Government of the
People’s Republic of Bangladesh
Local Government Engineering Department
Barisal Division Rural Infrastructure Development
Project
Agargaon, Sher-e-Bangla Nagar,
Dhaka-1207
Memo No: LGED/PD/BDRIDP/C-02/2014/19 Date : 08-01-2015
Request for Expression of Interest (EOI)
1. The Government of the People’s Republic of
Bangladesh (GOB) will provide fund from development budget towards the cost of
construction of 143 Nos of
4032.00m (APP.) RCC/Pre-stressed girder bridges of different length at
different Upazila
in Barisal Division under Barisal Division Rural Infrastructure Development Project (BDRIDP). It intends to apply part of the proceeds of this fund to
make payment under the contract for consultancy services to conduct "Detailed Digital Topographical
Survey, Conduct Hydrological study, Conduct Sub-soil Investigation, Prepare Bridge Layout Plan & Structural Design, Engineering Estimate, Bill of Quantities (BOQ)
& Modification of Design, Variation of Drawing, Estimate(if
applicable)" of the proposed schemes under this project.
All payments for the consultancy services will be made in Bangladesh currency
i.e. Bangladeshi Taka.
2. The Local Government Engineering Department
(hereinafter referred to as the Client) now invites Expression of Interest
(EOI) from reputed consulting firm (National) or firms in joint
ventures/association for short listing of the consultancy services to conduct
above mentioned tasks of RCC/Pre-stressed girder bridges of
different length at
different Upazilla in Barisal, Patuakhali,
Borguna, Pirojpur, Bhola &
Jhalokhati District.
3. As part of the services the consultant will :
i.
Prepare Detail Digital
Topographical Survey;
ii.
Conduct Hydrological design with necessary
data collection;
iii.
Conduct Sub-soil
investigation with report;
iv.
Conduct Initial Environmental
Examination (IEE) through prescribed format to be supplied by LGED;
v.
Fix up the total length of the
bridge, economical span length (in case of pre-stressed concrete
girder bridge) and cost effective design in
consideration of hydrological design;
vi.
Prepare Bridge
Layout Plan, Structural Design and Drawings &
Bar Bending Schedule;
vii.
Prepare of Detail
Engineering Estimate & BOQ; and
viii.
Modification of design, drawing
and estimate.
4. Selection/short listing
will be made in accordance with Quality and Cost Based Selection (QCBS)
procedure, following the procedure indicated in Public Procurement Rules-2008
(PPR-2008).
5. The client will conduct
the short-listing of interested consultant firms for the prior mentioned
Consultancy Services. The firm must have at least 5 (five) years relevant
experience of rendering consultancy services, especially working experience in
designing long RCC/Pre-stressed girder
bridge. The EOI shall be submitted along with the following documents.
a.
Background of the firm with brochures.
b.
Summary of similar nature of works experience
on the last 5 (five) years with assignment name/start date/length (m) including
financial year.
c.
Organizational Information, Manpower having
relevant experience and professional qualification.
d.
Financial Statement supported by audit report
for last 3(three) years.
6. Interested reputed
consulting firm or firms in joint ventures with another firm are being invited
to submit their EOI for short-listing. The capabilities of only the lead
partner will be short-listed. LGED will not entertain any claim with whatsoever
in this respect from other partner of the associations for not mentioning their
name along with the lead partner.
7. The EOI with supporting
documents must be delivered at or before 3.00 PM on 15/02/2015 in sealed envelopes, marked with “EOI for consultancy
services for Construction of 143 Nos
of 4032.00m (APP.) RCC/Pre-stressed girder bridges of different length at
different Upazila
under Barisal Division Rural
Infrastructure Development Project (BDRIDP)" (Package No. BDRIDP/SP-05)
to the signatory addressed and late submission will be
rejected.
8. The request for
proposal to submit detailed technical proposal is expected to be issued to the
short listed firms later on. The Employer will not be responsible for any costs
or expenses incurred by the firms in connection with the preparation or
delivery of the EOI.
9. The procuring entity
reserves the right to accept any or reject all EOI’s.
Sd=
(Md. Kamrul Ahsan)
Project Director
Phone: 02-8181057
e-mail : pd.bdridp@lged.gov.bd
C.C to :
1.
Chief Engineer,
LGED, Agargaon, Dhaka.
2.
Additional Chief
Engineer (Implementation)/(Planning & Design),
LGED, Agargaon, Dhaka.
3.
Superintending
Engineer, Barisal Region, LGED, Barisal.
4.
Assistant
Engineer, GIS, LGED, Agargaon, Dhaka. He is requested
to Published the EOI in LGED Website on or before 14/01/2015.
5.
CPTU, IMED,
Ministry of Planning.
6.
The Advertisement
Manager, The Daily Janakantha/
The New Age. He is requested to Published the EOI in his Newspaper for one day
on or before 14/01/2015.
7. Office Copy.