Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Magura-s
1 JRRIDP/20/MGR/W-64 Improvement of Borosoloi Bridge-Jogdol Ashba Road (Ch.00-1000m) by BC. 1.0000 99.120 M/S Nayon Entp. 99.120 0 26/09/2023
2 JRRIDP/22/MGR/W-75 Improvement of Sattarkandi - Khalia Bazar Rd (Ch. 03-976m & Ch.1708-2735m) by HBB Improvement of Dhori Khator Abdul Sardar House to Sabek Khator Muktijodha Moyen shiek House Pucca road (Ch.00-967m) by HBB. 2.9600 149.340 Abdur Rahim Entp 149.340 0 05/01/2023
3 JRRIDP/20/MGR/W-61 Part-A : Rehabilitation of 2x3.60x4.00m RCC Box Culvert on Boroi Govt. Primary School-Paturia more UNR Road at Ch.1200.00m. Part-B : Approach Road by HBB of 2x3.60x4.00m RCC Box Culvert on Boroi Govt. Primary School-Paturia more UNR Road at Ch.1200.00m. 42.960 M/S Alamin Entp 42.960 01/09/2021 06/05/2022 100 14/12/2022 Final
4 JRRIDP/20/MGR/W-60 Repair work of office Building at XEN Office, LGED, Magura. 50.000 Munshi Md. Anawerul Haue 50.000 12/08/2021 07/02/2022 95 14/12/2022
5 JRRIDP/20/ MGR/W-57 Development of Gangnalia Bazar Under Sadar Upazila, Magura. Development of Hazipur Bazar Under Sadar Upazila, Magura. 70.000 M/S Abu Isahaq & Sons 70.000 03/03/2021 02/03/2022 100 14/12/2022 Final
6 JRRIDP/ 19/MGR/ W-49 Improvement of Bogura Madrasha-Kharichal Via North Majail Road (Ch.2000-3000m) by BC. 1.0000 105.890 M/S Munshitrade International Jhenaidah 105.890 08/06/2020 15/06/2021 100 14/12/2022 Final
7 JRRIDP/19/ MGR/W-41 Banga Tematha-Majhail via Barail Purba para Bazar road (Ch.1663-3005m) by BC Atharokhada Kalam Biswas House - Alidhani Mosque road (Ch.1170-1982m) by BC. Hazrapur Rahim House (R&H) - Ichakada Road (Ch.00-700m) by BC. Sreefoltola -Laximpur Rd (Ch.00-1140m) by BC. 3.9900 279.030 KMR-PK (JV) 279.030 12/07/2020 10/01/2022 100 14/12/2022 Final
8 JRRIDP/19/ MGR/W-40 Hazrapur U.P Office (Ichakhaka) - Mothna bazar via Gangolia bazar Rd (Ch.1500-6200m) by BC. 4.7000 331.710 KMR-PK (JV) 331.710 12/07/2020 10/01/2022 100 14/12/2022 Final
9 JRRIDP/19/ MGR/W-38 Borasalai (Kalaidanga)-Ashba Rd (Ch.00-1000m) by BC. Dhankhali Puja Mondab-Mrigidanga via Charpara Pry.School Rd (Ch.00-1500m by BC. Mrigidangda - Goloknagor Rd (Ch.00-1000m) by BC. 3.5000 248.590 Shaik Md. Harun-or-Rashid 248.590 13/04/2020 29/04/2021 100 14/12/2022 Final
10 JRRIDP/19/ MGR/W-35 Bogura Mazail Pachem Para To Kherical Road Via Zam Mosque Road (Ch.00-250m) by BC. Baka Horispur - Baharbag Shoutpara road (Ch.00-1300m) by BC. 1.5500 103.950 M/S Razia Enterprise 103.950 16/02/2020 10/02/2021 100 14/12/2022 Final
11 JRRIDP/19/ MGR/W-26 Shonpur-Jagla Jagdal road (Ch.00-1000m) by BC. 1.0000 67.550 M/S JFR Enterprise 67.550 04/08/2019 13/05/2020 100 14/12/2022 Final
12 JRRIDP/20/MGR/W-65 Part-A : Rehabilitation of 2x3.60x4.00m Box Culvert on Paikel Abul Molla house - East Sitarampur road at Ch.600.00m. 42.070 M/S Kona Entp. 42.070 16/09/2021 18/04/2022 100 12/12/2022 Final
13 JRRIDP/18/MGR/W-08 Periodic Maintenance of Bashkhota- Jakarartack (Ch.00-1409m) Road. 1.4090 31.910 M/S Kakon Enterprise Stadiumpara, Magura 31.910 02/04/2019 02/06/2019 100 24/11/2022 Final
14 JRRIDP/18/MGR/W-07 Mohishadanga-Titarkhapara road (Ch.00-1000m) by BC. 1.0000 70.250 M/S Khondokar Enterprise Khamarpara, Sreepur, Magura 70.250 28/07/2019 23/01/2020 100 24/11/2022 Final
15 JRRIDP/22/MGR/W-76 Improvement of Mallondo Girl High School Road (Ch.00-164m) by BC. Improvement of Satrujitpur (R&H) Borioy - Motalab Mambor house Rd (Ch.00-1000m) by BC. 1.1600 88.250 88.250 0 22/11/2022
16 JRRIDP/22/MGR/W-74 Improvement of Rawtera High School To Biddut Biswas House Road (Ch.1850-2290m) by BC. 0.4400 32.710 32.710 0 15/11/2022
17 JRRIDP/22/MGR/W-70 Improvement of Malonchi-Benga Girls High School via Baliadanga Rd (Ch.00-585m) by BC. Improvement of Bogura Mazail Pachem Para To Kherical Road Via Zam Mosque Road (Ch.00-1500m) by BC. 2.0850 157.970 157.970 0 10/10/2022
18 JRRIDP/18/MGR/W-19 Ramnagar Hat-Krisnapur Rd (Ch.00-750m) by BC Baliadanga Bazar-Malonchi FRB Road (Ch.00-1000m) by BC. Bhudhairpara-Bhabonhati Bazar Road (Ch.1000-2000m) by BC. Jagla 7 Mile - Rajbear para Road (Ch.00-1000m) by BC. Dhormodha -Shinghodanga Road (Ch.500-1000m) by BC. 4.2500 263.160 M/S Rohima Traders 263.160 08/09/2019 31/07/2020 100 13/12/2021
19 JRRIDP/19/ MGR/W-43 Patharhat-south Durgapur Rd (Ch.00-1000m) by HBB Sarifaltola- Aruakandi Rd (Ch.00-755m) by HBB. 1.7550 80.950 Syed Enterprise 80.950 15/03/2020 14/12/2020 100 07/09/2021
20 JRRIDP/19/ MGR/W-27 Ramchandrapur-Kharichail Road (Ch.00-1000m) by BC. 1.0000 71.170 M/S PK Traders 71.170 04/08/2019 13/05/2020 100 04/02/2021
21 JRRIDP/18/MGR/W-12 Wapda Moar R&H - Mohammadpur GC via Pukhuria Rd (Ch.1500-2284m & Ch.5700-6324m) by BC Shekh para (Shonpur Duty shed)-Jagdal bazar road (Ch.850-1573m & Ch.1639-1916m) by BC 2.4000 203.430 Nishit Bosu 203.430 05/08/2019 100 29/11/2020
22 JRRIDP/19/ MGR/W-28 Satijet pur R& H (Mango Garden) - Collage Fild Road Via H/O Dheren Halder Road (Ch.00-848m) by BC. 0.8480 49.100 M/S JFR Enterprise 49.100 04/08/2019 13/05/2020 100 02/07/2020 Final
23 JRRIDP/19/ MGR/W-25 Ichakada 14 Mile R&H - Uttar Beerpur Road (Ch.00-750m) by BC. 0.7500 50.280 M/S Urme Traders 50.280 08/08/2019 13/05/2019 100 07/05/2020
24 JRRIDP/18/MGR/W-20 Sotto Joka R&H - Nolo Nogor Road (Ch.00-2000m) by BC. Beel Aksi Purbopara-Aksi UZ Road (Ch.00-1000m) by BC. Jendaidha (R&H) - Hazrapur (Somser house)-Uthali Rd (Ch.1000-1512m) by BC. Goalbathan Kawsar Molla house (R&H)-H/O Monir Uddin at Mowlabi road Via Gopalgram Primary School Rd (Ch.00-1060m) by BC 4.5720 303.910 Mir Abu sayed -sazzad Barkat Construction and Engineers Ltd. 303.910 01/10/2019 30/08/2020 100 07/05/2020
25 JRRIDP/19/ MGR/W-24 Monirampur R&H Road - Senerchar Road (Ch.871-1871m) by BC. 1.0000 69.220 M/S JFR Enterprise 69.220 04/08/2019 13/05/2020 100 31/12/2019 Final
26 JRRIDP/18/MGR/W-13 Periodic Maintenance of (Re-seal) Rawtera High School To Biddut Biswas House (Ch.00-952m) Road Periodic Maintenance of (Re-seal) Barosaloi high school- Barosalai ghat (Ch.00-1290m) road. 2.2400 62.000 M/S Urme Traders 62.000 24/06/2019 07/10/2019 100 31/12/2019 Final
27 JRRIDP/18/MGR/W-11 Periodic Maintenance of (Over Lay) Dholhara R&H-Chandpur FRB (Post office) Road (Ch.00-1449m). 1.4490 31.100 M/S Ahona Enterprise 31.100 29/04/2019 03/06/2019 100 01/08/2019 Final
2 Mohammadpur
1 JRRIDP/19/MGR/W-48 (R) Remaining work of Balidia UP office-Horekrishnapur Hat Rd (Ch. 950-3520m) by BC. 2.5700 254.280 254.280 0 19/02/2024
2 JRRIDP/19/MGR/W-33 (R) Remaining work of Kanutia Bazar to Babukhali UP via Chowbaria Bazar Rd (Ch. 3334-10060m) by BC. 6.7260 261.620 261.620 0 19/02/2024
3 JRRIDP/20/MGR/W-62 Improvement of Char Rajapur H/O Sayem- Nittonondopur H/O Sultan Molla Rd (Ch.00-750m) by BC. Improvement of Bongram-Kalishankerpur School Rd (Update Name : Bongram-Danagapara RHD) (Ch.00-750m) by BC Improvement of Nagra Bazar-Nowapara Hat Rd (Ch.00-1000m) by BC. 2.5000 199.120 M/S Rohan Construction 199.120 03/10/2021 03/09/2022 50 14/12/2022
4 JRRIDP/20/MGR/W-59 Mohespur Sluice gate-Bolorampur BC road near A. Salam house Road (Ch.00-1120m) by BC. 1.1200 95.010 M/S Bizli Enterprise 95.010 20/04/2021 25/03/2022 100 14/12/2022 Final
5 JRRIDP/20/ MGR/W-55 Development of Nagra Bazar Under Mohammadpur Upazila, Magura. Development of Dumurshia Bazar Under Mohammadpur Upazila, Magura. 70.000 Md. Rana Amir Osman 70.000 27/12/2020 26/12/2021 50 14/12/2022
6 JRRIDP/ 19/MGR/ W-51 Improvement of Rampur Mohor Sarder house - Char Rampur H/O Gokul Ch. Roy Road (Ch.00-1325m) by BC Improvement of Razer hat to Churargati Shamol hose road (Ch.00-515m) by BC. 1.8400 158.090 Md. Harun or Rashid 158.090 23/11/2020 25/02/2022 100 14/12/2022
7 JRRIDP/ 19/MGR/ W-50 Construction of 2x5.00x5.00m Box Culvert on BinodpurGC to Noapara GC via Chawbaria Bazar, Hatbaria Bazar & Nagra Bazar Road at Ch. 1450.00m. 70.050 M/S Gsun Bilders Kanchannagar, Jhenaidah 70.050 25/06/2020 07/07/2021 100 14/12/2022 Final
8 JRRIDP/ 19/MGR/W-46 Improvement of Binodpur UP office-Khalia Bazar Rd (Ch.1000-2580m) by BC. 1.5800 157.710 M/S Asif Construction 157.710 09/07/2020 02/03/2021 70 14/12/2022
9 JRRIDP/ 19/MGR/ W-44 Improvement of Digha UP office-Sirgram Bazar Rd (Ch.00-3110m) by BC. 3.1100 303.220 M/S Rasel Enterprise-Mir Abu Shayed (JV) 303.220 06/07/2020 20/05/2021 30 14/12/2022
10 JRRIDP/ 19/MGR/W-45 Improvement of Binodpur UP-Madhabpur Hat via Thakurer Hat & Churargati Hat Rd (Ch.8580-10780m) by BC. 2.2000 199.500 Al-Amin Traders 199.500 06/07/2020 14/07/2021 100 14/12/2022
11 JRRIDP/19/ MGR/W-39 Mohammadpur Upazila HQ - WAPDA Bazar RHD Rd (Ch.15900-23100m) by BC 7.2000 789.010 Nishit-Nuhudarul JV 789.010 23/06/2020 27/12/2021 85 14/12/2022
12 JRRIDP/19/ MGR/W-34 Billapara -Moifulkanda Rd (Ch.500-1165m) by BC. Mosakhali bridge - Barasia Fultola Rd (Ch.00-750m) by BC. Raypasa Elias shop-Muktijhodha Goffer master house Road (Ch.00-495m) by BC. 1.9100 133.980 M/S PK Traders 133.980 18/02/2020 21/01/2021 100 14/12/2022 Final
13 JRRIDP/19/ MGR/W-32 Mohammadpur Upazila HQ - WAPDA Bazar RHD Rd (Ch.8642-15900m) by BC 7.2580 828.800 Jaka-Rasel (JV) 828.800 20/07/2020 13/01/2022 60 14/12/2022
14 JRRIDP/19/ MGR/W-31 Ronagor- Kalishankerpur Bazar Rd (Ch.00-1000m) by BC. 1.0000 66.560 M/S P.K Traders 66.560 12/11/2019 16/08/2020 100 14/12/2022 Final
15 JRRIDP/18/MGR/W-10 Periodic Maintenance of Bethulia R&H to Mongolhata via Omedpur (Ch.00-1470m) Road. Periodic Maintenance of Polashbaria UP-Joshobontopur RHD via Gazir more bazar (Ch.990-1980m) Road 2.4600 45.550 M/S Khondokar Enterprise Khamarpara, Sreepur, Magura 45.550 15/04/2019 20/06/2019 100 24/11/2022 Final
16 JRRIDP/18/MGR/W-04 Mohammadpur H/Q to Dhuljuri Bazar road (Ch.00-500m & Ch.1150-3580m) by BC. 3.6800 249.020 Nishit Bosu 249.020 21/06/2019 20/06/2019 100 24/11/2022 Final
17 JRRIDP/22/MGR/W-72 Improvement of Bonogram GPS Road 0.9000 70.340 70.340 0 07/11/2022
18 JRRIDP/22/MGR/W-71 Improvement of Kaura Post office to Baniabhuhu Madrasha (Kaura to araji umadpur) Road (Ch.00-1240m) by BC. 1.2400 104.180 104.180 0 16/10/2022
19 JRRIDP/ 19/MGR/ W-53 Improvement of Mohammadpur Head Quater to Balidia UP office Rd (Ch.2887-3000m) by BC. 0.1130 14.690 M/S Naz Enterprise Jhenaidah 14.690 27/08/2020 03/01/2021 100 07/09/2021
20 JRRIDP/ 19/MGR/ W-47 Improvement of Rajapur UP office to Ganganandopur bazar Rd (Ch.00-3230m) by BC. 3.2300 269.880 M/S Emon Enterprise 269.880 15/07/2020 31/05/2021 30 07/09/2021
21 JRRIDP/20/MGR/W-63 Improvement of Dhoail-Raipur Rd (Ch.660-1410m) by BC. Improvement of Khalia Mondol Para-Gullia Uttor Para Rd (Ch.1351-2000m) by BC. Improvement of Palla Moddhopara Pochon Bosu house - Nowpara ghat mosque Rd (Ch.00-900m) by BC. 2.2990 174.290 174.290 0 05/05/2021
22 JRRIDP/ 19/MGR/W-48 Improvement of Balidia UP office-Horekrishnapur Hat Rd (Ch.950-3520m) by BC 2.5700 209.450 Rasel Enterprise 209.450 15/07/2020 20/05/2021 0 04/02/2021
23 JRRIDP/19/ MGR/W-33 Kanutia Bazar to Babukhali UP via Chowbaria Bazar Rd (Ch.3334-10060m) by BC 6.7260 518.350 Rasel Enterprise 518.350 18/02/2020 21/01/2021 70 30/11/2020
24 JRRIDP/18/MGR/W-18 Balidia UP office-Rarikhali Hat via Gopinathpur Hat Rd (Ch.8550-9100m) by BC. Sindhahin-Sirgram Bazar Rd (Ch.24-724m) by BC. Sibrampur BC road- Vatuadanga Rd (Ch.00-1343m) by BC. 2.5930 195.310 Rasel Enterprise 195.310 20/08/2019 01/08/2020 100 31/12/2019
3 Salikha
1 JRRIDP/22/MGR/W-69 Improvement of Rampur-Hatbaria Road (Ch.1400-2404m) by BC. 1.0000 9379060.000 M/S Bali Construction 9379060.000 0 29/03/2023
2 JRRIDP/22/MGR/W-77 Improvement of Sersha Road to Satapara Road. 0.7550 57.880 57.880 0 22/01/2023
3 JRRIDP/19/ MGR/W-37 Kumarkota Madhyapara-Westpara Rd (Ch.00-610m) by BC. 0.6100 43.130 M/S A.R Traders 43.130 02/03/2020 02/12/2020 100 14/12/2022
4 JRRIDP/19/ MGR/W-30 Remaining Estimate for Construction of 96m PC Girder Bridge on Baulia-Sorusuna Road at Sorusunaghat Ch.2940m over Chitra River. 247.150 M/S Faisal Traders, Khulna 247.150 09/02/2020 15/02/2021 100 14/12/2022 Final
5 JRRIDP/18/MGR/W-03 Raizadapur Motleb Mridha house-Nikanja House Rd (Ch.00-1280m) by BC. Narapati-Rampur Road (Ch.2350-3352m) by BC. Dhonesworgati Bauter more-Horir Battala Road (Ch. 00-1120m) by BC. 3.4020 241.040 Nishit Bosu 241.040 07/07/2019 06/07/2020 100 24/11/2022 Final
6 JRRIDP/18/MGR/W-02 Simakhali GCC-Gaidghat via Premchara road (Salikha Portion) (Ch.468-1600m) by BC. Digholgram-Gobindapur road (Ch.00-500m) by BC. Arpara Baulia Road at Borichara Deybari to Kalitala Road (Ch.00-920m) by BC. Sabek Khator Millghar - Khator Chowrasta, via Sabek Khator Uttarpara, Beelpara, High School Road (Ch.2656-2996m) by BC. 2.9220 205.400 M/S Rasel Enterprise-Mir Abu Shayed (JV) 205.400 06/11/2019 10/11/2020 100 24/11/2022 Final
7 JRRIDP/18/MGR/W-01 Talkhori-Naghosha via Sonadanga road (Ch.00-4300m) by BC. 4.3000 295.080 Mir Abu sayed -sazzad Barkat Construction and Engineers Ltd. 295.080 22/08/2019 31/07/2020 100 24/11/2022 Final
8 JRRIDP/20/ MGR/W-56 Construction of 3.00x4.00mx4.50m RCC Box Culvert on Poragachi-Horispur Road at Ch.1749.00m. 51.460 M/S Emon Entp 51.460 28/01/2021 24/10/2021 0 07/09/2021
9 JRRIDP/20/MGR/W-54 Improvement of Bunagati-Baroilpalita Via Naliaghat Road (Salikha Portion) (Ch.00-1035m) by BC. 1.0350 122.530 M/S Zaman Enterprise 122.530 08/12/2020 14/12/2021 100 07/09/2021
10 JRRIDP/ 19/MGR/ W-52 Re-Construction of 1.00x1.00m RCC Box Culvert on Arpara-Darisalai Road at Ch.300m. Re-Construction of 2.00x2.00m RCC Box Culvert on Talkhori-Naghosha via Sonadanga Road at Ch.1650m. 12.660 M/S A.R Ayaan Enterprise Jhenaidah 12.660 12/08/2020 03/01/2021 100 04/02/2021
11 JRRIDP/18/MGR/W-22 Deluabari Bazar-Chaturbari bazar Rd (Ch.00-750m) by BC. Radhadanga-Sarusuna Rd (Ch.2000-2710m) by BC. Chandra Malipara Amir hossain house to Kuskhali madrasha via Moulana hujureer bari road (Ch.00-1000m) by BC 2.4600 172.470 M/S Rasel Enterprise-Mir Abu Sayed (JV) 172.470 08/09/2019 03/08/2020 100 05/08/2020
12 JRRIDP/19/ MGR/W-42 Modhukhali Dokhinpara Madrasha-Dokhinpara Mosque via Doctor para Road (Ch. 00-586m) by BC. 0.5860 51.120 Sumon Enterprise 51.120 08/03/2020 06/12/2020 100 02/07/2020
13 JRRIDP/18/MGR/W-16 Part-01 : Construction of 3x5.00x5.00 Box Culvert on Bunagati GC-Narikelbaria GC (Bagherpara) Road at Ch. 4150.00m. Part-02 : Approach Road of 3x5.00x5.00 Box Culvert on Bunagati GC-Narikelbaria GC (Bagherpara) Road at Ch. 4150.00m. 41.050 Faruk Construction 41.050 19/05/2019 18/03/2019 100 07/05/2020
14 JRRIDP/18/MGR/W-17 Periodic Maintenance of Simakhali Madrasa-Satakhali Puratan bazar via Soigharia Road (Ch.00-680m). 0.6800 25.380 M/S Anti Enterprise 25.380 11/06/2019 13/09/2019 100 31/12/2019
15 JRRIDP/18/MGR/W-15 Periodic Maintenance of Borichara Atirvita -Boroichara Bazer (Ch.00-1645m) Road 1.6450 58.000 Md. Nuhudarrul Huda 58.000 19/05/2019 19/08/2019 100 31/12/2019 Final
4 Sreepur
1 JRRIDP/23/MGR/W-79 Development of Goaldah Bazar Under Sreepur Upazila, Magura. 23.390 23.390 0 04/10/2023
2 JRRIDP/23/MGR/W-78 Improvement of Ramnagar Reg. Non Govt. Primary School Connceting Road (Rainagar-Sabalgacha Road) at Ch.00-467m by BC. Improvement of Koddarroha Reg. Non Govt. Primary School Connceting Road (Koddarroha Village Road) at Ch.00-400m by BC. 0.8670 77.180 77.180 0 03/09/2023
3 JRRIDP/21/MGR/W-66 Improvement of Gopalpur-Rajapur Hat Road (Ch.00-1000m) by BC. Improvement of Hogoldanga Al Ahasan mosque to Moktijodda Abdulla house Rd (Ch.00-300m) by BC. 1.3000 92.370 Md. Alamgir 92.370 10/04/2022 29/03/2023 50 14/12/2022
4 JRRIDP/20/MGR/W-58 Improvement of Road from Char Chowgachi Mosque Pucca Road –Ghoshali Kheyaghat Road (Ch.00-520m) by BC. 0.5200 51.430 M/S Ali Ahmed Ahad 51.430 28/03/2021 23/09/2021 100 14/12/2022 Final
5 JRRIDP/19/ MGR/W-36 Chandrapara Upazila road - Hogoldanga Moynul shop via Major Siraz house Rd (Ch.00-400m) by BC. 0.4000 34.820 M/S Sarma Enterprise 34.820 15/01/2020 17/11/2020 100 14/12/2022 Final
6 JRRIDP/18/MGR/W-05 Sachilapur Bazar-Sabdalpur bazar via Sonatundi Road (Ch.2897-3897m) by BC Kodla Village Road (Ch.00-1150m) by BC. Modhupur pucca rd.-Belnagar Khaya Ghat Road (Ch.00-1000m) by BC Sreepur Purbapara-Hogaldanga Road (Ch.00-448m) by BC. Sreepur Upazila to Kajoli bazar via Musdia road (Ch. 00-500m) by BC. 4.0980 278.440 M/S Asif Construction 278.440 28/07/2019 30/06/2020 100 14/12/2022 Final
7 JRRIDP/19/ MGR/W-29 Dorannagar hat-Kadirpara UP office at Radhanagar GC Rd (Ch. 5100-6000m) by BC. WAPDA more-Guchagram Road (Ch.00-1000m) by BC. Joka village road 1 Road (Ch.250-1000m) by BC Barishat Village road -2 (Ch.00-1100m) by BC. 3.7500 239.040 M/S Eden Prise 239.040 09/02/2020 04/11/2020 100 11/12/2022 Final
8 JRRIDP/18/MGR/W-05 Sachilapur Bazar-Sabdalpur bazar via Sonatundi Road (Ch.2897-3897m) by BC Kodla Village Road (Ch.00-1150m) by BC. Modhupur pucca rd.-Belnagar Khaya Ghat Road (Ch.00-1000m) by BC Sreepur Purbapara-Hogaldanga Road (Ch.00-448m) by BC. Sreepur Upazila to Kajoli bazar via Musdia road (Ch. 00-500m) by BC. 4.0980 278.440 M/S Asif Construction 278.440 28/07/2019 30/06/2020 100 24/11/2022 Final
9 JRRIDP/18/MGR/W-14 Periodic Maintenance of Nakol Bazar (Bus stand) - Nakol Shasan Ghat (Ch.00-580m) Rd. Periodic Maintenance of Amtail Vill Rd-2 (Ch.00-1000m) Road 1.5800 56.000 M/S Asik Enterprise 56.000 23/05/2019 25/08/2019 100 24/11/2022 Final
10 JRRIDP/22/MGR/W-73 Improvement of Kalinagar Bazar-Balighata Road (Ch.00-1215m) by BC. Improvement of Radhanagor-Ramnagar R&H at Baralidah Miaparamore-Malotipara Club (R&H) Road (Ch.00-585m) by BC. 1.8000 132.570 132.570 0 15/11/2022
11 JRRIDP/22/MGR/W-68 Maintenance of Barishat RHD (Post office) to Gangnalia Bazar via Kazoli River ghat Road (Ch.00-1375m) Maintenance of Hogoldanga-Rajapur Hat Road (Ch.2874-3854m) 2.3550 62.410 Faruq Construction 62.410 0 10/11/2022
12 JRRIDP/21/MGR/W-67 Part-A : Construction of 3x5.00x5.00m Box Culvert on Kalinagar Bazar - Amalshah UP (Soto Udash) via Balia ghata Pry. School Rd at Ch.320m. 85.420 85.420 0 22/09/2022
13 JRRIDP/19/ MGR/W-23 Hogoldanga Village Road (Ch.00-600m) by BC. 0.6000 43.640 M/S Dhaka Traders 43.640 31/07/2019 13/05/2020 100 07/05/2020 Final
14 JRRIDP/18/MGR/W-21 Sachilapur GC to Gayespur UP office via Chilgari Bazar Rd (Ch.3900-6650m) by BC Sreepur-Kurundi via Chilgari Bazar Road (Ch.4905-5905m) by BC. 3.7500 244.810 KMR-PK (JV) 244.810 12/09/2019 05/08/2020 100 07/05/2020
15 JRRIDP/18/MGR/W-06 Dorannagar hat-Kadirpara UP office at Radhanagar GC Rd (Ch.1500-4500m) by BC. Roynagar Kharapa WAPDA Road- Gobindapur BC Road Via H/O Babu Mambur Road (Ch.00-500m) by BC. Modhupur Bazar to Gobindapur Road (Ch.1000-2000m) by BC 4.5000 323.710 MBC-MRT JV 323.710 22/05/2019 20/04/2020 100 31/12/2019 Final
16 JRRIDP/18/MGR/W-09 Periodic Maintenance of Kamlapur Bridge- Kamlapur Graveyard (Ch.00-520m) road 0.5200 14.220 M/S Khondokar Enterprise Khamarpara, Sreepur, Magura 14.220 15/04/2019 05/06/2019 100 02/12/2019 Final
Total : 160.4160 (Km) 9391315.87 (Lac) 9391315.87 (Lac)