horibor) (Road ID No: 335324055) under Sadar Upazila District Gopalganj [Salvage Materials Cost: Tk. 1,86,016.00]. 0.6600 60.620 s.m nurulislam 60.620 23/04/2019 26/02/2020 100 12/11/2019  
15 GDIRIIP/Sadar/VR/BC/18-19/114 Part-A: Improvement of Road by BC from ( Ch. 00-860m) Durgapur Bazar-Durgapur Kheyaghat & Part-B: Const. of 03 Nos 600mmx600mm Size U-drain at Ch. 30m, 260m & 390m on the same road (Road ID No: 335325286) under Sadar Upazila District Gopalganj. 0.8600 70.415 s.m nurulislam 70.415 23/04/2019 26/02/2020 100 12/11/2019  
16 GDIRIIP/Sadar/VR/BC/CUL/18-19/113 Part-A: Improvement of Road by BC from ( Ch. 00-1150m) Ghagadholiatola GPS (UZR)-H/O Hannan Gazi; Part-B: Const. of 4.00x4.00m size 2-vent RCC Box culvert on the same road at Ch. 120m & Part-C: Const. of 03 Nos 600mmx600mm Size U-drain at Ch. 410m, 830m & 1030m on the same road (Road ID No: 335324149) under Sadar Upazila District Gopalganj. 1.1500 114.285 M/S. Mohammad Ali Enterprise 114.285 12/06/2019 30/03/2020 70 12/11/2019  
17 GDIRIIP/Sadar/VR/BC/18-19/112 Part-A: Improvement of Road by BC from ( Ch. 00-1015m) Ghagadholiatola Pucca road-Dubushia GPS-H/O Hasan Sardar & Part-B: Const. of 02 Nos 600mmx600mm Size U-drain at Ch. 180m & 870m on the same road (Road ID No: 335325416) under Sadar Upazila District Gopalganj. 1.0150 73.930 M/s Tanha Enterprise 73.930 17/04/2019 02/12/2019 70 12/11/2019  
18 GDIRIIP/VR/BC/Culvert/Sadar/18-19/111 Part-A: Improvement of Matla high school (H/O Ilias Munshi)-Henara GPS road at Ch. 00-1100m; Part-B: Const. of 01 No 2x4.00x4.00m RCC Box culvert at Ch. 370m on the same road & Part-C: Const. of 01 No 2.50x2.50m RCC Box culvert at Ch. 550m on the same road (Road ID No: 335325162) under Sadar Upazila District Gopalganj [Salvage Materials Cost: Tk. 18,63,286.00]. 1.1000 137.324 Mahmud Enterprise 137.324 07/04/2019 07/10/2019 25 12/11/2019  
19 GDIRIIP/VR/BC/Sadar/18-19/110 Part-A: Improvement of Nizra-Kathalbari-Uttar Rauthkhamar via Thanderpar road at Ch. 00-386m & 926-2397m by BC & Part-B: Const. of 01 No 600*600mm U-drain at Ch. 1820m on the same road (Road ID No: 335324129) under Sadar Upazila District Gopalganj [Salvage Materials Cost: Tk. 42,46,224.00]. 1.8570 167.436 M/S. Sabbir Enterprise 167.436 10 12/11/2019
20 GDIRIIP/VR/HBB/Sadar/18-19/108 Improvement of Ulpur bazar (Shop of Shamol)-H/O Isar Mollah road at Ch. 00-340m by HBB (Road ID No: 335325423) under Sadar Upazila District Gopalganj. 0.3400 26.350 m/s ice world 26.350 27/03/2019 08/08/2019 100 12/11/2019  
21 GDIRIIP/VR/BC-HBB/Sadar/18-19/107 Part-A:Improvement of Ulpur-Durgapur pucca road ( Durgapur UP office road)-Moni Sk. via H/O Kolpon road at Ch. 00-1380m by HBB & Part-B: Const. of 01 No 600x600mm U-drain at Ch. 1242m on the same road (Road ID No: 335325407) under Sadar Upazila District G 1.3800 113.780 M/S. Ashraf Construction 113.780 08/04/2019 18/02/2010 100 12/11/2019  
22 GDIRIIP/VR/BC-HBB/Sadar/18-19/106 Part-A: Improvement of Maddhyobonogram (Bonogram Kochi Kacha GPS) pucca road ( H/O Shaheb member) at Ch. 00-850m by BC & Part-B: Const. of 01 No 600x600mm U-drain at Ch. 380m on the same road (Road ID No: 335324234) under Sadar Upazila District Gopalganj 0.8500 48.357 M/S. Nishat Enterprise 48.357 03/04/2019 26/02/2020 60 12/11/2019  
23 GDIRIIP/Sadar/LRAM18-19/104 Part-A: Const. of Boat landing Ramp of Bosherat Khal at Rahuthkhamar under Ulpur UP; Part-B: Const. of Boat landing Ramp near MBR khal at East side of under Ulpur bazar Connecting road Uplur & Part-C: Const. of Boat landing Ramp of attached Kathi GC under Kathi UP Sadar Upazila District Gopalganj. 100.550 M/s Shawkot Ali Enterprise 100.550 02/04/2019 12/11/2019 95 11/11/2019  
24 GDIRIIP/VR/BC-HBB/Sadar/18-19/103 Improvement of Durgapur H/O Kadammina-H/O Nannu mia road at Ch. 00-1450m by BC & Const. of 4Nos 600mmx600mm U-drain at Ch. 380m, 445m, 1300m & 1410m (Road ID No: 335325331) under Sadar Upazila District Gopalganj. 1.4500 116.250 Mahamudul Haque 116.250 17/04/2019 18/02/2020 60 11/11/2019  
25 GDIRIIP/VR/HBB/Sadar/cul/18-19/97 Part- A: Improvement of Borashi Uttarpara Mosque-Pourashava Border road at Ch. 00-1196m by HBB; Part-B:Const. of 01 No 1x4.30x4.30m RCC Box culvert at Ch. 760m on the same road & Part- C:Const. of 2Nos 600mmx600mm U-drain at Ch. 90m & 540m (Road ID No: 33 1.1190 79.843 m/s karuna traders 79.843 04/04/2019 03/09/2019 100 11/11/2019  
26 GDIRIIP/VR/BC/Sadar/18-19/95 Improvement of Krishnapur H/O Kettro Biswas to Boriar more via vadrabari road at Ch. 00-1350m by BC (Road ID No: 335324182) under Sadar Upazila District Gopalganj 1.3500 102.376 M/S. Tajim Traders 102.376 07/04/2019 27/11/2019 30 11/11/2019  
27 GDIRIIP/VR/BC/Sadar/18-19/94 Improvement of Kathi RHD-Betangi Bazar road at Ch. 00-3220m by BC Road ID No 335324017 under Sadar Upazila District Gopalganj 3.2000 29.241 M/S Kamrul & Brothers 29.241 15/04/2020 35 11/11/2019  
28 GDIRIIP/VR/BC/Sadar/18-19/91 Part-(1)A: Improvement of Perkushli Steel Bridge ( Nakrirchar RHD Bridge)-Mujib Bazar Bridge via Charpara ( Ziaul Hoque) road at Ch. 00-2220m by BC [Salvage Materials Cost. 36,79,308.00] ; Part-(1)B: Const. of 3Nos 1x4.50x3.50m RCC Box culvert at Ch. 38 2.2200 270.942 M/S. Jweel Construction 270.942 03/06/2019 18/04/2020 40 11/11/2019  
29 GDIRIIP/VR/BC/Sadar/18-19/90 Part-(1)A: Improvement of Tetulia-Rauthkhamar road at Ch. 00-1740m by BC [Salvage Materials Cost. 25,18,000.00] ; Part-(1)B: Const. of 1No 600x600mm U-drain at Ch. 990mon the same road (Road ID No: 335324012); Part-(2)A: Improvement of Kajulia Madrasha ( 2.6600 282.751 M/S Kamrul & Brothers 282.751 11/07/2019 26/11/2020 10 11/11/2019  
30 GDIRIIP/VR/HBB/Sadar/18-19/89 Part-(1)A: Improvement of Boalia Pucca road-Mathla Samaddarpara road at Ch. 00-1470m by HBB; Part-(1)B: Const. of 3Nos 600x600mm U-drain at Ch. 10m, 340m & 1100m on the same road ; Part-(1) C: Const. of 2x4.00x4.00m Box culvert at Ch. 160m & 500m on the s 2.3000 146.824 M/S. Lipe Engineering 146.824 20/02/2019 30/06/2019 100 11/11/2019  
31 GDIRIIP/VR/HBB/Culvert/Sadar/18-19/88 Part-(1)A: Improvement of Dumdia-Khagail Routhkhamar road at Ch. 5700-7600m by HBB (Road ID No: 335324100); Part-(1)B: Const. of 1No 2x4.50x4.50m Box culvert on the same road at Ch. 7175m & Part-(1)C: Const. of 02 Nos U-drain on the same road at Ch. 5850m & 6900m under Sadar Upazila District Gopalganj. 2.3000 189.202 Mahamudul Haque 189.202 14/01/2018 06/06/2019 100 11/11/2019  
32 GDIRIIP/VR/BR/Sadar/16-17/33 Improvement of Modhumoti Bazar-Godaikhali (Gopinathpur-Ghaghadholaitola UZR) road by BC (Ch. 00-610m) under Sadar Upazila, District: Gopalganj 0.6100 34.862 Abdus Salam Matubber 34.862 15/11/2016 28/03/2017 100 11/11/2019
33 GDIRIIP/VR/HBB/Sadar/16-17/39 (A) Improvement of Chartala Modhumoti river ghat-Tebaria bazar via Jagerchar road by HBB Ch. 00-1116m & (B) Const. of 1No U-Drain on the same road at Ch. 150m under Sadar Upazila District Gopalganj 1.1160 37.280 Abdur Rakib Sikder 37.280 15/03/2017 07/08/2017 100 16/10/2019 Final
34 GDIRIIP/Sadar/18-19/126 (1A) Improvement of Road by HBB From Ch. 00-830m Baroyvita Community Clinic-Fider School via Ponditbari & (1B) Const. of 600mmx600mm U-drain at Ch. 510m (Road ID No: 335325446) and (2A) Improvement of Road by BC From Ch. 00-1590m Char Gobra R&H ( Near the Mollarhat Bridge) Mollarhat Puraton Ferryghat & (2B) Const. of 2-Vent 4.00x4.00m RCC Box culvert (Road ID No: 335324237) under Sadar Upazila District Gopalganj. 2.4200 191.011   191.011 0 16/10/2019 Tender under process
35 GDIRIIP/Sadar/LRAM18-19/105 Part-A: Const. of Boat landing Ramp of near MBR khal at west side of Boultoli Bazar under Boultoli UP & Part-B: Const. of Boat landing Ramp of near MBR Khal at west side of Sanpukuria (Near the H/O Babu Roy) under Satpar UP Sadar Upazila District Gopalganj. 63.680 Mahmud Enterprise 63.680 05/04/2019 11/07/2019 30 10/10/2019  
36 GDIRIIP/VR/HBB/Sadar/18-19/93 Part-(1)A: Improvement of Gopinathpur Ear Ali road-Boalia pucca road-Mathla Somaddarpara road at Ch. 00-550m by HBB; Part-(1)B: Const. of 01 No 2x4.00x4.00m RCC Box culvert at Ch. 10m on the same road; Part-(1)C: Const. of 4Nos 600x600mm U-drain at Ch. 240m, 340m, 390m & 480m on the same road (Road ID No: 335325397); Part-(2)A: Improvement of Bedgram-Silna ( Dhorma Kheyaghat)-Amin Bazar road at Ch. 00-3420m by HBB; Part-(2)B: Const. of 12Nos 600mmx600mm U-drain at Ch. 200m, 270m, 445m, 720m, 1400m, 1990m, 2210m, 2610m, 2705m, 2870m, 3320m & 3400m on the same road (Road ID No: 335325408); Part-(3)A: Improvement of Boultoli Pachimpara Kheyaghat-Kalpur-Jadupur via H/O Engineer Saidul Hoque (Revaised Name) Boultoli Pachimpara Kheyaghat-Satpar RHD Briade via H/O Engineer Saidul Hoque road at Ch. 1000-2420m by HBB; Part-(3)B: Const. of 4Nos 600mmx600mm U-drain at Ch. 1200m, 1485m, 1920m & 2130m on the same road under Sadar Upazila District Gopalganj (Road ID No: 335324143). 5.3400 338.741 MS Anamica Traders 338.741 28/03/2019 12/02/2020 100 10/10/2019  
37 GDIRIIP/VR/HR/Sadar/16-17/19 (a) Improvement of Domrasur-Dighirper road by HBB (Ch. 00-135m & 865-2450m); (B) Const. of 4.50mx4.50m size 01 vent RCC box culvert on the same road at Ch. 2050m (Pond side) & (C) Const. of 4.50mx4.50m size 01 vent RCC box culvert on the same road at Ch. 2430m (Near the H/O Pandey bari) under Sadar Upazila, District: Gopalganj (Road ID No: 335324043). 1.7200 109.227 M/s. Mojumder Enterprise 109.227 17/11/2016 01/10/2017 100 10/10/2019 Final
38 GDIRIIP/VR/BC/HBB/Sadar/18-19/92 Part-(1)A: Improvement of Char Borfa Bridge-Kheyaghat via Char Borfa GPS road at Ch. 00-1000m by BC; Part-(1)B: Const. of 2Nos 600x600mm U-drain at Ch. 160m & 700m on the same road (Road ID No: 335325181); Part-(2)A: Improvement of Chotfa Amir khanâs bari-Modhumoti river road at Ch. 00-1500m by HBB; Part-(2)B: Const. of 2Nos 600mmx600mm U-drain at Ch. 215m & 1320m on the same road under Sadar Upazila District Gopalganj (Road ID No: 335325186); Part-(3)A: Improvement of Ghagadholitola UZR (Sikderpara Mosque)-H/O Golzar Mia road at Ch. 00-1200m by BC; Part-(3)B: Const. of 2Nos 600mmx600mm U-drain at Ch. 120m & 1050m on the same road under Sadar Upazila District Gopalganj (Road ID No: 335325205). 3.7000 267.618 M/S. Benojire Construction 267.618 16/04/2019 15/02/2020 60 03/10/2019  
39 GDIRIIP/Gopal/sadar/19-20/131 Improvement of Road by BC from Haridaspur RHD Bridge ( South side) Horidaspur Pashimpara GPS Samsul Ulum Madrasha road at Ch. 00m-720m (Road ID No: 335325435) under Sadar Upazila District Gopalganj [ Salvage Materials Cost Tk. 21,02,041.00]. 0.7200 75.022   75.022 0 02/10/2019 Tender under process
40 GDIRIIP/Gopal/sadar/19-20/130 Improvement of Boultoli Bazar-Angkur School road at Ch. 00-750m by BC (Road ID No: 335325066) under Sadar Upazila District Gopalganj 0.7500 54.287   54.287 0 02/10/2019 Tender under process
41 GDIRIIP/Sadar/18-19/127 Improvement of Road by BC From Kajulia UPC-Serabari-Domrasur RD (R&H) Domrasur Bazar Road at Ch. 9800m-11315m (Road ID No: 335323007) under Sadar Upazila District Gopalganj 1.5150 166.757   166.757 0 02/10/2019 Tender under process
42 GDIRIIP/Sadar/18-19/125 (a) Improvement of Road by BC From Horidaspur UPC Durgarpur Field Bazar via Arpara GPS road Ch. 00-3900m & (b) Const. of 03Nos 600mmx600mm U-drain at Ch. 1830m, 2848m & 3325m on the same road (Road ID No: 335323006) under Sadar Upazila District Gopalganj 3.9000 308.126   308.126 0 02/10/2019 Tender under process
43 GDIRIIP/Sadar/18-19/123 (a) Improvement of Road by BC From ( Ch. 00-1620m) Ranghunathour Ochout Master-Digherkul via Sharbojonin Shosan & (b) Const. of 600mmx600mm U-drain at Ch. 970m on the same road (Road ID No: 335324132) under Sadar Upazila District Gopalganj 1.6200 178.794   178.794 0 02/10/2019 Tender under process
44 GDIRIIP/Sadar/VR/BC/18-19/121 Improvement of Road by BC Dighirper ( H/O Hironmoy) to H/O Panday (Sadar Portion) Ch. 00m-900m (Road ID No: 335325445) under Sadar Upazila District Gopalganj [ Salvage Materials Cost Tk. 23,06,062.00]. 0.9000 108.155 Md. Azizul Islam 108.155 14/07/2019 18/05/2020 0 02/10/2019  
45 GDIRIIP/Sadar/UNR/18-19/Maint/12 Maintenence of Urfi UPC-Manikhar hat via Gopalpur road by BC at Ch. 190-1920m (Road ID No: 335323010) under Sadar Upazila District Gopalganj. 1.7300 60.686 M/S. E.S.Co 60.686 24/04/2019 12/05/2019 100 02/10/2019 Final
46 GDIRIIP/Sadar/UZR/BC/18-19/117 Improvement of Road by BC from Ch. 9950m-10770m Urfi UPC-Ulpur Bazar (Sokiner More) via Khagail Rahuthkhamar (Road ID No: 335323015) under Sadar Upazila District Gopalganj [ Salvage Materials Cost Tk. 7,66,762.00]. 0.8200 104.868 Nila Enterprise 104.868 07/05/2019 14/02/2020 60 02/10/2019  
47 GDIRIIP/VR/BC/Sadar/18-19/109 Improvement of Verarhat R&H-Purba Arpara GPS road at Ch. 00-1640m by BC (Road ID No: 335324112) under Sadar Upazila District Gopalganj [Salvage Materials Cost: Tk. 39,86,536.00]. 1.6400 132.128 Mahmud Enterprise 132.128 0 02/10/2019 Tender on Process
48 GDIRIIP/VR/BC-HBB/Sadar/18-19/102 Improvement of Modhumoti bazar-Godhaikhali Gopinathpur-Ghaghadholaitola UZR road at Ch. 00-610m by BC (Road ID No: 335325238) under Sadar Upazila District Gopalganj. 0.6100 18.094 M/S. Mohammad Ali Enterprise 18.094 28/03/2019 22/05/2019 100 02/10/2019 Final
49 GDIRIIP/VR/BC-HBB/Sadar/18-19/101 Part-A: Improvement of Dumrasur H/O Jiten Shadhu-Shusil Boul via GPS road at Ch. 00-1040 by BC & Part-B: Const. of 1No 600mmx600mm U-drain at Ch. 900m ( Near Boyragirtol GPS) (Road ID No: 335325317) under Sadar Upazila District Gopalganj. 1.0400 99.400 M/S. New Shikder Traders 99.400 04/03/2019 18/11/2019 65 02/10/2019  
50 GDIRIIP/VR/BC-HBB/Sadar/18-19/100 Part-A: Improvement of Chandradighalia R&H-Nuton Char road at Ch. 00-1007m by BC & Part-B:Const. of 3Nos 600mmx600mm U-drain at Ch. 30m, 400m & 790m (Road ID No: 335325090) under Sadar Upazila District Gopalganj 1.0000 94.849 Mahamudul Haque 94.849 17/04/2019 18/02/2020 10 02/10/2019  
51 GDIRIIP/VR/BC-HBB/Sadar/18-19/98 Part-A: Improvement of Horidaspur H/O Shahid Mintu mia-RHD ( Rakib Road) road at Ch. 00-420m by BC & Part-B: Const. of 2Nos 600mmx600mm U-drain at Ch. 98m & 255m (Road ID No: 335325099) under Sadar Upazila District Gopalganj 0.4200 30.496 M/S. New Shikder Traders 30.496 04/04/2019 03/06/2019 100 02/10/2019 Final
52 GDIRIIP/VR/HBB/Sadar/18-19/96 Improvement of Ulpur Muslimpara GPS-H/O Roice Mollah via Chairman bari road at Ch. 00-760m by HBB (Road ID No: 335324224) under Sadar Upazila District Gopalganj 0.7800 35.701 M/s Shawkot Ali Enterprise 35.701 05/04/2019 28/08/2019 100 02/10/2019  
53 GDIRIIP/VR/HBB/Sadar/17-18/85 Improvement Sultanshahi RHD-Chandradighalia GPS via Tebaria bazar road by HBB at Ch. 3000m-3175m under Sadar Upazila District Gopalganj 0.1750 6.870 M/s Alif Enterprise 6.870 22/05/2018 30/10/2018 100 02/10/2019 Final
54 GDIRIIP/VR/BC/Sadar/17-18/84 Improvement Sultanshahi high School-Tebaria bazar road by BC at Ch. 1700m-2190m under Sadar Upazila District Gopalganj 0.4900 36.910 M/S Shamim Traders 36.910 24/05/2018 10/05/2019 100 02/10/2019 Final
55 GDIRIIP/VR/BC/Sadar/17-18/83 Improvement Ulpur UPC-Malenga road by BC at Ch. 1000m-2950m & Const of 4Nos U-Drain at Ch. 1998m 2337m 2410m & 2635m on the same road under Sadar Upazila District Gopalganj 1.9500 129.450 M/S Shamim Traders 129.450 24/05/2018 30/12/2018 100 02/10/2019  
56 GDIRIIP/VR/BC/Sadar/17-18/82 Part-A Improvement Parkusli Steel Bridge R&H Bridge-Mujib bazar road by BC at Ch. 00m-1130m & Part-B Const of 4Nos U-Drain at Ch. 380m 470m 700m & 865m on the same road under Sadar Upazila District Gopalganj 1.1300 79.498 M/S Shamim Traders 79.498 24/05/2018 30/01/2019 100 02/10/2019 Final
57 GDIRIIP/VR/BC/Sadar/17-18/81 Improvement of Satpar Patkrlbari-UZR Pulin Bala house-Gopalganj Tekerhat RHD via GPS road by BC at Ch. 1000m-1670m Const. of 01 No U-drain at Ch. 1200m on the same road under Sadar Upazila District Gopalganj 0.6700 48.645 M/S. E.S.Co 48.645 25/04/2018 05/09/2018 100 02/10/2019 Final
58 GDIRIIP/VR/BC/Sadar/17-18/80 Improvement of Kekania H/O Upazila Chairman-Chairtala Bari-Parjoynagar road by BC at Ch. 2500m-4000m Const. of 04 Nos U-drain at Ch. 3191m 3290m 3635m & 3900m on the same road under Sadar Upazila District Gopalganj 1.5000 108.618 M/S. Mohammad Ali Enterprise 108.618 26/04/2018 01/09/2018 100 02/10/2019 Final
59 GDIRIIP/VR/HBB/Sadar/17-18/79 Improvement of Ulpur-Kongsur road by HBB at Ch. 1000m-2215m& Const. of 3 Nos U-drain at Ch. 1200m 1950m & 1990m on the same road under Sadar Upazila District Gopalganj 1.2150 59.251 M/S. Sajib Enterprise 59.251 19/04/2018 10/07/2018 100 02/10/2019 Final
60 GDIRIIP/VR/BC/Sadar/17-18/78 Improvement of Golabaria-Digharkul-Uttar Vennabari road FRB-Golabaria-Mujib Bazar by BC at Ch. 1000m-3000m under Sadar Upazila District Gopalganj 2.0000 118.922 M/S. Masud Enterprise 118.922 23/04/2018 10/11/2018 100 02/10/2019 Final
61 GDIRIIP/VR/HBB/Sadar/17-18/77 Improvement of Ichakhali Fulu Mollas Bari-Modhumoti Kheyaghat road by HBB at Ch. 1500-2190m Const. of 01 No U-drain on the same road at Ch. 1960m & Const. of 1No 1x2.50x2.00m RCC Box culvert on the same road at Ch. 1595m under Sadar Upazila District Gopal 0.6900 33.451 M/S. Showrove Traders 33.451 26/03/2018 16/08/2018 100 02/10/2019 Final
62 GDIRIIP/VR/HBB/Sadar/17-18/76 Improvement of Joynagar Dakhinpara GPS-H/O Litu sheikh via chartala road by HBB at Ch. 00-1000m under Sadar Upazila District Gopalganj 1.0000 40.160 M/S. Showrove Traders 40.160 13/02/2018 05/04/2018 100 02/10/2019 Final
63 GDIRIIP/VR/HBB/Sadar/17-18/75 Improvement of Suktail UZR H/O Dr. Mannan-Gopalpur Sharifbari road by HBB at Ch. 00-950m under Sadar Upazila District Gopalganj 0.9500 47.560 M/S. E.S.Co 47.560 04/01/2018 29/06/2018 100 02/10/2019 Final
64 GDIRIIP/VR/HBB/Sadar/16-17/74 Improvement of Dumlia-Khagail-Rauthkhamar road by HBB at Ch. 4700-5700m & Const. of 02 Nos U-drain on the same road at Ch. 4815m & 5400m under Sadar Upazila District Gopalganj 1.0000 52.500 M/S. Masud Enterprise 52.500 08/10/2017 10/02/2018 100 02/10/2019 Final
65 GDIRIIP/VR/HBB/Sadar/16-17/73 Improvement of Majhigati R&H-Dalnia High school road by HBB at Ch. 60-600m & 1620m-2470m & Const. of 01 No U-drain on the same road at Ch. 2210m under Sadar Upazila District Gopalganj 1.3900 56.027 M/S. E.S.Co 56.027 24/09/2017 16/02/2018 100 02/10/2019 Final
66 GDIRIIP/VR/HBB/Sadar/16-17/72 (A) Improvement of Mathla Nazruls bari-Maddhaypara mosque road by HBB Ch. 00-700m (B) Const. of 1No U-drain on the same road at Ch. 310m under Sadar Upazila District Gopalganj 0.7000 23.014 M/S. E.S.Co 23.014 20/10/2017 13/12/2017 100 02/10/2019 Final
67 GDIRIIP/VR/HBB/Sadar/16-17/71 (A) Improvement of Mathla-Henora Moffazel GPS-Madrasha road by HBB Ch. 00-1300m (B) Const. of 3Nos U-drain on the same road at Ch. 510m 950m & 1150m under Sadar Upazila District Gopalganj 1.3000 51.543 M/S. Masud Enterprise 51.543 31/10/2017 07/07/2018 100 02/10/2019 Final
68 GDIRIIP/VR/Bridge/Sadar/16-17/70 Construction of 15.00m RCC Bridge on Sanpukuria-Chakkrulia road at Ch. 800 under Sadar Upazila District Gopalganj 69.650 M/S Kamrul & Brothers 69.650 16/07/2017 14/02/2019 100 02/10/2019 Final
69 GDIRIIP/VR/HBB/Sadar/16-17/69 Improvement of Godaikhali RHD-Suktail Sardarpara UZR road by HBB at Ch. 500-2025m & Const of 1No U-drain on the same road at Ch. 1825m under Sadar Upazila District Gopalganj 1.8250 74.360 Mizanur Rahman Montu 74.360 26/12/2017 18/05/2018 100 02/10/2019 Final
70 GDIRIIP/VR/BC/Sadar/16-17/66 Improvement of Gobra-Singati Kheyaghat via Gobra Lunchghat road by BC at Ch. 2250-3050m & Const of 1No U-drain on the same road at Ch. 2445m under Sadar Upazila District Gopalganj 0.8000 45.102 M/S. Mohammad Ali Enterprise 45.102 16/10/2017 08/02/2018 100 02/10/2019 Final
71 GDIRIIP/VR/BC/Sadar/16-17/65 Improvement of Pukuria-Gopalpur road by BC at Ch. 1700-3100m under Sadar Upazila District Gopalganj 1.4000 80.565 M/S. Monir Traders 80.565 27/08/2017 19/06/2018 100 02/10/2019 Final
72 GDIRIIP/VR/BC/Sadar/16-17/64 Improvement of Satpar-Patkelbari UZR Pulin Bala house road by BC at Ch. 00-1000m & Const of 1No U-drain on the same road at Ch. 895m under Sadar Upazila District Gopalganj 1.0000 63.029 M/S. E.S.Co 63.029 16/10/2017 08/05/2018 100 02/10/2019 Final
73 GDIRIIP/VR/HBB/Sadar/16-17/63 Improvement of Bajunia-Bhojorgati road by HBB at Ch. 650-930m under Sadar Upazila District Gopalganj 0.2800 14.938 Md. Jiaul Haque 14.938 27/08/2017 19/12/2017 100 02/10/2019 Final
74 GDIRIIP/Bridge /Sadar/16-17/62 Construction of 30.00m RCC Girder Bridge Silna Bazar-Purba Singarpore road at Ch. 34m under Sadar Upazila District Gopalganj 112.392 M/S. Khandaker Shahin Ahmed 112.392 12/06/2017 25/04/2018 100 02/10/2019  
75 GDIRIIP/VR/BC/Sadar/16-17/61 Improvement of Patkelbari Balabari-Bibek Biswas via Gonopoti sarkar bari road by BC at Ch. 00-1020m & Const of 3Nos U-drain on the same road at Ch. 100m400m & 700m under Sadar Upazila District Gopalganj 1.2000 56.905 M/S. E.S.Co 56.905 13/06/2017 05/02/2018 100 02/10/2019 Final
76 GDIRIIP/VR/HBB/Sadar/16-17/60 Improvement of Uttar Suktail H/O Sudhir- Ayub member house road by HBB at Ch. 00-1035m & Const of 1No U-drain on the same road at Ch. 645m under Sadar Upazila District Gopalganj 1.0350 36.780 M/S. E.S.Co 36.780 13/06/2017 05/11/2017 100 02/10/2019 Final
77 GDIRIIP/VR/HBB/Sadar/16-17/59 Improvement of Jagarchar-Parchandradighalia road by HBB at Ch. 00-630m & Const of 1No U-drain on the same road at Ch. 70m under Sadar Upazila District Gopalganj 0.6300 22.860 M/S. Masud Enterprise 22.860 08/06/2017 30/07/2017 100 02/10/2019 Final
78 GDIRIIP/VR/HBB/Sadar/16-17/58 Improvement of Joynagar Pucca road-Maynapara road by HBB at Ch. 00-910m under & Const of 1No U-drain on the same road at Ch. 890m Sadar Upazila District Gopalganj 0.9100 31.930 M/S. E.S.Co 31.930 20/10/2017 13/12/2017 100 02/10/2019 Final
79 GDIRIIP/VR/BC/Sadar/16-17/57 Improvement of Kekania H/O Upazila Chairman-Chartala bari-Pora Joynagar road by BC at Ch. 2000-2500m under Sadar Upazila District Gopalganj 1.5000 28.338 M/S. Mohammad Ali Enterprise 28.338 27/10/2017 19/03/2018 100 02/10/2019 Final
80 GDIRIIP/VR/HBB/Sadar/16-17/56 Improvement of Suktail Borobari UZR-Panchuria UZR road by HBB at Ch. 00-965m under Sadar Upazila District Gopalganj 0.9650 34.372 M/S. E.S.Co 34.372 13/06/2017 05/11/2017 100 02/10/2019 Final
81 GDIRIIP/VR/HBB/Sadar/16-17/55 Improvement of Boultoli Pachim Kheyaghat-Kolpur Jadupur via Eng. Saydul Hoque house road by HBB at Ch. 00-1000m under Sadar Upazila District Gopalganj 1.0000 33.600 M/S. Masud Enterprise 33.600 08/06/2017 30/07/2017 100 02/10/2019 Final
82 GDIRIIP/VR/HBB/Sadar/16-17/54 Improvement of Bhennabari-Bedvita-Satpara road by HBB at Ch. 00-1000m & Const. of 01No U-drain on the same road at Ch 685m under Sadar Upazila District Gopalganj 1.0000 56.966 M/S. Ohona Traders 56.966 28/05/2017 04/04/2019 100 02/10/2019 Final
83 GDIRIIP/VR/HBB/Sadar/16-17/53 Improvement of Khanarpara Madrasha-Khanarpar Poschimpara road by HBB at Ch. 00-345m under Sadar Upazila District Gopalganj 0.3450 15.540 M/S. Mohammad Ali Enterprise 15.540 30/05/2017 22/07/2017 100 02/10/2019 Final
84 GDIRIIP/VR/HBB/Sadar/16-17/51 Improvement of Khagail Charpara Bridge-H/O Shahadat Sk road by HBB at Ch. 00-1000m under Sadar Upazila District Gopalganj 1.0000 33.747 M/S. Ohona Traders 33.747 28/06/2017 29/10/2018 100 02/10/2019 Final
85 GDIRIIP/VR/HBB/Sadar/16-17/50 Improvement of Chotfa Madrasha-Khalia road by HBB at Ch. 1000-1513m under Sadar Upazila District Gopalganj 0.5130 16.354 M/S. Mohammad Ali Enterprise 16.354 30/05/2017 22/07/2017 100 02/10/2019 Final
86 GDIRIIP/VR/HBB/Sadar/16-17/49 Improvement of Suktail-Sardarpara UZR-Lunchghat road by HBB at Ch. 00m-930m under Sadar Upazila District Gopalganj 0.9000 35.476 M/S. Ohona Traders 35.476 09/05/2017 01/10/2017 100 02/10/2019 Final
87 GDIRIIP/VR/HBB/Sadar/16-17/48 Improvement of Ishakhali-Mukter Mollik house to H/O Awal fakir via H/O Jafar Molla road by HBB at Ch. 00m-380m under Sadar Upazila District Gopalganj 0.3800 13.800 Md. Jiaul Haque 13.800 22/05/2017 14/07/2017 100 02/10/2019 Final
88 GDIRIIP/VR/HBB/Sadar/16-17/47 Improvement of Suktail-Sardarpara UZR-Bill via Chowdhury bari road by HBB at Ch. 00m-600m under Sadar Upazila District Gopalganj 0.6000 21.320 Md. Jiaul Haque 21.320 22/05/2017 14/07/2017 100 02/10/2019 Final
89 GDIRIIP/VR/HBB/Sadar/16-17/46 (a) Improvement of Durgapur-Pangu bazar-H/O Arif road by HBB at Ch. 00m-600m & (b) Const. of 2 Nos U-Drain on the same road at Ch. 160m & 300m under Sadar Upazila District Gopalganj 0.6000 24.683 s.m nurulislam 24.683 22/10/2017 11/03/2018 100 02/10/2019 Final
90 GDIRIIP/VR/HBB/Sadar/16-17/45 Improvement of Ghaga Dholaitola Kheyaghat-H/O Nazrul Gazi road by HBB at Ch. 00m-1000m under Sadar Upazila District Gopalganj 1.0000 35.300 M/S. Ohona Traders 35.300 19/12/2017 18/09/2017 100 02/10/2019 Final
91 GDIRIIP/VR/HBB/Sadar/16-17/43 Improvement of Ulpur-Rahutkhamar FRB Lunchghat road by HBB at Ch. 750-1780m under Sadar Upazila District Gopalganj 1.0300 48.240 Chowdury Traders 48.240 30/04/2017 22/08/2017 100 02/10/2019 Final
92 GDIRIIP/VR/HBB/Sadar/16-17/42 Improvement of Perkushli-Nokrirchar road by HBB at Ch. 540-1300m under Sadar Upazila District Gopalganj 0.7600 29.460 M/S. Nishat Enterprise 29.460 07/04/2017 29/08/2017 100 02/10/2019 Final
93 GDIRIIP/VR/CUL/Sadar/16-17/41 Construction of 4.50mx4.00m 1-vent RCC box culvert on Karargati road Police line-karargati at Ch. 750m under Sadar Upazila District Gopalganj 16.250 M/s. Nadia Enterprise 16.250 03/03/2017 25/06/2017 100 02/10/2019 Final
94 GDIRIIP/VR/HBB/Sadar/16-17/40 (A) Improvement of Mathla Bangobandhu Sriti hogh school-Mora nodi road by HBB Ch. 00-1060m & (B) Const. of 3Nos U-Drain on the same road at Ch. 360m 517m & 660m under Sadar Upazila District Gopalganj 1.6000 38.230 Mohammad Amzad Hossain 38.230 16/03/2017 08/08/2017 100 02/10/2019 Final
95 GDIRIIP/VR/HBB/Sadar/16-17/38 Improvement of Ghoradair-Shashabari road by HBB Ch. 1100-1310m & under Sadar Upazila District Gopalganj 0.2100 7.660 Mahmud Enterprise 7.660 09/03/2017 30/04/2017 100 02/10/2019 Final
96 GDIRIIP/VR/BC/Sadar/16-17/37 (A) Improvement of Sultanshahi-Tebaria bazar road by BC Ch. 700-1700m & (B) Const. of 2Nos U-Drain on the same road at Ch. 1200m & 1450m under Sadar Upazila District Gopalganj 1.0000 59.806 M/S. Alom Brothers 59.806 27/06/2017 15/01/2019 100 02/10/2019 Final
97 GDIRIIP/VR/HR/Sadar/16-17/36 (A) Improvement of Bijoypasha-Sultanshahi road by HBB Ch. 00-815m & (B) Const. of 2Nos U-Drain on the same road at Ch. 260m & 540m under Sadar Upazila District Gopalganj 0.8150 32.550 M/S. Oyishe Construction 32.550 27/02/2017 21/07/2017 100 02/10/2019 Final
98 GDIRIIP/VR/HBB/Sadar/16-17/35 Improvement of Sultanshahi RHD-Chandradighalia GPS via Tebaria bazar road by HBB Ch. 2300-3100m under Sadar Upazila District Gopalganj 0.8000 24.500 Mohammad Amzad Hossain 24.500 16/03/2017 08/08/2017 100 02/10/2019 Final
99 GDIRIIP/VR/HR/Sadar/16-17/34 Improvement of Borfa Boalia Pacca road-Ghenasur Mohasin Chowkder's bari via Abdur Razzak GPS road by HBB (Ch. 00-1035m) under Tungipara Upazila, District: Gopalganj 1.0350 40.180 M/S. Tamim Enterprise 40.180 25/12/2016 17/05/2017 100 02/10/2019 Final
100 GDIRIIP/VR/BR/Sadar/16-17/32 (a) Improvement of Ghaghadholaitola UZR (H/O Shiraj Sk.)-Ichakhali Gucchogram via H/O Hasan Sarder road by BC (Ch. 00-750m) & (B) Const. of 2Nos 600mmx600mm size U-drain on the same road at Ch. 235m & 700m under Sadar Upazila, District: Gopalganj 0.7500 47.875 Monir Sikder 47.875 27/11/2016 18/07/2017 100 02/10/2019 Final
101 GDIRIIP/VR/BR/Sadar/16-17/31 (a) Improvement of Tentulia Pucca road-Panchuria Lutfor's Sk. bari road by BC (Ch. 00-1070m) & (B) Const. of 3Nos 600mmx600mm size U-drain on the same road at Ch. 520m, 605m & 680m under Sadar Upazila, District: Gopalganj 1.0700 66.324 Afzal Construction 66.324 22/11/2016 14/10/2017 100 02/10/2019 Final
102 GDIRIIP/UNR/HR/Sadar/16-17/30 Improvement of Fulu Molla's bari-Madhumati kheyaghat road by HBB (Ch. 00-1500m) under Sadar Upazila, District: Gopalganj 1.5000 47.810 M/s Jhalak Business Center 47.810 20/11/2016 10/10/2018 100 02/10/2019 Final
103 GDIRIIP/VR/BR/Sadar/16-17/29 (a) Improvement of Durgapur Natun Bazar-Panchuria Lutfor's Sk. bari road by BC (Ch. 00-1180m) & (B) Const. of 3Nos 600mmx600mm size U-drain on the same road at Ch. 590m, 870m & 1160m under Sadar Upazila, District: Gopalganj 1.1800 70.216 M/S. Chowdhury Construction 70.216 26/11/2016 01/10/2017 100 02/10/2019 Final
104 GDIRIIP/VR/BR/Sadar/16-17/28 Improvement of Chandradighalia R&H-Godaikhali khal road by BC (Ch. 00-420m) under Sadar Upazila, District: Gopalganj 0.4200 25.101 M/s Samyo Enterprise 25.101 20/11/2016 12/04/2017 100 02/10/2019 Final
105 GDIRIIP/VR/HR/Sadar/16-17/26 Improvement of Mandartola-Banshbari H/O Lutfor Sk road by HBB (Ch. 00-820m) under Sadar Upazila, District: Gopalganj 0.8200 37.670 Meyad International 37.670 20/11/2016 12/04/2017 100 02/10/2019 Final
106 GDIRIIP/VR/HR/Sadar/16-17/24 Improvement of Shanpukuria-Chakkrulia road by HBB (Ch. 00-2250m) under Sadar Upazila, District: Gopalganj 2.2500 81.894 Md. Azizul Islam 81.894 02/01/2017 30/05/2017 100 02/10/2019  
107 GDIRIIP/VR/HR/Sadar/16-17/23 Improvement of Gobra Char Ghata Sluice Gate-Pathalia Mosque via H/O Nannu mia road by HBB (Ch. 00-1350m) under Sadar Upazila, District: Gopalganj 1.3500 51.060 M/S Jahanara Resource 51.060 22/11/2016 14/10/2017 100 02/10/2019 Final
108 GDIRIIP/VR/Bridge/Sadar/16-17/22 Construction of 18.00m RCC Girder Bridge on Ulpur UPC-Malenga road at Ch. 2200m ( Near GPS) under Sadar Upazila, District: Gopalganj 82.100 M/S. Mohammad Ali Enterprise 82.100 27/11/2016 30/09/2017 100 02/10/2019 Final
109 GDIRIIP/VR/HR/Sadar/16-17/21 (a) Improvement of Suktail Uttarpara-Tentulia road by HBB (Ch. 00-700) & (B) Const. of 600mmx600mm size U-drain on the same road at Ch. 595m (Near the H/O Bacchu Mollah) under Sadar Upazila, District: Gopalganj 0.7000 23.526 M/s Hena Corporation 23.526 20/11/2016 12/04/2017 100 02/10/2019 Final
110 GDIRIIP/VR/BR/Sadar/16-17/20 Improvement of Suktail-Launchghat road by BC (Ch. 00-900m) under Sadar Upazila, District: Gopalganj 0.9000 60.460 M/S. Obaydur Rahman 60.460 16/11/2016 03/04/2017 100 02/10/2019 Final
111 GDIRIIP/UNR/HR/Sadar/16-17/18 Improvement of Kajulia-Seorabari-Domrasur (R&H-Domrasur Bazar) road by HBB (Ch. 8510-9700m) under Sadar Upazila, District: Gopalganj 1.1900 65.995 M/S. Abid Bricks 65.995 18/11/2016 01/11/2017 100 02/10/2019 Final
112 GDIRIIP/VR/BR/Sadar/16-17/17 (a) Improvement of Hatbaria Pucca road to H/O Haider Sheikh road by BC (Ch. 00-930m) & (B) Const. of 600mmx600mm size U-drain on the same road at Ch. 750m under Sadar Upazila, District: Gopalganj 0.9300 60.446 M/s. Nadia Enterprise 60.446 16/11/2016 30/06/2017 100 02/10/2019 Final
113 GDIRIIP/VR/HR/Sadar/16-17/16 (A) Improvement of Gopinathpur Pachimpara Jame Mosque-Police IC road by HBB (Ch. 00-1050m) & (B) Const. of 1No U-drain on the same road at Ch. 230m under Sadar Upazila, District: Gopalganj 1.0500 35.637 M/s. Nadia Enterprise 35.637 26/01/2017 18/06/2017 100 02/10/2019 Final
114 GDIRIIP/VR/BR/Sadar/16-17/15 Improvement of Gopinathpur Uttar Charpara-Maddha Charpara road by BC (Ch. 00-1005m) under Sadar Upazila, District: Gopalganj 1.0000 60.160 m/s apu traders 60.160 26/01/2016 19/08/2017 100 02/10/2019 Final
115 GDIRIIP/UZR/BR/Sadar/16-17/14 Improvement of Tuthbati RHD-Ghoradair ( Telakekania GC) road by BC (Ch. 00-1515m) under Sadar Upazila, District: Gopalganj 1.5150 115.970 M/S. Bristy Enterprise 115.970 25/07/2017 02/08/2017 100 02/10/2019 Final
116 GDIRIIP/VR/SR/Sadar/15-16/13 Construction of 2 Vent 4.50x4.50m RCC Box culvert on Champta-Fulbari road at Ch. 750m ( Near the H/O Esken sheikh) under Sadar Upazila, District: Gopalgonj 22.250 m/s karuna traders 22.250 28/07/2016 22/12/2016 100 02/10/2019 Final
117 GDIRIIP/VR/HR/Sadar/15-16/12 (1) Improvement of Mollabari Dakkhinpara Connecting road by HBB (Ch. 00-320m) & (2) Const. of 2vent 4.50x4.50m RCC Box culvert on the same road at Ch. 10m under Sadar Upazila, District: Gopalgonj 34.250 M/s Lincon Enterprise 34.250 15/08/2016 09/01/2017 100 02/10/2019 Final
118 GDIRIIP/VR/BR/Sadar/15-16/11 Improvement of Gopinathpur- Bashabari Rayeb Ali Khondokar house-Kazi Collage road by BC (Ch. 00-1320m) under Sadar Upazila, District: Gopalgonj 1.4500 70.346 Mim Tower 70.346 27/06/2016 03/01/2019 100 02/10/2019 Final
119 GDIRIIP/VR/BR/Sadar/15-16/10 Improvement of Ghenasu-Suktail road by BC (Ch. 00-1450m) under Sadar Upazila, District: Gopalgonj 1.4500 89.830 m/s karuna traders 89.830 15/06/2016 09/04/2017 100 02/10/2019 Final
120 GDIRIIP/VR/HR/Sadar/15-16/09 Improvement of Chotfa H/O Monjil Molla-H/O Musa Mia road by HBB (Ch. 00-945m) under Sadar Upazila, District: Gopalgonj 0.9450 34.370 M/S. Liton & Brothers 34.370 27/06/2016 20/10/2016 95 02/10/2019  
121 GDIRIIP/VR/BR/Sadar/15-16/08 Improvement of Gopinathpur-Shorifpara-Bashabari road by BC (Ch. 00-1735m) under Sadar Upazila, District: Gopalgonj 1.7350 91.599 Mim Tower 91.599 27/06/2016 21/04/2017 100 02/10/2019 Final
122 GDIRIIP/VR/BR/Sadar/15-16/07 Improvement of Gopinathpur-Maddhacharpara-Gohala road by BC (Ch. 00-1120m) under Sadar Upazila, District: Gopalgonj 1.1200 67.793 Sumia Enterprise 67.793 27/06/2016 10/11/2018 100 02/10/2019 Final
123 GDIRIIP/VR/BR/Sadar/15-16/06 Improvement of Ulpur UP office-Malenga road by BC (Ch. 00-1000m) under Sadar Upazila, District: Gopalgonj 1.0000 50.828 s.m nurulislam 50.828 15/06/2016 23/10/2016 100 02/10/2019 Final
124 GDIRIIP/VR/BR/Sadar/15-16/05 Improvement of Golabaria-Digherkul-Uttar Vennabari (FRB Golabaria-Mujib Bazar) road by BC (Ch. 3000-5000m) under Sadar Upazila, District: Gopalgonj 2.0000 107.067 M/S. Masud Enterprise 107.067 16/06/2016 10/04/2017 100 02/10/2019 Final
125 GDIRIIP/VR/HR/Sadar/15-16/04 Improvement of Chamta-Fulbari road by HBB (Ch. 1000-2500m) under Sadar Upazila, District: Gopalgonj 1.0000 51.780 Md. Nazim Uddin Khan 51.780 26/06/2016 26/10/2016 100 02/10/2019 Final
126 GDIRIIP/VR/HR/Sadar/15-16/03 Improvement of Khatiagor-Kongsur road by HBB (Ch. 00-550m) under Sadar Upazila, District: Gopalgonj 0.5000 20.080 M/S. Chowdhury Construction 20.080 28/06/2016 21/11/2016 100 02/10/2019 Final
127 GDIRIIP/VR/HR/Sadar/15-16/02 Improvement of (1) Domrasur-Malibata-Kongsur road by HBB (Ch. 4000-5500m) & (2) Construction of 600mmx600mm U-drain culvert at Ch. 4240m on the same road under Sadar Upazila, District: Gopalgonj 1.5500 63.710 M/S Moni Enterprise 63.710 16/06/2016 09/11/2016 100 02/10/2019 Final
128 GDIRIIP/VR/HR/Sadar/15-16/01 GDIRIIP/VR/HR/Sadar/15-16/01 Improvement of Karargati ( Police line-Karargati) road by HBB (Ch. 00-1000m) under Sadar Upazila, District: Gopalgonj 1.0000 40.990 M/S. Farshi Traders 40.990 23/06/2016 16/11/2016 100 02/10/2019 Final
2 Kasiani
1 GDIRIIP/VR/HBB/Kash/17-18/57 Part-A Improvemnet of West Mazigati-Nowradola Road at Ch. 400-2000m by HBB Part-B Const. of 1No 2x4.30x4.30m Box culvert on the same road at Ch. 1980m Part-C Const. of 1No 3.30x3.30m Box culvert on the same road at Ch. 1180m Const. of 02Nos U-drain on the same road at Ch. 830m & 1520m under Kasiani Upazila District Gopalganj Road ID No 335435005. 1.6000 114.512 M/S Shamim Traders 114.512 24/05/2018 25/12/2018 60 17/12/2019  
2 GDIRIIP/UNR/HBB/Kash/17-18/73 Improvement of Rajpat UP-Puisur road at Ch. 00-2350m by HBB & Const. of 02 Nos U-drain at Ch. 510m & 1050m on the same road under Kasiani Upazila District Gopalganj 2.3500 97.124 Active Traders 97.124 05/09/2018 06/11/2019 90 17/12/2019  
3 GDIRIIP/UNR/HBB/Kash/17-18/75 Part-A: Improvement of Parulia-Kumaria GC road to Nowarbeel via Titagram Showkat Molla house road at Ch. 00-650m by HBB (Road ID No: 335434263) & Part-B: Parulia Battola to Parulia Khan bari via House of Mr. Jahid and House of Mokim road at Ch. 00-600m under Kasiani Upazila, District: Gopalganj (Road ID No: 335434264) [Salvage Materials Cost. Tk. 5,00,117.00]. 1.3500 102.091 Gazi Enterprise 102.091 04/08/2018 02/01/2019 30 17/12/2019  
4 GDIRIIP/VR/Bridge-BC/Kash/18-19/79 Part-A: Construction of 15.00m RCC Girder Bridge on Parulia-Kumaria GC road at Ch. 3356m ( Road ID No: 335434034); Part-B(1): Improvement of Perkorfa Nuzuruuddin molla bari-Uttor Dhankora Eidgha math road at Ch. 1100-1390m by BC ( Road ID No: 335435103) [Salvage Materials Cost Tk. 4,37,727.00.]; Part-B(2): Const. of 01 No 900*900m U-drain on the same road at Ch. 1335m; Part-C(1): Improvement of Purulia GPS-Dhankora ( via Char Budpasha) road at Ch. 00-1650m by BC ( Road ID No: 335435043) [Salvage Materials Cost Tk. 1,56,457.00.]; Part-C(2): Const. of 03 Nos 900*900m U-drain on the same road at Ch. 30m, 1000m & 1325m; Part-C(3): Const. of 01 No 2.00*2.00m RCC box culvert on the same road at Ch. 600m & Part-D: Improvement of Dhosur R&H-Purulia road at Ch. 00-600m by BC ( Road ID No: 335435204) under Kasiani Upazila District Gopalganj [Salvage Materials Cost Tk. 11,74,755.00.] 2.5400 335.194 Hamim & Mizan (JV) 335.194 31/01/2019 40 17/12/2019  
5 GDIRIIP/VR/BC/Kash/18-19/80 Part-(1)A: Improvement of Kasiani-Kumaria road to Emrul Kayes house road at Ch. 00-390m and connecting road at 140m ( Total 530m) by BC (Road ID No: 335435880) [Salvage Materials Cost Tk. 4,37,331.00.] ; Part-(1)B: Const. of 2Nos 900x900m U-drain on the same road at Ch. 840 & Connection road; Part-(1)C: Const. of 01 No 600x600m U-drain on the same road at Ch. 20m; Part-(2)A: Improvement of Titagram Growth center road to H/O Shahadat via H/O Akhter Mollah & Wohab member Road at Ch. 00-1020m by BC ( Road ID No: 335435200) [Salvage Materials Cost Tk. 12,08,941.00.]; Part-(2)B: Const. of 02 Nos 900x00m U-drain on the same road at Ch. 200m & 320m; Part-(2)C: Const. of 01 No 2.00x2.00m RCC box culvert on the same road at Ch. 50m under Kasiani Upazila District Gopalganj. 1.4100 158.690 M/S. Nafshi Construction 158.690 16/01/2019 08/09/2019 60 17/12/2019  
6 GDIRIIP/VR/BC/Kash/18-19/83 Part-(1)A: Improvement of Bayespur Treemohony-Shajan khan House road at Ch. 00-300m by BC (Road ID No: 335434285); Part-(1)B: Const. of 2Nos 600mmx600mm U-drain at Ch. 85m & 250m on the same road ; Part-(2)A: Improvement of Koramari Bottola-H/O Hoby Member via Dohordurgapur Mosarraf mia house road at Ch. 00-1300m by BC (Road ID No: 335434070)[ Salgave Materials Cost Tk. 22,26,528.00] ; Part-(2)B: Const. of 1No 900mmx900mm U-drain at Ch. 1000m on the same road under Kasiani Upazila District Gopalganj. 1.6000 140.418 M/S Mahmuda Enterprise 140.418 25/02/2019 03/01/2020 50 17/12/2019  
7 GDIRIIP/UNR/VR/BC/Kash/18-19/84 Part-(1): Improvement of Balugram-Arpara road at Ch. 00-1400m by BC (Road ID No: 335434009) [Salvage Materials Cost: Tk. 19,21,070.00] ; Part-(2)A: Improvement of Ratoil UP office (Horticulture Center)-Ghonapara RHD (Tuku Bazar) road at Ch. 3000-3750m by BC (Road ID No: 335433014); Part-(2)B: Const. of 3Nos 600mmx600mm size U-drain at Ch. 3040m, 3170m & 3525m on the same road; Part-(3)A: Improvement of Bayespur Manu kha bari-H/O Kamal via Hizli Bottala road at Ch. 2000-2600m by BC (Road ID No: 335434263); Part-(3)B: Const. of 02Nos U-drain at Ch. 2125m & 2470m on the same road; Part-(4)A: Improvement of Shibpur-Goalgram Bathandanga Bazar via Doripadmibil Mohespur union border road at Ch. 3200-3790m by BC (Road ID No: 335434003); Part-(4)B: Const. of 1No 2x4.30x4.30m RCC Box culvert at Ch. 3680m on the same road under Kasiani Upazila District Gopalganj. 3.3400 389.703 S S Engineering & Construction Ltd-M/s Anjurul Islam JV 389.703 30/06/2019 31/03/2020 25 17/12/2019  
8 GDIRIIP/VR/BC/Culvert/Kash/18-19/86 Part-(1)A: Improvement of Ghonapara RHD-Chapta Parghata road by BC at Ch. 730-2030m; Part-(1)B:Const. of 01No 2.00x3.00m RCC Box culvert at Ch. 885m on the same road; Part-(1)C: Const. 02Nos 900mmx900mm U-drain at Ch. 1280m & 1430m on the same road & Part-(1)D: Const. 03Nos 625mmx600mm U-drain at Ch. 1150m, 1530m & 2000m on the same road (Road ID No: 335435073) under Kasiani Upazila District Gopalganj [Salvage Materials Cost: Tk. 52,682.00]. 1.3000 115.039 M/S. Sunway Trading 115.039 10/04/2019 19/02/2020 60 17/12/2019  
9 GDIRIIP/VR/BC/Culvert/Kash/18-19/89 Part-(1)A: Improvement of Narail high school-Bayspur road by BC at Ch. 00-870m & 258m RHD Connecting road; Part-(1)B: Const. of 01No 1x3.00x2.50m Box culvert at Ch. 120m on the same road; Part-(1)C: Const. 02Nos 900mmx900mm U-drain at Ch. 80m & 150m on the same road & Part-(1)D: Road sefty (Road ID No: 335434047) under Kasiani Upazila District Gopalganj [Salvage Materials Cost: Tk. 17,42,079.00]. 0.8700 108.567 M/S. Sunway Trading 108.567 10/04/2019 19/02/2020 55 17/12/2019  
10 GDIRIIP/UNR/BC/Kash/18-19/93 Part-(1)A: Improvement of Puisur UP (Sitarampur R&H)-Singa UP road at Ch. 00-3750m by BC; Part-(1)B: Const. of 4Nos U-drain on the same road at Ch. 50m, 1260m, 2300m & 3125m; Part-(1)C: Road Sefty work on the same road; Part-(1)D: Improvement Protection work on the same road (Road ID No: 335433003) [Salvage Materials Cost Tk. 71,10,603.00.] 3.7500 412.829 Md. Mostafizur Rahman Sharif 412.829 10 17/12/2019
11 GDIRIIP/Kasiani/UZR/18-19/Maint/08 Maintenence of Ramdia-Ulpur R&H via Taltola road by BC at Ch. 00-6800m (Road ID No: 335432004) under Kasiani Upazila District Gopalganj. 6.8000 461.467 M/S Kamrul & Brothers 461.467 15 17/12/2019
12 GDIRIIP/Kasiani/UZR/Maint/18-19/16 Maintenance of Kasiani GC-Takerhat RHD via Rahuthor Hat ( Kasiani Part) Road at Ch. 1800m-7300m (Road ID No: 335432007) under Kasiani Upazila District Gopalganj. 5.5000 485.955 M/S Kamrul & Brothers 485.955 20 17/12/2019
13 GDIRIIP/Kasi/VR/BC/18-19/95 Part-A: Improvement of Khandarpara-Joynagar UZR Starting to near H/O Hossain Karigar Bari to bus stand road by BC at Ch. 00-750m & Part-B: Const. of 600x600mm size 03Nos U-drain at Ch. 125m, 456m & 680m on the same road (Road ID No: 335435154) under Kasia 0.7500 59.041 M/S. Haider Ali & Co. 59.041 02/04/2019 25/03/2020 60 11/11/2019  
14 GDIRIIP/VR/HBB/Culvert/Kash/18-19/92 Part-(1)A: Improvement of Pathargram-Rahuthor road by HBB at Ch. 1000-3150m & Part-(1)B: Const. of 03Nos 1x4.50.4.00m Box culvert at Ch. 1390m, 2000m & 2290m on the same road (Road ID No: 335434057) under Kasiani Upazila District Gopalganj. 3.0500 164.422 Nayan Traders 164.422 08/04/2019 26/02/2020 95 11/11/2019  
15 GDIRIIP/VR/HBB/Culvert/Kash/18-19/88 Part-(1)A: Improvement of Baliadanga-Maijkandi road R&H-Dhanjail Bazar road by HBB at Ch. 00-1120m; Part-(1)B: Const. of 01No 4.00x4.00m single vent RCC Box culvert at Ch. 10m on the same road; & Part-(1)C: Const. 01No 900mmx900mm U-drain at Ch. 910m on the same road (Road ID No: 335434290) under Kasiani Upazila District Gopalganj. 1.1200 68.556 M/S. Sheikh Enterprise 68.556 12/04/2019 15/01/2019 90 11/11/2019  
16 GDIRIIP/VR/HBB/Culvert/Kash/18-19/87 Part-(1)A: Improvement of Mohespur-Konokpur Bridge-Lokman Thakur Shop road by HBB at Ch. 00-1150m; Part-(1)B: Const. of 01No 4.30x4.30m Single vent RCC Box culvert at Ch. 1000m on the same road & Part-(1)C: Const. 02Nos 625mmx600mm U-drain at Ch. 350m & 760m on the same road (Road ID No: 335434266) under Kasiani Upazila District Gopalganj. 1.1500 83.217 S.M. RAKIB ENTERPRISE 83.217 07/03/2019 28/11/2019 100 11/11/2019  
17 GDIRIIP/VR/HBB/Kash/18-19/78 Part-(1)A: Improvement of Teghoria-Shibpur via Jangalia GPS road at Ch. 1000-2200m by HBB (Road ID No: 335434014); Part-(1)B: Const. of 3.30x3.30m RCC Box culvert at Ch. 1110m on the same road ; Part-(1) C: Const. of 03 Nos U-drain at Ch. 1350m, 1670m & 1925m on the same road ; Part-(2)A: Improvement of Kasiani-Mohanag-Bilpobonia road at Ch. 00-600m by HBB (Road ID No: 335435072); Part-(2)B: Const. of 2Nos U-drain at Ch. 30m & 320m on the same road; Part-(3)A: Improvement of Sajail-Shibpur road at Ch. 00-580m by HBB (Road ID No: 335435030) [Salvage Materials Cost: Tk. 66,073.00] ; Part-(3)B: Const. of 1No 900mmx900mm U-drain at Ch. 310m on the same road Part-(4)A: Improvement of Shibgati Pucca Mosque-H/O Akbar kazi road at Ch. 00-850m & Shibgati villege Connecting road 350m= Total:1200m by BC (Road ID No: 335435109); Part-(4)B: Const. of 1No 900mmx900mm U-drain at Ch. 250m on the same road under Kasiani Upazila District Gopalganj. 4.4300 252.307 Ashraf ALi Mredha - M/S Azam Construction (JV) 252.307 28/04/2020 21/04/2020 55 11/11/2019  
18 GDIRIIP/VR/culvert/Kash/17-18/74 Part-A: Construction 1x4.50x4.00m RCC Box culvert on Folshi bazar-Gopinathpur Uttarpara road at Ch. 565m (Road ID No: 33545112); Part-B: Construction 1x4.30x4.30m RCC Box culvert on Rahuthor-Pathargram road at Ch. 335m (Road ID No: 335434057); Part-D: Improvement of Dhirail-Shitarampur road by HBB at Ch. 00-1500m (Road ID No: 335435012); Part-E: Construction 2Nos 1x4.50x4.00m RCC Box culvert on Dhirail-Shitarampur road at Ch. 850m & 1400m (Road ID No: 335435012); Part-F: Construction 2Nos U-drain on Dhirail-Shitarampur road at Ch. 350m & 1320m (Road ID No: 335435012); Part-G: Construction 2x4.50x4.00m RCC Box culvert on Dhirail-Shitarampur road at Ch. 1150m (Road ID No: 335435012); Part-H: Improvement of Ramdia-Satpar R&H-Bethori GPS road by HBB at Ch. 1020-2720m (Road ID No: 335435113); Part-I: Construction 2Nos 1x4.50x4.00m RCC Box culvert on Ramdia-Satpar R&H-Bethori GPS road at Ch. 1320m & 2070m (Road ID No: 335435113) & Part-J: Construction 2Nos U-drain on Ramdia-Satpar R&H-Bethori GPS road at Ch. 1620m & 2540m (Road ID No: 335435113). 3.2000 293.366 Md. Mostafizur Rahman Sharif 293.366 03/10/2018 03/09/2019 85 11/11/2019  
19 GDIRIIP/VR/Bridge/Kash/17-18/69 Const. of 26.00m RCC Slab Bridge on Hishur Bazar-Passkahonia via Passkahonia GPS road at Ch. 575m under Kasiani Upazila District Gopalganj 167.776 M/S. Iqabal & Brothers 167.776 14/06/2018 24/04/2019 90 11/11/2019  
20 GDIRIIP/VR/Bridge/Kash/17-18/67 Const. of 20.00m RCC Girder Bridge on Parulia-Kumaria GC road at Ch. 1426m under Kasiani Upazila District Gopalganj 163.589 M/S. Sunway Trading 163.589 10/06/2018 22/04/2019 95 11/11/2019  
21 GDIRIIP/VR/HBB/Kash/17-18/60 Part-A Improvemnet of Padmabila-Kumaria Road at Ch. 00-950m & 1325m-3380m by HBB Part-B Const. of 1No 1x4.50x4.00m RCC Box culvert on the same road at Ch. 825m & Part-C Const. of 05Nos U-drain on the same road at Ch. 500m 1600m 1795m 2925m & 3050m under Kasiani Upazila. 3.0050 183.717 M/S Wafid Traders 183.717 07/05/2018 20/04/2019 100 11/11/2019  
22 GDIRIIP/VR/BC/Kash/17-18/47 Improvement of Purulia Primary School-Dhankora Via Charbudpasa road by BC at Ch. 1650m-3720m Const. of 01 No 2x4.30x4.30m RCC Box culvert at Ch. 1800m & Const. of 6Nos- U-drain at Ch. 2200m 2375m 2640m 2920m 3270m & 3550m on the same road under Kasiani Upazila, Diastrict-Gopalganj. 2.0700 184.159 M/S Islam Traders 184.159 02/05/2018 24/12/2018 100 11/11/2019  
23 GDIRIIP/VR/HBB/Kash/17-18/56 Part-A Improvemnet of Puisur-Jadupur Road at Ch. 00-2400m by HBB Part-B Const. of 3Nos 1x4.30x4.30m Box culvert on the same road at Ch. 180m1500m & 1760m & Part-C Const. of 04Nos U-drain on the same road at Ch. 450m 960m 1300m & 2115m under Kasiani Upazila 2.4000 237.797 M/S Amin & Co. & M/S Anjurul Islam (JV) 237.797 07/05/2018 20/02/2020 70 11/11/2019  
24 GDIRIIP/UNR/BC/Kash/18-19/94 Part-(1)A: Improvement of Puisur UP (Sitarampur R&H)-Singa UP road at Ch. 3750-7500mm by BC; Part-(1)B: Const. of 04 U-drain on the same road at Ch. 3950m, 4710m, 5360m & 6880m; Part-(1)C: Road Sefty work on the same road & Part-(1)D: Improvement Protection work on the same road under Kasiani Upazila District Gopalganj (Road ID No: 335433003) [Salvage Materials Cost Tk. 69,78,660.00.]. 3.7300 440.101 Md. Mostafizur Rahman Sharif 440.101 0 10/10/2019 Tender under Process
25 GDIRIIP/VR/BC/Culvert/Kash/18-19/90 Part-(1)A: Improvement of Pathargram Berybandh-Pathargram westpara road by HBB at Ch. 00-2500m; Part-(1)B: Const. of 01No 2x4.50x4.50m Box culvert at Ch. 1390m on the same road & Part-(1)C: Const. 03Nos 1x4.50x4.00 RCC Box culvert at Ch. 1890m, 2125m & 2445m on the same road (Road ID No: 335435122) under Kasiani Upazila District Gopalganj 2.5000 230.378 M/s. Amin & Co. & M/s. Anjurul Islam (JV) 230.378 14/05/2019 01/12/2019 0 10/10/2019  
26 GDIRIIP/VR/HBB/BC/Culvert/Kash/18-19/85 Part-(1)A: Improvement of Horidaspur Bottola-Raitkandi road by HBB at Ch. 1300-1700m; Part-(1)B: Const. of 01No 900mmx900mm U-drain at Ch. 1480m on the same road (Road ID No: 335435090) Part-(2)A: Improvement of Falshi Bazar-Karikarpara road by BC at Ch. 00-700m [Salvage Materials Cost: Tk. 4,89,051.00]; Part-(2)B: Const. of 01No 1x3.00x3.00m RCC Box culvert at Ch. 15m on the same road & Part-(2)C: Const. 02Nos U-drain at Ch. 225m & 570m on the same road (Road ID No: 335435111) under Kasiani Upazila District Gopalganj. 1.3000 99.764 Bhai Bhai Enterprise 99.764 05/03/2019 28/10/2019 60 10/10/2019  
27 GDIRIIP/VR/HBB/Kash/18-19/82 Part-(1)A: Improvement of Rajpat UP Sitarampur GPS road ( Suktogran Chowdhury Bari) Bridge via Dhopapara road at Ch. 00-3000m by HBB (Road ID No: 335435153); Part-(1)B: Const. of 3Nos 1x4.0x4.30m RCC Box culvert on the same road at Ch. 120m, 635m & 1354m; Part-(1)C: Const. of 03 Nos U-drain on the same road at Ch. 450m, 1650m & 2435m; Part-(2)A: Improvement of Gugulia R&H-Bahirbag Sharif bari UZR road via sorikandi road at Ch. 00-2130m by HBB (Road ID No: 335434089) [Salvage Materials Cost Tk. 2,59,629.00.]; Part-(2)B: Const. of 02 Nos 1x4.00x4.30m RCC Box culvert on the same road at Ch. 990m & 1500m & Part-(2)C: const. of 03 Nos U-drain on the same road at Ch. 430m, 1200m, & 1960m under Kasiani Upazila District Gopalganj. 5.1300 501.318 Khabir and Mostafizur JV 501.318 12/02/2019 28/12/2019 40 10/10/2019  
28 GDIRIIP/UNR/BC/Kash/18-19/81 Part-(1)A: Improvement of Puisur UP (Sitarampur R&H)-Singa UP road at Ch. 00-3750m by BC (Road ID No: 335433003) [Salvage Materials Cost Tk. 71,10,603.00.] ; Part-(1)B: Const. of 4Nos U-drain on the same road at Ch. 50m, 1260m, 2300m & 3125m; Part-(1)C: Road Sefty work on the same road; Part-(1)D: Improvement Protection work on the same road; Part-(2)A: Improvement of Puisur UP (Sitarampur R&H)-Singa UP road at Ch. 3750-7500mm by BC (Road ID No: 335433003) [Salvage Materials Cost Tk. 69,78,660.00.]; Part-(2)B: Const. of 04 U-drain on the same road at Ch. 3950m, 4710m, 5360m & 6880m; Part-(2)C: Road Sefty work on the same road & Part-(2)D: Improvement Protection work on the same road under Kasiani Upazila District Gopalganj. 7.5500 0.000 Hamim & Mizan (JV) 0.000 0 10/10/2019 Tender under Process
29 GDIRIIP/UNR/HBB/Kash/17-18/77 Part-A: Improvement of Pathorgram-Beribundh-Pathorgram Westpara road at Ch. 00-2500m by HBB; Part-B: Const. of 01 No 2x4.50x4.50m RCC Box culvert on the same road at Ch. 1390m; Part-C: Const. of 03Nos 1x4.50x4.00m RCC Box culvert on the same road at Ch. 1890m, 2125, & 2445m ( Road ID No: 335435122); Part-D: Const. of 01 Nos 1x4.50x3.50m RCC Box culvert on Narail High School-Tangrail Ghat via House of Pakhi Khan at Ch. 750m & Part-E: Const. of 1No 4.50x3.50m Box culvert on the same road at Ch. 1062m ( Road ID No: 335434045) under Kasiani Upazila, District: Gopalganj. 2.5000 0.000 M/S. Niaztraders and M/S. Masud Enterprise JV 0.000 0 10/10/2019 Tender under Process
30 GDIRIIP/VR/HBB/Kash/17-18/71 Improvement of Vhadulia Bridge Satbaria GPS-Sajail Bazar via Satbaria road at Ch. 00-1500m by HBB Const. of 03Nos U-drain at Ch. 110m 1000m & 1480m Const. of 01 No 4.50x4.50m Single vent RCC Box culvert at Ch. 10m & Const. of 02 Nos 2.00m2.00m single vent RCC Box culvert at Ch. 220m & 662m on the same road under Kasiani Upazila District Gopalganj Road ID No 335435070. 1.5000 117.280 M/S. Mohammad Ali Enterprise 117.280 04/08/2018 10/12/2018 0 10/10/2019  
31 GDIRIIP/VR/Bridge/Kash/17-18/70 Construction of 35.00m PC Girder Bridge on Moheshpur-Dolagram road at Ch. 340m under kasiani Upazila District Gopalgonj. 239.368 Md. Nayeb Ali Khan 239.368 10/09/2018 07/07/2019 60 10/10/2019  
32 GDIRIIP/VR/HBB/Kash/17-18/65 Part-A Improvement of Parulia-Ramdia via Khagrabaria bazar Road at Ch. 2832-4335m by HBB Part-B Const. of 4.00x4.00m Double vent RCC RCC Box culvert at Ch. 3277m on the same road & Part-C Const. of 2Nos U-drain at Ch. 3482m & 3912m on the same road under kasiani Upazila. 95.567 M/s. Nur Construction 95.567 28/05/2018 02/05/2019 100 10/10/2019 Final
33 GDIRIIP/VR/BC/Kash/17-18/64 Improvemnet of Kasiani-Kumaria road-Chotokharkandi Kuddus shop-Vattridhoba Talimul Quran Madrasha Road at Ch. 00-975m by BC under Kasiani Upazila District Gopalganj 0.9750 61.028 M/S. Lipe Engineering 61.028 28/05/2018 21/10/2018 100 10/10/2019  
34 GDIRIIP/VR/BC/Kash/17-18/63 Improvemnet of Bayespur Manu kha house-Kamal house via Hizli Bottola Road at Ch. 00-2000m by BC & Const. of 04Nos U-drain on the same road at Ch. 350m850 1350 & 1700m under Kasiani Upazila District Gopalganj 2.0000 124.677 M/S. Masud Enterprise 124.677 20/05/2018 18/04/2019 100 10/10/2019 Final
35 GDIRIIP/VR/BC/Kash/17-18/62 Improvemnet of Heronkandi Moslem House-Moshiur Master House Road at Ch. 00-1850m by BC Const. of 01 No 3.00x3.00m Box culvert at Ch. 650m on the same road & Const. of 02Nos U-drain on the same road at Ch. 1020m & 1525m under Kasiani Upazila District Gopalganj. 1.8500 126.134 M/S. Masud Enterprise 126.134 20/05/2018 07/04/2019 100 10/10/2019 Final
36 GDIRIIP/VR/BC/Kash/17-18/61 Improvemnet of Bayespur Siddik Sharif house-Shajhan Kha house Panna Member Road at Ch. 00-850m by BC & Const. of 02Nos U-drain on the same road at Ch. 235m & 775m under Kasiani Upazila District Gopalganj 0.9500 56.140 Md. Afjal Hossain 56.140 23/05/2018 28/04/2019 100 10/10/2019 Final
37 GDIRIIP/VR/HBB/Kash/17-18/59 Part-A Improvemnet of Jikabari-Majhigati Road at Ch. 00-1820m by HBB Part-B Const. of 1No 2x4.00x5.00m Box culvert on the same road at Ch. 10m Part-C Const. of 1No 1x3.00x3.00m Box culvert on the same road at Ch. 1125m Const. of 02Nos U-drain on the same road at Ch. 450m & 1650m under Kasiani Upazila District Gopalganj Road ID No 335435062. 1.8220 120.278 M/S. Naim Enterprise 120.278 28/05/2018 06/03/2019 100 07/10/2019 Final
38 GDIRIIP/VR/HBB/Kash/17-18/58 Part-A Improvemnet of Birudola-Chakbondola Road at Ch. 00-525m by HBB & Part-B Const. of 02Nos U-drain on the same road at Ch. 200m & 410m under Kasiani Upazila District Gopalganj 0.5250 30.000 M/S. Sheikh Enterprise 30.000 17/05/2018 26/02/2019 100 07/10/2019 Final
39 GDIRIIP/VR/BC/Kash/17-18/55 Improvement of Charchapta Jame Mosque-Kusumdia Kheyaghat via asrommission road by BC at Ch. 00m-1450m & Const. of 3Nos- U-drain at Ch. 240m 660m & 950m on the same road under Kasiani Upazila District Gopalganj 1.4500 101.506 Ashraf ALi Mredha 101.506 26/04/2018 20/06/2019 100 07/10/2019 Final
40 GDIRIIP/VR/BC/Kash/17-18/54 Improvement of Khayerhat Sikderpara Jame Mosque-Rail line road by BC at Ch. 350m-2150m & Const. of 4Nos- U-drain at Ch. 575m 800m 1440m & 1810m on the same road under Kasiani Upazila District Gopalganj 1.8000 128.027 Mizanur Rahman Montu 128.027 18/04/2018 07/03/2019 100 07/10/2019 Final
41 GDIRIIP/VR/BC/Kash/17-18/53 Improvement of Mohespur-Dolagram road by BC at Ch. 00m-1660m & Const. of 3Nos- U-drain at Ch. 280m 760m & 1325m on the same road under Kasiani Upazila District Gopalganj 1.6600 151.831 M/s. N. B. Construction 151.831 26/04/2018 08/10/2018 100 07/10/2019 Final
42 GDIRIIP/VR/Maint/Kash/17-18/04 Periodic Maintenance work of Tilchara Bazar-Paranpur Post office Madrasha Road at Ch. 00-500m under Kasiani Upazila District Gopalganj 0.5000 10.960 Ashraf ALi Mredha 10.960 23/04/2018 15/06/2018 100 07/10/2019 Final
43 GDIRIIP/VR/Bridge/Kash/17-18/52 Construction of 30.00m RCC Slab Bridge on Rajpat0Silta-Tatulia-Nutgram-Suktagram road at Ch. 2710m under Kasiani Upazila District Gopalganj 238.458 M/S. Niaz Traders 238.458 26/04/2018 09/03/2019 70 07/10/2019  
44 GDIRIIP/VR/HBB/Kash/17-18/49 Improvement of Kusumdia-Sajail Vadulia road by HBB at Ch. 00m-900m Const. of 01 No 1x4.50x4.00m RCC Box culvert at Ch. 100m & Const. of 4Nos- U-drain at Ch. 375m 500m 740m & 810m on the same road under Kasiani Upazila District Gopalganj 0.9000 67.974 Mizanur Rahman Montu 67.974 29/04/2018 21/09/2018 85 07/10/2019  
45 GDIRIIP/VR/BC/Kash/17-18/48 Improvement of Gerakhola Mosque-Highway via Kapalepara road by BC at Ch. 00m-800m & Const. of 02 Nos U-drain at Ch. 350m & 720m on the same road under Kasiani Upazila District Gopalganj 0.8000 56.036 M/S. Mukta Construction 56.036 26/03/2018 17/09/2018 100 07/10/2019  
46 GDIRIIP/VR/BC/Kasiani/17-18/46 Improvement of Shadhuhati Sarker Bari-Westpara Mosque road by BC at Ch. 00m-820m Const. of 01 No 1x2.60x2.60m RCC Box culvert at Ch. 30m & Const. of 3Nos- U-drain at Ch. 110m 260m & 650m on the same road under Kasiani Upazila District Gopalganj 0.8200 92.929 Nishit Bosu 92.929 30/04/2018 22/12/2018 25 07/10/2019  
47 GDIRIIP/VR/BC/Kasi/17-18/43 Improvement of Falshi Bazar-Gopinathpur Uttorpara R&H Kasiani Part road by BC at Ch. 00-565m & Const. of 2Nos U-drain on the same road at Ch. 120m & 380m under Kasiani Upazila District Gopalganj 0.5650 44.834 M/S. Nafshi Construction 44.834 05/04/2018 09/08/2018 100 07/10/2019 Final
48 GDIRIIP/VR/BC/Kasi/17-18/42 Improvement of Dhankora High School-Perkorfa road by BC at Ch. 00-620m & Const. of 2Nos U-drain on the same road at Ch. 60m & 440m under Kasiani Upazila District Gopalganj. 0.6200 42.919 Ashraf ALi Mredha 42.919 04/04/2018 26/08/2018 100 07/10/2019  
49 GDIRIIP/VR/HBB/Kash/16-17/33 (A) Improvement of Parulia-Kumaria GC road by HBB (Ch. 1000-3000m), (B) Const. of 2Nos 2x2.00x3.66m Box culvert on the same road at Ch. 1425m & 2780m and (C) Const. of 2Nos U-drain on the same road at Ch. 1755m & 2256m under Kashiani Upazila, District: Gopalganj. 2.0000 105.212 M/S. Green Construction 105.212 31/01/2017 12/05/2019 100 07/10/2019 Final
50 GDIRIIP/VR/BC/Kash/16-17/31 (A) Improvement of Bagihapa-Majra road by BC (Ch. 00-2042m), (B) Const. of 2Nos 1x1.50x1.50m Box culvert on the same road at Ch. 50m & 1550m & (C) Const. of 5Nos U-drain on the same road at Ch. 17m, 131m, 1200m, 1535m & 1740m under Kasiani Upazila, District-Gopalganj. 2.2420 140.458 M/S. Bristy Enterprise 140.458 31/01/2017 28/05/2019 100 07/10/2019 Final
51 GDIRIIP/VR/BR/Kash/16-17/23 (A) Improvement of Bhatiapara Busstand R&H-Bhatiapara-Kasiani GC via Md. Sardar house road by BC (Ch. 800-1700m) & (B) Const. of 2Nos U-drain on the same road at Ch. 920m & 1230m, (C) Const. of 1No 1x2.00mx2.00mx3.66m single vent Box culvert on the same road at Ch. 1420m (D) Const. of 1No 1x1.50mx1.50mx3.66m single vent Box culvert on the same road at Ch. 1550m under Kasiani Upazila, District: Gopalganj (Road ID No: 335434064) [ Salvage Materials Cost. Tk. 1,60,393.00]. 0.9000 67.512 m/s apu traders 67.512 26/12/2016 19/08/2017 100 07/10/2019 Final
52 GDIRIIP/VR/BR/Kash/15-16/14 (1) Improvement of Katham Dorbostan-Mazra road by BC (Ch. 217-2100m), (2) Const. of 1 No 1x4.30x4.30m Box culvert on the same road at Ch. 890m & (3) Const. of 2Nos U-drain culvert on the same road at Ch. 2330m & 1665m under Kasiani Upazila, Dist-Gopalganj 1.8300 108.344 M/S. Ruma Stor 108.344 09/08/2016 04/08/2017 100 07/10/2019 Final
53 GDIRIIP/VR/HR/Kash/15-16/12 (1) Improvement of Bolugram-Arpara road by HBB (Ch. 1400-3750m) , (2) Const. of 1 No 1x4.30x4.30m Box culver on the same road at Ch. 1760m & (3) Const. of 4Nos U-drain culvert on the same road at Ch. 1250m, 2100m, 2330m & 3150m under Kasiani Upazila, Dist-Gopalganj 2.3500 99.753 M/S. Farshi Traders 99.753 24/07/2016 18/05/2017 100 07/10/2019 Final
54 GDIRIIP/VR/HR/Kash/15-16/10 (1) Improvement of Hishsur bazar-Paskahona via Paskahona road by HBB (Ch. 00-1500m); (2) Const. of 1 No 1x4.30mx4.30m Box culvert at Ch. 1058m on the same road & (3) Const. of 2 Nos U-drain culvert at Ch. 290m & 1225m on the same road under Kasiani Upazila, Dist- Gopalganj 1.5000 94.515 Bismillah Traders 94.515 11/07/2016 05/05/2017 30 07/10/2019  
55 GDIRIIP/VR/HR/Kash/15-16/02 Construction of 2x4.30x4.30m RCC Box culvert on Dighargati to Domrakandi road at Ch. 3172 under Kasiani Upazila, District: Gopalgonj 21.050 M/s Lincon Enterprise 21.050 26/06/2016 18/11/2016 100 07/10/2019 Final
56 GDIRIIP/Kasiani/UZR/Maint/18-19/18 Maintenance of Kasiani_Kumaria Hat Road at Ch. 3115m-6115m Road ID No 335432002 under Kasiani Upazila District Gopalganj. 3.0030 263.340 MJB-MPB (JV2) 263.340 0 02/10/2019 Tender under Process
57 GDIRIIP/Kasiani/UZR/Maint/18-19/17 Maintenance of Kasiani GC-Takerhat RHD via Rahuthor Hat ( Kasiani Part) Road at Ch. 7300m-11900m (Road ID No: 335432007) under Kasiani Upazila District Gopalganj 4.6000 375.746 M/S Progoti Enterprise 375.746 0 02/10/2019 Tender under Process
58 GDIRIIP/Kasiani/UNR/18-19/Maint/09 Maintenence of Kumaria GC-Parulia UP via Parulia Battola road by BC at Ch. 4560-5800m (Road ID No: 335433010) under Kasiani Upazila District Gopalganj. 1.2400 44.908 Active Traders 44.908 14/07/2019 06/02/2020 0 02/10/2019  
59 GDIRIIP/Kas/UNR/BC/18-19/98 Part-A: Improvement of Ghonapara Bazar (R&H)-Sajail UP (Vadulia) via Horidaspur GCC Road at Ch. 3000m-5160m & Part-B: Const. of 04 Nos U-draon on the same road at Ch. 2760m, 3100m, 3850m & 4350m (Road ID No: 335433019) under Kasiani Upazila District Gopal 4.8600 168.955 Delwar-Ali JV 168.955 0 02/10/2019 Tender under Process
60 GDIRIIP/VR/Culvert/Kash/18-19/91 Const. of 02Nos 1x4.50x3.50m RCC Box culvert on Narail R&H-Tengrailghat via H/O Pakhi khan at Ch. 750m & 1062m (Road ID No: 335434045) under Kasiani Upazila District Gopalganj. 40.205 M/S. Mukta Manik Enterprise 40.205 16/04/2019 09/09/2019 100 02/10/2019  
61 GDIRIIP/VR/HBB/Kash/17-18/72 Improvement of Kusmdia-Sajail Vhadulia road at Ch. 900-2100m by HBB & Const. of 01 No 2.002.00m single venty RCC box culvert at Ch. 1520m on the same road under Kasiani Upazila District Gopalganj 1.2000 64.367 Active Traders 64.367 04/08/2018 07/01/2019 70 02/10/2019  
62 GDIRIIP/VR/Bridge/Kash/17-18/68 Const. of 15.00m RCC Girder Bridge on Parulia-Kumaria GC road at Ch. 2313m under Kasiani Upazila District Gopalganj 148.938 M/s. Bismilla Traders 148.938 26/05/2018 21/04/2019 95 02/10/2019  
63 GDIRIIP/VR/Culvert/Kash/17-18/66 Part-A Const. of 2x.3.30x3.30m Box culvert on Dighorgati-Domrakandi road at Ch. 4020m & Part-B Const. of 1x3.30x3.30m Box culvert on the same road at Ch. 3500m under Kasiani Upazila District Gopalganj 30.237 Joya Enterprise 30.237 12/06/2018 22/10/2018 100 02/10/2019  
64 GDIRIIP/VR/HBB/Kasi/17-18/41 Improvement of Rahuthar-Pathargram road by HBB at Ch. 00-1000m & Const. of 1No 1x4.30x4.30m RCC Box culvert on the same road at Ch. 675m under Kasiani Upazila District Gopalganj 1.0000 79.924 Md. Mortoza Mirdha 79.924 26/03/2018 24/02/2019 100 02/10/2019 Final
65 GDIRIIP/VR/BC/Kash/16-17/40 Improvement of Kumaria Ferryghat-Dighargati road by BC Ch. 00-730m under Kasiani Upazila District Gopalganj 0.7300 39.834 M/s. S.S. Traders 39.834 31/01/2017 12/01/2018 60 02/10/2019  
66 GDIRIIP/VR/HBB/Kash/16-17/39 (A) Improvement of Ramdia-Satpar R&H-Bethuri GPS road by HBB Ch. 00-1020m & (B) Const. of 2Nos U-drain on the same road at Ch. 285m & 775m under Kasiani Upazila District Gopalganj 1.0200 47.138 Md. Mostafizur Rahman Sharif 47.138 31/01/2017 25/11/2017 100 02/10/2019 Final
67 GDIRIIP/VR/BC/Kash/16-17/38 Improvement of Khanderpar-Ramdia road via Rajpart village eidgha by BC at Ch. 00m-1500m under Kasiani Upazila District Gopalganj 1.5000 90.115 M/S. Lipe Engineering 90.115 31/01/2017 20/10/2017 60 02/10/2019  
68 GDIRIIP/VR/BC/Kash/16-17/37 (A) Improvement of Baliadanga Ikram Master house-Khapara Baliadanga GPS & Rail gate connecting road by BC at Ch. 00-720m & (B) Construction of 03 Nos U-drain on the same road at Ch. 98m 112m & 242m under Kasiani Upazila District Gopalganj 0.7200 49.776 M/s. Ashik Builders 49.776 31/01/2017 25/10/2018 100 02/10/2019 Final
69 GDIRIIP/VR/HBB/Kash/16-17/36 (A) Improvement of Dhakkin Perkorfa-Joybangla road by HBB at Ch. 00-700m & (B) Construction of 01 No U-drain on the same road at Ch. 385m under Kasiani Upazila District Gopalganj 0.7000 31.392 Sayed Abdur Rahman 31.392 31/01/2017 25/08/2017 100 02/10/2019 Final
70 GDIRIIP/VR/Bridge/Kash/16-17/35 Construction of 18.00m RCC Bridge on Bahirbag-Falshi road at Ch. 2180m under Kashiani Upazila, District: Gopalganj 84.456 Md. Elias Hossain 84.456 31/01/2017 01/12/2017 100 02/10/2019 Final
71 GDIRIIP/VR/BC/Kash/16-17/34 (A) Improvement of Kasiani College-Barasia river Pingulia road by BC (Ch. 2110-2680m), (B) Const. of 1No U-drain on the same road at Ch. 2480m under Kashiani Upazila, District: Gopalganj 0.5700 35.557 m/s Shathi enterprise 35.557 31/01/2017 23/06/2017 100 02/10/2019 Final
72 GDIRIIP/VR/BC/Kash/16-17/30 (A) Improvement of Sajail bazar-Raitkandi-Majra west para road by BC (Ch. 00-1000m) & (B) Const. of 2Nos U-drain on the same road at Ch. 350m & 650m under Kasiani Upazila, District: Gopalganj 1.0000 66.905 Md. Shirajul Haque 66.905 31/01/2017 10/06/2017 100 02/10/2019 Final
73 GDIRIIP/VR/BC/Kash/16-17/29 Improvement of Mohespur-Bejidanga bridge-Dhanjail Bazar-Konokpur Dauli road by BC (Ch. 2900-3500m) under Kasiani Upazila, District: Gopalganj 0.6000 35.315 Rezaul Karim Ripan 35.315 31/01/2017 12/06/2017 100 02/10/2019 Final
74 GDIRIIP/VR/HBB/Kash/16-17/28 (A) Improvement of Tegharia-Shibpur via Jangalia road by HBB (Ch. 1900-2900m) & (B) Const. of 2Nos U-drain on the same road at Ch. 420m & 855m under Kasiani Upazila, District: Gopalganj 1.0000 50.393 M/S. Mukta Construction 50.393 31/01/2017 18/06/2017 100 02/10/2019 Final
75 GDIRIIP/VR/HBB/Kash/16-17/27 (A) Improvement of Padmabila-Gerakhola road by HBB (Ch. 1000-3650m) & (B) Const. of 4Nos U-drain on the same road at Ch. 1560m, 1877m, 2420m & 2970m under Kasiani Upazila, District: Gopalganj 3.6500 107.800 M/S. Sajib Enterprise 107.800 31/01/2017 17/09/2017 100 02/10/2019 Final
76 GDIRIIP/VR/BR/Kash/16-17/26 (A) Improvement of West Ratoil GPS-Borhan Talukder house road by BC (Ch. 00-720m) & (B) Const. of 1No U-drain on the same road at Ch. 350m under Kasiani Upazila, District: Gopalganj 0.7200 44.370 Saiful Alam Nannu 44.370 21/12/2016 12/05/2017 100 02/10/2019 Final
77 GDIRIIP/VR/BR/Kash/16-17/25 (A) Improvement of Kasiani Dakbanglo-Khayerhat R&H via Jolkarpara road by BC (Ch. 450-1220m) & (B) Const. of 2Nos U-drain on the same road at Ch. 560m & 840m under Kasiani Upazila, District: Gopalganj 0.7700 51.645 M/S SAJID MEDICAL HALL & CONSTRUCTION 51.645 20/12/2016 13/08/2017 100 02/10/2019 Final
78 GDIRIIP/VR/BR/Kash/16-17/24 (A) Improvement of Bhatiapara-Majkandi C&B Robban Molla house-Rail line road by BC (Ch. 1800-2800m) & (B) Const. of 3Nos U-drain on the same road at Ch. 2250m, 2520m & 2750m under Kasiani Upazila, District: Gopalganj 1.0000 65.618 M/S. Reaz Enterprise 65.618 19/12/2016 22/07/2017 100 02/10/2019 Final
79 GDIRIIP/VR/BR/Kash/16-17/22 (A) Improvement of Nowapara Bridge-Charpadmabil Pacca road by BC (Ch. 00-900m) & (B) Const. of 1No U-drain on the same road at Ch. 555m under Kasiani Upazila, District: Gopalganj 0.9000 62.907 M/S. Nahar Enterprise 62.907 26/12/2016 17/08/2017 100 02/10/2019 Final
80 GDIRIIP/VR/HR/Kash/16-17/21 (A) Improvement of Majra bazar-Mohanag road by HBB (Ch. 1500-3500m) & (B) Const. of 3Nos U-drain on the same road at Ch. 675m, 1125m & 1725m under Kasiani Upazila, District: Gopalganj 2.0000 81.803 M/S. Dadu Enterprise 81.803 28/12/2016 28/08/2016 100 02/10/2019 Final
81 GDIRIIP/VR/HR/Kash/16-17/20 (A) Improvement of Arpara bridge-Mohespur ghat road by HBB (Ch. 00-780m) & (B) Const. of 03Nos U-drain on the same road at Ch. 249m,550m & 710m under Kasiani Upazila, District: Gopalganj 0.7800 34.286 M/S. Iqabal & Brothers 34.286 20/12/2016 12/05/2016 100 02/10/2019 Final
82 GDIRIIP/VR/HR/Kash/16-17/19 (A) Improvement of Charpadmabila-Jonasur Pacca road-Md. Rowsan Ali Mridha bari via Mohammad Hossain shop road by HBB (Ch. 00-1000m) & (B) Const. of 02Nos U-drain on the same road at Ch. 160m & 450m under Kasiani Upazila, District: Gopalganj 1.0000 43.034 M/S. Ahrar Traders 43.034 11/12/2016 02/05/2017 100 02/10/2019 Final
83 GDIRIIP/VR/BR/Kash/16-17/18 (A) Improvement of Charvatpara-Itna Kheyaghat-Junior high school-Laldhigi road by BC (Ch. 00-650m) & (B) Const. of 02Nos U-drain on the same road at Ch.260m &450m under Kasiani Upazila, District: Gopalganj 0.6500 42.463 M/s Jhalak Business Center 42.463 20/11/2016 12/04/2017 100 02/10/2019 Final
84 GDIRIIP/VR/HR/Kash/16-17/17 (A) Improvement of Hironkandi-Bayespur road by HBB (Ch. 00-1300m) & (B) Const. of 02Nos U-drain on the same road at Ch.465m &1020m under Kasiani Upazila, District: Gopalganj 1.3000 47.989 M/S. Naim Enterprise 47.989 20/11/2016 12/04/2017 100 02/10/2019 Final
85 GDIRIIP/VR/BR/Kash/15-16/16 Development of Hoglakandi-Majhigari UZR road by BC (Ch. 1000-1510m) under Kasiani Upazila, District: Gopalgonj 0.5100 28.871 m/s ice world 28.871 28/09/2016 17/01/2017 100 02/10/2019 Final
86 GDIRIIP/VR/HR/Kash/15-16/15 (a) Development of Ratoil Boro Bari-Mosque-R&H Bishwa road ( Brick Field) by HBB (Ch. 00-450m) & (2) Const. of 2.00x2.00m RCC Box culvert on the same road at Ch. 100m under Kasiani Upazila, District: Gopalgonj 0.4500 20.518 M/S Rejent Builders 20.518 20/09/2016 12/02/2017 80 02/10/2019  
87 GDIRIIP/VR/HR/Kash/15-16/11 1) Improvement of Rajpat bazar-Asharayan-Rajpat Land office-Monnor Bari LGED road by HBB (Ch. 00-700m) & (2) Const. of 1 No U-drain culvert at Ch. 560m on the same road under Kotalipara Upazila, District: Gopalgonj 0.7000 30.447 M/S. Shikdar Brothers 30.447 10/07/2016 03/12/2016 80 02/10/2019  
88 GDIRIIP/VR/HR/Kash/15-16/09 Improvement of Narail R&H road to Tangrail Ghat via Pakhi Khan house road by HBB (Ch. 00-520m) under Kasiani Upazila, District: Gopalgonj 0.5200 18.700 M/S. Chowdhury Construction 18.700 08/06/2016 31/10/2016 100 02/10/2019 Final
89 GDIRIIP/VR/BR/Kash/15-16/08 Improvement of Hironkandi pacca road to Highway road by BC (Ch. 00-620m) under Kasiani Upazila, District: Gopalgonj 0.6200 29.599 M/S SAJID MEDICAL HALL & CONSTRUCTION 29.599 07/05/2016 30/10/2016 100 02/10/2019 Final
90 GDIRIIP/VR/HR/Kash/15-16/07 Improvement of Narail R&H road to Tengrailghat via Pakhi Khan road by HBB (Ch. 520-1052m) under Kasiani Upazila, District: Gopalgonj 0.5320 20.700 M/s. Turan & Brothers 20.700 29/06/2016 21/11/2016 100 02/10/2019 Final
91 GDIRIIP/VR/BR/Kash/15-16/06 Improvement of Kagdi Railgate to Khayerhat road by BC (Ch. 980-1880m) under Kasiani Upazila, District: Gopalgonj 0.9000 45.570 Ashraf ALi Mredha 45.570 14/06/2016 06/11/2016 100 02/10/2019 Final
92 GDIRIIP/VR/BR/Kash/15-16/05 Improvement of Perkorfa Nazruddin Molla-bari to Uttar Dhankora Eidgha road by BC (Ch. 00-1000m) under Kasiani Upazila, District: Gopalgonj 1.0000 52.067 Md. Elias Hossain 52.067 26/06/2016 18/11/2016 100 02/10/2019 Final
93 GDIRIIP/VR/BR/Kash/15-16/04 Improvement of Ramdia to Orakandi road by BC (Ch. 00-2500m) under Kasiani Upazila, District: Gopalgonj 2.5000 92.749 M/S. Masud Enterprise 92.749 07/06/2016 30/04/2017 100 02/10/2019 Final
94 GDIRIIP/VR/BR/Kash/15-16/03 Improvement of Khayerhat Primary school to Khayerhat Madrasha road by BC (Ch. 00-500m) under Kasiani Upazila, District: Gopalgonj 0.5000 26.804 M/S Waliar Motors Workshop 26.804 26/07/2016 18/11/2016 100 02/10/2019 Final
95 GDIRIIP/VR/HR/Kash/15-16/01 Improvement of Dighargati to Domrakandi road by HBB (Ch. 3000-4200m) under Kasiani Upazila, District: Gopalgonj 1.2000 41.340 M/S. Zakir Sarder 41.340 28/07/2016 20/12/2016 100 02/10/2019 Final
3 Kotwalipara
1 GDIRIIP/Kotali/Maint/wd 19-20/22 Maintenance of Ramshil UP-Pirerbari bazar Road from Ch. 00-1780m [EL=1.495km] under Kotwalipara Upazila District Gopalganj. 1.4950 146.370 146.370 0 06/03/2020
2 GDIRIIP/Kotali/ VR-BC19-20/108 Improvement of Tarashi Bipul Saha Bari Mohor Ali Bari-Moslem Sheikh Bari Road by HBB from Ch 00-400m Road ID-335515574 under Kotwalipara Upazila Dist Gopalganj Salvage Materials Cost. Tk. 55180.00 0.4000 37.280 37.280 0 06/03/2020 Tender on process.
3 GDIRIIP/Kotali/UZR-SR/19-20/102 Construcation of 42.00m Long RCC Girder Bridge ( Incomplete Part & Approach Road) on Pinjuri-Sonakhali via Chairman Bazar Road at Ch. 9600.00m (10100m) under Kotwalipara Upazila District Gopalganj. (Road ID: 335512018) 105.510 105.510 0 06/03/2020 Tender on process.
4 GDIRIIP/Kotali/BL-SR/19-20/98 Construction of Monohar Market Ghatla under Kotwalipara Upazila District Gopalganj 22.470 22.470 0 06/03/2020 Tender on process.
5 GDIRIIP/Kotali/BL-SR/19-20/97 Construction of Seatu Biswas House Pond Ghatla near at Gones Pagal Asram under Kotwalipara Upazila District Gopalganj. 22.640 22.640 0 06/03/2020 Tender on process
6 GDIRIIP/Kotali/VR-SR/19-20/96 Construction of 15.00m Long RCC Girder Bridge on Machatara High School-Gojalia GPS via uttar Talpukuria Bazar at Ch. 0.00m under Kotwalipara Upazila District Gopalganj 100.100 100.100 0 06/03/2020 Tender on process
7 GDIRIIP/Kotali/VR-SR/19-20/95 Part A:Construction of 45.00m Long RCC Girder bridge on Tupuria R&H-Dhorar GPS Road at Ch. 00m under Kotwalipara Upazila District Gopalganj. Part B: Improvement of Tupuria R&H-Dhorar GPS road from Ch. 00-1500m by BC under Kotwalipara Upazila District Gopalganj. Part C: Improvement of Chanmia Sarak to Engineer Tuhin House Sarak by BC from Ch. 00-210m under Kotwalipara Upazila District Gopalganj. 1.7100 482.900 482.900 0 06/03/2020 Tender on process.
8 GDIRIIP/Kotali/UZR-BC/19-20/94 Improvement of Khejurbari R&H-Parakata-Bhangerhat GC Road from Ch. 00m-3330m under Kotwalipara Upazila District Gopalganj. 3.3000 359.220 359.220 0 06/03/2020 Tender on process
9 GDIRIIP/Kotali/UNR-BC/19-20/93 Improvement of Bangolaxmi bazar-Ramshil UP Office Road by BC from Ch. 3641-6950m under Kotwalipara Upazila District Gopalganj. 3.3090 349.470 349.470 0 06/03/2020 Tender on process
10 GDIRIIP/Kotali/19-20/92 Improvement of Perar Bari R&H-Bhangerhat GC-Kaligonj GC-Patkelbari GC (Kotalipara part) Road by BC from Ch. 14160m-15060m under Kotalipara Upazila, District: Gopalganj. 0.9000 107.020 107.020 0 06/03/2020 Tender on Process.
11 GDIRIIP/VR/BC/Kotali/17-18/59 Part-A Improvemnet of Pachim Unoshia Madrasha-Votter Bagan Road at Ch. 00-1310m by BC Part-B Const. of 1No Single vent RCC Box culvert on the same road at Ch. 1100m & Part-C Const. of 01No Single vent RCC Box culvert on the same road at Ch. 1278m under Kotwalipara Upazila. 1.3100 122.261 M/s. Pial Bricks 122.261 06/05/2018 15/01/2019 85 17/12/2019  
12 GDIRIIP/VR/BR/Kotali/15-16/11 Improvement of Kushla (Tupuria)-Ashutia road Important villege road by BC (Ch. 00-1630m) under Kotalipara Upazila, District: Gopalgonj 1.6300 68.804 Sapon Kumar Saha 68.804 29/06/2016 13/02/2017 95 14/11/2019  
13 GDIRIIP/VR/HR/Kotali/16-17/19 (A) Improvement of Sikutibari-Uttarpara hat road by E/W & HBB (Ch. 1000-2500m) & (B) Const. of 03Nos 600mmx600mm size U-drain on the same road at Ch.1180m, 1330m & 1600m & (C) Const. of 25.00m RCC Girder Bridge on the same road at Ch. 00m under Kotwaliparipra Upazila 1.5000 187.259 M/S Kamrul & Brothers 187.259 13/11/2016 28/09/2017 95 14/11/2019  
14 GDIRIIP/VR/BC/Kotali/16-17/38 Improvement of Fulgacha Kotwalipara-Rajoir UZR-Tetulbari GPS road by BC Ch. 00-985m under Kotwalipara Upazila District Gopalganj 0.9850 67.820 M/S. Jahanara Enterprise 67.820 28/05/2018 20/09/2018 60 14/11/2019  
15 GDIRIIP/VR/HBB/Kotali/17-18/43 Improvement of Bandhabari-Bhai Bhai bazar to Shitaikundu bazar via H/O Shiraj Chairman road by HBB at Ch. 760-1760m & Const. of 1No 2x4.50x4.50m Double vent Box culvert on the same road at Ch. 1400m under Kotwalipara Upazila District Gopalganj 1.0000 89.786 MS Anamica Traders 89.786 18/03/2018 20/07/2018 90 14/11/2019  
16 GDIRIIP/VR/BC/Kotali/17-18/46 Improvement of Gunair Bridge Radhagonj-Pererbari road-Noyerbari bazar road by BC at Ch. 00-1100m & Const. of 3Nos U-drain on the same road at Ch. 300m 400m &1150m under Kotwalipara Upazila District Gopalganj 1.1000 95.638 M/S. Rupatoli Builders 95.638 18/04/2018 10/11/2018 30 14/11/2019  
17 GDIRIIP/UZR/Bridge/Kotali/17-18/56 Construction of 42.00m RCC Girder Bridge on Pinjuri-Sonakhali via Chairman bazar road at Ch. 9600m under Kotwalipara Upazila District Gopalganj 166.819 M/S Progoti Enterprise 166.819 30/05/2018 22/04/2019 80 13/11/2019  
18 GDIRIIP/UZR/VR/BC/HBB/Kotali/18-19/68 Part-A: Improvement of Pinjuri-Sonakhali via Chairman bazar road at Ch. 2681-6200m by BC (Road ID No: 335512018) [Salvage Materials Cost Tk. 1,10,09,732.00.] & Part-B: Improvement of Sorab Ali house-Dorar Hori Mondir road at Ch. 00-830m by HBB ( Road ID No: 335514005) under Kotwalipara Upazila District Gopalganj. 4.3490 433.667 M/S Rupali Construction 433.667 06/06/2019 18/04/2020 10 13/11/2019
19 GDIRIIP/UZR/BC/Kotali/17-18/62 Part-A: Improvement of Bandhabari UPC-Bhai Bhai Bazar road at Ch. 00-4830m by BC & Part-B: Construction of 5Nos U-drain on the same road at Ch. 2550m, 3000m, 4000m, 4400m & 4700m under Kotwalipara Upazila,, District: Gopalganj 4.8300 390.926 M/S. Lutful Kabir 390.926 25/10/2017 08/09/2019 98 13/11/2019  
20 GDIRIIP/UNR/RCC/Bridge/BC/Kotali/18-19/67 Part-(1)A: Construction of 20.00m RCC Girder Bridge on Bhangarhat GC-Chalbal Bazar (Shadullahpur UPC-Chalbal Bazar) road at Ch. 1850m (Road ID No: 335514027(old) & 335513022(new); Part-(1)B: Improvement of Kandi UPC-Nayakandi Bazar road at Ch. 2018-6978m 4.9600 686.807 Masud & Jewel JV 686.807 25/04/2019 12/03/2020 20 13/11/2019  
21 GDIRIIP/UZR/BC/Kotali/18-19/75 Improvement of Bhangerhat-Amgram GC(Madaripur-Rajoir Border) road by BC at Ch. 900-4900m (Road ID No: 335512009) under Kotwalipara Upazila District Gopalganj [Salvage Materials Cost: Tk. 1,17,83,823.00]. 4.0000 389.302 Alam-Subrin (Jvca) 389.302 12/05/2019 31/03/2020 20 13/11/2019  
22 GDIRIIP/UNR/Culvert/Kotali/18-19/76 Const. of 2x4.50x4.50x RCC Box culvert on Suagram bazar-Kandi bazar road infront H/O Bhabananda Dr. (Road ID No: 335513013) under Kotwalipara Upazila District Gopalganj. 27.674 Gazi Enterprise 27.674 12/04/2019 01/09/2019 90 13/11/2019  
23 GDIRIIP/VR/BC/Kotali/18-19/78 Part-(1)A:Improvement of Fulgacha (Kotwalipara-Rjoir UZR)-Tetulbari GPS road by BC at Ch. 1000-3658m & Part-(1)B:Const. of 03Nos U-drain at Ch. 1500m, 2050m & 3280m on the same road. 2.6580 240.929 M/s J.Alom Construction 240.929 01/04/2019 17/03/2020 55 13/11/2019  
24 GDIRIIP/Kotali/VR/Bridge/18-19/81 Construction of 15.00m Long RCC Grider Bridge on Kalabari Busstand-Radhakanta high School-Kaligonj bazar road at Ch. 1000m 118.361 M/S. Kamol Traders 118.361 24/04/2019 01/12/2019 85 13/11/2019  
25 GDIRIIP/Kotali/VR/HBB/18-19/82 Part-A: Improvement of Sikutibari-Utterpara hat road at Ch. 2500m-3600m by HBB Part-B: Const. of 4.00x4.00m Box culvert at Ch. 2550m on the same road & Part-C: Const. of 01 No 0.60mx0.60m U-drain at Ch. 690m on the same road Road ID No 335514030 under Kotwalipara Upazila District Gopalganj. 161.310 Abdul Malek Molla 161.310 14/04/2019 26/02/2020 70 13/11/2019  
26 GDIRIIP/Kotali/VR/HBB/18-19/83 Part-A: Improvement of Purbo Kandi GC road-Hijolbari GPS-Lebubari GPS-Machartara GPS road at Ch. 1000m-2320m by HBB; Part B: Const. of 03 Nos 2x4.50x4.50m Double vent Box culvert at Ch. 350m, 950m & 1010m on the same road & Part- C: Const. of 04 Nos 0.60mx0.60m size U-drain at Ch. 450m, 1300m, 1700m & 2100m on the same road (Road ID No: 335515174) under Kotwalipara Upazila District Gopalganj. 1.3200 191.774 M/S. Nayma Enterprise 191.774 17/04/2019 01/03/2020 30 13/11/2019  
27 GDIRIIP/Kotali/VR/Earth work/18-19/84 Eatimate for Earth Filling work on Komuria Upen Gunguly house to Jagodish Biswas House road LCS 1-7 (ch. 530-1290m). 0.7600 82.420 LCS 82.420 100 13/11/2019  
28 GDIRIIP/Kotali/VR/Earth work/18-19/85 Eatimate for Earth Filling work on Komuria Upen Gunguly house to Jagodish Biswas House road LCS 1-7 (ch. 1290-2085m). 0.7950 69.603 LCS 69.603 100 13/11/2019  
29 GDIRIIP/Kotali/UZR/18-19/Maint/14 Maintenence of Baravita bazar-Kandi UPC Dharabashail road by BC at Ch. 00-2271m 2.2710 81.538 M/s Bhai Bhai Electronics 81.538 01/04/2019 25/03/2020 20 13/11/2019  
30 GDIRIIP/Kotali/UNR/18-19/Maint/15 Maintenence of Ramshil UP-Pirerbari bazar road by BC at Ch. 00-6500m 6.5000 450.291 MS Anamica Traders-M/s. Mojumder Enterprise JV 450.291 30/05/2019 15/06/2020 30 13/11/2019  
31 GDIRIIP/Kotali/18-19/87 Construction 45.00m Long RCC Girder Bridge on Kolabari Bus stand-Radha Kanda School-Kaligonj Bazar Road at Ch. 500m 347.654 Md. Rafiqul Islam Khan & M/S Nwarin Traders(JV) 347.654 22/02/2021 5 13/11/2019
32 GDIRIIP/VR/HBB/Kotali/17-18/58 Part-A Improvemnet of Kandi Bazar-WAPDA Embankment Road at Ch. 2250-5500m by HBB Part-B Const. of 3Nos 2x4.50x4.50m RCC Box culvert on the same road at Ch. 3050m 4045m & 5160m & Part-C Const. of 05Nos U-drain on the same road at Ch. 2800m 3300m 3900m 4850m & 5300m under Kotwalipara Upazila District Gopalganj Road ID No 335514029. 3.2500 304.392 MS Anamica Traders 304.392 07/06/2018 15/04/2019 75 29/10/2019  
33 GDIRIIP/VR/Maint/Kotali/17-18/01 Periodic Maintenance work of Kotalipara UZ HQ-Dharabasail GC-Kandi Road at Ch. 00-2440m under Kotwalipara Upazila District Gopalganj. 2.4400 98.455 Architectural & Structural Consultants Ltd. 98.455 28/03/2018 12/05/2018 100 29/10/2019 Final
34 GDIRIIP/VR/HBB/Kotali/16-17/39 (A) Improvement of Digholia-Sreefalbari road by HBB Ch. 00-1020m (B) Const. of 2x4.50x4.50x3.66m double vent RCC box culvert on the same road at Ch. 453m C Const. of 2Nos U-drain on the same road at Ch. 60m & 870m under Kotwalipara Upazila District Gopalganj. 1.2000 67.252 Matiar Rahman Hazra 67.252 20/10/2017 05/08/2018 100 16/10/2019 Final
35 GDIRIIP/VR/HR/Kotali/16-17/21 (A) Improvement of Narayan khana bazar-WAPDA Embankment at Salta road by HBB (Ch. 500-1500m) ; (B) Const. of 1No 600mmx600mm size 8.00m long RCC U-drain on the same road at Ch. 800m & (C) Const. of 15.00m RCC Girder Bridge on the same road at Ch. 2450m under Kotwalipara Upazila, District: Gopalganj 1.0000 135.008 Matiar Rahman Hazra 135.008 19/12/2016 01/08/2017 100 16/10/2019 Final
36 GDIRIIP/VR/HR/Kotali/16-17/18 (A) Improvement of Dewpura-boholtoli GPS-Montu sikder house road by E/W & HBB (Ch. 00-1150m); (B) Const. of 01No 2x4.50mx4.50m Double vent RCC Box culvert on the same road at Ch.00m & Const. of 2Nos U-drain on the same road at Ch. 400m & 700m under Kotwalipara Upazila. 1.1500 77.313 m/s nawrin traders 77.313 27/11/2016 18/07/2017 100 16/10/2019 Final
37 GDIRIIP/VR/HR/Kotali/16-17/16 (A) Improvement of Nayakandi WAPDA road-Babul Member bari-Muktijodha Mojibur Rahman bari road by E/W & HBB (Ch. 00-1000m) & (B) Const. of 01No 2x4.50mx4.50m Double vent RCC Box culvert on the same road at Ch.950m under Kotwalipara Upazila, District: Gopalganj. 1.0000 79.787 m/s akon enterprise 79.787 16/11/2016 30/09/2016 100 16/10/2019 Final
38 GDIRIIP/UN/HR/Kotali/15-16/14 (1) Improvement of Bhandhabari-Jaharer Kandi bazar road by HBB (Ch. 00-3650m) ; (2) Construction of 15.00m RCC Girder Bridge at Ch.1408m on the same road; (3) Construction of 12.00m RCC Girder Bridge at Ch.2803m on the same road; (4) Const. of 1No 2x4.50x4.50m RCC box culvert at Ch. 663m on the same road & (5) Const. of 8Nos 600mm x600mm size 10.00m Long U-drain culvert at 1170m, 1710m, 2010m, 2315m, 2700m, 2960m, 2785m & 4060m on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335513015). 3.6500 366.988 MS Anamica Traders-M/s. Mojumder Enterprise JV 366.988 17/09/2016 01/08/2017 100 16/10/2019 Final
39 GDIRIIP/VR/HR/Kotali/15-16/10 (1) Improvement of Noyakandi-Talpukuria school-Tarail bazar road by HBB (Ch. 00-2000m) and (2) Construction of 12.00m RCC Girder bridge at Ch. 1590m; (3) Const. of 2 Nos 1x3.50x3.50m RCC box culvert at Ch. 450m & 990m on the same road & (4) Const. of 2 Nos 10.00m Long U-drain culvert at Ch. 890m & 1320m on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335515071). 2.0000 177.112 Bismillah Traders 177.112 13/07/2016 30/06/2018 100 16/10/2019 Final
40 GDIRIIP/VR/HR/Kotali/15-16/09 (1) Improvement of Talpukuria school-Dumuria Jamay bazar road by HBB (Ch. 00-2000m) and (2) Construction of 18.00m RCC Girder bridge at Ch. 1750m; (3) Const. of 1 No 1x3.50x3.50m RCC box culvert at Ch. 1350m on the same road & (4) Const. of 1 No 600mmx600mm size 10.00m Long U-drain culvert at Ch. 1050m on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335515070). 2.0000 186.371 M. Abul Munsur Munshi 186.371 27/06/2016 21/04/2017 90 16/10/2019 Final
41 GDIRIIP/VR/HR/Kotali/15-16/05 (1) Improvement of Horinahati-Amboula road by Earth work & HBB (Ch. 670-2000m) ; (2) Construction of 1 No 2x4.50x4.50m RCC Box culvert at Ch.2600m on the same road and (3) Const. of 3Nos U-drain culvert at Ch. 1050m, 1200m & 1590m on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335514012). 1.3300 90.640 Mim Tower 90.640 10/07/2016 29/03/2019 100 16/10/2019 Final
42 GDIRIIP/VR/HR/Kotali/15-16/03 (1) Improvement of Bhangarhat GC-Chalbal bazar road by Earth work & HBB (Ch. 2350-6385m) ; (2) Construction of 12.00m RCC Girder Bridge at Ch.2463m on the same road; (3) Const. of 2Nos 2x2.45x4.50m RCC box culvert at Ch. 3260m & 4750m on the same road & (4) Const. of 4Nos U-drain culvert at different Chainage on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335514027). 4.0350 279.328 MS Anamica Traders 279.328 04/07/2016 28/04/2017 100 16/10/2019 Final
43 GDIRIIP/VR/HR/Kotali/15-16/02 (1) Improvement of Tupuria GPS-Majhbari Bridge road by Earth work & HBB (Ch. 00-1000m) ; (2) Construction of 12.00m RCC Girder Bridge at Ch.360m on the same road and (3) Const. of 2Nos U-drain culvert at Ch. 120m & 200m on the same road under Kotalipara Upazila 1.0000 111.973 M/S Chokder Enterprise 111.973 30/06/2016 15/11/2018 100 16/10/2019 Final
44 GDIRIIP/VR/HR/Kotali/15-16/01 (1) Improvement of Nayiar bari High School-Uttar Pacschim Nayiar bari road by Earth work & HBB (Ch. 00-1820m) ; (2) Construction of 12.00m RCC Girder Bridge at Ch.250m on the same road and (3) Const. of 2Nos RCC Box culvert at Ch. 325m & 880m on the same road under Kotalipara Upazila, District: Gopalgonj (Road ID No: 335515221). 1.8200 198.164 M/S. Farshi Traders 198.164 24/07/2016 16/12/2018 100 16/10/2019 Final
45 GDIRIIP/VR/Bridge/Kotali/17-18/41 Part-A Construction of U-drain on Dharabashail-South Bhennabari road at Ch. 2700m Part-B Construction of 2 Nos 1x4.00x4.00m Box culvert on the same road at Ch. 1700m & 4100m Part-C Construction 12.00m RCC Girder Bridge on the same road at Ch. 2250m & Part-D Construction of 15.00m RCC Girder Bridge on the same road at Ch. 1061m under Kotwalipara Upazila District Gopalganj Road ID No 335514011. 169.924 M/S. Niaz Traders 169.924 23/11/2017 05/10/2018 65 16/10/2019  
46 GDIRIIP/VR/HBB/Kotali/16-17/35 (A) Improvement of Jatiarbari-Madarbari-Botbari to Shudhir Sing Bari road by HBB Ch. 2800-3950m, (B) Const. of 4.00x4.00x3.66m single vent Box culvert on the same road at Ch. 3576m, (C) Const. of 0.60x0.60m size 12.00m long RCC U-drain on the same road at Ch. 2950m & (D) Const. of 12.00m RCC Girder Bridge on the same road at Ch. 2800m under Kotwalipara Upazila District Gopalganj Road ID No 335514060. 1.1500 123.420 M/S. Lutful Kabir 123.420 17/07/2017 06/07/2018 100 16/10/2019 Final
47 GDIRIIP/VR/HBB/Kotali/16-17/34 Improvement of Bhuterbari GPS to Kafulabari GPS road by HBB at Ch. 00-1000m under Kotwalipara Upazila District Gopalganj 1.0000 50.660 Matiar Rahman Hazra 50.660 18/06/2017 11/10/2017 100 16/10/2019 Final
48 GDIRIIP/VR/HBB/Kotali/16-17/32 (A) Improvement of Dhakkin Sonatia-Kandi bazar road by HBB at Ch. 00-2000m (B) Const. of 15.00m RCC Girder Bridge on the same road at Ch. 00m (C) Const. of 01No 2x4.50mx4.00mx3.66m RCC double vent Box culvert on the same road at Ch. 800m (D) Const. of 01No 1x4.50mx4.00mx3.66m RCC single vent Box culvert on the same road at Ch. 1500m (E) Const. of 01No 1x4.50mx4.00mx3.66m RCC single vent Box culvert on the same road at Ch. 1850m (F) Const. of 12.00m RCC Girder Bridge on the same road at Ch. 2500m & (G) Const. of 01No U-Drain on the same road at Ch. 250m under Kotwalipara Upazila District Gopalganj Road ID No 335514098. 2.0000 361.996 SE & NIH (JV) 361.996 15/06/2017 17/04/2018 75 16/10/2019  
49 GDIRIIP/Kotali/18-19/88 (A) Improvement of Senergati Dr. Talab Ali Talukder House road at Ch. 00-126m by HBB & (B) Const. of 1-No 2x4.50x4.50m Double vent RCC Box culvert on the same road at Ch. 5m 0.1260 36.649   36.649 0 02/10/2019 Tender under process
50 GDIRIIP/Kotali/VR/HBB/18-19/86 Part-A: Improvement of Shaheedula Khandokar house harisit house via sezan house road at Ch. 00m-800m by HBB; Part-B: Const. of 2x4.00x5.00m double vent RCC box culvert on the same road at Ch. 400m; Part-C: Const. of 1.00x1.00m U-drain on the same road at 0.8000 108.058 M/s. Mohiuddin Enterprise 108.058 21/07/2019 13/04/2020 0 02/10/2019  
51 GDIRIIP/VR/HBB/Culvert/Kotali/18-19/79 Part (1) A: Improvement of Sonakhali bazar-Tarail road by HBB at Ch. 1000-2350m; Part (1) B: Const. of 2Nos 2x4.00x4.50m RCC Box culvert at Ch. 450m & 1010m on the same road; Part (1) C: Const. of 2Nos U-drain at Ch. 1750m & 1850m on the same road; (Road 3.4500 396.150 MS Anamica Traders-M/s. Mojumder Enterprise JV 396.150 18/05/2019 30/03/2020 75 02/10/2019  
52 GDIRIIP/UNR/BC/Kotali/18-19/77 Improvement of Kajulia UP-Polshir Bazar road by BC at Ch. 2627-4320m 1.6930 158.455 M/s J.Alom Construction 158.455 01/04/2019 17/03/2020 20 02/10/2019  
53 GDIRIIP/VR/Bridge/HBB/Kotali/18-19/74 Part-(1)A: Improvement of Radhagonj biswas bari-Bhangerhat road by HBB at Ch. 00-780m; Part-(1)B: Const. of 18.00m RCC Girder Bridge at Ch. 462m on the same road & Part-(1)C: Const. of 20.00m RCC Girder Bridge at Ch. 780m on the same road 0.7800 272.967 M/S Khan Bhander 272.967 10/04/2019 19/02/2020 60 02/10/2019  
54 GDIRIIP/UNR/Bridge/BC/ Kotali/18-19/73 Part-(1)A: Improvement of Bandhabari-Bujurgikona bazar road by BC at Ch. 00-2275m & Part-(1)B:Const. of 03Nos U-drain at Ch. 1150m, 1705m & 1756m on the same road 2.2750 242.916   242.916 0 02/10/2019 Tender under Process
55 GDIRIIP/Kotali/VR/Earth work/18-19/72 Eatimate for Earth Filling work on Komuria Upen Gunguly house to Jagodish Biswas House road LCS 1-4 (ch. 0.00-530m). 0.5300 35.492 LCS 35.492 12/06/2508 100 02/10/2019  
56 GDIRIIP/Kotali/VR/Earth work/18-19/71 Estimate for Earth Filling work on Kolabari Bus stand to Radhakanto School-Kaligonj bazar road LCS 1-5(ch 0-1100) 1.0000 64.811 LCS 64.811 12/06/2507 100 02/10/2019  
57 GDIRIIP/UNR/BC/Kotali/18-19/70 Part-(1)A: Improvement of Kandi UPC Talpukuria bazar via Gozalia road by BC at Ch. 2500-6400m; Part-(1)B: Const. of 5Nos U-drain at Ch. 2850, 4500m,4800m, 5400m & 6100m on the same road under Kotwalipara Upazila District Gopalganj 3.9000 560.837 Hamim & Mizan (JV) 560.837 30/07/2019 22/06/2020 0 02/10/2019  
58 GDIRIIP/VR/BC/HBB/Kotali/18-19/69 Part-(1)A: Improvement of Tupuria bazar R&H-Kushla UP via Jamulia road at Ch. 00-1730m by BC (Road ID No: 335515260(old) & 335514013(new) [Salvage Materials Cost Tk. 31,85,777.00.]; Part-(1)B: Const. of 01 No 0.60x0.60m U-drain at Ch. 750m on the same roa 4.6000 366.935 Md. Rafiqul Islam Khan & M/S. Nawrin Traders (JV) 366.935 30/04/2019 15/03/2020 40 02/10/2019 Tender under Process
59 GDIRIIP/VR/PC/Bridge/Kotali/18-19/66 Part-A: Construction of 30.00m PC Girder Bridge on Bandhabari-Jahurer Kandi bazar road at Ch. 00m ( Road ID No: 335513015) & Part-B: Improvement of Kurpala WAPDA road-Kamal Howlader bari road at Ch. 00-250m by HBB under Kotwalipara Upazila District Gopalg 0.2500 338.523 M/S. Rezvi Construction - MS Anamica Traders JV 338.523 30/01/2019 02/11/2019 40 02/10/2019  
60 GDIRIIP/Kotali/VR/17-18/Maint/05 Rehabilitation of Ramshil UP to Pirarbari bazar road at Ch. 00-6500m by BC ( Road ID No: 335513007) under Kotwalipara Upazila, District: Gopalganj. 6.5000 147.303   147.303 0 02/10/2019 Tender under Process
61 GDIRIIP/VR//HBB//Kotali/17-18/55 Improvement of Badalpal bari to Unoshya Ghosh bari bridge road by HBB at Ch. 00-1050m & Const. of 01No 15.00m RCC Gridge Bridge on the same road at Ch. 00m (Road ID No: 335515074) under Kotwalipara Upazila, District: Gopalganj 1.0500 138.002 M/S. Masud Enterprise 138.002 26/09/2018 09/08/2019 20 02/10/2019  
62 GDIRIIP/UZR/Bridge/Kotali/17-18/57 Construction of 24.00m RCC Girder Bridge on Pinjuri-Sonakhali via Chairman bazar road at Ch. 8550m under Kotwalipara Upazila District Gopalganj 165.487 M/S.Subarna Construction 165.487 30/05/2018 22/05/2019 70 02/10/2019  
63 GDIRIIP/VR/Maint/Kotali/17-18/02 Periodic Maintenance work of Baraivita bazar-Kandi UPC-Dharabasail GC Road at Ch. 2308-3415m under Kotwalipara Upazila District Gopalganj 1.1070 26.346 Architectural & Structural Consultants Ltd. 26.346 28/03/2018 04/05/2018 100 02/10/2019 Final
64 GDIRIIP/VR/HBB/Kotali/17-18/54 Part-A Improvement of Paiker bari-Palotana road by HBB at Ch. 00-1000m Part-B Const. of 2Nos 2x4.00x4.50m Double vent RCC Box culvert on the same road at Ch. 510m & 850m under Kotwalipara Upazila District Gopalganj 1.0000 105.665 M/S. Safol Enterprise 105.665 12/02/2018 04/07/2018 100 02/10/2019 Final
65 GDIRIIP/VR/Ramp/Kotali/17-18/53 Construction of 3Nos Ghatla Boat Landing Ramp at Trimohoni bazar Bujurgikona bazar & Johorere kandi bazar under Kotwalipara Upazila District Gopalganj. 33.801 M/S Nazrul And Brothers 33.801 13/02/2018 31/03/2019 100 02/10/2019 Final
66 GDIRIIP/VR/HBB/Kotali/17-18/52 Part-A Improvement of Kurpala Fokirbari WAPDA-Kazi bari Mosque road by HBB at Ch. 00-700m Part-B Const. of 1No 2x4.00x4.50m Double vent RCC Box culvert on the same road at Ch. 552m under Kotwalipara Upazila District Gopalgan 0.7000 63.980 M/S. N. R. Builders 63.980 16/04/2018 20/07/2018 100 02/10/2019 Final
67 GDIRIIP/VR/HBB/Kotali/17-18/51 Part-A Improvement of Horinahati Badsha member house-Rajapur high school road by HBB at Ch. 110-1110m & Part-B Const. of 02 Nos 1x4.00x4.003.66m singe vent RCC box culvert on the same road at Ch. 450m & 1070m under Kotwalipara Upazila District Gopalganj 1.0000 89.766 M/S. Lutful Kabir 89.766 12/02/2018 28/04/2019 100 02/10/2019 Final
68 GDIRIIP/VR/HBB/Kotali/17-18/50 Improvement of Chowdhuryhat road to Alauddin howlader house road by HBB at Ch. 00-750m under Kotwalipara Upazila District Gopalganj 0.7500 49.988 M/S. E.S.Co 49.988 05/02/2018 28/03/2018 100 02/10/2019 Final
69 GDIRIIP/VR/HBB/Kotali/17-18/49 Part-A Improvement of Narayonkhana bazar-Kalarbari Nowarbari road by HBB at Ch. 300-1300m Part-B Const. of 2Nos 2x4.00x4.50m Double vent RCC Box culvert on the same road at Ch. 390m & 590m Part-C Const. of 01 No 1x4.00x4.003.66m singe vent RCC box culvert 1.3000 122.282 M/s. Mojumder Enterprise 122.282 15/04/2018 20/11/2018 60 02/10/2019  
70 GDIRIIP/VR/HBB/Kotali/17-18/48 Improvement of Chitrapara DB road-Chitrapara Borobari road by HBB at Ch. 00-680m & Const. of 1No U-drain on the same road at Ch. 120m under Kotwalipara Upazila District Gopalganj 0.6800 40.453 M/s. Mojumder Enterprise 40.453 15/03/2018 10/07/2018 100 02/10/2019 Final
71 GDIRIIP/VR/HBB/Kotali/17-18/47 Improvement of Nagra Embankment to H/O Moniruzzaman via Panchkori Dewan Mazar road by HBB at Ch. 00-350m under Kotwalipara Upazila District Gopalganj 0.3500 19.340 M/S. Nafshi Construction 19.340 13/03/2018 05/06/2018 100 02/10/2019 Final
72 GDIRIIP/VR/HBB/Kotali/17-18/45 Improvement of Loharanka FRB H/O Mukbul Master-Barshapara GPS road by HBB at Ch. 00-1020m & Const. of 1No 2x4.50x4.50m Double vent Box culvert on the same road at Ch. 1020m under Kotwalipara Upazila District Gopalganj 1.0200 86.654 M/s. Mizan Traders 86.654 06/05/2018 28/09/2018 100 02/10/2019  
73 GDIRIIP/VR/HBB/Kotali/17-18/44 Improvement of Bankura GPS to Borobari road by HBB at Ch. 00-1000m & Const. of 1No U-drain on the same road at Ch. 460m under Kotwalipara Upazila District Gopalganj 1.0000 83.800 Matiar Rahman Hazra 83.800 08/07/2018 15/07/2018 100 02/10/2019 Final
74 GDIRIIP/VR/HBB/Kotali/17-18/42 Improvement of Kandi H/O Sekender Mowlovi to Dhorar Dariabari new Mosque road by HBB at Ch. 00-350m & Const. of 1No 2x4.50x4.50m Double vent Box culvert on the same road at Ch. 340m under Kotwalipara Upazila District Gopalganj 0.3500 41.813 M/S. Hazi Joynal Abedin & Sons 41.813 18/03/2018 17/07/2018 100 02/10/2019  
75 GDIRIIP/VR/Earth work/ Kotali/16-17/40 Improvement of Sonakhali Bazar to Tarail road at ch. 0.00-1000m 1.0000 48.617 LCS 48.617 30/05/2017 11/11/2017 100 02/10/2019  
76 GDIRIIP/UZR/BC/Kotali/16-17/37 Improvement of Radhaganj UPC-Doglas High school-Bhangarhat GC road by BC Ch. 3000-5200m under Kotwalipara Upazila District Gopalganj 2.2000 160.630 MS Anamica Traders 160.630 20/10/2017 12/06/2018 100 02/10/2019 Final
77 GDIRIIP/VR/HBB/Kotali/16-17/36 (A) Improvement of Madhur Dokan-Bancharams bari road by HBB Ch. 1000-1950m (B) Const. of 2Nos U-drain on the same road at Ch. 1180m & 1420m under Kotwalipara Upazila District Gopalganj 0.9500 44.336 M/s. Mojumder Enterprise 44.336 20/10/2017 26/08/2018 100 02/10/2019 Final
78 GDIRIIP/UZR/Bridge/Kotali/16-17/33 Construction of 25.00m RCC Girder Bridge on Radhaganj-Bujurgikona bazar-Sikir bazar R&H via Gochapara road at Ch. 5021m under Kotwalipara Upazila District Gopalganj 112.255 M/S. Lutful Kabir 112.255 14/07/2017 10/10/2018 100 02/10/2019 Final
79 GDIRIIP/VR/HBB/Kotali/16-17/31 Improvement of Machpara Chowmohoni to Pachim Machpara road by HBB at Ch. 1000-2000m & Const. of 01 No. 4.00mx4.00m double vent RCC Box culvert on the same road at Ch. 1900m under Kotwalipara Upazila District Gopalganj 1.0000 50.325 M/s Chowdhury & co. 50.325 11/05/2017 03/10/2017 100 02/10/2019  
80 GDIRIIP/VR/HBB/Kotali/16-17/30 Improvement of Kushla bazar-Ghaghor kheyghat road by HBB at Ch. 2350-3360m under Kotwalipara Upazila District Gopalganj 1.0100 56.602 M/S. Lutful Kabir 56.602 23/05/2017 25/10/2017 100 02/10/2019 Final
81 GDIRIIP/VR/HBB/Kotali/16-17/29 Improvement of Purba Kandi GC road to Hijolbari GPS-Lebubari GPS-Machartara GPS road by HBB (Ch. 00-1000m) under Kotwalipara Upazila, District: Gopalganj 1.0000 51.014 M/S. Abinash Traders 51.014 28/05/2017 20/10/2017 100 02/10/2019 Final
82 GDIRIIP/VR/BC/Kotali/16-17/28 Improvement of Purba Lakhanda to Paschim Lakhanda road by BC (Ch. 00-2365m) under Kotwalipara Upazila, District: Gopalganj 2.3650 142.728 MS Anamica Traders 142.728 22/02/2017 14/10/2017 97 02/10/2019  
83 GDIRIIP/VR/HR/Kotali/16-17/26 Improvement of Kandi bazar-WAPDA Embankment road by HBB (Ch. 1250-2250m) under Kotwalipara Upazila, District: Gopalganj 1.0000 47.259 m/s nawrin traders 47.259 22/01/2017 15/06/2017 100 02/10/2019 Final
84 GDIRIIP/VR/HR/Kotali/16-17/25 Improvement of Dhorar Solaiman house-Kumuria via Utter Baniary GPS road by HBB (Ch. 00-1000m) under Kotwalipara Upazila, District: Gopalganj 1.0000 43.872 Saiful Alam Nannu 43.872 01/01/2017 14/04/2019 100 02/10/2019 Final
85 GDIRIIP/VR/HR/Kotali/16-17/24 (A) Improvement of Bhangarhat School (Narayan Ojha house)-Latenga-Polotona R&H road by HBB (Ch. 1025-2255m) & (B) Const. of 1No 2x4.50mx4.50m Double vent RCC box culvert on the same road at Ch. 2120m under Kotwalipara Upazila, District: Gopalganj 1.2300 65.352 M/s. Muzahidul Islam 65.352 20/12/2016 13/08/2017 100 02/10/2019 Final
86 GDIRIIP/VR/HR/Kotali/16-17/23 (A) Improvement of Suagram BDS to Boudhabari road by E/W & HBB (Ch. 00-600m) & (B) Const. of 1No U-drain on the same road at Ch. 585m under Kotwalipara Upazila, District: Gopalganj 0.6000 28.424 m/s nupur traders 28.424 22/12/2016 15/05/2017 100 02/10/2019 Final
87 GDIRIIP/VR/HR/Kotali/16-17/22 Improvement of Bidhan Market-Biramer Kandi Soleman Sheikh house road by HBB (Ch. 00-750m) under Kotwalipara Upazila, District: Gopalganj 0.7500 30.656 M/s Bhai Bhai Electronics 30.656 25/12/2016 16/05/2017 100 02/10/2019 Final
88 GDIRIIP/VR/HR/Kotali/16-17/20 Improvement of Uttarpara Hatkhola to Nagra road by HBB (Ch. 2000-4650m) under Kotwalipara Upazila, District: Gopalganj 2.6500 92.406 Md. Haider Ali Hazra 92.406 13/12/2016 05/08/2017 100 02/10/2019 Final
89 GDIRIIP/VR/HR/Kotali/16-17/17 Improvement of Pinjuri high school-Gopalpur Sluicegate road by E/W & HBB (Ch. 1000-2200m) under Kotwalipara Upazila, District: Gopalganj 1.2000 48.069 S. M. Tutul 48.069 17/11/2016 09/04/2017 100 02/10/2019 Final
90 GDIRIIP/VR/HR/Kotali/15-16/13 Improvement of South Hiron Tolarvita-Goorkhal via Abdul Halim sheikh's house road by HBB (Ch. 00-1000m) under Kotalipara Upazila, District: Gopalgonj 1.0000 73.992 M/S. Showrove Traders 73.992 13/07/2016 15/02/2017 100 02/10/2019 Final
91 GDIRIIP/VR/HR/Kotali/15-16/12 Improvement of Tupuria bazar R&H-Kushla UP via Jamula road by HBB (Ch. 1680-3810m) under Kotalipara Upazila, District: Gopalgonj 2.1300 82.629 Mim Tower 82.629 10/07/2016 25/09/2018 100 02/10/2019 Final
92 GDIRIIP/VR/BR/Kotali/15-16/08 Improvement of Jotiar bari Upazila road-Bhangarhat GC road by BC (Ch. 00-2560m) under Kotalipara Upazila, District: Gopalgonj 2.5600 210.216 MS Anamica Traders-M/s. Mojumder Enterprise JV 210.216 04/07/2016 28/04/2017 100 02/10/2019 Final
93 GDIRIIP/VR/BR/Kotali/15-16/07 (1) Improvement of Sikir bazar-Unashia road by BC (Ch. 00-1280m) and (2) Construction of 1 No 2x4.50x4.50m RCC Box culvert at Ch. 1266m on the same road under Kotalipara Upazila, District: Gopalgonj 1.2800 82.211 M/S. Ovi Bildars 82.211 07/07/2016 27/04/2017 100 02/10/2019 Final
94 GDIRIIP/VR/BR/Kotali/15-16/06 1) Improvement of Sheikh Hasina Adarsho College-Gozaria GPS road by BC (Ch. 00-1000m) and (2) Construction of 1 No 8.00m Long U-drain culvert at Ch. 660m on the same road under Kotalipara Upazila, District: Gopalgonj 1.0000 62.500 M/S. Ruma Stor 62.500 07/07/2016 13/02/2017 100 02/10/2019 Final
95 GDIRIIP/VR/HR/Kotali/15-16/04 (1) Improvement of Purbo Lakhanda Sukchandra Baray's house to Dr. Sushanto Boiddya's house road by Earth work & HBB (Ch. 00-400m) and (2) Construction of 12.00m RCC Girder Bridge at Ch.00m on the same road under Kotalipara Upazila, District: Gopalgonj 0.4000 88.574 M/S. Hazi Enterprise 88.574 13/07/2016 08/05/2017 100 02/10/2019 Final
4 Muksudpur
1 GDIRIIP/VR/Bridge/Muk/17-18/82 Construction of 30.00m RCC Girder Bridge on Molladi Bazar to Sundardi Bapary bari road at Ch. 800m under Muksudpur Upazila District Gopalganj 190.000 S M Rifatul Alam 190.000 30/05/2018 01/04/2019 98 08/03/2020
2 GDIRIIP/RM/Muk/17-18/80 Improvement of Bahara Hat/Bazar under Muksudpur Upazila District Gopalganj. 49.000 M/S N.A.R Builders 49.000 29/05/2018 30/10/2019 100 08/03/2020  
3 GDIRIIP/VR/HBB/Muk/16-17/51 Improvement of Debgram Hori Mondir-BWDB Khal via Purnima GPS road by HBB Ch. 00-1278m under Muksudpur Upazila District Gopalganj 1.2780 79.620 M/S. Iqabal & Brothers 79.620 22/11/2017 14/06/2018 40 08/03/2020
4 GDIRIIP/Mural/Muk/16-17/44 Construction of Bangabandhu Sk. Mujibur Rahmans Mural & Independent war 1971 Smriti Stambho at site of Puraton Muksudpur Biswo Road under Muksudpur Upazila District Gopalganj. 0.2100 9.879 M/s. Shikder Jewellers 9.879 07/11/2017 30/12/2017 0 08/03/2020 land problem
5 GDIRIIP/VR/BR/Muk/15-16/12 Improvement of Holdivita-Pirerchar road to Guabahara road by BC (Ch. 2650-4170m) under Muksudpur Upazila, District: Gopalgonj 1.5200 90.465 Md. Nazim Uddin Khan 90.465 26/06/2016 10/10/2019 100 08/03/2020
6 GDIRIIP/RCC/Bridge/Muk/17-18/72 Construction of 35.10m RCC Girder Bridge at Ch. 4810m on Ujani UP Complex-Barampalta via Patkelbari road under Muksudpur Upazila District Gopalganj 283.505 RABRC-KBI-MAE (JV) 283.505 27/05/2018 01/04/2019 100 21/01/2020  
7 GDIRIIP/VR/BC/Muk/17-18/65 Improvement of Dignagar R&H-Alipur bazar vai Kanuria GPS & Mirridangi road by BC at Ch. 1675-3315m & Const. of 2Nos U-drain on the same road at Ch. 1870m & 2645m under Muksudpur Upazila District Gopalganj 1.6400 111.060 M/S. Khondokar Enterprise 111.060 10/04/2018 29/10/2018 100 21/01/2020  
8 GDIRIIP/VR/HBB/Muk/16-17/53 Improvement of Ujani UZR-Goalgram road to Bedgram hat via Bedgram High School road by HBB Ch. 00-1646m under Muksudpur Upazila District Gopalganj 1.6460 80.778 M/S. Iqabal & Brothers 80.778 22/11/2017 14/06/2018 100 21/01/2020  
9 GDIRIIP/UNR/Bridge/Muk/17-18/74 Construction of 30.10m RCC Girder Bridge at Ch. 2310m on Ujani UZR-Goalgram road-Bedgram hat via Bedgram high school road under Muksudpur Upazila District Gopalganj 178.046 M/S Rahman Engineering 178.046 26/03/2018 11/02/2019 100 10/12/2019  
10 GDIRIIP/VR/Bridge/Muk/17-18/83 Construction of 51.00m RCC Girder Bridge on Bamonborora GPS-Kalinagar bazar road at Ch. 1400m under Muksudpur Upazila District Gopalganj 376.863 M/s. N. B. Construction 376.863 11/06/2018 03/05/2019 80 10/12/2019  
11 GDIRIIP/VR/Bridge/Muk/17-18/84 Construction of 24.00m RCC Bridge on Bamondanga Bazar-Jalirpar GC road at Ch. 2900m under Muksudpur Upazila District Gopalganj 126.869 M/S Progoti Enterprise 126.869 07/06/2018 28/04/2019 80 10/12/2019  
12 GDIRIIP/VR/Bridge/Muk/17-18/85 Construction of 24.00m RCC Bridge on Ragdi R&H-Ragdi Kasibari GPS Rajoir Border road at Ch. 10m under Muksudpur Upazila District Gopalganj. 126.436 M/S Progoti Enterprise 126.436 07/06/2018 28/04/2019 90 10/12/2019  
13 GDIRIIP/VR/HBB/Muk/17-18/91 Improvement of Balnarayon-Ujani road to Basuria via Tekerdangi road at Ch. 2356-4715m by HBB Const. of 01 No 24.505.00m RCC Box culvert at Ch. 3570m & Const. of 5Nos U-Drain at Ch. 2390m 2600m 3200m 3800m & 4500m on the same road under Muksudpur Upazila District-Gopalganj. 2.3590 129.395 m/s sarna enterprise 129.395 20/11/2018 12/04/2019 25 10/12/2019  
14 GDIRIIP/UNR/BC/Muk/17-18/93 Improvement of Banshbaria UP office-Jalirpar GC Road ( Belayet Miaah Gheyer) via Ghechua-Hazragati-Kasalia Up office road at Ch. 5395-7350m by BC 2.1740 136.239 M/s J.Alom Construction 136.239 02/11/2018 04/06/2018 35 10/12/2019  
15 GDIRIIP/VR/Culvert/Muk/18-19/96 Part-(1)A: Construction of 2x4.50x5.00m RCC Box Culvert on Bamondanga (UZR)-Nowhata Bazar via Dopadi GPS road at Ch. 4500m (Road ID No: 335584058) & Part-(1)B: Construction of 3x4.50x5.00m RCC Box Culvert on Bamondanga (UZR)-Nowhata Bazar via Dopadi GPS road at Ch. 3200m (Road ID No: 335584058) under Muksudpur Upazila District Gopalganj. 71.460 M/S. Nur Traders 71.460 27/02/2019 19/07/2019 70 10/12/2019  
16 GDIRIIP/VR/BC/HBB/Muk/18-19/103 Improvement of Jalirpar UP office-Mochnahat Nowhata (UZR Bridge) via Nanikhir UP office road by BC at Ch. 6415-9136m (Road ID No: 335583013) under Muksudpur Upazila District Gopalganj 2.7210 220.858 BHAI BHAI TRADERS 220.858 03/04/2019 20/02/2020 25 10/12/2019  
17 GDIRIIP/GOPAL/Muk /18-19/119 Improvement of Road by BC from Chagolchira RHD Battala FRB Dasher Kandi road from Ch. 00m-1215m & Const. of U-drain on the same road at Ch. 950m under Muksudpur Upazila District Gopalganj 1.2250 91.729 Mizanur Rahman Montu 91.729 14/07/2019 15 10/12/2019  
18 GDIRIIP/Muk/UZR/Culvert/18-19/116 Const. of 3x4.50x5.00m (Three vent) RCC Box culvert on Tengrakhola-Jalirpar GC Besides of Mohistoli Nanikhir Helth Complex road at Ch. 5m (Road ID No: 3355852001) under Muksudpur Upazila District Gopalganj. 41.948 M/S. Oshi Enterprise 41.948 09/05/2019 25/09/2020 100 10/12/2019  
19 GDIRIIP/Muk/VR/BC/Culvert/18-19/113 Part-A: Improvement of Hogladanga (UZR) Boro Mosque to Char Ballavdi-Kamlampur Upazila by pass road by BC from Ch. 00-1200m & Part-B: Const. of 2x3.50x5.00m Double vent RCC Box culvert at Ch. 280m on the same road (Road ID No: 335584045) under Muksudpur Upazila. District: Gopalganj 1.2000 126.455 M/S. Amena Construction 126.455 13/05/2019 21/03/2020 40 10/12/2019  
20 GDIRIIP/Muk/UZR/BC/18-19/111 Improvement of Sheikh Rasel Mini Stadium Bypass & NHW Connecting road from Muksudpur to Kalinagar GC via Krishnadia Bahirbag road at Ch. 00-440m (Road ID No: 335582006) under Muksudpur Upazila District Gopalganj. 0.4400 65.144 M/S. Supti Traders 65.144 08/05/2019 28/02/2020 100 10/12/2019  
21 GDIRIIP/GOPAL/Muk /18-19/120 Improvement of Road by BC from Faridpur-Barishal (R&H)-Chagolchira Bridge (UZR) via Sreerampur Bazar Ch. 25m-1025m under Muksudpur Upazila District Gopalganj 1.0000 74.278 M/S Tonoya Traders 74.278 0 10/12/2019  
22 GDIRIIP/GOPAL/Muk /18-19/121 Improvement of Road by HBB from Koturakandi-Jalirpar road-Pathorgram to Nanikhir UP office Ch. 00m-1130m under Muksudpur Upazila District Gopalganj 1.1130 65.285 Chand Moni Enterprise 65.285 5 10/12/2019  
23 GDIRIIP/GOPAL/Muk /18-19/126 Improvement of Gerakhola NHW Bridge to Ramchandrapur via Madrasha Road by HBB from Ch. 00m-1150m under Muksudpur Upazila District Gopalganj. 1.1500 63.235 Md. Aminur Rahman Poltu 63.235 03/07/2019 18/05/2020 0 10/12/2019  
24 GDIRIIP/RCC/Bridge/Muk/17-18/70 Construction of 42.10m RCC Girder Bridge at Ch. 470m on Ujani to Rahuthor UZR Kacharibari Kandunipara GPS via WAPDA Khal road under Muksudpur Upazila District Gopalganj 175.126 Wahid Construction Ltd. 175.126 10/04/2018 12/02/2019 100 09/12/2019  
25 GDIRIIP/VR/HBB/Muk/16-17/35 (A) Improvement of Takerhat Uttarpara to Dignagar (RHD) via Molladi bazar road by HBB (Ch. 5800-6910m) under Muksudpur Upazila, District: Gopalganj 0.6900 38.445 M/s. S.S. Enterprise 38.445 21/02/2017 30/10/2019 100 09/12/2019  
26 GDIRIIP/GOPAL/Muk /18-19/125 Improvement of Gailakandi to Gangrampur Road by HBB from Ch. 00m-1800m under Muksudpur Upazila District Gopalganj 1.8000 89.846 M/S. Mukta Manik Enterprise 89.846 24/05/2020 60 11/11/2019  
27 GDIRIIP/GOPAL/Muk /18-19/124 Improvement of Gobindapur H/O Ala Mia-Fakirhatkhola Bill Sreepur Road by BC from Ch. 00m-1450m under Muksudpur Upazila District Gopalganj 1.4500 97.701 M/S. Nahar Enterprise 97.701 11/07/2019 25/05/2020 15 11/11/2019  
28 GDIRIIP/GOPAL/Muk /18-19/122 Improvement of Fakirhatkhola Monir Sheikh House to Fakirhatkhola Battala Road by HBB from Ch. 00m-570m under Muksudpur Upazila District Gopalganj (Road ID No: 335585589). 0.5700 30.046 M/S. SAMEM-ARA CONSTUCTION 30.046 30/11/2019 98 11/11/2019
29 GDIRIIP/Muk/UZR/VR/Culvert/18-19/115 Part-A: Const. of 1x4.50x4.50m one vent RCC Box culvert on Bansbaria UP ofice-Jalirpar GC road (Belayet Mina's Gheyr) via Ghechua-Hazragati-Kasalia UP office road at Ch. 2927m (Road ID No: 335583006); Part-B: Const. of 3x4.50x5.00m three vent RCC Box culvert on Goalgram Kiron Bairragi shop to Pathla Goalgram via Karatibari to Koligram Bus stand road at Ch. 1945m & Part-C: Const. of 1x4.50x4.50m one vent RCC Box culvert on Goalgram Kiron Bairragi shop to Pathla Goalgram via Karatibari to Koligerm Bus stand road at Ch. 2470m (Road ID No: 3355854103) under Muksudpur Upazila District Gopalganj. 79.390 M/S. R. R Electronics & Motors 79.390 12/05/2019 04/01/2020 60 11/11/2019  
30 GDIRIIP/VR/Bridge/Muk/18-19/110 Pat-A: Const. of 24.00m Long RCC Inverted Girder Bridge on Baraitala RHD-Chumurdi-Dhaka-Barisal road via Godar Vajandi-Fotepotty GPS road at Ch. 2300m & Part- B: Const. of 1x4.50x4.50m RCC Box culvert at Ch. 3400m on the same road (Road ID No: 335584094) 186.259 NITAI PADA DATTA 186.259 03/02/2019 24/02/2020 2 11/11/2019  
31 GDIRIIP/VR/BC/ Muk/18-19/102 Improvement of Ragdi R&H-Singdiaghat via Ragdi UP office road by BC at Ch. 480-1290m (Road ID No: 335583008) under Muksudpur Upazila District Gopalganj 1.2900 154.003 Mahamudul Haque 154.003 5 11/11/2019
32 GDIRIIP/VR/HBB/Muk/18-19/101 Improvement of Khanderpara UP office-Balnarayon Pucca road by HBB at Ch. 00-1000m (Road ID No: 335585403) under Muksudpur Upazila District Gopalganj. 1.0000 58.384 M/S SAYEBA ENTERPRISE 58.384 05/03/2019 28/08/2019 99 11/11/2019  
33 GDIRIIP/VR/Culvert/HBB/Muk/18-19/99 Part-(1): Improvement of Baraitala-Muksudpur ( Golabaria-Signboard) to Tengrakhola-Ujani (UZR) road at Ch. 1715-2350m by (Road ID No: 335584046) [Salvage Materials Cost: Tk. 14,04,624.00] & Part-A(2): Const. of 01 No 1x1.00x1.00m Box culvert on the same road at Ch. 2330m under Muksudpur Upazila District Gopalganj. 0.6350 61.127 M/S. Mukta Construction 61.127 28/03/2019 02/02/2020 25 11/11/2019  
34 GDIRIIP/VR/BC/HBB/Muk/18-19/98 Improvement of Takerhat RHD-Baniarchar bazar Fulkumari village road at Ch. 00-1500m by BC & Ch. 3680-3900m by HBB (Road ID No: 335584090) [Salvage Materials Cost: Tk. 16,38,421.00] under Muksudpur Upazila District Gopalganj. 1.7200 122.089 M/S. Khondokar Enterprise 122.089 25/03/2019 28/01/2020 35 11/11/2019  
35 GDIRIIP/UNR/BC/Muk/18-19/97 IImprovement of Khanderpara UP office-Kalinagar Hat via Baliakandi Bazar road by BC at Ch. 2000-3660m (Road ID No: 335583003) under Muksudpur Upazila District Gopalganj 1.6600 117.549 Syed Rafikul Hasan 117.549 07/04/2019 23/02/2020 15 11/11/2019  
36 GDIRIIP/VR/HBB/BC/Culvert/Muk/18-19/94 Part-(1)A: Improvement of Kutorakandi-Jalirpar road to Lowkhanda Noor-A-Madia Ebtadia Madrasha road at Ch. 00-420m by HBB (Road ID No: 335585130/4157); Part-(1)B: Const. of 3x3.50x5.00m Box culvert on Durbasur-Kawnia via Jannu Sheikh road at Ch. 1160m ( Road ID No: 335585238/4197) ; Part-(1) C: Const. of 2x3.50x5.00m Box culvert on Ujani UP complex-Patkelbari hat via Barampalta road at Ch. 4100m ( Road ID No: 335583017); Part-(1) D: Const. of 3x4.50x5.00m Box culvert on Mochna UP complex-WAPDA Khal Bridge road at Ch. 148m ( Road ID No: 335584099); Part-(1) E: Const. of 2x4.50x5.00m Box culvert on Mochna UP complex-WAPDA Khal Bridge road at Ch. 720m ( Road ID No: 335584099); Part-(1)F: Improvement of Boalia Bazar (UZR)-Moharajpur (UZR) road at Ch. 1000-1970m by BC ( Road ID No: 335584048/3024) [Salvage Materials Cost Tk. 22,82,858.00.]; Part-(1)G: Improvement of Bamandanga Bazar ( Prosannapur Bazar)-Jalirpar UP office (Bonogram) road at Ch. 4490-5400m by BC (Road ID No: 335584043/3023) [Salvage Materials Cost Tk. 12,92,363.00.] & Part-(1)H: Const. of 2x3.50x5.00m Box culvert on Basuria-Tikardangi road at Ch. 2640m ( Road ID No: 335584036) under Muksudpur Upazila District Gopalganj. 2.3590 351.275 M/S Kamrul & Brothers - ms.amir enterprise (JV) 351.275 14/03/2019 08/02/2020 65 11/11/2019  
37 GDIRIIP/VR/Wide/Muksud/17-18/06 Maintenance of Tengrakhola-Jalipar GC Road at Ch. 00-3810m by BC . 3.8100 182.834 M/S. Mukta Construction 182.834 06/10/2018 26/05/2019 90 11/11/2019  
38 GDIRIIP/VR/Bridge/Muk/17-18/92 Construction of 24.10m RCC Girder Bridge on Balnarayon bazar UZR-Ujani GC road via Bahugram UP office road at Ch. 2650m under Muksudpur Upazila District Gopalganj 191.938 ms.amir enterprise 191.938 06/09/2018 06/07/2019 100 11/11/2019  
39 GDIRIIP/UNR/HBB/Muk/17-18/90 Improvement of Gohala Kazipara to Lowkhanda road at Ch. 00-1650m by HBB & Const. of 2Nos U-Drain at Ch. 180m & 780m on the same road under Muksudpur Upazila District Gopalganj 1.6500 72.811 Mizanur Rahman Montu 72.811 19/11/2018 30/11/2019 100 11/11/2019  
40 GDIRIIP/VR/Bridge/Muk/17-18/89 Construction of 20.00m RCC Girder Bridge on Takerhat Uttarpar Bazar-Dignagar RHD via Molladi Bazar road at Ch. 6910m under Muksudpur Upazila District Gopalgonj 119.329 MD Abul Kalam Azad 119.329 27/06/2019 13/05/2019 100 11/11/2019  
41 GDIRIIP/VR/Bridge/Muk/17-18/87 Construction of 20.00m RCC Girder Bridge on Takerhat Uttarpar Bazar-Dignagar RHD via Molladi Bazar road at Ch. 6670m under Muksudpur Upazila District Gopalgonj 119.308 M/S Kazi & Brothers 119.308 07/09/2018 12/05/2019 100 11/11/2019  
42 GDIRIIP/VR/BC/Muk/17-18/86 Improvement of Dignagar R&H-Alipur Bazar via Kanuria GPS & Mirrerdanga road by BC at Ch. 3315-5550m and Const. of 2Nos U-drain at Ch. 4945m & 5340m on the same road under Muksudpur Upazila District Gopalganj 2.2350 148.296 M/S Sele Enterprise 148.296 06/06/2018 28/01/2019 45 11/11/2019  
43 GDIRIIP/VR/Bridge/Muk/17-18/81 Construction of 51.00m RCC Girder Bridge on Tengrakhola-Ujani to Shimulshur via Jhutigram road at Ch. 2200m under Muksudpur Upazila District Gopalganj 299.960 SS & Rubel (JV) 299.960 07/06/2018 25/06/2019 90 11/11/2019  
44 GDIRIIP/VR/Bridge/Muk/17-18/75 Construction of 24.10m RCC Slab Bridge at Ch. 00m on Balnarayon-Ujani road to Mollarpara road under Muksudpur Upazila District Gopalganj 149.040 Wahid Construction Ltd. 149.040 10/03/2018 12/02/2019 100 11/11/2019  
45 GDIRIIP/UNR/Bridge/Muk/17-18/73 Construction of 41.10m RCC Girder Bridge at Ch. 4960m on Balnarayon Bazar UZR-Ujani GC via Bohugram UP office road under Muksudpur Upazila District Gopalganj 273.066 PMPL-KSA JOINT VENTURE 273.066 04/05/2018 05/04/2019 75 11/11/2019  
46 GDIRIIP/VR/Culvert/Muk/ 17-18/68 Const. of 3x4.50x5.00m RCC Box culvert at Ch. 40m on Domrakandi bazar-Purbopara Rabon mia house road under Muksudpur Upazila District Gopalganj 37.569 Tamanna Constraction 37.569 16/01/2018 08/06/2019 100 11/11/2019  
47 GDIRIIP/GOPAL/Muk/18-19/131 Part-A: Construction of 3x4.50x5.00m Tripple vent RCC Box culvert on Bhabrasur UP office (Bamonpara GPS) to Kutarakandi UZR via Dumuria Dobila Bazar at Ch. 5150m ( Road ID No: 335583020); Part-B: Construction of 3x4.50x5.00m Tripple vent RCC Box culvert on Dignagar UP office to Holdivita Bazar via Kanuria Mirerdangi RHD & Alipur Bazar at Ch. 3250m (Road ID No: 335583021) ; Part-C: Construction of 3x4.50x5.00m Tripple vent RCC Box culvert on Dignagar UP office to Holdivita Bazar via Kanuria Mirerdangi RHD & Alipur Bazar at Ch. 3780m (Road ID No: 335583021) & Part-D: Construction of 3x4.50x5.00m Trriple vent RCC Box culvert on Dignagar R&H to Alipur Bazar Madrasha via Kanuria GPS road at Ch. 1282m (Road ID No: 335583021-new/335584014-old) under Muksudpur Upazila District Gopalganj. 175.524   175.524 0 07/10/2019 Tender under process
48 GDIRIIP/GOPAL/Muk/18-19/130 Part-A: Construction of RCC Ghatla Lakhirchar Shaharapa Shamshan Ghat of Kumar river; Part-B: Construction of RCC Ghatla Joy Bangla Bazar & Part-C: Construction of RCC Ghatla Dinobandhu Sebasram with Connecting road river under Pashergati UP of Muksudpur 110.217   110.217 0 07/10/2019 Tender under process
49 GDIRIIP/GOPAL/Muk /18-19/129 Part-A: Construction of RCC Ghatla Moddha Bonogram (Harr Bhanga) Near West Side of Mosque at Kumar river; Part-B: Construction of RCC Ghatla Feroj Beg House at Maharajpur Khal under Maharajpur UP ; Part-C: Construction of RCC Ghatla Munshi Narayonpur at Kanar Bazar (Kumar river) under Maharajpur UP & Part-D: Construction of RCC Ghatla Choto Bonogram Kali Mondir at Maharajpur UP under Muksudpur Upazila District Gopalganj. 148.963   148.963 0 07/10/2019 Tender under process
50 GDIRIIP/GOPAL/Muk /18-19/128 Construction of 15.00m long RCC Girder Bridge on Ujani UP Complex to Patikelbari road at Ch. 3200m under Muksudpur Upazila District Gopalganj (Road ID No: 335583017). 100.972 M/S. Satota Falar Bander 100.972 0 07/10/2019 Tender under process
51 GDIRIIP/Muk/VR/HBB/Culvert/18-19/117 Part-A: Improvement of road Muksudpur-Kasiani (Pachuria Malek Mia House) to Bolugram road by HBB at Ch. Ch. 00-560m & Part-B: Const. of 1x4.50x4.50m Single vent RCC Box culvert at Ch. 260m on the same road (Road ID No: 335585576) under Muksudpur Upazila District. 0.5600 43.997 M/S. Alam Trading 43.997 17/05/2019 09/09/2019 100 07/10/2019  
52 GDIRIIP/Muk/VR/HBB/Culvert/18-19/114 Part-A: Improvement of road Golabaria Sing Board Machin Gahar to Sheikh Fazilatunesa Dhakkin Chalk via H/O Sha Alam Ch. 00-250m by HBB & Part-B: Const. of 1x4.50x4.50m Single vent RCC Box culvert at Ch. 5m on the same road (Road ID No: 335585510) under Muksudpur Upazila District Gopalganj. 0.2500 36.373 M/s. National Electronics 36.373 05/04/2019 08/03/2020 100 07/10/2019  
53 GDIRIIP/VR/HBB/Muk/18-19/104 Improvement of Bhabrasur UP office (Bamonpara GPS)-Koturakandi via Dumuria-Dobila bazar road by HBB at Ch. 5190-6500m (Road ID No: 335583020) under Muksudpur Upazila District Gopalganj. 1.3100 52.153 M/S. Supti Traders 52.153 08/04/2019 15/06/2019 100 07/10/2019 Final
54 GDIRIIP/VR/Culvert/Muk/18-19/95 Part-(1)A: Construction of 4x4.50x4.50m RCC Box Culvert on Balnarayon-Ujani road-Basuria via Tikerdangi road at Ch. 1510m (Road ID No: 335584036).; Part-(1)B: Construction of 1x4.50x4.50m RCC Box Culvert on Balnarayon-Ujani road-Basuria via Tikerdangi road at Ch. 1560m (Road ID No: 335584036) ; Part-(1) C: Construction of 1x3.50x5.00m RCC Box Culvert on Ujani UP office-Goalgram Jalirpar (UZR) road at Ch. 3445m (Road ID No: 335583011) & Part-(1) D: Construction of 2x3.50x5.00m RCC Box Culvert on Tekerhat Uttarpara bazar-Dignagar (RHD) via Molladi bazar road at Ch. 4510m (Road ID No: 335584015/ New-335582015) under Muksudpur Upazila District Gopalganj. 120.925 M/S. Tripti Enterprise 120.925 05/03/2019 26/09/2019 25 07/10/2019  
55 GDIRIIP/VR/HBB/Muk/16-17/48 Improvement of Provakardi villege Idris mia house to Kawaldia H/O Moti Munshi via Alamgir member house road by HBB at Ch. 00-770m & Const. of 01 No 1x4.50x4.50m RCC single vent box culvert on the same road at Ch. 275m under Muksudpur Upazila District Goplganj. 0.7000 42.376 M/S. Zakir Sarder 42.376 02/11/2017 23/03/2018 100 02/10/2019 Final
56 GDIRIIP/VR/HR/Muk/15-16/13 Improvement of Banshbaria Uttarpara-Bahugram via H/O Dr. Humayun road by HBB (Ch. 00-2540m) under Muksudpur Upazila, District: Gopalgonj 2.5400 55.420 M/S. Enayet Hossain 55.420 13/06/2016 05/11/2016 100 02/10/2019 Final
57 GDIRIIP/VR/BR/Muk/15-16/19 Improvement of Murad Kazi (Boalia) house to Rasulpur-Krishnapur road by BC (Ch. 00-1740m) under Muksudpur Upazila, District: Gopalgonj 1.7400 75.384 M/s Alif Enterprise 75.384 18/09/2016 31/07/2016 100 02/10/2019 Final
58 GDIRIIP/GOPAL/Muk /18-19/127 Improvement of Basudebpur Dhakkinpara Jame-e-Mosque via Nower Mowlana House & H/O Dalil Uddin SK to House Addl. Sec (Home) WAPDA khal Road by HBB from Ch. 00m-800m under Muksudpur Upazila District Gopalganj 0.8000 52.773 Chand Moni Enterprise 52.773 0 02/10/2019 Tender under process
59 GDIRIIP/GOPAL/Muk /18-19/123 Improvement of Khanpura Darbesh Shaheb Huzur Bari to Uttar Khanpur Road by HBB from Ch. 00m-950m under Muksudpur Upazila District Gopalganj 0.9500 54.500 M/S JAFOR ENTERPRISE 54.500 09/07/2019 02/12/2019 40 02/10/2019  
60 GDIRIIP/GOPAL/Muk /18-19/118 Construction 1x4.50x4.50m one vent RCC Box culvert on Tengrakhola Ujani road to Simulsur via Jhutigram road at Ch. 322m under Muksudpur Upazila District Gopalganj 18.843 M/S. Oshi Enterprise 18.843 0 02/10/2019 Tender under Process
61 GDIRIIP/Muk/UNR/BC/18-19/112 Improvement of Road by BC from Khanderpara UP office to Kalinagar Hat via Baliakandia Bazar at Ch. 2000-3660m (Road ID No: 335583003) under Muksudpur Upazila District Gopalganj 1.6600 151.492   151.492 0 02/10/2019 Tender under Process
62 GDIRIIP/VR/Bridge/Muk/18-19/109 Const. of 24.00m Long RCC Inverted Girder Bridge on Baraitala RHD-Chumurdi-Dhaka-Barisal road via Godar Vajandi-Fotepotty GPS road at Ch. 1200m (Road ID No: 335584094) under Muksudpur Upazila District Gopalganj 165.857 Abul Khayer Enterprise 165.857 13/04/2019 22/02/2020 50 02/10/2019  
63 GDIRIIP/VR/Bridge/Muk/18-19/108 Const. of 24.00m Long RCC Inverted Girder Bridge on Bamongati bridge H/O Bachu-Nichindpur Kali Mondir Paucca road at Ch. 00m Road ID No 335584190 under Muksudpur Upazila District Gopalganj. 170.430 BHAI BHAI TRADERS 170.430 05/03/2019 20/02/2020 50 02/10/2019  
64 GDIRIIP/UNR/BC/Muk/18-19/107 Improvement of Banshbaria UP office-Jalirpar GC road ( Balayet Mia's Gher) via Ghechua-Hazragati-Kashalia UP office road by BC at Ch. 00-1284m (Road ID No: 335583006) under Muksudpur Upazila District Gopalganj 1.2840 156.385 BHAI BHAI TRADERS 156.385 05/03/2019 20/02/2020 5 02/10/2019  
65 GDIRIIP/VR/Bridge/Muk/18-19/106 Const. of 60.00m Long RCC Girder Bridge on Banshbaria Uttarpara-Bahugram via H/O Dr. Humayun road at Ch. 310m (Road ID No: 335584082) under Muksudpur Upazila District Gopalganj. 389.593 M/S Kamrul & Brothers - ms.amir enterprise (JV) 389.593 0 02/10/2019 Tender under Process
66 GDIRIIP/VR/BC/Muk/18-19/105 Improvement of Ujani UP complex-Borompalta road via patkelbari hat road by BC at Ch. 00-1530m (Road ID No: 335583017) under Muksudpur Upazila District Gopalganj 1.5300 137.789 Mahamudul Haque 137.789 11/04/2019 19/02/2020 0 02/10/2019  
67 GDIRIIP/VR/BC/Muk/18-19/100 Improvement of Baliakandi Bazar (UZR)-Kalinagar bazar road by BC at Ch. 2000-3560m (Road ID No: 335584047) under Muksudpur Upazila District Gopalganj 1.5600 142.477 Mahmud Enterprise 142.477 16/04/2019 19/02/2020 20 02/10/2019  
68 GDIRIIP/VR/BC/Muk/ 17-18/88 Improvement of Dignagar R&H-Alipur Bazar via Kanuria GPS & Mirridangi road at Ch. 5550-6860m by BC & Const. of 2NosU-Drain at Ch. 5810m & 6260m on the same road under Muksudpur Upazila District Gopalgonj 1.3100 109.764 M/S.KHB Bricks 109.764 19/01/2019 08/06/2019 5 02/10/2019  
69 GDIRIIP/Cannel/Muk/17-18/79 Eastimate for Re-excavation pal Minabari Khal ch.0.00-1000m) at pashergati UP 1.0000 14.096 LCS 14.096 100 02/10/2019  
70 GDIRIIP/Cannel/Muk/17-18/78 Eastimate for Re-excavation pal Goshpara Khal ch.0.00-400m) at pashergati UP 0.4000 5.876 LCS 5.876 100 02/10/2019  
71 GDIRIIP/Cannel/Muk/17-18/77 Eastimate for Re-excavation pal Bari Khal ch.0.00-900m) at pashergati UP 0.9000 9.641 LCS 9.641 100 02/10/2019  
72 GDIRIIP/BC/Muk/17-18/76 Improvement of Maita Bridge RHD-Mosna UP Office via Milik Sreerampur road by BC at Ch. 00m-530m under Muksudpur Upazila District Gopalganj 0.5300 33.116 ms.mia traders 33.116 19/04/2018 10/09/2018 100 02/10/2019 Final
73 GDIRIIP/RCC/Bridge/Muk/17-18/71 Construction of 33.10m RCC Girder Bridge at Ch. 1535m on Ujani-Rahuthor Mahatali-Digrekandi Mosque via WAPDA road under Muksudpur Upazila District Gopalganj 226.914 M.M. Builders & Engineers Ltd.-M/S. Niaz Traders-M/S. Khokan Trading Agency (JV) 226.914 26/03/2018 31/01/2019 95 02/10/2019  
74 GDIRIIP/RCC/Bridge/Muk/17-18/69 Construction of 36.10m RCC Girder Bridge at Ch. 1300m on Takerhat Uttarpara bazar-Dignagar R&H via Molladi bazar road under Muksudpur Upazila District Gopalganj 180.944 Wahid Construction Ltd. 180.944 10/04/2018 12/02/2019 100 02/10/2019  
75 GDIRIIP/VR/Culvert/Muk/17-18/67 Const. of 3x4.50x5.00m Three vent RCC Box culvert at Ch. 10m on Bakshakhola to Fotepatty road under Muksudpur Upazila District Gopalganj 35.609 M/S. Khandaker Shahin Ahmed 35.609 10/04/2018 02/09/2018 100 02/10/2019  
76 GDIRIIP/VR/BC/Muk/17-18/66 Improvement of WAPDA Bridge to Lakhairchar Madrasha via Pashimpara Eid-Gha & Madrasha road by BC at Ch. 00-1230m & Const. of 2Nos U-drain on the same road at Ch. 10m & 210m under Muksudpur Upazila District Gopalganj 1.2300 75.944 M/s. Bismilla Traders 75.944 26/03/2018 25/09/2018 100 02/10/2019 Final
77 GDIRIIP/VR/HBB/Muk/17-18/64 Improvement of Gerakhola R&H-Joynagar GC to H/O Sayed Muradul Islam via Salina Box Jam-e-Mosque road by HBB at Ch. 00-200m under Muksudpur Upazila District Gopalganj 0.2000 7.970 M/S. Nafshi Construction 7.970 26/03/2018 18/05/2018 100 02/10/2019 Final
78 GDIRIIP/VR/HBB/Muk/17-18/63 Improvement of Bamondanga Sanu Sharif house to Bamondanga Khoka Sheikh house road by HBB at Ch. 00-940m & Const. of 2Nos U-drain on the same road at Ch. 660m & 920m under Muksudpur Upazila District Gopalganj 0.9400 53.739 M/S. Sajib Enterprise 53.739 26/03/2018 16/08/2018 100 02/10/2019 Final
79 GDIRIIP/VR/BC/Muk/17-18/62 Improvement of Khanderpar bazar-Latifpur-Arjundha to Sultan Dighirpar pacca road by BC at Ch. 2800-3560m under Muksudpur Upazila District Gopalganj 0.7600 53.487 Royal Equipments & Construction Ltd. 53.487 26/03/2018 26/12/2018 100 02/10/2019 Final
80 GDIRIIP/VR/HBB/Muk/17-18/61 Improvement of West Krisnadia GPS-Giasuddin Master road by HBB at Ch. 00-250m under Muksudpur Upazila District Gopalganj 0.2500 9.414 M/S. Iqabal & Brothers 9.414 27/11/2017 19/01/2018 100 02/10/2019 Final
81 GDIRIIP/VR/BC/Muk/17-18/60 Improvement of Dignagar R&H-Alipur Bazar Madrasha via Kanuria GPS-Miridanga road by BC at Ch. 00-1675m under Muksudpur Upazila District Gopalganj 1.6750 98.108 M/S ISLAM BROTHERS 98.108 10/12/2017 25/02/2019 100 02/10/2019 Final
82 GDIRIIP/VR/BC/Muk/17-18/59 Improvement of Paschim Bamonpara GPS-Kalinagar Bazar road by BC at Ch. 00-1725m under Muksudpur Upazila District Gopalganj 1.7250 116.985 M/S. Samia Enterprise 116.985 22/11/2017 14/02/2019 100 02/10/2019 Final
83 GDIRIIP/VR/BC/Muk/17-18/58 Improvement of Tengrakhola Ujani GC road-Boalia Firoj Kazi Mosque-Edgha road by BC at Ch. 00-1050m under Muksudpur Upazila District Gopalganj 1.5000 69.623 M/S Hamim International 69.623 26/11/2017 19/07/2018 100 02/10/2019 Final
84 GDIRIIP/VR/BC/Muk/16-17/55 Improvement of Boalia UZR-Bamonpara GPS via Mondolgati road by BC at Ch. 1955-3310m & Const. of 01 No RCC box culvert on the same road at Ch. 2355m under Muksudpur Upazila District Gopalganj 1.3550 100.932 Md. Mortoza Mirdha 100.932 17/10/2017 09/06/2018 60 02/10/2019  
85 GDIRIIP/VR/BC/Muk/16-17/54 Improvement of Ragdi R&H to Ragdi Kasibari GPS Rajoir Upazila Border road by BC Ch. 00-750m under Muksudpur Upazila District Gopalganj 0.7500 51.148 M/S. Rubel Enterprise 51.148 07/11/2017 10/03/2019 100 02/10/2019 Final
86 GDIRIIP/VR/HBB/Muk/16-17/52 Improvement of Boro Vatra road-Bepari Bari Jame-E-Mosque-Molla bari road by HBB Ch. 00-300m under Muksudpur Upazila District Gopalganj 0.3000 16.753 M/S. Zakir Sarder 16.753 07/11/2017 30/12/2017 100 02/10/2019  
87 GDIRIIP/Bridge /Muk/16-17/50 (A) Construction of 24.00m RCC Girder Bridge on Garolgati-Tarail-Nokra khal via Basuria high school road at Ch. 1610m & (B) Construction of 50.00m RCC Girder Bridge on the same road at Ch. 5150m under Muksudpur Upazila District Gopalganj 402.281 Md Mahafuz Khan 402.281 07/07/2017 11/05/2018 20 02/10/2019  
88 GDIRIIP/VR/HBB/Muk/16-17/45 Improvement of Goalgram Kiron Bairagi shop to Pathla Goalgram Bus stand road by HBB at Ch. 2500m-3900m under Muksudpur Upazila District Gopalganj 1.4000 36.971 ms.amir enterprise 36.971 22/05/2017 14/10/2017 100 02/10/2019 Final
89 GDIRIIP/VR/HBB/Muk/16-17/43 Beautification of Muksudpur Upazila Parishad campus lake under Muksudpur Upazila District Gopalganj. 155.106 M/S Mon Mehera Enterprise 155.106 03/04/2017 25/11/2017 100 02/10/2019  
90 GDIRIIP/VR/HBB/Muk/16-17/42 Improvement of Goalgram Mosque-Chairman house road by HBB at Ch. 00-105m under Muksudpur Upazila District Gopalganj 0.1050 3.874 M/S. Papri Traders 3.874 03/04/2017 25/05/2017 100 02/10/2019 Final
91 GDIRIIP/VR/HBB/Muk/16-17/41 (A) Improvement of Bamangati bridge Bachu miass house-Nischinttapur kalimondir road by HBB at Ch. 00-1065m & (B) Construction of 01 No U-drain on the same road at Ch. 685m under Muksudpur Upazila District Gopalganj 1.0650 54.140 Abdul Hannan Mollah 54.140 07/04/2017 27/12/2018 100 02/10/2019 Final
92 GDIRIIP/UNR/HBB/Muk/16-17/40 Improvement of Ujani UP office-Goalgram Jalirpar UZR road by HBB at Ch. 00-4030m under Muksudpur Upazila District Gopalganj 3.2400 219.200 MS Anamica Traders 219.200 24/04/2017 12/05/2019 100 02/10/2019 Final
93 GDIRIIP/VR/BC/Muk/16-17/39 Improvement of Krishnadia GPS to Nabin Chandra road via Sheikhpara Jam-e-mosque by BC (Ch. 130-280m) under Muksudpur Upazila, District: Gopalganj 1.2420 8.743 M/S. Shanto Enterprise 8.743 21/02/2017 14/04/2017 100 02/10/2019 Final
94 GDIRIIP/VR/BC/Muk/16-17/38 Improvement of Kawliadia Ear Ali Buyan shop to Kawaldia Zakir khan house road by BC (Ch. 00-1625m) under Muksudpur Upazila, District: Gopalganj 1.0300 111.361 Debdas Gupta 111.361 08/02/2017 30/09/2017 100 02/10/2019 Final
95 GDIRIIP/VR/HBB/Muk/16-17/37 Improvement of Mochna UP Complexto WAPDA khal bridge road by HBB (Ch. 00-1013m) under Muksudpur Upazila, District: Gopalganj 1.7000 38.799 MD Abul Kalam Azad 38.799 19/02/2017 11/06/2017 100 02/10/2019 Final
96 GDIRIIP/VR/HBB/Muk/16-17/36 Improvement of Sultan Dighirpar to Gobindapur pucca road by HBB (Ch. 00-1700m) under Muksudpur Upazila, District: Gopalganj 1.1100 62.786 M/S KULSUM ENTERPRISE 62.786 19/02/2017 30/06/2017 100 02/10/2019 Final
97 GDIRIIP/VR/HBB/Muk/16-17/34 Improvement of Pashergati Eidgha-Krishnadia hat road to Hazirbag Zakir Sheikh house road via Jalil Master house by HBB (Ch. 00-690m) under Muksudpur Upazila, District: Gopalganj 0.6900 31.284 Mohammad Amzad Hossain 31.284 21/02/2017 13/07/2017 100 02/10/2019 Final
98 GDIRIIP/VR/HBB/Muk/16-17/33 (A) Improvement of Provakardi Madrasha-Provakardi road via H/O Mintu sheikh by HBB (Ch. 00-1010m), (B) Const. of 2Nos U-drain on the same road at Ch. 245m & 1000m under Muksudpur Upazila, District: Gopalganj 1.0100 37.108 M/S. Oshi Enterprise 37.108 19/02/2017 11/06/2017 100 02/10/2019 Final
99 GDIRIIP/VR/BR/Muk/16-17/31 Improvement of Muksudpur- R&H-(Nishitala) to Provakordi village ( H/O Bellal Sharif) road by BC (Ch. 00-1242m) under Muksudpur Upazila, District: Gopalganj 1.2420 79.607 M/S. Iqabal & Brothers 79.607 20/12/2017 12/05/2017 100 02/10/2019 Final
100 GDIRIIP/VR/BR/Muk/16-17/30 Improvement of Maita bridge Millik-Shreerampur Bamandanga FRB road by BC (Ch. 2650-4150m) under Muksudpur Upazila, District: Gopalganj 1.5000 102.476 M/S Hanif Enterprise 102.476 14/12/2016 30/07/2017 100 02/10/2019 Final
101 GDIRIIP/VR/BR/Muk/16-17/29 Improvement of Ujani-Rahuthar (UZR)-Ujani Dhopakandi GPS road via H/O Panna Molla by BC (Ch. 00-270m) under Muksudpur Upazila, District: Gopalganj 0.2700 24.202 M/S. Iqabal & Brothers 24.202 20/12/2016 12/05/2017 100 02/10/2019 Final
102 GDIRIIP/VR/HR/Muk/16-17/28 (A) Improvement of Joaria (R&H)-Chumurdi bazar via Fateyputty GPS road by HBB (Ch. 00-650m) & (B) Const. of 1 No 1x4.50mx4.50m Box culvert on the same road at Ch.15.00m under Muksudpur Upazila, District: Gopalganj 0.6500 42.785 M/S. Iqabal & Brothers 42.785 20/12/2016 12/05/2017 100 02/10/2019 Final
103 GDIRIIP/VR/HR/Muk/16-17/27 Improvement of Shalinabox to H/O Joynal via Kharikain Yakub Ali's house road by HBB (Ch. 00-620m) under Muksudpur Upazila, District: Gopalganj 0.6200 25.117 M/S KAZI TRADERS 25.117 25/12/2016 16/05/2017 100 02/10/2019 Final
104 GDIRIIP/VR/HR/Muk/16-17/26 Improvement of Ujani UP office-Kandunipara GPS-Kacharibari road by HBB (Ch. 00-500m) under Muksudpur Upazila, District: Gopalganj 0.5000 25.184 M/S KAZI TRADERS 25.184 25/12/2016 16/05/2017 100 02/10/2019 Final
105 GDIRIIP/VR/HR/Muk/16-17/25 Improvement of Bamandanga (UZR)-Nowhata via Dhopadi GPS road by HBB (Ch. 3892-5200m) under Muksudpur Upazila, District: Gopalganj 1.3080 72.542 Md. Mortoza Mirdha 72.542 28/12/2016 20/08/2017 100 02/10/2019 Final
106 GDIRIIP/VR/HR/Muk/16-17/24 Improvement of Garolgati-Tarail Nakra khal via Bashuria high school road by HBB Ch. 920-3624m under Muksudpur Upazila District Gopalganj 2.7040 126.649 M/s. Mojumder Enterprise 126.649 16/10/2017 10/12/2018 100 02/10/2019 Final
107 GDIRIIP/VR/HR/Muk/16-17/23 Improvement of Balnarayan-Ujani to Mollarpar road by HBB (Ch. 00-1100m) under Muksudpur Upazila, District: Gopalganj 1.1000 55.811 m/s.zilik enterprise 55.811 25/12/2016 25/04/2017 100 02/10/2019 Final
108 GDIRIIP/VR/HR/Muk/16-17/22 Improvement of Nayakandi FWC-Chairman bari to Gazina road by HBB (Ch. 00-2000m) under Muksudpur Upazila, District: Gopalganj. 2.0000 105.634 M/s. Sardar Enterprise 105.634 25/12/2016 05/05/2019 100 02/10/2019 Final
109 GDIRIIP/VR/BR/Muk/16-17/21 Improvement of Bahirbag Dulu Doctor's house to Bahirbag Musa Police's house road by BC (Ch. 00-260m) under Muksudpur Upazila, District: Gopalganj 0.2600 16.419 M/S Ayasa Corporation 16.419 19/12/2016 11/05/2016 100 02/10/2019 Final
110 GDIRIIP/VR/BR/Muk/16-17/20 Improvement of Panchuria Musta Kazi Bari to Boro Bari Graveyard road by BC (Ch. 00-455m) under Muksudpur Upazila, District: Gopalganj 0.4550 29.969 M/S KAZI TRADERS 29.969 18/12/2016 16/05/2017 100 02/10/2019 Final
111 GDIRIIP/VR/HR/Muk/16-17/19 Improvement of Khanderpar GC-Majigati (Tarail Mosque) Kawnia Mosque to Haldivita via H/O Rezaul Karim road by HBB (Ch. 00-560m & 1000-1360m) under Muksudpur Upazila 0.9200 38.326 ms.amir enterprise 38.326 21/12/2016 13/05/2017 100 02/10/2019 Final
112 GDIRIIP/VR/HR/Muk/16-17/18 Improvement of Balnarayon Bazar-Sreepur Takerhat-Garolgati road by HBB (Ch. 810-1570m) under Muksudpur Upazila, District: Gopalganj 0.7500 25.962 M/S. Iqabal & Brothers 25.962 20/12/2016 12/05/2017 100 02/10/2019 Final
113 GDIRIIP/VR/Bridge/Muk/15-17/17 Construction of 25.00m RCC Girder Bridge on Khanderpar-Majigati (Tarail Mosque)-Kawnia Mosque to Haldivita via H/O Rejaul Karim road at Ch. 920m under Muksudpur Upazila, District: Gopalganj 151.662 M/S Arafat Traders 151.662 13/12/2016 12/11/2018 100 02/10/2019 Final
114 GDIRIIP/VR/BR/Muk/15-16/18 Improvement of Tengrakhola-Ujani ( Bhabrasur Dulal shop) road to Bhabrasur UP office road by BC (Ch. 00-970m) under Muksudpur Upazila, District: Gopalgonj 0.9700 49.495 Bimol Kumar Saha 49.495 18/09/2016 10/02/2017 100 02/10/2019 Final
115 GDIRIIP/VR/BR/Muk/15-16/17 Improvement of Haldivita-Pererchar road to Guabahara ( Chairman bari) road by BC (Ch. 00-300m) under Muksudpur Upazila, District: Gopalgonj 0.3000 20.019 m/s piyas enterprise 20.019 02/09/2016 24/02/2017 100 02/10/2019 Final
116 GDIRIIP/VR/HR/Muk/15-16/16 Improvement of Durbasur-Kawnia road to H/O Janu Shiekh road by HBB (Ch. 00-1750m) under Muksudpur Upazila, District: Gopalgonj 1.7500 99.454 M/S. Razan Enterprise 99.454 18/09/2016 24/07/2017 100 02/10/2019 Final
117 GDIRIIP/VR/HR/Muk/15-16/15 (1) Improvement of Bezra Dhakkinpara pucca Mosque to Engineer Atiar Rahman's bari road by HBB (Ch. 00-800m) & (2) Construction of Single vent Box culvert at Ch. 754m on the same road under Muksudpur Upazila, District: Gopalgonj 0.8000 46.574 M/S Chokder Enterprise 46.574 30/06/2016 23/11/2016 80 02/10/2019  
118 GDIRIIP/VR/BR/Muk/15-16/14 Improvement of Khanderpar Bazar-Sultan Dighir pacca road via Latifpur-Arjundah road by BC (Ch. 1000-2800m) under Muksudpur Upazila, District: Gopalgonj 1.8000 119.472 M/s. Lalin Traders 119.472 13/06/2016 29/05/2018 100 02/10/2019 Final
119 GDIRIIP/VR/HR/Muk/15-16/11 Improvement of Baraitala-Muksudpur road to Batikamari village road by HBB (Ch. 00-250 & 440-1035m) under Muksudpur Upazila, District: Gopalgonj 0.8850 35.130 M/S. Zakir Sarder 35.130 28/07/2016 20/12/2016 100 02/10/2019 Final
120 GDIRIIP/VR/HR/Muk/15-16/10 Improvement of Tatihati Balumath to H/O Gozina Basu Molla via Tatihati Madrasha Mosque road by HBB (Ch. 00-620m) under Muksudpur Upazila, District: Gopalgonj 0.6200 36.436 M/S. Lamia Enterprise 36.436 27/07/2016 05/11/2016 100 02/10/2019 Final
121 GDIRIIP/VR/HR/Muk/15-16/09 Improvement of Purbo Lokhanda-Pachim Lokhanda road by HBB (Ch. 00-1560m) under Muksudpur Upazila, District: Gopalgonj 1.5600 79.353 Lina Traders 79.353 06/06/2016 27/11/2016 100 02/10/2019 Final
122 GDIRIIP/VR/HR/Muk/15-16/08 Improvement of Nonikhir Nader Hossain Mowlana-Vatra Delowar Hossain via Haider Talukder bari road by HBB (Ch. 00-990m) under Muksudpur Upazila, District: Gopalgonj 0.9000 53.740 M/S. Enayet Hossain 53.740 13/06/2016 05/11/2016 100 02/10/2019 Final
123 GDIRIIP/VR/HR/Muk/15-16/07 Improvement of Gohala bazar to Vhadakhali khal via Gohala high school road by HBB (Ch. 786-1530m) under Muksudpur Upazila, District: Gopalgonj 0.7440 43.431 M/s. Shikder Jewellers 43.431 27/07/2016 19/12/2016 100 02/10/2019 Final
124 GDIRIIP/VR/BR/Muk/15-16/06 Improvement of Khanderpara ( Sukur Sheikh-Shop)-Bejra high school road by BC (Ch. 1144-1760m) under Muksudpur Upazila, District: Gopalgonj. 0.6160 49.659 Md. Nazim Uddin Khan 49.659 26/06/2016 28/05/2019 100 02/10/2019 Final
125 GDIRIIP/VR/HR/Muk/15-16/05 Improvement of Godarvazondi GPS-Bakshakhola (RHD)-Fateputty GPS road by HBB (Ch. 00-1450m) & Const. of 1No 1x4.50x4.50m single venty Box culvert on the same road at Ch. 480m under Muksudpur Upazila, District: Gopalgonj 1.4500 72.995 M. M. Palash Ahmed 72.995 12/06/2016 10/03/2019 100 02/10/2019 Final
126 GDIRIIP/VR/HR/Muk/15-16/04 Improvement of Bakshakhola (RHD)-Fateputty GPS road by HBB (Ch. 00-1145m) under Muksudpur Upazila, District: Gopalgonj 1.1450 51.738 s.m nurulislam 51.738 15/06/2016 23/10/2016 100 02/10/2019 Final
127 GDIRIIP/VR/HR/Muk/15-16/03 Improvement of Muradkazi (Boalia)-Rasulpur-Krishnapur road by HBB (Ch. 1740-3150m) under Muksudpur Upazila, District: Gopalgonj 1.4100 62.907 M/S MOMTAJ TRADERS 62.907 24/07/2016 17/12/2016 100 02/10/2019 Final
128 GDIRIIP/VR/HR/Muk/15-16/01 Improvement of Balnarayon Uzani road-Bashuria via Tikardangi road by HBB (Ch. 00-2356m) under Muksudpur Upazila, District: Gopalgonj 2.5600 101.868 M/S Sufia Constrution 101.868 22/08/2016 25/06/2017 100 02/10/2019 Final
5 Tungipara
1 GDIRIIP/Gopal/Tungi/BL-SR/19-20/61 "Part A: Remaining work of Boat Landing Ramp of Baghia River at Tungipara Launch Ghat (Near Food Godown). Part B: Remaining work of Boat Landing Ramp of Baghia River at Tungipara Launch Ghat (Near Food Godown) under Tungipara Upazila, Dist: Gopalganj. (Canal Digging and Landscape Tree Plantation) Part C: Electrical work of Boat Landing Ramp of Baghia River at Tungipara Launch Ghat (Near Food Godown). " 161.926 161.926 0 06/03/2020 Tender on process
2 GDIRIIP/Tungi/VR-BC/19-20/60 Remaining work of Sreeramkandi Jahangir Sk. House-Kushli Dakshinpara UZR via H/O Bimol Bain from Ch. 00-2380m under Tungipara Upazila, District: Gopalganj. 2.3800 170.352 170.352 0 06/03/2020 Tender on Process
3 GDIRIIP/VR-SR/Tungi19-20/59 Construction of 20.60m Long RCC Slab Bridge on Singipara RHD-Munshirchar via Sheikh Kamal Road at Ch. 1270m under Tungipara Upazila District Gopalganj Road ID No 335914009 137.660 Ms. Munna Electronics, Kotalipara, Gopalganj 137.660 28/01/2020 04/02/2020 0 06/03/2020
4 GDIRIIP/VR-SR/Tungi19-20/58 Construction of 24.00m Long RCC Girder Bridge on Gopalpur UP Office-Kajulia UP Via Boraihati Polshair Bazar Road at Ch. 165m under Tungipara Upazila District Gopalganj Road ID No 335913008 Old Road ID-3359913003 192.565 M/S Janata Traders, Sarkit house, Road, Gopalganj 192.565 09/02/2020 08/08/2021 0 06/03/2020
5 GDIRIIP/Tungi/VR/BC/18-19/57 Improvement by BC of Joaria Sitla Mondir-Poshimpara H/O Habib Road at Ch. 2100m-3150m (Road ID No: 335915035) under Tungipara Upazila District Gopalganj 1.0500 67.287 M/S N.A.R Builders 67.287 07/06/2019 15/02/2020 100 05/03/2020  
6 GDIRIIP/Tungi/VR/BC/18-19/56 Improvement by BC of Silna-Chaprail via Rakhilabari Road at Ch. 1750m-5800m Road ID No 335914013 under Tungipara Upazila District Gopalganj. 4.0500 263.513 Md. Babul Sheikh 263.513 11/07/2019 20/11/2020 70 05/03/2020  
7 GDIRIIP/VR/BC/Tungi18-19/55 Improvement of Borni Baily Bridge RHD-Baladanga RHD road by BC at Ch. 00-855m (Road ID No: 335914055) under Tungipara Upazila District Gopalganj. 0.8550 59.683 M/S. Rangeshwor Hazra 59.683 10/04/2019 03/09/2019 100 05/03/2020  
8 GDIRIIP/VR/BC/Tungi18-19/53 Improvement of Borni H/O Khalil Munsi-H/O Montu Munsi road by BC at Ch. 00-500m (Road ID No: 335915019) under Tungipara Upazila District Gopalganj 0.5000 52.116 M/s Soheli Enterprise 52.116 12/06/2299 03/02/2020 70 05/03/2020  
9 GDIRIIP/Tun/BMGhat/18-19/52 Construction of Bangabandhu Memorial Boat Landing Ramp & Beutification of Madhumoti River at Patgati Launch Ghat under Tungipara Upazila District Gopalganj 1097.248 Kabico Ltd & Jewel Const.(JV) 1097.248 24/01/2019 03/05/2020 75 05/03/2020
10 GDIRIIP/UZR/BC/Tungi/17-18/50 Improvement of Kushli hat GC-Dharabashail GC via Mitrodanga-Sonakhali road by BC Ch. 16600-17080m & Const. of 20.00m RCC Girder Bridge on the same road at Ch. 16600m under Tungipara Upazila District 149.382 Saiful Alam Nannu 149.382 15/07/2018 07/06/2019 65 05/03/2020
11 GDIRIIP/VR/BC/Tungi/17-18/39 Improvement of Gimadanga Azim bazar-H/O Badsha Molla via Harun Molla road by BC at Ch. 00-265m under Tungipara Upazila District Gopalganj Road ID No 335914041 0.2650 19.218 M/s. S.S. Traders 19.218 27/03/2018 19/05/2018 60 05/03/2020
12 GDIRIIP/VR/BC/Tungi/17-18/38 Improvement of Gimadanga-Azim bazar BC road- H/O Justice Huda Justice Shamsur Huda Manik via Liakat Ali house road by BC at Ch. 00-185m under Tungipara Upazila District Gopalganj Road ID No 335915061 1.8500 13.908 M/s. S.S. Traders 13.908 27/06/2018 19/05/2018 60 05/03/2020
13 GDIRIIP/Ramp/Tungi/17-18/36 Construction of RCC Boat landing Ramp on Baghiarkul Ghat under Tungipara Upazila District Gopalganj. 12.038 M/S. Niaz Traders 12.038 05/03/2018 20/07/2018 100 05/03/2020  
14 GDIRIIP/Ramp/Tungi/17-18/35 Construction of RCC Boat landing Ramp on Mitrodanga Ghat under Tungipara Upazila District Gopalganj 12.038 M/S. Niaz Traders 12.038 05/03/2018 20/07/2018 95 05/03/2020
15 GDIRIIP/Ramp/Tungi/17-18/34 Construction of RCC Boat landing Ramp on Dariarkul Ghat under Tungipara Upazila District Gopalganj. 12.038 M/S. Niaz Traders 12.038 04/03/2018 08/06/2019 95 05/03/2020
16 GDIRIIP/VR/HBB/Tungi/16-17/17 Improvement of Karfa bazar-Jamai bazar road by HBB at Ch. 00-4925m & Const. of 02 Nos RCC box culvert on the same road at Ch. 230m & 400m under Tungipara Upazila District Gopalganj Road ID No 335914053 4.9250 216.284 Sajib Enterprise & Saiful Alam (JV) 216.284 15/04/2018 30/05/2019 85 05/03/2020
17 GDIRIIP/UNR/BC/Tungi/17-18/47 Improvemnet of Gopalpur UP office-Kajulia UP office via Baroihati-Polshar Bazar Road by BC at Ch. 2370-2950m under Tungipara Upazila District Gopalganj Road ID No 335913008. 0.5800 59.181 M/S Sele Enterprise 59.181 18/05/2018 28/01/2019 60 17/12/2019  
18 GDIRIIP/VR/HR/Tong/16-17/07 (A) Improvement of Banshbaria Bazar-Shahajan Talukder (College road) road by HBB (Ch. 00-700m); (B) Const. of 1No 2x2.50mx2.50m RCC Box culvert on the same road at Ch. 330m & (C) Const. of 1No 2.00mx2.00m RCC Box culvert on the same road at Ch. 207m and under Tungipara Upazila, District: Gopalganj (Road ID No: 335584047) [ Salvage Materials Cost. Tk. 1,51,684.00]. 0.7000 57.283 Saiful Alam Nannu 57.283 12/12/2016 04/08/2017 100 10/10/2019 Final
19 GDIRIIP/Tungi/VR/18-19/Maint/11 Maintenence of Borni Edgah-Mirtikabati GPS via H/O Ex-Vice-Chairman Milia Amin road by BC at Ch. 00-585m (Road ID No: 335915112) under Tungipara Upazila District Gopalganj 0.5850 16.921 M/S. Rangeshwor Hazra 16.921 30/04/2019 16/06/2019 100 02/10/2019  
20 GDIRIIP/Tungi/VR/18-19/Maint/10 Maintenence of Azimbazar-Gazalia via H/O Nazir mia-H/O Kalimullah road by BC at Ch. 00-660m Road ID No 335914061 under Tungipara Upazila District Gopalganj. 0.6600 15.853 M/s. Meghna Enterprise 15.853 30/04/2019 16/06/2016 100 02/10/2019  
21 GDIRIIP/VR/BC/Tungi18-19/54 Improvement of Borni H/O Sayed Mollah-Uttapara Jame Mosque via H/O Sobhan Sk. road by BC at Ch. 00-500m (Road ID No: 335914021) under Tungipara Upazila District Gopalganj 0.5000 40.337 Md. Iqbal Hossain 40.337 10/04/2019 03/02/2020 30 02/10/2019  
22 GDIRIIP/VR/Maint/Tungi/BC/18-19/07 Maintenance work of Gimadanga Moddhayapara-H/O Salam Khan via Motahar sheikh's bari road by BC at Ch. 00-1550m under Tungipara Upazila District Gopalganj 1.5500 41.053 M/s. Muzahidul Islam 41.053 18/02/2019 12/05/2019 100 02/10/2019 Final
23 GDIRIIP/UZR/BC/Tungi/17-18/49 Improvement of Kushli hat GC-Dharabashail GC via Mitrodanga-Sonakhali road by BC Ch. 7830-9930m under Tungipara Upazila District Gopalgonj 2.1300 175.271 Md. Abzal Hossain 175.271 23/06/2018 02/02/2019 100 02/10/2019 Final
24 GDIRIIP/VR/BC/Tungi/17-18/48 Improvemnet of Gopalpur UZR-H/O Anil Krisna Biswas Abashan Project Road by BC at Ch. 00-655m under Tungipara Upazila District Gopalganj 0.6550 49.582 M/S Sele Enterprise 49.582 05/06/2018 27/01/2019 100 02/10/2019 Final
25 GDIRIIP/VR/BC/Tungi/17-18/46 Improvement of Ramchandrapur RHD-Kushli Madrasha via Nilfa GPS road by BC at Ch. 1360m-2120m & Const. of 2Nos U-drain at Ch. 1867m & 2090m on the same road under Tungipara Upazila District Gopalganj Road ID No 335915001 0.8200 58.760 M/S. Masud Enterprise 58.760 23/04/2018 02/09/2018 85 02/10/2019  
26 GDIRIIP/Mural/Tungi/17-18/45 Construction for Father of the Nation Bangabandhu Sheikh Mujibur Rahman Mural under Tungipara Upazila District Gopalganj. 0.7600 31.700 M/S. Niaz Traders 31.700 25/04/2018 18/09/2018 0 02/10/2019  
27 GDIRIIP/VR/BC/Tungi/17-18/44 Improvement of Charkushli Main road UZR-H/O Mohammad Malla road by BC at Ch. 600m-1020m & Const. of 2Nos U-drain at Ch. 870m & 1005m on the same road under Tungipara Upazila District Gopalganj Road ID No 335915052 0.4200 28.717 s.m nurulislam 28.717 23/04/2018 15/09/2018 100 02/10/2019  
28 GDIRIIP/VR/BC/Tungi/17-18/43 Improvement of Kushli H/O Enayet Sheikh house-Kushli GC road by BC at Ch. 00m-395m & Const. of 1No U-drain at Ch. 160m on the same road under Tungipara Upazila District Gopalganj Road ID No 335915073 0.3950 28.176 s.m nurulislam 28.176 25/04/2018 01/07/2018 100 02/10/2019 Final
29 GDIRIIP/VR/Maint/Tunge/17-18/03 Periodic Maintenance work of Singipara Khayagat-143 No Basuria Road at Ch. 00-410m under Tungipara Upazila District Gopalganj Road ID No 335914008 0.5850 14.106 M/S. Jweel Construction 14.106 23/04/2018 26/06/2018 100 02/10/2019 Final
30 GDIRIIP/VR/BC/Tungi/17-18/42 Improvement of Basuria Pachimpara H/O Alamgir Farazi-Mitrikabati GPS road by BC at Ch. 00-585m & Const. of 3Nos U-drain under Tungipara Upazila District Gopalganj Road ID No 335915041 0.5850 39.347 M/s. Pial Bricks 39.347 26/03/2018 19/07/2018 100 02/10/2019 Final
31 GDIRIIP/VR/BC/Tungi/17-18/41 Improvement of Gimadanga Fazilatunnesa GPS bridge-H/O Liakat mia road by BC at Ch. 00-500m under Tungipara Upazila District Gopalganj Road ID No 335915065 0.5000 43.856 s.m nurulislam 43.856 27/03/2018 31/01/2019 100 02/10/2019 Final
32 GDIRIIP/VR/BC/Tungi/17-18/40 Improvement of Gimadanga Pachimpara- H/O Jer Ali Sk. road by BC at Ch. 00-660m under Tungipara Upazila District Gopalganj Road ID No 335915033 0.6600 42.556 Md. Iqbal Hossain 42.556 23/04/2018 25/11/2018 100 02/10/2019 Final
33 GDIRIIP/VR/BC/Tungi/17-18/37 Improvement of Gazalia H/O Nazir mia to H/O Kalimullah road by BC at Ch. 750-1530m under Tungipara Upazila District Gopalganj Road ID No 335915016 0.7800 19.796 S. M. Tutul 19.796 13/04/2018 24/05/2019 100 02/10/2019 Final
34 GDIRIIP/Ramp/Tungi/17-18/33 Construction of RCC Boat landing Ramp on Dumuria Malopara Ghat under Tungipara Upazila District Gopalganj. 12.038 M/S. Niaz Traders 12.038 04/03/2018 15/05/2019 100 02/10/2019 Final
35 GDIRIIP/VR/BC/Tungi/17-18/32 Improvement of Parjhanjhania Shop of Samad-H/O Hamid Sk. road by BC at Ch. 00-810m Const. of 2Nos 1x2.00x2.00m Box culvert on the same road at Ch. 210m & 445m & Const. of 3Nos U-drain on the same road at Ch. 150m 175m & 280m under Tungipara Upazila Distri 0.8100 81.647 M/S. Mahmud Haque 81.647 21/03/2018 08/06/2019 100 02/10/2019 Final
36 GDIRIIP/VR/BC/Tungi/17-18/31 Improvement of Pakurtia Babul Sk. house-H/O Shehab Sk. road by BC at Ch. 00-760m & Const. of 1No 1x4.00x4.00m RCC box culvert on the same road at Ch. 600m under Tungipara Upazila District Gopalganj Road ID No 335915046 0.7600 72.509 M/S. Mahmud Haque 72.509 21/03/2018 16/05/2019 100 02/10/2019 Final
37 GDIRIIP/VR/BC/Tungi/17-18/30 Improvement of Parjhanjhania Main road-H/O Amir Ali Biswas road by BC at Ch. 00-415m & Const. of 1No U-drain on the same road at Ch. 309m under Tungipara Upazila District Gopalganj Road ID No 335915031 0.4150 35.697 M/S. Nafshi Construction 35.697 13/03/2018 22/06/2019 100 02/10/2019 Final
38 GDIRIIP/VR/BC/Tungi/17-18/29 Improvement of Uttarpakurtia UZR-H/O Habi Sheikh via Uttarpakurtia GPS road by BC at Ch. 00-330m under Tungipara Upazila District Gopalganj Road ID No 335915058 0.3300 26.478 M/s. Meghna Enterprise 26.478 19/01/2017 12/07/2018 100 02/10/2019 Final
39 GDIRIIP/VR/BC/Tungi/17-18/28 Improvement of Jamai Bazar BWDB Bandh-H/O Sajol Pandey road by BC at Ch. 00-300m under Tungipara Upazila District Gopalganj Road ID No 335915053 3.0000 19.033 M/S. Rangeshwor Hazra 19.033 17/01/2017 23/04/2018 100 02/10/2019 Final
40 GDIRIIP/VR/BC/Tungi/17-18/27 Improvement of Pakurtia UZR-Near Mofazel Molla-H/O Mostofa Molla road by BC at Ch. 00-450m under Tungipara Upazila District Gopalganj 0.4500 45.867 M/s. Meghna Enterprise 45.867 19/01/2017 11/07/2018 100 02/10/2019 Final
41 GDIRIIP/VR/BC/Tungi/17-18/26 Improvement of Pakurtia Munshibari UZR-H/O Mosarraf Talukder road by BC at Ch. 00-665m under Tungipara Upazila District Gopalganj Road ID No 335915029 0.6650 48.222 M/s. Meghna Enterprise 48.222 19/01/2017 29/01/2019 100 02/10/2019 Final
42 GDIRIIP/VR/BC/Tungi/17-18/25 Improvement of Pakurtia Bazar UZR-H/O Abdur Razzaque Molla Jame Mosque road by BC at Ch. 00-315m under Tungipara Upazila District Gopalganj Road ID No 335915028 0.3150 23.075 MS Khondoker Jobaed Construction 23.075 05/11/2017 02/07/2018 100 02/10/2019 Final
43 GDIRIIP/VR/BC/Tungi/17-18/24 Improvement of Ekram Munshi shop to Mitrikabati road by BC at Ch. 00-810m under Tungipara Upazila District Gopalganj Road ID No 335914033 0.8400 52.622 M/s. Pial Bricks 52.622 05/12/2017 28/04/2018 100 02/10/2019 Final
44 GDIRIIP/VR/BC/Tungi/17-18/23 Improvement of Borni Notun Bazar-H/O Late Dr. Aboni road by BC at Ch. 500-1300m & Const. of 1No U-drain on the same road at Ch. 620m under Tungipara Upazila District Gopalganj Road ID No 335914032 0.8000 65.287 M/S. JAKAULLAH & BROTHERS 65.287 04/12/2017 26/04/2018 100 02/10/2019 Final
45 GDIRIIP/VR/BC/Tungi/17-18/22 Improvement of Charkushli Muslimpara road-Charkushli 18No GPS via Khokons shop road by BC at Ch. 00-1080m & Const. of 3Nos U-drain on the same road at Ch. 380m 695m & 940m under Tungipara Upazila District Gopalganj Road ID No 335915076 1.0800 73.504 s.m nurulislam 73.504 10/12/2017 29/06/2018 100 02/10/2019 Final
46 GDIRIIP/VR/BC/Tungi/17-18/21 Improvement of Borni RHD-Montu khan road by BC at Ch. 500-1190m & Const. of 3Nos U-drain on the same road at Ch. 655m 7602m & 1180m under Tungipara Upazila District Gopalganj Road ID No 335915060 0.6900 65.372 M/S. JAKAULLAH & BROTHERS 65.372 04/11/2017 26/04/2018 100 02/10/2019 Final
47 GDIRIIP/VR/BC/Tungi/17-18/20 Improvement of Sreeramkandi Baily Bridge-Uttarpara H/O Kabir Sk. Via Beltola more road by BC at Ch. 00-925m under Tungipara Upazila District Gopalganj Road ID No 335915062 0.9250 64.297 M/S Kamrul & Brothers 64.297 04/11/2017 30/08/2018 100 02/10/2019 Final
48 GDIRIIP/VR/BC/Tungi/17-18/19 Improvement of Sreeramkandi Uttarpara H/O Rafique kazi to Mollikermath H/O Ali road by BC at Ch. 00-580m & Const. of 2Nos U-drain on the same road at Ch. 50m & 240m under Tungipara Upazila District Gopalganj Road ID No 335915084 0.5800 46.086 s.m nurulislam 46.086 10/12/2017 28/03/2018 100 02/10/2019 Final
49 GDIRIIP/VR/BC/Tungi/16-17/16 Improvement of Tungipara Kotwalipara RHD-Balargati road by BC Ch. 00-440m under Tungipara Upazila District Gopalganj Road ID No 335915092 0.4400 29.194 M/s. Meghna Enterprise 29.194 23/10/2017 15/12/2017 100 02/10/2019  
50 GDIRIIP/VR/BC/Tungi/16-17/15 (A) Improvement of Singipara Kheyaghat-Anower Mollah Bari road by BC Ch. 00-1120m & (B) Const. of 1x2.00x2.00m Box culvert on the same road at Ch. 615m under Tungipara Upazila District Gopalganj Road ID No 335915072 1.1200 79.186 Md. Iqbal Hossain 79.186 03/06/2017 28/02/2018 100 02/10/2019 Final
51 GDIRIIP/VR/BC/Tungi/16-17/14 Improvement of Silna Guadhana GPS-H/O Nuru Member road by BC Ch. 1000-1685m under Tungipara Upazila District Gopalganj Road ID No 335914046 0.6850 41.246 M/s. Meghna Enterprise 41.246 17/07/2017 15/11/2017 100 02/10/2019 Final
52 GDIRIIP/VR/BC/Tungi/16-17/13 Improvement of Gimadanga Charpara to H/O Daudkari house road by BC (Ch. 620-1000m) under Tungipara Upazila, District: Gopalganj 0.3800 21.309 s.m nurulislam 21.309 18/02/2017 11/06/2017 100 02/10/2019 Final
53 GDIRIIP/VR/BC/Tungi/16-17/12 (A) Improvement of Borni Shamsul Chowkider-bari to Shanirvar khal (Bashir munshi, Chunnu Munshi) road by BC (Ch. 690-1450m), (B) Const. of 1No 900mmx900mm RCC Box culvert on the same road at Ch. 730m under Tungipara Upazila, District: Gopalganj (Road ID N 0.7600 48.867 S. M. Tutul 48.867 21/02/2017 15/04/2019 100 02/10/2019 Final
54 GDIRIIP/VR/BR/Tong/16-17/11 Improvement of Sreeramkandi Purbopara Hazi Esa's house (UZR)-Jafor Sk's house. road by BC (Ch. 00-565m) under Tungipara Upazila, District: Gopalganj 0.5650 25.743 Lokman Hossain Palwan 25.743 26/12/2016 17/05/2017 100 02/10/2019 Final
55 GDIRIIP/VR/HR/Tong/16-17/10 Improvement of Guadhana UNR-Gudhana Benimadhop GPS road by HBB (Ch. 00-415m) under Tungipara Upazila, District: Gopalganj 0.4150 19.561 M/S Moni Enterprise 19.561 14/12/2016 06/05/2017 100 02/10/2019 Final
56 GDIRIIP/VR/BR/Tong/16-17/09 Improvement of Munshirchar Nur Munshi's Bari-H/O Satish Muchi's bari road by BC (Ch. 00-1830m) under Tungipara Upazila, District: Gopalganj (Road ID No: 335585020) 1.8300 110.663 M/S. Jweel Construction 110.663 25/12/2016 10/03/2019 100 02/10/2019 Final
57 GDIRIIP/VR/BR/Tong/16-17/08 Improvement of Kushli GC-Kushli Jubili Islamia high School road by BC (Ch. 00-830m) under Tungipara Upazila, District: Gopalganj (Road ID No: 335585011) 0.8300 46.352 M/S Hasan Traders 46.352 20/12/2016 12/05/2017 100 02/10/2019 Final
58 GDIRIIP/VR/HR/Tong/16-17/06 Improvement of Bashuria Seenerchar high school-H/O Didar Molla via H/O Nazrul Molla road by HBB (Ch. 00-420m) under Tungipara Upazila, District: Gopalganj (Road ID No: 335585094). 0.4200 12.886 Md. Rezaul Haq Biswas 12.886 04/12/2016 05/05/2017 100 02/10/2019 Final
59 GDIRIIP/VR/BR/Tungi/15-16/05 Improvement of Sreeramkandi Jahangir sheikh's bari-Kushli Dakkhinpara Bimol Bayen-bari via Kusli Dakkhinpara UZR road by BC (Ch. 00-2380m) under Tungipara Upazila, District: Gopalgonj (Road ID No: 335915051). 2.3800 150.125 M/s Jhalak Business Center 150.125 13/06/2016 22/01/2019 100 02/10/2019 Final
60 GDIRIIP/VR/SR/Tungi/15-16/04 Construction 15.00m RCC Girder Bridge on Borodumuria Pandebari road at Ch. 150m under Tungipara Upazila, District: Gopalgonj (Road ID No: 335915041) 74.747 M/S Kamrul Hasan 74.747 13/06/2016 19/04/2017 100 02/10/2019 Final
61 GDIRIIP/VR/BR/Tungi/15-16/03 Improvement of Gozalia Nazir Sheikh-house-Gozalia Madrasha road by BC (Ch. 00-1350m) under Tungipara Upazila, District: Gopalgonj (Road ID No: 335915056). 1.3500 79.994 Md. Nazim Uddin Khan 79.994 26/06/2016 25/04/2017 100 02/10/2019 Final
62 GDIRIIP/VR/BR/Tungi/15-16/02 Improvement of Silna-Chaprail road by BC (Ch. 00-1750m) under Tungipara Upazila, District: Gopalgonj (Road ID No: 335914013). 1.7500 113.443 Md. Iqbal Hossain 113.443 13/06/2016 22/04/2017 100 02/10/2019 Final
63 GDIRIIP/VR/BR/Tungi/15-16/01 Improvement of Basuria Thakurbari-Basuria Dakkhinpara zame mosque road by BC (Ch. 00-1152m) under Tungipara Upazila, District: Gopalgonj (Road ID No: 335915070) 1.1520 63.921 M/s. S.S. Traders 63.921 23/06/2016 15/11/2016 100 02/10/2019 Final
Total : 612.9340 (Km) 56778.75 (Lac) 56778.75 (Lac)