Government of the People’s
Republic of
Local Government Engineering
Department
Office of the Executive Engineer
District: Satkhira.
Memo No : LGED/XEN/Sat/11/1825 Dated : 30/10/2011
Invitation for Tender (Works)
Sealed tenders are hereby
invited from the tenders enlisted under Clause No. 52 (I) & (2) of PPR - 2008 for limited tender Method up to
Taka 2.00 Crore and as defined in the
tender documents for the under mentioned works as per terms and conditions
stated below:
Package No. |
Gr No |
Name
of Works |
Tender
security
(Tk.) |
Time for completion ( days ) |
Price of tender documents (Tk.) |
|
GOB Maintenance |
|
|
||
GOBM/12/ SAT/W 1 |
1 |
Periodic Maintenance of
Budhata - Baka GC road at ch:8880 - 10200m & ch:11050-13295m (Assasuni). |
95,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 2 |
2 |
Periodic Maintenance of
Kaligonj ZR-Taltala hat Via Dk.Sreepur UP, Bishnopur UP, Bashtala Bazar &
Ramnagar road at ch:00-2550 & ch:6900-7700m (Kaligonj) |
70,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 3 |
3 |
(a) Periodic Maintenance of
Noabenki-Munshigonj-Harinagor-Nurnagar-R&H at Khanpur road at
ch:37000-39770m & ch:48750-50880m (Shyamnagar) (b) Periodic Maintenance
of 3 nos box culvert on Noabenki-Munshigonj-Harinagor-Nurnagar at Khanpur
road at ch:1300m, 14350m, 5850m & 366m (Shyamnagar).(c) Periodic
Maintenance of 2x2m box culvart on Noabenki-Munshigonj-Harinagar-Nurnagar
R&H at Khanpur road Ch:45000m (Shyamnagar) |
96,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 4 |
4 |
Periodic Maintenance of
Budhata - Baka GC road at ch:00 - 1350m, 1700-1995m & ch:6560-7560m
(Assasuni). |
65,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 5 |
5 |
Periodic Maintenance of
Alipur Hatkhola -Shibpur UP Office via Khanpur Bazar, Parandha Bazar road at
Ch:1500-2000m & 4937-5510m(Satkhira-S) |
40,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 6 |
6 |
Periodic Maintenance of
Kaligonj ZR - Khanpur ZR via Kushlia & Baliadanga GC road at Ch:
2500-4700m (Kaligonj) |
45,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 7 |
7 |
Periodic Maintenance of
Tala-Jatpur GC (R&H) via Khajurbunia GC road at Ch: 00-300m &
7300-10820m (Tala) |
1,00,000/- |
120 days |
2,000/- |
GOBM/12/ SAT/W 8 |
8 |
(a) Periodic Maintenance of
Mahamudpur Bazar- Varukhali Bazar- Kathonda (Baikari UP office) via Ghona UP
office Road at ch: 1750-4090m (Satkhira-S) (b) Rehabilitation of 2 nos
625x600mm U-type drain culvert on Mahamudpur bazar-Varukhali bazar-Kathonda
(Bankari UP office) via Ghona UP office road at ch: 4850m & 7400m
(Satkhira-S). |
50,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 9 |
9 |
Periodic Maintenance of Assasuni
- Bardal road at Ch: 00-500m & 1017-1342m (Assasuni) |
33,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 10 |
10 |
(a) Periodic Maintenance of
Chandpur R&H ( Jatan Mali More)-Bangdha GC road at Ch:3038-4415m
(Satkhira-S) (b) Rehabilitation of 2 nos 625x600mm U-type drain culvert on
Chandpur R&H (Janta Mail more)-Bangdha GC road at ch: 550m & 1800m
(Satkhira-S). |
30,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 11 |
11 |
(a) Periodic Maintenance of
Kaligong ZR-Uzirpur GC- Assasuni road at Ch: 10750-14750m (Kaligonj) (b)
Rehabilitation of 900x1300mm U-type drain culvert on Kaligonj ZR-Uzirpur GC-Assasuni road at
ch:4650m (Kaligonj) |
90,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 12 |
12 |
Periodic Maintenance of
Kachighata R&H-Mohandi Bazar road at Ch; 00-435m & 3100-4872m (Tala) |
75,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 13 |
13 |
(a) Periodic Maintenance of
Kalaroa H/Q-Khordohat road at Ch:00-2850m (Kalaroa) (b) Rehabilitation of
4Nos 625x600mm U-type drain culvert on Kalaroa H/Q- Khordohat road at Ch:
204,683,954,4148m (Kalaroa) |
80,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 14 |
14 |
(a) Periodic Maintenance of
Khanpur- Baliadanga road at Ch:00-2500m (Shyamnagar) (b) Periodic Maintenance
of 2 nos culvert on Nakipur-Kashimari-Jhapali road at ch:12100m &
ch:12150m (Shyamnagar). (c) Periodic Maintenance of |
55,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 15 |
15 |
Periodic Maintenance of
Kalaroa H/Q-Chandpur Bazar (Gaira-Goga GC(Upto Kadpur) road at Ch: 6390-6930m
(Kalaroa) |
42,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 16 |
16 |
Periodic Maintenance of
Moutala ZR -Jerrongacha Hat via Namazgar road at Ch: 2000-3500m (Kaligonj) |
50,000/- |
120 days |
1,000/- |
Contd....P/2
( 2 )
Package No. |
Gr No |
Name
of Works |
Tender
security
(Tk.) |
Time for completion ( days ) |
Price of tender documents (Tk.) |
GOBM/12/ SAT/W 17 |
17 |
Periodic Maintenance of 30
Mile (R&H) -Dhandia-Kalaroa road at Ch: 150-1500m (Tala) |
65,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 18 |
18 |
Periodic Maintenance of
Bangshipur-Paranpur-Ramjannagar Hat road at Ch: 00-1880m &3460-5080m
(Shyamnagar) |
90,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 19 |
19 |
Periodic Maintenance of
Kallayanpur Clinic to Kallayanpur Sluice Gate road (Shamimreja road) at
ch:00-1275m (Assasuni). |
60,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 20 |
20 |
Periodic Maintenance of
Kalaroa H/Q-Khordohat road at ch:2850-7302m (Kalaroa). |
90,000/- |
120 days |
1,000/- |
GOBM/12/ SAT/W 21 |
21 |
(a) Periodic Maintenance of
Satkhira R&H (Narkeltala)-Jhawdanga via Akrakhola bazar Balli UP Raipur
bazar & Pathorghata road at ch:1310-5910m (Satkhira-S) (b) Rehabilitation
of 625x600mm U-type drain culvert on Satkhira R&H (Narkeltala)-Jhawdanga
via Akrakhola bazar Balli UP Raipur bazar & Pathorghata road at ch: 4910m
(Satkhira-S). |
30,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 22 |
22 |
Periodic Maintenance of
Nowapara UP-Eidgha bazar road at ch:00-650m & ch:1200-2450m (Debhata). |
20,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 23 |
23 |
Periodic Maintenance of
Hadipur R&H-Hadipur Madrasha via Askarpur Alimia Kallyan Sangosta road at
ch:00-1145m (Debhata). |
28,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 24 |
24 |
Periodic Maintenance of
Bohera (R&H)-Ellarchar bazar-Bangdah GC(Sadar) road at ch:650-3600m
(Debhata). |
20,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 25 |
25 |
Periodic Maintenance of
Kalaroa-Tala via Dhandia Bazar Patkelghata GC(Kalaroa Portion) at
ch:4630-5329m, 6545-6793m, 7350-7410m & 8031-8229m (Kalaroa). |
12,000/- |
120 days |
500/- |
GOBM/12/ SAT/W 26 |
26 |
Periodic Maintenance of (A)
Nalta UP-Khanzia Bazar via Nalta Chowmohoni road at ch:3000-3900m (B) Paikara
Mizan Karikor house to Noapara road at ch. 00-200m (Kaligonj). |
27,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 27 |
27 |
(a)Periodic Maintenance of
Alipur Check post-Padma Shakra GC road via Bhomra at
ch:9200-10400m(Satkhira-S) (b) Rehabilitation of 625x600mm U-type drain
culvert on Alipur Chack post-Padma Shakra GC road via Bhomra at ch:9420m
(Satkhira-S). |
25,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 28 |
28 |
(a) Periodic Maintenance of
Assasuni-Parulia road at ch:1000- 1180m, 12810-13010m, 13573-14025m,
15100-15380m & 16700-18023m (Assasuni).(b) Periodic Maintenance of 11.5m
Bridge on Kadakati UP-Gabtala hat-Kadakati GC road at ch:4900m (Assasuni) |
20,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 29 |
29 |
Periodic Maintenance of
Subornabad GC-Padma sankra GC via Kulia Komorpur bazar road at ch:2950-5500m(Debhata) |
20,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 30 |
30 |
Periodic Maintenance of
Debhata GC-Nazimgonj GC via Khanzia bazar road at ch:00-1170m (Debhata) |
18,000/- |
120 days |
500/- |
GOBM/12/ SAT/W 31 |
31 |
Periodic Maintenance of
Bharashimla Bazar ZR-Bashantapur Bazar (Food Godown)-Via Bharashimla UP road
at ch:00-1200m (Kaligonj) |
24,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 32 |
32 |
Periodic Maintenance of
Debhata GC-Parulia R&H road at ch:00-2000m & 3200-3455m (Debhata). |
20,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 33 |
33 |
(a) Periodic Maintenance of
15.8m Bridge on Tala-Kalaroa via Dalua GC, Petkelghata GC road at Ch: 13410m
(Tala) (b) Rehabilitation of 2.5 x 3.0m box culvert on Tala-Kalaroa via Dalua
GC, Petkelghata GC road at ch:29125m (Tala). |
16,000/- |
120 days |
500/- |
GOBM/12/ SAT/W 34 |
34 |
Rehabilitation of 2.5 x
3.0m box culvert on Shapur R&H Bottala-Baruihati road at ch: 15m (Tala). |
14,000/- |
120 days |
500/- |
GOBM/12/ SAT/W 35 |
35 |
Rehabilitation of
2x3.6x3.3m box Culvart on Sonabaria UP-Karagachi Bazar via Madra Bazar road at
Ch: 6250m (Kalaroa) |
24,000/- |
120 days |
750/- |
GOBM/12/ SAT/W 36 |
36 |
(a) Periodic Maintenance of
10.97m Bridge on Kalaroa Bazar(Cold storage) Garakhali Khayaghat via
Langoljhara UP & Baliadanga hat road at Ch : 6500m (Kalaroa) (b)
Rehabilitation of 600x600mm U-type drain culvart on Chandanpur UP- Hijaldi
Bazar road at Ch: 1740m (Kalaroa) (c) Rehabilitation of 2Nos 600x600mm U-tipe
drain culvart on Gaira more -Sonabaria UP via Ramkrishnapur, Chanduria,
Sultanpur road at Ch: 2400&3100m (Kalaroa) |
10,000/- |
120 days |
500/- |
Contd....P/3
( 3 )
Package No. |
Gr No |
Name
of Works |
Tender
security
(Tk.) |
Time for completion ( days ) |
Price of tender documents (Tk.) |
|||
GOBM/12/ SAT/W 37 |
37 |
(a) Rehabilitation of
600x600mm U-type drain culvart on Kushodanga UP-Raita Bazar- Kalatupi road at
Ch: 3000m (Kalaroa) (b) Rehabilitation of 600x600mm & 600x900mm U-type
drain culvart on Jalalabad UP office
(Kaila More) - Batra Bazar road at Ch: 1000m & 1970m (Kalaroa) |
6,000/- |
120 days |
300/- |
|||
GOBM/12/ SAT/W 38 |
38 |
Rehabilitation of 3.0 x
2.5m box culvert on Dhulihar UP-Gobindapur road at ch: 2350m (Satkhira-S). |
12,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 39 |
39 |
Rehabilitation of 3.0 x
2.5m box culvert on Katia Bazar-Shally WAPDA road at ch: 2417m (Satkhira-S). |
12,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 40 |
40 |
Rehabilitation of 3.0 x
2.5m box culvert on Katia Bazar-Shally WAPDA road at ch: 2079m (Satkhira-S). |
12,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 41 |
41 |
Rehabilitation of 3.0 x
2.5m box culvert on R&H Puraton Satkhira-Machkhola road at ch: 2800m (Satkhira-S). |
12,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 42 |
42 |
Rehabilitation of 3.0 x
3.0m box culvert on Nowapara UP-Badartala GC via Chandpur-Atheapur road at
ch:3050m (Debhata). |
14,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 43 |
43 |
Rehabilitation of 3.0 x 3.0m
box culvert on Loudubi Yousuf house-Icepara
road at ch: 4000m (Kalaroa). |
14,000/- |
120 days |
500/ |
|||
GOBM/12/ SAT/W 44 |
44 |
(a) Periodic Maintenance of
6.0m slab culvert on Budhata - Baka GC road at ch:11970m (Assasuni).(b)
Periodic Rehabilitation of 1.0x2.0m box culvert on Budhata-Baka GC road at ch: 9172m (Assasuni). |
12,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 45 |
45 |
Rehabilitation of 1.0x2.0m
box culvert on Budhata - Baka GC road at ch:7982m (Assasuni). |
10,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 46 |
46 |
Rehabilitation of 1.0x2.0m
box culvert on Budhata - Baka GC road at ch: 8689m (Assasuni). |
10,000/- |
120 days |
500/- |
|||
GOBM/12/ SAT/W 47 |
47 |
Rehabilitation of 1.0x2.0m
box culvert on Kadakati UP-Gabtala hat-Kadakati GC road at ch: 8100m
(Assasuni). |
8,000/- |
120 days |
300/- |
|||
|
|
|
|
|
|
|||
1. |
Tendering
Method
|
: |
LTM |
|||||
2. |
Source
of Funds
|
: |
GOB |
|||||
3. |
Date,
time and place of pre-tender meeting |
: |
Date: 15th November 2011, Time: 11.00am and Place: Office of the undersigned |
|||||
4. |
Last
date, time and places of selling tender documents |
: |
Date: 21st November 2011, Time: During Office hours Places: Office of the
undersigned / The concern Upazila
Engineer, Upazila: Sadar/Kalaroa/ Tala / Assasuni / Kaligonj / Debhata / Shyamnagar, District: Satkhira./ The Deputy Commissioner, Satkhira./ The Superintendent of Police,
Satkhira./ The Superintending
Engineer, LGED, Khulna Region, District: Jessore/ The Superintending Engineer
(Maint.), LGED Bhaban, Agargaon , Dhaka-1207 |
|||||
5. |
Last
date, time and places of receiving tender |
: |
Date: 22nd
November 2011, Time: 1.00 noon and Places: Office of the
undersigned / The Upazila Engineer, Upazila:
Sadar, Kalaroa, Tala, Assasuni, Kaligonj, Debhata & Shyamnagar, District:
Satkhira./ The Deputy
Commissioner, Satkhira./The Superintendent of Police, Satkhira/The Executive
Engineer, LGED Jessore. |
|||||
6. |
Date,
time and place of opening of tender |
: |
Date: 22nd November 2011,
Time: 04.00 pm and Place: Office of the undersigned |
|||||
7. |
Tender shall be valid for
a period of 120 days after
tender opening and must be accompanied by the tender security specified
above. Interested Tenderer may obtain further information from the office of
the undersigned and purchase the tender documents in cash/treasury chalan/
bank draft from the places mentioned above. The Tenderer or their authorized
representatives are allowed to attend the opening of tenders. The authority
reserves the right to accept or reject any or all the tenders without
assigning any reasons whatsoever. |
|||||||
8. |
The provisions laid down
in the public Procurement Regulation (PRP) 2008, PRP(2nd
revision)-2009 & PW-2,PW-3 for procurement of work will be binding upon
the contractors |
|||||||
9. |
In case of official
estimate up to take 2.00(Two) crore, the total Quoted amount by the
contractor Must not be less or above than 5% of the official estimate,
otherwise the tender shall be rejected . |
|||||||
This invitation for tender
is available on the website http/www.lged.gov.bd
( Md. Anwarul Islam )
Executive Engineer.
Ph:0471-63413
Contd....P/4
( 4 )
Memo No : LGED/XEN/Sat/ Dated :
Copy forwarded for kind information & necessary
action to :
1. The Superintending Engineer (Maint.) , LGED Bhaban, Agargaon Sher-E-Bangla Nagar,
Dhaka-1207
2. The Superintending Engineer, LGED,
3. The Deputy Commissioner, District: Satkhira.
4. The
Chief Executive Officer, Zilla Parishad, Satkhira.
5. The
Superintendent of Police, District: Satkhira.
6. The Executive Engineer, LGED,
District:_____________________.
7. The Executive Engineer,RHD/PHE/BWDB,
Satkhira.
8. The Mayor, Pourashava, Satkhira.
9. The Upazila Engineer, LGED, Upazila
: _________________, Satkhira.
10. Assistant Engineer, LGED, GIS Unit,
Level - 4, LGED Bhaban, Agargaon, Dhaka-1207.
He is requested to publish the IFT at the LGED web site.
11. The Editor
.................................................................. He is requested to publish the tender notice.
12. Notice Board (All).
(G.M. Mujibor Rahman)
Senior Assistant Engineer.
LGED, Satkhitra.atkhira.
atkhira.