Dbœq‡bi MYZš¿ †kL nvwmbvi g~jgš¿ |
Government of the people’s
republic of Bangladesh
Local government Engineering
Department
Office of the Executive
Engineer
District : Bhola.
Reference No: LGED/XEN/Bho/ET-27/16-17/17/1022 Date : 27/04/2017
e –Tender Notice No. 27/2016-17
e – Tender is invited in the national e –GP System Portal (http://www.eprocure.gov.bd) for the
procurement of :
SL No. |
Upazila |
Package No |
T-ID No. |
Name of Scheme |
Last date of selling |
Last
date of receiving |
|
IRIDP-Bhola
Project |
|||||||
01. |
Lalmohan |
LAL/R-16 |
100062 |
a Improvement of Muguria Bazar-UZR-2002 Fazal
Munsir Bari Mosque via Janata Bazar via Bangla Bazar Road at CH-2000-3000m.
Road ID-509544004BC Pavement Length 1000m.b Construction of Palisading Work
on Muguria Bazar-UZR-2002 Fazal Munsir Bari Mosque via Janata Bazar via
Bangla Bazar Road at CH-2125-2135m L/S & 2213-2253m L/S. Road
ID-509544004 Length-50m. |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
02. |
Lalmohan |
LAL/R-19 |
100063 |
a Improvement of Torabagonj Pas pagar more-UNR
Road at CH-00-1000m. Road ID-50945226BC Pavement Length 1000m.b Construction
of Palisading Work on Torabagonj Pas pagar more-UNR Road at CH-26-40m L/S
110-115 L/S 480-490m L/S 990-1000m L/S. Road ID-50945226 Length-39m. |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
03. |
Bhola Sadar |
SA/M-10 |
100064 |
a Improvement of Ponditer pole-Hassain member bari
Berry Bandh Ekata Brick field road at CH-00-1660.0m Road ID-509185031BC
Pavement Length 1660m.b Construction of Palisading Work on Ponditer
pole-Hassain member bari Berry Bandh Ekata Brick field Road at CH-82-92m R/S
156-170m L/S 354-360m R/S 375-390m R/S 438-466m R/S 530-555m R/S 700-725m L/S
719-754m R/S 760-786m L/S 764-786m R/S 998-1009m R/S 1023-1087m L/S
1093-1115m R/S 1131-1145m L/S 1306-1316m R/S 1368-1378m L/S 1425-1470m R/S
1555-1571m L/S. Road ID-509185031 Length-398m.c Construction of 3 no cross
Drain on Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field Road
at CH-750m 768m & 1172m Road ID-509185031 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
04. |
Bhola Sadar |
SA/M-09 |
100065 |
a Improvement of Velumia Bazar UPC-Sharif Khan
Bazar-Bauphal Lunch Ghat Road. at CH-4170-5620.0m. Road ID-509183008BC
Pavement Length 1450m.b Construction of Palisading Work on Velumia Bazar
UPC-Sharif Khan Bazar-Bauphal Lunch Ghat Road at CH-4308-4324m L/S 4347-4360m
L/S 4470-4495m L/S 4526-4540m L/S 4550-4563m L/S 4573-4594m L/S 4776-4837m
R/S 4853-4922m L/S 4991-5005m R/S 5065-5087m L/S 5355-5363m L/S 5572-5608m
R/S. Road ID-509183008 Length-312m. |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
05. |
Bhola Sadar |
SA/M-08 |
100066 |
a Improvement of Alia Madrasha-Kheya ghat Babul
Molla Bridge road at Ch-00m-680.0mm Road ID-509184008BC Pavement Length
680m.b Construction of Palisading Work on Alia Madrasha-Kheya ghat Babul
Molla Bridge Road at Ch-120-140m L/S Pound 360-370m L/S Pound Road
ID-509184008 Length-210m.c Construction of 0.75m x 0.75m RCC Box Culvert on
Alia Madrasha-Kheya ghat Babul Molla Bridge Road at Ch-57.00m. Road
ID-509184008 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
06. |
Bhola Sadar |
SA/M-07 |
100067 |
a Improvement of Bangla Bazar-Bagmara-Baroni
kachare-Shainter hat road at Ch-00m-1930.00m Road ID-509185087BC Pavement
Length 1930m.b Construction of Palisading Work on Bangla Bazar-Bagmara-Baroni
kachare-Shainter hat Road at Ch-25-75m R/S Pond 150-180m R/S Pond 320-345m
L/S Pond 370-380m R/S Pond 730-780m L/S Pond 1100-1115m R/S Pond 1170-1200m
R/S Pond. Road ID-509185087 Length-210m. |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
07. |
Charfession |
CH/R-15 |
100068 |
a Improvement of Road From RHD Road Hali pad-West
way of Kuchiamora Dr. Bari Bridge Road at Ch-00m-2432.0mm Road ID-509254018
BC Pavement Length 2432.0m.b Construction of Palisading Work on RHD Road Hali
pad-West way of Kuchiamora Dr. Bari Bridge Road at Ch-00-100m L/S 280-336m
L/S 460-535m L/S 590-620m L/S 631-676m L/S 721-731m L/S 941-970m L/S
1092-1149m L/S 1260-1286m L/S. Road ID-509254018 Length-428m.c Construction of
1 no 2m x 4.50m x 3.50m w-5.50m RCC Box Culvert on RHD Road Hali pad-West way
of Kuchiamora Dr. Bari Bridge Road at Ch-815.0m. Road ID-509254018d
Construction of 4 no 1.50m x 1.50m w-5.50m RCC Box Culvert on RHD Road Hali
pad-West way of Kuchiamora Dr. Bari Bridge Road at Ch-21.0m 333.0m 1928.m
& 2075.0m Road ID-509254018e Construction of 10 no 0.75m x 0.75m w-5.50m
RCC Box Culvert on RHD Road Hali pad-West way of Kuchiamora Dr. Bari Bridge
Road at Ch-167.0m 515.0m 655.0m 1040.0m 1156.0m 1260.0m 1482.0m 2024.0m
2220.0m 2342.0m & 2386.0m Road ID-509254018 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
08. |
Monpura |
MO/R-20 |
100069 |
a Improvement of Hazirhat UP. Badher Hat-Bhuiar
Hat South Embankment Road at Ch-00m-3960.0mm Road ID-509653009 3960m RCC
Road.b Construction of Palisading Work on Hazirhat UP. Badher Hat-Bhuiar Hat
South Embankment Road at Ch-295-304m L/S 490-503m L/S 700-730m L/S 700-715m
R/S. Road ID-509653009 Total 67.0m. c Construction of 6 no 0.75m x 0.75m RCC
Box Culvert on Hazirhat UP. Badher Hat-Bhuiar Hat South Embankment Road at
Ch-700m 875m 1107m 1175m 1375m & 1516m Road ID-509653009d Construction of
2x3.50x4.00m RCC Box Culvert on Hazirhat UP. Badher Hat-Bhuiar Hat South
Embankment Road at Ch-295m 333.0m 1928.m & 2075.0m Road ID-509653009 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
09. |
Monpura |
MO/R-21 |
100070 |
a Improvement of Latakhali-Banglabazar GC-Zakir
Chairman Bar-East EMBK. Road at Ch-1443-3650m Road ID-509654025 2270m RCC
Road.b Construction of Palisading Work on Latakhali-Banglabazar GC-Zakir
Chairman Bar-East EMBK. Road at Ch-2860-3080m R/S Road ID-509654025 Total
220m. c Construction of 2 no 1x1.50x1.50m RCC Box Culvert on
Latakhali-Banglabazar GC-Zakir Chairman Bar-East EMBK. Road at Ch-2045m &
2275m Road ID-509654025d Construction of 2x3.50x2.50m RCC Box Culvert on
Latakhali-Banglabazar GC-Zakir Chairman Bar-East EMBK. Road at Ch-2585m Road
ID-509654025e Construction of 2x3.50x2.50m RCC Box Culvert on
Latakhali-Banglabazar GC-Zakir Chairman Bar-East EMBK. Road at Ch-2045m &
2275m Road ID-509654025 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
10. |
Tazumuddin |
TAZ/R-22 |
100071 |
a Improvement of Pandith kandi Bridge to Badura
bridge Road. at CH-00-1000m BC Pavement. Length-1000m. Road ID-509914010b
Construction of Palisading Work on Pandith kandi Bridge to Badura bridge Road
at CH-70-94m 910-930m 930-980m 5363m L/S 5572-5608m R/S. Length-94m. Road
ID-509914010c Construction of 1mx1m W-3.70m RCC Box Culvert on Pandith kandi
Bridge to Badura bridge Road at Ch-865m Road ID-509914010 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
11. |
Tazumuddin |
TAZ/M-11 |
100072 |
a Maintenance of RHD Fulkuri-Shibpur khasherhat
GCCR Road. at CH-00-1400m Road ID-509914013b Construction of Palisading Work
on RHD Fulkuri-Shibpur khasherhat GCCR Road at CH-445-460 L/S 810-825m L/S
1293-1308m R/S 1312-1327m R/S 1400-1414m L/S. Length-74m. Road ID-509914013c
Construction of 3 no 1mx1m W-5.50m RCC Box Culvert on RHD Fulkuri-Shibpur
khasherhat GCCR Road at Ch-18.00m 970.0m 1125.0m Road ID-509914013 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
12. |
Borhanuddin |
BOR/M-13 |
100073 |
a Maintenance of Sikderhat-Kunjer Hat GC up to
Boyder Bridge Road. at CH-00-3405m BC Pavement Length-3405m Road
ID-509212011b Construction of Palisading Work on Sikderhat-Kunjer Hat GC up
to Boyder Bridge Road at CH-3364-3374m L/S Total Length-10m Road
ID-509212011c Construction of 3 no 1mx1m W-4.66m RCC Box Culvert on
Sikderhat-Kunjer Hat GC up to Boyder Bridge Road at Ch-70m 3318m 3400m. Road
ID-509212011d Construction of 6 no 0.625m x 0.600m 7.30m RCC Box Culvert on
Sikderhat-Kunjer Hat GC up to Boyder Bridge Road at Ch-680m 880m 1670m 2172m.
Road ID-509212011 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
13. |
Borhanuddin |
BOR/M-12 |
100074 |
a Maintenance of Mirzakalu GC Near Chowdhury
Bari-Fakir hat Dalal Bazar R & D Road. at CH-00-2111m & 6000-9755m BC
Pavement Length-5866m Road ID-509212004b Construction of Palisading Work on
Mirzakalu GC Near Chowdhury Bari-Fakir hat Dalal Bazar R & D Road at
CH-842-847m L/S 854-859m R/S 1172-1178m L/S 1302-1318m R/S 1500-1519m R/S
1743-1753m L/S 1772-1800m L/S. Total Length-98m Road ID-509212004c
Construction of 5 no 1m x 1m RCC Box Culvert on Mirzakalu GC Near Chowdhury
Bari-Fakir hat Dalal Bazar R & D Road at Ch-790m 1790m 6458m 6725m 8470m.
Road ID-509212004d Construction of 6 no 0.625m x 0.600m U Drain on Mirzakalu
GC Near Chowdhury Bari-Fakir hat Dalal Bazar R & D Road at Ch-815m 6275m
6624m 7860m. Road ID-509212004 |
21-05-2017 till
17:00 PM |
22-05-2017 till
12:00 AM |
|
This is an online Tender
where only e – Tender will be accepted in the national e – GP portal and on
offline/ hard copies will be accepted to submit e – Tender registration in the
National e – GP system portal (http://WWW.eprocure.gov.bd)
is required.
The fees for down loading the
e – Tender documents from the national e – GP System portal have to be
deposited online through any registers banks branch up to 21/05/2017 till 17.00 PM.
Further information and guidelines and available in the national e – GP system
portal and from e – GP help desk (helpdesk@eprocure.gov.bd)
(Md. Shakhawat Hossain)
Executive Engineer
LGED, Bhola.
Ph: No.0491-61378
E-mail: xen.bhola@lged.gov.bd
CC.
Memo No: LGED/XEN/Bho/ET-27/16-17/17/1022(50) Date : 27/04/2017
Copy forwarded for
information & necessary action please:-
1. |
Chief Engineer, LGED, LGED Bhabon,
Agargaon Shar-E-Bangla Nagar,Dhaka-1207 |
2. |
The Additional Chief Engineer, LGED, Barisal
Division, Barisal. |
3. |
The Superintendent Engineer, LGED, Barisal Zone,
Barisal. |
4. |
The Project Director, (IRIDP-Bhola Project), LGED
Bhabon, Agargaon Shar-E-Bangla Nagar,Dhaka-1207 |
5. |
The Deputy Commissioner, Bhola. |
6. |
The Superintendent of Police, Bhola |
7. |
The Executive Engineer RHD/PWD/WDB/DPHE, Bhola. |
8. |
The Upazila Engineer, Bhola(s)/ Borhanuddin/
Daulatkhan/ Lalmohan/ Tozumuddin/ Charfassion & Monpura, Bhola |
9. |
The Editor, Daynik Janakantho,
24/A, New |
10. |
The Editor, Bangladesh Today, Level-14, UTC Tower, 8 Panthapath (East side of
Bashandura), Dhaka-1215. Requested to
published the Tender Notice. |
11. |
The Editor, Daynik
Banglarkantho, Sadar Road, Bhola. Requested to published the Tender Notice. |
12. |
Notice Board, of this office. |
(Md. Shakhawat Hossain)
Executive Engineer
LGED, Bhola.
Ph: No.0491-61378
E-mail: xen.bhola@lged.gov.bd