1
|
CIB-Mym-W-42
|
Const. of 100m long RCC Girder Bridge over Jolvurunga river on Achintopur UP-Valukapur road at Ch. 3800m under Gouripur Upazila District: Mymensingh
|
CIBRR
|
gouripur
|
[Road ID: 361233025
|
|
100.00
|
86
|
510.20
|
Mominul Haque- Swarna Bricks(JV) Sadar, Mymensing
|
470.79
|
07/02/2018
|
14/02/2018
|
22/06/2021
|
100
|
400.78
|
86
|
05/02/2025
|
|
2
|
CIB-Mym-W-45
|
"Construction of 730.90 m Arch bridge over Brammaputra river at Ch. 4300 m on the west bank road of Mridhapara Govt Primary School to Brammaputra river through Millennium Bazar through Pandapara paved road-Payistirchar under Sadar upazila of Mymensingh district
[Road ID: 361524043]
CIB-Mym-W-45"
|
CIBRR
|
mymensingh-s
|
361524043
|
673.00
|
730.90
|
0
|
12138.38
|
National Development Engineering Ltd
|
12500.00
|
15/07/2024
|
15/09/2024
|
01/09/2027
|
2
|
0.00
|
0
|
05/01/2025
|
|
3
|
CIB-Mym-W-44
|
Const. of 70m long PSC Girder Bridge over Norsunda river on Udla Bazar connecting road at Ch. 3900m under Nandail Upazila District: Mymensingh
|
CIBRR
|
nandail
|
361724094
|
|
75.00
|
91
|
421.12
|
Shahjahan Ali-Saiful Islam(JV)
|
387.99
|
05/02/2018
|
11/02/2018
|
30/11/2021
|
100
|
358.78
|
91
|
05/02/2025
|
|
4
|
CIB-Mym-W-43
|
Const. of 45m long PSC Girder Bridge over Norsunda river on Nandail-Jahangirpur via Garua and Chanpur (Amudabad GPS) road in Purhori Village at Ch.613m under Nandail Upazila District: Mymensingh
|
CIBRR
|
nandail
|
361724090
|
|
45.00
|
86
|
452.54
|
M/S. Chowdhury Enterprise Sarderpere,Jamalpur"
|
452.50
|
20/05/2020
|
27/05/2020
|
19/10/2022
|
100
|
382.22
|
86
|
05/02/2025
|
|
5
|
CRMIDP/MYM/W-256
|
Mahmudpur Bazar
|
CRMIDP
|
bhaluka
|
|
|
|
46
|
184.00
|
Maliha Trade International
|
165.60
|
26/06/2022
|
|
31/08/2022
|
80
|
76.50
|
46
|
26/07/2022
|
|
6
|
CRMIDP/MYM/W-255
|
Sharuapara Bazar
|
CRMIDP
|
dhobaura
|
|
|
|
|
255.00
|
KK Enterprise-BAK construction
|
224.56
|
23/08/2021
|
02/04/2022
|
15/05/2022
|
10
|
|
|
26/07/2022
|
|
7
|
CRMIDP/MYM/W-253
|
Babugonj Bazar
|
CRMIDP
|
fulbaria
|
|
|
|
42
|
310.00
|
M/S Surma Engineering works
|
262.66
|
17/07/2022
|
20/03/2022
|
20/09/2022
|
48
|
111.00
|
42
|
26/07/2022
|
|
8
|
CRMIDP/MYM/W-251
|
Pahsar Bazar
|
CRMIDP
|
gouripur
|
|
|
|
27
|
216.00
|
"M/S Mahbub Enterprise 35, Sahab Ali Road Nutun Bazar, Mymensingh "
|
190.08
|
06/02/2020
|
|
24/07/2022
|
45
|
52.00
|
27
|
26/07/2022
|
|
9
|
CRMIDP/MYM/W-250
|
Baghitola Hat
|
CRMIDP
|
haluaghat
|
|
|
|
54
|
326.00
|
M/S Jerin Enterprise
|
275.43
|
13/12/2020
|
|
03/07/2022
|
60
|
148.50
|
54
|
26/07/2022
|
|
10
|
CRMIDP/MYM/W-248
|
Kali Bazar
|
CRMIDP
|
nandail
|
|
|
|
60
|
207.00
|
"Noor Hossain-Snaha Enterprise (JV) 105/B, D.B.Raod. Sadar Mymensingh "
|
190.37
|
20/02/2020
|
|
04/07/2022
|
70
|
115.00
|
60
|
26/07/2022
|
|
11
|
CRMIDP/MYM/W-247
|
Boula Bazar
|
CRMIDP
|
phulpur
|
|
|
|
45
|
213.00
|
"Noor Hossain-Snaha Enterprise (JV) 105/B, D.B.Raod. Sadar Mymensingh "
|
192.46
|
20/02/2020
|
|
04/07/2022
|
50
|
87.50
|
45
|
26/07/2022
|
|
12
|
CRMIDP/MYM/W-258
|
Tarakanda Dokkhin Bazar
|
CRMIDP
|
Tarakanda
|
|
|
|
40
|
188.00
|
SE & EET (JV), Bagmara, Mymensingh Sadar, Mymensingh
|
174.39
|
04/11/2019
|
|
30/11/2020
|
60
|
69.00
|
40
|
26/07/2022
|
|
13
|
CRMIDP/MYM/W-249
|
Danikhola Bazar
|
CRMIDP
|
trishal
|
|
|
|
25
|
205.00
|
M/S Surma Engineering works
|
173.37
|
26/06/2022
|
|
06/09/2022
|
45
|
43.50
|
25
|
26/07/2022
|
|
14
|
EUCPW-111
|
Construction of Upazila Extension Building & Hall Room
|
EUCP-2
|
mymensingh-s
|
|
|
|
30
|
779.74
|
M/S. maltiplex Enterprise
|
662.00
|
17/12/2020
|
27/12/2020
|
26/03/2022
|
50
|
198.43
|
30
|
20/12/2021
|
|
15
|
(GMRIDP/MYM/BHAL/UNR/79)
|
Improvement of Dhaka-Mymensingh H/W Baksatra-Randia Bridge road (Ch. 2070-2825m)
|
GMRIDP
|
bhaluka
|
|
0.75
|
|
|
47.16
|
Md. Mohibul Haque Gaffargaon,Mymensingh
|
43.33
|
|
|
14/04/2016
|
100
|
|
|
10/03/2019
|
|
16
|
(GMRIDP/MYM/BHAL/VR/146)
|
Improvement of Tamat bazar - Angargara bazar R&H-road (Ch. 2400-3400m)
|
GMRIDP
|
bhaluka
|
|
1.00
|
|
|
56.94
|
M/S. Rifat Enterprise Gazipur.
|
56.85
|
|
|
|
70
|
|
|
10/03/2019
|
|
17
|
(GMRIDP/MYM/BHAL/VR/148)
|
Improvement of Rajoy - Matherghat-Morolpara to Rajoy Girls High School(Rajoy bazar-Urahati) road (Ch. 2650-3050m)
|
GMRIDP
|
bhaluka
|
|
0.40
|
|
|
22.33
|
M/S. M. Nahian Traders
|
22.16
|
|
|
|
25
|
|
|
10/03/2019
|
|
18
|
(GMRIDP/MYM/BHAL/VR/181)
|
Improvement of Jamirapara-Urahati Gov. Pry. School(Urahati Rubber Dam-Urahali Pry. School Jamirapara Board bazar-Birunia bazar) road (Ch. 650-1150m)
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
42.56
|
M/S. Abul Basher Bhaluka,Mymensingh.
|
41.28
|
|
13/09/2017
|
18/02/2018
|
85
|
|
|
10/03/2019
|
|
19
|
(GMRIDP/MYM/BHAL/VR/199)
|
Improvement of Seedstor-Jhalupaja road-Boroshree road (Ch. 855-1105m)
|
GMRIDP
|
bhaluka
|
|
0.25
|
|
|
15.53
|
M/S. Sikder Enterprise Motijhel, Dhaka
|
17.01
|
|
19/08/2018
|
25/12/2018
|
35
|
|
|
10/03/2019
|
|
20
|
(GMRIDP/MYM/BHAL/VR/200)
|
Improvement of Dhitpur bazar-Panihadi Primary School-Randia bazar road (Ch. 00-500m)
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
35.17
|
M/S. Liton Enterprise Gaffargaon, Mymensingh
|
36.80
|
|
25/03/2018
|
31/07/2018
|
65
|
|
|
10/03/2019
|
|
21
|
(GMRIDP/MYM/BHAL/VR/201)
|
Improvement of Chandabo board bazar-Jeetendranath Bhowmeker bari(Nondipara) via Modda Rajoi Gov. girls School road (Ch. 1355-1917m)
|
GMRIDP
|
bhaluka
|
|
0.56
|
|
|
31.47
|
M/S. Shad Engineering Const. Firms
|
32.38
|
|
|
|
30
|
|
|
10/03/2019
|
|
22
|
(GMRIDP/MYM/BHAL/VR/218)
|
Improvement of Noyanpur - Hajir bazar(Hajir bazar - Noyanpur Gadumiah Mosque Market road start of HBB Last Border) road (Ch. 2775-3775m)
|
GMRIDP
|
bhaluka
|
|
1.00
|
|
|
61.15
|
Salman Enterprise
|
64.21
|
|
|
13/12/2018
|
100
|
|
|
10/03/2019
|
|
23
|
(GMRIDP/MYM/BHAL/UNR/08)
|
Improvement of Batajur bazar (Kachina UP)-Dakatia bazar road (Ch. 3000-3750m) with 0.375x0.450m. 1 no U-drain
|
GMRIDP
|
bhaluka
|
|
0.75
|
|
|
42.55
|
Shahabuddin Ahammed
|
46.57
|
|
13/10/2014
|
|
100
|
|
|
|
|
24
|
(GMRIDP/MYM/BHAL/VR/18)
|
Improvement of Kashore Advance Textaile Mill - Gouripur bazar (Jamairdia Master Bari - Paragoan road) road (Ch. 2645-3145m)
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
25.69
|
M/S. Abul Basher
|
28.21
|
|
|
|
100
|
|
|
|
|
25
|
(GMRIDP/MYM/BHAL/VR/24)
|
Improvement of Paragaon (Nalua kuri) - Gouripur bazar road (Ch. 2850-3600m)
|
GMRIDP
|
bhaluka
|
|
0.75
|
|
|
39.41
|
Md. Abul Bashar
|
39.20
|
|
30/12/2014
|
29/06/2015
|
100
|
|
|
|
|
26
|
(GMRIDP/MYM/BHAL/VR/23)
|
Improvement of Jamirdia (Master Bari) - Paragoan road (Ch. 3145-3795m)
|
GMRIDP
|
bhaluka
|
|
0.65
|
|
|
36.15
|
Md. Abul Bashar
|
35.95
|
|
30/12/2014
|
29/06/2015
|
100
|
|
|
|
|
27
|
(GMRIDP/MYM/BHAL/UZR/33)
|
Improvement of Bhoradoba Nutun bus Stand - Dholia bazar(Dholia GC - Bhoradoba Natun Bus Stand road) (Ch. 00-1000m) with 2nos U-Drain.
|
GMRIDP
|
bhaluka
|
|
1.00
|
|
|
74.03
|
Md. Shahab Uddin Ahammed
|
77.30
|
|
|
30/08/2015
|
100
|
|
|
|
|
28
|
(GMRIDP/MYM/BHAL/UNR/42)
|
Improvement of Meduary UP Office (Nijhori Bazar) - Panchgaon bazar via Boherertek road (Ch. 3940-4640m)
|
GMRIDP
|
bhaluka
|
|
0.70
|
|
|
41.47
|
M/S. Shaharia Enterprise
|
45.55
|
|
|
14/12/2015
|
100
|
|
|
|
|
29
|
(GMRIDP/MYM/BHAL/UNR/46)
|
Improvement of Batajore-Shoilat(Shailat-Batazore) road (Ch. 4150-4650m) with 1 no U-drain
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
26.79
|
M/S. Munira Enterprise
|
28.64
|
|
28/04/2015
|
|
100
|
|
|
|
|
30
|
(GMRIDP/MYM/BHAL/VR/95)
|
Maintenance of Hatiber Nobarun Shango-Koedi bazar via Chamiadi bazar road (Ch. 00-1500m)
|
GMRIDP
|
bhaluka
|
|
1.50
|
|
|
34.93
|
Masud Alam Tipu Netrokona
|
31.61
|
|
24/01/2016
|
30/05/2016
|
100
|
|
|
|
|
31
|
(GMRIDP/MYM/BHAL/VR/147)
|
Improvement of Batajore-Shoylat (Shoylat- batajore) road (Ch. 2650-3150m)
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
29.85
|
M/S. M. Nahian Traders
|
29.34
|
|
|
|
100
|
|
|
|
|
32
|
(GMRIDP/MYM/BHAL/UNR/182)
|
Improvement of Mollikbari bazar-Kachina bazar road (Ch. 2000-2350m)
|
GMRIDP
|
bhaluka
|
|
0.35
|
|
|
19.08
|
Mukta Mondal Enterprise, Gazipur.
|
20.21
|
|
20/09/2017
|
|
100
|
|
|
|
|
33
|
(GMRIDP/MYM/BHAL/VR/183)
|
Improvement of Uthora-Morich-Kathlamari, Interghat bridge-Akhalia BIT Office (Dakatia-Akhaliapara-Chamiadi bazar via Katlamari bazar) road (Ch. 9750-10250m)
|
GMRIDP
|
bhaluka
|
|
0.50
|
|
|
28.28
|
|
0.00
|
|
|
|
0
|
|
|
|
|
34
|
(GMRIDP/MYM/DHUB/UZR/151)
|
(a) Improvement of Dhobaura Upazila H/Q-Shibgonj GC road via Kolshindur GC & Charuapara bazar road(Ch. 11300-14440m) (b) Construction of Drainage Structure (Box Culvert) of Dhobaura Upazila H/Q-Shibgonj GC road via Kolshindur GC & Charuapara bazar road at
|
GMRIDP
|
dhobaura
|
|
3.14
|
|
|
787.29
|
Ashim Singh Purbadhola, Netrokona.
|
697.92
|
|
19/12/2016
|
15/05/2018
|
95
|
|
|
10/03/2019
|
|
35
|
(GMRIDP/MYM/Dhub/UZR/171)
|
Improvement of Goatola GC-Purakandulia GC via Roghurampur bazar road (Ch. 1780-2787m)
|
GMRIDP
|
dhobaura
|
|
1.07
|
|
|
73.48
|
M/S. Subrata Shutradhar
|
69.08
|
|
30/04/2017
|
31/10/2017
|
40
|
|
|
10/03/2019
|
|
36
|
(GMRIDP/MYM/DHUB/VR/217)
|
Improvement of Dhubaura-(Purakandulia GC road-Dudnoy bazar road(Ch. 860-1500m)
|
GMRIDP
|
dhobaura
|
|
0.64
|
|
|
59.74
|
M/S. Islam Traders Sadar, Mymensingh
|
62.50
|
|
|
|
50
|
|
|
10/03/2019
|
|
37
|
(GMRIDP/MYM/DHUB/UZR/87)
|
Improvement of Taldhighi-Munshir Hat GC road(Ch. 4000-5000m)with 2nos RCC Box Culvert
|
GMRIDP
|
dhobaura
|
|
1.00
|
|
|
79.74
|
M/S. Shaharia Enterprise Sadar, Mymensingh.
|
83.73
|
|
|
19/08/2016
|
100
|
|
|
|
|
38
|
(GMRIDP/MYM/F.BARIA/VR/97)
|
Maintenance of Porabari - Kholabari road (Ch. 4550-7570m)
|
GMRIDP
|
fulbaria
|
|
3.02
|
|
|
45.09
|
M/S. Mahbub Enterprise Nutun bazar, Mym
|
36.14
|
|
24/01/2016
|
30/05/2016
|
12
|
|
|
10/03/2019
|
|
39
|
(GMRIDP/MYM/F.BARIA/MAINT/UZR/217-A)
|
Maintenance & Wedening of Fulbaria GC-Trishal GC via Durduria road (Ch.00-4320m)
|
GMRIDP
|
fulbaria
|
|
4.32
|
|
|
264.24
|
|
0.00
|
|
|
|
0
|
|
|
10/03/2019
|
|
40
|
(GMRIDP/MYM/F.BARIA/MAINT/UZR/218-A)
|
(a) Maintenance of Keshoregonj GC-Modhopur GC road (Ch.4000-9440m) (b) Maintenance of Fulbaria UP-Shibgonj bazar GC road (Ch100-4700m)
|
GMRIDP
|
fulbaria
|
|
10.40
|
|
|
237.40
|
|
0.00
|
|
|
|
0
|
|
|
10/03/2019
|
|
41
|
(GMRIDP/MYM/F.Baria/VR/01)
|
Improvement of Basdi Moor - Kumarpara road at ch. 00-1100m with 0.625x0.60m. 4 nos U-Drain
|
GMRIDP
|
fulbaria
|
|
1.10
|
|
|
63.13
|
Md. Lal Mahmud
|
59.97
|
|
|
|
100
|
|
|
|
|
42
|
(GMRIDP/MYM/F.BARIA/VR/02)
|
Improvement of Biddanonda Natun Bazar-Patia RHD via Alauddin Bari road at ch. 00-1000m. With 0.625x0.60m 5 nos U-drain
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
48.95
|
M/S Proshad Enterprise
|
46.50
|
|
|
|
100
|
|
|
|
|
43
|
(GMRIDP/MYM/F.BARIA/VR/03)
|
Improvement of Bashdi Rafiqul Islam House (House of Suruj Ali) to Dr. Tajul Islam House Road (Ch. 00-400m) with 0.625x0.60m 2 nos U-drain
|
GMRIDP
|
fulbaria
|
|
0.40
|
|
|
23.00
|
M/S Proshad Enterprise
|
21.54
|
|
25/08/2014
|
17/02/2015
|
100
|
|
|
|
|
44
|
(GMRIDP/MYM/F.BARIA/UZR/28)
|
Improvement of Dewkhola-Muktagacha Road from Ch. 700-1700m
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
73.78
|
M/S. Redoy Enterprise
|
74.16
|
|
|
27/08/2015
|
100
|
|
|
|
|
45
|
(GMRIDP/MYM/F.BARIA/VR/35)
|
Improvement of Kandania - Loharshor road from Ch. 1500-2500m
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
56.98
|
M/S. Proshad Enterprise
|
59.59
|
|
18/03/2015
|
29/09/2015
|
100
|
|
|
|
|
46
|
(GMRIDP/MYM/F.BARIA/UNR/53)
|
Improvement of Anaetpur UP-Soaitpur Road with 3 nos U-drain (Ch. 00-1000m)
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
57.30
|
Md. Chan Mahmud
|
56.00
|
|
26/08/2015
|
18/02/2016
|
100
|
|
|
|
|
47
|
(GMRIDP/MYM/F.BARIA/UNR/54)
|
Improvement of Asim-Dholikurivia Joypur bazar Road with 5 nos U-drain (Ch. 4000-5000m)
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
60.83
|
M/S. Proshad Enterprise
|
56.94
|
|
26/08/2015
|
27/02/2016
|
100
|
|
|
|
|
48
|
(GMRIDP/MYM/F.BARIA/VR/55)
|
Improvement of Rangamatia - Siddikhali bazar road with 1 no U-drain (Ch. 00-500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
27.48
|
Md. Chan Mahmud
|
26.51
|
|
26/08/2015
|
18/02/2016
|
100
|
|
|
|
|
49
|
(GMRIDP/MYM/F.BARIA/VR/56)
|
Improvement of Laheripara - Salir bazar road with 3 nos U-drain (Ch. 1900-2400m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
28.38
|
M/S. Redoy Enterprise
|
26.67
|
|
17/08/2015
|
18/02/2016
|
100
|
|
|
|
|
50
|
(GMRIDP/MYM/F.BARIA/UNR/68)
|
Improvement of Basdi moor - Keshobgonj road via Shushuty Babugonj road with 4 nos U-drain (Ch. 9840-10840m)
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
59.66
|
Md. Chan Mahmud
|
55.31
|
|
30/09/2015
|
30/03/2016
|
100
|
|
|
|
|
51
|
(GMRIDP/MYM/F.BARIA/VR/101)
|
Improvement of Dashmail - Bhatipara via Borohat road with 3 nos U-drain (Ch. 1000-1500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
29.42
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
27.56
|
|
24/04/2016
|
31/10/2016
|
100
|
|
|
|
|
52
|
(GMRIDP/MYM/F.BARIA/VR/102)
|
Improvement of Jorbaria North GPS-Kachari road with 3 nos U-drain (Ch. 1000-1500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
34.92
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
32.19
|
|
24/04/2016
|
31/10/2016
|
100
|
|
|
|
|
53
|
(GMRIDP/MYM/F.BARIA/VR/103)
|
Improvement of Andhariapara-Fulbaria bazar road with 3 nos U-drain (Ch. 00-500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
30.98
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
29.71
|
|
24/04/2016
|
31/10/2016
|
100
|
|
|
|
|
54
|
(GMRIDP/MYM/F.BARIA/VR/104)
|
Improvement of Shibgonj bazar-Balughat bazar road with 2 nos U-drain (Ch. 3000-3500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
28.58
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
26.26
|
|
24/04/2016
|
31/10/2016
|
100
|
|
|
|
|
55
|
(GMRIDP/MYM/F.BARIA/UNR/105)
|
Improvement of Basdi moor - Keshobgonj road via Shushuty Babugonj road with 4 nos U-drain (Ch. 10840-11840m)
|
GMRIDP
|
fulbaria
|
|
1.00
|
|
|
62.00
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
57.15
|
|
24/04/2016
|
31/10/2016
|
100
|
|
|
|
|
56
|
(GMRIDP/MYM/F.BARIA/UNR/117)
|
Improvement of Dewkhola-Andharia para Via Boiragir bazar road with 2 nos U-drain (Ch. 2450-2950m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
29.01
|
M/S. Redoy Enterprise Fulbaria,Mymensingh.
|
28.84
|
|
|
14/11/2016
|
100
|
|
|
|
|
57
|
(GMRIDP/MYM/F.BARIA/UNR/118)
|
Improvement of Durarkhal-Kodomtoli road with 3 nos U-drain (Ch. 2500-3000m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
32.76
|
M/S. Nihad Builders & Suppliers, DB road, Mymensing.
|
32.36
|
|
|
|
100
|
|
|
|
|
58
|
(GMRIDP/MYM/F.BARIA/UNR/119)
|
Improvement of Bhalukjan-Kandania via Rugunathpur Alongi road with 3 nos U-drain (Ch. 8030-8530m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
30.05
|
Md. Lal Mahmud
|
27.92
|
|
|
|
100
|
|
|
|
|
59
|
(GMRIDP/MYM/F.BARIA/UNR/120)
|
Improvement of Fulbaria-Durduria bazar via Chagalchira road with 2 nos U-drain (Ch. 3820-4320m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
33.93
|
M/S. Nihad Builders & Suppliers, DB road, Mymensing.
|
33.54
|
|
|
|
100
|
|
|
|
|
60
|
(GMRIDP/MYM/F.BARIA/UNR/121)
|
Improvement of Pirgonj bazar-Bakta Kalirgor via Solir bazar road with 4 nos U-drain (Ch. 4600-5100m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
33.18
|
Md. Lal Mahmud
|
34.66
|
|
|
|
100
|
|
|
|
|
61
|
(GMRIDP/MYM/F.BARIA/UNR/167)
|
Improvement of Asim UP-Purabari bazar via Kalaipar road (Ch. 3420-3920m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
31.84
|
M/S. Proshad Enterprise
|
31.49
|
|
31/05/2017
|
30/11/2017
|
100
|
|
|
|
|
62
|
(GMRIDP/MYM/F.BARIA/VR/185)
|
Improvement of Dewkhola-Kalibajail via Shobhoria road (Ch. 1663-2163m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
33.47
|
M/S. Mohsina Enterprise, Fulbaria, Mymensingh.
|
32.06
|
|
25/01/2018
|
30/07/2018
|
100
|
|
|
|
|
63
|
(GMRIDP/MYM/F.BARIA/VR/186)
|
Improvement of Mymensingh FRA-Minar bazar road (Ch. 2200-2700m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
31.05
|
Md. Abdul Malek Fulbaria, Mymensingh.
|
29.76
|
|
|
15/08/2018
|
100
|
|
|
|
|
64
|
(GMRIDP/MYM/F.BARIA/VR/187)
|
Improvement of Kuthubkhana-Sonkanda bazar road (Ch. 00-500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
43.70
|
Md. Lal Mahmud, Fulbaria, Mymensingh.
|
40.38
|
|
|
20/06/2018
|
100
|
|
|
|
|
65
|
(GMRIDP/MYM/F.BARIA/VR/188)
|
Improvement of Radhakanai UP Office-Sonkanda bazar road (Ch. 3930-4430m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
32.87
|
Md. Abdul Malek Fulbaria, Mymensingh.
|
30.37
|
|
|
13/08/2018
|
100
|
|
|
|
|
66
|
(GMRIDP/MYM/F.BARIA/VR/189)
|
Improvement of Bakta-Kaladah road (Ch.1000-1500m)
|
GMRIDP
|
fulbaria
|
|
0.50
|
|
|
28.75
|
M/S. Himi Enterpise Fulbaria, Mymensingh.
|
27.86
|
|
18/02/2018
|
24/08/2018
|
100
|
|
|
|
|
67
|
(GMRIDP/MYM/F.BARIA/VR/190)
|
Improvement of Newgi-Kushmail-Boyddobari road (Ch.1900-2700m)
|
GMRIDP
|
fulbaria
|
|
0.80
|
|
|
52.78
|
Md. Abul Kalam Azad Fulbaria, Mymensingh.
|
49.59
|
|
25/01/2018
|
30/07/2018
|
100
|
|
|
|
|
68
|
(GMRIDP/MYM/Tris/UNR/64)
|
Improvement of Trishal UP Horirampur Mirdhar bazar road at (Ch. 9300-10300m) with 1no U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
57.13
|
Ismail Trade Com. & Const.
|
53.62
|
|
28/09/2015
|
30/03/2016
|
100
|
|
|
10/03/2019
|
|
69
|
(GMRIDP/MYM/TRIS/ BRDG/VR/133)
|
Construction of 84m.RCC girder bridge on Danikhola Kanhore road of Usmani High School at ch. 3880m over Sutia river.
|
GMRIDP
|
gaffargaon
|
|
|
|
|
459.12
|
M/S. Durga Enterprise Dewngonj, Jamalpur
|
377.64
|
|
29/06/2016
|
|
100
|
|
|
10/03/2019
|
|
70
|
(GMRIDP/MYM/Tris/VR/152)
|
Improvement of Dhanikhola Charpara - Nageshory River via Shimuliapara road at (Ch. 00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
32.98
|
M/S. Nijhum Traders
|
30.41
|
|
20/12/2016
|
25/06/2017
|
100
|
|
|
10/03/2019
|
|
71
|
(GMRIDP/MYM/Trish/VR/198)
|
Improvement of Mokkhapur GPS-Shankibhanga via Shapkhali road (Ch. 1504-2004.50m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
31.79
|
Mohosina Enterprise
|
33.57
|
|
20/06/2018
|
26/10/2018
|
30
|
|
|
10/03/2019
|
|
72
|
(GMRIDP/MYM/TRIS/UNR/227)
|
Improvement of Dhanikhola UP Kutubkhana bazar via Paglar bazar road (Ch.4350-4610m)
|
GMRIDP
|
gaffargaon
|
|
0.26
|
|
|
19.96
|
|
0.00
|
|
|
|
0
|
|
|
10/03/2019
|
|
73
|
(GMRIDP/MYM/GAFF/VR/09)
|
Improvement of Goeshore-Kandipara road at Dorbesher Badh-Munshibari to Muslem Bapari's house road (Ch. 00-1000m) with 0.625x0.600m. 4 nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
51.66
|
M/S. Ahad Traders
|
53.87
|
|
18/09/2014
|
25/03/2015
|
100
|
|
|
|
|
74
|
(GMRIDP/MYM/GAFF/VR/14)
|
Improvement of Dobail Pry: School-Azizul Haque Master's house road at (Ch. 00-600m) with 0.625x0.600m. 1no U-drain
|
GMRIDP
|
gaffargaon
|
|
0.60
|
|
|
31.32
|
Md. Arshad Hossain
|
32.22
|
|
|
|
100
|
|
|
|
|
75
|
(GMRIDP/MYM/ GAFF/UNR/15)
|
Improvement of Sipan-Bonogram bazar via Goffargaon UP & Hatikhola bazar (Hatikhola Rail Lain - Qutbaria GPS) road at (Ch. 3555-4555m) with 3670m., 4085m. & 4510m. at Ch 0.625x0.600m. 3nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
57.25
|
M/S. Hashem & Sons
|
59.50
|
|
|
28/05/2015
|
100
|
|
|
|
|
76
|
(GMRIDP/MYM/GAFF/VR/57)
|
Improvement of Goeshpur bazar - Udghata bridge road at (Ch. 1000-2910m) with 7nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.91
|
|
|
104.48
|
Md. Mohibul Haque
|
104.40
|
|
28/09/2015
|
30/05/2016
|
100
|
|
|
|
|
77
|
(GMRIDP/MYM/GAFF/VR/58)
|
Improvement of Longair Kumarbari Moszid (Goffargaon - Bormi road)-Uthia bazar road at (Ch. 00-500m) with 2nos U-drain
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
27.13
|
Al-Maijbhandari Enterprise
|
28.40
|
|
20/09/2015
|
27/03/2016
|
100
|
|
|
|
|
78
|
(GMRIDP/MYM/GAFF/VR/59)
|
Improvement of Khurshid Mahal - Dhalibari(Nutun Moszid) - Khurshid mahal bridge road at (Ch.00-430m) with 2nos U-drain
|
GMRIDP
|
gaffargaon
|
|
0.43
|
|
|
24.79
|
M/S. Bromhaputra Enterprise
|
26.01
|
|
28/09/2015
|
15/03/2016
|
100
|
|
|
|
|
79
|
(GMRIDP/MYM/GAFF/VR/60)
|
Improvement of Charkamari-Nakkata road - Bhurakhali road at (Ch. 00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
27.29
|
M/S. Shohel Enterprise
|
28.63
|
|
28/09/2015
|
15/03/2016
|
100
|
|
|
|
|
80
|
(GMRIDP/MYM/GAFF/VR/61)
|
Improvement of Goespur-Udghata road Siddik Mistri's House - Beparibari - Motaleb's house road at (Ch. 00-1000m) with 5nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
56.81
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
59.60
|
|
13/10/2015
|
|
100
|
|
|
|
|
81
|
(GMRIDP/MYM/GAFF/UZR/63)
|
Improvement of Amlitola GC - Shibgonj GC road at (Ch. 00-1800m) with 4nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.80
|
|
|
124.05
|
M/S Doly Const: Dhaka
|
115.35
|
|
23/12/2015
|
29/09/2016
|
100
|
|
|
|
|
82
|
(GMRIDP/MYM/GAFF/VR/67)
|
Improvement of Lawtoil-Shohid Abdul Zabbernagar road at (Ch. 00-500m) with 1no U-drain
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
26.75
|
M/S. Liton Enterprise
|
26.70
|
|
30/09/2015
|
29/03/2016
|
100
|
|
|
|
|
83
|
(GMRIDP/MYM/GAFF/VR/80)
|
Improvement of Paccati bazar - Futangir Moor road at (Ch. 00-1000m) with 2nos U-drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
54.63
|
M/S. Shohel Enterprise
|
57.28
|
|
|
14/04/2016
|
100
|
|
|
|
|
84
|
(GMRIDP/MYM/GAFF/VR/92)
|
Improvement of Datter bazar - Biroy-Pachali Pagla bazar road at (Ch. 1256-1756m) with 2nos U-drain
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
28.59
|
M/S. Shohel Enterprise
|
29.16
|
|
|
|
100
|
|
|
|
|
85
|
(GMRIDP/MYM/GAFF/VR/136)
|
Improvement of Dhopaghat Bridge - Bowna road at (Ch. 540-1415m)
|
GMRIDP
|
gaffargaon
|
|
0.87
|
|
|
47.08
|
M/S. Bramhaputra Enterprise
|
46.98
|
|
|
20/03/2017
|
100
|
|
|
|
|
86
|
(GMRIDP/MYM/GAFF/VR/150)
|
Improvement of Moshakhali-Shahmiskin road at (Ch. 1000-1500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
33.33
|
M/S. Khan Enterprise
|
31.76
|
|
|
|
100
|
|
|
|
|
87
|
(GMRIDP/MYM/GAFF/VR/172)
|
Improvement of Goyeshor-Kandipara road at Dorbasher Badh-Munshibari to Muslem Baparir bari road at (Ch.1000-1250m)
|
GMRIDP
|
gaffargaon
|
|
0.25
|
|
|
16.93
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
16.91
|
|
|
|
100
|
|
|
|
|
88
|
(GMRIDP/MYM/GAFF/VR/173)
|
Improvement of Joydhorkhali Dali bari-Kashem's Daruga house road at (Ch.00-700m)
|
GMRIDP
|
gaffargaon
|
|
0.70
|
|
|
42.31
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
42.27
|
|
|
26/09/2017
|
100
|
|
|
|
|
89
|
(GMRIDP/MYM/GAFF/VR/174)
|
Improvement of Gaffargaon-Bormi-Datter bazar UP road at (Ch.00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
34.30
|
M/S. Shohel Enterprise Goffargaon,Mymensingh
|
34.95
|
|
|
|
100
|
|
|
|
|
90
|
(GMRIDP/MYM/GAFF/VR/175)
|
Improvement of Kurchai Chakua - Shadula R&H via Foraji house's road at (Ch.800-1300m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
27.97
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
29.34
|
|
30/01/2018
|
|
100
|
|
|
|
|
91
|
(GMRIDP/MYM/GAFF/VR/176)
|
Improvement of West Side of Hatikhola Rail Line-Bangaon Outbaria School road at (Ch.00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
32.20
|
M/S. Bappy Traders Goffargaon,Mymensingh
|
33.71
|
|
|
13/01/2018
|
100
|
|
|
|
|
92
|
(GMRIDP/MYM/GAFF/VR/177)
|
Improvement of Goeshpur-Baroihati Shekh Vita-Negoari UP road at (Ch.1000-1500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
28.57
|
M/S. Bramhaputra Enterprise
|
29.99
|
|
|
13/05/2018
|
100
|
|
|
|
|
93
|
(GMRIDP/MYM/GAFF/VR/178)
|
Improvement of Bushbushia bazar-Kurchai road at (Ch.00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
30.63
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
32.14
|
|
30/01/2018
|
|
100
|
|
|
|
|
94
|
(GMRIDP/MYM/GAFF/VR/202)
|
Improvement of Tangabo UP-Pulerghat bazar road at (Ch.00-1000m)
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
66.68
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
69.91
|
|
28/03/2018
|
27/09/2018
|
100
|
|
|
|
|
95
|
(GMRIDP/MYM/GAFF/VR/203)
|
Improvement of Bishertek road Last Border - Niguari UP road at (Ch.00-681m)
|
GMRIDP
|
gaffargaon
|
|
0.68
|
|
|
41.19
|
Md. Arshad Hussain Goffargaon,Mymensingh
|
48.46
|
|
28/03/2018
|
27/09/2018
|
100
|
|
|
|
|
96
|
(GMRIDP/MYM/GAFF/MAINT/UZR/219)
|
Maintenance of Shibgonj GC-Goespur GC road at (Ch.00-18800m)
|
GMRIDP
|
gaffargaon
|
|
18.80
|
|
|
606.28
|
|
0.00
|
|
|
|
0
|
|
|
|
|
97
|
(GMRIDP/MYM/GAFF/VR/224)
|
(a) Improvement of Zashora Pathorkata-Moddha Zashora Mosque road at ch.00-1070m.(b) Improvement of Uthuri Hatikhola road via Bashutia Taher's Shop road at ch.600-1600m. (c) Improvement Dhaigaon bazar-Jaidabad Post Office road at ch.450-1450m. (d) Improvem
|
GMRIDP
|
gaffargaon
|
|
4.07
|
|
|
308.86
|
|
0.00
|
|
|
|
0
|
|
|
|
|
98
|
(GMRIDP/MYM/Tris/VR/10)
|
Improvement of Taltola KBI Road via Kanihari UP road(Ch. 2100-2600m) with 0.625x0.600m. 1 no U-drain
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
26.26
|
Md. Shamsul Alam
|
27.05
|
|
18/09/2014
|
25/03/2015
|
100
|
|
|
|
|
99
|
(GMRIDP/MYM/Tris/VR/12)
|
Improvement of Kathal Kachari - Kowarikanda road(Ch. 00-435m) with 0.625x0.600m.1no U-drain
|
GMRIDP
|
gaffargaon
|
|
0.43
|
|
|
24.99
|
M/S Munira Enterprise
|
22.75
|
|
25/09/2014
|
25/03/2015
|
100
|
|
|
|
|
100
|
(GMRIDP/MYM/Tris/MAINT/UNR/20)
|
Maintenance of Trishal UP -Durduria bazar road road from ch. 2850-5850m.
|
GMRIDP
|
gaffargaon
|
|
3.00
|
|
|
46.75
|
Md. Lal Mahmud
|
39.02
|
|
30/12/2014
|
29/06/2015
|
100
|
|
|
|
|
101
|
(GMRIDP/MYM/Tris/VR/34)
|
Improvement of Ukil bari KBI road via Dori Kathal road at (Ch. 970-1470m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
25.86
|
M/S. Istiaque Ahammed
|
25.08
|
|
|
14/09/2015
|
100
|
|
|
|
|
102
|
(GMRIDP/MYM/Tris/UNR/62)
|
Improvement of Kanihari UP-Dhola bazar road at (Ch. 700-1800m) with 1no U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.10
|
|
|
69.38
|
M/S. Istiaque Ahammed
|
65.15
|
|
16/09/2015
|
30/03/2016
|
100
|
|
|
|
|
103
|
(GMRIDP/MYM/Tris/UNR/65)
|
Improvement of Dhanikhola UP - Kutubkhana road via Pagla bazar road at (Ch. 3250-4250m) with 2nos U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
61.88
|
M/S. Alam Enterprise
|
59.38
|
|
28/09/2015
|
31/03/2016
|
100
|
|
|
|
|
104
|
(GMRIDP/MYM/Tris/UZR/66)
|
Improvement of Hoddervita RHD-Kalir bazar GC road at (Ch. 3904-4910m) with 3nos U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.06
|
|
|
70.30
|
M/S. Alam Enterprise
|
66.09
|
|
28/09/2015
|
31/03/2016
|
100
|
|
|
|
|
105
|
(GMRIDP/MYM/Tris/UNR/90)
|
Improvement of Mukhopur UP - Bogar bazar via shapkhali bazar road at (Ch. 6967-7967m) with Structure U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
66.59
|
Md. Abul Kalam Trishal, Mymensingh.
|
61.36
|
|
|
|
100
|
|
|
|
|
106
|
(GMRIDP/MYM/Tris/UNR/93)
|
Improvement of Amirabari UP-Mirdhar bazar road at (Ch. 900-1900m) with Structure U-Drain
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
62.40
|
Md. Abul Kalam Trishal, Mymensingh.
|
57.46
|
|
|
|
100
|
|
|
|
|
107
|
(GMRIDP/MYM/Tris/VR/96)
|
Maintenance of Dhaka-Mymensingh H/W - Jatio Kobi Kazi Nazrul Islam Univercity road at (Ch. 00-2500m) with Structure U-Drain
|
GMRIDP
|
gaffargaon
|
|
2.50
|
|
|
48.55
|
M/S. Mahbub Enterprise Nutun bazar, Mym
|
38.96
|
|
24/01/2016
|
30/05/2016
|
100
|
|
|
|
|
108
|
(GMRIDP/MYM/Tris/VR/113)
|
Improvement of Trisha-Dhani Khola road via Samaniapara road at (Ch. 00-500m)
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
29.74
|
M/S. Nijhum Traders
|
26.85
|
|
28/04/2016
|
|
100
|
|
|
|
|
109
|
(GMRIDP/MYM/Tris/VR/114)
|
Improvement of Khan Bahadur Ismail road Daker char Nutun bazar - Thapunhala GPS road with Protection work(Char Madakhali Borma bazar via Thaponhala) (Ch.1680-2180m) with Structure U-Drain
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
41.64
|
M/S. Nijhum Traders
|
37.27
|
|
28/04/2016
|
|
100
|
|
|
|
|
110
|
(GMRIDP/MYM/TRIS/BRDG/VR/132)
|
Construction of 30m. RCC girder bridge on Baliapara-Millon bazar road at ch. 1120m over Pagaria river
|
GMRIDP
|
gaffargaon
|
|
|
|
|
147.71
|
M/S. Durga Enterprise Dewngonj, Jamalpur
|
125.45
|
|
|
31/05/2017
|
100
|
|
|
|
|
111
|
(GMRIDP/MYM/Tris/VR/141)
|
Improvement of Trishal-Balipara road to Kazirkanda Govt. Primary School (Haydar Master's house) at (Ch. 00-1000m)
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
59.76
|
M/S. Rokea Enterprise Trishal, Mymensingh.
|
58.53
|
|
|
|
100
|
|
|
|
|
112
|
(GMRIDP/MYM/Tris/VR/142)
|
Improvement of Purabari-Alongi (Mothbari-Dakhinpara Abul Master's Deep Tubwel to Bharar Khal - Alongi road) road at (Ch. 940-1940m)
|
GMRIDP
|
gaffargaon
|
|
1.00
|
|
|
70.89
|
M/S. Jamir Traders Gouripur, Mymensingh.
|
65.75
|
|
|
|
100
|
|
|
|
|
113
|
(GMRIDP/MYM/Tris/VR/153)
|
Improvement of Amian Danguri-Ramomritgonj bazar(Balipara) road at Ch. 1400-1900m
|
GMRIDP
|
gaffargaon
|
|
0.50
|
|
|
30.73
|
Md. Samsul Alam
|
27.97
|
|
21/12/2016
|
26/06/2017
|
100
|
|
|
|
|
114
|
(GMRIDP/MYM/TRIS/UNR/228)
|
(a) Improvement of Gofakuri bazar-Babupur bazar road( Start of Babupur Old Mosque-Awal Mamber's house) (Ch.00-1000m) (b) Improvement of Trishal Fulbaria Chikon-Raghunathpur road(Sangbadik Muklesur Rahman's house)(Ch.1500-2500m) (c) Improvement of Bahadurp
|
GMRIDP
|
gaffargaon
|
|
2.95
|
|
|
230.29
|
|
0.00
|
|
|
|
0
|
|
|
|
|
115
|
(GMRIDP/MYM/TRIS/UNR/229)
|
(a) Improvement of Khan Bahadur Ismail road at Dakerchar Natun bazar Thaponhala GPS with protection work(Charmadakhali-Borma bazar via Thaponhala) (Ch.2180-2930m) (b) Improvement of Katalkachari-Kawari Kanda road at Salam's house to Adarsha Children Acade
|
GMRIDP
|
gaffargaon
|
|
2.71
|
|
|
236.43
|
|
0.00
|
|
|
|
0
|
|
|
|
|
116
|
|
(a) Improvement of Trishal Balipara road-Kazir Kanda GPS road(Haidar Master's house road (Ch.1000-1600m) (GMRIDP/MYM/TRIS/UNR/230) (b) Improvement of Munsipara-Bukabill road(Start of East side at RHD road) (Ch.00-1600m) (GMRIDP/MYM/TRIS/UNR/230) (c) Impr
|
GMRIDP
|
gaffargaon
|
|
4.45
|
|
|
372.56
|
M/S Associate Builders
|
0.00
|
|
|
|
0
|
|
|
|
|
117
|
(GMRIDP/MYM/GOUR/UNR/197)
|
Improvement of Ramgupalpur-Dhorua bazar road at ch.700-1700m.
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
90.78
|
M/S. Jamir Traders
|
86.01
|
|
13/02/2018
|
20/08/2018
|
100
|
|
|
10/03/2019
|
|
118
|
(GMRIDP/MYM/GOUR/UNR/27)
|
Improvement of Biska UP-Douhakhola UP via Koltapara bazar road from ch. 1111-2150m. with 1 no U-drain
|
GMRIDP
|
gouripur
|
|
1.04
|
|
|
58.96
|
M/S. Sharia Enterprise
|
58.88
|
|
15/04/2015
|
27/09/2015
|
100
|
|
|
|
|
119
|
(GMRIDP/MYM/GOUR/UNR/48)
|
Improvement of Ramgupalpur UP H/Q-Bishanathpur bazar Pumbail Moor via Dharua bazar, Teroshia bazar & Jamtola moor road from ch. 7960-8850m. with 3 nos U-drain
|
GMRIDP
|
gouripur
|
|
0.89
|
|
|
58.26
|
Md. Sarwar Jahan Netrokona
|
55.38
|
|
|
29/12/2015
|
100
|
|
|
|
|
120
|
(GMRIDP/MYM/GOUR/UZR/69)
|
Improvement of Dhakkin Bisura GC-Ishwargonj road(Gouripur Part) from ch. 5674-6674m. with 2 nos U-drain
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
69.69
|
M/S. S.S. Traders Puraton Bus Stand, Rngamati
|
63.95
|
|
|
|
100
|
|
|
|
|
121
|
(GMRIDP/MYM/GOUR/UNR/77)
|
Improvement of Gouripur UP-Shalihar bazar road from ch. 3220-4220m. with 3 nos U-drain
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
58.22
|
M/S. Jamir Traders Gouripur,Mymensingh
|
51.75
|
|
|
14/04/2016
|
100
|
|
|
|
|
122
|
(GMRIDP/MYM/GOUR/UNR/78)
|
Improvement of Bhangnamari UP - Gazipur bazar road from ch.2792-3792m with 2.00x1.50m. Box-Culvert.
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
58.91
|
M/S. Shaharia Enterprise Sadar,Mymensingh
|
53.60
|
|
|
14/04/2016
|
100
|
|
|
|
|
123
|
(GMRIDP/MYM/GOUR/UNR/81)
|
Improvement of Achintapur UP(Shahagonj)-Bhuiar bazar road -Pachar bazar(Sonajandigram-Bhuiar bazar) road with 2nos U-drain from ch.4600-5600m.
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
59.47
|
M/S. Jamir Traders Gouripur,Mymensingh
|
58.81
|
|
26/10/2015
|
28/04/2016
|
100
|
|
|
|
|
124
|
(GMRIDP/MYM/GOUR/UNR/107)
|
Improvement of Sahanati UP-Mouha bazar via Bir Ahammadpur bazar & Nauhata bazar road with 3nos U-drain from ch.00-1000m.
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
59.79
|
M/S. Sharia Enterprise
|
56.92
|
|
|
|
100
|
|
|
|
|
125
|
(GMRIDP/MYM/GOUR/UNR/108)
|
Improvement of Gouripur UP-Shamgonj road via Lamapara(Star from Shamgonj bazar) road with 2nos U-drain from ch.9300-10300m.
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
64.51
|
Uzzal Chandra Gosh
|
60.15
|
|
16/05/2016
|
22/11/2016
|
100
|
|
|
|
|
126
|
(GMRIDP/MYM/GOUR/UNR/109)
|
Improvement of Khicha-Shidla road (via Shidla UP Office Monati) Hasanpur Shidla UP - Hasabpur bazar ch.3250-3750m.
|
GMRIDP
|
gouripur
|
|
0.50
|
|
|
28.72
|
M/S. Mahbub Enterprise
|
26.02
|
|
16/05/2016
|
22/11/2016
|
100
|
|
|
|
|
127
|
(GMRIDP/MYM/GOUR/VR/124)
|
Improvement of RHD-Nondigram(Mymensingh-Kishoregonj-RHD-Delta Factory-Somoy Ali Member's house road via Satter Chairmen's house & Sarker House) road ch.00-500m.
|
GMRIDP
|
gouripur
|
|
0.50
|
|
|
30.18
|
M/S. Shaharia Enterprise Sadar,Mymensingh
|
28.70
|
|
25/05/2016
|
27/11/2016
|
100
|
|
|
|
|
128
|
(GMRIDP/MYM/GOUR/VR/125)
|
Improvement of Shalihore Nutun bazar-Gaon Gouripur road ch.00-500m.
|
GMRIDP
|
gouripur
|
|
0.50
|
|
|
27.97
|
M/S. Shaharia Enterprise Sadar,Mymensingh
|
27.15
|
|
25/05/2016
|
27/11/2016
|
100
|
|
|
|
|
129
|
(GMRIDP/MYM/GOUR/VR/126)
|
Improvement of Mymensingh-Kishoregonj H/W road Charshrirampur Poultry Firm - Amir Uddin Govt. Primary School road ch.00-500m.
|
GMRIDP
|
gouripur
|
|
0.50
|
|
|
29.48
|
Md. Muklesur Rahman
|
27.78
|
|
|
30/11/2016
|
0
|
|
|
|
|
130
|
(GMRIDP/MYM/GOUR/VR/127)
|
Improvement of Gobindapur bazar-Lamapara road (Starting of Longker Bridge) road ch.2900-3400m.
|
GMRIDP
|
gouripur
|
|
0.50
|
|
|
33.41
|
M/S. Jamir Traders
|
31.17
|
|
|
13/01/2017
|
100
|
|
|
|
|
131
|
(GMRIDP/MYM/GOUR/UNR/225)
|
Improvement of Ramgupalpur UP-Bangla bazar via Basabari bazar, Maizhati bazar & Telihati bazar road (Ch.750-1750m)
|
GMRIDP
|
gouripur
|
|
1.00
|
|
|
80.24
|
|
0.00
|
|
|
|
0
|
|
|
|
|
132
|
(GMRIDP/MYM/GOUR/VR/226)
|
(a) Improvement of Gouripur Bekurhati road(Bir Ahammedpur)-Gidhausha Jame Mosque(Fukakkhali Bridge) road (Ch.00-1000m)(b) Improvement of Nohata bazar-Bishompur bazar road (Ch.00-1000m) (c) Improvement of Bir Ahammedpur-Shapla Nawhata road (Ch.00-860m)
|
GMRIDP
|
gouripur
|
|
2.86
|
|
|
241.96
|
|
0.00
|
|
|
|
0
|
|
|
|
|
133
|
(GMRIDP/MYM/Halua/VR/36)
|
Improvement of Jamgora-Kalapagla via Kholishakuri road by bituminous carpeting (Ch.100-600m) with 1 no U-drain at ch. 137m.
|
GMRIDP
|
haluaghat
|
|
0.50
|
|
|
26.82
|
Md. Atiqur Rahman
|
29.01
|
|
|
31/12/2015
|
70
|
|
|
10/03/2019
|
|
134
|
(GMRIDP/MYM/Halu/VR/162)
|
Improvement of Mekiakanda Mosque - Bhasha Shohid Abdul Jobber High school-Shimulkuti Border road (Ch.1500-2000m)
|
GMRIDP
|
haluaghat
|
|
0.50
|
|
|
31.77
|
Taslim Ahamed
|
31.55
|
|
15/02/2017
|
21/08/2017
|
65
|
|
|
10/03/2019
|
|
135
|
(GMRIDP/MYM/Halu/VR/216)
|
Improvement of Haluaghat-Rangrapara bazar via baparipara road (Ch.600-1100m)
|
GMRIDP
|
haluaghat
|
|
0.50
|
|
|
32.02
|
M/S. Flora Enterprise
|
32.00
|
|
|
14/06/2018
|
65
|
|
|
10/03/2019
|
|
136
|
(GMRIDP/MYM/Halua/UNR/06)
|
Improvement of Haluaghat UP-Joyramkura bazar-Koroytola BDR Camp road (Ch. 2947-3947m) with 0.625x0.600m 1 no U-drain
|
GMRIDP
|
haluaghat
|
|
1.00
|
|
|
57.86
|
M/S. Ahad Traders
|
60.70
|
|
26/08/2014
|
22/02/2015
|
100
|
|
|
|
|
137
|
(GMRIDP/MYM/Halua/VR/17)
|
Improvement of Joinati Women market - Fonia Ferighat road (Ch. 00-1000m)
|
GMRIDP
|
haluaghat
|
|
1.00
|
|
|
51.35
|
Md. Saiful Islam
|
53.54
|
|
|
|
100
|
|
|
|
|
138
|
(GMRIDP/MYM/Halua/Maint/VR/22)
|
Maintenance of Tinani( Sapla bazar) - Gobrakora Coal Depu road (Ch. 00-2018m)
|
GMRIDP
|
haluaghat
|
|
2.01
|
|
|
32.72
|
M/S. Sowrna Bricks
|
28.70
|
|
30/12/2014
|
29/06/2015
|
100
|
|
|
|
|
139
|
(GMRIDP/MYM/Halua/VR/41)
|
Improvement of Koroitoli - Koyla Depo buypass road (Ch.00-500m)
|
GMRIDP
|
haluaghat
|
|
0.50
|
|
|
26.74
|
Md. Foijul Karim
|
27.81
|
|
26/08/2015
|
27/02/2016
|
100
|
|
|
|
|
140
|
(GMRIDP/MYM/Halua/UNR/47)
|
Improvement of West Pabiajuri-East Pabiajuri via Durail UP Office road (Ch.1347-2347m)
|
GMRIDP
|
haluaghat
|
|
1.00
|
|
|
59.24
|
M/S. Talukder Enterprise
|
55.65
|
|
23/06/2015
|
29/12/2015
|
100
|
|
|
|
|
141
|
(GMRIDP/MYM/Halu/VR/129)
|
Improvement of Joynati Women Market-Fonia Feryghat road (Ch.1000-1118m)
|
GMRIDP
|
haluaghat
|
|
0.12
|
|
|
8.44
|
Mirza Anser Uddin Beg Haluaghat, Mymensingh
|
8.40
|
|
30/05/2016
|
|
100
|
|
|
|
|
142
|
(GMRIDP/MYM/Halu/ BRDG/UNR/131)
|
Construction of 36m.RCC girder bridge on Gajirvita UP Office-Badsha bazar via Char Bangalia road at ch. 195m.over Boraghat river.
|
GMRIDP
|
haluaghat
|
|
|
|
|
318.03
|
M/S. Durga Enterprise Dewangonj, Jamalpur
|
261.50
|
|
29/06/2016
|
|
100
|
|
|
|
|
143
|
(GMRIDP/MYM/ Halu/UNR/161)
|
Improvement of Dhara UP-Babu bazar road (Ch.00-990m)
|
GMRIDP
|
haluaghat
|
|
0.99
|
|
|
67.00
|
M/S. Sharia Enterprise
|
69.94
|
|
15/11/2017
|
15/05/2018
|
100
|
|
|
|
|
144
|
(GMRIDP/MYM/Halu/MAINT/VR/222)
|
Maintenance & road Wedining of RHD Border (Mazrakura bazar)-Koraitoli Koyla Dipo road (Ch.00-2150m)
|
GMRIDP
|
haluaghat
|
|
2.15
|
|
|
184.20
|
|
0.00
|
|
|
|
0
|
|
|
|
|
145
|
(GMRIDP/MYM/ISHA/UNR/154)
|
Improvement of Suhagi UP-Daribri bazar road from ch.3135-3885m.
|
GMRIDP
|
ishwarganj
|
|
0.75
|
|
|
44.58
|
M/S. Riazuddin Kendua, Netrokona
|
40.30
|
|
19/12/2015
|
23/06/2017
|
75
|
|
|
10/03/2019
|
|
146
|
(GMRIDP/MYM/ISHA/UZR/43)
|
Improvement of Maizbag-Dattagram-Kumaruli road from ch. 2150-3632m. with 3 nos U-drain
|
GMRIDP
|
ishwarganj
|
|
1.51
|
|
|
107.63
|
M/S Bhati Bangla Enterprise
|
105.35
|
|
30/04/2015
|
14/02/2016
|
100
|
|
|
|
|
147
|
(GMRIDP/MYM/ISHA/UZR/44)
|
Construction of 2.50m.x2.50m RCC Box Culvertat at ch. 2415m. & 1.50m.x1.50m. RCC Box Culvertat ch. 2973m on Maizbag-Dattagram-Kumaruli road
|
GMRIDP
|
ishwarganj
|
|
|
|
|
16.05
|
M/S Tomal Const
|
11.61
|
|
28/04/2015
|
|
100
|
|
|
|
|
148
|
(GMRIDP/MYM/ISHA/VR/45
|
Improvement of Ishwargonj-Kalir bazar road at Tarundia -Uriaghat road from ch. 00-435m.)
|
GMRIDP
|
ishwarganj
|
|
0.43
|
|
|
23.39
|
M/S Tariq International
|
22.97
|
|
30/04/2015
|
15/11/2015
|
100
|
|
|
|
|
149
|
(GMRIDP/MYM/IISHA/UZR/73)
|
Improvement of Shohagi bazar - Bekurhati road from ch. 2227-2779m.
|
GMRIDP
|
ishwarganj
|
|
0.55
|
|
|
38.85
|
Md. Jasim Uddin Bhuiyan, Muktarpur, Netrokaona
|
35.72
|
|
18/11/2015
|
17/05/2016
|
100
|
|
|
|
|
150
|
(GMRIDP/MYM/ISHA/UNR/88)
|
Improvement of Shohagi UP - Khalbolla bazar road from ch. 1121-2121m. with 2 nos RCC box culvert
|
GMRIDP
|
ishwarganj
|
|
1.00
|
|
|
74.23
|
M/S. Tomal Construction Nandail, Mymensingh
|
72.74
|
|
15/11/2015
|
14/08/2016
|
100
|
|
|
|
|
151
|
(GMRIDP/MYM/ISHA/UNR/89)
|
Improvement of Mogtola UP Char Hossainpur Hat road from ch. 1300-2300m. with 2 nos RCC box culvert
|
GMRIDP
|
ishwarganj
|
|
1.00
|
|
|
76.01
|
M/S. Tomal Construction Nandail, Mymensingh
|
67.84
|
|
15/11/2015
|
14/08/2016
|
100
|
|
|
|
|
152
|
(GMRIDP/MYM/ISHA/UNR/91)
|
Improvement of Sharisha UP-Khalbollah bazar road from ch. 2739-3739m. with 5 nos U-drain
|
GMRIDP
|
ishwarganj
|
|
1.00
|
|
|
58.55
|
M/S. Tomal Construction Nandail, Mymensingh
|
58.16
|
|
|
30/06/2016
|
100
|
|
|
|
|
153
|
(GMRIDP/MYM/ISHA/UNR/94)
|
Improvement of Uchakhila UP-Moricherchar Nutun bazar road from ch.5050-5485m.
|
GMRIDP
|
ishwarganj
|
|
0.44
|
|
|
22.86
|
Md Shamsul Alam
|
20.83
|
|
29/11/2015
|
|
100
|
|
|
|
|
154
|
(GMRIDP/MYM/ISHA/VR/149)
|
Improvement of Nur Uddin Khan house - Uriaghat road via Tarundia Khan Bari road from ch.00-1100m.
|
GMRIDP
|
ishwarganj
|
|
1.10
|
|
|
54.61
|
M/S. Shaharia Enterprise
|
50.49
|
|
|
19/06/2017
|
100
|
|
|
|
|
155
|
(GMRIDP/MYM/ISHA/UZR/155)
|
Improvement of Ishwargonj-Kalir bazar road from ch.9100-9850m.
|
GMRIDP
|
ishwarganj
|
|
0.75
|
|
|
51.07
|
M/S. Riazuddin Kendua, Netrokona
|
46.68
|
|
19/12/2016
|
23/06/2017
|
100
|
|
|
|
|
156
|
(GMRIDP/MYM/MUKT/UZR/168)
|
Improvement of Chechua GC-Hatkalir bazar GC via Kalir bazar & Shibgonj bazar road from ch.13500-14645m.
|
GMRIDP
|
muktagacha
|
|
1.15
|
|
|
78.37
|
M/S. Prosad Enterprise
|
78.26
|
|
|
31/10/2017
|
70
|
|
|
10/03/2019
|
|
157
|
(GMRIDP/MYM/MUKT/VR/210)
|
Improvement of Bashati-JannatbariGPS-Goari bazar road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
34.08
|
M/S. Shapla Enterprise
|
34.10
|
|
|
14/08/2018
|
100
|
|
|
10/03/2019
|
|
158
|
(GMRIDP/MYM/MUKT/VR/212)
|
Improvement of Mymensingh-Jamalpur road at Cheru Mondal's Pukurpar to Krishnanagar Reg. Prymari School road from ch. 00-882m.
|
GMRIDP
|
muktagacha
|
|
0.88
|
|
|
70.48
|
M/S. Prosad Enterprise
|
67.84
|
|
|
13/08/2018
|
75
|
|
|
10/03/2019
|
|
159
|
(GMRIDP/MYM/MUKT/VR/213)
|
Improvement of Katbowla-Balipara road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
32.27
|
M/S. Porimal Sharma
|
33.96
|
|
|
13/09/2018
|
70
|
|
|
10/03/2019
|
|
160
|
(GMRIDP/MYM/MUKT/VR/214)
|
Improvement of Mymensingh Tangail R&H-Debgram road from ch. 7600-8100m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
34.21
|
M/S. Prosad Enterprise
|
35.53
|
|
25/04/2018
|
|
40
|
|
|
10/03/2019
|
|
161
|
(GMRIDP/MYM/MUKT/VR/215)
|
Improvement of Rambhadrapur Bazar-Kheruajani via Bhitibari Madrasa road from ch.1980-2480m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
38.30
|
M/S. Porimal Sharma
|
40.84
|
|
22/04/2018
|
28/08/2018
|
40
|
|
|
10/03/2019
|
|
162
|
(GMRIDP/MYM/ MUKT/MAINT/UNR/19)
|
Maintenance of Langulia R&H - Jhonka bazar via Bashati & Kashimpur UP office road from ch. 3140-6400m.
|
GMRIDP
|
muktagacha
|
|
3.26
|
|
|
44.58
|
M/S. Swarna Bricks
|
39.41
|
|
19/01/2015
|
29/06/2015
|
100
|
|
|
|
|
163
|
(GMRIDP/MYM/MUKT/UNR/26)
|
Improvement of Mankon UP office - Borogram UP office Mogoltola bazar road from ch. 00-1000m.with 1 no U-drain at ch. 385m.
|
GMRIDP
|
muktagacha
|
|
1.00
|
|
|
60.98
|
M/S. Ridoy Enterprise Fulbaria, Mymensingh
|
63.88
|
|
|
13/04/2016
|
100
|
|
|
|
|
164
|
(GMRIDP/MYM/MUKT/VR/31)
|
Improvement of Salora bazar - Bandhoboroze road from ch. 1450-2350m.
|
GMRIDP
|
muktagacha
|
|
0.90
|
|
|
50.16
|
Md. Faruq
|
48.65
|
|
19/02/2015
|
24/08/2015
|
100
|
|
|
|
|
165
|
(GMRIDP/MYM/MUKT/VR/32)
|
Improvement of Zhonka bazar- Mohishtara bazar road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
25.93
|
Md. Faruq
|
25.15
|
|
19/02/2015
|
24/08/2015
|
100
|
|
|
|
|
166
|
(GMRIDP/MYM/MUKT/VR/115)
|
Improvement of Mymensingh Tangail R&H-Bonas road-Lichutola bazar road from ch.00-500m
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
29.98
|
The Road Developars
|
28.30
|
|
17/05/2016
|
23/11/2016
|
100
|
|
|
|
|
167
|
(GMRIDP/MYM/MUKT/VR/116)
|
Improvement of Dolla bazar-Kolorghat via Goeshpur road from ch. 00-500m
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
29.31
|
M/S. Prosad Enterprise
|
27.94
|
|
16/05/2016
|
22/11/2016
|
100
|
|
|
|
|
168
|
(GMRIDP/MYM/MUKT/VR/122)
|
Improvement of Chalura bazar-Bondha Buruz road from ch. 2350-2650m
|
GMRIDP
|
muktagacha
|
|
0.30
|
|
|
16.26
|
M/S. Nihad Builders & Suppliers, DB road, Mymensing.
|
16.08
|
|
26/05/2016
|
29/11/2016
|
100
|
|
|
|
|
169
|
(GMRIDP/ MYM/MUKT/VR/123)
|
Improvement of Paikura-Kheruajani UP Office road from ch. 00-400m
|
GMRIDP
|
muktagacha
|
|
0.40
|
|
|
24.00
|
M/S. Nihad Builders & Suppliers, DB road, Mymensing.
|
23.72
|
|
26/05/2016
|
29/11/2016
|
100
|
|
|
|
|
170
|
(GMRIDP/MYM/ MUKT/VR/128)
|
Improvement of Binnakuri-Malajani road from ch. 00-500m
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
30.48
|
Md. Muklesur Rahman Sadar, Mymensingh
|
28.75
|
|
|
27/11/2016
|
100
|
|
|
|
|
171
|
(GMRIDP/MYM/MUKT/BRDG/VR/130)
|
Construction of 60m. RCC girder bridge on Dulla bazar-Kulurghat via Goeshpur road at ch. 4000m.over banar river
|
GMRIDP
|
muktagacha
|
|
|
|
|
279.65
|
M/S. Durga Enterprise Dewangonj, Jamalpur.
|
230.11
|
|
29/06/2016
|
|
100
|
|
|
|
|
172
|
(GMRIDP/MYM/MUKT/VR/143)
|
Improvement of Jhanka bazar-Mohish Tara bazar road from ch. 500-1000m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
27.37
|
M/S. Bashudeb Shaha
|
26.30
|
|
|
|
100
|
|
|
|
|
173
|
(GMRIDP/MYM/MUKT/VR/169)
|
Improvement of Nimuria Dubarpar-Tangail R&H road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
32.69
|
M/S. Shapla Enterprise
|
31.90
|
|
|
|
100
|
|
|
|
|
174
|
(GMRIDP/MYM/MUKT/VR/170)
|
Improvement of Charipara Idgha-Charipara(Talukder Bari) road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
28.79
|
M/S. Jenish Enterprise Sadar, Mymensingh.
|
28.77
|
|
30/04/2017
|
31/03/2018
|
100
|
|
|
|
|
175
|
(GMRIDP/MYM/MUKT/VR/211)
|
Improvement of Bechukhali-Shimla(Shimla-Bechukhali) road from ch. 00-500m.
|
GMRIDP
|
muktagacha
|
|
0.50
|
|
|
35.00
|
M/S. Shapla Enterprise
|
34.85
|
|
|
14/06/2018
|
100
|
|
|
|
|
176
|
(GMRIDP/MYM/MUKT/MAINT/UZR/220)
|
a) Maintenance of Muktagacha-Biddagonj GC road from ch.00-5120m. b) Maintenance of Kandigaon-Prannath house road from ch.00-1162m.
|
GMRIDP
|
muktagacha
|
|
6.28
|
|
|
127.37
|
|
0.00
|
|
|
|
0
|
|
|
|
|
177
|
(GMRIDP/MYM/Sadar/VR/163)
|
Improvement of Firuz Library Moor-Maskand Parail road (Ch.2480-2880m.)
|
GMRIDP
|
mymensingh-s
|
|
0.40
|
|
|
21.72
|
M/S. Shohel Enterprise Gaffargaon, Mymensingh.
|
20.73
|
|
|
|
65
|
|
|
10/03/2019
|
|
178
|
(GMRIDP/MYM/SADR/VR/184)
|
Improvement of Dorgapara Moor -Morolpara Community Pry. School road (Ch.00-542m)
|
GMRIDP
|
mymensingh-s
|
|
0.54
|
|
|
35.21
|
M/S. Sahara Enterprise Rambabu road, Mymensingh.
|
35.99
|
|
|
|
60
|
|
|
10/03/2019
|
|
179
|
(GMRIDP/MYM/SADR/VR/206)
|
Improvement of Shohid Muktijoddha Idris Ali road (Ch.00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
31.81
|
Porimal Sharma
|
34.63
|
|
31/05/2018
|
|
80
|
|
|
10/03/2019
|
|
180
|
(GMRIDP/MYM/SADR/VR/209)
|
Improvement of Charhorinpur-Ganginapar-Nilkuthi road (Ch.450-950m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
30.72
|
Md. Sarwar Jahan Netrokona.
|
32.11
|
|
|
|
65
|
|
|
10/03/2019
|
|
181
|
(GMRIDP/MYM/Sadar/VR/39)
|
Improvement of Borbilarpar Primary School - Churkhai Bhabho Khali road (Ch.1000-1500m.) with .625x.600m. 2nos U-Drain
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
29.46
|
Md. Atiqur Rahman
|
31.51
|
|
|
|
80
|
|
|
10/02/2019
|
|
182
|
(GMRIDP/MYM/Sadar/UNR/04)
|
Improvement of Dapunia UP-Montola bazar road Via Shasshamala bazar road (Ch. 00-1000m)
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
58.33
|
M/S Tital Enterprise
|
61.01
|
|
28/08/2014
|
27/02/2015
|
100
|
|
|
|
|
183
|
(GMRIDP/MYM/Sadar/VR/05)
|
Improvement of Shambugonj-Ambikagonj road(Abul Master House)-CharBorbila Ganginapar bazar road (Ch. 00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
25.24
|
M/S. Rafi Traders
|
26.19
|
|
14/08/2014
|
|
100
|
|
|
|
|
184
|
(GMRIDP/MYM/Sadar/VR/07)
|
Improvement of Muktagacha-Biddagonj GC road-Kustia Namarapa road (Ch. 1000-1475m.)
|
GMRIDP
|
mymensingh-s
|
|
0.47
|
|
|
24.73
|
M/S. Redoy Enterprise
|
23.96
|
|
18/09/2014
|
25/03/2015
|
100
|
|
|
|
|
185
|
GMRIDP/MYM/ Sadar/UZR/11
|
Improvement of Muktagacha-Biddagonj GC road (Ch.00-850m.) with .625x.600m. 3nos U-Drain at ch. 450,740&750m.
|
GMRIDP
|
mymensingh-s
|
|
0.85
|
|
|
62.83
|
M/S. Redoy Enterprise
|
62.72
|
|
18/09/2014
|
25/03/2015
|
100
|
|
|
|
|
186
|
(GMRIDP/MYM/Sadar/VR/38)
|
Improvement of Beltoli-Sutiakhali road Altab Membar's Diptewbwel - Mohoribari road (Ch.00-500m.) with .625x.600m. 1no U-Drain
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
26.85
|
M/S.Istiaque Ahamed
|
26.85
|
|
15/04/2015
|
|
100
|
|
|
|
|
187
|
(GMRIDP/MYM/Sadar/VR/40)
|
Improvement of Bhabho Khali Pagaria Brige Moor - Goffargaon -Mymensingh (K.B.I road) road (Ch.00-500m.)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
29.16
|
M/S. Tariq International
|
30.77
|
|
21/04/2015
|
20/10/2015
|
100
|
|
|
|
|
188
|
(GMRIDP/MYM/Sadar/UNR/49)
|
Improvement of Churkhai GC - Bhabokhali Poraton bazar via Bhabokhali UP Road with 2nos U-Drain(Ch.2500-3500m.)
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
58.85
|
M/S. Arif Enterprise Netrokona
|
54.97
|
|
26/08/2015
|
14/02/2016
|
100
|
|
|
|
|
189
|
(GMRIDP/MYM/Sadar/VR/50)
|
Improvement of Katlashen - Chander bazar via Nama Katlashen road (Ch.00-500m.)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
26.66
|
M/S. Saiful Bricks
|
27.46
|
|
20/08/2015
|
20/02/2016
|
100
|
|
|
|
|
190
|
(GMRIDP/MYM/Sadar/VR/51)
|
Improvement of Ambikagonj GC - Shambugonj Puraton Bus Stand - Porangonj road (Ch.00-500m.)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
25.90
|
M/S. Arif Enterprise Netrokona
|
24.19
|
|
26/08/2015
|
14/02/2016
|
100
|
|
|
|
|
191
|
(GMRIDP/MYM/Sadar/UNR/75)
|
Improvement of Dapunia UP- Churckai GC road via gopal Nagar bazar road (Ch.5490-6490m.) with 2nos U-drain
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
54.82
|
M/S. Istiak Ahamed
|
52.75
|
|
16/09/2015
|
14/03/2016
|
100
|
|
|
|
|
192
|
(GMRIDP/MYM/Sadar/UNR/76)
|
Improvement of Nilokkhia UP Mohojampur bazar via Ghonti bazar road (Ch.2300-3300m.) with 3nos U-drain
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
54.85
|
M/S. Jamir Traders Gouripur,Mymensingh
|
51.29
|
|
19/10/2015
|
24/04/2016
|
100
|
|
|
|
|
193
|
(GMRIDP/MYM/Sadar/UZR/99)
|
Maintenance of Tangail R&H-Begunbari GC road (Ch.00-3500m.)
|
GMRIDP
|
mymensingh-s
|
|
3.50
|
|
|
82.51
|
Md. Atiqur Rahman
|
78.38
|
|
26/01/2016
|
|
100
|
|
|
|
|
194
|
(GMRIDP/MYM/Sadar/UNR/100)
|
Improvement of Bororchar UP-Rambhadrapur bazar via Degreepara road with link road (Ch.650-1950m.)
|
GMRIDP
|
mymensingh-s
|
|
1.30
|
|
|
81.08
|
Md. Monjurul Haque Monju
|
81.05
|
|
22/02/2016
|
30/11/2016
|
100
|
|
|
|
|
195
|
(GMRIDP/MYM/Sadar/UNR/106)
|
Improvement of Porangonj UP-Charsrigoldi bazar road (Ch.00-1000m.) with 2nos U-drain
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
56.42
|
M/S. Islam Traders
|
55.83
|
|
|
|
100
|
|
|
|
|
196
|
(GMRIDP/MYM/Sadar/VR/144)
|
Improvement of Char Kalibari Bus stand -Jhaugora road (Ch.2200-2300m & 2800-3700m.)
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
53.04
|
M/S. Islam Traders
|
53.00
|
|
|
|
100
|
|
|
|
|
197
|
(GMRIDP/MYM/Sadar/VR/145)
|
Improvement of Jadabdi Primary school-Jhaparkanda Godaraghat via chairmen Bari road (Ch.400-900m.)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
26.52
|
Md. Sarwar Jahan Netrokona.
|
27.79
|
|
|
28/04/2017
|
100
|
|
|
|
|
198
|
(GMRIDP/MYM/Sadar/VR/164)
|
Improvement of Ambikagonj GC - Shombugonj Old Bus stand -Porangonj road (Ch.500-1800m.)
|
GMRIDP
|
mymensingh-s
|
|
1.30
|
|
|
73.25
|
M/S. Porimal Shorma
|
69.59
|
|
13/02/2017
|
19/08/2017
|
100
|
|
|
|
|
199
|
(GMRIDP/MYM/Sadar/VR/165)
|
Improvement of Char Khoricha-Malidanga road (Ch.150-900m.)
|
GMRIDP
|
mymensingh-s
|
|
0.75
|
|
|
41.14
|
Md. Faruque
|
38.66
|
|
13/02/2017
|
19/08/2017
|
100
|
|
|
|
|
200
|
(GMRIDP/MYM/Sadar/MAINT/VR/166)
|
Maintanance of Shahebkhali - Char Ishordia road (Ch.00-1410m.)
|
GMRIDP
|
mymensingh-s
|
|
1.41
|
|
|
29.65
|
M/S. Shohel Enterprise Gaffargaon, Mymensingh.
|
26.38
|
|
|
|
100
|
|
|
|
|
201
|
(GMRIDP/MYM/SADR/VR/179)
|
Improvement of Char Kalibari Bus stand-Jhawgora road (Ch.2300-2800m. & 3700-4200m)
|
GMRIDP
|
mymensingh-s
|
|
1.00
|
|
|
53.91
|
M/S. Sahara Enterprise Rambabu road, Mymensingh.
|
55.80
|
|
20/09/2017
|
25/03/2018
|
100
|
|
|
|
|
202
|
(GMRIDP/MYM/SADR/ VR/204)
|
Improvement of Churkhai-Sutiakhali Pacca road-Churkhai to Bhabokhali road via Kombu & Usman Sarkar's house road (Ch.00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
32.96
|
Md. Sarwar Jahan Netrokona.
|
34.45
|
|
|
|
100
|
|
|
|
|
203
|
(GMRIDP/MYM/SADR/VR/205)
|
Improvement of Rupakhali Rail Line-Begunbari-Austadhar GC road (Ch.00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
30.27
|
M/S. Mir Enterprise Sadar, Mymensingh
|
28.61
|
|
15/02/2018
|
21/06/2018
|
100
|
|
|
|
|
204
|
(GMRIDP/MYM/SADR/VR/207)
|
Improvement of Digarkanda-Nosurmur via UP Complex road (Ch.00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
32.01
|
Md. Sarwar Jahan Netrokona.
|
33.46
|
|
|
|
100
|
|
|
|
|
205
|
(GMRIDP/MYM/SADR/VR/208)
|
Improvement of Porangonj-Foliamari road (Ch.00-500m)
|
GMRIDP
|
mymensingh-s
|
|
0.50
|
|
|
34.38
|
Md. Porimal Sharma Kendua, Netrokona
|
35.49
|
|
25/03/2018
|
31/07/2018
|
100
|
|
|
|
|
206
|
(GMRIDP/MYM/SADR/MAIN/VR/221)
|
Maintenance of Shikari Kanda RHD road-Mymensingh Goffargaon(Omed Ali road) road (Ch.00-3660m)
|
GMRIDP
|
mymensingh-s
|
|
3.66
|
|
|
135.14
|
|
0.00
|
|
|
|
0
|
|
|
|
|
207
|
(GMRIDP/MYM/ PHUL/VR/223
|
Improvement of Pagla-Biharanga road from ch. 00-2500m.
|
GMRIDP
|
phulpur
|
|
2.50
|
|
|
203.91
|
|
0.00
|
|
|
|
0
|
|
|
10/03/2019
|
|
208
|
(GMRIDP/MYM/PHUL/UZR/25)
|
Improvement of Amuakanda bazar-Bahadhurpur GC road from ch. 5280-7300m.
|
GMRIDP
|
phulpur
|
|
2.02
|
|
|
128.27
|
M/S.Saiful Bricks
|
138.44
|
|
|
14/01/2016
|
100
|
|
|
|
|
209
|
(GMRIDP/MYM/PHUL/UNR/30)
|
Improvement of Poari UP(Amua Kanda bazar) - Rahimgonj bazar road from ch. 2420-4435m.
|
GMRIDP
|
phulpur
|
|
2.01
|
|
|
111.14
|
M/S. Shorna Bricks
|
120.68
|
|
|
30/09/2015
|
100
|
|
|
|
|
210
|
(GMRIDP/MYM/ PHUL/UZR/72)
|
Improvement of Kakni R&H-Shamgonj via Vusher Bazr & Rajdarikal GC road from ch. 11600-13649m.with 2 nos U-drain
|
GMRIDP
|
phulpur
|
|
2.04
|
|
|
133.29
|
M/S. Shorna Bricks Goffergaon,Mymensingh.
|
129.51
|
|
19/10/2015
|
26/07/2016
|
100
|
|
|
|
|
211
|
(GMRIDP/MYM/PHUL/Maint/UNR/99)
|
Maintenance of Bhaitkandi UP office-Tarakanda bazar road via Partola Neemtola & Dadra bazar road from ch. 5150-9163m.
|
GMRIDP
|
phulpur
|
|
4.01
|
|
|
77.99
|
M/S. Mahbub Enterprise Nutun bazar, Mym
|
62.82
|
|
24/01/2016
|
30/05/2016
|
100
|
|
|
|
|
212
|
(GMRIDP/MYM/ PHUL/UNR/111)
|
Improvement of Phulpur UP - Defulia bazar road from ch. 5100-6100m.
|
GMRIDP
|
phulpur
|
|
1.00
|
|
|
54.52
|
M/S. Flora Enterprise
|
52.44
|
|
|
15/11/2016
|
100
|
|
|
|
|
213
|
(GMRIDP/MYM/ PHUL/UNR/112)
|
Improvement of Rupshi UP-Thakurbakhai road via Defulia raod from ch. 9200-10200m.with 2 nos U-drain
|
GMRIDP
|
phulpur
|
|
1.00
|
|
|
64.79
|
Joyon Enterprise
|
62.03
|
|
15/05/2016
|
21/11/2016
|
100
|
|
|
|
|
214
|
(GMRIDP/MYM/ PHUL/VR/156)
|
Improvement of Sahapur bazar-Bhaitkandi bazar road from ch. 450-950m.
|
GMRIDP
|
phulpur
|
|
0.50
|
|
|
27.72
|
Biplob Chondra Datta, Phulpur.
|
25.36
|
|
20/02/2017
|
26/08/2017
|
100
|
|
|
|
|
215
|
(GMRIDP/MYM/ PHUL/VR/180)
|
Improvement of Sokholla Moor-Choto Shonoy road from ch. 1535-2045m.
|
GMRIDP
|
phulpur
|
|
0.51
|
|
|
30.93
|
M/S. Joyan Enterprise Phulpur, Mymensingh
|
32.39
|
|
|
18/02/2018
|
100
|
|
|
|
|
216
|
GSIDP/MYM/DW-155
|
Improvement of Porakandolia Shoshan Ghat under Porakandulia UP (Lititude : 25.035346, Longitude : 90.589747)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Akanda Traders
|
4.75
|
14/01/2019
|
|
20/05/2019
|
95
|
|
0
|
06/05/2019
|
|
217
|
GSIDP/MYM/DW-156
|
Improvement of Kolsindur Bazar Shoshan Ghat under Gamaritola UP (Lititude : 25.120908, Longitude : 90.56419)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Islam Traders
|
4.75
|
20/01/2019
|
|
26/05/2019
|
0
|
|
0
|
06/05/2019
|
|
218
|
GSIDP/MYM/DW-157
|
Improvement of Krishnopur Jame Mosque under Gamaritola UP (Lititude : 25.106687, Longitude : 90.543192)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Tura Enterprise
|
4.75
|
20/01/2019
|
|
26/05/2019
|
30
|
|
0
|
06/05/2019
|
|
219
|
GSIDP/MYM/DW-143
|
Improvement of Sree Sree Kamakha Matry Tirtho Mondir under Goshgaon UP (Lititude : 25.15147, Longitude : 90.51165).
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Akanda Traders
|
4.75
|
14/01/2019
|
|
20/05/2019
|
50
|
|
0
|
24/04/2019
|
|
220
|
GSIDP/MYM/DW-152
|
Improvement of Gigatola Eidgah under Goshgaon UP (Lititude : 25.15238, Longitude : 90.50378)
|
GSIDP
|
dhobaura
|
|
|
|
99
|
5.00
|
M/S. Maria Enterprise
|
4.75
|
23/01/2019
|
|
03/03/2019
|
100
|
|
99
|
24/04/2019
|
|
221
|
GSIDP/MYM/DW-154
|
Improvement of Dodnoy Eidgah under Porakandolia UP (Lititude : 25.079670, Longitude : 90.557588)
|
GSIDP
|
dhobaura
|
|
|
|
98
|
5.00
|
M/S. Tura Enterprise
|
4.75
|
20/01/2019
|
|
11/03/2019
|
100
|
|
98
|
24/04/2019
|
|
222
|
GSIDP/MYM/DW-142
|
Improvement of Dhobaura Shoshan Ghat under Dhobaura UP (Lititude : 25.075078, Longitude : 90.543657)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
3.00
|
M/S. Maria Enterprise
|
2.85
|
|
|
|
0
|
|
0
|
24/04/2019
|
|
223
|
GSIDP/MYM/DW-148
|
Improvement of South Bagber Social Graveyard under Bagber UP(Lititude : 25.09455, Longitude : 90.46527)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Islam Traders
|
4.75
|
20/01/2019
|
|
26/05/2019
|
70
|
|
0
|
24/04/2019
|
|
224
|
GSIDP/MYM/DW-149
|
Improvement of Sent Anstoni Girja under Dhobaura UP(Lititude : 25.090016, Longitude : 90.530816)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
3.00
|
M/S. Maria Enterprise
|
2.85
|
23/01/2019
|
|
29/05/2019
|
65
|
|
0
|
24/04/2019
|
|
225
|
GSIDP/MYM/DW-150
|
Improvement of Dodkora Jangalia Dorga Mondir under Dakkhin Maizpara UP(Lititude : 25.143905, Longitude : 90.564038)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
3.00
|
|
2.99
|
23/01/2019
|
|
29/05/2019
|
95
|
|
0
|
24/04/2019
|
|
226
|
GSIDP/MYM/DW-151
|
Improvement of Ezara Para Eidgah under Goatola UP (Lititude : 25.1623, Longitude : 90.3549)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Islam Traders
|
4.75
|
20/01/2019
|
|
26/05/2019
|
30
|
|
0
|
24/04/2019
|
|
227
|
GSIDP/MYM/DW-153
|
Improvement of Munshirhat Kalimondir under Bagber UP(Lititude : 25.10533, Longitude : 90.45367)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Akanda Traders
|
4.75
|
14/01/2019
|
|
20/05/2019
|
0
|
|
0
|
24/04/2019
|
|
228
|
GSIDP/MYM/DW-144
|
/DW-144 Improvement of Dhobaura Main Eidgah under Dhobaura UP.(Lititude : 25.088536, Longitude : 90.514451)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
4.00
|
M/S. Maria Enterprise
|
3.80
|
|
|
|
40
|
|
0
|
20/03/2019
|
|
229
|
GSIDP/MYM/DW-145
|
Improvement of Dairpara Kathalik Girja under Dakkhin Maizpara UP(Lititude : 25.090016, Longitude : 90.530816)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
3.00
|
M/S. Maria Enterprise
|
2.97
|
|
|
|
95
|
|
0
|
20/03/2019
|
|
230
|
GSIDP/MYM/DW-146
|
Improvement of Uttar Ranipur Eidgah under Dakkhin Maizpara UP(Lititude : 25.160932, Longitude : 90.563745)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
4.00
|
M/S. Tura Enterprise
|
3.80
|
|
|
|
90
|
|
0
|
20/03/2019
|
|
231
|
GSIDP/MYM/DW-147
|
/DW-147 Improvement of Haripur Shashan Ghat under Goatola UP (Lititude : 25.1100, Longitude : 90.4800)
|
GSIDP
|
dhobaura
|
|
|
|
0
|
5.00
|
M/S. Akanda Traders
|
4.75
|
|
|
|
0
|
|
0
|
20/03/2019
|
|
232
|
GSIDP/MYM/DW-11
|
Improvement of Biska Bazar Central Jame Masjid.. under Biska Union.Latitude:24.7575, Longitude:90.5150
|
GSIDP
|
Tarakanda
|
|
|
|
99
|
5.00
|
Nowab Properties
|
4.75
|
22/05/2018
|
|
28/06/2018
|
100
|
|
99
|
06/05/2019
|
|
233
|
GSIDP/MYM/DW-12
|
Improvement of Shalpo Butta Eidgha under Rampur Union. Latitude:24.9740, Longitude:90.5188
|
GSIDP
|
Tarakanda
|
|
|
|
92
|
5.04
|
M/S. Hira Enterprise
|
4.79
|
21/06/2018
|
|
24/07/2018
|
100
|
|
92
|
06/05/2019
|
|
234
|
IRIDP-2/MYM/DW-1
|
a)Improvement of Rasulpur R&H – Hatkalir Bazar GC via Chandoniata Road (Muktagacha portion) (Ch.7365-8460m). b) Construction of 2nos 0.625x0.600m Culvert on Same Road (Ch8170m,8370m)
|
IRIDP-2
|
muktagacha
|
|
1.10
|
|
|
76.06
|
M/S. Prasad Enterprise
|
74.88
|
|
11/01/2016
|
18/01/2018
|
100
|
|
|
|
|
235
|
IRIDP-2/MYM/DW-2
|
a)Improvement of Montola R&H – Dapunia GC via Khukshia Road (Ch. 2490-3490m). b) Construction of 1no 0.625x0.600m Culvert on Same Road (Ch2890m)
|
IRIDP-2
|
muktagacha
|
|
1.00
|
|
|
67.82
|
M/S. Prasad Enterprise
|
66.74
|
|
11/01/2016
|
08/06/2017
|
100
|
|
|
|
|
236
|
IRIDP-2/MYM/DW-3
|
a)Improvement of Kumargata UP – Lichutola Bazar Road (Ch.00-585m). b) Construction of 1no 0.625x0.600m Culvert on Same Road (Ch.157m)
|
IRIDP-2
|
muktagacha
|
|
0.59
|
|
|
39.28
|
M/S. Saiful Bricks
|
38.60
|
|
03/02/2016
|
11/06/2017
|
100
|
|
|
|
|
237
|
IRIDP-2/MYM/DW-4
|
a)Improvement of Muktagacha Tangail R&H- Debogram Road (Ch. 6600-7600m). b) Construction of 1no 0.625x0.600m Culvert on Same Road ( Ch.7590m)
|
IRIDP-2
|
muktagacha
|
|
1.00
|
|
|
55.45
|
Md. Faruq
|
51.57
|
|
16/03/2016
|
11/08/2016
|
100
|
|
|
|
|
238
|
IRIDP-2/MYM/DW-5
|
Improvement of Muktagacha – Biddagonj Road Pirakanda (Ch. 2100-3100m).
|
IRIDP-2
|
muktagacha
|
|
1.00
|
|
|
60.59
|
Md. Sirajul Islam
|
59.15
|
|
03/02/2016
|
28/05/2017
|
100
|
|
|
|
|
239
|
IRIDP-2/MYM/DW-6
|
Improvement of Ramchandrapur- Ban Bangla Road (Ch. 1000-2200m).
|
IRIDP-2
|
muktagacha
|
|
1.20
|
|
|
69.35
|
Md. Sirajul Islam
|
67.62
|
|
02/02/2016
|
28/04/2017
|
100
|
|
|
|
|
240
|
IRIDP-2/MYM/DW-7
|
a)Improvement of Muktagacha Natun Bazar –Malotipara Pathalia Bazar Road (Ch.00-1390m). b) Construction of 3nos 0.625x0.600m Culvert on Same Road (Ch.480m, Ch.840m ,1304 m)
|
IRIDP-2
|
muktagacha
|
|
1.39
|
|
|
86.72
|
M/S. Shapla Enterprise
|
85.33
|
|
11/02/2016
|
24/10/2016
|
100
|
|
|
|
|
241
|
IRIDP-2/MYM/DW-8
|
Improvement of Dhaka Mymensingh R&H (Chalerghat)Amlitola GC road via Chawladi Bazar (St. from chawladi Bazar BC road – Kanarghat Bazar) Road (Ch.3250-4100m).
|
IRIDP-2
|
trishal
|
|
0.85
|
|
|
58.88
|
M/S. Alam Enterprise
|
54.83
|
|
14/01/2016
|
14/06/2016
|
100
|
|
|
|
|
242
|
IRIDP-2/MYM/DW-9
|
a)Improvement of Mathbari UP – Amirabare UProad via Roymoni Road (Ch.5855-6800m). b) Construction of 3nos 0.625x0.600m Culvert on Same Road (Ch6202m, Ch.6335m ,6397 m)
|
IRIDP-2
|
trishal
|
|
0.95
|
|
|
53.88
|
M/S. Alam Enterprise
|
49.50
|
|
14/01/2016
|
23/08/2016
|
80
|
|
|
|
|
243
|
IRIDP-2/MYM/DW-10
|
a)Improvement of UkilBari – KBI road via Dorikathal Bazar Road (Ch.1470-1970, 4650 -5550m). b) Construction of 3nos 0.625x0.600m Culvert on Same Road (Ch5310m, Ch.5370m ,5520 m)
|
IRIDP-2
|
trishal
|
|
1.40
|
|
|
90.56
|
M/S. Saiful Bricks
|
79.69
|
|
11/01/2016
|
08/10/2016
|
100
|
|
|
|
|
244
|
IRIDP-2/MYM/DW-11
|
a)Improvement of Dhanikhola Kutubkhana road at Charkumaria – Uzandash Para road via Charag Ali College Pazlarchar Bazar Road (Ch889-1389m). b) Construction of 2nos 0.600x0.600m Culvert on Same Road (Ch.909m, Ch.1304m)
|
IRIDP-2
|
trishal
|
|
0.50
|
|
|
28.78
|
M/S. Alam Enterprise
|
26.32
|
|
14/01/2016
|
14/06/2016
|
100
|
|
|
|
|
245
|
IRIDP-2/MYM/DW-12
|
a)Improvement of KBI road – Kazir Shimla road via Banpathalia Road (Ch5460-6360m). b) Construction of 2nos 0.625x0.600m Culvert on Same Road (Ch.5560m, Ch.5860m)
|
IRIDP-2
|
trishal
|
|
0.90
|
|
|
51.10
|
M/S. Shofiqul Islam Babul
|
47.06
|
|
12/01/2016
|
24/08/2016
|
80
|
|
|
|
|
246
|
IRIDP-2/MYM/DW-13
|
a)Improvement of Hadder vita Kabir Bazar road Bottola –Kalir Hat Bazar Road (Hadder vita Bottola More Kalir Hat road ) (Ch.00-700m). b) Construction of 3nos 0.625x0.600m Culvert on Same Road (Ch.234m, Ch365m ,460 m)
|
IRIDP-2
|
trishal
|
|
0.70
|
|
|
44.80
|
M/S. Shofiqul Islam Babul
|
41.29
|
|
12/01/2016
|
18/11/2016
|
100
|
|
|
|
|
247
|
IRIDP-2/MYM/DW-14
|
Improvement of Dhala Kha Para – Lakhapur (St from Dhala – Amlitola BC road –Lakhanpur) Road (Ch.1000-1450m).
|
IRIDP-2
|
trishal
|
|
0.45
|
|
|
29.26
|
M/S Monera Enterprise
|
26.84
|
|
19/01/2016
|
24/08/2017
|
100
|
|
|
|
|
248
|
IRIDP-2/MYM/DW-15
|
a)Improvement ofDhaka Mymensingh road at Bagan Chairman House – Konabari Road (Ch.00-700m). b) Construction of 3nos 0.625x0.600m Culvert on Same Road (Ch.13m, Ch.107m ,300 m)
|
IRIDP-2
|
trishal
|
|
0.70
|
|
|
52.02
|
M/S Reday Enterprise
|
48.81
|
|
13/01/2016
|
02/07/2016
|
100
|
|
|
|
|
249
|
MGSP/BLK/W-01
|
a) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Dhaka -Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.00-2150m) (Total Length: 2150m.)
b) Construction of RCC Surface drain beside at the BC road starting from Dhaka –Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.800-875 & Ch. 1500-1575m) (Total Length: 150m.)
c) Construction of RCC Retaining wall & Brick Guide wall beside at the BC road starting from Dhaka–Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.1600-1680 Retaining wall & Ch. 700-850m Brick Guide wall) (Total Length: 230m.)
d) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Dhaka -Mymensingh Highway near Russel Spening Mills to Labu Member house ward no-9. (Ch.00-570m) (Total Length: 570m.)
e) Development of road with bituminous carpeting starting from Panch Rasta moor to S.R Office Ch. 00-440m, & 118m Link road (PDB Office road) at Bhaluka Bazar (Total Length: 600m.)
f) Improvement of road with RCC casting starting from Bhaluka S.R Office road (Kitchen market moor) Kitchen market (Ch.00-190m) (Total Length: 190m.)
g) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Bhaluka -Gafforgoan highway near Fire Service moor to Bhaluka -Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School . (Ch. 00-1800m) (Total Length: 1800m.)
h) Construction Surface drain beside at the road starting from Bhaluka-Gafforgoan highway near Fire Service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School (Ch. 700-800m & Ch. 950-1200m) (Total Length: 350m.)
i) Construction of RCC Retaining wall beside at the road starting from Bhaluka-Gafforgoan highway near Fire Service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School (Ch. 840-900m) (Total Length: 60m.)
|
MGSP
|
bhaluka
|
|
6.10
|
|
|
48701006.00
|
M/S Niaz Traders
|
48681532.88
|
|
05/05/2015
|
16/07/2016
|
97
|
|
|
|
|
250
|
MGSP/BLK/2015-16/W-02
|
(a) Construction of RCC drain with footpath & street light (Both side of Bhaluka- Gafforgaon road) starting from Dhaka-Mymensing highway to eastern end of Bhaluka pourashava, Mymensingh. ( Total Length = 813.00 m).
(b) Supplying, fitting & fixing of street light starting from Dhaka-Mymensingh highway to eastern end of Bhaluka pourashava. Ch.0+000 to 1+045m).
|
MGSP
|
bhaluka
|
|
1.86
|
|
|
18153562.00
|
N H Enterprise
|
15211166.52
|
|
11/12/2016
|
10/12/2017
|
30
|
|
|
|
|
251
|
MGSP/TRI/W-01
|
a) Construction of Commissioner road by Bitumenous carpeting from Mr Lalu's shop to Dhaka-Mymensingh highway at ward No-4,5,6 under Trishal Pourashava. (Ch 0+00-0+960 m). (Total Length: 960m)
b) Construction of Both side RCC drain beside Commissioner road to Dhaka-Mymensingh highway.at ward No-4,5,6 under Trishal Pourashava (Ch 0+00-0+600 m). (Total Length: 1275m)
c) Improvement of Fishary road by Bitumenous carpeting work at ward no-8 under Trishal Pourashava. (Ch 0+000-1+165 m). (Total Length: 1165m)
d) Construction of Road side drain starting from Shamuddin road to Main road via Hindu polly Dhanikhola road by RCC (Ch 248.00-511.00m =263.00m, & Link Ch 00-291.00m=291.00m, By Link-1 Ch.00-89.00m=89.00m, By Link-2 Ch. 00-20.70m=20.70m) (Total Length: 663.70m)
e) Improvement of road from Trishal Nazrul Museum to Fulbaria road by Bitumenous carpeting at ward No-01 under Trishal Pourashava. (Ch 0+00-0+800 m). (Total Length: 800m)
|
MGSP
|
trishal
|
|
4.86
|
|
|
47443434.00
|
UDC-SRS (JV)
|
46391632.92
|
|
29/03/2015
|
31/05/2016
|
100
|
|
|
|
|
252
|
MGSP/TRI/2015-16/W-02
|
(a) Construction of RCC Cover Slab on Existing Drain beside from Lalus Shop to Dhaka- Mymensingh Highway Road (Comissioner Road) Ch: 0.00-600 m with Drain (Nupur Chinema Hall Road) Ch : 0.00-112.00 m Under Trishal Pourashava, Mymensingh. (Total length of cover slab = 1048 m and drain = 112 m)
|
MGSP
|
trishal
|
|
1.05
|
|
|
6392603.00
|
Md. Jahangir Alam
|
5265043.25
|
|
15/09/2016
|
11/06/2017
|
93
|
|
|
|
|
253
|
MRRIDP/18/MYM/BHAL/UZR-UNR/58
|
(a) Improvement of Dhaka-Mymensingh H/W road-Bhoradoba Natun bazar-Dholia GC road (Ch.2006-3450m) (b) Improvement of Angargara bazar(Dakatia UP)-Katlamari Chamiadi bazar road (Ch.00-5980m) with 1no 2x3.0x2.5m. box culvert ch.1395m. (c) Improvement of Daka
|
MRRIDP
|
bhaluka
|
|
10.11
|
0.00
|
0
|
673.16
|
Dolly Const. Ltd. Motijhil, Dhaka.
|
693.20
|
01/01/1900
|
08/11/2018
|
16/03/2020
|
25
|
0.00
|
0
|
16/08/2020
|
|
254
|
MRRIDP/18/MYM/BHAL/VR/59
|
(a) Improvement of Gotiar bazar-Gonoker bazar road (Ch.00-2000m)(b) Improvement of Bonkua bazar-Rampur Madrasa via Mora Nodir Par road (Ch.1500-2600m) (c) Improvement of Batazore-Shoylat road(Start of Modhu Market) (Ch.3150-4200m & 5605-5900m.)(d) Improve
|
MRRIDP
|
bhaluka
|
|
7.00
|
0.00
|
0
|
435.77
|
SRS & SE(JV) Sadar, Jamalpur.
|
470.12
|
01/01/1900
|
30/10/2018
|
30/09/2019
|
22
|
300.00
|
0
|
16/08/2020
|
|
255
|
MRRIDP/18/MYM/BHAL/VR/78
|
Improvement of Goari-Jhunakirteck road (Ch.00-1000m.)
|
MRRIDP
|
bhaluka
|
361134006
|
1.00
|
0.00
|
0
|
64.06
|
M/S. Tripti Steel Bitan, Bhaluka, Mymensingh
|
67.26
|
01/01/1900
|
22/10/2018
|
28/04/2019
|
100
|
66.93
|
0
|
16/08/2020
|
|
256
|
MRRIDP/18/MYM/BHAL/VR/65
|
Improvement of Angargara bazar(Angargara bazar Start of Tamat road) Shaerbari-Dowalpara road (Ch.00-1405m.)
|
MRRIDP
|
bhaluka
|
361135131
|
1.41
|
0.00
|
0
|
94.98
|
M/S. Rizvi Enterprise Bhaluka, Mymensingh
|
90.23
|
01/01/1900
|
10/10/2018
|
14/07/2019
|
0
|
0.00
|
0
|
16/08/2020
|
|
257
|
MRRIDP/18/MYM/ BHAL/SCR/107
|
(a) Improvement of Vandabo Govt. Primary School connecting road at ch.500-1200m. (b) Improvement of Borta Govt. Primary School connecting road at ch.00-900m. (c) Improvement of South Bhandabo Govt. Primary School connecting road at ch.30-680m. (d) Improve
|
MRRIDP
|
bhaluka
|
|
3.20
|
0.00
|
0
|
150.09
|
M/S. Nishat Enterprise Bhaluka, Mymensingh
|
142.59
|
01/01/1900
|
19/03/2019
|
25/03/2020
|
85
|
53.00
|
0
|
16/08/2020
|
|
258
|
MRRIDP/18/MYM/ BHAL/SCR/108
|
(a) Improvement of Hatiber Duliavita Govt. Primary School connecting road at ch.00-300m. (b) Improvement of Kholabari Dishari Govt. Primary School connecting road at ch.00-210m. (c) Improvement of Bhoradoba Govt. Primary School connecting road at ch.00-60
|
MRRIDP
|
bhaluka
|
|
1.81
|
0.00
|
0
|
72.11
|
M/S. Sarker Enterprise Shilashi,Gaffargaon Mymensingh
|
71.32
|
01/01/1900
|
16/05/2019
|
22/11/2019
|
7
|
0.00
|
0
|
16/08/2020
|
|
259
|
MRRIDP/18/MYM/ BHAL/SCR/110
|
(a) Improvement of Dakatia Govt. Primary School connecting road at ch.00-400m. (b) Improvement of West Kachina Govt. Primary School connecting road at ch.00-500m. (c) Improvement of Talab Govt. Primary School connecting road at ch.00-500m. (d) Improvement
|
MRRIDP
|
bhaluka
|
|
1.75
|
0.00
|
0
|
73.82
|
M/S. Abul Bashar Bhaluka, Mymensingh
|
70.13
|
01/01/1900
|
19/03/2019
|
21/08/2019
|
30
|
0.00
|
0
|
16/08/2020
|
|
260
|
MRRIDP/19/MYM/BRDG/UZR/142
|
Const.of 81m. PC Girder Bridge at Mollikbari GC to Bhoradoba-Ghatail RHD(Uthura bazar) road at ch.527m.
|
MRRIDP
|
bhaluka
|
361132009
|
|
81.00
|
0
|
628.15
|
M/S. Chowdhury Enterprise Sharishabari, Jamalpur.
|
604.25
|
01/01/1900
|
01/12/2019
|
29/06/2021
|
40
|
184.92
|
0
|
16/08/2020
|
|
261
|
MRRIDP/18/MYM/ BHAL/VR/148
|
Improvement of Jahlupaza bazar-Mora road (Pailabo Poshcim para at Khurddu Fakir bari-Shuktajuri Slowich gate & Khiru river Jhalupaza Ghat) road at ch.00-1000m.
|
MRRIDP
|
bhaluka
|
361134022
|
1.00
|
0.00
|
0
|
72.70
|
Md. Asraf Khan Bhaluka, Mymensingh
|
69.07
|
01/01/1900
|
19/02/2020
|
16/08/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
262
|
MRRIDP/18/MYM/ BHAL/UNR/152
|
Improvement of Angargara bazar(Dakatia UP)-Batajore bazar road at ch.800-2800m.
|
MRRIDP
|
bhaluka
|
361133009
|
1.00
|
0.00
|
0
|
147.68
|
M/S. Asfaq Enterprise, Sadar, Mymensingh
|
140.30
|
01/01/1900
|
07/04/2020
|
06/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
263
|
MRRIDP/19/MYM/BHAL/ BRDG/VR/174
|
Const.of 60.00m. Long RCC Girder Bridge on Moddharajoi-Sojongaon road at ch.150m. over Kanhori Khal
|
MRRIDP
|
bhaluka
|
361135116
|
|
60.00
|
0
|
396.93
|
M/S. Shohel Enterprise, Gaffargaon, Mymensingh
|
395.88
|
01/01/1900
|
20/07/2020
|
26/12/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
264
|
(MRRIDP/18/MYM/ BHAL/VR/65)
|
Improvement of Angargara bazar(Angargara bazar Start of Tamat road) Shaerbari-Dowalpara road (Ch.00-1405m.)
|
MRRIDP
|
bhaluka
|
|
1.41
|
0.00
|
0
|
94.98
|
M/S. Rizvi Enterprise Bhaluka, Mymensingh
|
90.23
|
01/01/1900
|
10/10/2018
|
14/07/2019
|
0
|
0.00
|
0
|
01/01/1900
|
|
265
|
MRRIDP/18/ MYM/DHUB/UNR/79
|
(a) Improvement of Bagber UP(Munsirhat GC)-Chariakanda via Bagber(R&H) road at ch.00-2740m. ID-308758(b) Improvement of Ghoshgaon UP(Goashgaon GC)-Baligaon bazar via Shaluatola GC road at ch.00-3870m.
|
MRRIDP
|
dhobaura
|
|
6.61
|
0.00
|
0
|
254.45
|
SE & SB (JV), Sadar, Mymensingh
|
605.20
|
01/01/1900
|
19/09/2019
|
13/08/2020
|
35
|
0.00
|
0
|
16/08/2020
|
|
266
|
MRRIDP/18/MYM/DHOB/ MAINT/UZR/98
|
Maintenance of Dhobaura Upazila H/Q-Goatola GC road at ch.440-9385m.
|
MRRIDP
|
dhobaura
|
361162002
|
8.95
|
0.00
|
0
|
561.83
|
IA-SE(JV), Sadar, Mymensingh
|
589.29
|
01/01/1900
|
04/08/2019
|
02/06/2020
|
35
|
0.00
|
0
|
16/08/2020
|
|
267
|
MRRIDP/18/MYM/DHOB/SCR/111
|
(a) Improvement of Chandrokona Reg. Non Govt. Primary School connecting road at ch.00-368m. (b) Improvement of Ganoi Reg. Non Govt. Primary School connecting road at ch.00-1200m.(c) Improvement of Gamariatola Govt. Primary School connecting road at ch.00-
|
MRRIDP
|
dhobaura
|
|
2.86
|
0.00
|
0
|
125.13
|
M/S. Onik Enterprise Melandah, Jamlpur
|
130.76
|
01/01/1900
|
18/06/2019
|
23/06/2020
|
15
|
0.00
|
0
|
16/08/2020
|
|
268
|
MRRIDP/18/ MYM/DHOB/SCR/112
|
(a) Improvement of Ranigaon Govt. Primary School connecting road at ch.00-75m. ID-(b) Improvement of Sohagipara Govt. Primary School connecting road at ch.00-872m. (c) Improvement of Dighir Par Govt. Primary School connecting road at ch.00-55m.(d) Improve
|
MRRIDP
|
dhobaura
|
|
2.35
|
0.00
|
0
|
117.30
|
M/S. Onik Enterprise Melandah, Jamlpur
|
122.58
|
01/01/1900
|
18/06/2019
|
23/06/2020
|
14
|
0.00
|
0
|
16/08/2020
|
|
269
|
MRRIDP/19/MYM/DHUB/MAINT/UZR/159
|
Maintenance of Dhobaura Upazila H/Q-Shibgonj GC road via Kolshindur GC & Charuapara bazar road at ch.3000-5855m.
|
MRRIDP
|
dhobaura
|
361162003
|
2.86
|
0.00
|
0
|
134.78
|
M/S. Apon Enterprise Haluaghat, Mymensingh
|
128.04
|
01/01/1900
|
15/04/2020
|
24/02/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
270
|
MRRIDP/19/MYM/DHUB/MAINT/UZR/160
|
Maintenance of Munshirhat GC-Mymensingh-Haluaghat RHD(Taldighi) Dhobaura Part road at ch.00-4000m.
|
MRRIDP
|
dhobaura
|
361162005
|
4.00
|
0.00
|
0
|
158.06
|
M/S Phulpur Enterprise Phulpur, Mymensingh
|
150.16
|
01/01/1900
|
20/04/2020
|
07/09/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
271
|
MRRIDP/18/MYM/DHOB/UZR/204
|
Improvement of Dhobaura-Haluaghat RHD-Ghoshgaon GC road at ch.984-6820m. & 1no 2.0X2.0m size. box culver ch. 2864m. Tender ID-416293
|
MRRIDP
|
dhobaura
|
361162001
|
5.84
|
4.00
|
0
|
625.74
|
SRS. Construction Jamalpur
|
624.63
|
01/01/1900
|
13/07/2020
|
06/06/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
272
|
MRRIDP/18/MYM/ FULBARIA/UZR/16
|
Improvement of Dewkhola-Muktagacha RHD(Fulbaria Part) road (Ch. 2430-4550m)
|
MRRIDP
|
fulbaria
|
361202009
|
2.12
|
0.00
|
0
|
172.23
|
M/S. Himi Enterprise, Fulbaria, Mymensingh
|
163.34
|
01/01/1900
|
10/06/2018
|
16/06/2019
|
100
|
146.00
|
0
|
16/08/2020
|
|
273
|
MRRIDP/18/MYM/ FULBARIA/VR/18
|
Improvement of Dulma-Mission road (Ch.1500-3200m)
|
MRRIDP
|
fulbaria
|
361205011
|
1.70
|
0.00
|
0
|
108.07
|
M.S. Mohosina Enterprise
|
102.49
|
01/01/1900
|
02/07/2018
|
17/05/2019
|
60
|
68.00
|
0
|
16/08/2020
|
|
274
|
MRRIDP/18/MYM/ FULBARIA/VR/19
|
Improvement of Kaladah Janata Collage-Kosim Uddin's house road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361205112
|
1.00
|
0.00
|
0
|
69.05
|
Jerin Enterprise, Fulbaria, Mymensingh.
|
65.49
|
01/01/1900
|
10/06/2018
|
16/12/2018
|
100
|
65.46
|
0
|
16/08/2020
|
|
275
|
MRRIDP/18/MYM/ FULBARIA/VR/20
|
Improvement of Kalaypar R&H-PDB bazar via Patuli Senior Madrasa road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361205070
|
1.00
|
0.00
|
0
|
66.58
|
M/S. Arnob Enterprise Fulbaria, Mymensingh.
|
63.15
|
01/01/1900
|
31/05/2018
|
05/12/2018
|
100
|
63.14
|
0
|
16/08/2020
|
|
276
|
MRRIDP/18/MYM/ F.BARIA/VR/57
|
(a) Improvement of Fulbaria Mymensingh RHD-Pondithbari road (Ch.00-370m)(b) Improvement of Fulbaria Mymensingh RHD-Islami Academy & Atimkhana road (Ch.00-140m)
|
MRRIDP
|
fulbaria
|
|
0.51
|
0.00
|
0
|
36.50
|
Jerin Enterprise Fulbaria, Mymensingh.
|
34.68
|
01/01/1900
|
23/10/2018
|
29/03/2019
|
100
|
34.12
|
0
|
16/08/2020
|
|
277
|
MRRIDP/18/MYM/F.BARIA/UNR/64
|
Improvement of Radhakanai UP-Chonkanda bazar road (Ch.2000-3900m)
|
MRRIDP
|
fulbaria
|
361203020
|
1.90
|
0.00
|
0
|
148.60
|
M/S. Arnob Enterprise, Fulbaria, Mymensingh.
|
141.17
|
01/01/1900
|
23/09/2018
|
11/08/2019
|
100
|
141.06
|
0
|
16/08/2020
|
|
278
|
MRRIDP/18/MYM/F.BARIA/UZR/68
|
(a) Improvement of Hatkalir bazar GC-Rasulpur RHD via Chandaniata(Fulbaria Part) road with Protection work (Ch.00-1350m) (b) Improvement of Fulbaria GC-Trishal GC road via Dhurduria (Fulbaria Part) road with Protection work (Ch. 4320-7320m)
|
MRRIDP
|
fulbaria
|
|
4.35
|
0.00
|
0
|
346.72
|
Md. Chan Mahmud Fulbaria, Mymensingh
|
326.02
|
01/01/1900
|
26/11/2018
|
02/05/2020
|
70
|
224.00
|
0
|
16/08/2020
|
|
279
|
MRRIDP/18/MYM/ F.BARIA/UNR-VR/69
|
(a) Improvement of Durarkhal-Kodomtoli road with Protection work (Ch.3000-4850m) (b) Improvement of Radhakanai UP-Trishal GC road with Protection work (Ch.1000-2200m)(Fulbaria Part) (c) Improvement of Keshoregonj-Baighat via Shibpur road (Ch.00-1000m) (d)
|
MRRIDP
|
fulbaria
|
|
10.30
|
0.00
|
0
|
547.75
|
Md.Lal Mahmud Fulbaria, Mymensingh
|
545.82
|
01/01/1900
|
26/11/2018
|
23/04/2020
|
69
|
422.00
|
0
|
16/08/2020
|
|
280
|
MRRIDP/18/MYM/ F.BARIA/VR/77
|
Improvement of Fulbaria Boilor road-Jorebaria Akter Ali's house road (Ch.00-700m)
|
MRRIDP
|
fulbaria
|
361205120
|
0.70
|
0.00
|
0
|
55.36
|
M/S. Pavel Enterprise, Sarishabari, Jamalpur.
|
52.59
|
01/01/1900
|
24/10/2018
|
30/04/2019
|
100
|
52.57
|
0
|
16/08/2020
|
|
281
|
MRRIDP/18/ MYM/ FULBARIA/UNR/17
|
Improvement of Dewkhola GC-Andhariapara via Boyragir bazar road (Ch. 3950-5950m)
|
MRRIDP
|
fulbaria
|
361203003
|
1.00
|
0.00
|
0
|
133.69
|
Md. Chan Mahmud
|
126.24
|
01/01/1900
|
05/06/2018
|
04/06/2019
|
100
|
126.16
|
0
|
16/08/2020
|
|
282
|
MRRIDP/18/MYM/F.BARIA/SCR/113
|
(a) Improvement of Anantapur Govt. Primary School connecting road at ch.00-350m. (b) Improvement of Chakradhakanai Govt. Primary School connecting road at ch.00-240m. (c) Improvement of Chankanda Govt. Primary School connecting road at ch.00-150m. (d) Imp
|
MRRIDP
|
fulbaria
|
|
1.21
|
0.00
|
0
|
92.17
|
M/S. Ornab Enterprise Phulbaria, Myemensing
|
87.56
|
01/01/1900
|
19/03/2019
|
25/09/2019
|
67
|
43.00
|
0
|
16/08/2020
|
|
283
|
MRRIDP/18/MYM/ F.BARIA/VR/149
|
Improvement of Kukrail-Noyabill road (Ch.00-1050m)
|
MRRIDP
|
fulbaria
|
361204024
|
1.05
|
0.00
|
0
|
114.00
|
M/S. L.R Construction, Madargonj, Jamalpur
|
108.30
|
01/01/1900
|
20/02/2020
|
16/07/2020
|
25
|
0.00
|
0
|
16/08/2020
|
|
284
|
MRRIDP/19/MYM/ F.BARIA/UZR/183
|
Improvement of Fulbaria GC-Kandania RHD via Ragunathpur road (Ch.8700-9100m) & (Ch. 12850-15650m.
|
MRRIDP
|
fulbaria
|
361202015
|
3.20
|
0.00
|
0
|
390.76
|
MSE-MPE(JV) Fulbaria, Mymensingh
|
390.55
|
01/01/1900
|
16/07/2020
|
22/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
285
|
MRRIDP/19/MYM/ F.BARIA/UZR/184
|
Improvement of Asim GC-Bhoradoba Ghatail RHD(Uthura UP) road (Ch.6000-7000m)
|
MRRIDP
|
fulbaria
|
361202016
|
1.00
|
0.00
|
0
|
92.20
|
M/S. Arnob Enterprise, Fulbaria, Mymensingh
|
91.28
|
01/01/1900
|
24/06/2020
|
23/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
286
|
MRRIDP/19/MYM/F.BARIA/UNR/185
|
Improvement of Anaetpur UP-Lohashar bazar road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361203016
|
1.00
|
0.00
|
0
|
79.43
|
M/S. Arnob Enterprise, Fulbaria, Mymensingh
|
78.63
|
01/01/1900
|
24/06/2020
|
23/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
287
|
MRRIDP/19/MYM/F.BARIA/UNR/186
|
Improvement of Pirgonj bazar-Bakta Kalirghar road (Ch.00-1500m)
|
MRRIDP
|
fulbaria
|
361203011
|
1.50
|
0.00
|
0
|
135.91
|
M/S.Proshad Enterprise Fulbaria, Mymensingh
|
129.11
|
01/01/1900
|
24/06/2020
|
23/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
288
|
MRRIIDP/19/MYM/F.BARIA/UNR/187
|
Improvement of Kandania-Jabed Mondal Ghat road (Ch.5900-7400m)
|
MRRIDP
|
fulbaria
|
361203010
|
1.50
|
0.00
|
0
|
125.41
|
M/S.Proshad Enterprise Fulbaria, Mymensingh
|
119.14
|
01/01/1900
|
24/06/2020
|
23/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
289
|
MRRIDP/19/MYM/F.BARIA/VR/188
|
Improvement of Mohiarteky-Sagordighi via Fultola Dakhil Madrasa (Anayetpur bazar-Phultola Dakhil Madrasa) road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361205074
|
1.00
|
0.00
|
0
|
78.44
|
M/S. Bristi Enterprise Fulbaria, Mymensingh
|
77.65
|
01/01/1900
|
24/06/2020
|
23/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
290
|
MRRIDP/19/MYM/F.BARIA/VR/189
|
Improvement of Suaithpur-Kahalgaon road (Ch.5450-5950m)
|
MRRIDP
|
fulbaria
|
361204017
|
0.50
|
0.00
|
0
|
41.20
|
M/S. Bristi Enterprise, Fulbaria, Mymensingh
|
40.79
|
01/01/1900
|
24/06/2020
|
23/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
291
|
MRRIDP/19/MYM/F.BARIA/VR/190
|
Improvement of Shusuti-Gopinathpur road (Ch.00-500m)
|
MRRIDP
|
fulbaria
|
361205022
|
0.50
|
0.00
|
0
|
46.61
|
M/S. Arnob Enterprise Fulbaria, Mymensingh
|
44.28
|
01/01/1900
|
24/06/2020
|
23/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
292
|
(MRRIDP/19/MYM/F.BARIA/VR/191
|
Improvement of Lokkhipur-Noinbari road (Ch.1980-2480m)
|
MRRIDP
|
fulbaria
|
361204031
|
0.50
|
0.00
|
0
|
48.05
|
M/S. Bristi Enterprise Fulbaria, Mymensingh
|
47.57
|
01/01/1900
|
24/06/2020
|
23/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
293
|
MRRIDP/19/MYM/F.BARIA/VR/192
|
Improvement of Rangamatia UP(Babugonj bazar) Anayetpur UP (Anantapur-Anayetpur bazar) road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361204053
|
1.00
|
0.00
|
0
|
79.53
|
M/S. Arnob Enterprise Fulbaria, Mymensingh
|
78.74
|
01/01/1900
|
24/06/2020
|
23/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
294
|
MRRIDP/19/MYM/F.BARIA/VR/193
|
Improvement of Patira-Ramnagar via Kotira road (Ch.00-1000m)
|
MRRIDP
|
fulbaria
|
361205020
|
1.00
|
0.00
|
0
|
84.06
|
M/S. Arnob Enterprise Fulbaria, Mymensingh
|
79.85
|
01/01/1900
|
24/06/2020
|
23/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
295
|
MRRIDP/19/MYM/F.BARIA/VR/194
|
Improvement of Kotira-Ramnagar road (Ch.00-500m)
|
MRRIDP
|
fulbaria
|
361205021
|
0.50
|
0.00
|
0
|
47.52
|
M/S. Arnob Enterprise Fulbaria, Mymensingh
|
45.15
|
01/01/1900
|
24/06/2020
|
23/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
296
|
(MRRIDP/18/ MYM/ FULBARIA/ UNR/17)
|
Improvement of Dewkhola GC-Andhariapara via Boyragir bazar road (Ch. 3950-5950m)
|
MRRIDP
|
fulbaria
|
|
1.00
|
0.00
|
0
|
133.69
|
Md. Chan Mahmud
|
126.24
|
01/01/1900
|
06/05/2018
|
|
35
|
0.00
|
0
|
01/01/1900
|
|
297
|
|
(b) Improvement of Fulbaria Mymensingh RHD-Islami Academy & Atimkhana road (Ch.00-140m)
|
MRRIDP
|
fulbaria
|
|
0.14
|
0.00
|
0
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
298
|
MRRIDP/18/MYM/GAFF/UZR/54
|
Improvement of Goeshpur-Baroyhati road (Ch.3000-8550m)
|
MRRIDP
|
gaffargaon
|
361222009
|
5.55
|
0.00
|
0
|
434.80
|
M/S. Shohel Enterprise Gaffargaon, Mymensingh
|
456.22
|
01/01/1900
|
06/11/2018
|
26/09/2019
|
100
|
0.00
|
0
|
16/08/2020
|
|
299
|
MRRIDP/18/MYM/GAFF/UNR-VR/55
|
(a) Improvement of Kandipara GC-Pagla road via Dotter bazar UP road (Ch.00-3360m) (b) Improvement of Charani bazar-Rasulpur Chakrampur road (Ch.00-2000m)
|
MRRIDP
|
gaffargaon
|
|
3.36
|
0.00
|
0
|
340.08
|
Md. Abdul Hamid Bachu, Gaffargaon, Mymensingh
|
357.01
|
01/01/1900
|
01/11/2018
|
01/10/2019
|
70
|
456.06
|
0
|
16/08/2020
|
|
300
|
MRRIDP/18/MYM/ GAFF/VR/76
|
Improvement of Mukhi bazar bridge-Rajghat (Rouna Border Moor) road (Ch.00-1000m)
|
MRRIDP
|
gaffargaon
|
361224120
|
1.00
|
0.00
|
0
|
63.71
|
M/S. Bappy Traders Gaffargaon, Mymensingh
|
66.87
|
01/01/1900
|
24/10/2018
|
11/03/2019
|
100
|
66.79
|
0
|
16/08/2020
|
|
301
|
MRRIDP/18/MYM/GAFF/VR/56
|
(a) Improvement of Uttar Lamkain to Degreebhumi to Kandapara road Shohid Mohiuddin road at ch.00-2000m. (b) Improvement of Amlitola Shibgonj GC Pacca road of Saibali's house Moor-Soani Rasulpur GPS Saidian road of Soani Rasulpur GPS road at ch.00-1000m.
|
MRRIDP
|
gaffargaon
|
|
3.00
|
0.00
|
0
|
227.02
|
MMH-MBT(JV) Gaffargaon, Mymensingh
|
227.00
|
01/01/1900
|
05/08/2019
|
30/06/2020
|
35
|
50.00
|
0
|
16/08/2020
|
|
302
|
MRRIDP/18/MYM/GAFF/VR/63
|
Improvement of Bokhura Rosulpur(Biharimur Pacca road -Rakain Hafijia Madrasa) road (Ch.00-1300m)
|
MRRIDP
|
gaffargaon
|
361224056
|
1.30
|
0.00
|
0
|
89.53
|
M/S. Bappy Traders Gaffargaon, Mymensingh
|
89.46
|
01/01/1900
|
09/07/2019
|
15/01/2020
|
100
|
86.50
|
0
|
16/08/2020
|
|
303
|
MRRIDP/18/MYM/ GAFF/MAINT/UNR/93
|
Maintenance of Niguari UP-Baroyhati GC road via Bakoltola bazar road (Ch.00-8670m)
|
MRRIDP
|
gaffargaon
|
361223019
|
8.67
|
0.00
|
0
|
115.38
|
Md. Arshad Hossain, Gaffargaon, Mymensingh
|
115.33
|
01/01/1900
|
13/01/2019
|
27/11/2019
|
100
|
115.26
|
0
|
16/08/2020
|
|
304
|
MRRIDP/18/MYM/ GAFF/VR/100
|
(a) Improvement of Panchbag Mr. Shahin's house-Kanda & Eidgah Math-Usthi UP road (Ch.00-2200m) (b) Improvement of Shila bazar-Birmuktijuddha-Selim Chairman's house-Vaturi Kheaghat road (Ch.00-1000m)
|
MRRIDP
|
gaffargaon
|
|
3.20
|
0.00
|
0
|
247.77
|
MMH-MBT(JV) Sadar, Mymensingh
|
248.91
|
01/01/1900
|
25/03/2019
|
16/02/2020
|
90
|
179.00
|
0
|
16/08/2020
|
|
305
|
MRRIDP/18/MYM/ GAFF/SCR/114
|
(a) Improvement of Bagbari Govt. Primary School connecting road at ch.00-67m. (b) Improvement of Barbhora Uttar Namapara Govt. Primary School connecting road at ch.00-1000m. (c) Improvement of Bagua Govt. Primary School connecting road at ch.00-328m. (d)
|
MRRIDP
|
gaffargaon
|
|
3.21
|
0.00
|
0
|
140.31
|
M/S. Bappy Traders Gaffargaon, Mymensingh
|
140.29
|
01/01/1900
|
10/03/2019
|
16/03/2020
|
100
|
70.30
|
0
|
16/08/2020
|
|
306
|
MRRIDP/18/MYM/ GAFF/SCR/115
|
(a) Improvement of Dugachia Govt. Primary School connecting road at ch.00-842m. (b) Improvement of Islampur Darpavita Govt. Primary School connecting road at ch.00-700m. (c) Improvement of Kandi Govt. Primary School connecting road at ch.00-313m.(d) Impro
|
MRRIDP
|
gaffargaon
|
|
3.54
|
0.00
|
0
|
141.64
|
M/S. Dewan Traders Gaffargaon, Mymensingh
|
141.56
|
01/01/1900
|
19/03/2019
|
18/02/2020
|
100
|
123.91
|
0
|
16/08/2020
|
|
307
|
MRRIDP/19/MYM/GAFF/MAINT/UZR/161
|
Maintenance of Amlitola GC-Shibgonj GC road (Ch.1779-4690m)
|
MRRIDP
|
gaffargaon
|
361222012
|
2.91
|
0.00
|
0
|
84.60
|
M/S. Bappy Traders Gaffargaon, Mymensingh
|
84.60
|
01/01/1900
|
19/07/2020
|
21/10/2020
|
100
|
0.00
|
0
|
16/08/2020
|
|
308
|
MRRIDP/19/MYM/GAFF/VR/198
|
Improvement of Dewlpara Moorer bazar-Shila Nodi road (Ch.00-1500m)
|
MRRIDP
|
gaffargaon
|
361225066
|
1.50
|
0.00
|
0
|
117.24
|
M/S. S.B Enterprise Gaffargaon, Mymensingh
|
117.23
|
01/01/1900
|
19/07/2020
|
21/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
309
|
MRRIDP/19/MYM/GAFF/VR/199
|
Improvement of Pithagoir Pool-Dwalpara Mridha Bari road (Ch.00-1500m)
|
MRRIDP
|
gaffargaon
|
361225220
|
1.50
|
0.00
|
0
|
122.87
|
M/S. S.B Enterprise Gaffargaon, Mymensingh
|
122.87
|
01/01/1900
|
19/07/2020
|
15/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
310
|
MRRIDP/19/MYM/GAFF/VR/200
|
Improvement of Porshipara Highway Moor-Sipan Siraz Master's house -Tetulia Maiz Bari road (Ch.00-1000m)
|
MRRIDP
|
gaffargaon
|
361225130
|
1.00
|
0.00
|
0
|
81.43
|
M/S. Shariful Enterprise Gaffargaon, Mymensingh
|
81.43
|
01/01/1900
|
19/07/2020
|
02/06/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
311
|
MRRIDP/19/MYM/GAFF/VR/201
|
Improvement of Shibgonj-Trishal Border road (Ch.3100-3800m)
|
MRRIDP
|
gaffargaon
|
361224028
|
0.70
|
0.00
|
0
|
53.31
|
M/S. Bappy Traders, Gaffargaon, Mymensingh
|
53.31
|
01/01/1900
|
19/07/2020
|
25/11/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
312
|
MRRIDP/18/MYM/GOUR /VR/87
|
Improvement of Dhopa Jangalia-Shaliapara road (Ch.00-1000m.)
|
MRRIDP
|
gouripur
|
361235099
|
1.00
|
0.00
|
0
|
96.87
|
Jarif Traders, Gouripur, Mymensingh
|
92.03
|
01/01/1900
|
12/12/2018
|
17/06/2019
|
100
|
90.43
|
0
|
16/08/2020
|
|
313
|
MRRIDP/18/ MYM/GOUR/VR/88
|
Improvement of Bir Ahammedpur-Rayshimul via Ghaterkona road (Ch.1500-2500m.)
|
MRRIDP
|
gouripur
|
361234051
|
1.00
|
0.00
|
0
|
82.67
|
M/S. Akanda Enterprise Gouripur, Mymensingh
|
78.53
|
01/01/1900
|
11/12/2018
|
17/06/2019
|
100
|
78.52
|
0
|
16/08/2020
|
|
314
|
MRRIDP/18/ MYM/GOUR /UZR/83
|
Improvement of Bekurhati GC-Shohagi GC(Gouripur Part) road with protection work (Ch.00-5594m.) with 1 no 3.0x2.0m. Box Culvert on same road at ch. 4245m.
|
MRRIDP
|
gouripur
|
361232009
|
5.59
|
0.00
|
0
|
575.02
|
M/A Wahid & Sarwar Jahan (JV)
|
574.48
|
01/01/1900
|
03/05/2019
|
28/10/2020
|
30
|
45.00
|
0
|
16/08/2020
|
|
315
|
MRRIDP/18/MYM/GOUR /UZR/84
|
Improvement of Bekurhati GC-Shohagi GC(Gouripur Part) road with protection work (Ch.6600-9500m.)
|
MRRIDP
|
gouripur
|
361232009
|
2.90
|
0.00
|
0
|
303.80
|
M/A Wahid & Sarwar Jahan (JV)
|
314.44
|
01/01/1900
|
30/05/2019
|
05/05/2020
|
50
|
40.85
|
0
|
16/08/2020
|
|
316
|
MRRIDP/18/MYM/GOUR /UZR/85
|
Improvement of Mymensingh Kishoregonj RHD(Ramgupalpur-Ishwargonj Upazila road via Dhorua bazar Teroshira bazar & Jamtoil Moor & Pumbail road(Ch.2750-6941m.) with 3 nos 3.0x2.0m. Box Culvert on same road at ch. 3250m, 5340m & 5936m. (ID-311185) ID-31118
|
MRRIDP
|
gouripur
|
361232011
|
4.19
|
0.00
|
0
|
484.74
|
M/S. Saiful Bricks Sadar, Mymensingh
|
508.01
|
01/01/1900
|
22/03/2020
|
14/02/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
317
|
MRRIDP/18/ MYM/GOUR /UNR/86
|
(a) Improvement of Shidla UP-Hasanpur bazar road(Ch.6400-8600m.b) Improvement of Gouripur Upazila H/Q-Dowhakhola UP road via Ramgupalpur road (Ch.550-2550m.)
|
MRRIDP
|
gouripur
|
|
4.20
|
0.00
|
0
|
368.23
|
M/S. Saiful Bricks Sadar, Mymensingh
|
380.69
|
01/01/1900
|
07/03/2019
|
16/01/2020
|
65
|
225.00
|
0
|
16/08/2020
|
|
318
|
MRRIDP/18/MYM/GOUR/MAINT/UZR/94
|
Maintenance of Mymensingh-Kishoregonj RHD (Kaltapara)-Gouripur Upazila H/Q road at ch.00-3830m
|
MRRIDP
|
gouripur
|
361232006
|
3.83
|
0.00
|
0
|
321.99
|
M/S. Istiaque Ahammed, Sadar, Mymensingh
|
320.15
|
01/01/1900
|
03/03/2019
|
08/10/2020
|
100
|
320.15
|
0
|
16/08/2020
|
|
319
|
MRRIDP/18/MYM/ GOUR/MAINT/UZR/95
|
Maintenance of Mymensingh-Kishoregonj RHD (Ramgupalpur Basstand bazar)-Shamgonj GC road via Gouripur GC road.00-3830m
|
MRRIDP
|
gouripur
|
361232001
|
3.83
|
0.00
|
0
|
374.23
|
M/S. Bhati Bangla Enterprise Ukilpara, Kishoregonj
|
345.93
|
01/01/1900
|
25/02/2019
|
03/09/2020
|
100
|
345.78
|
0
|
16/08/2020
|
|
320
|
MRRIDP/18/ MYM/GOUR /VR/104
|
Improvement of Maizhati bazar-Ishwargonj UP road at ch. 00-1000m
|
MRRIDP
|
gouripur
|
361234029
|
1.00
|
0.00
|
0
|
105.90
|
M/S. Lovely Enterprise Kendua, Mymensingh
|
105.67
|
01/01/1900
|
22/01/2019
|
31/10/2019
|
100
|
105.41
|
0
|
16/08/2020
|
|
321
|
MRRIDP/18/MYM/ GOUR/SCR/116
|
(a) Improvement of Teroshira Govt. Primary School connecting road at ch.00-200m. (b) Improvement of Bordonpara Govt. Primary School connecting road at ch.00-90m. (c) Improvement of Panati Govt. Primary School connecting road at ch.00-470m. (d) Improvement
|
MRRIDP
|
gouripur
|
|
4.35
|
0.00
|
0
|
146.34
|
Jarif Traders Gouripur, Mymensingh
|
139.02
|
01/01/1900
|
19/03/2019
|
04/02/2020
|
100
|
128.52
|
0
|
16/08/2020
|
|
322
|
MRRIDP/18/MYM/GOUR/VR/140
|
Improvement of Latur Payar UZR Sorishati(Tatir Paya Moor-Sonampur Moor via Latur Payar)road at ch.00-1500m. ID-335087
|
MRRIDP
|
gouripur
|
361814166
|
1.50
|
0.00
|
0
|
111.52
|
M/S. Siful Bricks & Akanda Enterprise(JV)
|
108.18
|
01/01/1900
|
11/02/2020
|
16/11/2020
|
70
|
48.00
|
0
|
16/08/2020
|
|
323
|
MRRIDP/18/MYM/GOUR/VR/177
|
Improvement of Ramgupalpur-Shamgonj(Boleshar)-Ramgopalpur Pacha Pukurpar RHD via Shredharpur road at ch.00-1000m.
|
MRRIDP
|
gouripur
|
361235154
|
1.00
|
0.00
|
0
|
127.87
|
Pronoy Kanti Bhowmik Boro bazar, Netrokona
|
121.48
|
01/01/1900
|
19/04/2020
|
17/11/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
324
|
MRRIDP/18/MYM/HALU/VR/36
|
Improvement of Dhorail bazar-Dobarpar bazar road (Ch.00-2700m) with 3.0x3.0m. RCC Box Culvert on same road at ch.1307m.
|
MRRIDP
|
haluaghat
|
361244061
|
2.70
|
0.00
|
0
|
212.00
|
Fariha Enterprise 514/1,B Ibrahimpur Dhaka-1206
|
209.21
|
01/01/1900
|
15/08/2018
|
14/08/2019
|
90
|
160.60
|
0
|
16/08/2020
|
|
325
|
MRRIDP/18/MYM/HALU/UNR/45
|
Improvement of Pagolpara bazar-Koychapur UP Office road (Ch.00-575m)
|
MRRIDP
|
haluaghat
|
361243005
|
0.58
|
0.00
|
0
|
34.85
|
M/S. Sharia Enterprise, Sadar, Mymensingh
|
36.24
|
01/01/1900
|
03/09/2019
|
04/03/2019
|
100
|
36.24
|
0
|
16/08/2020
|
|
326
|
MRRIDP/18/MYM/HALU/UNR-VR/67
|
(a) Improvement of Defulia bazar-Bildura UP Office via Krisnonogar Chowrasta road (Ch.400-2330m) (b) Improvement of Dhorabni Madrasa-Dhorail Up Office road (Ch.00-2000m) (c) Improvement of Joynati Mohila bazar-Fonia Feru Ghat road (Ch.1118-2600m)(d) Impro
|
MRRIDP
|
haluaghat
|
|
6.58
|
0.00
|
0
|
451.25
|
M/S. S.R.S Construction Sadar, Jamalpur.
|
465.34
|
01/01/1900
|
30/10/2018
|
05/05/2020
|
100
|
465.26
|
0
|
16/08/2020
|
|
327
|
MRRIDP/18/MYM/ HALU/VR/82
|
Improvement of Koruapara Chowrasta-Kodalia Nodi via Rustompur road (Ch.00-1000m)
|
MRRIDP
|
haluaghat
|
361244012
|
1.00
|
0.00
|
0
|
86.98
|
Mirza Unser Uddin Beg
|
82.63
|
01/01/1900
|
13/12/2018
|
19/06/2019
|
100
|
55.00
|
0
|
16/08/2020
|
|
328
|
MRRIDP/18/ MYM/HALU/MAINT/UNR/12
|
Maintenance of Haluaghat UP Joyramkura bazar via Korytoly BGB Camp road at ch.00-3950m.
|
MRRIDP
|
haluaghat
|
361243001
|
3.95
|
0.00
|
0
|
54.56
|
Salman Enterprise Sarishabari, Jamalpur
|
54.56
|
01/01/1900
|
07/05/2018
|
28/07/2018
|
100
|
52.47
|
0
|
16/08/2020
|
|
329
|
MRRIDP/18/ MYM/HALU/MAINT/UNR/13
|
Maintenance of Gajirvita UP-Badsha bazar via Char Bangalia bazar road at ch.1400-3050m.
|
MRRIDP
|
haluaghat
|
361243017
|
1.65
|
0.00
|
0
|
40.88
|
M/S. R.H. Construction Sadar, Mymensingh
|
38.84
|
01/01/1900
|
08/05/2018
|
29/07/2018
|
100
|
35.88
|
0
|
16/08/2020
|
|
330
|
MRRIDP/18/ MYM/HALU/UNR/37
|
Improvement of R&H(Gangina bazar)-Lorki Nodi via Koychapur UP Office road (Ch.1020-2865m)
|
MRRIDP
|
haluaghat
|
361243014
|
1.85
|
0.00
|
0
|
128.45
|
Md. Hossain Ali, Nokla, Sherpur
|
152.57
|
01/01/1900
|
01/03/2020
|
29/01/2021
|
5
|
0.00
|
0
|
16/08/2020
|
|
331
|
MRRIDP/18/MYM/HALU/UZR/80
|
Improvement of Pabiajuri GC-Tarakanda GC road via Gorokpur bazar road (Ch.2100-5425m) with Protection wall & with 1 no 3.5x3.5m. Box Culvert on same road at ch. 2550m. & 1 no 2.0x2.0m. Box Culvert on same road at ch. 4625m. ID-328878
|
MRRIDP
|
haluaghat
|
361242006
|
3.33
|
0.00
|
0
|
369.20
|
M/S. Shapla Enterprise & Md. Hossain Ali (JV) Nakla, Sherpur
|
387.40
|
01/01/1900
|
23/02/2020
|
04/04/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
332
|
MRRIDP/18/MYM/HALU/UNR/81
|
Improvement of West Pabiajuri GC-East Pabiajuri via Dhurail UP Office via Mominpur & Shimultoli bazar road (Ch.780-1150m & 3347-3477m.)
|
MRRIDP
|
haluaghat
|
361243008
|
0.50
|
0.00
|
0
|
45.19
|
M/S. Azad Enterprise Gaffargaon, Mymensingh
|
42.93
|
01/01/1900
|
21/04/2019
|
27/10/2019
|
50
|
0.00
|
0
|
16/08/2020
|
|
333
|
MRRIDP/18/MYM/HALU/Maint/UNR/103
|
Improvement of Amtoil UP Office-Chandsree bazar via Bahirshimul bazar road (Ch.00-4025m)
|
MRRIDP
|
haluaghat
|
361243015
|
4.03
|
0.00
|
0
|
237.44
|
S.R.S Construction Tomaltola, Jamalpur
|
232.28
|
01/01/1900
|
27/02/2019
|
22/01/2020
|
100
|
232.26
|
0
|
16/08/2020
|
|
334
|
MRRIDP/18/MYM/HALU/VR/VR/154
|
Improvement of Dhara Nalitabari(Antaj Alir Bari)-Poshchim Kitikura GPS road (Ch.00-1000m)
|
MRRIDP
|
haluaghat
|
361245127
|
1.00
|
0.00
|
0
|
75.46
|
M/S. Islam Traders Sadar, Mymensingh.
|
71.68
|
01/01/1900
|
19/03/2020
|
30/09/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
335
|
MRRIDP/19/MYM/HALU/VR/207
|
Improvement of Kutikura Upazila road-Kutikura Panchamoor road via Selim Akoner Bari road (Ch.00-850m)
|
MRRIDP
|
haluaghat
|
361245125
|
0.85
|
0.00
|
0
|
76.51
|
Al-Zami Trade Line Haluaghat, Mymensingh
|
72.69
|
01/01/1900
|
30/04/2020
|
29/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
336
|
MRRIDP/19/MYM/ HALU/VR/208
|
Improvement of Kutikura Utthar Jame Mosque-Late Abdul Khalek's Fisheries road (Ch.00-900m)
|
MRRIDP
|
haluaghat
|
361245126
|
0.90
|
0.00
|
0
|
86.35
|
M/S. Rose Enterprise Haluaghat, Mymensingh
|
82.04
|
01/01/1900
|
30/04/2020
|
29/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
337
|
MRRIDP/19/MYM/ HALU/UNR/209
|
Improvement of Shakuai UP Office-Kanakurikanda via Joinati road (Ch.00-2100m)
|
MRRIDP
|
haluaghat
|
361243020
|
2.10
|
0.00
|
0
|
175.69
|
MNT-MPE(JV), Fulbaria, Mymensigh
|
175.46
|
01/01/1900
|
06/07/2020
|
12/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
338
|
MRRIDP/19/MYM/HALU/VR/210
|
Improvement of Shakuai GC bazar-Nagla Goatola UZR road (Ch.00-916m)
|
MRRIDP
|
haluaghat
|
361244134
|
0.92
|
0.00
|
0
|
77.94
|
M/S. Shuvo Enterprise, Sribordi, Sherpur.
|
74.04
|
01/01/1900
|
08/04/2020
|
07/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
339
|
(MRRIDP/18/ MYM/HALU/MAINT/ UNR/12)
|
Maintenance of Haluaghat UP Joyramkura bazar via Korytoly BGB Camp road at ch.00-3950m.
|
MRRIDP
|
haluaghat
|
|
3.95
|
0.00
|
0
|
54.56
|
Salman Enterprise Sarishabari, Jamalpur
|
54.56
|
01/01/1900
|
05/07/2018
|
28/07/2018
|
100
|
0.00
|
0
|
01/01/1900
|
|
340
|
.(MRRIDP/18/ MYM/HALU/MAINT/ UNR/13)
|
Maintenance of Gajirvita UP-Badsha bazar via Char Bangalia bazar road at ch.1400-3050m
|
MRRIDP
|
haluaghat
|
|
1.65
|
0.00
|
0
|
40.88
|
M/S. R.H. Construction Sadar, Mymensingh
|
38.84
|
01/01/1900
|
05/08/2018
|
29/07/2018
|
80
|
0.00
|
0
|
01/01/1900
|
|
341
|
(MRRIDP/18/MYM/ HALU/UNR-VR/67)
|
(c) Improvement of Joynati Mohila bazar-Fonia Feru Ghat road (Ch.1118-2600m)
|
MRRIDP
|
haluaghat
|
|
1.54
|
0.00
|
0
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
342
|
(MRRIDP/18/MYM/HALU/ UNR-VR/67)
|
(d) Improvement of Shakuai bazar-Dhaknait bazar road (Ch.00-1110m)
|
MRRIDP
|
haluaghat
|
|
1.11
|
0.00
|
0
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
343
|
MRRIDP/18/MYM/ISHA/ MAINT/UNR/01
|
Maintenance of Sohagi UP-Khalbolla bazar road at ch. 00-1153m.
|
MRRIDP
|
ishwarganj
|
361313007
|
1.15
|
0.00
|
0
|
22.07
|
M/S. Salman Enterprise
|
23.17
|
01/01/1900
|
18/07/2018
|
24/09/2018
|
100
|
23.05
|
0
|
16/08/2020
|
|
344
|
MRRIDP/18/MYM/ ISHA/MAINT/UZR/21
|
Improvement of Anandagonj GC Mymensingh Kishoregonj R&H(Chandrapara Moor) Ishwargonj Point road at ch.3762-4570m.
|
MRRIDP
|
ishwarganj
|
361312011
|
0.81
|
0.00
|
0
|
62.24
|
M/S. Nimu Traders Fulbaria, Mymensingh
|
59.02
|
01/01/1900
|
04/06/2018
|
10/12/2018
|
100
|
52.51
|
0
|
16/08/2020
|
|
345
|
MRRIDP/18/MYM/ISHA/ MAINT/UNR/22
|
Improvement of Borohit UP- Surjer bazar road at ch.986-3340m.
|
MRRIDP
|
ishwarganj
|
361313017
|
2.35
|
0.00
|
0
|
166.84
|
M/S. Salman Enterprise
|
174.91
|
01/01/1900
|
18/07/2018
|
24/06/2019
|
50
|
37.70
|
0
|
16/08/2020
|
|
346
|
MRRIDP/18/MYM/ISHA/SCR/117
|
(a) Improvement of Bakhripara Govt. Primary School connecting road at ch.00-870m. (b) Improvement of Morichar Char Govt. Primary School connecting road at ch.00-500m. (c) Improvement of Chotoragobpur Govt. Primary School connecting road at ch.00-1290m. (d
|
MRRIDP
|
ishwarganj
|
|
3.11
|
0.00
|
0
|
199.57
|
M/S. Niti Enterprise Sadar, Mymensingh
|
199.37
|
01/01/1900
|
13/03/2019
|
30/01/2020
|
66
|
83.00
|
0
|
16/08/2020
|
|
347
|
MRRIDP/18/MYM/ ISHA/SCR/118
|
(a) Improvement of Durgapur Govt. Primary School connecting road at ch.00-210m. (b) Improvement of Bagber Govt. Primary School connecting road at ch.00-240m. (c) Improvement of Boirati Govt. Primary School connecting road at ch.00-540m. (d) Improvement of
|
MRRIDP
|
ishwarganj
|
|
2.19
|
0.00
|
0
|
141.44
|
M/S. Niti Enterprise Sadar, Mymensingh
|
141.29
|
01/01/1900
|
13/03/2019
|
30/01/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
348
|
MRRIDP/18/MYM/ISHA/VR/144
|
Improvement of Mogtola-Modhupur bazar road(Start of Sikder Bari) Parabashati bazar via Aquriakanda R.N GPS road at ch.700-1551m.
|
MRRIDP
|
ishwarganj
|
361314063
|
0.85
|
0.00
|
0
|
69.44
|
M/S. Talukder Enterprise Gouripur, Mymensingh.
|
65.97
|
01/01/1900
|
10/12/2019
|
15/06/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
349
|
MRRIDP/19/ MYM/ISHA/UNR/167
|
Improvement of Ishwargonj UPC-Sutia bazar via Dewangonj Hat road at ch.4890-8643m.
|
MRRIDP
|
ishwarganj
|
361133002
|
3.75
|
0.00
|
0
|
289.10
|
M/S. Roza Traders, Kendua, Netrokona
|
274.64
|
01/01/1900
|
30/04/2020
|
29/10/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
350
|
MRRIDP/19/MYM/ISHA/UNR/168
|
Improvement of Boroit UPC-Maizbag UPC road at ch.655-3205m.
|
MRRIDP
|
ishwarganj
|
361133012
|
2.55
|
0.00
|
0
|
240.18
|
M/S.Alif Traders, Kendua, Netrokona
|
228.17
|
01/01/1900
|
30/04/2020
|
20/05/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
351
|
(MRRIDP/18/MYM/ISHA/ MAINT/UNR/ 02)
|
Maintenance of Borohit UP-Charpara bazar road at ch. 4235-4750m.(MRRIDP/18/MYM/ISHA/ MAINT/UNR/ 02)
|
MRRIDP
|
ishwarganj
|
|
0.52
|
0.00
|
0
|
13.41
|
M/S. Wasi Enterprise Sadar,Mymensingh
|
12.74
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
352
|
MRRIDP/18/MYM/ MUKT/MAINT/UNR/10
|
Maintenance of Mankon UP Office-Sreepur bazar via Charadhpakhia road at ch.00-2670m.
|
MRRIDP
|
muktagacha
|
361653015
|
2.67
|
0.00
|
0
|
54.02
|
Salman Enterprise, Sarishabari, Jamalpur
|
54.02
|
01/01/1900
|
07/05/2018
|
28/07/2018
|
100
|
54.00
|
0
|
16/08/2020
|
|
353
|
MRRIDP/18/MYM/ MUKT/MAINT/ UNR/11
|
Maintenance of Langrer bazar GC-Mankon UP Office road at ch.00-3455m.
|
MRRIDP
|
muktagacha
|
361653004
|
3.46
|
0.00
|
0
|
55.33
|
M/S. C.S.B. Enterprise, Nagarpur, Tangail
|
52.56
|
01/01/1900
|
17/04/2018
|
07/07/2018
|
100
|
52.46
|
0
|
16/08/2020
|
|
354
|
MRRIDP/18/ MYM/MUKT/MAINT/ UZR/33
|
Widening & Rehabilitation of Muktagacha-Begunbari road at ch.00-6550m.
|
MRRIDP
|
muktagacha
|
361652004
|
6.55
|
0.00
|
0
|
271.59
|
M/S. Durga Enterprise
|
262.38
|
01/01/1900
|
09/07/2018
|
08/11/2018
|
100
|
261.15
|
0
|
16/08/2020
|
|
355
|
MRRIDP/18/MYM/MUKT/VR/39
|
Improvement of Ramchandrapur-Bonbangla road at ch.2200-3108m
|
MRRIDP
|
muktagacha
|
361654056
|
0.91
|
0.00
|
0
|
58.64
|
M/S. Arnob Enterprise
|
61.57
|
01/01/1900
|
10/07/2018
|
16/01/2019
|
60
|
0.00
|
0
|
16/08/2020
|
|
356
|
MRRIDP/18/MYM/MUKT/UZR/42
|
Improvement of Sotrashia R&H-Begunbari GC road at ch.1640-3510m
|
MRRIDP
|
muktagacha
|
361652005
|
1.87
|
0.00
|
0
|
150.95
|
M/S. Saiful Bricks, Sadar, Mymensingh
|
143.40
|
01/01/1900
|
04/09/2018
|
10/09/2019
|
100
|
141.20
|
0
|
16/08/2020
|
|
357
|
MRRIDP/18/MYM/MUKT/VR/66
|
Improvement of Mogoltola-Subornokhola-Bahanga road at ch.00-1000m
|
MRRIDP
|
muktagacha
|
361654142
|
1.00
|
0.00
|
0
|
69.51
|
M/S. Mir Enterprise, Sadar, Mymensingh
|
66.04
|
01/01/1900
|
16/09/2018
|
22/03/2019
|
100
|
65.99
|
0
|
16/08/2020
|
|
358
|
MRRIDP/18/MYM/MUKT/VR/38
|
(a) Improvement of Rasulpur-Horinatola road at ch.00-785m Tender ID-308756(b) Improvement of Ramchandrapur-Kakinati road at ch.1910-3110m (c) Improvement of Jhanka bazar High School-Tan Mohishtara Govt. Primary School road at ch.00-1000m
|
MRRIDP
|
muktagacha
|
|
2.99
|
0.00
|
0
|
216.65
|
M/S. Shapla Enterprise & Alomgir Enterprie (JV) Muktagacha, Mymensingh
|
208.73
|
01/01/1900
|
|
|
33
|
0.00
|
0
|
16/08/2020
|
|
359
|
MRRIDP/18/MYM/ MUKT/VR/40
|
(a) Improvement of Bashhati Jogonnatbari GPS(Dholaikhal Moor-Soyedpara road at ch.00-935m ID-308757(b)Improvement of Binnakuri Molajani road at ch.500-1500m(c) Improvement of Dulla bazar-Kulurghat via Goeshpur road at ch.500-1500m
|
MRRIDP
|
muktagacha
|
|
2.94
|
0.00
|
0
|
239.22
|
M/S. Shapla Enterprise & Alomgir Enterprie (JV) Muktagacha, Mymensingh
|
251.11
|
01/01/1900
|
|
|
47
|
70.00
|
0
|
16/08/2020
|
|
360
|
MRRIDP/18/MYM/ MUKT/VR/41
|
(a) Improvement of Manikpur-Horipur(Horipur Dewli Moddhapara ganguli house Dighirpar Mosque) road at ch.00-695m (b) Improvement of Binnakuri-Gulabari road at ch.00-1000m(c) Improvement of Paikura(Pakratola)-Kheruajani UP Office via Vitibari(Shimultola-Pak
|
MRRIDP
|
muktagacha
|
|
3.36
|
0.00
|
0
|
264.79
|
M/S. Shapla Enterprise Muktagacha, Mymensingh
|
264.29
|
01/01/1900
|
25/03/2019
|
30/09/2020
|
56
|
156.00
|
0
|
16/08/2020
|
|
361
|
MRRIDP/18/MYM/ MUKT/UNR/43
|
(a) Improvement of Bechukhali bazar-Kashimpur UP road via Palgaon GPS road at ch.3265-5200m(b) Improvement of Kumargata UP-Ghoshbari bazar road at ch.1970-2720m
|
MRRIDP
|
muktagacha
|
|
2.69
|
0.00
|
0
|
212.76
|
M/S. Shapla Enterprise Muktagacha, Mymensingh
|
212.66
|
01/01/1900
|
21/03/2019
|
27/09/2020
|
65
|
146.45
|
0
|
16/08/2020
|
|
362
|
MRRIDP/18/MYM/ MUKT/VR/92
|
Improvement of Chechua-Bahenga road with protection work at ch.1000-2000m
|
MRRIDP
|
muktagacha
|
361654081
|
1.00
|
0.00
|
0
|
80.40
|
M/S. Basudeb Saha Muktagacha, Mymensingh
|
76.38
|
01/01/1900
|
18/02/2019
|
24/08/2019
|
70
|
43.50
|
0
|
16/08/2020
|
|
363
|
MRRIDP/18/MYM/MUKT/MAINT/UNR/99
|
a) Maintanance of Langulia R&H-Jhonka bazar via Bashati UP Office & Kashimpur UP Office road at ch.00-1500m b) Maintanance of Dawgaon UP Office-Bottola bazar road at ch.3490-4340mc) Maintanance of Ramchandrapur bazar-Kashimpur UP Office road at ch.00-2950
|
MRRIDP
|
muktagacha
|
|
5.30
|
0.00
|
0
|
121.77
|
M/S. Shapla Enterprise Muktagacha, Mymensingh.
|
115.68
|
01/01/1900
|
14/01/2019
|
03/03/2020
|
100
|
37.00
|
0
|
16/08/2020
|
|
364
|
MRRIDP/18/MYM/MUKT/SCR/119
|
(a) Improvement of Bashati Charpara Govt. Primary School connecting road at ch.00-580m.(b) Improvement of Joyda Dakkhinpara Govt. Primary School connecting road at ch.00-360m. (c) Improvement of Kutubpur Govt. Primary School connecting road at ch.00-377m
|
MRRIDP
|
muktagacha
|
|
3.33
|
0.00
|
0
|
190.26
|
M/S. Talukder Enterprise Gouripur, Mymensingh
|
198.82
|
01/01/1900
|
26/06/2019
|
25/06/2019
|
62
|
40.00
|
0
|
16/08/2020
|
|
365
|
MRRIDP/18/MYM/ MUKT/SCR/120
|
(a) Improvement of Tarati Poshim Charpara Govt. Primary School connecting road at ch.00-723m. (b) Improvement of Tarati Teripara Govt. Primary School connecting road at ch.00-200m. (c) Improvement of Tarati Poshimpara Govt. Primary School connecting road
|
MRRIDP
|
muktagacha
|
|
1.36
|
0.00
|
0
|
106.99
|
M/S. Sapla Enterprise Muktagacha, Mymensingh
|
101.64
|
01/01/1900
|
18/03/2019
|
24/03/2020
|
93
|
74.00
|
0
|
16/08/2020
|
|
366
|
MRRIDP/18/MYM/MUKT/SCR/121
|
(a) Improvement of Mohishtara Govt. Primary School connecting road at ch.00-1055m. (b) Improvement of Chondani Ata Dori Kathbowla Govt. Primary School connecting road at ch.00-70m. (c) Improvement of Kashimpur Govt. Primary School connecting road at ch.00
|
MRRIDP
|
muktagacha
|
|
2.39
|
0.00
|
0
|
141.25
|
M/S. Sapla Enterprise Muktagacha, Mymensingh
|
134.19
|
01/01/1900
|
18/03/2019
|
24/03/2020
|
100
|
102.50
|
0
|
16/08/2020
|
|
367
|
MRRIDP/18/MYM/ MUKT/SCR/122
|
(a) Improvement of Gobindapur Govt. Primary School connecting road at ch.00-700m. (b) Improvement of Bahadurpur Govt. Primary School connecting road at ch.00-527m. (c) Improvement of Porabari Govt. Primary School connecting road at ch.00-391m. (d) Improve
|
MRRIDP
|
muktagacha
|
|
1.71
|
0.00
|
0
|
114.58
|
M/S. Abul Kalam Azad Ghatail, Tangail
|
108.85
|
01/01/1900
|
06/03/2019
|
12/03/2020
|
88
|
73.50
|
0
|
16/08/2020
|
|
368
|
MRRIDP/18/MYM/MUKT/SCR/123
|
(a) Improvement of Bongabondhu Govt. Primary School connecting road at ch.00-70m. (b) Improvement of Soyodpara Govt. Primary School connecting road at ch.00-100m. (c) Improvement of Rampur Govt. Primary School connecting road at ch.00-610m. (c) Improvemen
|
MRRIDP
|
muktagacha
|
|
1.99
|
0.00
|
0
|
108.91
|
M/S. Talukder Enterprise Gouripur, Mymensingh
|
103.47
|
01/01/1900
|
25/03/2019
|
31/03/2020
|
50
|
22.25
|
0
|
16/08/2020
|
|
369
|
MRRIDP/18/MYM/MUKT/VR/44
|
Improvement of Chechua GC(Bhalukchapra)-Sholakuri via Kacharighat road at ch.2425-5595m.
|
MRRIDP
|
muktagacha
|
361654085
|
3.17
|
0.00
|
0
|
222.23
|
M/S. Shapla Enterprise. Sahria Enterprise(JV) Muktagacha
|
222.16
|
01/01/1900
|
01/08/2019
|
18/06/2020
|
20
|
8.50
|
0
|
16/08/2020
|
|
370
|
MRRIDP/18/MYM/MUKT/VR/150
|
Improvement of Kolakanda-Tarakandi road at ch.00-500m.
|
MRRIDP
|
muktagacha
|
361654026
|
0.50
|
0.00
|
0
|
48.27
|
M/S. Setu International Haluaghat, Mymensingh
|
45.86
|
01/01/1900
|
09/03/2020
|
10/07/2020
|
5
|
0.00
|
0
|
16/08/2020
|
|
371
|
MRRIDP/19/MYM/MUKT/VR/197
|
Improvement of Babarpar-Shukpatuli road at ch.3620-4620m. ID-444140
|
MRRIDP
|
muktagacha
|
361654051
|
1.00
|
0.00
|
0
|
88.89
|
M.N. Enterprise, Naha road, Mymensingh
|
84.45
|
01/01/1900
|
05/07/2020
|
31/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
372
|
MRRIDP/18/MYM/SADR/VR/62
|
(a) Improvement of Bororchar-Kachari bazar-Raghobpur via Osim Master's house road (Charraghobpur Osim Uddin Master's house-Kustiapara-Poshim Kachari bazar road (Ch.00-2200m) (b) Improvement of Malidanga-Baghadoba road (Ch.00-1700m)
|
MRRIDP
|
mymensingh-s
|
|
3.90
|
0.00
|
0
|
294.90
|
SI-SE(JV) Sadar, Mymensingh
|
293.36
|
01/01/1900
|
01/11/2018
|
30/09/2019
|
55
|
138.40
|
0
|
16/08/2020
|
|
373
|
MRRIDP/18/MYM/SADAR/VR/75
|
Improvement of Tangirhat-Charduri Kustia via Bonpara & Bharotipara(Raghobpur Moor-infront of Rashid Chairmans house Tongir Ghat - Bharotipara bazar-Karimgonj Madrasa-Noapara Eidghah Math-Akkas's house Beribadh) road at ch.00-1500m.
|
MRRIDP
|
mymensingh-s
|
361525008
|
1.50
|
0.00
|
0
|
118.98
|
M/S. Ayon Enterprise
|
116.35
|
01/01/1900
|
24/10/2018
|
30/04/2019
|
15
|
0.00
|
0
|
16/08/2020
|
|
374
|
MRRIDP/18/ MYM/SADR/VR/30
|
Improvement of Muktagacha Biddagonj GCC road-Kustia Namapara road (Ch.00-1000m)
|
MRRIDP
|
mymensingh-s
|
361524012
|
1.00
|
0.00
|
0
|
73.65
|
M/S. Shahara Enterprise
|
77.26
|
01/01/1900
|
01/07/2018
|
31/12/2018
|
69
|
15.08
|
0
|
16/08/2020
|
|
375
|
MRRIDP/18/MYM/SADR/VR/31
|
Improvement of Montola bazar-Joybangla bazar road (Ch.00-3100m)
|
MRRIDP
|
mymensingh-s
|
361524011
|
3.10
|
0.00
|
0
|
172.60
|
M/S. Istiaq Ahamed
|
178.55
|
01/01/1900
|
30/10/2018
|
05/11/2019
|
100
|
171.64
|
0
|
16/08/2020
|
|
376
|
MRRIDP/18/MYM/SADR/ MAINT/UZR/97
|
Maintenance of Khagdahar R&H-Begunbari GC road (Ch.00-4720m)
|
MRRIDP
|
mymensingh-s
|
361522008
|
4.72
|
0.00
|
0
|
181.87
|
M/S. Lovely Enterprise, Kendua, Netrokona.
|
172.78
|
01/01/1900
|
23/01/2019
|
18/12/2019
|
95
|
135.60
|
0
|
16/08/2020
|
|
377
|
MRRIDP/18/MYM/SADAR/SCR/124
|
(a) Improvement of Baghadoba Govt. Primary School connecting road at ch.00-350m. (b) Improvement of Borarchar Barthipara Govt. Primary School connecting road at ch.00-100m.(c) Improvement of Fadiarchar Govt. Primary School connecting road at ch.00-150m. (
|
MRRIDP
|
mymensingh-s
|
|
2.24
|
0.00
|
0
|
96.14
|
M/S. Azad Enterprise Gaffargaon, Mymensingh
|
91.34
|
01/01/1900
|
21/04/2019
|
09/03/2020
|
38
|
18.00
|
0
|
16/08/2020
|
|
378
|
MRRIDP/18/MYM/SADAR/SCR/125
|
(a) Improvement of Dishari Taragai Govt. Primary School connecting road at ch.00-530m. (b) Improvement of Goneshampur Govt. Primary School connecting road at ch.00-400m. (c) Improvement of Harti Govt. Primary School connecting road at ch.00-1300m. (d) Imp
|
MRRIDP
|
mymensingh-s
|
|
2.29
|
0.00
|
0
|
161.29
|
M/S. Razib Enterprise Trishal, Mymensingh
|
153.22
|
01/01/1900
|
05/03/2019
|
29/01/2020
|
90
|
117.30
|
0
|
16/08/2020
|
|
379
|
MRRIDP/18/MYM/SADAR/UNR/138
|
Improvement of Dapunia UP-Churkhai GC road via Gopalnagar bazar road at ch.7050-9700m. ID-335085
|
MRRIDP
|
mymensingh-s
|
361523002
|
2.65
|
0.00
|
0
|
209.77
|
M.A. Wahid-Md Sarwar Jahan (JV) Modon, Netrokona.
|
228.02
|
01/01/1900
|
20/02/2020
|
28/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
380
|
MRRIDP/18/MYM/SADAR/VR/139
|
Improvement of Manikdoba Bridge-Bonpara Notun bazar (Manikdoba bridge-Bonpara Notun bazar, Gucchagram bazar-Jafor Mondaler Para Old Bromhaputra Nod) road at ch.00-3500m. ID-335086
|
MRRIDP
|
mymensingh-s
|
361525126
|
3.50
|
0.00
|
0
|
267.03
|
M/S. Siful Bricks Sadar, Mymensingh
|
291.06
|
01/01/1900
|
09/02/2020
|
31/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
381
|
MRRIDP/18/MYM/SADAR/FB/143
|
Vertical Extension of Supereintending Engineer Residential building (3rd floor).
|
MRRIDP
|
mymensingh-s
|
|
|
0.00
|
0
|
75.00
|
Disha Builders, Phulpur, Mymensingh
|
71.25
|
01/01/1900
|
11/11/2019
|
17/11/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
382
|
MRRIDP/19/MYM/ SADR/VR/175
|
Improvement of Khoricha bazar-Jailkhanar Char via Abdur Rahman Master's house road at ch.2250-3525m.
|
MRRIDP
|
mymensingh-s
|
361524149
|
1.27
|
0.00
|
0
|
109.27
|
A M Trade Corporation Sadar, Mymensingh
|
103.81
|
01/01/1900
|
09/04/2020
|
27/08/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
383
|
MRRIDP/18/MYM/ SADR/VR/181
|
Improvement of Char Bhobanipur-Jelkhana Ferighat road at ch.00-1870m.
|
MRRIDP
|
mymensingh-s
|
361525025
|
1.87
|
0.00
|
0
|
149.48
|
A M Trade Corporation, Sadar, Mymensingh
|
142.00
|
01/01/1900
|
09/04/2020
|
27/08/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
384
|
(MRRIDP/18/ MYM/SADR/ VR/30)
|
Improvement of Muktagacha Biddagonj GCC road-Kustia Namapara road (Ch.00-1000m)
|
MRRIDP
|
mymensingh-s
|
|
1.00
|
0.00
|
0
|
73.65
|
M/S. Shahara Enterprise
|
77.26
|
01/01/1900
|
07/01/2018
|
31/12/2018
|
0
|
0.00
|
0
|
01/01/1900
|
|
385
|
(MRRIDP/18/MYM/SADR/ VR/31)
|
Improvement of Montola bazar-Joybangla bazar road (Ch.00-3100m)
|
MRRIDP
|
mymensingh-s
|
|
3.10
|
0.00
|
0
|
172.60
|
M/S. Istiaq Ahamed
|
178.55
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
386
|
|
(b) Improvement of Malidanga-Baghadoba road (Ch.00-1700m)
|
MRRIDP
|
mymensingh-s
|
|
1.70
|
0.00
|
0
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
01/01/1900
|
|
387
|
MRRIDP/18/MYM/NAND/UNR/72
|
Improvement of Gangail Up-Mia Hossain bazar road with protection work (Ch.1200-6230m.)
|
MRRIDP
|
nandail
|
361723017
|
5.03
|
0.00
|
0
|
84.00
|
Ratna Enterprise & Sharia Enterprise(JV) 62, Bagmara, Mymensingh
|
352.35
|
01/01/1900
|
27/11/2018
|
26/04/2020
|
25
|
84.00
|
0
|
16/08/2020
|
|
388
|
MRRIDP/18/MYM/NAND/UZR/70
|
Improvement of Mymensingh-Kishoregonj R&H (Kanarampur bazar)-(Dewangonj GC road) road (Ch.3500-8505m.)
|
MRRIDP
|
nandail
|
361722006
|
5.01
|
0.00
|
0
|
0.00
|
M/S. Shapla Enterprise & Nayem Enterprise (JV), Nandail, Mymensingh
|
470.80
|
01/01/1900
|
18/07/2019
|
28/05/2020
|
30
|
0.00
|
0
|
16/08/2020
|
|
389
|
MRRIDP/18/MYM/ NAND/UNR/71
|
(a) Improvement of Sherpur UP-Kalian bazar road (Ch.1000-5360m.) (b) Improvement of Jahangirpur UP-Bongram bazar road with protection work (Ch.1500-3400m.) (c) Improvement of Chamta bazar-Sherpur UP road (Ch.3514-5360m.)
|
MRRIDP
|
nandail
|
|
8.10
|
0.00
|
0
|
166.68
|
M/S. Musfiqur Rahman Kachan & M/S. Nishat Enterprise (JV) Nandail, Mymensingh
|
663.60
|
01/01/1900
|
24/07/2019
|
17/06/2020
|
30
|
166.68
|
0
|
16/08/2020
|
|
390
|
MRRIDP/18/MYM/ NAND/VR/73
|
(a) Improvement of Hatshira bazar-Rajabaria bazar via Kharua bazar road with protection work (Ch.1000-2000m.) (b) Improvement of Fakirer Moor-Ratoner bazar road with protection work (Ch.00-1200m.) (c) Improvement of Birkamatkhali Post Office-Dewangonj baz
|
MRRIDP
|
nandail
|
|
3.20
|
0.00
|
0
|
99.00
|
SI-TC (JV) Nandail, Mymensingh
|
276.92
|
01/01/1900
|
17/07/2019
|
28/05/2020
|
60
|
99.00
|
0
|
16/08/2020
|
|
391
|
MRRIDP/18/MYM/NAND/ VR/89
|
Improvement of Seedstor bazar-Monapasha bazar-Bongram road [Monapasha-Datartia via Putlakanda road] (Ch.4000-6000m)
|
MRRIDP
|
nandail
|
361725098
|
2.00
|
0.00
|
0
|
87.90
|
M/S. Shakin Const. Holding 613/8 Harua, Kishoregonj. M.N.01711177615
|
151.40
|
01/01/1900
|
03/03/2019
|
20/01/2020
|
60
|
87.90
|
0
|
16/08/2020
|
|
392
|
MRRIDP/18/MYM/NAND/VR/106
|
Improvement of Charshreerampur-Char Uttar Bond(Charshreerampur Sarkerbari-Char Uttar Bond via Kornel Mr. Sakhawat's house) road (Ch.00-1000m.)
|
MRRIDP
|
nandail
|
361184010
|
1.00
|
0.00
|
0
|
85.20
|
M/S. Sarker Traders Nandail, Mymensingh
|
80.94
|
01/01/1900
|
28/01/2019
|
03/08/2019
|
100
|
80.93
|
0
|
16/08/2020
|
|
393
|
MRRIDP/18/ MYM/NAND/SCR/126
|
(a) Improvement of Al Azhar Govt. Primary School connecting road at ch.190-265m.(b) Improvement of Fulbaria Govt. Primary School connecting road at ch.00-186m.(c) Improvement of Kandiura Govt. Primary School connecting road at ch.00-225m. (d) Improvement
|
MRRIDP
|
nandail
|
|
1.89
|
0.00
|
0
|
99.36
|
M/S. Shahid Enterprise Nandail, Mymensingh
|
103.98
|
01/01/1900
|
13/03/2019
|
19/03/2020
|
100
|
90.50
|
0
|
16/08/2020
|
|
394
|
MRRIDP/18/ MYM/NAND/VR/135
|
(a) Improvement of Vati Sabhar Community Clinic-Vati Sabhar Hafizia Furkania Madrasa via Engineer Dr. Azizur Rahman's house road at ch.00-800m. (b) Improvement of Nandail Dewangonj raod(Haliura Natun bazar-Rajabaria Hatshira road) via Motaleb Chearmen's
|
MRRIDP
|
nandail
|
|
1.30
|
0.00
|
0
|
117.81
|
M/S. Shahid Enterprise
|
111.92
|
01/01/1900
|
18/06/2019
|
14/11/2019
|
60
|
52.20
|
0
|
16/08/2020
|
|
395
|
MRRIDP/18/MYM/NAND/VR/151
|
Improvement of Moazzempur(Compani Dhighi)-Tanguar Khal via Md. Mia Hossain's house road (Ch.00-700m.)
|
MRRIDP
|
nandail
|
361725196
|
0.70
|
0.00
|
0
|
72.76
|
M/S. Melisa Enterprise Nandail, Mymensingh
|
69.13
|
01/01/1900
|
07/04/2020
|
12/10/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
396
|
MRRIDP/19/MYM/NAND/VR/182
|
Improvement of Betagoir-Batali road (Ch.00-1520m.)
|
MRRIDP
|
nandail
|
361724030
|
1.52
|
0.00
|
0
|
174.79
|
M/S. Rafi Construction Karimgonj,Kishorgonj
|
162.52
|
01/01/1900
|
02/06/2020
|
01/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
397
|
MRRIDP/19/MYM/NAND/VR/211
|
Improvement of Batali Jame Mosque-Jahangir nagar Moor via Kali Mondir road (Ch.00-1000m.)
|
MRRIDP
|
nandail
|
361725242
|
1.00
|
0.00
|
0
|
113.25
|
M/S. Akota Enterprise Trishal, Mymensingh.
|
107.59
|
01/01/1900
|
19/03/2020
|
30/09/2020
|
100
|
0.00
|
0
|
16/08/2020
|
|
398
|
MRRIDP/18/ MYM/PHUL/ MAINT/UZR/03
|
Maintenance of Mymensingh-Sherpur R&H (Bhaitkandi)-Narayankhola GC via Bhaitkandi road at ch.00-1122m.
|
MRRIDP
|
phulpur
|
361812006
|
1.12
|
0.00
|
0
|
53.75
|
M/S Flora Enterprise Phulpur, Mymensigh
|
53.21
|
01/01/1900
|
08/05/2018
|
29/07/2019
|
100
|
53.20
|
0
|
16/08/2020
|
|
399
|
MRRIDP/18/MYM/PHUL/UZR/47
|
Improvement of Mymensingh-Serpur R&H (Amuakanda)-Hugla GC road via Boula road at ch.14500-17100m.
|
MRRIDP
|
phulpur
|
361812005
|
2.60
|
0.00
|
0
|
199.53
|
Md. Foizul Karim, Phulpur, Mymensingh.
|
207.01
|
01/01/1900
|
03/09/2018
|
28/08/2019
|
100
|
194.04
|
0
|
16/08/2020
|
|
400
|
MRRIDP/18/MYM/ PHUL/UNR/48
|
Improvement of Singheshore UP(Chanpur)-Bahirshimul bazar via Putia bazar road at ch.00-2015m.
|
MRRIDP
|
phulpur
|
361813031
|
2.02
|
0.00
|
0
|
144.74
|
Md. Foizul Karim, Phulpur, Mymensingh.
|
149.08
|
01/01/1900
|
30/09/2018
|
28/08/2019
|
65
|
56.30
|
0
|
16/08/2020
|
|
401
|
MRRIDP/18/MYM/PHUL/UNR/49
|
Improvement of Poyari UP(Amuakanda bazar) Rahimgonj bazar road at ch.4435-6800m.
|
MRRIDP
|
phulpur
|
361813030
|
2.37
|
0.00
|
0
|
144.56
|
M/S. R.H Construction K.B Ismail Road, Mymensingh.
|
142.03
|
01/01/1900
|
03/09/2018
|
09/09/2019
|
100
|
141.13
|
0
|
16/08/2020
|
|
402
|
MRRIDP/18/MYM/PHUL/VR/50
|
Improvement of Bilashti-Chandrapur road at ch.2407-3916m.(Sutarpara Chowrasta-Ramsona bazar)
|
MRRIDP
|
phulpur
|
361814054
|
1.51
|
0.00
|
0
|
108.54
|
M/S. Mir Enterprise Haluaghat, Mymensingh
|
106.37
|
01/01/1900
|
05/09/2018
|
11/09/2019
|
100
|
105.98
|
0
|
16/08/2020
|
|
403
|
MRRIDP/18/MYM/ PHUL/VR/60
|
Improvement of Ghoshgaon-Batta bazar via Noyhati bazar(Start of Last Border) road at ch.1350-3350m.
|
MRRIDP
|
phulpur
|
361814121
|
2.00
|
0.00
|
0
|
145.03
|
Md. Foijul Karim, Phulpur, Mymensingh
|
149.36
|
01/01/1900
|
23/09/2018
|
08/08/2019
|
60
|
91.50
|
0
|
16/08/2020
|
|
404
|
MRRIDP/18/ MYM/PHUL/MAINT/UNR/04
|
Maintenance of Poary UP(Amuakanda bazar)-Rahimgonj bazar road at ch.00-2440m.
|
MRRIDP
|
phulpur
|
361813030
|
2.44
|
0.00
|
0
|
38.55
|
Salman Enterprise, Sarishabari, Jamalpur
|
40.12
|
01/01/1900
|
07/05/2018
|
13/07/2018
|
100
|
40.06
|
0
|
16/08/2020
|
|
405
|
MRRIDP/18/MYM/PHUL/MAINT/ UNR/05
|
Maintenance of Poary UP-Dista bazar road at ch.00-4584m.
|
MRRIDP
|
phulpur
|
361813014
|
4.58
|
0.00
|
0
|
74.60
|
Salman Enterprise, Sarishabari, Jamalpur
|
74.60
|
01/01/1900
|
07/05/2018
|
28/07/2018
|
100
|
74.58
|
0
|
16/08/2020
|
|
406
|
MRRIDP/18/MYM/ PHUL/UZR/46
|
Improvement of Bahadurpur GC-Bhaitkandi GC road at ch.4360-6860m.
|
MRRIDP
|
phulpur
|
361812010
|
2.50
|
0.00
|
0
|
239.10
|
M/S. Sharia Enterprise, Sadar, Mymensingh.
|
249.90
|
01/01/1900
|
10/07/2019
|
10/06/2010
|
35
|
29.20
|
0
|
16/08/2020
|
|
407
|
MRRIDP/18/MYM/PHUL/UNR/90
|
Improvement of Shingheshore UP(Chanpur)-Bahirshimul bazar via Putia bazar road with Protection work at ch.2500-4500m.
|
MRRIDP
|
phulpur
|
361813012
|
2.00
|
0.00
|
0
|
151.85
|
Sura International Sadar, Mymensingh.
|
150.33
|
01/01/1900
|
14/01/2019
|
20/01/2020
|
100
|
149.43
|
0
|
16/08/2020
|
|
408
|
MRRIDP/18/MYM/ PHUL/VR/91
|
(a) Improvement of Shokhollah-Singheshor bazar road at ch.1000-1585m. (b) Improvement of Maishakanda bazar-Ramsuna road at ch.00-1000m. (MRRIDP/18/MYM/ PHUL/VR/91)
|
MRRIDP
|
phulpur
|
|
1.59
|
0.00
|
0
|
144.00
|
Sura International Sadar, Mymensingh.
|
144.01
|
01/01/1900
|
04/03/2019
|
20/01/2020
|
60
|
86.00
|
0
|
16/08/2020
|
|
409
|
MRRIDP/18/MYM/PHUL/MAINT/UNR/96
|
Maintanance of Mymensingh-Sherpur R&H (Bhaitkandi)-Narayankhola GC via Vaitkandi GC road at ch.1122-5700m.
|
MRRIDP
|
phulpur
|
361812006
|
4.58
|
0.00
|
0
|
107.59
|
M/S. Lovely Enterprise Kendua, Netrokona.
|
102.21
|
01/01/1900
|
23/01/2019
|
15/12/2019
|
100
|
101.88
|
0
|
16/08/2020
|
|
410
|
MRRIDP/18/MYM/ PHUL/SCR/127
|
(a) Improvement of Balia Govt. Primary School connecting road at ch.00-105m.(b) Improvement of Bashati Govt. Primary School connecting road at ch.00-440m. (c) Improvement of Goshgaon Govt. Primary School connecting road at ch.00-315m.(d) Improvement of Ru
|
MRRIDP
|
phulpur
|
|
1.08
|
0.00
|
0
|
46.93
|
M/S. Niti Enterprise Sadar, Mymensingh
|
46.89
|
01/01/1900
|
13/03/2019
|
30/01/2020
|
4
|
0.00
|
0
|
16/08/2020
|
|
411
|
MRRIDP/18/MYM/ PHUL/SCR/128
|
(a) Improvement of Bashtola Govt. Primary School connecting road at ch.6100-6900m.(b) Improvement of Nagua Govt. Primary School connecting road at ch.00-1020m. (c) Improvement of Fatehpur Govt. Primary School connecting road at ch.00-700m.
|
MRRIDP
|
phulpur
|
|
2.52
|
0.00
|
0
|
170.55
|
Md. Sazzad Hossain Phulpur, Mymensingh.
|
168.96
|
01/01/1900
|
19/03/2019
|
25/03/2020
|
45
|
122.00
|
0
|
16/08/2020
|
|
412
|
MRRIDP/18/MYM/PHUL/UNR/134
|
Improvement of Ghomgaon-Boroikandi road at ch.1575-2500m.
|
MRRIDP
|
phulpur
|
361814030
|
0.93
|
0.00
|
0
|
74.75
|
Disha Builders, Phulpur, Mymensingh
|
74.08
|
01/01/1900
|
06/08/2019
|
12/02/2020
|
60
|
13.50
|
0
|
16/08/2020
|
|
413
|
MRRIDP/18/MYM/PHUL/UNR/136
|
Improvement of Rambhodrapur UP(Ramnathpur) -Dadra bazar via Narikeli & Donta bazar road at ch.4550-6550m. Tender ID-313826
|
MRRIDP
|
phulpur
|
361813041
|
2.00
|
0.00
|
0
|
155.14
|
AKMAQS-MRK(JV) R.K. Mission road, Mymensingh
|
154.36
|
01/01/1900
|
30/09/2019
|
12/09/2020
|
20
|
0.00
|
0
|
16/08/2020
|
|
414
|
MRRIDP/18/MYM/PHUL/VR/137
|
(a) Improvement of Badamia bazar-Ananda bazar road at ch.00-1000m. Tender ID-297212(b) Improvement of Rambhodrapur UP (Ramnathpur) -Ramnathpur Tular Bari road-(Unus Master's house-Vaitkandi Ghatpar Pacca road via Ramnathpur bazar & Motaleber Bari road) a
|
MRRIDP
|
phulpur
|
|
1.90
|
0.00
|
0
|
149.96
|
Redoy Enterprise-Joyon Enterprise (JV) Phulpur, Mymensingh
|
146.02
|
01/01/1900
|
21/10/2019
|
03/09/2020
|
45
|
0.00
|
0
|
16/08/2020
|
|
415
|
MRRIDP/18/MYM/PHUL/VR/141
|
Improvement of Charbahadurpur Khamarermoor-Charraghobpur road via Chairman bari Mosque & Charsholpa Noapara bazar(Charbahadurpur Mozid Master's Khamar-CharraGhobpur Pacca road via Noapara bazar) road at ch.214-1214m. Tender ID-335088
|
MRRIDP
|
phulpur
|
361814166
|
1.00
|
0.00
|
0
|
77.97
|
M/S. Joyon Enterprise Phulpur, Mymensingh.
|
74.07
|
01/01/1900
|
11/12/2019
|
17/06/2020
|
15
|
0.00
|
0
|
16/08/2020
|
|
416
|
MRRIDP/19/MYM/PHUL/VR/173
|
Improvement of Biharanga Government Pri. School -Nishchintapur Fakirbari road at ch.00-1400m.
|
MRRIDP
|
phulpur
|
361814171
|
1.40
|
0.00
|
0
|
127.28
|
M/S. Hadisur Rahman Purbadhola, Netrokona
|
120.91
|
01/01/1900
|
30/04/2020
|
29/04/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
417
|
MRRIDP/19/MYM/PHUL/UNR/205
|
Improvement of Vaitkandi UP-Tarakanda bazar road via Partola, Nimtola & Dadra bazar(Phulpur Part) road at ch.1840-3840m. (ID-416294)
|
MRRIDP
|
phulpur
|
361813032
|
2.00
|
0.00
|
0
|
191.35
|
M/S. Shohel Enterprise Gaffargaon, Mymensingh
|
191.31
|
01/01/1900
|
19/07/2020
|
25/04/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
418
|
MRRIDP/19/MYM/PHUL/VR/206
|
Improvement of Fotehpur-Thakurbakhai road at ch.5730-6730m.
|
MRRIDP
|
phulpur
|
361814053
|
1.00
|
0.00
|
0
|
84.41
|
M/S. Shopna Bricks Tarakanda, Mymensingh
|
80.19
|
01/01/1900
|
07/04/2020
|
06/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
419
|
(MRRIDP/18/ MYM/PHUL/ MAINT/UNR/04)
|
Maintenance of Poary UP(Amuakanda bazar)-Rahimgonj bazar road at ch.00-2440m.
|
MRRIDP
|
phulpur
|
|
2.44
|
0.00
|
0
|
38.55
|
Salman Enterprise Sarishabari, Jamalpur
|
40.12
|
01/01/1900
|
05/07/2018
|
13/07/2018
|
100
|
0.00
|
0
|
01/01/1900
|
|
420
|
(MRRIDP/18/MYM/PHUL/ MAINT/UNR/05)
|
Maintenance of Poary UP-Dista bazar road at ch.00-4584m
|
MRRIDP
|
phulpur
|
|
4.58
|
0.00
|
0
|
74.60
|
Salman Enterprise Sarishabari, Jamalpur
|
74.60
|
01/01/1900
|
05/07/2018
|
28/07/2018
|
100
|
0.00
|
0
|
01/01/1900
|
|
421
|
MRRIDP/18/MYM/TARA/VR/51
|
Improvement of Tukanda-Hugla road at ch.500-2760m.
|
MRRIDP
|
Tarakanda
|
361184059
|
2.26
|
0.00
|
0
|
145.28
|
M/S. Sharia Enterprise, Sadar, Mymensingh
|
149.64
|
01/01/1900
|
03/09/2018
|
06/09/2019
|
100
|
149.59
|
0
|
16/08/2020
|
|
422
|
MRRIDP/18/ MYM/TARA/UNR/52
|
Improvement of Kamargaon UP(Ashia) Chongnapara bazar(Royjan Jossorbari) road at ch.00-1250m. & 1no Box Culver 3.0x2.0m.
|
MRRIDP
|
Tarakanda
|
361183018
|
1.25
|
0.00
|
0
|
106.45
|
M/S. Sharia Enterprise Sadar, Mymensingh
|
109.64
|
01/01/1900
|
03/09/2018
|
06/09/2019
|
100
|
108.26
|
0
|
16/08/2020
|
|
423
|
MRRIDP/18/MYM/TARA/UZR/53
|
Improvement of Mymensingh-Netrokona R&H (Kashigonj bazar) Ambikagonj GC road at ch.13170-18000m.
|
MRRIDP
|
Tarakanda
|
361182011
|
4.83
|
0.00
|
0
|
394.18
|
Dolly Construction, Motijhil, Dhaka.
|
383.24
|
01/01/1900
|
27/08/2018
|
02/03/2020
|
70
|
203.50
|
0
|
16/08/2020
|
|
424
|
MRRIDP/18/ MYM/TARA/UNR/101
|
(a) Improvement of Balikha UP-Charkhoricha bazar road with protection work at ch.00-1300m. (b) Improvement of Kamaria UP(Kashigonj) Charia bazar road at ch.00-2000m.with 2nos double vent 2x3.5x3.0m. & 2x.2.0x2.0m. Box culvert at ch. 750m. & 1340m. On same
|
MRRIDP
|
Tarakanda
|
|
3.30
|
0.00
|
0
|
308.59
|
M/S. Saiful Bricks Sadar, Mymensingh
|
304.44
|
01/01/1900
|
12/03/2019
|
16/01/2020
|
29
|
48.00
|
0
|
16/08/2020
|
|
425
|
MRRIDP/18/ MYM/ TARA/UNR/102
|
Improvement of Balikha UP-Dadri bazar road at ch.00-4400m.with 4nos Box culvert at ch. 65m.,1880m., 3637m. & 4240m. On same road
|
MRRIDP
|
Tarakanda
|
361813025
|
4.40
|
0.00
|
0
|
433.23
|
M/S. Saiful Bricks Sadar, Mymensingh
|
428.13
|
01/01/1900
|
07/03/2019
|
16/01/2020
|
37
|
72.00
|
0
|
16/08/2020
|
|
426
|
MRRIDP/18/MYM/ TARA/VR/105
|
Improvement of Mailora-Pakritola road(Tarakanda-Shamgonj road at Chinapara Moor-Kanuhari bazar road via Mylora bazar road) at ch.00-1000m.
|
MRRIDP
|
Tarakanda
|
361184014
|
1.00
|
0.00
|
0
|
74.87
|
Purnata Enterprise Baghmara, Mymensingh
|
71.12
|
01/01/1900
|
23/01/2019
|
27/07/2019
|
100
|
71.07
|
0
|
16/08/2020
|
|
427
|
MRRIDP/18/MYM/ TARA/SCR/129
|
(a) Improvement of Khatashia Govt. Primary School connecting road at ch.00-80m. (b) Improvement of Balijana Govt. Primary School canecting road at ch.00-190m.(c) Improvement of Ramchandrapur Govt. Primary School connecting road at ch.00-100m. (d) Improve
|
MRRIDP
|
Tarakanda
|
|
0.43
|
0.00
|
0
|
27.39
|
Purnata Enterprise Baghmara, Mymensingh
|
26.02
|
01/01/1900
|
19/03/2019
|
25/07/2019
|
100
|
25.98
|
0
|
16/08/2020
|
|
428
|
MRRIDP/18/ MYM/TARA/VR/131
|
Improvement of Teukanda-Hugla bazar road at Dhakua-Dhakua Dakkhinpara Mosque(Bhasha Soinik Late Sumsul Haque) road at ch.00-1000m.
|
MRRIDP
|
Tarakanda
|
361185189
|
1.00
|
0.00
|
0
|
85.30
|
Purnata Enterprise Baghmara, Mymensingh
|
84.27
|
01/01/1900
|
19/03/2019
|
25/09/2019
|
100
|
84.23
|
0
|
16/08/2020
|
|
429
|
MRRIDP/18/ MYM/TARA/VR/225
|
Improvement of Bakura-Dadra bazar road at ch.00-1000m.
|
MRRIDP
|
Tarakanda
|
361184086
|
1.00
|
0.00
|
0
|
86.71
|
M/S. Shopna Bricks, Tarakanda, Mymensingh
|
82.38
|
01/01/1900
|
13/07/2020
|
19/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
430
|
MRRIDP/18/MYM/TARA/ VR/226
|
Improvement of Kakni Bus Stand-Kazi's Shop via Moriom's house road at ch.00-1000m.
|
MRRIDP
|
Tarakanda
|
361184064
|
1.00
|
0.00
|
0
|
88.81
|
M/S. Shopna Bricks Tarakanda, Mymensingh
|
84.37
|
01/01/1900
|
13/07/2020
|
19/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
431
|
MRRIDP/18/MYM/TARA/VR/227
|
Improvement of Kakni bazar Pacca road-Kader BSC House via Madrasa road at ch.00-1200m.
|
MRRIDP
|
Tarakanda
|
361184168
|
1.20
|
0.00
|
0
|
115.18
|
M/S. Shopna Bricks Tarakanda, Mymensingh
|
109.42
|
01/01/1900
|
13/07/2020
|
19/03/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
432
|
MRRIDP/18/MYM/TRIS/ MAINT/VR/06
|
Maintenance of Shingroil-Dhanikhola Katakhali road at Usmania High school via Kanhor bazar road at ch.1300-3565m.
|
MRRIDP
|
trishal
|
361944088
|
2.27
|
0.00
|
0
|
57.78
|
M/S. R.H. Construction Sadar, Mymensingh
|
54.89
|
01/01/1900
|
08/05/2018
|
29/07/2018
|
100
|
54.82
|
0
|
16/08/2020
|
|
433
|
MRRIDP/18/ MYM/TRIS/MAINT/UNR/07
|
Maintenance of Trishal UP-Shakua UP via Nagarchara road at ch.1700-4100m
|
MRRIDP
|
trishal
|
361943004
|
2.40
|
0.00
|
0
|
76.58
|
M/S. Suma Enterprise, Trishal, Mymensingh
|
72.75
|
01/01/1900
|
24/04/2018
|
31/07/2018
|
100
|
72.11
|
0
|
16/08/2020
|
|
434
|
MRRIDP/18/MYM/TRIS/ MAINT/VR/08
|
Maintenance of Kazir Shimla-Kazir Shimla GPS road at ch.00-870m.
|
MRRIDP
|
trishal
|
361945152
|
0.87
|
0.00
|
0
|
27.01
|
M/S. Ayon Enterprise, Sadar, Mymensingh
|
25.85
|
01/01/1900
|
08/05/2018
|
14/07/2018
|
100
|
25.85
|
0
|
16/08/2020
|
|
435
|
MRRIDP/18/MYM/ TRIS/ MAINT/UNR/09
|
Maintenance of Mukkhapur UP-Bogar bazar road via Sapkhali bazar road at ch.00-3100m.
|
MRRIDP
|
trishal
|
361943013
|
3.10
|
0.00
|
0
|
91.84
|
M/S. Suma Enterprise, Trishal, Mymensingh
|
87.25
|
01/01/1900
|
24/04/2018
|
31/07/2018
|
35
|
220.00
|
0
|
16/08/2020
|
|
436
|
MRRIDP/18/MYM/TRIS/ MAINT/UZR/14
|
Rehabilitation & Protection Work of Dhaka-Mymensingh RHD (Boilor)-Fulbaria GC(Trishal Part) road at ch.00-5030m.
|
MRRIDP
|
trishal
|
361942001
|
5.03
|
0.00
|
0
|
1177.67
|
Dhali Const. Ltd. Mirpur, Dhaka.
|
1212.77
|
01/01/1900
|
19/06/2018
|
13/08/2019
|
100
|
133.00
|
0
|
16/08/2020
|
|
437
|
MRRIDP/18/MYM/TRIS/UNR/23
|
Improvement of Horirampur UP-Chanderteki bazar road (Ch. 00-2950m)
|
MRRIDP
|
trishal
|
361943009
|
2.95
|
0.00
|
0
|
195.90
|
M/S. Salman Enterprise
|
205.69
|
01/01/1900
|
10/07/2018
|
05/06/2019
|
60
|
104.50
|
0
|
16/08/2020
|
|
438
|
MRRIDP/18/MYM/TRIS/VR/24
|
Improvement of Bogar bazar-Kashigonj bazar road (Ch. 715-2650m)
|
MRRIDP
|
trishal
|
361944061
|
1.64
|
0.00
|
0
|
143.54
|
M/S. Redoy Enterprise R.K Mission road, Mymensingh
|
136.37
|
01/01/1900
|
05/06/2018
|
11/06/2019
|
100
|
104.14
|
0
|
16/08/2020
|
|
439
|
MRRIDP/18/MYM/TRIS/VR/25
|
Improvement of Gopalpur GPS-Shimulia bazar via Sonkanda road(Ch.1700-3230m)
|
MRRIDP
|
trishal
|
361944049
|
1.53
|
0.00
|
0
|
102.27
|
Himi Enterprise, Fulbaria,Mymensingh
|
107.38
|
01/01/1900
|
10/06/2018
|
16/06/2019
|
65
|
66.70
|
0
|
16/08/2020
|
|
440
|
MRRIDP/18/MYM/TRIS/VR/26
|
Improvement of Trishal-Fulbaria Chikna - Rogunathpur road (Sangbadik Muklesur Rahman's house) (Ch.00-1500m)
|
MRRIDP
|
trishal
|
361944064
|
1.50
|
0.00
|
0
|
98.64
|
M/S. Redoy Enterprise Fulbaria, Mymensingh
|
0.00
|
01/01/1900
|
10/06/2018
|
16/06/2019
|
100
|
154.88
|
0
|
16/08/2020
|
|
441
|
MRRIDP/18/MYM/TRIS/VR/27
|
Improvement of Trishal-Purabari via Chikna road (Ch.00-2900m) [ Start of Kazi Nazrul Islam Bypass)
|
MRRIDP
|
trishal
|
361944054
|
2.90
|
0.00
|
0
|
185.00
|
M/S. Redoy Enterprise, Fulbaria, Mymensingh
|
194.25
|
01/01/1900
|
10/06/2018
|
16/06/2019
|
100
|
20.00
|
0
|
16/08/2020
|
|
442
|
MRRIDP/18/MYM/ TRIS/UNR/28
|
Improvement of Trishal-Durduria-Amlitola bazar road (Ch.1000-1350m)
|
MRRIDP
|
trishal
|
361945082
|
0.35
|
0.00
|
0
|
21.55
|
Himi Enterprise, Fulbaria,Mymensingh
|
28.86
|
01/01/1900
|
16/09/2018
|
20/01/2019
|
100
|
82.00
|
0
|
16/08/2020
|
|
443
|
MRRIDP/18/ MYM/TRIS/VR/29
|
Improvement of Alhory bridge-Purabari via Kharhor road (Ch.00-1000m)
|
MRRIDP
|
trishal
|
361944035
|
1.00
|
0.00
|
0
|
80.92
|
Nowab Properties, Sadar, Mymensingh.
|
84.97
|
01/01/1900
|
11/06/2018
|
17/12/2018
|
100
|
74.12
|
0
|
16/08/2020
|
|
444
|
MRRIDP/18/MYM/TRIS/VR/34
|
Improvement of Dhaka-Mymensingh RHD road Model School-Hoddervita Dulalbari Chairman bari -Konabari road (Ch.00-980m)
|
MRRIDP
|
trishal
|
361945054
|
0.98
|
0.00
|
0
|
79.48
|
M/S. Redoy Enterprise Fulbaria, Mymensingh
|
79.08
|
01/01/1900
|
01/07/2018
|
07/01/2019
|
100
|
82.53
|
0
|
16/08/2020
|
|
445
|
MRRIDP/18/ MYM/TRIS/VR/35
|
Improvement of KBI(RHD) road-Kazigram Namapara road (Ch.00-1100m) )
|
MRRIDP
|
trishal
|
361945143
|
1.10
|
0.00
|
0
|
78.90
|
Md. Shamsul Alam Ishwargonj, Mymensingh
|
82.65
|
01/01/1900
|
25/07/2018
|
31/01/2019
|
100
|
61.60
|
0
|
16/08/2020
|
|
446
|
MRRIDP/18/MYM/TRIS/VR/61
|
Improvement of Shakhua-Bisnupur road (Ch.00-1000m)
|
MRRIDP
|
trishal
|
361944079
|
1.00
|
0.00
|
0
|
64.67
|
Md. Shamsul Alam, Ishwargonj, Mymensingh
|
64.66
|
01/01/1900
|
16/09/2018
|
22/03/2019
|
100
|
45.00
|
0
|
16/08/2020
|
|
447
|
MRRIDP/18/ MYM/TRIS/VR/74
|
Improvement of Dhanikhola Dokkhin Bhatipara Govt. Pry.School-Samania road (Ch.00-1200m)
|
MRRIDP
|
trishal
|
361944043
|
1.20
|
0.00
|
0
|
90.99
|
M/S. Islam Traders, Sadar, Mymensingh.
|
90.08
|
01/01/1900
|
08/10/2018
|
28/02/2019
|
100
|
73.70
|
0
|
16/08/2020
|
|
448
|
MRRIDP/18/MYM/ TRIS/SCR/130
|
(a) Improvement of Alongjani Govt. Primary School connecting road at ch.00-155m. (b) Improvement of Balidia Kochi Kancha Govt.Primary School connecting road at ch.00-300m. (c) Improvement of Angrarchar Govt Primary School connecting road at ch.00-1020m. (
|
MRRIDP
|
trishal
|
|
2.04
|
0.00
|
0
|
125.57
|
M/S. Amdad Enterprise Trishal, Mymensingh
|
119.29
|
01/01/1900
|
13/03/2019
|
19/03/2020
|
58
|
0.00
|
0
|
16/08/2020
|
|
449
|
MRRIDP/18/MYM/TRIS/UNR/132
|
Improvement of Mothbari UP-Ragamara bazar road at ch.700-4130m.
|
MRRIDP
|
trishal
|
361943007
|
3.43
|
0.00
|
0
|
259.28
|
M/S. Redoy Enterprise, Fulbaria, Mymensingh
|
267.59
|
01/01/1900
|
28/07/2019
|
13/07/2020
|
15
|
0.00
|
0
|
16/08/2020
|
|
450
|
MRRIDP/18/MYM/TRIS/UNR/145
|
Improvement of Amirabari UP-Mirder bazar road at ch.1900-2900m.
|
MRRIDP
|
trishal
|
361943015
|
1.00
|
0.00
|
0
|
74.95
|
M/S.Unique Consortiam, Sadar, Jamalpur.
|
71.20
|
01/01/1900
|
09/12/2019
|
15/06/2020
|
40
|
0.00
|
0
|
16/08/2020
|
|
451
|
MRRIDP/18/MYM/TRIS/VR/146
|
Improvement of RHD road at Signboard-Mokkhopur road ch.00-1000m.
|
MRRIDP
|
trishal
|
361944060
|
1.00
|
0.00
|
0
|
84.78
|
M/S.Unique Consortiam, Sadar, Jamalpur.
|
80.54
|
01/01/1900
|
09/12/2019
|
15/06/2020
|
10
|
0.00
|
0
|
16/08/2020
|
|
452
|
MRRIDP/ 18/MYM/TRIS/VR/147
|
Improvement of Kajirshimla-Pazlar Char via Hazigonj bazar road ch.1860-3360m.
|
MRRIDP
|
trishal
|
361944067
|
1.50
|
0.00
|
0
|
112.44
|
M/S.Unique Consortiam, Sadar, Jamalpur.
|
106.82
|
01/01/1900
|
30/12/2019
|
04/11/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
453
|
MRRIDP/19/ MYM/TRIS/UZR/162
|
Improvement of Dhaka-Mymensingh RHD(Signboard)-Shibgonj GC via Kashigonj GC road ch.3100-7200m. (ID-415853)
|
MRRIDP
|
trishal
|
361942004
|
4.10
|
0.00
|
0
|
401.76
|
JAKASD-JVCA Haque Para, Chuadanga
|
391.67
|
01/01/1900
|
22/07/2020
|
21/12/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
454
|
MRRIDP/19/MYM/TRIS/VR/163
|
Improvement of Bogar bazar-Gogiam road ch.00-1100m.
|
MRRIDP
|
trishal
|
361944034
|
1.10
|
0.00
|
0
|
112.41
|
M/S. Redoy Enterprise R.K. Mission road, Sadar, Myensingh
|
106.79
|
01/01/1900
|
08/07/2020
|
14/01/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
455
|
MRRIDP/19/MYM/TRIS/ VR/164
|
Improvement of Mokkhopur Bhuanbari-Futi Government Pri. School road ch.00-750m.
|
MRRIDP
|
trishal
|
361944031
|
0.75
|
0.00
|
0
|
77.66
|
M/S. Redoy Enterprise R.K. Mission road, Sadar, Myensingh
|
73.78
|
01/01/1900
|
08/07/2020
|
14/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
456
|
MRRIDP/19/MYM/TRIS/ VR/165
|
Improvement of Kanihari UP-Dhola bazar road ch.1800-3653m. & 6400-9110m.
|
MRRIDP
|
trishal
|
361943006
|
4.55
|
0.00
|
0
|
456.91
|
M/S. K. K Enterprise, Bijoy Nagar, Dhaka.
|
446.02
|
01/01/1900
|
22/07/2020
|
28/01/2022
|
0
|
0.00
|
0
|
16/08/2020
|
|
457
|
MRRIDP/19/MYM/ TRIS/UZR/176
|
Maintanance of Trishal GC-Fulbaria GC via Durduria bazar road at ch. 2350-6080m.
|
MRRIDP
|
trishal
|
361942015
|
3.75
|
0.00
|
0
|
103.81
|
M/S. Ma Enterprise, Fulbaria, Mymensingh
|
98.62
|
01/01/1900
|
09/07/2020
|
15/11/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
458
|
MRRIDP/19/MYM/TRIS/VR/179
|
Improvment of Boroma-Kakchar bazar-Pagaria river road (Start Late. Hares Uddin's Gravyard road) at ch. 3350-4350m.
|
MRRIDP
|
trishal
|
361944076
|
1.00
|
0.00
|
0
|
88.57
|
M/S. Suma Enterprise, Trishal, Mymensingh
|
84.14
|
01/01/1900
|
06/07/2020
|
31/12/2020
|
0
|
0.00
|
0
|
16/08/2020
|
|
459
|
MRRIDP/19/MYM/TRIS/BRDG/ VR/195
|
Construction of 40.00m. RCC Garder bridge on Alongjani-Kalirbazar road at ch. 2600m under Kanihari Union over Pagaria River
|
MRRIDP
|
trishal
|
361944072
|
|
40.00
|
0
|
318.08
|
M/S. Mitu Traders Sarishabari, Jamalpur
|
346.50
|
01/01/1900
|
05/07/2022
|
30/11/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
460
|
MRRIDP/19/MYM/TRIS/BRDG/VR/196
|
Construction of 50.00m. RCC Girder bridge on Narayanpur-Kashigonj road at ch. 550m
|
MRRIDP
|
trishal
|
361944062
|
|
50.00
|
0
|
343.93
|
Taher & Songs Pvt Ltd-Md. Lalmahmud (JV)
|
337.02
|
01/01/1900
|
20/07/2020
|
09/12/2021
|
0
|
0.00
|
0
|
16/08/2020
|
|
461
|
WNOBI-MYM(BHA)-UZRU-75
|
Improvement of Bhaluka-Gafforgaon R&H (Fire Service Station) to Dhalia GC Road at Ch. 0+000 - Ch. 6+176km Under Bhaluka Upazila, District: Mymensingh. (ID No. 361132005)
|
NOBIDEP
|
bhaluka
|
361132005
|
6.18
|
0.00
|
0
|
967.49
|
Dolly Construction Ltd-Infratech (JV), Sena Kalyan Bhaban, 195 Mothijheel C/A, Suit # 1602, Dhaka-1000
|
901.24
|
17/01/2018
|
24/01/2018
|
25/05/2020
|
75
|
689.47
|
0
|
12/07/2020
|
|
462
|
WNOBI-MYM(BHA)-UZRU-08(A)
|
Improvement of A) Mallikbari Bazar - Borchona Road at ch. 0+000 Km - 9+750Km under Bhaluka Upazila, District : Mymensingh (ID-361132004)
|
NOBIDEP
|
bhaluka
|
361132004
|
9.75
|
0.00
|
0
|
844.17
|
SEL-MSB(JV), Gulkibari, Mymensingh
|
915.20
|
06/10/2015
|
13/10/2015
|
05/12/2017
|
100
|
914.40
|
0
|
12/07/2020
|
|
463
|
WNOBI-MYM(BHA)-UNRU-132
|
Improvement of Mallikbari Bazar (UP) to Kachina Bazar Road. at Ch. 3+350km. to Ch. 9+450km Under Bhaluka Upazila, District: Mymensingh. (Road ID No. 361133005)
|
NOBIDEP
|
bhaluka
|
361133005
|
6.10
|
0.00
|
0
|
398.85
|
M/S. Dolly construction, Senakallan Bhaban, 195. Matijhil C/A, Suit#1708/C, Dhaka-1000. Mobile: 01715972411
E-mail: dollyconstructionltd@gmail.com
|
418.69
|
27/08/2018
|
|
30/06/2020
|
60
|
314.00
|
0
|
12/07/2020
|
|
464
|
WNOBI/MYM/ GC/111(A)
|
Development of Birunia Growtg Center Market(GCM) at
Upazila: Bhaluka, District: Mymensingh
|
NOBIDEP
|
bhaluka
|
|
|
0.00
|
0
|
41.71
|
M/S Nahian Traders, Bhaluka, Mymensingh
|
39.31
|
18/01/2016
|
25/01/2016
|
10/06/2017
|
100
|
38.43
|
0
|
12/07/2020
|
|
465
|
WNOBI-MYN-RM-133(B)
|
Development of Angargara Bazar, Rural Market At Upazila: Bhaluka, District: Mymensingh.
|
NOBIDEP
|
bhaluka
|
|
|
0.00
|
0
|
89.67
|
M/S Shohel Enterprise, Gaffargaon, Mymensingh
|
74.88
|
03/05/2016
|
10/05/2016
|
10/06/2019
|
100
|
74.35
|
0
|
12/07/2020
|
|
466
|
WNOBI-MYM(DHO)-UNRU-79(A)
|
Improvement of Dhobaura UP to Ghoshgaon Up Road (Started from Hospital) at Ch.1+092 to 7+950km. Under Dhobaura Upazila, District: Mymensingh (ID No. 361163001)
|
NOBIDEP
|
dhobaura
|
361163001
|
6.86
|
0.00
|
0
|
383.90
|
Samiron Chowdhury & M/S Subrata Sutradhare (JV)
|
360.00
|
18/02/2016
|
25/02/2016
|
31/01/2018
|
100
|
346.20
|
0
|
12/07/2020
|
|
467
|
WNOBI-MYM(FUL & GOR)-UZRU-09
|
Improvement of A) Hatkair bazar GC-Kalibari Bazar Via Garajan Road.Ch 0+000Km-3+100Km under Fulbaria Upazila, District : Mymensingh (ID-361202011) (B)Shyamgonj GC -Hogla Gc Road Ch.0+000 Km-7+650 Km under Gouripur Upazila, District : Mymensingh ( ID-36123
|
NOBIDEP
|
fulbaria
|
|
10.75
|
0.00
|
0
|
823.98
|
NEC-SEL(JV),Sadar, Mymensingh.
|
844.04
|
16/08/2015
|
23/08/2015
|
14/10/2018
|
100
|
674.11
|
0
|
12/07/2020
|
|
468
|
WNOBI-MYM(FUL)-UZRU-70(A)
|
Improvement of Kayarchala Nashor Shop RHD–Shagordighi GC Road. Ch. 00+000km-Ch.10+100km Under Fulbaria Upazila, District: Mymensingh. (ID No. 361202013)
|
NOBIDEP
|
fulbaria
|
361202013
|
10.10
|
0.00
|
0
|
696.80
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
730.64
|
03/12/2017
|
10/12/2017
|
31/03/2021
|
55
|
700.00
|
0
|
12/07/2020
|
|
469
|
WNOBI-MYM(FUL)-UZRU-70(B)
|
Improvement of Kayarchala Nashor Shop RHD–Shagordighi GC Road. Ch. 10+100km-Ch.15+252km Under Fulbaria Upazila, District: Mymensingh.(ID No. 361202013)
|
NOBIDEP
|
fulbaria
|
361202013
|
5.15
|
0.00
|
0
|
458.03
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229
|
478.80
|
13/12/2017
|
20/12/2017
|
31/03/2021
|
56
|
442.00
|
0
|
12/07/2020
|
|
470
|
WNOBI-MYM(FUL)-UZRR-GOB-39
|
Rehabilitation & Periodic maintenance of Assim GC- Boraduba Ghatail RHD (Tomaltola) road from Ch. 0+000km to 3+850km (361202010)
|
NOBIDEP
|
fulbaria
|
361202010
|
3.85
|
0.00
|
0
|
549.97
|
Taher & Sons(Pvt) Ltd-Md. Lal Mahmood, Joint Venture, Fulbaria, Mymensingh.
|
545.11
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
12/07/2020
|
|
471
|
WNOBI-MYM(GAF)-UZRU-08(B)
|
Improvement of B) Lamkain - Kandipara Road at ch. 0+000 Km. - 4+288 Km. under Gaffargaon Upazila, District : Mymensingh ( ID-361222010)
|
NOBIDEP
|
gaffargaon
|
361222010
|
4.29
|
0.00
|
0
|
463.42
|
AS-SI-SE (JV), ChotuBazar, Netrokona
|
458.70
|
28/09/2015
|
07/10/2015
|
14/02/2018
|
100
|
418.62
|
0
|
12/07/2020
|
|
472
|
WNOBI-MYN-RM-133(D)
|
Development of Mukhi School Bazar, Rural Market At Upazila: Gaffargaon, District: Mymensingh.
|
NOBIDEP
|
gaffargaon
|
|
|
0.00
|
0
|
82.09
|
M/S. Shohel Enterprise, Gafargaon, Mymensingh.
|
82.06
|
12/07/2017
|
19/07/2017
|
10/12/2019
|
100
|
76.95
|
0
|
12/07/2020
|
|
473
|
WNOBI/MYM/GC/112 (B)
|
Development of Gouripur Growth Center Market at Upazila: Gouripur, District: Mymensingh.
|
NOBIDEP
|
gouripur
|
|
|
0.00
|
0
|
97.40
|
M/S Talukder Traders, Purbadhola, Netrokona
|
75.85
|
21/03/2016
|
29/03/2016
|
28/03/2017
|
100
|
75.50
|
0
|
12/07/2020
|
|
474
|
WNOBI-MYM(HAL)-UZRU-10
|
Improvement of R&H (Nagla -Goatala GC via Shakuai Gc (Haluaghat part) at Ch 0+000 to 10+000 km under Haluaghat Upazila, District : Mymensingh
|
NOBIDEP
|
haluaghat
|
361242003
|
10.00
|
0.00
|
0
|
779.79
|
TSL-SE (JV), 55, west Panthopath, Sheltech Tower, Dhaka-1205
|
722.09
|
25/05/2015
|
01/06/2015
|
31/12/2016
|
100
|
721.09
|
0
|
12/07/2020
|
|
475
|
WNOBI-MYM(HAL)-UZRU-11
|
Improvement of R&H (Nagla -Goatala GC via Shakuai Gc (Haluaghat part) at Ch 10+000 to 18+020 km under Haluaghat Upazila, District : Mymensingh
|
NOBIDEP
|
haluaghat
|
361242003
|
8.02
|
0.00
|
0
|
818.39
|
Taher & Sons (Pvt.) Ltd., 55 West Panthopath, Sheltech Tower, Dhaka-1205.
|
855.50
|
30/04/2015
|
07/05/2015
|
31/12/2016
|
100
|
812.49
|
0
|
12/07/2020
|
|
476
|
WNOBI-MYM(HAL)-UZRB-164
|
Construction of 165.20m Long PC Girder Bridge on R&H (Nagla)-Goatola GC Shakuai GC (Haluaghat Part) over Godaria river. 16+680km. Under Haluaghat Upazila, District: Mymensingh. (ID No. 361242003)
|
NOBIDEP
|
haluaghat
|
361242003
|
|
165.20
|
0
|
1039.47
|
M/S Mominul Haque-Baset Prokousholi(JV), Sadar, Netrokona.
|
929.95
|
27/06/2016
|
03/07/2016
|
31/01/2020
|
98
|
738.09
|
0
|
12/07/2020
|
|
477
|
WNOBI/MYM/ GC/111(B)
|
Development of Shakuai Growtg Center Market(GCM) at Upazila: Haluaghat, District: Mymensingh
|
NOBIDEP
|
haluaghat
|
|
|
0.00
|
0
|
75.79
|
Md. Saiful Islam Sarda Goash Road, Sadar, Mymensingh
|
57.08
|
09/03/2016
|
16/03/2016
|
30/11/2017
|
100
|
48.28
|
0
|
12/07/2020
|
|
478
|
WNOBI/MYM/ GC/111(C)
|
Development of Haluaghat Growtg Center Market(GCM) at Upazila: Haluaghat, District: Mymensingh
|
NOBIDEP
|
haluaghat
|
|
|
0.00
|
0
|
97.22
|
M/S. Talukder Traders, Netrokona
|
77.80
|
16/02/2016
|
23/02/2016
|
23/02/2017
|
0
|
0.00
|
0
|
12/07/2020
|
|
479
|
WNOBI-MYM-(ISH)-UNRU-80
|
Improvement of Magtala UP-Modhupur Bazar Road. Ch.0+000km to Ch.6+319km[Excluded Part- Ch.0+816km - Ch.0+936km] Under Ishwarganj Upazila, District: Mymensingh.
(ID No: 361313006)
|
NOBIDEP
|
ishwarganj
|
361313006
|
6.20
|
0.00
|
0
|
386.21
|
M/S. Istiaque Ahmed, Kalibari road, Mymensingh
|
396.04
|
12/12/2016
|
19/12/2016
|
04/06/2018
|
100
|
381.26
|
0
|
12/07/2020
|
|
480
|
WNOBI-MYM(ISH)-UNRU-80-B
|
Construction of 14m Long RCC Slab Bridge on Magtala UP- Modhupur Bazar road over Moga Khal at Ch. 0+869km Under Ishwarganj Upazila, District: Mymensingh. (Road ID No. 361313006)
|
NOBIDEP
|
ishwarganj
|
361313006
|
|
14.00
|
0
|
108.83
|
M.A. Wahed, Jahangirpur, Madan, Netrokona
|
109.77
|
24/08/2017
|
31/08/2017
|
31/01/2019
|
100
|
102.02
|
0
|
12/07/2020
|
|
481
|
WNOBI/MYM/GC/112(C)
|
Development of Growtg Center Market(GCM) at Rayer bazar
Upazila: Ishwarganj, District: Mymensingh
|
NOBIDEP
|
ishwarganj
|
|
|
0.00
|
0
|
74.01
|
M/S Nayeem Enterprise, Nandail, Mymensingh
|
59.52
|
27/12/2015
|
03/01/2016
|
30/05/2019
|
100
|
49.00
|
0
|
12/07/2020
|
|
482
|
WNOBI-MYM-RM-135(A)
|
Development of Charpara Bazar, Rural Market At Upazila: Ishwarganj, District: Mymensingh.
|
NOBIDEP
|
ishwarganj
|
|
|
0.00
|
0
|
84.55
|
M/S. Ratan Enterprise, Kalibari road, Mymensingh
|
69.95
|
11/05/2016
|
18/05/2016
|
15/12/2019
|
100
|
33.23
|
0
|
12/07/2020
|
|
483
|
WNOBI-MYM-RM-135(B)
|
Development of Rural Market at Surjer Bazar.
Upazila: Ishwarganj, District: Mymensingh
|
NOBIDEP
|
ishwarganj
|
|
|
0.00
|
0
|
63.50
|
M/S. Ratan Enterprise, Kalibari road, Mymensingh
|
50.00
|
25/01/2016
|
01/02/2016
|
18/06/2019
|
100
|
37.66
|
0
|
12/07/2020
|
|
484
|
WNOBI-MYM(MUK)-UZRU-12
|
Improvement of Trimohoni Natun Bazar GC-Mohammadnagar GC Via Hazi Kashen Ali Girls College Shibbari & Gorbazil Bazar Road. Ch. 00+000Km- Ch.11+124Km under Muktagacha Upazila, District:Mymensingh. (ID No. 361652010)
|
NOBIDEP
|
muktagacha
|
361652010
|
11.12
|
0.00
|
0
|
909.74
|
Saleh-Hanif JV, Laxipur, Faridpur
|
891.76
|
29/03/2017
|
04/04/2017
|
31/03/2020
|
90
|
710.00
|
0
|
12/07/2020
|
|
485
|
WNOBI-MYM(SAD)-UNRU-79(B)
|
Improvement of Dapunia UP to Montala Bazar road via Shorshamala Bazar Road. Ch. 0+000km to Ch. 6+100Km under Sadar Upazila, District: Mymensingh.
(ID No. 361523004)
|
NOBIDEP
|
mymensingh-s
|
361523004
|
6.10
|
0.00
|
0
|
515.31
|
M/S Hanif Enterprise, Station Road, Faridpur Sadar, Faridpur.
|
502.61
|
12/04/2017
|
19/04/2017
|
31/12/2019
|
44
|
420.00
|
0
|
12/07/2020
|
|
486
|
WNOBI-MYM(SAD)-UZRR-77
|
Rehabiliatation of Churkhai GC-Mymensingh Goffargaon R & H at Sutiakhali road Ch. 0+000-6+538km. (ID no. 361522012)
|
NOBIDEP
|
mymensingh-s
|
361522012
|
6.54
|
0.00
|
0
|
483.29
|
Samiron Chowdhury
|
483.00
|
25/02/2016
|
02/03/2016
|
31/12/2017
|
100
|
482.01
|
0
|
12/07/2020
|
|
487
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
488
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
489
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
490
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
491
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
492
|
WNOBI-MYM(SAD)-UZRU-67
|
Improvement of Begunbari GC-Rahimgonj GC Road via Parangonj Bazar Road (Sadar Portion). Ch. 0+000km to Ch. 8+115km [Excluded Part: Ch. 1+005km to 1+547km, Ch. 2+667km to 2+685km Ch. 5+280km to 5+380km and Ch. 7+925km to 8+115km] under Sadar Upazila, Distr
|
NOBIDEP
|
mymensingh-s
|
361522009
|
7.27
|
0.00
|
0
|
742.67
|
MAE & DCL (J.V), House# 22, Road# 12, Nikunja-02, Khilkhet, Dhaka-1229.
|
794.15
|
22/11/2017
|
29/11/2017
|
31/03/2021
|
43
|
630.00
|
0
|
12/07/2020
|
|
493
|
WNOBI-MYM(SAD)-UZRU-67-B
|
Construction of 66m Long RCC Girder Bridge on Begunbari GC-Rahimgonj GC via Parangonj Bazar (Sadar Portion) at Ch. 8+025km Under Sadar Upazila, District: Mymensingh. (Road ID No. 361522009)
|
NOBIDEP
|
mymensingh-s
|
361522009
|
|
66.00
|
0
|
283.83
|
UDC-SRS JV, Jamalpur Sadar, Jamalpur
|
294.95
|
19/12/2017
|
26/12/2017
|
25/12/2018
|
80
|
223.80
|
0
|
12/07/2020
|
|
494
|
WNOBI-MYM(SAD)-UNRU-79(B)
|
Improvement of Dapunia UP to Montala Bazar road via Shorshamala Bazar Road. Ch. 0+000km to Ch. 6+100Km under Sadar Upazila, District: Mymensingh.
(ID No. 361523004)
|
NOBIDEP
|
mymensingh-s
|
361523004
|
6.10
|
0.00
|
0
|
515.31
|
M/S Hanif Enterprise, Station Road, Faridpur Sadar, Faridpur.
|
502.61
|
12/04/2017
|
19/04/2017
|
31/12/2019
|
44
|
420.00
|
0
|
12/07/2020
|
|
495
|
WNOBI-MYM(NAN)-UNRU-81
|
Improvement of Chindipasha UP - Shildhora Bazar via Bashati Bazar Road at Ch. 0+000 Km - 9+578 Km. Under Nandail Upazila District: Mymensingh. (ID- 361723007).
|
NOBIDEP
|
nandail
|
361723007
|
9.58
|
0.00
|
0
|
621.91
|
MAW-RI (JV) Madan, Netrokona
|
604.85
|
01/03/2016
|
07/03/2016
|
30/06/2018
|
100
|
581.75
|
0
|
12/07/2020
|
|
496
|
WNOBI-MYN-RM-135(D)
|
Development of Seed Store, Rural Market At Upazila: Nandail, District: Mymensingh.
|
NOBIDEP
|
nandail
|
|
|
0.00
|
0
|
99.22
|
M/S. Shila Enterprise, Nandail, Mymensingh.
|
81.85
|
20/02/2017
|
27/02/2017
|
26/02/2018
|
100
|
79.49
|
0
|
12/07/2020
|
|
497
|
WNOBI-NANDI(MYM)-P/1(1)
|
(A) Rehabilitation of Noor Uddin Shop to House of Raisuddin via Doshalia Mosque Road (Ch. 0+000 - 1+526 Km.) ID- LR-361758033 (B) Rehabilitation of Chondipasha more to Eidgah field Road (Ch. 0+000 - 0+470Km.) ID-LR-361758037 (C) Rehabilitation of Nandail
|
NOBIDEP
|
nandail
|
|
4.00
|
0.00
|
0
|
211.84
|
A.K.M Abdul Quddus Seikh, 9, Nataok Ghar Lane, Mymensingh. Mob: 01711853698
|
210.74
|
01/06/2015
|
08/06/2015
|
25/10/2016
|
100
|
210.54
|
0
|
12/07/2020
|
|
498
|
WNOBI-NANDI(MYMN)-P/II(1)
|
A) Rehabilitation of Jhaugara Road start from Nandail Hossainpur D.C Road to Jhaugara Bridge, (Ch. 0+000 km to Ch. 1+761km)
(LR-361758027)
B) Improvement of Road From 4 No. RHD Vatikandha Road to Chimni Khal via Dewanganj Road, (Ch. 0+000km to Ch. 1+300k
|
NOBIDEP
|
nandail
|
|
5.39
|
0.00
|
0
|
417.71
|
Saleh and Brothers, Laxmipur, Faridpur
|
409.09
|
16/03/2017
|
30/03/2017
|
08/11/2018
|
100
|
408.54
|
0
|
12/07/2020
|
|
499
|
WNOBI-NANDI(MYM)-P/III-PR(1)
|
A) Improvement of Road from Nathpara Bridge to Old Dak Bangla Road via Nathpara Jame Mosque Road. Road ID: LR-361818025. (Ch. 0+00 to 0+850 km)
B) Improvement of Road from RHD Road to Mahamuda Sarker Bari House Road, Road ID: LR-361818 WLCC. (Ch. 0+00 to
|
NOBIDEP
|
nandail
|
|
1.29
|
0.00
|
0
|
130.10
|
M.A. WAHED, MODON, NETROKONA
|
135.84
|
02/08/2018
|
16/08/2018
|
08/01/2020
|
100
|
121.69
|
0
|
12/07/2020
|
|
500
|
WNOBI-NANDI(MYMN)-P/III(3)-DR&SWM
|
a)Constructin of drain from Hakim Bhuyan house to River, Ch. 0+00 to 0+668 km (ID. TD-361759013).
b)Supplying 10 nos. of solid waste collection Rickshaw Van.
c)Development of waste collection Pit, size (1×1)m (Garbage Pit, no. 30)
|
NOBIDEP
|
nandail
|
|
668.00
|
0.00
|
0
|
119.51
|
A K M Abdul Kuddus Shak, 9 No. Natokghor lane, Mymensingh.
|
125.25
|
02/08/2018
|
16/08/2018
|
24/04/2020
|
74
|
72.93
|
0
|
12/07/2020
|
|
501
|
WNOBI-NANDI(MYMN)-P/III(4)
|
Improvement of 3 slum area Kakchar (Part-01, 02, 03), and RHD road to Sarafat Doctor house via Fazlu Bhuyan house road, ID: LR- 361818012, Under Nandail Pourashava District: Mymensing.
|
NOBIDEP
|
nandail
|
|
3.00
|
0.00
|
0
|
84.05
|
M/S Samiran Chowdhury, Ukilpara, Netrokona.
|
88.06
|
02/08/2018
|
16/08/2018
|
30/06/2020
|
100
|
70.66
|
0
|
12/07/2020
|
|
502
|
WNOBI-NANDI(MYMN)-P/III-PR&DR(2)
|
Construction of drain from
(a) Kakchar Raton Bhuya House to Narasundar River via shahjahan Commissioner House Ch. 0+00 to 0+350 km, ID. TD-361759006
(b) Improvement of Kakchar Raton Bhuya House to Narasundar River Road via shahjahan Commissioner House C
|
NOBIDEP
|
nandail
|
|
0.65
|
0.00
|
0
|
131.13
|
M/S J.N Enterprise, Propriter: Md. Tajul Islam(Taj) Dampara Bazar, Nikli, Kishoreganj.
|
137.22
|
02/08/2018
|
16/08/2018
|
20/02/2020
|
100
|
111.10
|
0
|
12/07/2020
|
|
503
|
WNOBI-NANDI(MYMN)-P/III(5)
|
(a)Improvement of Kackchar Helal Bhuya House to Hasur House Road, Ch. 0+000 to 0+735km.
(b)Junction Improvement.
(c)02 Nos. of community Toilets at Nandail & Chandipasha Bazar.
(d)Passenger Shed.
|
NOBIDEP
|
nandail
|
|
|
0.00
|
0
|
130.87
|
M/S Ahad Traders, 537, Shibganj Road, Gafargaon, Mymensingh.
|
139.41
|
28/08/2018
|
10/09/2018
|
31/03/2020
|
89
|
26.86
|
0
|
12/07/2020
|
|
504
|
WNOBI-MYM(PHU)-UZRU-14
|
Improvement of Kakni R&H Shyamganj GC road via Bhusher Bazar & Rajdarkel GC Road. Ch. 10+000km-Ch 16+651km(Excluded Ch. 11+508km-13508km) under Phulpur (Tarakanda) Upazila, District: mymensingh. (Id No. 361182007)
|
NOBIDEP
|
phulpur
|
361812007
|
4.65
|
0.00
|
0
|
337.38
|
M/s. Dolly Construction-Khandaker Shahin Ahmed (JV)
|
333.84
|
12/01/2017
|
18/01/2017
|
15/06/2018
|
100
|
333.39
|
0
|
12/07/2020
|
|
505
|
WNOBI-MYM-(PHU)-UZRU-13
|
Improvement of Kakni R&H Shymganj GC road via Bhusher Bazar & Rajdarikal GC Road. ch.00+000km-ch.10+000km Under Phulpur(Tarakanda) Upazila, District: Mymensingh.
(ID No.361182007)
|
NOBIDEP
|
phulpur
|
177902006
|
10.00
|
0.00
|
0
|
791.28
|
M/S Hanif Enterprise, Station Road, Faridpur
|
767.74
|
23/01/2017
|
30/01/2017
|
28/02/2020
|
50
|
550.00
|
0
|
12/07/2020
|
|
506
|
WNOBI-MYM(PHU)-UNRU-123
|
Improvement of Balia UP-Mohishakanda Bazar (Balia Sultaner Moor Chowrasta- Mohishakanda Bazar Road). Ch. 0+000km. to Ch. 4+200km. Under Phulpur Upazila, District: Mymensingh. (Road ID No. 361813022).
|
NOBIDEP
|
phulpur
|
361813022
|
4.20
|
0.00
|
0
|
342.26
|
Dhaly Construction Ltd, Monipur, Mirpur, Dhaka
|
352.22
|
07/02/2018
|
14/02/2018
|
31/12/2020
|
43
|
338.00
|
0
|
12/07/2020
|
|
507
|
WNOBI/MYM/GC/111(D)
|
Development of Growtg Center Market(GCM) at Bhaitkandi bazar
Upazila: Phulbari, District: Mymensingh
|
NOBIDEP
|
phulpur
|
|
|
0.00
|
0
|
83.44
|
Md. Hossain Ali, Nokla, Sherpur
|
69.86
|
28/12/2015
|
04/01/2016
|
22/11/2017
|
100
|
60.23
|
0
|
12/07/2020
|
|
508
|
WNOBI-MYN-RM-134(C)
|
Development of Horiagai Bazar, Rural Market At Upazila: Tarakanda(Phulpur), District: Mymensingh.
|
NOBIDEP
|
phulpur
|
|
|
0.00
|
0
|
94.66
|
Md. Sarwar Jahan, Madan, Netrokona
|
83.69
|
30/07/2017
|
06/08/2017
|
17/12/2018
|
100
|
66.95
|
0
|
12/07/2020
|
|
509
|
WNOBI-MYM-RM-134(D)
|
Development of Charia Bazar, Rural Market At Upazila: Phulpur, District: Mymensingh.
|
NOBIDEP
|
phulpur
|
|
|
0.00
|
0
|
92.80
|
M/S. Setu Enterprise, Phulpur, Mymensingh.
|
84.41
|
20/07/2016
|
27/07/2016
|
30/04/2018
|
100
|
78.21
|
0
|
12/07/2020
|
|
510
|
WNOBI-PHULP(MYMN)-P/II(2)
|
A) Improvement of Amukanda Masjid to Telmohol road at Ch. 0+000km to Ch. 0+319km & Ch. 0+000km to Ch. 0+075km (LR-361818067)
B) Improvement of Road from Naguarasta Sankanda Bazar to Pourashava Boundary at Ch. 0+000km to Ch. 0+775km), (LR-361818005)
C) Imp
|
NOBIDEP
|
phulpur
|
|
4.12
|
0.00
|
0
|
367.97
|
M/S Bonus International, Pro: Md. Abul Hossain, 230/B Khilgon, Zone-01, Tilpapara, Dhaka
|
385.52
|
25/05/2017
|
15/06/2017
|
14/06/2018
|
39
|
111.15
|
0
|
12/07/2020
|
|
511
|
WNOBI-PHULP(MYM)-P/1(1)
|
(A) Rehabilitation of Amuakanda koler bari road ( Ch 0+000Km -0+900Km) ID-LR-361818072 (B) Rehabilitation of Sanchur road Haluaghat road toCharpara moral bari road (UP Connecting road (Ch 0+000Km -0+750Km)ID-LR-361818014
|
NOBIDEP
|
phulpur
|
|
4.91
|
0.00
|
0
|
319.89
|
M/S SRS Construction-Foizul(JV), Kaziakanda, Phulpur, Mymensingh. Mob: 01855686076
|
335.81
|
11/05/2015
|
12/05/2015
|
31/12/2016
|
100
|
335.28
|
0
|
12/07/2020
|
|
512
|
WNOBI-PHULP(MYMN)-P/II(1)
|
A) Rehabilitation of Road Mogarkandha Road to Sanchur Road via Charpara Primary School, (Ch. 0+400 km to Ch. 2+111km)
(LR-361818004)
B) Rehabilitation of Sanchur road from Haluaghat to Charpara Moral Bari road, (Ch. 0+750km to Ch. 1+314km) (LR-361818014)
|
NOBIDEP
|
phulpur
|
|
4.11
|
0.00
|
0
|
279.75
|
Saleh and Brothers , Pro-Saleh Ahmed, Laxmipur, Faridpur Sadar, Faridpur
|
305.17
|
12/04/2017
|
17/04/2017
|
05/12/2018
|
100
|
300.77
|
0
|
12/07/2020
|
|
513
|
WNOBI-PHULP(MYMN)-P/III-PR(1)
|
Improvement of Road from
(a) Cherag Ali’s Rice Mill of Sherpur Road to Basir Mahjon’s House road Ch. 0+00 to 1+035 km, ID. LR-361818059
(b) Motaleb’s House of Amuakandha Bazar to Jigir Guha Hasem’s House Road, Ch. 0+00 to 0+875 km ID. LR-361818018
c) Sh
|
NOBIDEP
|
phulpur
|
|
2.56
|
0.00
|
0
|
281.64
|
MD. Saiful Islam & M/S Khaleque Enterprise JV, Amuakanda, Phulpur,Mymensingh.
|
319.07
|
18/04/2018
|
22/04/2018
|
31/12/2019
|
100
|
317.43
|
0
|
12/07/2020
|
|
514
|
WNOBI-PHULP(MYMN)-P/III(5)
|
(a)Improvement of road from Naguarasta Sankanda bazar to pourashava boundary (Union connecting road), Ch. 0+000 to 0+775km. ID No. LR-361818005.(b)Improvement of road from old degree college to Balia road from, Ch. 0+000 to 1+404km. ID No. LR-361818052.(c
|
NOBIDEP
|
phulpur
|
|
3.72
|
0.00
|
0
|
312.72
|
MSI-MRK(JV), 175/1 R.K Mission road, Mymensingh Town, P.S. Kotwali, District: Mymensingh.
|
311.13
|
01/01/1900
|
|
|
45
|
58.86
|
0
|
12/07/2020
|
|
515
|
WNOBI-PHULP(MYMEN)-P/III(2)
|
a)Improvement of road Strat from charpara Rojob Ali’s house to Godaria Madrasa via Hafiz’s Chairman house (Dulal Kerani’s shop), Ch. 0+000 to 0+995km. ID. LR-361818015.
b)Improvement of road from Amuakandha Bazar Dalmohal to Poyari road via Mannan Chairma
|
NOBIDEP
|
phulpur
|
|
2.23
|
0.00
|
0
|
285.37
|
Md. Foizul Karim, Kazikanda, Phulpur, Mymensingh.
|
306.50
|
28/05/2018
|
04/06/2018
|
25/04/2020
|
76
|
236.12
|
0
|
12/07/2020
|
|
516
|
WNOBI-PHULP(MYMN)-P/III(4)
|
Rehabilitation of road & drain, start from Shibbari to Raton Babu house, Ch. 0+000 to 0+465 km, Road ID. No: LR-361818017, Phulpur Pourashava, District: Mymensingh.
|
NOBIDEP
|
phulpur
|
|
0.47
|
0.00
|
0
|
10.40
|
M/S. Biplab Chandra Datta,Master road, Phulpur, Mymensingh.
|
0.00
|
09/07/2019
|
11/07/2019
|
10/07/2020
|
100
|
0.00
|
0
|
12/07/2020
|
|
517
|
WNOBI-PHUL(MYMN)-P/III(3)
|
Construction of Drain with Slab from Sherpur Road to Rashid Khan’s Rice Mill via Godaria Madrasha Road at Ch. 0+020km to 0+720km (Road ID. DS-361819006,10) Under Phulpur Pourashava, District: Mymensingh.
|
NOBIDEP
|
phulpur
|
|
500.00
|
0.00
|
0
|
222.99
|
N H Enterprise-M/S. Joyan Enterprise (JV), Phulpur, Mymensingh.
|
242.95
|
06/06/2018
|
16/06/2018
|
31/12/2019
|
100
|
193.33
|
0
|
12/07/2020
|
|
518
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
519
|
WNOBI-MYM(TRI)-UZRU-73
|
Improvement of Hoddervita RHD - Kalirbazar GC Road. Ch. 0+000 - Ch. 8+332km [Excluded Part Ch. 3+867km to Ch. 4+875km] Under Trishal Upazila, District: Mymensingh. (ID No. 361942006)
|
NOBIDEP
|
trishal
|
361942006
|
7.32
|
0.00
|
0
|
730.65
|
M/S K.K. Enterprise, Bijoy Nagor, Dhaka-1000
|
749.84
|
05/12/2017
|
12/12/2017
|
15/07/2020
|
72
|
617.00
|
0
|
12/07/2020
|
|
520
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
521
|
WNOBI-MYM-RM-136(C)
|
Development of Dhala Bazar Rural Market under
Trishal Upazila, District: Mymensingh.
|
NOBIDEP
|
trishal
|
|
|
0.00
|
0
|
83.97
|
AKM Mizanur Rahman, Sadar, Mymensingh
|
63.05
|
21/12/2015
|
28/12/2015
|
13/02/2017
|
100
|
62.76
|
0
|
12/07/2020
|
|
522
|
WNOBI-MYN-RM-136(D)
|
Developement of Kashiganj Bazar, Rural Market At Upazila: Trishal, District: Mymensingh.
|
NOBIDEP
|
trishal
|
|
|
0.00
|
0
|
96.55
|
M/S. Redoy Enterprise, Fulbaria, Mymensingh.
|
78.65
|
24/10/2016
|
31/10/2016
|
31/05/2019
|
100
|
60.00
|
0
|
12/07/2020
|
|
523
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
524
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
525
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
526
|
WNOBI-MYM(TRI)-UZRU-15
|
Improvement of Chakrampur GC - Kalirbazar GC Road at Ch. 0+000km.- 11+710km under Trishal Upazila, District: Mymensingh. (ID No. 361942010)
|
NOBIDEP
|
trishal
|
361942010
|
11.71
|
0.00
|
0
|
1021.96
|
Shamim Enterprise (pvt) Ltd. 4 K.B. Islam road, Mymensingh.
|
977.40
|
03/05/2016
|
10/05/2016
|
31/05/2020
|
80
|
754.86
|
0
|
12/07/2020
|
|
527
|
WNOBI-MYM(TRI)-UZRU-15-B
|
Construction of 42m Long RCC Girder Bridge on Chakrampur GC- Kalir Bazar GC Road Over Pagaria River at Ch: 6+592 km Under Trishal Upazila, District: Mymensingh (Road ID No: 361942010).
|
NOBIDEP
|
trishal
|
361942010
|
|
42.00
|
0
|
224.76
|
M/S SAIFUL BRICKS, Barrerar Par Fulbaria Road, Mymensingh
|
209.53
|
22/01/2018
|
29/01/2018
|
30/11/2020
|
55
|
180.50
|
0
|
12/07/2020
|
|
528
|
RERMP-3/MY MEN/W-47
|
Maintenance of Rural
Roads Mymensingh ()
|
RERMP-3
|
mymensingh-s
|
N/A
|
|
|
37
|
5365.50
|
N/A
|
5365.50
|
|
|
|
40
|
1985.00
|
37
|
26/12/2021
|
|
529
|
RTIP-II/MYM/RPM-20.1
|
Dhaka-Mym. H/Way (Seed Store GC)-Shakhipur
|
RTIP-2
|
bhaluka
|
|
6.00
|
|
|
91.52
|
Md. Saiful Islam
|
93.53
|
|
23/04/2013
|
01/04/2014
|
100
|
|
|
|
|
530
|
RTIP-II/MYM/RPM-20.2
|
Dhaka-Mym. H/Way (Seed Store GC)-Shakhipur
|
RTIP-2
|
bhaluka
|
|
7.75
|
|
|
109.34
|
DIENCO-Shapla Joint Venture
|
114.94
|
|
24/04/2013
|
30/06/2014
|
100
|
|
|
|
|
531
|
RTIP-II/MYM/RPM-231
|
Bhaluka UP-Vote Bazar
|
RTIP-2
|
bhaluka
|
|
10.41
|
|
|
300.38
|
M/S. Dolly Construction_Khandaker Shahin Ahmed (JV)
|
266.57
|
|
30/12/2015
|
30/12/2017
|
100
|
|
|
|
|
532
|
RTIP-II/MYM/RPM-366
|
Dhaka-Mymensingh H/W-Mollikbary GC
|
RTIP-2
|
bhaluka
|
|
5.87
|
|
|
418.74
|
Saleh and Brothers
|
303.38
|
|
07/03/2017
|
29/08/2018
|
100
|
|
|
|
|
533
|
RTIP-II/MYM/UNR-25
|
a) Dhudnoy bazar-Gamaretola UP (Kolsindur GC) Rd
|
RTIP-2
|
dhobaura
|
|
4.79
|
|
|
384.49
|
Md. Farid Uddin
|
778.82
|
|
11/08/2014
|
25/03/2017
|
0
|
|
|
|
|
534
|
RTIP-II/MYM/RPM-90
|
b) Dhobaura Upazila H/Q-Goatola GC road
|
RTIP-2
|
dhobaura
|
|
9.39
|
|
|
281.70
|
|
0.00
|
|
02/03/2014
|
08/08/2015
|
0
|
|
|
|
|
535
|
RTIP-II/MYM/UZR-20
|
Hatkalir Bazar to Patira Bazar R&H via Keshoregonj GC
|
RTIP-2
|
fulbaria
|
|
13.00
|
|
|
1700.39
|
Taher & Sons (Pvt.) Ltd.
|
1842.90
|
|
20/09/2015
|
31/03/2018
|
100
|
|
|
|
|
536
|
RTIP-II/MYM/RPM-23
|
Fulbaria-Hat Kalirbajar
|
RTIP-2
|
fulbaria
|
|
9.30
|
|
|
290.40
|
M/S. Shahil Enterprise
|
328.42
|
|
17/04/2013
|
18/06/2014
|
100
|
|
|
|
|
537
|
RTIP-II/MYM/RPM-232
|
Fulbaria-Bailor Road via Radhakanai Bazar
|
RTIP-2
|
fulbaria
|
|
9.60
|
|
|
360.10
|
JV of Taher & Sons (Pvt.) Ltd. & Md. Lal Mahmood JV (TSL-LM JV)
|
321.57
|
|
06/05/2015
|
03/05/2016
|
100
|
|
|
|
|
538
|
RTIP-II/MYM/RPM-365
|
Assim-Trishal via Porabari Road.
|
RTIP-2
|
fulbaria
|
|
7.50
|
|
|
318.29
|
JV of Sheik Hemayet Ali & Rodoy Enterprise [SHA-RE (JV)]
|
315.90
|
|
13/02/2017
|
30/04/2018
|
100
|
|
|
|
|
539
|
RTIP-II/MYM/UZR-21
|
Kandipara-Goyeshpur Rd.
|
RTIP-2
|
gaffargaon
|
|
11.54
|
|
|
1387.17
|
Md. Shajahan Ali
|
1525.19
|
|
11/05/2015
|
30/04/2018
|
100
|
|
|
|
|
540
|
RTIP-II/MYM/RPM-91
|
Shibgonj-Goyeshpur road
|
RTIP-2
|
gaffargaon
|
|
15.30
|
|
|
222.49
|
Md. Saiful Islam
|
201.85
|
|
12/02/2014
|
02/02/2015
|
100
|
|
|
|
|
541
|
RTIP-II/MYM/PBMC-5.3
|
Maizbari-Baraihati Rd.
|
RTIP-2
|
gaffargaon
|
|
19.30
|
|
|
595.69
|
Samiran Chowdhury
|
541.99
|
|
14/06/2015
|
13/06/2020
|
100
|
|
|
|
|
542
|
RTIP-II/MYM/GCM-21
|
Improvement of Ambitala GCM
|
RTIP-2
|
gaffargaon
|
|
1.00
|
|
|
75.24
|
M/S. Shohel Enterprise
|
85.00
|
|
22/10/2015
|
30/06/2017
|
100
|
|
|
|
|
543
|
RTIP-II/MYM/RPM-236
|
Gaffargaon-Chak Rampur Road.
|
RTIP-2
|
gaffargaon
|
|
15.40
|
|
|
300.60
|
Sheik Hemayet Ali
|
275.10
|
|
19/10/2015
|
20/11/2017
|
100
|
|
|
|
|
544
|
RTIP-II/MYM/RPM-21.1
|
Ramgopalpur RHD to Shyamgonj GC via Gouripur
|
RTIP-2
|
gouripur
|
|
4.35
|
|
|
78.96
|
M/S. Babul Enterprise
|
82.36
|
|
09/05/2013
|
30/04/2014
|
100
|
|
|
|
|
545
|
RTIP-II/MYM/RPM-21.2
|
Ramgopalpur RHD to Shyamgonj GC via Gouripur
|
RTIP-2
|
gouripur
|
|
7.73
|
|
|
176.03
|
M/S. Samiron Chowdhury
|
190.92
|
|
13/05/2013
|
10/06/2014
|
100
|
|
|
|
|
546
|
RTIP-II/MYM/RPM-233
|
Gouripur-Bekurhati GC (Gouripur part).
|
RTIP-2
|
gouripur
|
|
14.09
|
|
|
478.91
|
M/S. Shahil Enterprise
|
418.07
|
|
26/04/2015
|
06/12/2016
|
100
|
|
|
|
|
547
|
RTIP-II/MYM/UZR-70
|
Haluaghat-Nalitabari Rd.
|
RTIP-2
|
haluaghat
|
|
8.57
|
|
|
1006.69
|
UDC Construction Limited & SRS Construction [UDC-SRS JV]
|
970.23
|
|
20/01/2016
|
15/03/2018
|
100
|
|
|
|
|
548
|
RTIP-II/MYM/RPM-22.1
|
Pabiajuri Bailly Bridge (Nalitabari)-Dhara Road (Mymensingh part)
|
RTIP-2
|
haluaghat
|
|
9.80
|
|
|
182.24
|
M/S. S. R. S. Construction
|
190.09
|
|
23/04/2013
|
01/03/2014
|
100
|
|
|
|
|
549
|
RTIP-II/MYM/UZR-70-STR-36
|
Construction of 35m RCC Bridge at Ch. 0+165km on Haluaghat-Nalitabari Road.
|
RTIP-2
|
haluaghat
|
|
35.00
|
|
|
195.22
|
MD. Monjurul Haque (Monju)
|
167.48
|
|
02/06/2016
|
24/05/2018
|
95
|
|
|
|
|
550
|
RTIP-II/MYM/RPM-93
|
Iswargonj-Royer Bazar road
|
RTIP-2
|
ishwarganj
|
|
12.43
|
|
|
321.13
|
M/S. Tanvir Traders
|
336.37
|
|
02/03/2014
|
30/07/2015
|
100
|
|
|
|
|
551
|
RTIP-II/MYM/PBMC-5.1
|
Uchakhila (Ishwarganj)-Laxmiganj-Kumaruli-Atharabari-Kendua road
|
RTIP-2
|
ishwarganj
|
|
21.42
|
|
|
543.78
|
M/S. Nipoon Engineers & Constructions
|
520.89
|
|
22/09/2015
|
16/09/2020
|
100
|
|
|
|
|
552
|
RTIP-II/MYM/UZR-68
|
Chechua-Khamarer Bazar Road Via Mogaltola & Syedpara Bazar Road.
|
RTIP-2
|
muktagacha
|
|
4.35
|
|
|
692.91
|
M/S. Chowdhury Enterprise
|
641.42
|
|
25/01/2016
|
31/12/2018
|
95
|
|
|
|
|
553
|
RTIP-II/MYM/UNR-24
|
b) Daowgaon U.P Office-Battola Bazar Road
|
RTIP-2
|
muktagacha
|
|
3.49
|
|
|
286.93
|
|
0.00
|
|
07/09/2014
|
19/12/2016
|
100
|
|
|
|
|
554
|
RTIP-II/MYM/RPM-305
|
Muktagacha-Khamarar Bazar Road
|
RTIP-2
|
muktagacha
|
|
11.53
|
|
|
483.63
|
M/S. Nawal Construction
|
442.33
|
|
24/01/2017
|
30/06/2018
|
68
|
|
|
|
|
555
|
RTIP-II/MYM/UZR-71
|
Dapunia GC-Myn. Tangail R&H Road at Khagdohar via Sarkari Pukurpar
|
RTIP-2
|
mymensingh-s
|
|
7.62
|
|
|
985.70
|
M/S. Bhawal Construction & M/S. Saiful Bricks (JV)
|
967.70
|
|
04/01/2016
|
17/06/2018
|
100
|
|
|
|
|
556
|
RTIP-II/MYM/UNR-25
|
b) Shambugonj Old Bus stand bazar-Parangonj Bazar via Sirta UP Office
|
RTIP-2
|
mymensingh-s
|
|
5.10
|
|
|
300.04
|
|
0.00
|
|
11/08/2014
|
25/03/2017
|
0
|
|
|
|
|
557
|
RTIP-II/MYM/RPM-92
|
Shambugonj bazar (R&H)-Ambikagonj GC road
|
RTIP-2
|
mymensingh-s
|
|
15.60
|
|
|
374.23
|
M/S. Nippon Engineers & Constructions
|
319.34
|
|
09/02/2014
|
15/06/2015
|
100
|
|
|
|
|
558
|
RTIP-II/MYM/RPM-234
|
Begunbari GC-Austadhar GC Road.
|
RTIP-2
|
mymensingh-s
|
|
14.45
|
|
|
501.32
|
Md. Monjurul Haque Monju & M/S. Alam Construction (JV)
|
498.64
|
|
17/12/2015
|
15/03/2018
|
100
|
|
|
|
|
559
|
RTIP-II/MYM/RPM-402
|
Late Engr S.M. Aminul Haque Road [Tarakanda-Guatala road] (Phulpur part of Dhobaora-Tarakanda Road).
|
RTIP-2
|
mymensingh-s
|
|
7.86
|
|
|
576.05
|
M/S. Hanif Enterprise
|
560.64
|
|
22/05/2017
|
03/01/2018
|
50
|
|
|
|
|
560
|
RTIP-II/MYM/RPM-403
|
Late Engr S.M. Aminul Haque Road [Tarakanda-Guatala road] (Phulpur part of Dhobaora-Tarakanda Road).
|
RTIP-2
|
mymensingh-s
|
|
7.96
|
|
|
570.25
|
M/S. Nawal Construction
|
540.29
|
|
11/05/2017
|
29/05/2018
|
47
|
|
|
|
|
561
|
RTIP-II/MYM/RPM-24
|
Nandail H.Q-Bakchanda G.C
|
RTIP-2
|
nandail
|
|
7.98
|
|
|
311.28
|
M/S. Paradise Traders
|
304.01
|
|
17/06/2013
|
10/06/2014
|
100
|
|
|
|
|
562
|
RTIP-II/MYM/RPM-235
|
Nandail H.Q-Dewanganj GC Road.
|
RTIP-2
|
nandail
|
|
17.08
|
|
|
704.42
|
JV of Samiran Chowdhury & Md. Mizanur Rahman Shamim (Samiran Chowdhury & MRS JV)
|
626.38
|
|
21/06/2015
|
14/06/2016
|
100
|
|
|
|
|
563
|
RTIP-II/MYM/RPM-306
|
Madhupur R&H-Dewangonj G.C Rd.
|
RTIP-2
|
nandail
|
|
8.90
|
|
|
226.15
|
Redoy Enterprise & Swarna Bricks JV [RE-SB (JV)]
|
209.75
|
|
05/02/2017
|
04/02/2018
|
100
|
|
|
|
|
564
|
RTIP-II/MYM/UZR-67
|
Taldighi R&H-Munshir hat GC Rd.
|
RTIP-2
|
phulpur
|
|
10.36
|
|
|
1331.24
|
UDC Construction Limited & SRS Construction [UDC-SRS JV]
|
1331.12
|
|
27/01/2016
|
25/01/2018
|
100
|
|
|
|
|
565
|
RTIP-II/MYM/UNR-24
|
a) Bhaitkandi U.P. to Chargoadanga bazar Road via Rambhadrapur.
|
RTIP-2
|
phulpur
|
|
10.38
|
|
|
692.27
|
JV of M/S. Mollik Enterprise & M/S. Haque Enterprise (Mollik-Hoque 2014 JV)
|
1117.04
|
|
07/09/2014
|
19/12/2016
|
100
|
|
|
|
|
566
|
RTIP-II/MYM/RPM-22.2
|
Bhaitkandi R&H. Road-Narayankhula G.C. Bhaitkandi G.C
|
RTIP-2
|
phulpur
|
|
5.65
|
|
|
85.68
|
M/S. S. R. S. Construction
|
90.49
|
|
23/04/2013
|
10/04/2014
|
100
|
|
|
|
|
567
|
RTIP-II/MYM/PBMC-5.2
|
Late Engr S.M. Aminul Haque Road [Tarakanda-Guatala road] (Phulpur part of Dhobaora-Tarakanda Road).
|
RTIP-2
|
phulpur
|
|
4.00
|
|
|
824.41
|
Md. Shahjahan Ali
|
918.91
|
|
06/01/2016
|
31/12/2020
|
30
|
|
|
|
|
568
|
RTIP-II/MYM/RPM-90
|
a) Bailor-Fulbaria road
|
RTIP-2
|
trishal
|
|
5.10
|
|
|
175.63
|
M/S. Tanvir Traders
|
432.84
|
|
02/03/2014
|
08/08/2015
|
0
|
|
|
|
|
569
|
RTIP-II/MYM/GCM-22
|
Improvement of Chakrumpur GCM
|
RTIP-2
|
trishal
|
|
1.00
|
|
|
126.63
|
Md. Saiful Islam
|
107.08
|
|
22/10/2015
|
12/06/2017
|
100
|
|
|
|
|
570
|
RTIP-II/MYM/RPM-237
|
Trishal UP-Katakhali bazar Road via Dhanikhola UP
|
RTIP-2
|
trishal
|
|
13.75
|
|
|
254.59
|
JV of G.M Sons & Md. Jahangir Alam (GM-JA JV)
|
218.05
|
|
07/12/2015
|
11/05/2017
|
100
|
|
|
|
|
571
|
RTIP-II/MYM/RPM-397
|
RHD road at Raghamara-Chakrampur GC.
|
RTIP-2
|
trishal
|
|
7.59
|
|
|
490.11
|
M/S. K.K. Enterprise & Nationtech Communications Ltd [(NATIONTECH-KKE (JV)]
|
465.68
|
|
11/05/2017
|
06/06/2018
|
82
|
|
|
|
|
572
|
SP33088
|
Foliar Khal Sub-project: Foliar Khal WRS 2Vent 1.5mx1.80m, Re-excavation of Foliar Khal 4.10 km (Ch.0.00km to Ch.4.10km) and Re-sectioning of Embankment 1.861 (Ch.0+00km to Ch.1+861km)
|
SSWRDP-JICA-2
|
fulbaria
|
|
5.96
|
0.00
|
0
|
145.62
|
LCS
|
145.62
|
10/03/2019
|
|
30/04/2019
|
90
|
20.50
|
0
|
30/06/2020
|
|
573
|
SP32027
|
Kharia Nadi Sub-project: Construction of Regulator (at ch. 1+690km), Re-excavation of Kharia Nadi at (Ch.0+000km to Ch.12+800km), Re-excavation of suti khal at (Ch.0+00km to Ch.2+275km), Re-sectioning of Embankment
|
SSWRDP-JICA-2
|
phulpur
|
|
14.71
|
0.00
|
0
|
238.48
|
LCS
|
0.00
|
08/02/2020
|
|
30/04/2020
|
60
|
0.00
|
0
|
30/06/2020
|
|
574
|
W.205
|
Construction ofMEYDURAI UP Complex
|
UCCP-2
|
bhaluka
|
|
|
|
100
|
90.31
|
|
76.37
|
07/04/2016
|
|
30/09/2018
|
100
|
75.45
|
100
|
25/08/2020
|
|
575
|
W.346
|
Construction of 1 NO MAIJPARA UP Complex
|
UCCP-2
|
dhobaura
|
|
|
|
100
|
93.31
|
|
93.31
|
21/09/2015
|
|
26/06/2016
|
100
|
93.00
|
100
|
25/08/2020
|
|
576
|
W.093
|
Construction of 5 NO GOATOLA UP Complex
|
UCCP-2
|
dhobaura
|
|
|
|
100
|
92.14
|
|
86.48
|
31/05/2015
|
|
24/04/2016
|
100
|
86.30
|
100
|
25/08/2020
|
|
577
|
NEW
|
Construction of PORAKANDUILA UP Complex
|
UCCP-2
|
dhobaura
|
|
|
|
|
101.00
|
|
83.30
|
24/05/2016
|
|
06/05/2017
|
100
|
76.69
|
|
25/03/2020
|
|
578
|
W.290
|
Construction of BALIAN UP Complex
|
UCCP-2
|
fulbaria
|
|
|
|
100
|
86.84
|
|
82.50
|
26/10/2013
|
|
08/02/2015
|
100
|
79.90
|
100
|
25/08/2020
|
|
579
|
W.323
|
Construction oF RANGAMATIA UP Complex
|
UCCP-2
|
fulbaria
|
|
|
|
100
|
86.27
|
|
81.97
|
15/07/2013
|
|
20/03/2014
|
100
|
81.90
|
100
|
25/08/2020
|
|
580
|
167/246
|
Construction of fulbaria UP Complex
|
UCCP-2
|
fulbaria
|
|
|
|
100
|
51.10
|
|
51.10
|
15/09/2010
|
|
30/12/2011
|
100
|
51.00
|
100
|
26/07/2020
|
|
581
|
168/246
|
Construction of kaladah UP Complex
|
UCCP-2
|
fulbaria
|
|
|
|
100
|
59.00
|
|
56.05
|
12/04/2011
|
|
30/10/2012
|
100
|
56.00
|
100
|
23/07/2020
|
|
582
|
W-588
|
Construction of DEWKHOLA UP Complex
|
UCCP-2
|
fulbaria
|
|
|
|
|
112.08
|
|
106.48
|
28/05/2018
|
|
27/02/2019
|
100
|
94.77
|
|
25/03/2020
|
|
583
|
W.250
|
Construction of GOFFARGAON UP Complex
|
UCCP-2
|
gaffargaon
|
|
|
|
100
|
84.84
|
|
88.99
|
29/01/2014
|
|
30/06/2015
|
100
|
88.99
|
100
|
25/08/2020
|
|
584
|
164/246
|
Construction of Shalitha (remaining) Up Complex
|
UCCP-2
|
gaffargaon
|
|
|
|
100
|
69.17
|
|
72.62
|
04/09/2010
|
|
03/07/2015
|
100
|
69.16
|
100
|
28/07/2020
|
|
585
|
W.570
|
Construction of PYTHOL UP Complex
|
UCCP-2
|
gaffargaon
|
|
|
|
|
109.18
|
|
109.11
|
25/05/2018
|
|
30/07/2019
|
100
|
70.00
|
|
25/03/2020
|
|
586
|
W.207
|
Construction of01 NO MAYLAKANDA UP Complex
|
UCCP-2
|
gouripur
|
|
|
|
100
|
88.12
|
|
83.72
|
02/12/2013
|
|
30/12/2015
|
100
|
83.42
|
100
|
25/08/2020
|
|
587
|
W.223
|
Construction of 2 NO GOURIPUR UP Complex
|
UCCP-2
|
gouripur
|
|
|
|
100
|
83.54
|
|
87.71
|
06/10/2013
|
|
30/10/2015
|
100
|
86.97
|
100
|
25/08/2020
|
|
588
|
W.149
|
Construction of 4 NO MAUHA UP Complex
|
UCCP-2
|
gouripur
|
|
|
|
100
|
83.38
|
|
87.52
|
10/11/2013
|
|
25/12/2015
|
100
|
87.21
|
100
|
25/08/2020
|
|
589
|
163/246
|
Construction ofbhagnama Up Complex
|
UCCP-2
|
gouripur
|
|
|
|
100
|
56.05
|
|
56.05
|
|
|
|
100
|
55.95
|
100
|
28/07/2020
|
|
590
|
W.395
|
Construction of 10 N0 DHURAIL UP Complex
|
UCCP-2
|
haluaghat
|
|
|
|
100
|
84.22
|
|
80.01
|
16/02/2014
|
|
15/12/2015
|
100
|
78.32
|
100
|
25/08/2020
|
|
591
|
W.107
|
Construction of 11 no Amtoil UP Complex
|
UCCP-2
|
haluaghat
|
|
|
|
100
|
94.25
|
|
80.02
|
25/01/2016
|
|
30/10/2016
|
100
|
80.02
|
100
|
24/08/2020
|
|
592
|
W.356
|
Construction of 7 no Sakuai UP Complex
|
UCCP-2
|
haluaghat
|
|
|
|
100
|
84.23
|
|
80.02
|
16/02/2014
|
|
20/09/2015
|
100
|
79.51
|
100
|
24/08/2020
|
|
593
|
W.005
|
Construction of Borohit UP Complex
|
UCCP-2
|
ishwarganj
|
|
|
|
100
|
85.62
|
|
74.61
|
24/05/2016
|
|
30/09/2019
|
100
|
73.94
|
100
|
24/08/2020
|
|
594
|
W.281
|
Construction of Shohagi UP Complex
|
UCCP-2
|
ishwarganj
|
|
|
|
100
|
85.73
|
|
85.73
|
25/02/2013
|
|
30/06/2015
|
100
|
85.54
|
100
|
24/08/2020
|
|
595
|
W.563
|
Construction of Atharobari UP Complex
|
UCCP-2
|
ishwarganj
|
|
|
|
60
|
139.51
|
|
125.56
|
29/03/2018
|
|
28/02/2020
|
85
|
70.00
|
60
|
24/08/2020
|
|
596
|
W.257
|
Construction of 2 no Barogram UP Complex
|
UCCP-2
|
muktagacha
|
|
|
|
100
|
93.42
|
|
89.54
|
04/02/2014
|
|
30/10/2015
|
100
|
89.53
|
100
|
24/08/2020
|
|
597
|
W.314
|
Construction of Kashimpur UP Complex
|
UCCP-2
|
muktagacha
|
|
|
|
100
|
90.95
|
|
95.04
|
21/05/2013
|
|
30/04/2014
|
100
|
95.03
|
100
|
24/08/2020
|
|
598
|
162/246
|
Construction of bororchar Up Complex
|
UCCP-2
|
mymensingh-s
|
|
|
|
100
|
56.05
|
|
56.05
|
27/04/2010
|
|
03/11/2010
|
100
|
56.00
|
100
|
28/07/2020
|
|
599
|
161/246
|
Construction of charnilokh Up Complex
|
UCCP-2
|
mymensingh-s
|
|
|
|
100
|
59.00
|
|
59.00
|
24/10/2010
|
|
08/07/2011
|
100
|
58.96
|
100
|
28/07/2020
|
|
600
|
160/246
|
Construction ofparanganj Up Complex
|
UCCP-2
|
mymensingh-s
|
|
|
|
100
|
67.21
|
|
63.86
|
30/04/2014
|
|
07/12/2014
|
100
|
63.83
|
100
|
28/07/2020
|
|
601
|
159/246
|
Construction of shirta Up Complex
|
UCCP-2
|
mymensingh-s
|
|
|
|
100
|
56.05
|
|
56.05
|
30/04/2010
|
|
30/10/2010
|
100
|
55.92
|
100
|
27/07/2020
|
|
602
|
W.402
|
Construction of 12 no Barogram UP Complex
|
UCCP-2
|
nandail
|
|
|
|
100
|
93.42
|
|
80.08
|
12/11/2015
|
|
19/08/2016
|
100
|
79.51
|
100
|
24/08/2020
|
|
603
|
W.006
|
Construction of 03 no Nandail UP Complex
|
UCCP-2
|
nandail
|
|
|
|
100
|
84.71
|
|
84.71
|
22/09/2015
|
|
14/02/2017
|
100
|
81.84
|
100
|
24/08/2020
|
|
604
|
W.315
|
Construction of 7 no Musulli UP Complex
|
UCCP-2
|
nandail
|
|
|
|
100
|
85.04
|
|
89.20
|
22/01/2014
|
|
18/10/2014
|
100
|
89.14
|
100
|
24/08/2020
|
|
605
|
W.431
|
Construction of Batagoir UP Complex
|
UCCP-2
|
nandail
|
|
|
|
100
|
31.91
|
|
28.64
|
18/03/2010
|
|
22/07/2010
|
100
|
28.63
|
100
|
24/08/2020
|
|
606
|
101/176
|
Construction of RAHIMGANJ UP Complex
|
UCCP-2
|
phulpur
|
|
|
|
100
|
87.20
|
|
85.01
|
03/03/2015
|
|
28/06/2016
|
100
|
84.95
|
100
|
06/09/2020
|
|
607
|
W.313
|
Construction of 5 no Phulpur UP Complex
|
UCCP-2
|
phulpur
|
|
|
|
100
|
93.06
|
|
79.94
|
08/02/2016
|
|
13/11/2016
|
100
|
79.73
|
100
|
24/08/2020
|
|
608
|
W.501
|
Construction of 4 no Sinharsur UP Complex
|
UCCP-2
|
phulpur
|
|
|
|
100
|
103.42
|
|
93.08
|
31/07/2017
|
|
30/06/2019
|
100
|
92.78
|
100
|
24/08/2020
|
|
609
|
W.31
|
Construction of Pyari UP Complex
|
UCCP-2
|
phulpur
|
|
|
|
80
|
148.48
|
|
141.06
|
10/12/2018
|
|
31/01/2019
|
100
|
110.47
|
80
|
24/08/2020
|
|
610
|
W.642
|
Construction of Bowla UP Complex
|
UCCP-2
|
phulpur
|
|
|
|
75
|
133.83
|
|
127.14
|
10/12/2018
|
|
31/01/2021
|
100
|
79.53
|
75
|
24/08/2020
|
|
611
|
166/246
|
Construction of biska Up Complex
|
UCCP-2
|
phulpur
|
|
|
|
100
|
56.05
|
|
56.05
|
12/04/2010
|
|
28/09/2011
|
100
|
55.95
|
100
|
28/07/2020
|
|
612
|
165/246
|
Construction oframpur Up Complex
|
UCCP-2
|
phulpur
|
|
|
|
100
|
50.70
|
|
50.60
|
15/09/2009
|
|
08/01/2012
|
100
|
50.59
|
100
|
28/07/2020
|
|
613
|
W.446
|
Construction of 05 no Balikha UP Ccmplex
|
UCCP-2
|
Tarakanda
|
|
|
|
100
|
97.61
|
|
82.47
|
14/02/2017
|
|
30/05/2019
|
100
|
81.31
|
100
|
24/08/2020
|
|
614
|
W.387
|
Construction of Kamargaon UP Complex
|
UCCP-2
|
Tarakanda
|
|
|
|
100
|
87.79
|
|
85.04
|
22/04/2015
|
|
20/10/2016
|
100
|
83.88
|
100
|
24/08/2020
|
|
615
|
W.365
|
Construction of 9 no Kakoni UP Complex
|
UCCP-2
|
Tarakanda
|
|
|
|
100
|
87.79
|
|
84.22
|
22/04/2015
|
|
30/03/2017
|
100
|
84.07
|
100
|
24/08/2020
|
|
616
|
W.661
|
Construction of Kathal UP Complex
|
UCCP-2
|
trishal
|
|
|
|
40
|
130.79
|
|
119.00
|
29/09/2019
|
|
25/06/2020
|
75
|
50.54
|
40
|
24/08/2020
|
|
617
|
CBU-100/ Purto-309
|
ময়মনসিংহ জেলার ভালুকা উপজেলাধীন ভরাডোবা নতুন বাসষ্ট্যান্ড-জুলুরবাজার সড়কে PSC ব্রিজ নির্মাণ (রোড আইডিঃ ৩৬১১৩৪০৩৬)
|
UHBP
|
bhaluka
|
361134036
|
|
90.00
|
0
|
705.62
|
M/S. Chowdhury Enterprise, Faruque Ahmed Chowdhury, Sardar para, Jamalpur.
|
702.08
|
01/06/2020
|
08/06/2020
|
31/12/2024
|
92
|
593.30
|
0
|
28/09/2024
|
|
618
|
CBU-100/ Purto-310
|
ময়মনসিংহ জেলার ধোবাউড়া উপজেলাধীন ঘোষগাঁও ইউপি (ঘোষগাঁও জিসি)-চাড়ুয়াপাড়াভায়া বাগপাড়া বাজার এবং সাদ্দাম বাজার সড়কে ১৪০০ মিটার চেইনেজে শশীয় খাল RCC ব্রিজ নির্মাণ (রোড আইডিঃ ৩৬১১৬৩০১৭)
|
UHBP
|
dhobaura
|
361163017
|
|
72.00
|
0
|
587.39
|
M/S. S.R.S Construction
|
595.99
|
08/06/2020
|
08/06/2020
|
21/04/2021
|
100
|
595.81
|
0
|
28/09/2024
|
|
619
|
CBU-100/ Purto-305
|
ময়মনসিংহ জেলার গৌরীপুর উপজেলাধীন নওডাঙ্গা বাজার -ভোলার আলগী রাস্তায় ৫০০ মিটার চেইনেজে মাঠিয়া নদীর উপর 96m PSC সেতু নির্মাণ (রোড আইডিঃ ৩৬১২৩৪০৫৭)
|
UHBP
|
gouripur
|
361234057
|
|
96.00
|
0
|
729.33
|
M/S. Shohel Enterprise
|
729.29
|
08/06/2020
|
15/06/2020
|
30/06/2024
|
100
|
693.97
|
0
|
28/09/2024
|
|
620
|
CBU-100/ Purto-311
|
ময়মনসিংহ জেলার হালুয়াঘাট উপজেলাধীন ধারা ইউনিয়নের রুহিপাগারিয়া ভায়া শুনিয়ারী কান্দা সড়কে ২৫৭৭ মিটার চেইনেজে গাঙ্গিনা নদীর উপর ব্রিজ নর্মাণ (রোড আইডিঃ ৩৬১২৪৩০২১)
|
UHBP
|
haluaghat
|
361243021
|
|
54.00
|
0
|
467.46
|
M/S. Mirza Construction- Masum Construction (JV)
|
428.14
|
12/08/2021
|
19/08/2021
|
26/04/2024
|
95
|
376.60
|
0
|
28/09/2024
|
|
621
|
CBU-100/ Purto-306
|
ময়মনসিংহ জেলার নান্দাইল উপজেলাধীন বিলভাদেরা-দরিলস্না সংযোগকারী ও মুসল্লী সড়ক ১৬০০মিটার চেইনেজে সুখাইজুরী PSC সেতু নির্মাণ (রোড আইডিঃ ৩৬১৭২৪০৮১)
|
UHBP
|
nandail
|
361724081
|
|
96.00
|
0
|
697.13
|
M/S. Mushfiqur Rahman(Kanchjan)-M/S. Nishat Enterprise (JV)
|
677.49
|
07/06/2020
|
13/06/2020
|
19/01/2023
|
95
|
619.00
|
0
|
28/09/2024
|
|
622
|
CBU-100/ Purto-307
|
ময়মনসিংহ জেলার নান্দাইল উপজেলাধীন ময়মনসিংহ কিশোরগঞ্জ R&H -তাড়াইল সড়ক এবং লয়লার বাজার তারের ঘাট বাজার সড়কে ৪০০০মিটার চেইনেজে কালীগন্জ PSC ব্রিজ নির্মাণ (রোড আইডি : ৩৬১৭২৪০৮৯)
|
UHBP
|
nandail
|
361724089
|
|
96.00
|
0
|
767.89
|
M/S. Mushfiqur Rahman(Kanchjan)-M/S. Nishat Enterprise(JV)
|
741.78
|
07/06/2020
|
14/06/2020
|
19/01/2023
|
90
|
624.38
|
0
|
28/09/2024
|
|
623
|
CBU-100/ Purto-455
|
ময়মনসিংহ জেলার নান্দইল উপজেলাধীন চন্ডিপাশা ইউপি-নতুন কুরাটি বাজার ভায়া পুরাতন কুরাট বাজার সংলগ্ন ৪৮০০মিটার চেইনেজে কুরাটি সেতু (রোড আইডি -৩৬১৭২৩০১৮) নির্মাণ।
|
UHBP
|
nandail
|
361723018
|
|
66.00
|
0
|
752.57
|
OSMANIBRAHIM (JV)
|
654.82
|
27/03/2022
|
03/04/2022
|
07/08/2024
|
68
|
377.40
|
0
|
28/09/2024
|
|
624
|
CBU-100/ Purto-456
|
ময়মনসিংহ জেলার তারাকান্দা উপজেলাধীন টিউকান্দা হতে লোনহালা ভায়া গীর্দাপাড়া সরকারী প্রাথমিক বিদ্যালয় সড়কে ১০মিটার চেইনেজে মাগুরজানী খালের উপর(রোড আইডি -৩৬১১৮৪১৪৭) সেতু নির্মাণ।
|
UHBP
|
Tarakanda
|
361184147
|
|
33.00
|
0
|
396.37
|
M/S. Mirza Construction-Masum Construction (JV). Arua (Bara Bari) Sadar, Kishoreganj.
|
348.44
|
17/11/2021
|
24/11/2021
|
26/09/2023
|
78
|
259.11
|
0
|
28/09/2024
|
|
625
|
CBU-100/ Purto-304
|
ময়মনসিংহ জেলার ত্রিশাল উপজেলাধীন আমিরাবাড়ী ইউপি-মির্দার বাজার রাস্তায় ডানপাশ্বেৃ হামিদের বাড়ী রাস্তা সংলগ্ন ২৮৯০ মিটার চেইনেজে খীরু নদীর উপর PSC ব্রিজ নির্মাণ (রোড আইডিঃ ৩৬১৯৪৩০১৫)
|
UHBP
|
trishal
|
361943015
|
|
96.00
|
0
|
956.78
|
M/S. Mirza Construction -Salman Enterprise (JV)
|
943.76
|
16/06/2020
|
23/06/2020
|
30/06/2024
|
96
|
856.74
|
0
|
28/09/2024
|
|
626
|
UTMIDP- DHOB/ MOY/ WR-40
|
1.Improvement of RCC Road on Dhobaura Bazar Internal road from Ch.00-590m. Under Dhobaura Upazila, Dist: Mymensing
2.Improvement of RCC Road on Dhobaura Upazila H/Q- Shoshan Ghat via play Ground road from Ch. 00-910m. Under Dhobaura Upazila, Dist: Mymensing.
|
UTMIDP
|
dhobaura
|
|
1.50
|
|
0
|
200.29
|
M/S S.R.S Construction, Tomaltola Road, Jamalpur
|
209.22
|
16/09/2019
|
|
02/10/2020
|
60
|
0.00
|
0
|
10/10/2019
|
|
627
|
UTMIDP- TARA/ MOY/ WD-02
|
Construction of RCC Drain with Outfall at Tarakanda Bazar. Under Tarakanda Upazila, Dist: Mymensing
|
UTMIDP
|
Tarakanda
|
|
0.21
|
|
0
|
49.47
|
M/S Nihad Builders & Suppliers
|
46.99
|
23/07/2019
|
|
19/12/2019
|
10
|
0.00
|
0
|
10/10/2019
|
|