Package No. |
Gr No |
Name of
Works |
Tender security
(Tk.) |
Time for completion ( days ) |
Price of tender document (Tk.) |
|
Important Rural Infrastructure Development Project on Priority Basis |
|
|
||
LGED/XEN/Sat/T-12/84 |
1 |
(a)
Improvement of Kazla Alahi Box
house-Nalta Tarali road at Tiger Club
via Kazla Donpar, Sardarbari, Kollouck house, Swapan house, Ismail house
& Samsu house road by 25mm BC
& 7mm thick seal coat at Ch:00 - 1000m (b) Construction of 1 Nos U-Type drain culvert at Ch:210m on
the same road under Kaligonj Upazila, Satkhira (Package No: IRIDP/STK/W-44). |
65,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-12/85 |
2 |
Improvement
of Kazla LGED - Sannashirchalk Bazar
road by 25mm BC & 7mm thick seal coat at Ch:2204 - 3204m under Kaligonj
Upazila, Satkhira (Package No: IRIDP /STK/W-45). |
70,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-12/86 |
3 |
(a)
Improvement of East Tarali
UZR-Kashipbati GPS (Nalta-Tarali UZR road) road by 25mm BC & 7mm thick seal coat at
Ch:2300 - 3300m (b) Construction of 4
Nos U-Type drain culvert at Ch:2420m, Ch:2568m, Ch:2675m & Ch:3282m on
the same road under Kaligonj Upazila, Satkhira (Package No: IRIDP/STK/W-46). |
75,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/95 |
4 |
Improvement
of Sathalia Junior High School-Sathalia BOP via Kasaripara road by HBB at
Ch:00-1380m under Kaligonj Upazila, Satkhira (Package No: IRIDP/STK/W-51). |
53,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/96 |
5 |
(a)
Improvement of Dhohakula FRB-Dhohakula
R&H (Assasuni) road by BC at Ch:1160-2004m & Link road at Ch:00-200m
(b) Construction of 1 No 625x600mm
size U-Type drain culvert at Ch:1340m and 6 Nos 375mmx450mm size U-Type drain
culvert at Ch:1436m, 1472m, 1536m, 1723m, 1810m & Link road Ch:180m on the same road under Sadar Upazila,
Satkhira (Package No: IRIDP/STK/W-52). |
75,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/97 |
6 |
(a)
Improvement of Bhomra bazar-WAPDA via Lakkhidari road by BC at Ch:00-1057m
(b) Construction of 3 Nos 625x600mm
size U-Type drain culvert at Ch:467m, 508m, 817m and 4 Nos 375mmx450mm size U-Type drain
culvert at Ch:245m, 424m, 713m & 750m
on the same road under Sadar Upazila, Satkhira (Package No:
IRIDP/STK/W-53). |
75,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/98 |
7 |
(a)
Improvement of Alipur Burir Battala Mosqlue-Talbaria via Rishipara road by BC
at Ch:00-1000m (b) Construction of 2
Nos 625x600mm size U-Type drain culvert at Ch:552m & 972m and 3 Nos 375mmx450mm size U-Type drain
culvert at Ch:200m, 340m & 459m on
the same road under Sadar Upazila, Satkhira (Package No: IRIDP /STK/W-54). |
60,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/99 |
8 |
(a)
Improvement of Ellarchor Govt. Primary School-Brahmmorajpur bazar via Balitha
road by BC at Ch:00-926m (b) Construction of
3 Nos 625x600mm size U-Type drain culvert at Ch:8m, 370m, 450m and 4 Nos 375mmx450mm size U-Type drain
culvert at Ch:157m, 312m, 395m & 523m
on the same road under Sadar Upazila, Satkhira (Package No: IRIDP
/STK/W-55). |
75,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/100 |
9 |
(a)
Improvement of Kayer beel Mosque more-Hawalkhali Primary School road by BC at
Ch:570-1960m (b) Construction of 3 Nos
375mmx450mm size U-Type drain culvert at Ch:860m, 1140m & 1577m and 1 No 1000mmx1300mm size U-Type drain culvert
at Ch:960m on the same road under Sadar Upazila, Satkhira (Package No: IRIDP
/STK/W-56). |
75,000/- |
365 days |
1,000/- |
|
Rural Infrastructure development ( |
|
|
||
LGED/XEN/Sat/T-18/101 |
10 |
Improvement
of Nakipur-Chaltaghata R&H road at Ch:1058-1713m by 25mm carpeting+7mm
seal coat under Shyamnagar Upazila, Satkhira. |
55,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/102 |
11 |
Improvement of |
28,000/- |
365 days |
750/- |
LGED/XEN/Sat/T-18/103 |
12 |
Construction of 20.00m |
1,80,000/- |
365 days |
2,000/- |
|
Union Infrastructure development ( |
|
|
||
LGED/XEN/Sat/T-18/104 |
13 |
Development of Kushlia Hat Growth Centre under Kaligonj Upazila,Satkhira.(Package
No:UIDP(KBS)/GC-01 /Sat/12) |
55,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/105 |
14 |
Development of Zada Hat Growth Centre under
Shyamnagar Upazila, Satkhira. (Package No:UIDP(KBS)/ GC-02/Sat/12) |
48,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/106 |
15 |
Improvement of |
80,000/- |
365 days |
1,000/- |
LGED/XEN/Sat/T-18/107 |
16 |
Improvement of Sovnali Kheyaghat to Bangdah
GC road by BC at Ch:4000-4766m under Assasuni
Upazila, Satkhira. (Package No:UIDP(KBS)/ VR(BC)-02/Sat/12) |
60,000/- |
365 days |
1,000/- |
Contd....P/2
( 2 )
Package No. |
Gr No |
Name of
Works |
Tender security
(Tk.) |
Time for completion ( days ) |
Price of tender document (Tk.) |
|||
LGED/XEN/Sat/T-18/108 |
17 |
Improvement of Godaipur - Rautara road at
Ch:6222 - 7772.38m under Assasuni Upazila, Satkhira.(Package No:UIDP (KBS)/
VR(BC)-03/Sat/12) |
50,000/- |
365 days |
1,000/- |
|||
LGED/XEN/Sat/T-18/109 |
18 |
Improvement of Senergati - Sarsha road by 25mm BC
+ 7mm thick seal coat at Ch:3900 - 4860m under Tala Upazila, Satkhira.
(Package No:UIDP(KBS)/VR(BC)-04/ Sat/12) |
60,000/- |
365 days |
1,000/- |
|||
LGED/XEN/Sat/T-18/110 |
19 |
Improvement of
Bardal-Baintala road at Ch:5353
- 5953m & Ch:6509-6961.852m under Assasuni Upazila, Satkhira. (Package
No:UIDP (KBS) / VR(HBB)-01/Sat/12) |
35,000/- |
365 days |
750/- |
|||
LGED/XEN/Sat/T-18/111 |
20 |
(a) Improvement of Rasulpur R&H (Circket
House)-Baikari UP via Pairadanga-Aruakhali via Mirgidanga road by BC at
Ch:13984-15298m (b) Construction of 4 Nos 375mm x 450mm size U-Type drain
culvert at Ch:14,314m, 14426m, 14806m & 14854m on the same road under
Sadar Upazila, Satkhira. (Package No:UIDP(KBS)/ UNR(BC)-01/Sat/11-12) |
1,10,000/- |
365 days |
2,000/- |
|||
LGED/XEN/Sat/T-18/112 |
21 |
(a) Improvement of Tujulpur more to Madhokati
via Mohonnpur road by BC at Ch:00-778m
(b) Construction of 3 Nos 375mm x 450mm size U-Type drain culvert at Ch:513m,
563m & 740m on the same road under Sadar Upazila, Satkhira. (Package
No:UIDP(KBS)/ VR(BC)-05/Sat/11-12) |
65,000/- |
365 days |
1,000/- |
|||
LGED/XEN/Sat/T-18/113 |
22 |
Development of
Damdam bazar to Helatala UP road by 25mm BC+7mm seal coat at
Ch:890-1890m under Kalaroa Upazila, Satkhira. (Package No:UIDP(KBS)/
UNR(BC)-02/Sat/11-12) |
80,000/- |
365 days |
1,000/- |
|||
|
|
|
|
|
|
|||
1. |
Method
of Tender
|
: |
LTM |
|||||
2. |
Source
of Funds
|
: |
GOB |
|||||
3. |
Date,
time and place of pre-tender meeting |
: |
Date: 28th June 2011, Time: 11.00am and Place: Office of the undersigned |
|||||
4. |
Last
date, time and places of selling tender documents |
: |
Date: 5h July
2011, Time: During Office hours Places: Office of the
undersigned / The concern Upazila Engineer, Upazila: Sadar, Kalaroa, Tala,
Assasuni, Kaligonj, Debhata & Shayamnagar, District: Satkhira./ The
Executive Engineer, LGED Jessore/The Deputy Commissioner, Satkhira./ The
Superintendent of Police, Satkhira./ The Superintending Engineer, LGED, Khulna Region, District: Jessore/The Project Director, Union Infrastructure
development/Rural Infrastructure development (Khulna, Bagarhat & Satkhira)
Project.. LGED
Bhaban, Agargaon Sher-E-Bangla Nagar, Dhaka-1207 |
|||||
5. |
Last
date, time and places of receiving tender |
: |
Date: 6th July
2011, Time: 01.00 pm and Places: Office of the
undersigned / The concern Upazila Engineer, Upazila: Sadar, Kalaroa, Tala,
Assasuni,Kaligonj, Debhata & Shayamnagar, District: Satkhira./ The Deputy
Commissioner, Satkhira./The Superintendent of Police, Satkhira/The Executive
Engineer, LGED Jessore. |
|||||
6. |
Date,
time and place of opening of tender |
: |
Date: 6th July
2011, Time: 04.00 pm and Place: Office of the undersigned |
|||||
7. |
Tender shall be valid for a
period of 120 days after
tender opening and must be accompanied by the tender security specified
above. Interested Tenderer may obtain further information from the office of
the undersigned and purchase the tender documents in cash/treasury chalan/
bank draft from the places mentioned above. The Tenderer or their authorized
representatives are allowed to attend the opening of tenders. The authority
reserves the right to accept or reject any or all the tenders without
assigning any reasons whatsoever. |
|||||||
8. |
The provisions laid down in
the public Procurement Regulation (PRP) 2008, PRP(2nd
revision)-2009 & PW-2,PW-3 for procurement of work will be binding upon
the contractors |
|||||||
9. |
In case of official estimate
up to take 2.00(Two) crore, the total Quoted amount by the contractor Must
not be less or above than 5% of the official estimate, otherwise the tender
shall be rejected . |
|||||||
This invitation for tender is
available on the website http/www.lged.gov.bd
(Md. Anwarul Islam)
Executive Engineer.
Ph:0471-63413
Memo No : LGED/XEN/Sat/ 11/913/1(100) Dated : 02/06/2011
Copy forwarded for kind information & necessary
action to :
1. The Superintending Engineer, LGED,
2. The Project Director, Important Rural
Infrastructure Development Project on Priority Basis/ Rural Infrastructure
development (
Satkhira) Project..
LGED Bhaban, Agargaon Sher-E-Bangla Nagar, Dhaka-1207
3. The Deputy Commissioner, District: Satkhira.
4. The
Chief Executive Officer, Zilla Parishad, Satkhira.
5. The
Superintendent of Police, District: Satkhira.
6. The Mayor, Pourashava, Satkhira.
7. The Executive Engineer, LGED,
District:_____________________.
8. The Executive Engineer,
RHD/PHE/BWDB, Satkhira.
9. The Upazila Engineer, LGED, Upazila
: _________________, Satkhira.
10. Assistant Engineer, LGED, GIS Unit,
Level - 4, LGED Bhaban, Agargaon, Dhaka-1207.
He is requested to publish the IFT at the LGED web site.
11. The Editor
....................................................................... He is requested to publish the tender notice.
12. Notice Board (All).
( G. M. Mujibor Rahman )
Senior Assistant Engineer.
LGED, Satkhira.