Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bagerhat-s
1 SP43064/Dier Khal Subproject Re-excavation of Dier Khal (Part-1) (Ch-0+00km to 1+000km) Re-excavation of Dier Khal (Part-2) (Ch-0+000km to 1+700km) Re-excavation of Fakirer Khal (Ch-0+000km to 0+720km) Re-excavation of Putir Khal (Ch-0+000km to 0+410km) Re-excavation of Shimanar Khal (Ch-0+000km to 0+800km) Ref. Lined Section 6 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Dier Khal re-xcavation (Ch:1000.00m - 1850.00m) 2023-24 Doyachir Khal re-xcavation (Ch:0.00m - 750.00m) 2023-24 Putir Khal re-xcavation (Ch:410.00m - 1340.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 90.065 LCS 90.065 31/03/2022 30/04/2022 71 13/08/2024 Ongoing
2 SP25284/Goshala Subproject Remaining work of Repair and Maintenance of WMCA Office Remaining work of Construction of RCC Drain (500mx500m, Length - 18m) Repair and Maintenance of 4vent Regulator on Goshala Khal Installation of Deep Tube-Well Maintenance 4vent Regulator on Goshala Khal, Repair and Maint. of WMCA Office Building, Construction of RCC Drain (500mmx500mm) and Installation of Deep Tube-Well (Work Incompleted, Contact Terminated) 53.997 Mohammad Eunus & Brothers(Pvt.) Ltd. Panclaish, Chittagong. 53.997 21/10/2021 81 13/08/2024 Ongoing
3 SP25198/Laupala-Surjabedi Subproject Surjabedi khal re-excavation(ch.00-2700m) Pachur khal re-excavation(ch.00-600m) Referenced line section(4 Nos.) Bamboo bridge(4 Nos.) Rehabi. of Regu. 2V-(1.50m X 1.80) on Laupala Khal at Ch. 0+100km, Regu. 1V-(1.50m X 1.80) on Surjobedi Khal at Ch. 0+270km, Rehabi. of Pipe Sluice 1V- (900mm dia) on Panchur Khal at Ch. 0+50 km, SP Idntf S.board, SP Idntf Post | 2023-24 98.960 M/S Alif Traders 98.960 15/01/2024 30/04/2019 100 13/08/2024 Completed
4 SP14113/Nilur Khal FCD Subproject Nilur khal re-excavation(ch.00-1275m) Referenced line section(2 Nos.) Bamboo bridge(3 Nos.) Structure maintenance -. 35.237 LTM-Niloy Enterpeise 35.237 28/01/2019 28/04/2019 100 13/08/2024 Completed
5 SP14112/Harikhali-Doborkhali FCD Subproject Harikhali khal re-excavation (Ch.00-2100m) - (18-19) Embankment re-sectioning (Ch.370-2285m) - (18-19) Referenced line section 3 Nos. (18-19) WMCA office and 3 other structures - (18-19) Harikhali Embankment Re-Sectioning (Ch-0+00km to 0+450km) - (21-22) Harikhalil-Nayadanga Khal Re-excavation (Ch-0+00km to 0+660km) - (21-22) Majhi Danga-Railline Khal Re-excavation (Ch-0+00km to 0+490km) - (21-22) Majhidanga-Layer Parer Khal Re-excavation (Ch-0+00km to 0+280km) - (21-22) Ref. Lined Section 3 Nos. On 3 Khals - (21-22) 125.868 OTM-M/s Shahanara & Baby, Sharankhola 125.868 18/05/2022 30/04/2019 100 13/08/2024 Completed
2 Chitalmari
1 SP13108/Kachubunia-Saratkhali FCD Subproject Kachubunia Khal Re-excavation (ch0.00-4605m) Adikhali Khal Re-excavation(ch0.00-460m) Jianir Khal Re-excavation(ch0.00-500m) Adikhali Branch Khal Re-excavation (ch0.00-200m) Ref. Lined Section 8 Nos. On 4 Khals, And SP Identf. Signboard (2 nos.) Repair and Maintenance of Regulator 1Nos of (2v-1.50m x 1.80m), 2Nos of (1v-1.50 x 1.80m) Shimanar Khal Re-excavation (Ch:0.00m - 3000m) - 2023-24 Katipara Khal Re-excavation (Ch:0.00m - 1450m) - 2023-24 Umajuri Khal Re-excavation (Ch:0.00m - 1100m) - 2023-24 Adikhali Khal Re-excavation (Ch:0.00m - 1585m) - 2023-24 Naykura Khal Re-excavation (Ch:0.00m - 375m) - 2023-24 Const. of 10 Nos. Ref. lined Section on 05 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office | 2023-24 174.155 Md. Badruddaza Bablu,Dumuria Bazar,Khulna 174.155 19/05/2024 30/04/2021 78 13/08/2024 Ongoing
2 SP12028/Melarkul Khal FCD Subproject Melarkul khal re-excavation(ch.1960-7100m) Referenced line section (6 Nos.) Bamboo bridge (6 Nos.) Construction of WMCA Office, Electrification Works and Supplying of Office Furniture | 2023-14 161.588 M/S Masud Enterprise 161.588 15/01/2024 30/04/2019 98 13/08/2024 Ongoing
3 Fakirhat
1 SP62029/KumarKhali Subproject Mora Posur Khal Re-excavation(Ch-0+000km to 2+700km) Kumarkhali Khal Re-excavation(Ch-0+000km to 7+870km) Faishakhali Khal Re-excavation(Ch-0+000km to 2+950km) Datnimari Khal Re-excavation(Ch-0+000km to 2+195km) Bashabari Khal Re-excavation(Ch-0+000km to 1+1330km) Gojar Khal Re-excavation(Ch-0+000km to 2+075km) Chakulia Khal Re-excavation(Ch-0+000km to 2+115km) Ref. Lined Section 20 Nos. On 7 Khals Construction of WMCA office building 256.040 OTM-Sayed Ziaul Hoque 256.040 11/08/2022 30/04/2023 100 13/08/2024 Completed
2 SP11010/Maskata Khal FCD Subproject Minadia Khal Re-excavation(ch0.00-1400m) Husnar Khal Re-excavation(ch0.00-1200m) Repair and Maintaence of Regulator (6v-1.50m x 1.80m ) -. Ref. Lined Section 2 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) 90.005 Md. Badruddaza Bablu,Dumuria Bazar,Khulna 90.005 15/02/2023 30/04/2021 95 13/08/2024 Ongoing
4 Kachua
1 SP45180/Tengrakhali-Char Tengrakhali Subproject Dharar Khal re-xcavation (Ch:0.00m - 4600.00m) Const. of 05 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 35.158 LCS 35.158 0 13/08/2024 Ongoing
5 Morrelganj
1 SP43072/Pathuria-Kalibari Subproject Pathuria Kalibarir Embankment Re-excavation (Ch-0+00km to 7+865km) and SP Identf. Signboard (2 nos.) 78.747 LCS 78.747 28/04/2022 30/03/2023 100 13/08/2024 Completed
2 SP24184/Tafalbari Khal Subproject Rehabilitation of OnM Shed (9x5m) - Mainttenance of Tafalbari Regulator (2v) and Goalbari Pipe Regulator (1v) -. Tafal Bari Embankment Re-Sectioning (Ch-0+000km to 1+805km) Tafal Bari Khal Re-excavation (Ch-0+000km to 1+775km) Ref. Lined Section 3 Nos. On 1 Khal 44.648 M/S Azad & Brothers, Bhuapur, Tangail 44.648 28/04/2022 29/11/2022 40 13/08/2024 Ongoing
Total : 0.0000 (Km) 1244.47 (Lac) 1244.47 (Lac)