1
|
SP62050/Saula Subproject
|
Re-excavation of Bhayalar Khal (Ch. 0+000 to Ch. 1+166 km) Re-excavation of Bhuria Khal (Ch. 0+000 to Ch. 2+210 km) Re-excavation of Biler Bari Khal (Ch. 0+000 to Ch. 2+600 km) Re-excavation of Biler Bari Br. Khal (Ch. 0+000 to Ch. 0+387 km) Re-excavation of Boyati Bari Khal (Ch. 0+000 to Ch. 0+880m) Re-excavation of Saula Sikdar Bari Khal (Ch. 0+000 to Ch. 1+160m) Const. of 09 Nos. Ref. Lined Section and SP Identification Signboard Construction of WMCA office
|
|
159.720
|
Md.Mohibul Islam
|
159.720
|
28/03/2023
|
30/05/2023
|
100
|
13/08/2024
|
Completed
|
|
2
|
SP44143/Hetalia-Ballabhpur Khal Subproject
|
Re-excavation of Hetalia Khal (Ch: 0 m to 2076 m) Re-excavation of Dudhar Khal (Ch: 0 m to 1160 m) Re-excavation of Poshurbunia Khal (Ch: 0 m to 1450 m) Re-excavation of Bausar Khal (Ch: 0 m to 1235 m) Re-excavation of Bahalgachia Khal (Ch: 0 m to 1150 m) Ref line section (5 nos. ) and SP signboard (2 nos.) Charabunia Switch to Miya Bari Ballavpur Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Wazid Bari Katakhali Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Kalam Gazi to Bahalgachiya Bharania Khal re-xcavation (Ch:0.00m - 1800.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
110.005
|
pesident:Mst.Nur-Jahan Begum
Secretary:Md.Yousuf monsi
|
110.005
|
31/03/2024
|
31/05/2024
|
100
|
13/08/2024
|
Completed
|
|
3
|
SP15316/Bhagirabad-Jainkathi FCD Subproject
|
Kalibari khal re-excavation(ch.00-800m) Referenced line section((2 Nos.) Bamboo bridge((1 Nos.) Embankment re-sectioning(ch.00-1800m)
|
|
51.851
|
LCS
|
51.851
|
08/01/2019
|
30/09/2019
|
100
|
13/08/2024
|
Completed
|
|
4
|
SP15266/Barabighai DR Subproject
|
Chakar Bari Khal Re-excavation(ch0.00-2500m) Katakhali Khal Re-excavation(ch0.00-1650m) Shadhu Akan Khal Re-excavation(ch0.00-2000m) Shedam Gain Khal Re-excavation(ch0.00-950m) Titkata Khal Re-excavation(ch0.00-1550m) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
|
76.158
|
Sohidul/Nasima
|
76.158
|
27/03/2021
|
30/04/2021
|
100
|
13/08/2024
|
Completed
|
|
5
|
SP15265/Pairakunja FCD Subproject
|
Embankment Re-exca (Ch: 500 - 3227 m, 5600 - 7100 m and 8800 - 10800 m ) 2 SP Identifying Board Repair of Galachipa Khal Regulator (3 Vent) -. Repair of Durgapur Khal Regulator (2 Vent) -. Repair of Kurir Khal Regulator (2 Vent) -. Repair of Hala BashKhali Khal Pipe Sluice (1 Vent) -. Repair of Golabunia Khal Pipe Sluice (1 Vent) -. Durgpur Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Gilabuni Khal re-xcavation (Ch:0.00m - 2050.00m) 2023-24 Eitbaria Khal re-xcavation (Ch:0.00m - 2000.00m) 2023-24 Lakshmipur Shiri Khali Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Area Indication Post 2 Nos. | 2023-24 Cons. of Pipe Sluice (1V- 600m dia at Ch. 9+110 km of Embankment.) & Cons. of Pipe Sluice (1V-600m dia at Ch. 10+800 km of Embankment.) 2023-24
|
|
219.192
|
President:mokbul hossain
Secretary:ali akbor mirrida
|
219.192
|
28/12/2020
|
30/04/2021
|
60
|
13/08/2024
|
Ongoing
|
|
6
|
SP13104/Barobigha Mollabari FCD Subproject
|
Embankment Re-Sectioning (Ch: 1320.00m-5500.00 m)
|
|
84.547
|
syed Nurul Islam/Md Kobir Uddin
|
84.547
|
27/03/2021
|
30/04/2021
|
100
|
13/08/2024
|
Completed
|
|
7
|
SP13103/Hetalia-Madarbunia FCD Subproject
|
Patabunia khal re-excavation(ch.00-2200m) Meser Mollar khal re-excavation(ch.00-1000m) Hetalia embankment re-sectioning(ch.1000-4000m) Referenced line section(4 Nos.) WMCA Office and Others Bamboo bridge(2nos)
|
|
127.456
|
Md.Kholil Kazi/Abu Hawlader
|
127.456
|
25/07/2019
|
30/04/2019
|
100
|
13/08/2024
|
Completed
|