|
GOVERNMENT OF THE |
|
||||||||||
|
LOCAL GOVERNMENT ENGINEERING DEPARTMENT |
|
||||||||||
|
OFFICE OF THE EXECUTIVE ENGINEER |
|
||||||||||
|
PEROJPUR. |
|
||||||||||
|
Memo:no:LGED/XEN//Peroj/2012/123 |
|
|
Dated: 22.01.2012 |
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Invitation for Tender (LTM) No-23/2011-2012 |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sealed
tenders are hereby invited from the enlisted contractors of LGED under LTM as
defined in the tender documents for
the following works as per
terms and conditions stated below: |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Sl No |
Group No / Package No |
Upazila |
Road Code |
Name of Schemes |
Estimated Cost (Tk.) |
Tender security (Tk) |
Time for completion (days) |
Price of tender documents (Tk) |
|
|||
1 |
Name of Project : RAARIP
Project (2011-2012) |
|
|
|
|
|
|
|
|
|||
1 |
RAILA/PRJ/ W11 |
Sadar |
579805040 |
Construction
of 12.50m long bridge on Kalikati UZR to Uttar Gazipur hat via |
900387.00 |
20000.00 |
180 |
500.00 |
|
|||
2 |
RAILA/PRJ/ W12 |
Sadar |
579804031 |
Maintenance
of Nimar Bridge to Kadamtola Bazar via Khanakuniari Madrasha L=3.50km, Ch.
00-3500m and 14.00m long Bridge at ch. 2990m. |
4069774.00 |
82000.00 |
180 |
1000.00 |
|
|||
3 |
RAILA/PRJ/ W02 |
Sadar |
579804004 |
Const.
of Bagri to Kachubunia road, 1Nos 2.00x2.00m RCC Box Culvert at ch. 300m
& 1Nos 3.00x3.00m RCC Box Culvert at ch. 500m. |
1013514.00 |
21000.00 |
180 |
750.00 |
|
|||
4 |
RAILA/PRJ/ W14 |
Sadar |
579803009 |
Sikder
Mallik UP-Kolakhali UP upto Gojalia Lanchghat via Ghop hat ch. 00-2246m and
Bridge & Culverat at h. 1252m 1x4.30x4.30m ch. 1330m-1x4.00x4.00m, ch.
1495m-12.00m Long bridge , ch. 1790m-1x2.00x2.00m, RCC Box Culvert. |
7080599.00 |
142000.00 |
180 |
2000.00 |
|
|||
5 |
RAILA/PRJ/ W03 |
Kawkhali |
579474033 |
Amrajuri
Abasion Connacting road L=3.00km, ch. 700-1800m; |
436170.00 |
9000.00 |
120 |
500.00 |
|
|||
6 |
RAILA/PRJ/ W04 |
Kawkhali |
579474032 |
Ashoa
R&H to Gondarbo Abasion road L=1.86km, ch. 00-1000m. |
2696992.00 |
53000.00 |
180 |
1000.00 |
|
|||
7 |
RAILA/PRJ/ W05 |
Kawkhali |
579473002 |
Amrajuri
UP Office to Kawkhali GC ch. 700-1200m. |
1269546.00 |
25000.00 |
180 |
750.00 |
|
|||
8 |
RAILA/PRJ/ W18 |
Kawkhali |
579473001 |
Kawkhali
UP Office to Keundia Bazar ch. 00-2000m and 2Nos 10.00m Bridge culvert at ch.
1821m & 2842m. |
3135019.00 |
63000.00 |
180 |
1000.00 |
|
|||
9 |
RAILA/PRJ/ W19 |
Kawkhali |
579473006 |
Sialkati
UP Office -Sialkati Talukder Hat, ch. 00-500m, & 2Nos 10.00m Bridge
culvert at ch. 244m, 530m, & 1Nos 30.00m Bridge at ch. 708m. |
5582098.00 |
112000.00 |
180 |
2000.00 |
|
|||
10 |
RAILA/PRJ/ W06 |
Kawkhali |
579474013 |
Bramon
Titna Embankment to Rakhal Mondoll house road at ch. 00-2000m and 2Nos 12.00m
Bridge at ch. 258m & 911m. |
2997352.00 |
60000.00 |
180 |
1000.00 |
|
|||
11 |
RAILA/PRJ/ W21 |
Mothbaria |
579582002 |
Masua
RHD to Safa Amua RHD via Mathbaria GC via Algi hat L=9.59km, at ch. 00-1645m.
|
8780519.00 |
176000.00 |
180 |
2000.00 |
|
|||
12 |
RAILA/PRJ/ W07 |
Mothbaria |
579584001 |
Sapleza
Varani to Kachubaria lanchghat HBB road L=4.00km (HBB), at ch. 00-2200m. |
8676730.00 |
173000.00 |
180 |
2000.00 |
|
|||
13 |
RAILA/PRJ/ W23 |
Mothbaria |
579584105 |
Sapleza
Bazar to Vijora HBB road L=3.75km (HBB, at ch. 00-1500m. |
6179708.00 |
123000.00 |
180 |
1000.00 |
|
|||
14 |
RAILA/PRJ/ W24 |
Mothbaria |
579584049 |
Masua
Bazar to Khejurbaria cyclone shelter road Bridge near the house of Adiker,
1Nos 3.00x3.00m RCC Box Culvert at ch. 500m. |
887817.00 |
18000.00 |
150 |
750.00 |
|
|||
15 |
RAILA/PRJ/ W25 |
Mothbaria |
579584072 |
Tulatala
to Angulkata road Box culvert near the house of Mollik, 1Nos 3.00x3.00m RCC
Box Culvert at ch. 500m. |
898278.00 |
18000.00 |
150 |
750.00 |
|
|||
16 |
RAILA/PRJ/ W26 |
Mothbaria |
579584049 |
Masua
bazar to Khejurbaria cyclone shelter HBB road L=2.50km, at ch. 1500-2500m. |
4577370.00 |
91000.00 |
180 |
1000.00 |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Source of Funds |
: GOB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Date, Time and Place of
Pre-Tender Meeting : |
10, February, 2012, Time : |
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Last Date,Time and Places of
Selling of Tender Documents: |
19, February, 2012, Time |
|
|
||||||||
|
a)
Office of the Project Director, Rehabilitation of AILA Affected Rural
Infrastructure Project (RAARIP, LGED Bhavan, Agargoan Sherebangla Nagar,
Dhaka-1207. |
|
||||||||||
|
b) Office of
the Deputy Commissioner,Pirojpur |
|
|
|||||||||
|
|
|
c) Office of
the Superintendent of Police,
Pirojpur. |
|
|
|||||||
|
|
|
d) Office of
the Executive Engineer, LGED, Jhalakati. |
|
|
|||||||
|
|
|
e) Office of the Executive Engineer
LGED,Pirojpur. |
|
|
|||||||
|
|
|
f)
Office of the Upazila Engineer, LGED, Sadar, Kawkhali & Mothbaria Upazila,Dist. Pirojpur. |
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Last Date,Time and Places
of Receiving: Tender |
20, February, 2012 up to |
|
|
||||||||
|
Office of The Executive
Engineer,LGED,Pirojpur. |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Date, Time and Place of
Opening of Tender |
20, February, 2012 at |
|
|
||||||||
|
Office of the Executive
Engineer,LGED, Pirojpur. |
|
|
|||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Tender
shall be valid for a period of 120 (One Hundred Twenty) days from bid opening
and must be accompanied by the tender
security specified above. Interested tenderer may obtain further information
from the undersigned and purchase the tender documents in cash/treasury
chalan/bank draft/Pay-order from the places mentioned above. If the quoted
tender prices more than 5 (five) precent above or less than the engineering
estimate cost the tender should be rejected. The tenderer or their authorized
representatives are allowed to attend the opening of tenders. The Authority
reservers the right to accept or reject any or all the tenders without
assigning any reasons whatsoever. This invitation for tender is available on
the LGED website http/www.lged.gov.bd. |
|
||||||||||
|
|
|||||||||||
|
|
|||||||||||
|
|
|||||||||||
|
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Executive Engineer |
|
|
|
|
|
|
|
|
|
|
|
|
LGED,Perojpur |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Memo:no:LGED/XEN//Peroj/2012/123
/1(40) |
|
|
Dated: 22.01.2012 |
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copy forwarded for favour
of information to:- |
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Superintending Engineer,
Regional Office,LGED, |
|
|
|||||||||
2 |
Project Director,Project
Director, Rehabilitation of AILA Affected Rural Infrastructure Project
(RAARIP,LGED, LGED, Bhavan Agargoan Shere-E-Bangla Nagar Dhaka-1207. |
|
||||||||||
3 |
Deputy Commissioner,
Pirojpur |
|
|
|
|
|
|
|
|
|
||
4 |
Superintendent of Police,
Pirojpur. |
|
|
|
|
|
|
|
|
|
||
5 |
Executive Engineer,
PWD/RHD/BWDB/PHE/PDB,Pirojpur. |
|
|
|
||||||||
6 |
Assistant Engineer, LGED,
GIS Unit, Leve-4, LGED Bhaban, Agargaon, Dhaka-1207- He is requested to
publish the IFT at the LGED web site. |
|
||||||||||
7 |
Upazila
Engineer,LGED,Pirojpur Sadar/Zianagar/Nazirpur/Nesarabad/Kawkhali/Bhandaria
/Mathbaria Upazila, Dist.Pirojpur. |
|
||||||||||
8 |
Notice Board. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Executive Engineer |
|
|
|
|
|
|
|
|
|
|
|
|
LGED,Perojpur |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|