Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Chandina
1 MGSP/CND/2015-16/W-02 (a) Construction of BC/RCC road and Street Lighting from Palki Cinema hall to Dhaka-Chittagong Highway via Hazi Moar BC road at Ch. 00m-1013m & Ch. 1459m-2296m (b) Construction of BC/RCC road and Street Lighting from Palki Cinema hall to Hazi Moar RCC road at Ch. 1013m-1459m (c) Construction of RCC drain with footpath starting from Palki Cinema hall to thana moar link Mukum bari to Dumuria canal at Ch. 00m-3454m and Construction of RCC drain staring from Rammohan road to Kudirpur canal at Ch. 00m-1100m (d) Supplying fitting & fixing of street light starting from Palki Cinema hall to Hazi Moar Link (Upazilla) at Ch. 00m-2458m under Chandina Pourashava, District:Comilla. 6.3000 176117111.590 RT-QC-Bithi Enterprise (JV) 176117111.590 06/02/2017 01/02/2018 15 27/09/2017  
2 MGSP/CND/W-01 a) Improvement of road from harong H/O Ansor Ali to Abdulir par Mor road at word no. 02 &03 under Chandina Pourashava.(ch. 0.00m to 1700m) b) Improvement of road from Tolatali Moulabi bari Jame mosque towards south baniachong bridge & Kurbanpur bridge (Ch. 0.00m to 658m). c) Improvement of Boro-Gobindapur Nathpara H/O. Shyamshundar - via Baro-gobindapur Ali Mia High School - Dhaka-Chittagong High way road.(at word no. 06) under- Chandina Pourashava. Ch.0.0 - 316 m. d) Improvement of road from Srimontopur High School road to Kurbanpur Mosque at ward no. 09 under Chandina Pourashava Ch:0.0 to 585m. e) IMPROVEMENT OF ROAD FROM e1) Chandina poura bhobon East site Culvert to southway up to Chaycot mor at word no 07(Ch:0.0 to1000m) e2) from shahapara to kazee para road at word no 05(Ch:0.0 to 293m) e3) Upazila road to Chandina Bazer Ch:0.0 to 258m. f) Construction of a drain from jute office south gate towards east and then north way canel at word no 05 under Chandina pourashava.(ch. 0.00m to 335m). g) Construction of (a) R.C.C Drain from WAPDA more Mizan’s Shop to Moslem Driver’s Shop up to cross drain & H/O Ayat ali towards north main drain (ch. 0.00m to 250m).(b) brick drain from moharong jalal hujur house towards west up to old drain at word no.01 under Chandina Pourashava(ch. 0.00m to 233m). 3.2700 30745322.900 M.K Enterprise & T.H Enterprise 30745322.900 02/02/2016 30/11/2016 77 27/09/2017  
2 Cumilla-s
1 MGSP/CCC/2015-16/W-06 Development of Bypass road from Amtoli to Tickarchor (Vatpara to Jagonnathpur moar) beside river Gomoty (Ch. 5+150 to 10+309m) under Comilla City Corporation 5.1590 114345329.000 RT-QC-Bithi Enterprise (JV) 114345329.000 20/10/2016 19/01/2018 60 27/09/2017  
2 MGSP/CCC/2015-16/W-04 Development of Bypass road from Amtoli to Tickarchor beside river Gomoty (Ch. 0+00 to 5+150m) under Comilla City Corporation. 5.1500 113419728.000 M/s. M.A. Engineering-M/s. Ananta Enterprise 113419728.000 30/10/2016 19/01/2018 65 27/09/2017  
3 MGSP/CCC/W-03 (a) Improvement of Station BC road from Old Dhaka-Chittagong Road Badsha Mia Bazar Portion to Dharmapur East Chowmohoni (Ch. 0.00-800m) (Total Length =800m) (b) Construction of road side RCC Drain & Slab from Station road from Old Dhaka-Chittagong Road Badsha Mia Bazar Portion to Dharmapur East Chowmohoni (Ch. 0.00-800m) with cross drain at ch. 230m, 450m, (Total Length =800m) (c) Improvement of Abu Jahid BC Road (Ch.0.00-1450m) (Total Length =1450m) 3.0500 34871819.000 Md. Abdul Mannan 34871819.000 25/05/2015 21/02/2016 100 27/09/2017 Completed
4 MGSP/CCC/W-02 (a) Improvement of BC road from Chortha Chowmohani to EPZ road (Ch.0.00-700m) (Total Length =700m) (b) Construction of RCC Drain with slab from Chortha Chowmohani to EPZ road (Ch.0.00-700m) with cross drain at ch. 250m, 300m, 370m, 410m, 520m, 590m, 630m, (Total Length =700m) (c) Improvement of Mogotoly Shah Suja Mosque BC road (Ch.0.00-750m) (Total Length =750m) (d) Improvement of Othindra Mohon Roy BC Road (Ch. 0.00-530m) (Total Length =530m) (e) Improvement of Othindra Mohon Roy Road side RCC Drain & Slab(Ch. 0.00-530) with cross drain at ch. 100m, 220m, 350m, 480m, (Total Length =530m) 3.2100 30865975.000 M/S. Bithi Enterprise 30865975.000 01/05/2015 20/04/2016 100 27/09/2017 Completed
5 MGSP/CCC/W-01 (a) Improvement of Nazrul Avenue BC road from (i) Kandirpar Pubali Chattar To Dharmapur East Chowmohuni via Ranir Bazar (Ch.0.00-1300m), (ii) Dharmapur West Chowmuhuni to Daulatpur via Victoria Degree College (Ch. 1500m-2300m) (Total Length =2100m) (b) Construction of Nazrul Avenue road side RCC Drain from (i) Kandirpar Pubali Chattar To Dharmapur East Chowmohuni via Ranir Bazar (Ch.0.00-1300m), (ii) Dharmapur West Chowmuhuni to Daulatpur via Victoria Degree College (Ch. 1500m-2300m) with cross Drain at Ch. 200.00m, (Total Length =2100m) 4.2000 52771417.000 M/S. Haque Enterprise 52771417.000 01/05/2015 14/04/2016 100 27/09/2017 Completed
3 Daudkandi
1 MGSP/DAD/2015-16/W-02 (a) Construction of RCC Drain from Daudkandi R&H Road to old Ferri ghat on both side of the road with footpath on top of drain (Ch. 0+000 to 1+295m) under Daudkandi Pourashava.Total length-2667 m (b) Construction of RCC Drain on both side of the road in Daudkandi Pailot High School to Old Petrol Pamp with footpath on top of drain (Ch. 0+000 to 500.00m) under Daudkandi Pourashava. Total length-1089m (c) Supplying, fitting, and fixing of street light with pole from Daudkandi R&H to Daudkandi Toll Plaza via Daudkandi Bazar (Ch. 0+000 to 1+295m, & Ch. 0+000 to 0+425m) on both side under Daudkandi Pourashava. (d) Development of RCC Road from R&H Road to Motel ghat via Daudkandi Model Thana.(Ch. 0+00 to 0+1295m and Ch. 0+000 to 0+425m) under Daudkandi Pourashava. Total length-1720m, wide-6 m 8.9160 152631365.000 SB-LT (JV) 152631365.000 05/09/2016 04/09/2017 44 27/09/2017  
2 MGSP/DAD/W-01 a) Development of road from Daudkandi R&H road to Daudkandi bazaar via old Farighat (Ch.0.00-1890.00m), Under Daudkandi Pourashava (Total Length= 1890m) b) Development of road from Daudkandi Bazaar to Tuzarvanga KanuBepari house road(Ch. 0.00-518.00m), under Daudkandi Pourashava (Total Length= 518m) c) Development of road from Daudkandi Toolplaza to Donarchar Wood Ghat road (Ch. 0.00-793.00m) under Daudkandi Pourashava (Total Length= 793m) d) Construction of Drain from Daudkandi Toolplaza to Donarchar Wood Ghat road (Ch. 107.00m-747.00m), under Daudkandi Pourashava (Total Length=640.00m) 3.8410 31425219.000 M/S. R-TA Enterprise 31425219.000 13/07/2015 13/07/2016 100 27/09/2017 Final Bill Paid, Part of the Package dropped.
Total : 43.0960 (Km) 737193286.49 (Lac) 737193286.49 (Lac)