Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bauphal
1 SP43058/Shabupura Khal Subproject Re-excavation of Fultala Khal-1 (Ch-0+00km to 1+600km) Re-excavation of Fultala Khal-2 (Ch-0+000km to 1+800km) Re-excavation of Fultala Khal-3 (Ch-0+000km to 0+820km) Re-excavation of Fultala Khal-4 (Ch-0+000km to 0+500km) Re-excavation of Uttar Raj Nagar Khal (Ch-0+000km to 1+400km) Re-excavation of Gazi Hota-2 Khal (Ch-0+000km to 1+100km) Ref. Lined Section 13 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of WMCA Office - 71.755 MD. KHOKON SHIKDAR 71.755 25/07/2022 30/04/2022 100 13/08/2024 Completed
2 SP43050/Moddah-Purba Rajapur Subproject Shikhol Gara Khal Re-excavation(ch0.00-2500m) Kumar Khali Branch Khal Re-excavation(ch0.00-2100m) Hisbullah Khal Re-excavation(ch0.00-1380m) Dighir Par Khal Re-excavation(ch0.00-900m) Souder Khal Re-excavation(ch0.00-500m) Thakur Bari Khal Re-excavation(ch0.00-500m) Ref. Lined Section 12 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Maintenace of WMCA office building - 71.293 Shidul rahaman/Farjana 71.293 26/07/2021 30/04/2022 100 13/08/2024 Completed
3 SP41005/Kanakdia FMD Subproject Re-Sectioning of Kanadia Embankment(Ch.0+000 Km to 7+750 Km) Re-Excavation of Amirabad Khal (Ch.0+000 Km to 2+750 Km) Re-Excavation of Narayanpasha Branch Khal (Ch.0+000 Km to 1+200 Km) Re-Excavation of Dakual Khal (Ch.0+000 Km to 0+600 Km) Const. of 6 Nos. Reference Lined on 3 Khals, SP Identification sign board 2 Nos. and SP Indication Post 2 Nos. 111.858 LCS-08 111.858 05/03/2023 30/05/2023 100 13/08/2024 Completed
4 SP22027/Dhulia Subproject Dhulia Embankment re-sectioning(ch:350.00 - 2400m, 4870m - 6250m and 11300m - 12790m), Const. SP Identf. sign board 2 Nos. and SP Area Indication Post 2 Nos. Rehabi. of 2Nos Regulator (1v-1.50mx1.50m) on Mondal bari Khal At Ch-12+809Km (emb) and Patuakhali Khal At ch.19+204Km (emb) Rehabi. 1No Regulator (1v-1.50mx1.50m) on Rabaiyer Bazer Khal At Ch-2+850 Maint. of WMCA Office 74.992 OTM 74.992 22 13/08/2024 Ongoing
5 SP15345/Rajapur Patilapara FCD Subproject Rajapur-Patilapara Embankment re-sectioning(ch:0.00 - 1000m and 2700m - 3250m) Rajapur Khal re-excavation (Ch:0.00 - 1600m) Kachabunia Khal re-excavation (Ch:0.00 - 450m) Burir Khal re-excavation (Ch:0.00 - 1700m) Rajapur Branch Khal re-excavation (Ch:0.00 - 1180m) Mahish Barir Khal re-excavation (Ch:0.00 - 1250m) Const. of 09 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Rehabilitation of Regula. (1V-1.5m x 1.5) on Burir khal, Rehabilitation of 2Nos Regu. (2V-1.5m x 1.5) on Rajapur Branch & Kalia Barir khal, Rehabi. of 2Nos Regulator (1V-1.5m x 1.5) on Arinow & Patilapara Khal 79.462 M/S Mohiuddin Ahmed 79.462 30/01/2024 30/04/2024 87 13/08/2024 Ongoing
6 SP14194/Anarashia FCD Subproject Rehebilitation of 2Nos Regulator (Size 1V-1.50mX1.80m.) at ch. 5680m & ch. 6530m on Meser Khal. Rehebilitation of 3Nos Pipe Sluice (Size 1V-900mm) at ch. 200m on Betaler khal-1, ch.3235m on Betaler khal-2 & ch. 4125m on Meser Khal. Rehebilitation of 1No. Regulator (Size 2V-1.50mX1.50m.) at ch. 200m on Betaler khal-2 Re-excavation of Betaler Khal-2 (Ch-0+000km to 1+950km) Re-excavation of Betaler Khal-1 (Ch-0+000km to 1+650km) Re-excavation of Meser Khal (Ch-0+000km to 0+750km) Re-excavation of Bausar Khal (Ch-0+000km to 0+500km) Re-excavation of Bangar Khal (Ch-0+000km to 0+500km) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) 67.755 M/S Mohiuddin Ahmed 67.755 20/02/2024 30/04/2024 97 13/08/2024 Ongoing
7 SP14192/Char Roy Shaheb FCD Subproject Char Alji Khal Re-excavation(ch: 0.00-1900 m) Char Kachua Khal Re-excavation(ch: 0.00-650 m) Char Roy Shaherb Embankment Re-sectioning (Ch: 5035 - 13550 m) Reference Lined Section (4 nos.) and SP Identification Signboard (2 nos.) WMCA Office Construction, Electrification Works and Furniture Supply Regulator Repair of Char Kachua Khal -. Regulator Repairs of Dakshin Char Mizan Khal -. Regulator Repairs of Char Alji Khal -. 121.994 Presideny:Sohel Rana Secretary:Mahinur 121.994 23/02/2021 30/04/2021 96 13/08/2024 Ongoing
2 Galachipa
1 SP62053/Guabaria Subproject Re-excavation of Paschim Guabaria Khal (Ch.0+000 to Ch. 3+887 km) Re-excavation of Taltalir Khal (Ch. 0+000 to Ch. 2+207 km) Re-excavation of Puraba Guabaria Khal (Ch.0+000 to Ch. 2+002 km) Re-excavation of Lamnar Khal (Ch. 0+000 to Ch. 1+180 km) Const. of 9 Nos. Ref. lined Section, SP Identification Signboard and Post 2 Nos. and Demarcation Post 22 Nos. Construction of WMCA office 152.106 Md.Mohibul Islam 152.106 28/03/2023 30/05/2024 96 13/08/2024 Ongoing
2 SP61018/Uttar Char Bishwas Subproject Re-exacavation of Annir Khal (Ch-0+00km to 8+568km) Re-excavation of Char Agosthi Khal (Ch-0+00km to 6+215km) Re-excavation of Modon Hawlader Barir Khal (Ch-0+000km to 2+472km) Ref. Lined Section 19 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building 207.382 M/S Ayan Enterprise 207.382 27/03/2022 30/04/2022 100 13/08/2024 Completed
3 Mirjaganj
1 SP62048/Madhya Amragachia Subproject Re-excavation of Bebajia Khal (Ch. 0+000 to Ch. 3+000 km) Re-excavation of Ruitar Khal (Ch. 0+000 to Ch.1+885 km) Re-excavation of Daser Danga Khal (Ch. 0+000 to Ch. 2+256 km) Re-excavation of Molla Barir Khal (Ch. 0+000 to Ch. 1+550 km) Re-excavation of Thakurer Khal (Ch. 0+000 to Ch. 1+710m) Re-excavation Nizam Alir Khal (Ch. 0+000 to Ch. 2+800m) Const. of 14 Nos. Ref. lined Section, SP Indentification signboard and Post 2 Nos. and Demarcation Post 48 Nos. Construction of WMCA office Construction of Thakurer Khal Box culvert (2v-2.80m x 3.70m) at ch.0+625km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.0+400km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.1+885km | 2023-24 209.043 OTM 209.043 28/03/2023 30/05/2023 72 13/08/2024 Ongoing
2 SP61013/Dakkhin Amragachhia Subproject Re-excavation Gawatala Char Khal (Ch-0+000km to 0+930km) Re-excavation of Napiter Khal (Ch-0+000km to 1+440km) Re-excavation of Hashemer khal (Ch-0+00km to 0+615km) Re-excavation of Jugir khal (Ch-0+000km to 0+915km) Re-exacavation of Kamarer Khal (Ch-0+000km to 1+374km) Re-excavation of Purbo Awra to Pashim Awra khal (Ch-0+000km to 2+800km) Re-excavation of Uttar Awra Mongoler khal (Ch-0+000km to 2+775km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Const. of Gawatala Khal Box culvert (2v-3.00mx3.50m) at ch.0+010km | 2023-24 135.069 OTM 135.069 27/03/2022 30/04/2022 90 13/08/2024 Ongoing
3 SP25210/Deuli-Subidkhali Subproject Golkhali Branch Khal re-xcavation (Ch:0.00m - 3000.00m) 2023-24 Charer Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 48.725 LCS-3 48.725 10/06/2024 25 13/08/2024 Ongoing
4 Patuakhali-s
1 SP62050/Saula Subproject Re-excavation of Bhayalar Khal (Ch. 0+000 to Ch. 1+166 km) Re-excavation of Bhuria Khal (Ch. 0+000 to Ch. 2+210 km) Re-excavation of Biler Bari Khal (Ch. 0+000 to Ch. 2+600 km) Re-excavation of Biler Bari Br. Khal (Ch. 0+000 to Ch. 0+387 km) Re-excavation of Boyati Bari Khal (Ch. 0+000 to Ch. 0+880m) Re-excavation of Saula Sikdar Bari Khal (Ch. 0+000 to Ch. 1+160m) Const. of 09 Nos. Ref. Lined Section and SP Identification Signboard Construction of WMCA office 159.720 Md.Mohibul Islam 159.720 28/03/2023 30/05/2023 100 13/08/2024 Completed
2 SP44143/Hetalia-Ballabhpur Khal Subproject Re-excavation of Hetalia Khal (Ch: 0 m to 2076 m) Re-excavation of Dudhar Khal (Ch: 0 m to 1160 m) Re-excavation of Poshurbunia Khal (Ch: 0 m to 1450 m) Re-excavation of Bausar Khal (Ch: 0 m to 1235 m) Re-excavation of Bahalgachia Khal (Ch: 0 m to 1150 m) Ref line section (5 nos. ) and SP signboard (2 nos.) Charabunia Switch to Miya Bari Ballavpur Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Wazid Bari Katakhali Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Kalam Gazi to Bahalgachiya Bharania Khal re-xcavation (Ch:0.00m - 1800.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 110.005 pesident:Mst.Nur-Jahan Begum Secretary:Md.Yousuf monsi 110.005 31/03/2024 31/05/2024 100 13/08/2024 Completed
3 SP15316/Bhagirabad-Jainkathi FCD Subproject Kalibari khal re-excavation(ch.00-800m) Referenced line section((2 Nos.) Bamboo bridge((1 Nos.) Embankment re-sectioning(ch.00-1800m) 51.851 LCS 51.851 08/01/2019 30/09/2019 100 13/08/2024 Completed
4 SP15266/Barabighai DR Subproject Chakar Bari Khal Re-excavation(ch0.00-2500m) Katakhali Khal Re-excavation(ch0.00-1650m) Shadhu Akan Khal Re-excavation(ch0.00-2000m) Shedam Gain Khal Re-excavation(ch0.00-950m) Titkata Khal Re-excavation(ch0.00-1550m) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) 76.158 Sohidul/Nasima 76.158 27/03/2021 30/04/2021 100 13/08/2024 Completed
5 SP15265/Pairakunja FCD Subproject Embankment Re-exca (Ch: 500 - 3227 m, 5600 - 7100 m and 8800 - 10800 m ) 2 SP Identifying Board Repair of Galachipa Khal Regulator (3 Vent) -. Repair of Durgapur Khal Regulator (2 Vent) -. Repair of Kurir Khal Regulator (2 Vent) -. Repair of Hala BashKhali Khal Pipe Sluice (1 Vent) -. Repair of Golabunia Khal Pipe Sluice (1 Vent) -. Durgpur Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Gilabuni Khal re-xcavation (Ch:0.00m - 2050.00m) 2023-24 Eitbaria Khal re-xcavation (Ch:0.00m - 2000.00m) 2023-24 Lakshmipur Shiri Khali Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Area Indication Post 2 Nos. | 2023-24 Cons. of Pipe Sluice (1V- 600m dia at Ch. 9+110 km of Embankment.) & Cons. of Pipe Sluice (1V-600m dia at Ch. 10+800 km of Embankment.) 2023-24 219.192 President:mokbul hossain Secretary:ali akbor mirrida 219.192 28/12/2020 30/04/2021 60 13/08/2024 Ongoing
6 SP13104/Barobigha Mollabari FCD Subproject Embankment Re-Sectioning (Ch: 1320.00m-5500.00 m) 84.547 syed Nurul Islam/Md Kobir Uddin 84.547 27/03/2021 30/04/2021 100 13/08/2024 Completed
7 SP13103/Hetalia-Madarbunia FCD Subproject Patabunia khal re-excavation(ch.00-2200m) Meser Mollar khal re-excavation(ch.00-1000m) Hetalia embankment re-sectioning(ch.1000-4000m) Referenced line section(4 Nos.) WMCA Office and Others Bamboo bridge(2nos) 127.456 Md.Kholil Kazi/Abu Hawlader 127.456 25/07/2019 30/04/2019 100 13/08/2024 Completed
Total : 0.0000 (Km) 2180.36 (Lac) 2180.36 (Lac)