Government
of the People’s Republic of
Local Government Engineering Department
Construction of 950m PC Girder Bridge over
in Phulbari Upazila of Kurigram District Project (1st Revised).
LGED Bhaban ( Level-9),
Agargaon, Sher-e-Bangla Nagar
Dhaka-1207.
www.lged.gov.bd
Memo
No- LGED/PD(Dharola)/C-14(Part-3)/2015/391 Date: 18.09.2016
Request for Application (RFA)
For
Selection of Bridge Engineer
(RFA- 01/2016-2017)
LGED has received public funds from the
Government of the Peoples Republic of Bangladesh (GOB) toward the cost of
“Construction of 950m PC Girder Bridge over Dharola
River in Phulbari Upazila
of Kurigram District (1st
Revised)” and intends to apply part of the fund for payments for the
consultancy services for the project to be provided by the individual
consultant (Bridge Engineer) as below:
Package
no |
Proposed Position & Number |
Service Required |
Qualification and Experience |
PD/Dharola/S-01 |
Bridge
Engineer & 1(One) No. |
a)
Intensive supervision and monitoring of construction work. b)
Checking the quality of construction material and also perform lab test of
accomplished work. c)
Provide technical assistance to LGED. d)
Reporting and bill certification (Detail given in ToR). |
Must have minimum 10 years working experience in
relevant field i.e supervision of bridge
construction etc Experience
in construction/ supervision of PC girder bridges will be considered as
additional qualification. (Other criteria as mentioned in the RFA document). |
The Project Director , Construction of
950m PC Girder Bridge over Dharola River in Phulbari Upazila of Kurigram District Project (1st Revised), LGED
now invites eligible applicants to apply for the positions mentioned above.
Interested applicants are invited to provide information indicating that they
are qualified to perform the services (Complete CV with other details as
required as per the Application Forms)
Consultants will be selected using the
selection of individual consultant sub-method in accordance with the Public
Procurement Rules 2008. It is
expected that the services will commence on 1st November’ 2016 and shall
continue up to 30th June’
2017.
Interested applicants are requested to
submit their expression of interest in accordance with the request for
Application which may be obtained from the office of the undersigned during
normal office hours. A complete set of “ Request for
Application” including Terms of Reference may be obtained from the office of
the undersigned.
Request for Application shall be
submitted by 2.00 PM on 18.10.2016 in sealed envelope delivered to The Project
Director, “Construction of 950m PC Girder Bridge over Dharola
River in Phulbari Upazila
of Kurigram District (1st
Revised) Project”, Level-9, LGED Bhaban, Agargaon, Dhaka-1207 and be clearly marked “Request for
Application (RFA) for Selection of Bridge
Engineer as Individual Consultant”.
The authority
reserves the right to accept or reject the RFA.
Sd/-
(Md. Allah Hafiz)
Project
Director