Contract No:LGED/UE/SS/2012/588 |
Date: 23/08/2012 |
To: Asaduzzman
Salim, Itagacha, Satkhira. |
|
This is to notify you that your Tender dated 17/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0362 for
Re-Construction of (a) Nebakhali Khokan Smriti (RNGPS),(b) Tentuldanga
(Community) (c) Ghona Paschim Para (Community) primary school including
Furniture Supply Under Sadar Upazila, Dist. Satkhira for the Contract Price of
Tk 1,69,47,501.65 Amount in word (One Core Sixty nine Lac forty seven thousand five
hundred one and Paisa sixty five ) only as corrected and modified
in accordance with
the Instructions to Tenderers , has been approved
by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide Memo
No.LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i.
accept in writing the Notification of Award within
seven (7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii.
furnish a
Performance Security in the form as
specified and in the amount of Tk. 8,47,375/- (Eight Lac. Forty seven
thousand three hundred seventy five only
) ,within fourteen (14) days of acceptance of this
Notification of Award but not later than
16/09/2012 in accordance with ITT
Clause 65.
iii.
sign the
Contract within twenty eight (28) days of issuance of this Notification of
Award but not later than 19/09/2012,
in accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/588/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The Executive
Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila : Sadar,
District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Nebakhali
Khokan Smriti (RNGPS),(b) Tentuldanga (Community) (c) Ghona Paschim Para
(Community) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/587 |
Date: 23/08/2012 |
To: Md.
Iqbal Jamader, Polashpole, Satkhira. |
|
This is to notify you that your Tender dated 17/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0361 for
Re-Construction of (a) Chokighata Choygharia (RNGPS),(b) Nehal pur (GPS) (c) Jagannath
pur (GPS) primary school including Furniture Supply Under Sadar Upazila, Dist.
Satkhira for the Contract Price of Tk 1,68,70,000.20
Amount in word (One Core Sixty Eight Lac. Seventy thousand and Paisa twenty
) only as corrected and modified in
accordance with the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No.LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i.
accept in writing the Notification of Award within
seven (7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii.
furnish a
Performance Security in the form as
specified and in the amount of Tk. 8,43,500/- (Eight Lac. Forty three
thousand five hundred only ) ,within fourteen (14) days of acceptance of this Notification of
Award but not later than 16/09/2012 in accordance with ITT Clause
65.
iii.
sign the
Contract within twenty eight (28) days of issuance of this Notification of
Award but not later than 19/09/2012,
in accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which shall
become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/587/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Chokighata
Choygharia (RNGPS),(b) Nehal pur (GPS) (c) Jagannath pur (GPS),
Upazila : Sadar, District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/589 |
Date: 23/08/2012 |
To: Ansan
Bahar Bulbul, Katia, Satkhira. |
|
This is to notify you that your Tender dated 17/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0363 for
Re-Construction of (a) Raj Nagar (GPS) & (b) Narayanzole (Community) primary
school including Furniture Supply Under Sadar Upazila, Dist. Satkhira for the
Contract Price of Tk 1,13,06,839.82 Amount
in word (One Core Thirteen Lac Six thousand
eight hundred thirty nine and Paisa eighty two ) only as corrected and modified
in accordance with
the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No.LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.5,65,342/- ( Five
Lac sixty five thousand three hundred forty two only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/589/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Raj
Nagar (GPS) & (b) Narayanzole (Community) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/590 |
Date:
23/08/2012 |
To: S.M.
Shamsuzzman Munshipara, Satkhira. |
|
This is to notify you that your Tender dated 17/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0364 for
Re-Construction of (a) Mohanpur (Community) & (b) Gopinathpur (Community) primary
school including Furniture Supply Under Sadar Upazila, Dist. Satkhira for the
Contract Price of Tk 1,12,90,663.72 Amount
in word (One Core Twelve Lac ninety thousand six hundred sixty three and Paisa seventy
two ) only as corrected and modified
in accordance with
the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No.LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.5,64,533/- ( Five
Lac sixty four thousand five hundred thirty three only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/590/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Mohanpur
(Community) & (b) Gopinathpur (Community) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/591 |
Date: 23/08/2012 |
To: M/S Orin
Enterprise Baykari, Satkhira. |
|
This is to notify you that your Tender dated 29/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0672 for
Construction of additional class room (a) Chaygharia (RNGPS) & (b) Kamar
Baysa (GPS) including Furniture Supply Under Sadar Upazila, Dist. Satkhira for
the Contract Price of Tk 63,06,973.15 Amount
in word (Sixty three Lac six thousand nine hundred seventy three and Paisa fifteen ) only as corrected and modified
in accordance with
the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No. LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.3,15,350/- ( Three
Lac fifteen thousand three hundred fifty only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/591/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Chaygharia (RNGPS) & (b) Kamar Baysa (GPS)
primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/592 |
Date: 23/08/2012 |
To: Md.
Iqbal Jamadar Polashpole, Satkhira. |
|
This is to notify you that your Tender dated 29/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.0673 for
Construction of additional class room (a) Dahakula (GPS) & (b) Alipur
Dighir par (GPS) including Furniture Supply Under Sadar Upazila, Dist. Satkhira
for the Contract Price of Tk 65,78,741.17
Amount in word (Sixty five Lac seventy
eight thousand seven hundred forty one and
Paisa seventeen ) only as corrected and
modified in accordance
with the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No. LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.3,28,937/- ( Three
Lac twenty eight thousand nine hundred thirty seven only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/592/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Dahakula (GPS) & (b) Alipur Dighir par
(GPS) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/593 |
Date:
23/08/2012 |
To: Anshan
Bhar Bul bul, Katia,
Satkhira. . |
|
This is to notify you that your Tender dated 29/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.1070 for
Construction of additional class room (a) Rajar Bagan (GPS) & (b) Daulat
Pur (GPS) including Furniture Supply Under Sadar Upazila, Dist. Satkhira for
the Contract Price of Tk 1,14,02,941.40 Amount
in word ( One Core fourteen Lac two
thousand nine hundred forty one and
Paisa forty ) only as corrected and
modified in accordance
with the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No. LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.5,70,147/- ( Five Lac seventy
thousand one hundred forty seven only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/593/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Rajar Bagan (GPS) & (b) Daulat Pur (GPS) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/594 |
Date: 23/08/2012 |
To: S.M.
Shamsuzzaman Katia,
Satkhira. . |
|
This is to notify you that your Tender dated 29/05/2012 for the
execution of the Works Package No.PEDP-III/SKR/SAD/2011-2012/W2.1071 for
Construction of additional class room (a) Bow khola (GPS) & (b) Damar pota
(GPS) including Furniture Supply Under Sadar Upazila, Dist. Satkhira for the
Contract Price of Tk 1,13,99,496.84 Amount
in word ( One Core thirteen Lac ninety
nine thousand four hundred ninety six and Paisa eighty four ) only as corrected
and modified in
accordance with the Instructions to Tenderers , has been
approved by Additional Chief Engineer(M), LGED, H/Q. Dhaka Vaide
Memo No. LGED/PEDP-III/D-5/2012(Part-14)/4575 Dated:06/08/2012.
You are thus requested to take
following actions:
i) accept in writing the Notification of Award within seven
(7) working days of its issuance pursuant to ITT Sub Clause 63.1
ii) furnish a
Performance Security in the form as
specified and in the amount of Tk.5,69,975/- ( Five
Lac sixty nine thousand nine hundred seventy five only ) ,within
fourteen (14) days of acceptance of this Notification of Award but not later than 16/09/2012 in accordance with ITT Clause 65.
iii) sign the Contract
within twenty eight (28) days of issuance of this Notification of Award but not later than 19/09/2012, in
accordance with ITT Sub Clause 69.2.
You may proceed with the execution of the Works only
upon completion of the above tasks. You may also please note that this
Notification of Award shall constitute the formation of this Contract which
shall become binding upon you.
We attach the draft Contract and
all other documents for your perusal and signature.
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |
Contract
No:LGED/UE/SS/2012/594/1(14) |
Date: 23/08/2012 |
C.C:
1. The Additional Chief Engineer, (Maint) LGED, LGED Bhaban,
Agargaon, Dhaka-1207.
2. The
Director General, Directorate of Primary Education Mirpur -2, Dhaka-1216.
3. The Superintendent Engineer, LGED, Khulna
Region, Khulna.
4. The Program Director, PEDP-III, Primary
Education Department, Mirpur-2, Dhaka-1216.
5. The
Executive Engineer, LGED, District: Satkhira
6. The Executive Engineer, ( Primary Education
& Training)LGED, Khulna Region, Khulna.
7. The Chairman
Upazila Parished, Sadar, Satkhira.
8. The Upazila Nirbahi Officer, Upazila : Sadar
, District: Satkhira
9. The District Primary Education Officers,
District: Satkhira.
10. The District Accounts Offiicer, District :
Satkhira
11. The Upazila Education Officer, Upazila :
Sadar, District: Satkhira .
12. ..................................................................
(SAE), LGED, Upazila : Sadar, District: Satkhira.
13. ..................................................................
(W/A)., LGED, Upazila : Sadar, District: Satkhira.
14. The Head Master, (a) Bow khola (GPS) & (b) Damar pota (GPS) primary school, Upazila : Sadar,
District: Satkhira
|
( S.M.Eyafe ) Upazial Engineer, LGED,Sadar, Satkhira. |