SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Gomostapur
1 SP25238/Hogla-Darabaj Subproject Const. of RCC Over Head Tank (4.45x3.00m) Ch. 0+450km | 2023-24 Const. of RCC Pumping Platform, Ram and Stair | 2023-24 Const. of RCC Pumping Platform near Hogla (Darmus) Beel | 2023-24 Const. of 1-500 mm dia UPVC Buried Pipe Main Line from 2nd Lift Bailibridge to Over Head Tank Ch: 0+000 km to 0+450km (Total Langth A-K=450m) 2023-24 Const. of 1-355mm dia UPVC Buried Pipe Line near Tower to Shesha Vati Ch: 0+000 km to 1+000 km (Total Langth H-L=1000m) | 2023-24 Const. of RCC open Irrigation Canel Main line End (G-P=500m) from Ch:1+200km to 1+700km (Size 500mmx500m), Nalkati to Nalkatibeel (M-N=350m) from 0+030km to 0+380km (Size 500mmx500m), Gabtala to Nalkathibeel Middle point (M-O =250m) from ch. 0+030km to 0+280km (Size 500mmx500m) | 2023-24 178.580 OTM 178.580 0 13/08/2024 Ongoing
2 SP25237/Hogla-Damosh Subproject UPVC Buried pipe,RCC pumping platform with stair guide,Exten.WMCA office and Godown 116.888 Md. Shah Alamgir 116.888 03/12/2019 02/06/2020 100 13/08/2024 Completed
3 SP25195/Sonar Bangla Subproject UPVC Buried pipe and RCC Guide wall 120.231 Md. Shah Alamgir 120.231 08/12/2019 17/01/2021 100 13/08/2024 Completed
4 SP15297/Pabdamari & Charal Beel FCD Subproject Pabdamari Churoi Beel Embankment Re-habilitation (ch0.00-8222m), and Subproject Identification signb 79.275 LCS 79.275 13/12/2020 30/03/2021 100 13/08/2024 Completed
2 Nachol
1 SP25267/Chandpara Subproject Construction of 1-250mm dia uPvc Buried Pipe Line B-B1-B1 Ch. 0+000km to 0+600km (Length=600m) Construction of 1-500mm dia uPvc Buried Pipe Line B-C-D-E-F-G Ch. 0+000km to 0+850km (Length=850m) Construction of 1-315mm dia uPvc Buried Pipe Line G-H-I-J Ch. 0+850km to 1+590km (Length=740m) Construction of 1-280mm dia uPvc Buried Pipe Line J-J1-J2 Ch. 1+590km to 2+700km (Length=1110m) Construction of 5 Nos. Brick Name Plates and Two Nos. Project Indentification Signbord 135.657 Bismillah Trading co & Ethen Enterprise Pvt.Ltd (JV) 135.657 29/03/2022 20/03/2023 100 13/08/2024 Completed
3 Nawabganj-s
1 SP46278/Gorakhonathpur CAD Subproject Construction of RCC Main Open Irr. Canal at line EF Ch. 1.540 km to 2.920 km (L: 1.36km) Construction of RCC Branch Open Irr. Canal line DID2 at Ch. 1.100 km to 1.890 km (L: 0.790km) 2 nos. RCC Aqueduct Main Open Irr. Canal at line EF Ch. 1.540 km and 2.920 km, 2nos. SP Signboard 134.851 Md. Abdul Mannan 134.851 22/02/2021 15/06/2022 100 13/08/2024 Completed
2 SP46261/Sreerampur Subproject Construction of RRC Open Irrigation Canal Line EF: Ch: 1254m-1500m. Construction of RRC Open Irrigation Canal Line FF1: Ch: 0.00m-445m. Construction of RRC Open Irrigation Canal Line DD1: Ch: 0.00m-460m. Construction of RRC Open Irrigation Canal Line FG: Ch: 1500m-1805m. Construction of RRC Pumping Platfrom With RCC Stair Near Mohananda River. WMCA Office and Others Construction of 1-900 mm dia RCC Drainage Pipe Line HH1: Ch. 0.00-680 m. 178.003 M/s.Mau Construction & M/s.Dulha Enterprise(JV) 178.003 25/10/2020 15/12/2021 100 13/08/2024 Completed
3 SP44121/Kalitala Kashmahal Subproject Laying of 1-500 mm dia UPVC Buried Pipe Main Line=70m (A-A3) & 2nd Lift Over Head Tank Gonshapara at ch: 0+000 km to 1+200 km (D-D1) Length 1200m Total Langth= (70+1200) =1270m Laying of 1-315 mm dia UPVC Buried Pipe Line (D-D2), 2nd Lift over Head Tank To Nadashi School at Ch: 0+000 km to 1+000 km Laying of 1-250 mm dia UPVC Buried Pipe Line (D-D3) Bhut Pukur to North Bhut Pukur at Ch 0+00km to 0+450km =450m and Mot Pukur to East Mot Pukur (E-F) at Ch 0+000 to 0+250km=250m (Total 700m) Construction of RCC Over Head Tank-3 (4.45x3.00m) near 2nd Lift Bhut Pukur 168.916 Barendra Constraction LTD 168.916 21/05/2024 0 13/08/2024 Ongoing
4 SP44087/Mohadanga Panna Beel Subproject Construction of RCC Pump Operating Platform, Ramp and Stair near Header Tank Construction Over Head Tank (3.00m X 4.45m) Near Panna Beel Mango Garden Const. of Join. Chamber,1-500 mm UPVC Buried Line Pipe Rest (L-90m) Wall and Br Name Plate S.Board Construction of 1-500mm UPVC Main Buried Pipe from New OHT to Gobura pukur, Ch.0+00km to 1+650km Const. of 1-250mm UPVC Branch-1 Buried Pipe from Existing OHT to Mona pukur, Ch.0+00 km to 0+650km Const. of 1-250mm UPVC Branch-2 Buried Pipe from Existing OHT to Goburatola, Ch.0+00 km to 0+550km Const. of 1-250mm UPVC Branch-3 Buried Pipe from Existing OHT to Hosendanga, Ch.0+00 km to 0+350km Maint. WMCA Off. and Const. of 1 Toilet (1.50m X 2.10m) Including Sanit. Works, Submer. Pump. 200.804 Md.Shah Alamgir 200.804 27/07/2022 97 13/08/2024 Ongoing
5 SP43039/Ghoghodima Khutbatala Subproject Construction of RCC Pump Operating Platefrom Ramp and Stair (Size:2.4mX12.575m) Const. RCC Cover Slab (10Nos), Brick Name Plate (10Nos), SP Sign board and Post (2 Nos) Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+000 km to 0+200 km Construction of RCC Over Head Tank (4.450m X 3.00m) near Bifurcation Point Construction of 1-450mm dia UPVC buried Pipe Line C-G from Ch.0+000km to1+075km Const. 1-315mm dia UPVC buried Pipe G-H from Ch.0+0km to0+375km&Line G-G1 from Ch.0+0km to Ch.0+500 Repair and Maintenace of WMCA Office (12.00m X6.00m) - Const. of 1-450mm dia Upvc Buried Pipe Main Line (G-J-I) at Ch. 1+075km to Ch. 3+075km | 2023-24 Const. of 1-315mm dia Upvc Buried Pipe Main Line (J-J1) (Alfaz Land) Ch. 0+000km to (Akram hazi Deep) Ch. 0+500km (Length=500m) | 2023-24 Const. of RCC Open Irrigation Canal (E-F) Ch. 1+416km to Ch. 1+666km) Length= 250m | 2023-24 327.898 Md.Shah Alamgir 327.898 30/11/2022 10/05/2023 89 13/08/2024 Ongoing
6 SP25289/Chapai Grameen Subproject Construction of Header Tank-01 (6.10m* 3.00m) near zero point (Mohananda River) Re-laying of 1-500mm dia UpvcBuried pipe from ch.13m-1903m=1890m near zampukur. Re-laying of 1-400mm dia UpvcBuried pipe from ch.0.00m (zampukur OHT) - 460.00m Eest of koroitala. Laying of 1-355 mm dia UPVC Buried Pipe Line B-B5 from Ch.0+000km to Ch.0+500 km (2022-23) Laying of 1-500 mm dia UPVC Buried Pipe Line M-N from Ch.0+000km to Ch.2+000 km (2022-23) Construction of Over Head Tank (6.050m X 3.175m) Near Jampukur (2022-23) Construction of Rcc Platform, Brick Name Plate, SPISB & SPIP (2022-23) Const. of Rcc Box Culvert (750mm X 750mm) Near Chapai Bazar, Chapainawabjonj to Gomostapur Main RHD Road at Chapai-Grameen CAD (2023-24) 404.064 OTM 404.064 23/08/2020 05/04/2021 66 13/08/2024 Ongoing
7 SP25288/Dariapur Subproject Re-Laying of 1-500mm dia Upvc Buried Pipe Main Lain BE.Ch.950m-2890m (Length=1940m) Laying of 1-400mm dia Buried Pipe of Main Lain EM. Ch.2890m-3690m (Length=800m) Construction of Over Header Tank (3.00mx 4.30m) (2nd Lift) near Gohal Pukur Construction of 2 Nos. PVC Pipe Rest Construction of 7 Nos. Check Gate Chamber Construction of One RCC Operating Platfrom Const. of 2-500mm dia Upvc Buried Pipe Main Line (A-B1) from ch. 0+000km to 0+950km (Length=950×2=1900m) 2023-24 Const. of 1-400mm dia Upvc Buried Pipe Main Line (M-N) from ch. 3+690km to 5+490km (Length=1800m) 2023-24 Const. of 1-355mm dia Upvc Buried Pipe Branch Line (G1-G2=1000m) North of Main line from ch. 0+000km to 1+000km & G1-G3=1000m (Length=2000m) 2023-24 543.966 OTM 543.966 19/11/2020 25/01/2022 66 13/08/2024 Ongoing
8 SP25257/Gohalbari Subproject 7 Nos RCC branch canal, RCC cover slab and footpath,RCC pumping platform with RCC stair Construction of RCC Open Irrigation Canal A1-A2 From Ch.0+000 km to 2+000 Km (22-23) Cnst. RCC Open Irrig. Cnl Line K-K1-Ch.0+0km to 0+100 Km & Line S-S1 - Ch 0+00km - 0+200km (22-23) Cnst RCC Open Irrig. Cnl Line R2-R3-Ch.0+0 km to 0+900 Km. SP Identf S.boardANDIndica. Post (22-23) 255.926 Md. Sohel 255.926 27/12/2022 05/06/2020 97 13/08/2024 Ongoing
9 SP25241/Palsha-Moheshpur Subproject Construction of WMCA Office, Electrification Work, Office Furnitures Construction of RCC over Head Tank Construction of UPVC Buried pipe Lain FF5F7. Ch. 0m-900m Laying of 1-400mm dia Construction of RCC Buried Pipe Lain AB. Ch.0 m-25 m and DF Line: Ch. 1070m-1660m Construction of UPVC Burried Pipe Line D1D2; Ch.0m-170m and F7F8 Line Ch.0m-580m and F7 Construction of UPVC Burried Pipe Line F2F4; Ch.0m-150m and F5F6; Line Ch.0m-150m Construction of RCC Pumping Platform (12mx3m) Contst. of Laying of 1-500mm dia Upvc Buried Pipe 2nd Main Line (F-F12)=1400m from Loila Pond to Hazra Pond (ch. 0+000km to 1+400km) and (Laying of 1-500mm dia Upvc Buried Pipe Main Line (F12-F13)=780m from Hazra Pond to Jordani Three Mohoni (ch. 1+400km to 2+180km) (Total Length 1400m+780m= 2180m) 2023-24 Const. of Laying of 1-315mm dia Upvc Buried Pipe Branch Line F14-F15=780m from Hiru Deep to Shahin Bathan Ch. 0+000km to 0+780km | 2023-24 Cosnt. of RCC Over Head Tank (4.45mx3.00m) at Hazra Pond (Ch.1+400km of 2nd Main Buried Pipe Line) | 2023-24 414.134 OTM 414.134 19/11/2020 28/06/2022 70 13/08/2024 Ongoing
10 SP25197/Chechinia Subproject Re-Laying of 1-500mm dia UPVC Buried Pipe Line A-F from Ch.0+00km to 3+400 km Laying of 1-315mm dia UPVC Buried Line L-L1 from Ch.0km to 0+500km and Line J-J1 - Ch.0km to 0+325km Cons. of RCC Pump Platfrom (2.40mX12.575m) at zero point 1Nos, Name Plate (7Nos),SP Signboard & Posts 2Nos 306.757 Sanitary Museum & M/S Md. Wasimul Haque (JV) 306.757 27/12/2022 98 13/08/2024 Ongoing
11 SP22023/Nayagola-Mohananda Subproject Construction of 2-315mm dia UPVC buried Pipe Line A-A1 from Ch.0+000km to 1+250km Construction of 1-400mm dia UPVC buried Pressure Pipe Line A1-A2 from Ch.0+000km to1+750km Construction of RCC Over Head Tank(6.050m X 3.175m) near Luxman Pond Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+450 km to 0+950 km Construction of Two Now RCC Platfrom , Eight Now. Brick Name Plate and Two Now. SPISB (Total=12Nos) 243.268 Md.Selim Reza 243.268 20/11/2022 76 13/08/2024 Ongoing
12 SP22022/Behula Subproject Construction of 1-315mm dia UPVC buried Pipe Line G-H, G-G1, & G-G2 (Length = 1000m) Construction of RCC Open Irrigation Canal line I-J, J-K & J-L (Length=500m) 67.368 Sanitary Museum 67.368 27/12/2022 24/12/2023 100 13/08/2024 Completed
13 SP22021/Mohammadkhani Subproject Over Head Tank & Barid pipe 2-300mm dia Re-Const. of RCC Open Irrigation Canal A-B Ch.0+000 km to 0+400 Km. 2 SP Idntf. S. board & 2 post (22-23) Re-Construction of RCC Open Irrigation Canal B-D Ch.0+000 km to 0+750 Km (22-23) Re-Construction of RCC Open Irrigation Canal B-C Ch.0+000 km to 1+050 Km (22-23) Construction of RCC Irrigation Canal F-F1 Ch.0+000 km to 0+900 Km (22-23) Construction of RCC Open Irrigation Canal A1-A2 Ch.0+000 km to 0+250 Km (22-23) Construction of RCC Open Irrigation Canal E-E1 Ch.0+000 km to 0+500Km (22-23) Construction of Extension of Existing RCC Sumps (3.05m X 2.30m) and (3.95mX1.90m) - (22-23) Const. 5-250mm dia Upvc Pressure Buried Pipe (Replacing existing & damaged 5-200mm dia Upvc pipe) 2nd Lift Showratola to Fultola Water Reservation at (A3-A4) ch.0+000km to 1+200km (Length 1200m) - 2023-24 Const. of RCC Open Irrigation Canal (0.60m x 0.60m) on Harudhigi to East side MP Bathen Bari line at (F1-F2) ch.0+900km to 1+400km | 2023-24 514.067 OTM 514.067 21/05/2024 10/01/2019 90 13/08/2024 Ongoing
14 SP11004/Agrani Irrigation CAD Subproject Construction of 1-355mm dia UPVC Buried Pipe Branch Lines BR-8 From Ch.(0.00 m+500 m) Construction of 1-355mm dia UPVC Buried Pipe Lines BR-5E From Ch.(0.00m to 500 m) Re-Construction of RCC Open Main Irrigation Canal From Ch.(1950 m to 2167 m) and Ch.(2337m to 2490m) Re-Cons. of RCC Open Branch Irr. Canal BR-3 From Ch.(0.00 m to 890 m) and Ch.(1050 m to 1320m) Re-Construction of RCC Open Branch Irrigation Canal BR-6E From Ch.(0.00 to 400 m) Construction of RCC Pump Operating Platform (21.50m x 1.85m x 0.50m) and Extension of Existing Sump (4.00m x 1.65m x 1.80m) at Zero point (2023-24 FY) Construction of RCC Slope Protection Work by Double Plate Palisading near pond (Ch. 0+000 Km to Ch. 0+095 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R1-R2 (Bidirpur Math) (Ch. 0+00 Km to Ch. 0+385 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R3-R4 (Khondar Math) (Ch. 0+00 Km to Ch. 0+380 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R5-R6 (Modonbari Math) (Ch. 0+00 Km to Ch. 0+450 Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P1-P2 (Milki Math) (Ch. 0+000 Km to Ch. 0+350Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P5-P6 (Bishu Miah Math) (Ch. 0+000 Km to Ch. 0+250Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried Line: P7-P8 (Ruhul Scheme) (Ch. 0+000 Km to Ch. 1+050Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P9-P10 (Gorostan Math) (Ch. 0+000 Km to Ch. 0+300Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P11-P12 (Gucchagram) (Ch. 0+000 Km to Ch. 1+000Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P13-P14 (Kamitikar Math-1) (Ch. 0+000 Km to Ch. 0+700Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P15-P16 (Kamitikar Math-2) (Ch. 0+000 Km to Ch. 0+400Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P17-P18 (Kamitikar Math-3) (Ch. 0+000 Km to Ch. 0+260Km) (2023-24 FY) 467.879 M/s.Mau Construction & M/s.Dulha Enterprise(JV) 467.879 25/10/2020 20/04/2021 51 13/08/2024 Ongoing
4 Shibganj
1 SP62035/Moheshpur CAD Subproject Construction of RCC Lined Canal (4.498km),20nos 2m RCC Slab, Distribution Box, Outfall With gate 25n Construction of Stair, Pump Platform and Sump. Estimate for the Construction of 6nos Culvert Construction of 8 Nos Syphone Construction of WMCA Office and Sub-Project Indication Sign Board & Post. 429.846 Abdul Mannan & Mminul Hoque JV 429.846 25/01/2023 70 13/08/2024 Ongoing
Total : 0.0000 (Km) 5288.38 (Lac) 5288.38 (Lac)