1
|
SP46278/Gorakhonathpur CAD Subproject
|
Construction of RCC Main Open Irr. Canal at line EF Ch. 1.540 km to 2.920 km (L: 1.36km) Construction of RCC Branch Open Irr. Canal line DID2 at Ch. 1.100 km to 1.890 km (L: 0.790km) 2 nos. RCC Aqueduct Main Open Irr. Canal at line EF Ch. 1.540 km and 2.920 km, 2nos. SP Signboard
|
|
134.851
|
Md. Abdul Mannan
|
134.851
|
22/02/2021
|
15/06/2022
|
100
|
13/08/2024
|
Completed
|
2
|
SP46261/Sreerampur Subproject
|
Construction of RRC Open Irrigation Canal Line EF: Ch: 1254m-1500m. Construction of RRC Open Irrigation Canal Line FF1: Ch: 0.00m-445m. Construction of RRC Open Irrigation Canal Line DD1: Ch: 0.00m-460m. Construction of RRC Open Irrigation Canal Line FG: Ch: 1500m-1805m. Construction of RRC Pumping Platfrom With RCC Stair Near Mohananda River. WMCA Office and Others Construction of 1-900 mm dia RCC Drainage Pipe Line HH1: Ch. 0.00-680 m.
|
|
178.003
|
M/s.Mau Construction & M/s.Dulha Enterprise(JV)
|
178.003
|
25/10/2020
|
15/12/2021
|
100
|
13/08/2024
|
Completed
|
3
|
SP44121/Kalitala Kashmahal Subproject
|
Laying of 1-500 mm dia UPVC Buried Pipe Main Line=70m (A-A3) & 2nd Lift Over Head Tank Gonshapara at ch: 0+000 km to 1+200 km (D-D1) Length 1200m Total Langth= (70+1200) =1270m Laying of 1-315 mm dia UPVC Buried Pipe Line (D-D2), 2nd Lift over Head Tank To Nadashi School at Ch: 0+000 km to 1+000 km Laying of 1-250 mm dia UPVC Buried Pipe Line (D-D3) Bhut Pukur to North Bhut Pukur at Ch 0+00km to 0+450km =450m and Mot Pukur to East Mot Pukur (E-F) at Ch 0+000 to 0+250km=250m (Total 700m) Construction of RCC Over Head Tank-3 (4.45x3.00m) near 2nd Lift Bhut Pukur
|
|
168.916
|
Barendra Constraction LTD
|
168.916
|
21/05/2024
|
|
0
|
13/08/2024
|
Ongoing
|
4
|
SP44087/Mohadanga Panna Beel Subproject
|
Construction of RCC Pump Operating Platform, Ramp and Stair near Header Tank Construction Over Head Tank (3.00m X 4.45m) Near Panna Beel Mango Garden Const. of Join. Chamber,1-500 mm UPVC Buried Line Pipe Rest (L-90m) Wall and Br Name Plate S.Board Construction of 1-500mm UPVC Main Buried Pipe from New OHT to Gobura pukur, Ch.0+00km to 1+650km Const. of 1-250mm UPVC Branch-1 Buried Pipe from Existing OHT to Mona pukur, Ch.0+00 km to 0+650km Const. of 1-250mm UPVC Branch-2 Buried Pipe from Existing OHT to Goburatola, Ch.0+00 km to 0+550km Const. of 1-250mm UPVC Branch-3 Buried Pipe from Existing OHT to Hosendanga, Ch.0+00 km to 0+350km Maint. WMCA Off. and Const. of 1 Toilet (1.50m X 2.10m) Including Sanit. Works, Submer. Pump.
|
|
200.804
|
Md.Shah Alamgir
|
200.804
|
27/07/2022
|
|
97
|
13/08/2024
|
Ongoing
|
5
|
SP43039/Ghoghodima Khutbatala Subproject
|
Construction of RCC Pump Operating Platefrom Ramp and Stair (Size:2.4mX12.575m) Const. RCC Cover Slab (10Nos), Brick Name Plate (10Nos), SP Sign board and Post (2 Nos) Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+000 km to 0+200 km Construction of RCC Over Head Tank (4.450m X 3.00m) near Bifurcation Point Construction of 1-450mm dia UPVC buried Pipe Line C-G from Ch.0+000km to1+075km Const. 1-315mm dia UPVC buried Pipe G-H from Ch.0+0km to0+375km&Line G-G1 from Ch.0+0km to Ch.0+500 Repair and Maintenace of WMCA Office (12.00m X6.00m) - Const. of 1-450mm dia Upvc Buried Pipe Main Line (G-J-I) at Ch. 1+075km to Ch. 3+075km | 2023-24 Const. of 1-315mm dia Upvc Buried Pipe Main Line (J-J1) (Alfaz Land) Ch. 0+000km to (Akram hazi Deep) Ch. 0+500km (Length=500m) | 2023-24 Const. of RCC Open Irrigation Canal (E-F) Ch. 1+416km to Ch. 1+666km) Length= 250m | 2023-24
|
|
327.898
|
Md.Shah Alamgir
|
327.898
|
30/11/2022
|
10/05/2023
|
89
|
13/08/2024
|
Ongoing
|
6
|
SP25289/Chapai Grameen Subproject
|
Construction of Header Tank-01 (6.10m* 3.00m) near zero point (Mohananda River) Re-laying of 1-500mm dia UpvcBuried pipe from ch.13m-1903m=1890m near zampukur. Re-laying of 1-400mm dia UpvcBuried pipe from ch.0.00m (zampukur OHT) - 460.00m Eest of koroitala. Laying of 1-355 mm dia UPVC Buried Pipe Line B-B5 from Ch.0+000km to Ch.0+500 km (2022-23) Laying of 1-500 mm dia UPVC Buried Pipe Line M-N from Ch.0+000km to Ch.2+000 km (2022-23) Construction of Over Head Tank (6.050m X 3.175m) Near Jampukur (2022-23) Construction of Rcc Platform, Brick Name Plate, SPISB & SPIP (2022-23) Const. of Rcc Box Culvert (750mm X 750mm) Near Chapai Bazar, Chapainawabjonj to Gomostapur Main RHD Road at Chapai-Grameen CAD (2023-24)
|
|
404.064
|
OTM
|
404.064
|
23/08/2020
|
05/04/2021
|
66
|
13/08/2024
|
Ongoing
|
7
|
SP25288/Dariapur Subproject
|
Re-Laying of 1-500mm dia Upvc Buried Pipe Main Lain BE.Ch.950m-2890m (Length=1940m) Laying of 1-400mm dia Buried Pipe of Main Lain EM. Ch.2890m-3690m (Length=800m) Construction of Over Header Tank (3.00mx 4.30m) (2nd Lift) near Gohal Pukur Construction of 2 Nos. PVC Pipe Rest Construction of 7 Nos. Check Gate Chamber Construction of One RCC Operating Platfrom Const. of 2-500mm dia Upvc Buried Pipe Main Line (A-B1) from ch. 0+000km to 0+950km (Length=950×2=1900m) 2023-24 Const. of 1-400mm dia Upvc Buried Pipe Main Line (M-N) from ch. 3+690km to 5+490km (Length=1800m) 2023-24 Const. of 1-355mm dia Upvc Buried Pipe Branch Line (G1-G2=1000m) North of Main line from ch. 0+000km to 1+000km & G1-G3=1000m (Length=2000m) 2023-24
|
|
543.966
|
OTM
|
543.966
|
19/11/2020
|
25/01/2022
|
66
|
13/08/2024
|
Ongoing
|
8
|
SP25257/Gohalbari Subproject
|
7 Nos RCC branch canal, RCC cover slab and footpath,RCC pumping platform with RCC stair Construction of RCC Open Irrigation Canal A1-A2 From Ch.0+000 km to 2+000 Km (22-23) Cnst. RCC Open Irrig. Cnl Line K-K1-Ch.0+0km to 0+100 Km & Line S-S1 - Ch 0+00km - 0+200km (22-23) Cnst RCC Open Irrig. Cnl Line R2-R3-Ch.0+0 km to 0+900 Km. SP Identf S.boardANDIndica. Post (22-23)
|
|
255.926
|
Md. Sohel
|
255.926
|
27/12/2022
|
05/06/2020
|
97
|
13/08/2024
|
Ongoing
|
9
|
SP25241/Palsha-Moheshpur Subproject
|
Construction of WMCA Office, Electrification Work, Office Furnitures Construction of RCC over Head Tank Construction of UPVC Buried pipe Lain FF5F7. Ch. 0m-900m Laying of 1-400mm dia Construction of RCC Buried Pipe Lain AB. Ch.0 m-25 m and DF Line: Ch. 1070m-1660m Construction of UPVC Burried Pipe Line D1D2; Ch.0m-170m and F7F8 Line Ch.0m-580m and F7 Construction of UPVC Burried Pipe Line F2F4; Ch.0m-150m and F5F6; Line Ch.0m-150m Construction of RCC Pumping Platform (12mx3m) Contst. of Laying of 1-500mm dia Upvc Buried Pipe 2nd Main Line (F-F12)=1400m from Loila Pond to Hazra Pond (ch. 0+000km to 1+400km) and (Laying of 1-500mm dia Upvc Buried Pipe Main Line (F12-F13)=780m from Hazra Pond to Jordani Three Mohoni (ch. 1+400km to 2+180km) (Total Length 1400m+780m= 2180m) 2023-24 Const. of Laying of 1-315mm dia Upvc Buried Pipe Branch Line F14-F15=780m from Hiru Deep to Shahin Bathan Ch. 0+000km to 0+780km | 2023-24 Cosnt. of RCC Over Head Tank (4.45mx3.00m) at Hazra Pond (Ch.1+400km of 2nd Main Buried Pipe Line) | 2023-24
|
|
414.134
|
OTM
|
414.134
|
19/11/2020
|
28/06/2022
|
70
|
13/08/2024
|
Ongoing
|
10
|
SP25197/Chechinia Subproject
|
Re-Laying of 1-500mm dia UPVC Buried Pipe Line A-F from Ch.0+00km to 3+400 km Laying of 1-315mm dia UPVC Buried Line L-L1 from Ch.0km to 0+500km and Line J-J1 - Ch.0km to 0+325km Cons. of RCC Pump Platfrom (2.40mX12.575m) at zero point 1Nos, Name Plate (7Nos),SP Signboard & Posts 2Nos
|
|
306.757
|
Sanitary Museum & M/S Md. Wasimul Haque (JV)
|
306.757
|
27/12/2022
|
|
98
|
13/08/2024
|
Ongoing
|
11
|
SP22023/Nayagola-Mohananda Subproject
|
Construction of 2-315mm dia UPVC buried Pipe Line A-A1 from Ch.0+000km to 1+250km Construction of 1-400mm dia UPVC buried Pressure Pipe Line A1-A2 from Ch.0+000km to1+750km Construction of RCC Over Head Tank(6.050m X 3.175m) near Luxman Pond Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+450 km to 0+950 km Construction of Two Now RCC Platfrom , Eight Now. Brick Name Plate and Two Now. SPISB (Total=12Nos)
|
|
243.268
|
Md.Selim Reza
|
243.268
|
20/11/2022
|
|
76
|
13/08/2024
|
Ongoing
|
12
|
SP22022/Behula Subproject
|
Construction of 1-315mm dia UPVC buried Pipe Line G-H, G-G1, & G-G2 (Length = 1000m) Construction of RCC Open Irrigation Canal line I-J, J-K & J-L (Length=500m)
|
|
67.368
|
Sanitary Museum
|
67.368
|
27/12/2022
|
24/12/2023
|
100
|
13/08/2024
|
Completed
|
13
|
SP22021/Mohammadkhani Subproject
|
Over Head Tank & Barid pipe 2-300mm dia Re-Const. of RCC Open Irrigation Canal A-B Ch.0+000 km to 0+400 Km. 2 SP Idntf. S. board & 2 post (22-23) Re-Construction of RCC Open Irrigation Canal B-D Ch.0+000 km to 0+750 Km (22-23) Re-Construction of RCC Open Irrigation Canal B-C Ch.0+000 km to 1+050 Km (22-23) Construction of RCC Irrigation Canal F-F1 Ch.0+000 km to 0+900 Km (22-23) Construction of RCC Open Irrigation Canal A1-A2 Ch.0+000 km to 0+250 Km (22-23) Construction of RCC Open Irrigation Canal E-E1 Ch.0+000 km to 0+500Km (22-23) Construction of Extension of Existing RCC Sumps (3.05m X 2.30m) and (3.95mX1.90m) - (22-23) Const. 5-250mm dia Upvc Pressure Buried Pipe (Replacing existing & damaged 5-200mm dia Upvc pipe) 2nd Lift Showratola to Fultola Water Reservation at (A3-A4) ch.0+000km to 1+200km (Length 1200m) - 2023-24 Const. of RCC Open Irrigation Canal (0.60m x 0.60m) on Harudhigi to East side MP Bathen Bari line at (F1-F2) ch.0+900km to 1+400km | 2023-24
|
|
514.067
|
OTM
|
514.067
|
21/05/2024
|
10/01/2019
|
90
|
13/08/2024
|
Ongoing
|
14
|
SP11004/Agrani Irrigation CAD Subproject
|
Construction of 1-355mm dia UPVC Buried Pipe Branch Lines BR-8 From Ch.(0.00 m+500 m) Construction of 1-355mm dia UPVC Buried Pipe Lines BR-5E From Ch.(0.00m to 500 m) Re-Construction of RCC Open Main Irrigation Canal From Ch.(1950 m to 2167 m) and Ch.(2337m to 2490m) Re-Cons. of RCC Open Branch Irr. Canal BR-3 From Ch.(0.00 m to 890 m) and Ch.(1050 m to 1320m) Re-Construction of RCC Open Branch Irrigation Canal BR-6E From Ch.(0.00 to 400 m) Construction of RCC Pump Operating Platform (21.50m x 1.85m x 0.50m) and Extension of Existing Sump (4.00m x 1.65m x 1.80m) at Zero point (2023-24 FY) Construction of RCC Slope Protection Work by Double Plate Palisading near pond (Ch. 0+000 Km to Ch. 0+095 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R1-R2 (Bidirpur Math) (Ch. 0+00 Km to Ch. 0+385 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R3-R4 (Khondar Math) (Ch. 0+00 Km to Ch. 0+380 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R5-R6 (Modonbari Math) (Ch. 0+00 Km to Ch. 0+450 Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P1-P2 (Milki Math) (Ch. 0+000 Km to Ch. 0+350Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P5-P6 (Bishu Miah Math) (Ch. 0+000 Km to Ch. 0+250Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried Line: P7-P8 (Ruhul Scheme) (Ch. 0+000 Km to Ch. 1+050Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P9-P10 (Gorostan Math) (Ch. 0+000 Km to Ch. 0+300Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P11-P12 (Gucchagram) (Ch. 0+000 Km to Ch. 1+000Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P13-P14 (Kamitikar Math-1) (Ch. 0+000 Km to Ch. 0+700Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P15-P16 (Kamitikar Math-2) (Ch. 0+000 Km to Ch. 0+400Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P17-P18 (Kamitikar Math-3) (Ch. 0+000 Km to Ch. 0+260Km) (2023-24 FY)
|
|
467.879
|
M/s.Mau Construction & M/s.Dulha Enterprise(JV)
|
467.879
|
25/10/2020
|
20/04/2021
|
51
|
13/08/2024
|
Ongoing
|