Government of the
Local
Government Engineering Department
Office of the Executive Engineer
District: Patuakhali.
Memo.No.LGED/XEN/Patua/2011/B-01/10-12/975
Date : 18/03/2012
Sealed tenders are hereby invited from the eligible
tenderers as defined in the tender documents for the under mentioned works as
per terms and conditions stated below:
Sl No |
Package No. |
Name of Works |
Tender security (Tk.) |
Time for completion (days) |
Price of tender documents (Tk.) |
|
1 |
RAILA/PTK/W-01 |
Rehab.
of road from Patuakhali Khalishakhali Ferry Bazer-(Pukurjana bazar) Itbaria
UP at ch.00-3000m, ID No.578953011 (Sadar) |
78,000/= |
120 days |
1000/= |
|
2 |
RAILA/PTK/W-02 |
Rehab.
of road from Patuakhali H/Q-Muradia GC via Sreerampur Bazar (Sadar part), at
ch.3700-6100m, ID No.578952009 (Sadar) |
2,88,000/= |
150 days |
3000/= |
|
3 |
RAILA/PTK/W-05 |
Rehab.
of road from Nazirpur UP-Dhandi GPS-Chandapara Bazar road, at ch.1500-1850m,
ID No.578383039 Const. of Mathborehat-Kalisuri-Kachipara-Gopalia Bazar (Jamal
Munshi Bari) road: 3x3m RCC box culvert at ch.800m ID No.578384120 (Bauphal) |
68,000/= |
120 days |
1000/= |
|
3 |
RAILA/PTK/W-06 |
Rehab.
of road from Kachipara UP-Joybangla Bazar-Karkhana Bazar-Paier hat-Dariabad
UZR, at ch.0.0-4038m, ID No.578383037 (Bauphal) |
1,34,000/= |
120 days |
2000/= |
|
4 |
RAILA/PTK/W-04 |
Bauphal
UP (Sher-E-Bangla road)-Naomala BDC road, at ch.0.0-4700m, ID No.578383021 (Bauphal) |
1,49,000/= |
120 days |
2000/= |
|
5 |
RAILA/PTK/W-15 |
Rehab.
of road from Nazirpur UP-Upazila
H/Q-Daspara UP-Moisadi Bazar road, at ch.1500-3055m, ID No.578383013 (Bauphal) |
2,27,000/= |
150 days |
2000/= |
|
6 |
RAILA/PTK/W-09 |
Rehab. of
road from Lalua UP-Chinguria-Teakhali UP, at ch.0.0-1000m & RCC
box culvert on 1.50mX1.50m at ch.190m, ID No.578663009 (Kalapara) |
1,46,000/= |
120 days |
2000/= |
|
7 |
RAILA/PTK/W-10 |
Rehab.
of road from Solimpur Bazar-West
Sonatola Nilgonj UP, at ch.0.0-960m,
ID No.578663008 (Kalapara) |
70,000/= |
120 days |
1000/= |
|
8 |
IRIDP/PTU/ W-41 |
Improvement
of Charmontaj Sluice Bazar-Char Basten Bazar road at ch.0.0m-2500.0m (Galachipa). |
2,66,000/= |
150 days |
3000/= |
|
9 |
IRIDP/PTU/ W-55 |
Improvement
of Charmontaj Sluice Bazar-Char Basten Bazar road at ch.2500.0m-5000m (Galachipa). |
2,66,000/= |
180 days |
3000/= |
|
10 |
IRIDP/PTU/ W-56 |
Improvement
of Galachipa (Kalikapur)-Panpatty
Launch ghat road from ch.4000m-6000m (Galachipa). |
2,34,000/= |
150 days |
2000/= |
|
11 |
IRIDP/PTU/ W-57 |
Improvement
of Galachipa (Kalikapur)- Panpatty Launch ghat road from ch.6000m-8500m (Galachipa). |
2,86,000/= |
150 days |
3000/= |
|
12 |
IRIDP/PTU/ W-42 |
Improvement
of road from Madrasha connecting road from Kachipara UP-Joy Bangla
Bazar-Karkhana Bazar-Parerhat-Dariabad UZR (Kachipara Danida
Bazar-Dariabad-Parerhat RNGPS-Karkhana Launch ghat) road by BC at
ch.4550.0m-5400.0m (Bauphal) |
92,000/= |
120 days |
1000/= |
|
13 |
IRIDP/PTU/ W-43 |
A)Improvement
of road from School connecting road from Kalisuri UP- |
54,000/= |
150 days |
750/= |
|
14 |
IRIDP/PTU/ W-44 |
Improvement
of School connecting road from Boga GC (Shaplakhali R&H)-Kanakdia
hat-Surjamoni-Kalisuri GC road-Pashim Indrokul GPS by BC at ch.0.0m-810.0m (Bauphal) |
78,000/= |
120 days |
1000/= |
|
15 |
IRIDP/PTU/ W-45 |
Improvement
of School connecting road from Madanpura UP-Kanakdia bazar-Kachipara UP
road-Joybangla Zakerabad Dakhan Madrasha
by BC at ch.0.0m-180.0m (B)Imp. of school connecting road from |
74,000/= |
120 daus |
1000/= |
|
16 |
IRIDP/PTU/ W-46 |
Improvement
of School connecting road from Mominpur GC-Kalaiya GC road-Kachua Dalima
GPS by BC at ch.0.0m-1036.0m under
Nazirpur Union (Bauphal) |
89,000/= |
150 days |
1000/= |
|
17 |
IRIDP/PTU/ W-47 |
(A)Improvement
of School connecting road from Purbo Kalaiya Sattar Master Bari road-Hasan
Siddique High school by BC at ch.0.0m-730m (B)Const. of 01 No U-Drain culvert
on at ch.550m on the same road (Bauphal) |
66,000/= |
120 days |
1000/= |
|
18 |
IRIDP/PTU/ W-48 |
(A)Improvement
of School connecting road from Dakhin Dipasha RHD-Dakhin Dipasha GPS by BC at
ch.0.0m-140m under Modonpura Union (B)Imp.of school connecting road from
Madanpura UP-Kachipara UP BC road-Sonamaddin H/school by BC at ch.0.0m-200.0m
(C)Const.of 1No 0.375mX0.450m U-Drain at ch.160m on the same road under
Madanpura Union(D)Imp.of school connecting road from Uttar Kalaiya BC
road-Uttar Kalaiya GPS by BC at ch.0.0m-180.0m under Kalaiya Union (Bauphal) |
47,000/= |
120 days |
750/= |
|
19 |
IRIDP/PTU/ W-49 |
Improvement
of Aynabas Kalaiya Comunity school- connecting road at ch.0.0m-700.0 m (Bauphal) |
61,000/= |
120 days |
750/= |
|
20 |
IRIDP/PTU/ W-50 |
(A)Improvement
of School connecting road from Boga-Kalaiya R&H road-Salam Pada
House-Purbo Daspara Nesaria Dhakhil Madrasha by BC at ch.0.0m-950m (B) Const.
2Nos 0.625mX0.600m U-Drain at ch.130m
& 350m on the same road (Bauphal) |
88,000/= |
150 days |
1000/= |
|
21 |
IRIDP/PTU/ W-51 |
(A)Improvement
of School connecting road from Bauphal-Kalaiya RHD road-South side of Amena
Khatun RNGPS by BC at ch.0.0m-275.0m under Daspara Union (B)Imp.of school
connecting road from Bauphal UP (Sher-e-bangla road)-Nowmala VCD road-Jouta
Dakhil Mohila Madrasha by BC at ch.0.0m-250m (C)Const.of 01No 0.625mX0.600m U-Drain at ch.4.0m on the
same road under Bauphal Union(D)Imp.of school connecting road from
Dasmina-Bauphal-Patuakhali RHD-Bauphal collage road by BC at ch.0.0m-180.0m
under Bauphal Union (Bauphal) |
65,000/= |
150 days |
1000/= |
|
22 |
IRIDP/PTU/ W-52 |
(A)Improvement
of School connecting road from |
62,000/= |
120 days |
750/= |
|
23 |
IRIDP/PTU/ W-53 |
(A)Improvement
of School connecting road from |
53,000/= |
120 days |
750/= |
|
24 |
IRIDP/PTU/ W-54 |
(A)Improvement
of School connecting road from UZR-Holabunia Bazar-North side of Sitakundo |
22,000/= |
90 days |
500/= |
|
25 |
UCRIP-18 |
A)Improvement
of road from Kanakdia up to Birpasha
bazar via Nadu Howlader house via Chairman Abdul Raman house Shinherakati
road by BC at ch.2500m-3400m (B)Imp. of same road by earth from
ch.2500m-3400m (Bauphal) |
1,12,000/= |
120 days |
1000/= |
|
26 |
UCRIP-19 |
A)Improvement
of road from kalaiya UP-Bogi hat (Aynabaj-Kalaiya-S Karpurkathi GPS) road by
BC at ch.00m-900m (B)Imp. of same road by earth from ch.00m-900m (Bauphal) |
1,12,000/= |
120 days |
1000/= |
|
27 |
UCRIP-20 |
A)Improvement
of road from kalaiya UP-Kalaiya Launch ghat Cable house road by BC at
ch.3000m-3500m (B)Imp. of same road by earth from ch.3000m-3500m (Bauphal) |
62,000/= |
120 days |
1000/= |
|
28 |
UCRIP-21 |
A)Improvement
of road from Kalishuri UP-Dhulia UP Jamalkathi Reg. Primary school & Chadkathi road at ch.4000m-5000m (B)Imp. of same road
by earth from ch.4000m-5000m (Bauphal) |
1,24,000/= |
150 days |
1000/= |
|
29 |
UCRIP-22 |
A)Improvement
of road from Deuli Subidkhali UP Office-Goalkhali Bazar road by HBB
at ch.1000m-2560m (B)Imp. of same road by earth from ch.1000m-2560m
(C)Const. of 2Nos 625mX600m U-Drain at
ch.1120m & 1490m on the same road
(Mirzagonj) |
1,04,000/= |
120 days |
1000/= |
|
1. |
Method of
Procurement. |
: |
Open Tendering Method
(OTM). |
2. |
Source of Funds |
: |
RAARIP/ IRIDP/ UCRIP |
3. |
Date, time and
place of pre-tender meeting |
: |
Date:
19 April 2012, Time: 11.00am and Place:
Office of the undersigned |
4. |
Last date, time and
places of selling tender documents |
: |
Date:
29 April 2012, Time: 5.00pm
and a)The
Project Director( RAARIP/IRIDP/UCRIP)(Concerned
Project),LGED, LGED Bhaban, Agargoan, Sher-e-Bangla Nagar, Dhaka-1207. b)The
Deputy Commissioner, Patuakhali. c)The
Superintendent of Police, Patuakhali. d)The
Executive Engineer, LGED, Patuakhali/Barisal. e)The
Upazila Engineer, LGED, Patuakhali
Sadar/ Bauphal, Kalapara, Galachipa & Mirzagonj, Dist. Patuakhali (Concerned Group). |
5. |
Last date, time and
places of receiving tender |
: |
Date:
30 April 2012, Time: 01:00 p.m and a)The
Deputy Commissioner, Patuakhali. b)The
Superintendent of Police, Patuakhali. c)The
Executive Engineer, LGED, Patuakhali/Barisal. d)The
Upazila Engineer, LGED, Patuakhali
Sadar/Bauphal, Kalapara, Galachipa & Mirzagonj, Dist. Patuakhali. |
6. |
Date, time and
place of opening of tender |
: |
Date:
30 April 2012, Time: 03.00pm and Place:
Office of the undersigned. |
7. |
Tender shall be valid for a period of 90 days days after tender opening and
must be accompanied by the tender security specified above. Interested
tenderers may obtain further information from the office of the undersigned
and purchase the tender documents in cash/treasury chalan/ bank draft from
the places mentioned above. The tenderer or their authorized representatives
are allowed to attend the opening of tenders. The authority reserves the
right to accept or reject any or all the tenders without assigning any
reasons whatsoever. |
(Sayeed Ahmed Baset)
Executive Engineer
LGED, Patuakhali.
Ph: 0441-62244
Email:xen.patuakhali@lged.gov.bd
Contd..P/3
Page No.3
CC.
1.The Chief Engineer, LGED, LGED Bhaban, Agargaon,
Dhaka-1207.
2. The Superintending Engineer(Admin.), LGED,
LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207.
3. The
Superintending Engineer, LGED,
4. The Project Director, (RAARIP/IRIDP/UCRIP),
LGED, LGED Bhaban, Agargaon, Sher-E-Bangla Nagar, Dhaka-1207.
5. The Deputy Commissioner, District: Patuakhali.
6. The
Superintendent of Police, District: Patuakhali.
7. The
District Special Branch, Patuakhali.
8. The
Executive Engineer, LGED, District:
9. The Executive
Engineer, RHD/BWDB/PWD, District:Patuakhali.
10. The
Upazila Engineer, LGED, Upazila : Kalapara,Patuakhali
Sadar,Bauphal, Galachipa & Mirzagonj, District:Patuakhali.
11. m¤úv`K, ˆ`wbK
Lei, †ZRMvI wkí GjvKv, XvKv z (for wide circulation before 25
March/2012)
12.The
Editor,The Daily New Nation, R.K.Mission road #1, Dhaka-1203 (for wide circulation before 25
March/2012)
13. Notice Board (All).