Memo No: 46.02.09.000.07.005.17. 1743 Date : 23/07/2017
e –Tender Notice No. 05/2017-18
e – Tender is invited in the national e –GP System Portal (http://www.eprocure.gov.bd) for the
procurement of :
SL No. |
Upazila |
Package No |
T-ID No. |
Name of Scheme |
Last date of selling |
Last
date of receiving |
IRIDP-Bhola Project |
||||||
01. |
Bhola Sadar |
SA/M-24 |
111867 |
Earth Work of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer
pool-Gozaria GC road at CH-00-4000.00m Road
ID-509182010Maintenance of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer
pool-Gozaria GC road at CH-00-4000.00m Road
Length-4000mConstruction of Palisading work on kheya
ghat-Kalinath bazar-Dorgar
road-Bypass-Ponditer pool-Gozaria
GC road at CH-146-185m L/S 160-191.0m R/S 230-259.0m R/S
Length-99.0mConstruction of Surface Drain on kheya ghat-Kalinath bazar-Dorgar
road-Bypass-Ponditer pool-Gozaria
GC road at CH-00-4000.0m Length-10000m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
02. |
Bhola Sadar |
SA/M-25 |
111868 |
Maintenance of Ilisha RHD Pulesher Dokan-Chowdagor Road
at CH-00-1170m Length-1170m Road Id-509185143Construction of Palisading work
on Ilisha RHD Pulesher Dokan-Chowdagor Road at CH-44-64m R/S 250-281 R/S 472-479
R/S 686-700 R/S 852-862 R/S 972-979 L/S 1035-1048 R/S 1077-1106 R/S 1132-1142
R/S. Length-141.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
03. |
Bhola Sadar |
SA/M-26 |
111869 |
Maintenance of Teli bari Nabipur-Giringi bazar.
Site Wading at CH-00-1790.0m Length-1790.0m Road Id-509184016Construction of
Palisading work on Teli bari
Nabipur-Giringi bazar. Site Wading at CH-10-24m L/S
117-132 L/S 195-206 L/S 402-408 R/S 746-774 R/S 1211-1245 L/S 1260-1287 B/S
1503-1515 R/S 1660-1675 R/S. Length-189.0mConstruction of 2 no Cross Drain on
Teli bari Nabipur-Giringi bazar. Site Wading at CH-570m &
1270m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
04. |
Bhola Sadar |
SA/M-27 |
111870 |
Maintenance of Puran Gogirghol-by pass road- Puran kathali-Nazi Bepari shop Road
under Alinagar UP at CH-00-2600.00m Length-2600.00m
Road Id-509184025Construction of Palisading work on Puran
Gogirghol-by pass road- Puran
kathali-Nazi Bepari shop
Road under Alinagar UP at CH-445-489 R/S 550-572
R/S 735-750 R/S 837-854 R/S 949-968 L/S 2050-2085 L/S.
Length-177.0mConstruction of 3 no RCC Cross Drain on Puran
Gogirghol-by pass road- Puran
kathali-Nazi Bepari shop
Road under Alinagar UP at CH-700 1000m & 1208m.
Construction of 2 vent 3.0x3.0m RCC Box Culvert on Puran
Gogirghol-by pass road- Puran
kathali-Nazi Bepari shop
Road under Alinagar UP at CH-00m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
05. |
Bhola Sadar |
SA/M-28 |
111871 |
Maintenance of Dania Munaf Talukder Bari Madrasha-Bodi Ker
Bari at CH-00-850.0m Length-850.0m Road ID-509185155Construction of
Palisading work on Dania Munaf Talukder
Bari Madrasha-Bodi Ker Bari Road at CH-100-125m L/S
525-552m. L/S 580-603m L/S 655-678m L/S 770-805m L/S. & R/S.
Length-195.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
06. |
Daulatkhan |
DA/M-20 |
111872 |
Maintenance of Orni Brick
field to Azimuddin Noor miar
hat Road at CH-00-909.0m Length-909m road ID-509295057Construction of
Palisading work on Orni Brick field to Azimuddin Noor miar hat Road at
CH-332-387m L/S 332-363 R/S 387-409 R/S 437-459 R/S 487-500 L/S 847-867 L/S.
Length-163.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
07. |
Daulatkhan |
DA/M-21 |
111873 |
Maintenance of Daulatkhan GC
to Daulatkhan Live Stock office Guinger
hat-Daulatkhan UZR via Radhaballov
GC road at CH-00-720.0m Length-720.0m road ID-509293007Construction of
Palisading work on Daulatkhan GC to Daulatkhan Live Stock office Guinger
hat-Daulatkhan UZR via Radhaballov
GC road at CH-239-260 R/S 355-367 R/S 432-459 R/S 465-484 R/S 503-517 R/S
565-591 R/S 604-6156 R/S 654-705 R/S. Length-181.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
08. |
Daulatkhan |
DA/M-22 |
111874 |
Maintenance of Chailtatali-Noormiarhat
road to Howlader para
NGPS via mohon propesar bari at CH-00-607.0m Length-607m Road
ID-509295069Construction of Palisading work on Chailtatali-Noormiarhat
road to Howlader para NGPS
via mohon propesar bari road at CH-67-110 L/S 297-314 L/S 430-453 L/S
560-580 R/S 579-589 L/S. Length-113.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
09. |
Daulatkhan |
DA/M-23 |
111875 |
Maintenance of Banglabazaar-Daulatkhan
R&H to Kalim Patwary bari to Helipad road at CH-00-900.0m Length-900.0m Road
ID-509295058Construction of Palisading work on Banglabazaar-Daulatkhan
R&H to Kalim Patwary bari to Helipad road at CH-30-52 L/S 245-281 L/S 315-335
R/S 393-424 R/S. Length-109.0mConstruction of 1.0mx1.0mx5.50m RCC Box Culvert
on Banglabazaar-Daulatkhan R&H to Kalim Patwary bari to Helipad road at CH-50.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
10. |
Borhanuddin |
BOR/R-50 |
111876 |
Improvement of Sikderhat-Maniram
RHD Borhanuddin Lalmohan
RHD Road at CH-1230-2230.0m Length-1000m Road ID-509214016Construction of
Palisading work on Sikderhat-Maniram RHD Borhanuddin Lalmohan RHD Road
at CH-1230-1235m 1241-1250m 1707-1734m 1752-1766m 1880-1890m 1930-1944m Total
Length79.0mConstruction of 0.625x0.600 5.5m RCC U Drain on Sikderhat-Maniram RHD Borhanuddin
Lalmohan RHD Road at CH-1475m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
11. |
Borhanuddin |
BOR/R-51 |
111877 |
Improvement of South Mirzakalu
bazar-Katakhali bridge road at CH-00-1000.00m
Length-1000m Road ID-509214074Construction of Palisading work on South Mirzakalu bazar-Katakhali
bridge road at CH-23-35m L/S 359-374 L/S 475-500 L/S 694-713 R/S 846-876 R/S
952-900 R/S. Total Length148.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
12. |
Borhanuddin |
BOR/R-52 |
111878 |
Improvement of Char Gazipur Hawlader bari to west Gazi Bari road at CH-00-1000.00m Length-1000m Road
ID-509214080Construction of Palisading work on Char Gazipur
Hawlader bari to west Gazi Bari road at CH-19-30 R/S 40-58 L/S 64-74 L/S 450-465
R/S 610-619 R/S 633-642 R/S 652-664 L/S 831-842 R/S 945-966 R/S. Total
Length116.5mConstruction of 0.625x0.600 5.5m RCC U Drain Char Gazipur Hawlader bari to west Gazi Bari road at
CH-114m & 468m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
13. |
Borhanuddin |
BOR/R-59 |
112101 |
Improvement of RHD Krisnachura
Tree-Shohid Zia road to Borhangonj
Ranigonj road at CH-00-1340.0m Length-1340.0m Road
ID-509214037Construction of Palisading work on RHD Krisnachura
Tree-Shohid Zia road to Borhangonj
Ranigonj road at CH-286-306m R/S 297-606 L/S
335-345 L/S 362-390 R/S 490-5174 L/S 555-568 R/S 568-591 L/S 591-620 L/S
620-640 B/S 753-773 L/S 792-828 R/S 852-888 R/S 919-930 R/S. Total
Length302.0m |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
Continue
Page-02
Page-02
SL No. |
Upazila |
Package No |
T-ID No. |
Name of Scheme |
Last date of selling |
Last
date of receiving |
IRIDP-Bhola Project |
||||||
14. |
Lalmohan |
LAL/R-53 |
111880 |
Improvement of Fatemabad barri-H/o Jashim member towards
west road at CH-00-500m Total Length500m Road ID-50945112Construction of
Palisading work on Fatemabad barri-H/o
Jashim member towards west road at CH-125-146.0m
Total Length21mConstruction of 2 no RCC 0.75x0.75m box Culvert on Fatemabad barri-H/o Jashim member towards west road at CH-105m & 470m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
15. |
Lalmohan |
LAL/R-54 |
111881 |
Improvement of Natun Bazar Lordharding-Char Udaykhali Wapda Road at CH-00-1050m Length1050 Road
ID-509545004Construction of Palisading work on Natun
Bazar Lordharding-Char Udaykhali
Wapda Road at CH-14-20m B/S 24-32m B/S 300-312m L/S
514-532m R/S. Length58.0mConstruction of 3 no RCC 3.0mx3.0m box Culvert on Natun Bazar Lordharding-Char Udaykhali Wapda Road at
CH-20m.Construction of 5 no RCC 0.75mx0.75m box Culvert on Natun Bazar Lordharding-Char Udaykhali Wapda Road at CH-20m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
16. |
Lalmohan |
LAL/R-55 |
111883 |
Improvement of Hazigonj
Junior High School-Betua river H/o Bazlu Mia road Banghabandhu Sarak road at CH-2700-3450.0m Length750m Road
ID-50945167Construction of Palisading work on Hazigonj
Junior High School-Betua river H/o Bazlu Mia road Banghabandhu Sarak road at CH-2740-2769m R/S 2881-2900m R/S 2940-2950m
L/S 3010-3035m L/S. Length83.0mConstruction of 3 no RCC 0.75x0.75m box
Culvert on Hazigonj Junior High School-Betua river H/o Bazlu Mia road Banghabandhu Sarak road at
CH-2710m 3073m & 3370m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
17. |
Lalmohan |
LAL/R-56 |
111884 |
Improvement of Gazaria-Sashibhoson
road H/O Manik Mistry-H/O
Younus Fakir road at CH-1180-1680m Length500m Road
ID-509544047Construction of Palisading work on Gazaria-Sashibhoson
road H/O Manik Mistry-H/O
Younus Fakir road at CH-1320-1360m R/S.
Length40mConstruction of RCC 0.75x0.75m box Culvert on Gazaria-Sashibhoson
road H/O Manik Mistry-H/O
Younus Fakir road at CH- |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
18. |
Lalmohan |
LAL/R-57 |
111885 |
Improvement of Raychad Road-Katatara Khal road at
CH-00-2000m Length2000m Road ID-509544001Construction of Palisading work on Raychad Road-Katatara Khal road at CH-1040m R/S 15-50m L/S 1385-1405m R/S
1880-1900m R/S. Length105.0mConstruction of 3no 1.50mx1.50m RCC box Culvert
on Raychad Road-Katatara Khal road at CH-420m 1385m & 1900m.Construction of
3no 0.75mx0.75m RCC box Culvert on Raychad Road-Katatara Khal road at CH-250m
900m & 1700m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
19. |
Lalmohan |
LAL/R-58 |
111886 |
Improvement of RHD Napith bari-Uttar Purbo Aslampur GPS road at CH-00-1000m Road
ID-50945223Construction of Palisading work on RHD Napith
bari-Uttar Purbo Aslampur GPS road at CH-5-24m L/S 671-698m L/S. Length46m
road ID-50945223Construction of 2no 0.75mx0.75m RCC box Culvert on RHD Napith bari-Uttar Purbo Aslampur GPS road at
CH-322m & 525m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
20. |
Daulatkhan |
DA/M-27 |
111887 |
Earth Work on South charshuvi
Faruk miar hat to Noormiarhat Road at CH- 00-3407.0m 2143.0m3Maintenance of
Pavment & Surfacing Works on South charshuvi Faruk miar hat to Noormiarhat Road. at CH.00-3470.0m. Road ID-509294015Construction of 5no
1.0mx1.0mx5.50m RCC Box Culvert on South charshuvi Faruk miar hat to Noormiarhat Road. at CH. 72.0m
137m 530m 660m.Construction of Palisading Work on South charshuvi
Faruk miar hat to Noormiarhat Road. at CH.688-703m R/S 728-745m L/S
761-777m L/S 952-968m L/S 1057-1070m L/S 1074-1105m L/S 1250-1288m R/S
1536-1558m R/S 1876-1955m L/S 2666-2685m R/S 2968-2983m R/S 2990-3020m R/S
3030-3040m R/S 3077-3086m R/S 3170-3183m R/S 3327-3339m R/S Length-381.0m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
21. |
Daulatkhan |
DA/M-28 |
111888 |
Earth Work on Noor miar hat
to Chailtatali hat UZR Road at CH- 00-3407.0m
2143.0m3Maintenance of Pavment & Surfacing
Works on Noor miar hat to Chailtatali
hat UZR Road. at CH.00-5315.0m. Length-5315.0m Road
ID-509294013Construction of 1.0mx1.0mx5.50m RCC Box Culvert on Noor miar hat to Chailtatali hat UZR
Road. at CH. 1498.0m.Construction of Palisading Work
on Noor miar hat to Chailtatali
hat UZR Road. at CH. 178-184m L/S 362-388m R/S 465-480m L/S 752-780m L/S
667-684m R/S 721-752m L/S 844-862m L/S 915-928m L/S 968-985m L/S 1002-1023m
L/S 1120-1129m L/S 1175-1198m R/S 1721-1729m R/S 2201-2238m R/S 2352-2364m
R/S 3150-3166m R/S 3269-3306m R/S 3426-3458m R/S 4090-4102m R/S
Length-351.0m. |
16-08-2017 till 17:00 PM |
17-08-2017 till 12:00 AM |
This
is an online Tender where only e – Tender will be accepted in the national e –
GP portal and on offline/ hard copies will be accepted to submit e – Tender
registration in the National e – GP system portal (http://WWW.eprocure.gov.bd) is required.
The fees for down loading the
e – Tender documents from the national e – GP System portal have to be
deposited online through any registers banks branch up to 16/08/2017 till 17.00 PM.
Further information and guidelines and available in the national e – GP system
portal and from e – GP help desk (helpdesk@eprocure.gov.bd)
(Md. Shakhawat
Hossain)
Executive Engineer
LGED, Bhola.
Ph: No.0491-61378
E-mail: xen.bhola@lged.gov.bd
Memo No: 46.02.09.000.07.005.17. 1743(100)
Date : 23/07/2017
Copy forwarded for
information & necessary action please:-
1. |
Chief Engineer, LGED, LGED Bhabon,
Agargaon Shar-E-Bangla
Nagar,Dhaka-1207 |
2. |
The Additional Chief Engineer, LGED, Barisal
Division, Barisal. |
3. |
The Superintendent Engineer, LGED, Barisal Zone,
Barisal. |
4. |
The Project Director, (IRIDP-Bhola
Project), LGED Bhabon, Agargaon Shar-E-Bangla Nagar,Dhaka-1207 |
5. |
The Deputy Commissioner, Bhola. |
6. |
The Superintendent of Police, Bhola |
7. |
The Executive Engineer RHD/PWD/WDB/DPHE, Bhola. |
8. |
The Upazila Engineer, Bhola(s)/ Borhanuddin/ Daulatkhan/ Lalmohan/ Tozumuddin/ Charfassion & Monpura, Bhola |
9. |
The Editor, Daily Jai Jai
Din, HRC
Media Bhaban, 446/E, Tejgoan
I/A, Dhaka-1208, Requested to published the Tender Notice. |
10. |
The Editor, The Daily Observer, Aziz Babhan
(2nd Floor), 93 Motijheel, C/A, Dhaka-1000.
Requested to published
the Tender Notice. |
11. |
The Editor, Daynik Banglarkantho, Sadar
Road, Bhola. Requested to published
the Tender Notice. |
12. |
Notice Board, of this office. |
(Md. Shakhawat
Hossain)
Executive Engineer
LGED, Bhola.