Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Barura
1 PEDP-III/CML/BAR/2011-12/W2.0973 Mandar Tali Reg. School Additional Room 5186000.000 M/S Jahangir Enterprise 5186000.000 14/11/2012 20/11/2013 0 22/09/2014  
2 PEDP-III/CML/BAR/2011-12/W2.0972 Nula Chindpur Reg. School Additional Room 5186000.000 M/S Arshad & Sons 5186000.000 13/11/2012 20/11/2013 100 22/09/2014  
3 PEDP-III/CML/BAR/2011-12/W2.0466 BISNAPUR School Additional Room 2993000.000 M/S Aradhana Enter. 2993000.000 05/08/2012 30/10/2013 80 22/09/2014  
4 PEDP-III/CML/BAR/2011-12/W2.0197 UTTAR SHAKPUR REG School Additional Room 3388000.000 M/S RTA Enterprise 3388000.000 12/09/2012 08/10/2013 100 22/09/2014  
5 PEDP-III/CML/BAR/2011-12/W2.0465 DULIA MURY School Additional Room 2993000.000 M/S Tekbag Inter. 2993000.000 12/08/2012 30/10/2013 90 22/09/2014  
6 PEDP-III/CML/BAR/2011-12/W2.1360 MONDUK School Additional Room 2385000.000 M/S M.I. Construction 2385000.000 18/10/2012 31/10/2013 100 22/09/2014  
7 PEDP-III/CML/BAR/2012-13/W2.1999 MUGGOW School Additional Room 5186000.000 M/S RTA Enterprise 5186000.000 16/05/2013 26/05/2014 40 22/09/2014  
8 PEDP-III/CML/BAR/2011-12/W2.0464 GALIMPUR School Additional Room 4069000.000 M/S Arshad & Sons 4069000.000 09/09/2012 08/10/2013 100 22/09/2014  
9 e-Tender/PEDP-III/CML/BAR/2013-14/W2.2972 SHAWROTALI School Additional Room 3955000.000 M/S R.TA Enterprise 3955000.000 16/06/2014 0 22/09/2014  
10 PEDP-III/CML/BAR/2012-13/W2.2000 SHILMLIRI School Additional Room 5186000.000 M/S Haque Enterprise 5186000.000 05/02/2013 19/11/2013 80 22/09/2014  
11 PEDP-III/CML/BAR/2011-12/W2.0463 MADHAY LASKIMPUR School Additional Room 2993000.000 M/S Haque Enterprise 2993000.000 29/07/2012 30/10/2013 100 22/09/2014  
12 PEDP-III/CML/BAR/2012-13/W2.2101 BARURA POURA ADARSHA School Additional Room 3388000.000 M/S M.I. Construction 3388000.000 06/03/2013 14/03/2014 100 22/09/2014  
13 PEDP-III/CML/BAR/2011-12/W2.0971 ARIFPUR REG School Additional Room 5186000.000 M/S Bhuiya Traders 5186000.000 05/08/2012 30/10/2013 85 22/09/2014  
14 PEDP-III/CML/BAR/2011-12/W2.0462 JHALAM School Additional Room 2993000.000 M/S Haque Enterprise 2993000.000 29/07/2012 30/10/2013 100 22/09/2014  
15 PEDP-III/CML/BAR/2012-13/W2.2102 Mirzanagar Reg. School Additional Room 3388000.000 M/S M.I. Construction 3388000.000 06/03/2013 14/03/2014 70 22/09/2014  
16 PEDP-III/CML/BAR/2011-12/W1.0389 Mothurapur Community School Reconstruction 5140000.000 M/S Techbag International 5140000.000 10/07/2012 18/10/2013 90 22/09/2014  
17 PEDP-III/CML/BAR/2011-12/W1.0388 Boalia Community School Reconstruction 5140000.000 M/S Hoque Enterprise 5140000.000 11/07/2012 22/10/2013 100 22/09/2014  
18 PEDP-III/CML/BAR/2011-12/W1.0387 Bhori Communite School Reconstruction 5140000.000 M/S Hoque Enterprise 5140000.000 11/07/2012 22/10/2013 100 22/09/2014  
19 PEDP-III/CML/BAR/2011-12/W1.0386 Hoshanpur School Reconstruction 5140000.000 M/S Hoque Enterprise 5140000.000 11/07/2012 22/10/2013 100 22/09/2014  
2 Brahmanpara
1 PEDP-III/CML/BRA/2011-12/W3.0300 NAGAR PAR School Major Maintenance 311046.000 M/S Maruf Enterprise 311046.000 23/10/2012 30/04/2013 100 22/09/2014  
2 PEDP-III/CML/BRA/2013-14/W2.2974 Naighar Noya Para Reg. School Additional Room 2765000.000 M.K Enter 2765000.000 03/03/2014 05/12/2014 35 22/09/2014  
3 PEDP-III/CML/BRA/2012-13/W2.2001 NALLA School Additional Room 2793000.000 M/S Iqbal & Brothers 2793000.000 13/01/2013 20/10/2013 100 22/09/2014  
4 PEDP-III/CML/BRA/2011-12/W2.0469 DULALAL PUR School Additional Room 2993000.000 M/S Bondi Shahi Traders 2993000.000 27/08/2012 03/09/2013 100 22/09/2014  
5 PEDP-III/CML/BRA/2011-12/W2.0468 SHIDLAI GULA BARIA School Additional Room 2993000.000 M/S Maruf Enterprise 2993000.000 27/08/2012 03/09/2013 100 22/09/2014  
6 PEDP-III/CML/BRA/2013-14/W2.2973 Dhakin Shashidal Hazi Fazlur Rahman Reg. School Additional Room 6279000.000 M.K Enter 6279000.000 03/03/2014 05/12/2014 0 22/09/2014  
7 PEDP-III/CML/BRA/2011-12/W2.0049 SOUTH SHIDLAI School Additional Room 4069000.000 M/S Maruf Enterprise 4069000.000 25/07/2012 24/07/2013 100 22/09/2014  
8 PEDP-III/CML/BRA/2011-12/W2.0974 SHAIT SHALAT.B School Additional Room 5186000.000 M/S Maruf Enterprise 5186000.000 27/08/2012 03/09/2013 100 22/09/2014  
9 PEDP-III/CML/BRA/2011-12/W2.0467 KANDUGHAR School Additional Room 2993000.000 M/S Zamir Hossain 2993000.000 27/08/2012 03/09/2013 100 22/09/2014  
10 PEDP-III/CML/BRA/2011-12/W1.0023 Uttur Telabhomi Mostuba Reg. School Reconstruction 5140000.000 M/S Zamir Hossain 5140000.000 05/11/2012 31/01/2014 100 22/09/2014  
3 Burichong
1 PEDP-III/CML/BUR/2011-12/W3.0301 North Jagat Pur Jalarbary School Major Maintenance 291000.000 Md. Anwar Hossain 291000.000 02/12/2012 07/06/2013 100 22/09/2014  
2 PEDP-III/CML/BUR/2011-12/W2.1361 CHANGACHA RAG School Additional Room 2191000.000 Md. Alamgir Hossain 2191000.000 12/11/2013 17/08/2014 100 22/09/2014  
3 PEDP-III/CML/BUR/2011-12/W2.0470 PARIHAL PARA HAZI ALI MIA REG. School Additional Room 3388000.000 M/S Haque Traders 3388000.000 27/08/2012 01/09/2013 100 22/09/2014  
4 PEDP-III/CML/BUR/2011-12/W1.0024 MIRPUR School Reconstruction 5140000.000 Md. Khorshed Alam 5140000.000 27/08/2012 01/12/2013 100 22/09/2014  
4 Chandina
1 PEDP-III/CML/CHA/2011-12/W3.0050 JATASHAR School Major Maintenance 321868.000 M/S Moni Builders 321868.000 06/11/2012 07/05/2013 100 22/09/2014  
2 PEDP-III/CML/CHA/2012-13/W2.2103 KAILINE EAST School Additional Room 3388000.000 M/S M.M. Enterprise 3388000.000 02/04/2013 08/10/2013 100 22/09/2014  
3 PEDP-III/CML/CHA/2011-12/W2.0198 Shorikhola commiuniti School Additional Room 4069000.000 M/S M.M. Enterprise 4069000.000 06/11/2012 14/11/2013 100 22/09/2014  
4 PEDP-III/CML/CHA/2011-12/W2.1362 DARORA School Additional Room 2385000.000 M/S M.M. Enterprise 2385000.000 06/11/2012 14/11/2013 100 22/09/2014  
5 PEDP-III/CML/CHA/2011-12/W2.0473 RASUL PUR School Additional Room 2993000.000 M/S Moni Builders 2993000.000 12/07/2012 01/08/2013 100 22/09/2014  
6 PEDP-III/CML/2012-13/W2.1861 Madhushair reg School Additional Room 6072000.000 M/S M.M. Enterprise 6072000.000 13/10/2013 19/10/2014 70 22/09/2014  
7 PEDP-III/CML/CHA/2013-14/W2.2976 BARERA NORTH School Additional Room 3955000.000 M/S M.M. Enterprise 3955000.000 10/02/2014 10/11/2014 70 22/09/2014  
8 PEDP-III/CML/CHA/2011-12/W2.0472 BAMUTIA School Additional Room 2993000.000 M/S M.M. Enterprise 2993000.000 02/04/2013 08/04/2014 100 22/09/2014  
9 PEDP-III/CML/CHA/2012-13/W2.2159 SHUHIL PUR School Additional Room 7636000.000 M/S Sumi Enterprise 7636000.000 23/12/2013 26/12/2014 15 22/09/2014  
10 PEDP-III/CML/CHA/2011-12/W2.0471 KRISHNA PUR School Additional Room 2993000.000 M/S M.M. Enterprise 2993000.000 02/04/2013 08/04/2014 100 22/09/2014  
11 PEDP-III/CML/CHA/2011-12/W1.0390 Laksmipur commi School Reconstruction 5140000.000 M/S Moni Builders 5140000.000 12/07/2012 01/08/2013 100 22/09/2014  
5 Chouddagram
1 PEDP-III/CML/CHU/2011-12/W3.0302 Bejay Pur Razarmar Digirpar School Major Maintenance 585377.000 Md. Mahbub Hos. Mazum. 585377.000 15/10/2012 15/04/2013 100 22/09/2014  
2 PEDP-III/CML/CHU/2011-12/W2.0476 SURIKARA School Additional Room 2993000.000 M/S Saleh Ahmad 2993000.000 08/07/2012 07/07/2013 100 22/09/2014  
3 PEDP-III/CML/CHU/2011-12/W2.0475 BAKAGRAM School Additional Room 4069000.000 M/S MRE & MAE(JV) 4069000.000 21/06/2012 20/06/2013 100 22/09/2014  
4 PEDP-III/CML/CHU/2011-12/W2.0975 GHOSHTAL School Additional Room 5186000.000 M/S Saleh Ahmad 5186000.000 08/07/2012 07/07/2013 100 22/09/2014  
5 PEDP-III/CML/CHU/2011-12/W2.0050 CHATYANI School Additional Room 4069000.000 M/S Neiber Associates 4069000.000 08/07/2012 02/07/2013 100 22/09/2014  
6 PEDP-III/CML/CHU/2012-13/W2.2002 MUNSHIR HAT School Additional Room 2793000.000 M/S Md. Abul Hasem 2793000.000 20/03/2013 19/09/2013 100 22/09/2014  
7 PEDP-III/CML/2012-13/W2.1636 CHANDSISH KARA School Additional Room 2993000.000 M/S Poly Enterprise 2993000.000 09/12/2012 15/09/2013 100 22/09/2014  
8 PEDP-III/CML/CHU/2011-12/W2.0474 DANIZ KARA School Additional Room 2993000.000 MD. Abul Hasem 2993000.000 08/07/2012 07/07/2013 100 22/09/2014  
9 PEDP-III/CML/CHU/2011-12/W1.0025 KENDUA RANIR BAZAR COMUNITY School Reconstruction 5140000.000 M/S Saleh Ahmad 5140000.000 08/07/2012 08/07/2013 100 22/09/2014  
6 Cumilla-s
1 PEDP-III/CML/SAD/2011-12/W3.0304 BHUBAN GHAR School Major Maintenance 411858.000 M/S Shahid International 411858.000 03/01/2013 03/07/2013 100 22/09/2014  
2 PEDP-III/CML/SAD/2011-12/W2.0478 DAULAT PUR School Additional Room 2993000.000 MD Mainul Hasan 2993000.000 22/07/2012 22/07/2013 100 22/09/2014  
3 PEDP-III/CML/SAD/2012-13/W2.2004 TATAIARA COMMUNITY School Additional Room 4069000.000 M/S Shahid International 4069000.000 14/02/2013 30/03/2014 100 22/09/2014  
4 PEDP-III/CML/SAD/2012-13/W2.2160 MAJIGACHA School Additional Room 3546000.000 M/S Hamim Brothers 3546000.000 18/12/2013 18/09/2014 70 22/09/2014  
5 PEDP-III/CML/2012-13/W2.1637 SHASAN GACHA School Additional Room 2993000.000 M/S Hamim Brothers 2993000.000 25/02/2013 04/12/2013 100 22/09/2014  
6 PEDP-III/CML/SAD/2011-12/W2.1366 KAMALAPUR School Additional Room 2385000.000 Md. Alamgir Hossain 2385000.000 03/01/2013 30/10/2013 100 22/09/2014  
7 e-Tender/PEDP-III/CML/2013-14/W2.3003 UJIR DIGHIR PAR School Additional Room 3546000.000 pioner Construction 3546000.000 16/06/2014 0 22/09/2014  
8 PEDP-III/CML/SAD/2011-12/W1.0391 JAGONADHPUR COMMUNITY School Reconstruction 5140000.000 M/S Sahid Enterprise 5140000.000 22/07/2012 22/07/2013 100 22/09/2014  
9 PEDP-III/CML/2011-12/W1.0614 SAYABITAN COMMUNITY School Reconstruction 6072000.000 M/S Rehana Cons. 6072000.000 04/07/2012 28/06/2013 90 22/09/2014  
7 Cumilla-s daksin
1 PEDP-III/CML/SOU/2011-12/W3.0303 PREMNAL School Major Maintenance 319440.000 M/S A. Rahman Enterprise 319440.000 27/09/2012 09/03/2013 100 22/09/2014  
2 PEDP-III/CML/SOU/2011-12/W2.1364 Jafar pur School Additional Room 3388000.000 M/S A. Rahman Ent. 3388000.000 28/11/2012 07/11/2013 60 22/09/2014  
3 PEDP-III/CML/SOU/2011-12/W2.1365 FATEPUR School Additional Room 2191000.000 M/S Sabuj & Brothers 2191000.000 22/11/2012 07/11/2013 70 22/09/2014  
4 PEDP-III/CML/SOU/2011-12/W2.0477 Dotiapur Haji Babro Miah School Additional Room 3388000.000 M/S A. Rahman Ent. 3388000.000 14/01/2013 24/12/2013 60 22/09/2014  
5 PEDP-III/CML/SOU/2011-12/W2.1363 SHANICHOW School Additional Room 2385000.000 M/S Abdul Razzak 2385000.000 28/11/2012 07/11/2013 100 22/09/2014  
6 PEDP-III/CML/SOU/2012-13/W2.2003 CHASHA PARA School Additional Room 5186000.000 M/S A. Rahman Ent. 5186000.000 12/02/2013 14/11/2013 40 22/09/2014  
8 Daudkandi
1 PEDP-III/CML/DAU/2011-12/W3.0051 BARASHAT PARA COMMUNITRY P.S School Major Maintenance 168565.000 M/S Akas Enterprise 168565.000 01/10/2012 30/03/2013 100 22/09/2014  
2 PEDP-III/CML/DAU/2011-12/W2.0479 RAIPUR GOVT. School Additional Room 2993000.000 M/S Al Aksa Const. 2993000.000 23/07/2012 30/10/2013 100 22/09/2014  
3 PEDP-III/CML/DAU/2013-14/W2.2983 DAULAT PUR COMMUNITRY P.S School Additional Room 4896000.000 M/S Mozahid Traders 4896000.000 18/02/2014 17/02/2015 0 22/09/2014  
4 PEDP-III/CML/DAU/2011-12/W2.0051 ZINGLATALI School Additional Room 3388000.000 M/S Libarty Readers 3388000.000 23/07/2012 31/12/2013 100 22/09/2014  
5 PEDP-III/CML/DAU/2012-13/W2.2104 PENNAI School Additional Room 2793000.000 M/S Akas Enterprise 2793000.000 20/03/2013 30/12/2013 100 22/09/2014  
6 PEDP-III/CML/DAU/2013-14/W2.2984 DHARIBON School Additional Room 3546000.000 M/S Faruk Enterprise 3546000.000 09/03/2014 14/03/2015 0 22/09/2014  
7 PEDP-III/CML/DAU/2011-12/W2.0976 SENDI School Additional Room 5186000.000 M/S Muzahid Traders 5186000.000 23/07/2012 30/10/2013 100 22/09/2014  
8 PEDP-III/CML/DAU/2013-14/W2.2199 DAUD KANDI MODEL School Additional Room 6279000.000 M/S Mozahid Traders 6279000.000 19/01/2014 19/01/2015 0 22/09/2014  
9 PEDP-III/CML/DAU/2011-12/W1.0026 CHANDRA REG School Reconstruction 5140000.000 M/S Liberty Traders 5140000.000 01/04/2013 31/03/2014 70 22/09/2014  
9 Debidwar
1 PEDP-III/CML/DEB/2011-12/W3.0052 NUR MANIKCHAR School Major Maintenance 347598.000 M/S M.M. Enterprise 347598.000 03/10/2012 02/04/2013 100 22/09/2014  
2 PEDP-III/CML/DEB/2013-14/W2.2987 MOHE SHPUR EAST GOVT PRIMARY SCHOOL School Additional Room 3955000.000 M/S M. M. Enterprise 3955000.000 06/03/2014 10/03/2015 60 22/09/2014  
3 PEDP-III/CML/DEB/2011-12/W2.0978 EGARA GRAM PASCHIM School Additional Room 5186000.000 M/S M.M. Enterprise 5186000.000 19/06/2012 19/09/2013 100 22/09/2014  
4 PEDP-III/CML/DEB/2011-12/W2.1367 TALTALA School Additional Room 2385000.000 M/S Saikat Construction 2385000.000 18/10/2012 11/10/2013 100 22/09/2014  
5 PEDP-III/CML/DEB/2012-13/W2.2005 DHAMTI MADRASHA PARA REG. PRI SCHOOL School Additional Room 3388000.000 M/S Saikat Construction 3388000.000 04/04/2013 10/01/2014 100 22/09/2014  
6 PEDP-III/CML/DEB/2012-13/W2.2006 MASHIKARA School Additional Room 2993000.000 M/S Sumi Enterprise 2993000.000 08/10/2013 07/07/2014 100 22/09/2014  
7 PEDP-III/CML/DEB/2011-12/W2.0480 BAMANISHAIR School Additional Room 2993000.000 M/S Saikot Construction 2993000.000 19/06/2012 19/06/2013 100 22/09/2014  
8 PEDP-III/CML/DEB/2011-12/W2.0977 SAICHA PARA School Additional Room 5186000.000 M/S Sumi Enterprise 5186000.000 19/06/2012 19/09/2013 100 22/09/2014  
9 PEDP-III/CML/DEB/2013-14/W2.2986 ASHONPUR COMMUNITY PRI SCHOOL School Additional Room 4896000.000 M/S Sumi Enterprise 4896000.000 06/03/2014 10/03/2015 50 22/09/2014  
10 PEDP-III/CML/DEB/2013-14/W2.2985 RASUL PURBA COMMUNITY PRI SCHOOL School Additional Room 4896000.000 M/S Sumi Enterprise 4896000.000 06/03/2014 10/12/2014 70 22/09/2014  
11 PEDP-III/CML/DEB/2011-12/W1.0392 PRAMU COMMUNITRY P.S School Reconstruction 5140000.000 M/S M.M. Enterprise 5140000.000 19/06/2012 19/09/2013 100 22/09/2014  
10 Homna
1 PEDP-III/CML/HOM/2011-12/W3.0053 PARSCHIM KASHIPUR School Major Maintenance 703880.000 M/S S. R. Enterprise 703880.000 30/10/2012 30/04/2013 100 22/09/2014  
2 PEDP-III/CML/HOM/2011-12/W2.0481 KRIPA RAM PUR School Additional Room 2993000.000 M/S Chad Mia Enterprise 2993000.000 28/06/2012 03/10/2013 100 22/09/2014  
3 PEDP-III/CML/HOM/2011-12/W2.1368 GOARI BHANGA School Additional Room 2191000.000 M/S Miyad Enterprise 2191000.000 25/10/2012 30/10/2013 100 22/09/2014  
11 Laksham
1 PEDP-III/CML/LAK/2011-12/W3.0305 Dhankhuiya School Major Maintenance 266814.000 M/S Sazani Enterprise 266814.000 02/12/2012 08/06/2013 100 22/09/2014  
2 PEDP-III/CML/LAK/2011-12/W2.0484 KANDIRPAR SOUTH School Additional Room 2993000.000 Md. Abdur Razzak 2993000.000 24/03/2013 29/03/2014 100 22/09/2014  
3 PEDP-III/CML/LAK/2011-12/W2.1369 Rampur School Additional Room 2191000.000 M/S Abdus Salam 2191000.000 24/03/2013 29/03/2014 100 22/09/2014  
4 PEDP-III/CML/LAK/2012-13/W2.2008 MOHAMMED PUR School Additional Room 3388000.000 M/S Nasir Enterprise 3388000.000 24/03/2013 29/12/2013 80 22/09/2014  
5 PEDP-III/CML/LAK/2013-14/W2.2989 ICHA PURA PURBA School Additional Room 3955000.000 M/S M. M. Enterprise 3955000.000 05/03/2014 11/03/2015 0 22/09/2014  
6 PEDP-III/CML/LAK/2012-13/W2.2105 BATIA VITA School Additional Room 2385000.000 M/S Jaman Traders 2385000.000 24/03/2013 29/12/2013 100 22/09/2014  
7 PEDP-III/CML/LAK/2011-12/W2.0483 NARIADIA School Additional Room 2993000.000 M/S Priyanka Enterprise 2993000.000 24/03/2013 29/03/2014 100 22/09/2014  
8 PEDP-III/CML/LAK/2011-12/W2.0482 PULGOAN School Additional Room 2993000.000 M/S Priyanka Enterprise 2993000.000 24/03/2013 29/03/2014 95 22/09/2014  
9 PEDP-III/CML/LAK/2011-12/W2.0979 Kamodda School Additional Room 5186000.000 M/S Meksha & Co. 5186000.000 02/01/2013 08/01/2014 80 22/09/2014  
10 PEDP-III/CML/LAK/2012-13/W2.2009 SALEH PUR School Additional Room 2993000.000 M/S Bhuiya Builders 2993000.000 28/03/2013 02/01/2014 100 22/09/2014  
11 PEDP-III/CML/LAK/2011-12/W1.0393 GHATER DARGABARI COMMUNITY School Reconstruction 5140000.000 M/S Meksha & Co. 5140000.000 27/12/2012 02/04/2014 50 22/09/2014  
12 Meghna
1 PEDP-III/CML/MEG/2011-12/W3.0306 BARAHAZARY School Major Maintenance 316982.000 M/S Monia Enterprise 316982.000 15/10/2012 14/04/2013 100 22/09/2014  
2 PEDP-III/CML/MEG/2011-12/W2.0485 MANIKER CHAR School Additional Room 2993000.000 M/S Babul Enterprise 2993000.000 27/09/2012 26/09/2013 100 22/09/2014  
3 PEDP-III/CML/MEG/2011-12/W2.1370 RAM PROSADAR CHAR School Additional Room 1643000.000 M/S Micro International 1643000.000 24/01/2013 23/01/2014 100 22/09/2014  
13 Monohorganj
1 PEDP-III/CML/MON/2011-12/W3.0054 SHIKCHAIL School Major Maintenance 292915.000 M/S Emon Enterprise 292915.000 13/01/2013 02/07/2013 100 22/09/2014  
2 PEDP-III/CML/MON/2011-12/W2.0489 BHOGAI DAKHIN School Additional Room 2993000.000 M/S Emon Enterprise 2993000.000 13/01/2013 12/01/2014 100 22/09/2014  
3 PEDP-III/CML/MON/2011-12/W2.1371 BHOGAI UTTAR School Additional Room 2385000.000 M/S Emon Enterprise 2385000.000 07/03/2013 06/03/2014 100 22/09/2014  
4 PEDP-III/CML/MON/2011-12/W2.0980 BHARANI KHANDA School Additional Room 5186000.000 M/S Emon Enterprise 5186000.000 13/01/2013 12/01/2014 0 22/09/2014  
5 PEDP-III/CML/MON/2011-12/W2.0488 UTTAR HOWLA School Additional Room 2993000.000 M/S Emon Enterprise 2993000.000 13/01/2013 12/01/2014 95 22/09/2014  
6 PEDP-III/CML/MON/2011-12/W2.0487 KOWTOLA KESHTLOA School Additional Room 2993000.000 M/S Liton Construction 2993000.000 06/11/2013 05/11/2014 80 22/09/2014  
7 PEDP-III/CML/MON/2011-12/W2.0486 ASHIR PAR School Additional Room 2993000.000 M/S Zannatul Metal Ind. & Workshop 2993000.000 13/01/2013 12/01/2014 100 22/09/2014  
8 PEDP-III/CML/MON/2011-12/W1.0394 Bara Uttar Howla School Reconstruction 5140000.000 M/S Emon Enterprise 5140000.000 13/01/2013 12/01/2014 95 22/09/2014  
14 Muradnagar
1 PEDP-III/CML/MUR/2011-12/W3.0307 ANANTA PUR School Major Maintenance 261324.000 M/S Rashid & Brothers 261324.000 30/12/2012 05/07/2013 100 22/09/2014  
2 PEDP-III/CML/MUR/2011-12/W2.0495 BORAR CHAR School Additional Room 2993000.000 M/S Moni Builders & Associates 2993000.000 27/03/2013 26/03/2014 65 22/09/2014  
3 e-Tender/PEDP-III/CML/MUR/2013-14/W2.2999 BAIRA School Additional Room 6279000.000 M/S Sumi Enterprise 6279000.000 10/05/2014 0 22/09/2014  
4 PEDP-III/CML/MUR/2012-13/W2.2106 Lakshipur School Additional Room 3388000.000 M/S Abdus Samad 3388000.000 11/03/2013 17/12/2013 75 22/09/2014  
5 PEDP-III/CML/MUR/2011-12/W2.0202 PAHAR PUR UTTAR School Additional Room 4069000.000 M/S Sumi Enterprise 4069000.000 21/11/2013 04/12/2014 60 22/09/2014  
6 PEDP-III/CML/MUR/2011-12/W2.0983 PANCH PUKURIA School Additional Room 5186000.000 M/S Sumi Enterprise 5186000.000 30/12/2012 05/01/2014 95 22/09/2014  
7 e-Tender/PEDP-III/CML/MUR/2013-14/W2.2998 Nuakandy Comy. School Additional Room 4896000.000 M/S Sumi Enterprise 4896000.000 10/05/2014 0 22/09/2014  
8 PEDP-III/CML/MUR/2011-12/W2.0201 BANSKAIT School Additional Room 4069000.000 M/S Islam Brothers 4069000.000 16/10/2012 15/10/2013 100 22/09/2014  
9 PEDP-III/CML/MUR/2011-12/W2.1374 KAZIATAL DAKHIN School Additional Room 2385000.000 M/S Poddar International 2385000.000 21/11/2013 03/12/2014 30 22/09/2014  
10 PEDP-III/CML/MUR/2012-13/W2.2010 AMPAL School Additional Room 5186000.000 M/S Sumi Enterprise 5186000.000 13/03/2013 19/12/2013 35 22/09/2014  
11 PEDP-III/CML/MUR/2012-13/W2.2012 MELAM CHAR School Additional Room 5186000.000 M/S Rashid & Brothers 5186000.000 29/09/2013 12/07/2014 70 22/09/2014  
12 PEDP-III/CML/MUR/2011-12/W2.0494 KHURUIL School Additional Room 4069000.000 M/S Rabeya Enterprise 4069000.000 20/03/2012 19/03/2013 100 22/09/2014  
13 PEDP-III/CML/MUR/2012-13/W2.2014 PARAMTALA School Additional Room 2993000.000 M/S Kamal Uddin 2993000.000 11/03/2013 17/12/2013 100 22/09/2014  
14 PEDP-III/CML/MUR/2011-12/W2.0493 DHAM GHAR PURBA School Additional Room 2993000.000 M/S Sumi Enterprise 2993000.000 20/03/2013 19/03/2014 100 22/09/2014  
15 PEDP-III/CML/MUR/2011-12/W2.1375 Gokul nagar School Additional Room 2191000.000 M/S Abdus Samad 2191000.000 30/12/2012 05/01/2014 100 22/09/2014  
16 e-Tender/PEDP-III/CML/MUR/2013-14/W2.2997 Alirchar School Additional Room 3955000.000 M/S Sumi Enterprise 3955000.000 10/05/2014 0 22/09/2014  
17 PEDP-III/CML/MUR/2011-12/W2.0492 KARIM PUR School Additional Room 2993000.000 M/S Rafique Traders 2993000.000 30/12/2012 05/01/2014 80 22/09/2014  
18 PEDP-III/CML/MUR/2012-13/W2.2162-A B. CHAPITLA School Additional Room 6279000.000 M/S Zakir Traders 6279000.000 10/10/2013 20/10/2014 25 22/09/2014  
19 PEDP-III/CML/MUR/2012-13/W2.2013 MOCHAGARA DHAKIN School Additional Room 5186000.000 M/S M.M. Enterprise 5186000.000 11/03/2013 19/12/2013 90 22/09/2014  
20 PEDP-III/CML/MUR/2011-12/W2.0982 BHABANI PUR School Additional Room 5186000.000 M/S Kamal Uddin 5186000.000 11/12/2013 17/12/2014 65 22/09/2014  
21 PEDP-III/CML/MUR/2011-12/W2.0200 KAMAR CHAR School Additional Room 4069000.000 M/S Happy Enterprise 4069000.000 22/09/2013 12/10/2013 60 22/09/2014  
22 PEDP-III/CML/MUR/2011-12/W2.1373 CHAIN PUR School Additional Room 2385000.000 M/S Al Mahmub Enterprise 2385000.000 21/11/2013 03/12/2014 10 22/09/2014  
23 PEDP-III/CML/MUR/2011-12/W2.0491 CHAPITALA UTTAR School Additional Room 2993000.000 M/S Niro & Brothers 2993000.000 06/01/2013 05/01/2014 100 22/09/2014  
24 PEDP-III/CML/MUR/2011-12/W2.0981 KODAL KATA School Additional Room 5186000.000 M/S Naiyum Enterprise 5186000.000 21/11/2013 03/12/2014 25 22/09/2014  
25 PEDP-III/CML/MUR/2011-12/W2.0490 MOKLISH PUR School Additional Room 2993000.000 M/S M.M. Enterprise 2993000.000 16/10/2012 15/10/2013 100 22/09/2014  
26 PEDP-III/CML/MUR/2011-12/W2.0199 NABIA BAD School Additional Room 4069000.000 M/S Vaily Enterprise 4069000.000 20/02/2013 26/02/2014 75 22/09/2014  
27 PEDP-III/CML/MUR/2011-12/W2.1372 PURBA DHAIR School Additional Room 2385000.000 M/S Saikat Construction 2385000.000 11/12/2013 17/12/2014 60 22/09/2014  
28 e-Tender/PEDP-III/CML/MUR/2013-14/W2.2996 South Jangar School Additional Room 3955000.000 M/S E F trade Internationl 3955000.000 10/05/2014 20 22/09/2014  
29 PEDP-III/CML/MUR/2012-13/W2.2161 ZADDA School Additional Room 6773000.000 M/S Rafiq Traders 6773000.000 23/03/2014 31/03/2015 0 22/09/2014  
30 PEDP-III/CML/MUR/2011-12/W1.0397 PAHARPUR GANDRA School Reconstruction 5140000.000 M/S Kalpana Bilas 5140000.000 10/10/2012 15/01/2014 100 22/09/2014  
31 PEDP-III/CML/MUR/2011-12/W1.0396 shahaNagar School Reconstruction 5140000.000 M/S Vally Enterprise 5140000.000 11/02/2013 12/05/2013 25 22/09/2014  
32 PEDP-III/CML/MUR/2011-12/W1.0395 Hosnabad School Reconstruction 5140000.000 M/S Saikat Construction 5140000.000 10/10/2012 15/01/2014 100 22/09/2014  
15 Nangalkot
1 PEDP-III/CML/NAN/2011-12/W3.0308 SARFATALI School Major Maintenance 155523.000 M/S Banu Enterprise 155523.000 14/03/2013 21/09/2013 100 22/09/2014  
2 PEDP-III/CML/NAN/2011-12/W2.0498 SHIHAR CHIORA School Additional Room 2993000.000 M/S Abdul Razzak 2993000.000 20/02/2013 20/02/2014 100 22/09/2014  
3 PEDP-III/CML/NAN/2011-12/W2.0497 KASHIPUR School Additional Room 2993000.000 M/S Buyen & Hoqe Cons. Com. 2993000.000 13/02/2013 20/02/2014 100 22/09/2014  
4 PEDP-III/CML/NAN/2013-14/W2.3000 TUA COMMUNITY PRIMARY SCHOOL School Additional Room 4896000.000 M/S Modina Construction 4896000.000 10/03/2014 10/03/2015 35 22/09/2014  
5 PEDP-III/CML/NAN/2012-13/W2.2107 LAMI PADUA School Additional Room 2793000.000 M/S Miazi Enterprise 2793000.000 14/03/2013 21/09/2013 100 22/09/2014  
6 PEDP-III/CML/NAN/2011-12/W2.0496 TULATALI School Additional Room 2993000.000 M/S Buisness Association International 2993000.000 13/02/2013 20/02/2014 100 22/09/2014  
7 PEDP-III/CML/NAN/2011-12/W1.0027 ADRA School Reconstruction 5140000.000 M/S H. Kabir 5140000.000 13/02/2013 20/02/2014 100 22/09/2014  
16 Titas
1 PEDP-III/CML/TIT/2011-12/W3.0055 UTTAR AKALIYA School Major Maintenance 146689.000 M/S Nazia Enterprise 146689.000 18/10/2012 17/04/2012 100 22/09/2014  
2 PEDP-III/CML/TIT/2011-12/W2.0499 DUDGHATA School Additional Room 2993000.000 M/S M.M. Enter[prise 2993000.000 20/03/2013 11/03/2014 85 22/09/2014  
3 PEDP-III/CML/TIT/2011-12/W2.0984 CHAR RAJA PUR School Additional Room 5186000.000 M/S Noona Traders 5186000.000 29/05/2013 14/06/2014 100 22/09/2014  
Total : 0.0000 (Km) 552663879.00 (Lac) 552663879.00 (Lac)