1
|
RIDP(CBC)/C-W183 419315224
|
Improvement of Amangonda (Takia Amgash Koborastan) East Side Babuchi Village road at ch.2300-2940m
|
0.6400
|
31.973
|
M/S Poly Enterprise
|
31.973
|
05/10/2016
|
11/06/2017
|
100
|
22/12/2018
|
Complete
|
|
2
|
RIDP(CBC)/C-SW23 419314283
|
Improvement Of Khironshal High School-Shampur Bridge road Ch.00-1355m
|
1.3550
|
63.936
|
M/S Fatema Traders
|
63.936
|
21/07/2016
|
30/05/2018
|
100
|
22/12/2018
|
Complete
|
|
3
|
RIDP(CBC)/C-W11 419313013
|
Improvement of Miabazar-Uzirpur UP Office-Shiberbazar-Chalklaxipur road at Ch. 4154-5170m
|
1.0160
|
55.230
|
M/S Hazi Enterprise
|
55.230
|
20/04/2015
|
31/05/2016
|
100
|
22/12/2018
|
Complete
|
|
4
|
RIDP(CBC)/C-BW26 419315142
|
Construction of 36.06 Long RCC Girder Bridge on Vatora (Sreepur UP) village road at ch.550m
|
|
182.039
|
M/S Mazumder Traders
|
182.039
|
11/03/2018
|
17/03/2019
|
65
|
22/12/2018
|
On going
|
|
5
|
RIDP(CBC)/C-BW25 419314280
|
Construction of 48.06 Long RCC Girder Bridge on Boro Kachnai-Sreefoltala road via Reazul jannat Madrasha road at ch.750m
|
|
273.087
|
M/S Poly Enterprise & Mazumder Traders (JV)
|
273.087
|
17/01/2018
|
23/01/2019
|
65
|
22/12/2018
|
On going
|
|
6
|
RIDP(CBC)/C-SW47 419315094
|
Improvement Of Munshirhat high School-Mestala village ( Girls high school North) road ch.00-366m
|
0.3660
|
32.861
|
M/S ABC Construction
|
32.861
|
14/11/2017
|
20/05/2018
|
100
|
22/12/2018
|
Complete
|
|
7
|
RIDP(CBC)/C-W226 419314128
|
Const Of 2x4.50mx5.00m RCC Box Culvert on Dhaka Ctg highway (Dhailbari school)-Sufua bazar road ch.952mm
|
|
25.292
|
M/S Poly Enterprise
|
25.292
|
14/05/2017
|
10/03/2018
|
100
|
22/12/2018
|
Complete
|
|
8
|
RIDP(CBC)/C-W156 419314223
|
(A) Improvement of Vitorchar-Dumuria Purbapara-Hossainpur Bridge- Gajaria-Dharmapur road. Ch.1944 -2876m
|
0.9320
|
39.279
|
M/S S.S Corporation
|
39.279
|
24/05/2016
|
30/04/2017
|
100
|
22/12/2018
|
Complete
|
|
9
|
RIDP(CBC)/C-W134 419315101
|
(A) Improvement of Dhaka Ctg Highway- Uttur Betiyara - Kodalia road. Ch.00-1000m
|
1.0000
|
55.419
|
M/S Rehana Construction
|
55.419
|
11/04/2016
|
28/06/2017
|
100
|
22/12/2018
|
Complete
|
|
10
|
RIDP(CBC)/C-W120 419315029
|
Improvement of Meshtola (Mazumder Bari)-Shuvapur GPS Via Laxmipur road Ch.557-1307m
|
0.7500
|
35.276
|
M/S Patowari Enterprise
|
35.276
|
28/02/2016
|
28/02/2017
|
100
|
22/12/2018
|
Complete
|
|
11
|
RIDP(CBC)/C-W119 419314128
|
Improvement of Dhaka Ctg Highway(Dulbari School)-Sufa Bazar road Ch.00-1250m
|
1.2500
|
59.016
|
M/S Saiful Enterprise
|
59.016
|
28/02/2016
|
05/03/2017
|
100
|
22/12/2018
|
Complete
|
|
12
|
RIDP(CBC)/C-W111 419315144
|
Improvement of Ashadia Purbapara Julpa Dhokan-Baraipur road at ch.00-600m
|
0.6000
|
30.649
|
M/S Abul hasem
|
30.649
|
25/01/2016
|
31/12/2016
|
100
|
22/12/2018
|
Complete
|
|
13
|
RIDP(CBC)/C-W104 419314235
|
Improvement of Bijoypur-Shomespur road at ch.00-547m
|
0.5470
|
35.255
|
M/S Rehana construction
|
35.255
|
17/12/2015
|
30/12/2016
|
100
|
22/12/2018
|
Complete
|
|
14
|
RIDP(CBC)/C-W103 419315196
|
Improvement of Athakara-Taltula MSQ road at ch.00-590m
|
0.5900
|
26.722
|
M/S Patawari Enterprise
|
26.722
|
10/12/2015
|
31/01/2017
|
100
|
22/12/2018
|
Complete
|
|
15
|
RIDP(CBC)/C-W102 419314133
|
Improvement of Patadda bazar-Jamukara(Singgapur market) road at ch.1305-1765m
|
0.4600
|
22.033
|
M/S Patawari Enterprise
|
22.033
|
10/12/2015
|
31/01/2017
|
100
|
22/12/2018
|
Complete
|
|
16
|
RIDP(CBC)/C-W101 419314262
|
Improvement of King Kachnoi-Bagigram road at ch.00-825m
|
0.8250
|
46.108
|
M/S Abul Hasem
|
46.108
|
09/12/2015
|
31/05/2017
|
100
|
22/12/2018
|
Complete
|
|
17
|
RIDP(CBC)/C-W100 419315168
|
Improvement of Debipur-Sonapur Primary School-Boshkora road at ch. 1000-1780m
|
0.7800
|
39.719
|
M/S Patowari Enterprise
|
39.719
|
10/12/2015
|
31/01/2017
|
100
|
22/12/2018
|
Complete
|
|
18
|
RIDP(CBC)/C-W77 419314209
|
Improvement of Fakirhat (Mazar)-Durgapur-Girls School road at ch. 900-2100m
|
1.2000
|
52.114
|
M/S Mazumder Traders
|
52.114
|
16/07/2015
|
30/06/2016
|
100
|
22/12/2018
|
Complete
|
|
19
|
RIDP(CBC)/C-W76 419314261
|
Improvement of Anarpur-Kawiyoni-Taltala road at ch. 00-1810m
|
1.6150
|
66.239
|
M/s Janani varietie stor
|
66.239
|
14/07/2015
|
31/03/2016
|
100
|
22/12/2018
|
Complete
|
|
20
|
RIDP(CBC)/C-W75 419315274
|
Improvement of Lohari-Gandashi road at ch. 00-1015m
|
1.0150
|
46.538
|
M/S Erfan Enterprise
|
46.538
|
26/07/2015
|
31/01/2017
|
100
|
22/12/2018
|
Complete
|
|
21
|
RIDP(CBC)/C-W74 419314244
|
Improvement of Kashinagar-Jogirkandi-Joymangalpur road at ch. 3900-5019m
|
1.1190
|
72.511
|
M/S Abul Hasem
|
72.511
|
29/06/2015
|
30/12/2016
|
100
|
22/12/2018
|
Complete
|
|
22
|
RIDP(CBC)/C-W35 419314280
|
Improvement of Bor Kasnai-Sreefoltala road via Reazul Jannat Madrasha road at ch. 00-587m
|
0.5870
|
28.544
|
M/S Tanha Enterprise
|
28.544
|
16/07/2015
|
30/10/2016
|
100
|
22/12/2018
|
Complete
|
|
23
|
RIDP(CBC)/C-W34 419314282
|
Improvement of Narchar South Para Jame mosque-Hilalnagar via Narchar GPS road at ch. 00-960m
|
0.9600
|
48.185
|
M/S Tanha Enterprise
|
48.185
|
16/07/2015
|
30/10/2016
|
100
|
22/12/2018
|
Complete
|
|
24
|
RIDP(CBC)/C-SW10 419315289
|
Construction of 2x4.50x4.50m RCC Box culvert on Pachra-Fulmuri road over Baluzori khal.
|
|
19.492
|
M/S Patawari Enterprise
|
19.492
|
31/03/2015
|
28/02/2016
|
100
|
22/12/2018
|
Complete
|
|
25
|
RIDP(CBC)/C-W12 419314131
|
Improvement of Naraonpur -Baiskara via Jospur madrasha-& Mandaria Road at Ch. 4410-5195m
|
0.7850
|
31.652
|
M/S Abul Hasem
|
31.652
|
20/04/2015
|
30/08/2015
|
100
|
22/12/2018
|
Complete
|
|
26
|
RIDP(CBC)/C-W1 41915171
|
(a) Improvement of Dhaka Ctg Highway-Kuliara-Ludiara road at Ch 800-1253m & 1280-2310m (b) Construction of Brick culvert & Protective work on Dhaka Ctg Highway-Kuliara-Ludiara road
|
1.4830
|
76.543
|
M/S Maisha Enterprise
|
76.543
|
05/05/2015
|
31/03/2016
|
100
|
22/12/2018
|
Complete
|
|
27
|
RIDP(CBC)/C-SW-8 419315291
|
Improvement of Fulagram Digi-Kapowchatoly village road at Ch. 00-1137m
|
1.1370
|
39.596
|
M/S Abir Enterprise
|
39.596
|
23/04/2015
|
30/05/2016
|
100
|
22/12/2018
|
Complete
|
|
28
|
RIDP(CBC)/C-SW9 419314216
|
Improvement opf Chandiskara-Satitala-Baraiya road at ch. 525-1687m.
|
1.1620
|
54.529
|
M/S Patawari Enterprise
|
54.529
|
31/03/2015
|
30/06/2016
|
100
|
22/12/2018
|
Complete
|
|
29
|
RIDP(CBC)/C-SW7 419314157
419315284
|
(A) Improvement of Basanta pur Motin member-Nankara mohila Madrasha-Dhaka-Chittagonj(Kathal Gastala) road at ch. 3150-4000m.
(B) Nankara Maddampara Edris bhuiyan bari-Motin bari-Nankara Utterpara Esak Chowdhury bari road at ch. 00-353m & 391-792m.
|
1.6040
|
66.390
|
M/S Patawari Enterprise
|
66.390
|
31/03/2015
|
31/12/2015
|
100
|
22/12/2018
|
Complete
|
|
30
|
RIDP(CBC)/C-SW6 419314123
|
Improvement of Bulkara-Buddin road at ch. 504-1376m
|
0.8720
|
36.445
|
M/S Abir Enterprise
|
36.445
|
22/03/2015
|
31/12/2016
|
100
|
22/12/2018
|
Complete
|
|
31
|
RIDP(CBC)/C-SW3 419314284
|
Improvement of Mia Bazar GC-Asrafpur-Krisnapur road at ch. 90-436m
|
0.3460
|
13.553
|
M/S Abir Enterprise
|
13.553
|
15/03/2015
|
31/05/2017
|
100
|
22/12/2018
|
Complete
|
|
32
|
RIDP(CBC)/C-SW2 419314168
|
Improvement of Gobindapur bazar-Hazari para road at ch. 970-2090m
|
1.1200
|
45.618
|
M/S Shahajan Enterprise
|
45.618
|
11/06/2015
|
31/05/2017
|
100
|
22/12/2018
|
Complete
|
|
33
|
RIDP(CBC)/C-SW1 419315287
|
Improvement of Utter Lateme Master Mohammed Ali bari to Let. Situ mia bari via Rafiq bhuiyan bari road at ch. 00-275m
|
0.2750
|
15.398
|
M/S Saiful Enterprise
|
15.398
|
16/06/2015
|
31/01/2017
|
100
|
22/12/2018
|
Complete
|
|
34
|
RIDP(CBC)/C-W3 419315176
|
Improvement of Asrafpur-Komardoga road at ch. 75-675m.
|
0.6000
|
24.106
|
M/S Abir Enterprise
|
24.106
|
15/03/2015
|
31/05/2016
|
100
|
22/12/2018
|
Complete
|
|
35
|
RIDP(CBC)/C-W2 419314178
|
Improvement of Zatrapur-Hilalnagar-Dharmopur-Basantapur road at ch. 00-1418m.
|
1.4180
|
56.588
|
M/S Tanha Enterprise
|
56.588
|
22/02/2015
|
31/01/2016
|
100
|
22/12/2018
|
Complete
|
|
36
|
RIDP(CBC)/C-W244 419313025
|
Improvement Of Chouddagram (Upzila Parishad)-Khironshal Bazar-Mitalla road ch.4756-5293m
|
0.5370
|
32.948
|
M/S Poly Enterprise
|
32.948
|
28/06/2017
|
21/04/2018
|
100
|
22/12/2018
|
Complete
|
|
37
|
RIDP(CBC)/C-W10 419312007
|
Improvement of Gunabati-Akdia road at Ch. 4423-5014m
|
0.5910
|
49.405
|
M/S Rehana construction
|
49.405
|
09/04/2015
|
30/04/2017
|
100
|
22/12/2018
|
Complete
|
|
38
|
RIDP(CBC)/C-W303 419314137
|
Improvement Of West Dekra-Narayankuri road to Alkora Bazar Road ch.1550-2665m
|
1.1150
|
79.921
|
M/S Finex Construction
|
79.921
|
31/07/2018
|
06/08/2019
|
10
|
22/12/2018
|
On going
|
|
39
|
RIDP(CBC)/C-W304 419315273
|
Improvement Of Akab Bazar-Sorputi Road ch.00-2004m
|
2.0040
|
126.978
|
M/S Saiful Enterprise
|
126.978
|
11/04/2018
|
17/04/2019
|
70
|
22/12/2018
|
On going
|
|
40
|
RIDP(CBC)/C-W302 419314048
|
Improvement Of Chandul-Mothua Road ch.00-825m
|
0.8250
|
51.183
|
M/S Poly Enterprise
|
51.183
|
09/04/2018
|
15/12/2018
|
70
|
22/12/2018
|
On going
|
|
41
|
RIDP(CBC)/C-W301 419314211
|
Improvement Of Khillapara-Akshor Rajghat Road ch.00-840 & 900-960m
|
1.4400
|
59.788
|
M/S ABC Construction
|
59.788
|
03/04/2018
|
09/12/2018
|
70
|
22/12/2018
|
On going
|
|
42
|
RIDP(CBC)/C-W300 419315174
|
Improvement Of Rampur-Subarnapur-Aripukor -Al Amin Market Road ch.00-1310m
|
1.3100
|
89.185
|
M/S G.S Fashion
|
89.185
|
11/04/2018
|
17/04/2019
|
20
|
22/12/2018
|
On going
|
|
43
|
RIDP(CBC)/C-BW35 419314054
|
Construction of 72.00 Long PSC Girder Bridge On krishnapur-Chalklaxmipur road at ch.900m
|
|
324.001
|
M/S Poly Enterprise
|
324.001
|
14/02/2018
|
14/03/2019
|
50
|
22/12/2018
|
On going
|
|
44
|
RIDP(CBC)/C-BW27 419314281
|
Construction of 30.06 Long RCC Girder Bridge on Hossainpur Moddompara eidgah-Bander bari Dumuria West para Modina bazar road at ch.60m
|
|
152.302
|
M/S Poly Enterprise
|
152.302
|
11/03/2018
|
17/03/2019
|
60
|
22/12/2018
|
On going
|
|
45
|
RIDP(CBC)/C-SW43 419314146
419315348
419315347
|
Improvement Of (A) Gangra bazar-Satchar-Vajonkora west Para Mosque road ch.1030-1795m
Improvement Of (B) Ratonpur Helal Master house-Ratonpur Jame Mosque road ch.00-605m
Improvement Of (C) Rampur Soban Mia house-Subarnapur Master Jolil house road ch.00-2
|
1.5960
|
80.603
|
M/S R-Ta Enterprise
|
80.603
|
20/09/2017
|
26/09/2018
|
60
|
22/12/2018
|
On going
|
|
46
|
RIDP(CBC)/C-W294 419315029
|
Improvement Of Mestala (Mazumder bari) -Shuvapur GPS Via Laxmipur Road ch.00-557m
|
0.5570
|
32.413
|
M/S Patowary Enterprise
|
32.413
|
27/03/2018
|
02/10/2018
|
100
|
22/12/2018
|
Complete
|
|
47
|
RIDP(CBC)/C-W293 41935224
|
Improvement Of Amangonda (Takiamgach Koborastan) East side Babuchi village Road ch.1700-2300m & 2940-3225m
|
0.8850
|
51.132
|
M/S Poly Enterprise
|
51.132
|
18/03/2018
|
24/11/2018
|
100
|
22/12/2018
|
Complete
|
|
48
|
RIDP(CBC)/C-M27 419314189
|
Maintenance of Dhorkara-Shaktala Village Road at Ch. 00-1775m .
|
1.7750
|
39.453
|
M/S. Rehana Construction
|
39.453
|
30/09/2016
|
07/08/2016
|
100
|
22/12/2018
|
Completed
|
|
49
|
RIDP(CBC)/C-M24 419314008
|
Maintenance of Syedpur-Narayanpur Uttar para road at Ch. 00-1500m .
|
1.5000
|
31.141
|
M/S. Mahabub Enterprise
|
31.141
|
31/03/2016
|
15/03/2016
|
100
|
22/12/2018
|
Completed
|
|
50
|
RIDP(CBC)/C-M155 419313019
|
Periodic Maintenance (Re-Seal)) of Gunabati GC (UPC)-Batiara via Al-Amin Market-Gangra road ch.00-4260m & 6394-7291m.
|
5.1570
|
60.437
|
M/S Abul Hasem
|
60.437
|
25/10/2018
|
|
50
|
22/12/2018
|
On-Going
|
|
51
|
RIDP(CBC)/C-M105 419313003
|
Periodic Maintenance of (Re-Seal) Latimi R&H-Banderjola via Alkora UPC road ch. 3805-8012m.
|
4.2070
|
80.555
|
M/S Rehana Construction
|
80.555
|
30/05/2018
|
20/05/2018
|
100
|
22/12/2018
|
Completed
|
|
52
|
RIDP(CBC)/C-M26 419313006
|
Re-Construction of 3x4.5x5.0m RCC Box Culvert on Protabpur (Uzirpur UP)-Darbesh bazar road at Ch 3480m Under Chouddagram Upazila.
|
|
26.729
|
M/S Poly Enterprise
|
26.729
|
03/09/2015
|
03/09/2015
|
100
|
22/12/2018
|
Completed
|
|
53
|
RIDP(CBC)/C-M25 419313003
|
Maintenance of Latimi R&H-Railline-Bendarjola via Alkara up office Road at Ch. 00-3805m Under Chouddagram Upazila
|
3.8050
|
45.853
|
M/S Rehana Construction
|
45.853
|
19/08/2015
|
30/06/2015
|
100
|
22/12/2018
|
Completed
|
|
54
|
RIDP(CBC)/C-M40 413912009
|
Maintenance of (Rehabilitation) of Padua(NHW) Bazar-Gunabati GC road at ch. 00-3000m.
|
3.0000
|
70.576
|
M/S Rehana Construction
|
70.576
|
23/06/2016
|
10/06/2016
|
100
|
22/12/2018
|
Completed
|
|
55
|
RIDP(CBC)/C-M39 413912009
|
Maintenance of (Rehabilitation) of Padua(NHW) Bazar-Gunabati GC road at ch. 3000-5837m.
|
2.8370
|
64.199
|
M/S Patowari Enterprise
|
64.199
|
15/06/2016
|
10/06/2016
|
100
|
22/12/2018
|
Completed
|