Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Anwara
1 PEDP-III/CTG/ANW/2011-12/W3.0017 HETIKHAIN School Major Maintenance 230766.000 M/S Azad Enterprise 230766.000 14/08/2012 03/03/2013 100 22/09/2014  
2 PEDP-III/CTG/ANW/2013-14/W2.2262 KAIKHAINE School Additional Room 3546000.000 M/S Hazrat shah sufi tuib shah ® & Brothers. 3546000.000 13/02/2014 28/05/2014 40 22/09/2014  
3 PEDP-III/CTG/ANW/2012-13/W2.1714 ANWARA SARASATI School Additional Room 2743000.000 M/S julda Bricks 2743000.000 03/02/2014 28/05/2014 80 22/09/2014  
2 Banskhali
1 PEDP-III/CTG/BAS/2011-12/W3.0018 East Mingiritala Non Gov. Reg. Pri. Sch. School Major Maintenance 330699.000 M/S Janashaba Enterprise 330699.000 15/07/2012 15/10/2012 100 22/09/2014  
2 PEDP-III/CTG/BAS/2013-14/W2.2266 SARAL School Additional Room 7636000.000 Iashaba Enterprise 7636000.000 14/06/2017 15/06/2016 0 22/09/2014  
3 PEDP-III/CTG/BAS/2013-14/W2.2265 DAKKHIN NAPORA School Additional Room 3546000.000 M/S Paragum 3546000.000 14/06/2017 15/03/2016 0 22/09/2014  
4 PEDP-III/CTG/BAS/2013-14/W2.2264 PURBO CHECHURIA School Additional Room 4896000.000 Bappa Enterprise 4896000.000 14/06/2027 15/03/2016 0 22/09/2014  
5 PEDP-III/CTG/BAS/2013-14/W2.2263 BAILCHARI School Additional Room 4896000.000 M/S Bappa Enterprise 4896000.000 14/06/2017 14/03/2016 0 22/09/2014  
6 PEDP-III/CTG/2011-12/W1.0608 North Jaldi Ahmadia Cominith Primary Sch School Reconstruction 6072000.000 M/S Sha Monir Enterprise 6072000.000 27/01/2013 05/02/2014 70 22/09/2014  
7 PEDP-III/CTG/BAS/2012-13/W1.0738 Maizpara Community Pri. Schoo. School Reconstruction 8305500.000 M/S Shafi Enterprise 8305500.000 04/07/2013 03/07/2014 50 22/09/2014  
8 PEDP-III/CTG/BAS/2012-13/W1.0739 PASCHIM PUKURIA School Reconstruction 9515500.000 M/S Bappa Enterprise 9515500.000 01/03/2013 28/02/2014 90 22/09/2014  
3 Boalkhali
1 PEDP-III/CTG/BOA/2011-12/W3.0019 SREE PUR KHARAN DWIP School Major Maintenance 262102.000 M/S Jannath Enterprise 262102.000 12/08/2012 10/02/2013 100 22/09/2014  
2 PEDP-III/CTG/BOA/2011-12/W2.0937 AHALLA SADAR PARA School Additional Room 5186000.000 M/S Khair & Son's 5186000.000 18/06/2012 31/05/2013 100 22/09/2014  
3 PEDP-III/CTG/BOA/2013-14/W2.3042 KANUNGO PARA MUKTAKESHI School Additional Room 2995000.000 M/S Towakkul Enterprise. 2995000.000 28/01/2014 25/10/2014 90 22/09/2014  
4 PEDP-III/CTG/BOA/2011-12/W2.0382 MADHYA SHAKPURA School Additional Room 2993000.000 M/S Jakir hossain and M/S Saleh Cons't JV 2993000.000 13/06/2012 31/05/2013 100 22/09/2014  
5 PEDP-III/CTG/BOA/2011-12/W1.0385 SHAHEED DR. SYAMOL LALA KARIM COMMUNITY School Reconstruction 5140000.000 M/S Tawakkul Enterprise 5140000.000 13/06/2012 31/08/2013 100 22/09/2014  
4 Chandanish
1 PEDP-III/CTG/CHA/2011-12/W3.0020 DHOPACHARI School Major Maintenance 301295.000 M/S Bappa Enterprise 301295.000 03/09/2012 19/02/2013 100 22/09/2014  
2 PEDP-III/CTG/CHA/2011-12/W2.0384 HASHIM PUR J.T.S. School Additional Room 2993000.000 M/S A R M Engineers, 2993000.000 25/09/2013 01/10/2014 35 22/09/2014  
3 PEDP-III/CTG/CHA/2011-12/W1.0320 north dhopa para community School Reconstruction 5140000.000 M/S A.R.M Engineer,s 5140000.000 24/02/2014 02/06/2015 20 22/09/2014  
5 Fatikchari
1 PEDP-III/CTG/FAT/2011-12/W3.0021 S. Nichintapur Amania Reg. School Major Maintenance 254425.000 M/S Tayeb Enterprise 254425.000 26/11/2012 24/05/2013 100 22/09/2014  
2 PEDP-III/CTG/FAT/2013-14/W2.2271 Uttar Nichintapur Am.Ulum Akota Reg. School Additional Room 3955000.000 M/S Monir Ahmed 3955000.000 15/06/2026 0 22/09/2014  
3 PEDP-III/CTG/FAT/2011-12/W2.0386 SUABIL School Additional Room 4896000.000 M/S MR Constructin 4896000.000 06/02/2014 06/10/2014 90 22/09/2014  
4 PEDP-III/CTG/FAT/2011-12/W2.0938 West Sovendandi J,M,C. School Additional Room 6093000.000 MS Zahangir Alam 6093000.000 06/02/2014 06/10/2014 50 22/09/2014  
5 PEDP-III/CTG/FAT/2011-12/W2.0026 KANCHAN NAGAR RUSTOMIA School Additional Room 4896000.000 M/S haqe and sons Ent 4896000.000 06/02/2014 06/10/2014 45 22/09/2014  
6 PEDP-III/CTG/FAT/2013-14/W2.2270 Painding sabujbug N.G.P.School School Additional Room 3955000.000 M/S ilias bros & M/S Berger con. 3955000.000 04/12/2014 04/11/2015 0 22/09/2014  
7 PEDP-III/CTG/FAT/2012-13/W2.1972 PASCHIM BHUJ PUR School Additional Room 6093000.000 M/S MR Const 6093000.000 06/02/2014 06/10/2014 85 22/09/2014  
8 PEDP-III/CTG/FAT/2013-14/W2.2269 Rashida Khatun Reg.pri.sch School Additional Room 3955000.000 M/S Monir Ahmed 3955000.000 04/12/2014 04/11/2015 0 22/09/2014  
9 PEDP-III/CTG/FAT/2013-14/W2.3045 Moumana Kahtun Reg. Pri. Sch School Additional Room 2765000.000 M/S Tayeb Enterprise 2765000.000 04/12/2014 01/06/2015 45 22/09/2014  
10 PEDP-III/CTG/FAT/2011-12/W2.0025 HAPANIA School Additional Room 4896000.000 M/S ilias bros 4896000.000 20/01/2014 06/10/2014 35 22/09/2014  
11 PEDP-III/CTG/FAT/2012-13/W2.2091 Chalaugan Rag. Pri.Sch School Additional Room 3281000.000 M/S Monir Ahmed 3281000.000 06/02/2014 06/10/2014 10 22/09/2014  
12 PEDP-III/CTG/FAT/2011-12/W2.0026-A Tarakhow Res. Pri. Sch. School Additional Room 3955000.000 M/S Na Trading 3955000.000 06/02/2014 06/10/2014 35 22/09/2014  
13 PEDP-III/CTG/FAT/2011-12/W1.0321-A BARA BETUA School Reconstruction 6093000.000 M/S Monir Ahmed 6093000.000 06/02/2014 06/10/2014 12 22/09/2014  
6 Hathazari
1 PEDP-III/CTG/HAT/2011-12/W3.0286 MUHAMMAD PUR School Major Maintenance 148738.000 M/S Elias Enterprise 148738.000 06/03/2013 26/09/2013 100 22/09/2014  
2 PEDP-III/CTG/HAT/2012-13/W2.2154 HAT HAZARI MODEL School Additional Room 6773000.000 M/S Elias Enterprise 6773000.000 04/12/2013 04/12/2014 40 22/09/2014  
3 PEDP-III/CTG/HAT/2011-12/W2.1335 MIRZAPUR School Additional Room 3388000.000 M/S Shahen Shah Bricks. 3388000.000 08/12/2013 05/10/2014 35 22/09/2014  
4 PEDP-III/CTG/HAT/2011-12/W2.0388 FATEH PUR KULAL PARA School Additional Room 2993000.000 M/S Fabiha enterprise 2993000.000 26/09/2012 12/09/2013 100 22/09/2014  
5 PEDP-III/CTG/HAT/2011-12/W2.0387 DHALAI SONAY School Additional Room 2993000.000 M/S Idel Enterprise 2993000.000 26/09/2012 12/09/2013 90 22/09/2014  
6 PEDP-III/CTG/HAT/2011-12/W2.0939 MADHYA MADARSHA AKBARIA School Additional Room 5186000.000 M/S Gulgar Trader's 5186000.000 26/09/2012 12/09/2013 100 22/09/2014  
7 PEDP-III/CTG/HAT/2011-12/W2.0027 Est Dewannagar shayesta khan para R.Pri. School Additional Room 3388000.000 M/S S.M. Salim enterprise 3388000.000 26/09/2012 12/09/2013 80 22/09/2014  
8 PEDP-III/CTG/HAT/2012-13/W2.1973 FARHADABAD QUORANIA School Additional Room 2793000.000 M/S S.M. Salim Enterprise 2793000.000 06/03/2013 26/09/2013 85 22/09/2014  
9 PEDP-III/CTG/HAT/2011-12/W1.0324 EAST JORDUARA School Reconstruction 5140000.000 M/S Sha Latif Enterprise 5140000.000 20/01/2013 20/03/2014 100 22/09/2014  
10 PEDP-III/CTG/HAT/2011-12/W1.0323 MAHAKALI School Reconstruction 5140000.000 M/S Monir Ahammed 5140000.000 20/01/2013 20/03/2014 90 22/09/2014  
7 Lohagara
1 PEDP-III/CTG/LOH/2011-12/W3.0022 ADAR CHAR School Major Maintenance 309042.000 M/S Tithi Associates 309042.000 13/08/2012 21/02/2013 100 22/09/2014  
2 PEDP-III/CTG/LOH/2011-12/W2.0392 UTTOR AMIRABAD School Additional Room 2993000.000 M/S Tithi Associates 2993000.000 13/08/2012 21/08/2013 100 22/09/2014  
3 PEDP-III/CTG/LOH/2012-13/W2.2092 UTTOR PADUA School Additional Room 2793000.000 M/S S. Brother's 2793000.000 14/07/2013 13/07/2014 25 22/09/2014  
4 PEDP-III/CTG/LOH/2012-13/W2.1974 KALAUZAN School Additional Room 2793000.000 M/S Shafi Enterprise 2793000.000 24/03/2013 26/11/2013 100 22/09/2014  
5 PEDP-III/CTG/LOH/2011-12/W2.0391 UZIRA VITA School Additional Room 2993000.000 M/S Md. Faruque 2993000.000 15 22/09/2014  
6 PEDP-III/CTG/LOH/2012-13/W2.2155 PURBO PUTIBILA School Additional Room 4896000.000 M/S S Brothers 4896000.000 18/11/2013 20/08/2014 40 22/09/2014  
7 PEDP-III/CTG/LOH/2013-14/W2.2273 Amirabad Notun Bazar Comiumity School School Additional Room 3955000.000 M/S S Brothers 3955000.000 02/03/2014 03/12/2014 0 22/09/2014  
8 PEDP-III/CTG/LOH/2011-12/W2.0390 RASHIDER GHONA School Additional Room 4069000.000 M/S S Brothers 4069000.000 14/06/2015 15/03/2015 40 22/09/2014  
9 PEDP-III/CTG/LOH/2011-12/W2.0389 BARA HATIA School Additional Room 2993000.000 M/S Dot Enterprise 2993000.000 14/06/2015 15/06/2015 15 22/09/2014  
10 PEDP-III/CTG/LOH/2011-12/W1.0326 Sarya Cpmmu: Primary School School Reconstruction 5140000.000 M/S Tithi Associates 5140000.000 13/08/2012 21/11/2013 100 22/09/2014  
8 Mirsharai
1 PEDP-III/CTG/MIR/2011-12/W3.0023 Maddam naher pur reg: School Major Maintenance 214234.000 M/S Mirsarai Enterprise 214234.000 10/07/2012 10/01/2013 100 22/09/2014  
2 PEDP-III/CTG/MIR/2013-14/W2.3631 SARKAR HAT School Additional Room 2765000.000 M/S Onik Enterprise 2765000.000 04/01/2014 15/03/2020 0 22/09/2014  
3 PEDP-III/CTG/MIR/2013-14/W2.3630 UTTOR HAITH KANDI School Additional Room 2765000.000 M/S Onik Enterprise 2765000.000 04/02/2014 15/03/2020 0 22/09/2014  
4 PEDP-III/CTG/MIR/2013-14/W2.2274 MADHY MITHANA ALAMJREG: School Additional Room 3955000.000 M/S Onik Enterprise 3955000.000 04/01/2014 15/03/2020 30 22/09/2014  
5 PEDP-III/CTG/MIR/2011-12/W2.0393 HARIHAR PUR RULULAMIN REG: School Additional Room 2993000.000 M/S Shajahan Cons't 2993000.000 30/07/2012 30/07/2013 100 22/09/2014  
6 PEDP-III/CTG/MIR/2012-13/W2.2156 KARER HAT School Additional Room 3281000.000 M/S Adian Enterprise 3281000.000 14/01/2016 08/01/2015 20 22/09/2014  
7 PEDP-III/CTG/MIR/2011-12/W1.0328 POURBO MAYANJ JANMJA BHUIYAN COM: School Reconstruction 5140000.000 M/S Haque 5140000.000 01/10/2013 100 22/09/2014  
8 PEDP-III/CTG/MIR/2011-12/W1.0694 DUARU School Reconstruction 5140000.000 M/S Shajahan Cons't 5140000.000 02/07/2012 19/09/2013 60 22/09/2014  
9 PEDP-III/CTG/MIR/2011-12/W1.0327 RAHMOTABAD RABIUL HOSSAIN School Reconstruction 5140000.000 M/S Haque Traders 5140000.000 19/06/2012 19/09/2013 100 22/09/2014  
10 PEDP-III/CTG/MIR/2011-12/W1.0693 TETAIYA NABA TARA School Reconstruction 5140000.000 M/S Haque Traders 5140000.000 19/06/2012 19/09/2013 100 22/09/2014  
9 Patiya
1 PEDP-III/CTG/PAT/2011-12/W3.0024 MILAN CHAKRA REG. School Major Maintenance 124244.000 M/S Hazi M.A. Sikder Tyrader's 124244.000 12/08/2028 23/08/2013 100 22/09/2014  
2 e-Tender/PEDP-III/CTG/PAT/2013-14/W2.3632 CHANHARA JOTISH School Additional Room 2765000.000 M/S, Julda Brick Manufacturing 2765000.000 06/05/2014 06/10/2015 45 22/09/2014  
3 PEDP-III/CTG/PAT/2013-14/W2.2207 Pairol Community Pri.school School Additional Room 5810000.000 Ms/Moms Tra 5810000.000 14/02/2013 12/11/2014 50 22/09/2014  
4 PEDP-III/CTG/PAT/2012-13/W2.1715 GOAL PARA School Additional Room 8915500.000 M/S Unnayan Prakawshali 8915500.000 19/06/2013 19/06/2013 60 22/09/2014  
5 PEDP-III/CTG/PAT/2011-12/W2.0395 DAKKHIN ASHIYA SADEKIYA School Additional Room 2993000.000 M/S Sha Amir Cons't 2993000.000 25/07/2012 01/08/2013 100 22/09/2014  
6 PEDP-III/CTG/PAT/2012-13/W2.2157 KOLA GOAN School Additional Room 4896000.000 M/S Nipa 4896000.000 10/10/2013 09/09/2014 30 22/09/2014  
7 PEDP-III/CTG/PAT/2011-12/W2.0029 UTTOR SHIKAL BAHA School Additional Room 3388000.000 M/S Nipa Enterprise 3388000.000 12/08/1930 29/08/2013 100 22/09/2014  
8 PEDP-III/CTG/PAT/2012-13/W2.1716 DAULATPUR M.R School Additional Room 2743000.000 M/S Touhid & Brother's 2743000.000 13/06/2020 14/06/2019 100 22/09/2014  
9 PEDP-III/CTG/PAT/2011-12/W2.0028 UTTOR CHAR LAKHYA School Additional Room 3388000.000 M/S juldha Brick's 3388000.000 12/08/2012 30/08/2013 100 22/09/2014  
10 PEDP-III/CTG/PAT/2011-12/W1.0700 Maddah Baralia Community School School Reconstruction 9790000.000 Structural Corporation 9790000.000 13/06/2020 19/06/2014 90 22/09/2014  
11 PEDP-III/CTG/PAT/2011-12/W1.0699 Ashata Community School School Reconstruction 9490000.000 M/S Royal Asso. 9490000.000 19/06/2013 19/06/2014 85 22/09/2014  
12 PEDP-III/CTG/PAT/2011-12/W1.0697 East Maliara Community Pri. School School Reconstruction 8580000.000 M/S Kasham & Brother's 8580000.000 13/06/2020 19/06/2014 15 22/09/2014  
13 PEDP-III/CTG/PAT/2011-12/W1.0695 HULAIN A.S.CHY. School Reconstruction 8580000.000 M/S Touhid & Brother 8580000.000 13/06/2020 19/06/2014 95 22/09/2014  
10 Rangunia
1 PEDP-III/CTG/RAN/2011-12/W3.0025 HILA GAZI PARA School Major Maintenance 155416.000 M/S Akhi International 155416.000 26/07/2012 15/02/2013 100 22/09/2014  
2 PEDP-III/CTG/RAN/2012-13/W2.1975 SHILAK FAKIRAGHAT School Additional Room 4069000.000 M/S Roni Enterprise 4069000.000 16/01/2013 20/10/2013 60 22/09/2014  
3 PEDP-III/CTG/RAN/2011-12/W2.0940 SHOUTH DHOPAGHAT REG: PRIMARY SCHOOL School Additional Room 5186000.000 M/S Roni Enterprise 5186000.000 16/07/2012 15/10/2013 100 22/09/2014  
4 PEDP-III/CTG/RAN/2011-12/W2.0396 SHARAF VATA School Additional Room 2993000.000 M/S F.R. Trader's 2993000.000 12/07/2012 15/10/2013 100 22/09/2014  
5 PEDP-III/CTG/RAN/2011-12/W1.0329 KANURKHILL COMMUNITY PRIMARY SCHOOL School Reconstruction 5140000.000 M/S The Five Star 5140000.000 02/07/2012 18/10/2013 100 22/09/2014  
11 Raojan
1 PEDP-III/CTG/RAO/2011-12/W3.0026 DHAKHIN DHAKA-KHALI School Major Maintenance 121125.000 M/S Abu Monsur Chow 121125.000 22/07/2012 04/02/2013 100 22/09/2014  
2 PEDP-III/CTG/RAO/2013-14/W2.2280 KUSHALLAMOYEE School Additional Room 3955000.000 M/S S.A.B.B Traders 3955000.000 14/05/2014 02/04/2015 60 22/09/2014  
3 PEDP-III/CTG/RAO/2013-14/W2.3046 NADIM PUR School Additional Room 2995000.000 Bayzed Enterprise 2995000.000 05/07/2014 01/04/2015 35 22/09/2014  
4 PEDP-III/CTG/RAO/2013-14/W2.2279 GORIB ULLA PARA School Additional Room 3955000.000 M/S Samhun Enterprise 3955000.000 06/05/2014 15/05/2014 35 22/09/2014  
5 PEDP-III/CTG/RAO/2011-12/W2.0397 HOARA PARA School Additional Room 2993000.000 M/S Fabiha Enterprise 2993000.000 07/10/2012 08/10/2013 100 22/09/2014  
6 PEDP-III/CTG/RAO/2013-14/W2.2278 YASIN NAGAR JUBILEE School Additional Room 3955000.000 M/S Maa Traders 3955000.000 06/05/2014 15/05/2015 55 22/09/2014  
7 PEDP-III/CTG/RAO/2011-12/W1.0330 GOHIRA ANKUR DIGHI School Reconstruction 5140000.000 M/S Anma Traders 5140000.000 25/06/2012 06/07/2013 100 22/09/2014  
12 Sandwip
1 PEDP-III/CTG/SAN/2011-12/W3.0027 GACHUA SONTOSH PUR School Major Maintenance 190939.000 M/S Sohag Enterprise 190939.000 05/09/2012 27/03/2013 100 22/09/2014  
2 PEDP-III/CTG/SAN/2013-14/W2.2282 Nurul Ahad Talukder Reg. School Additional Room 3955000.000 M/S, Ritrika Traders 3955000.000 0 22/09/2014  
3 PEDP-III/CTG/SAN/2011-12/W2.0400 UTTOR MOGDHARA School Additional Room 2993000.000 M/S Rittika Trader's 2993000.000 05/08/2012 04/08/2013 100 22/09/2014  
4 PEDP-III/CTG/SAN/2012-13/W2.1718 NYAMASTY MADHYA PARA School Additional Room 8305500.000 M/S Rittika Trader's 8305500.000 18/05/2013 17/05/2014 50 22/09/2014  
5 PEDP-III/CTG/SAN/2011-12/W2.0399 PASCHIM CHOWKATALI School Additional Room 2993000.000 M/S SHIBLO & BROTHERS 2993000.000 10/12/2013 12/02/2013 100 22/09/2014  
6 PEDP-III/CTG/SAN/2011-12/W2.0032 UTTAR AZIM PUR School Additional Room 3388000.000 M/S Shapan & Brother's 3388000.000 07/07/2012 20/07/2013 100 22/09/2014  
7 PEDP-III/CTG/SAN/2011-12/W2.1336 PASCHIM AZIMPUR School Additional Room 4750000.000 M/S Shamim & Brother's 4750000.000 03/12/2013 02/09/2014 80 22/09/2014  
8 PEDP-III/CTG/SAN/2011-12/W2.0031 MUSA PUR ALI MEAR BAZAR School Additional Room 3388000.000 M/S Shamim & Brother's 3388000.000 05/07/2012 03/10/2013 100 22/09/2014  
9 PEDP-III/CTG/SAN/2012-13/W2.1717 KAZIR KHIL School Additional Room 2743000.000 M/S Lacky Enterprise 2743000.000 23/03/2013 22/03/2014 100 22/09/2014  
10 PEDP-III/CTG/SAN/2011-12/W2.0030 Urirchir GG.U. Sykat pri sch. School Additional Room 3388000.000 M/S Nadim Enterprize 3388000.000 11/07/2012 13/11/2021 60 22/09/2014  
11 PEDP-III/CTG/SAN/2011-12/W1.0701 CHOWKATALI NAYA PARA School Reconstruction 8580000.000 M/S Rittika Trader's 8580000.000 27/03/2013 04/04/2013 90 22/09/2014  
13 Satkania
1 PEDP-III/CTG/SAT/2011-12/W3.0028 S. Sadaha Reg. School Major Maintenance 266565.000 M/S Chowdhuri International 266565.000 09/08/2012 09/02/2013 100 22/09/2014  
2 PEDP-III/CTG/SAT/2011-12/W2.0941 PASCHIM AMILIASH School Additional Room 5186000.000 M/S.Safi & Chowdhury 5186000.000 27/06/2012 27/09/2013 70 22/09/2014  
3 PEDP-III/CTG/SAT/2011-12/W2.0404 CHAN KHOLA School Additional Room 2993000.000 M/S Masud Enterpice 2993000.000 27/06/2012 27/09/2013 100 22/09/2014  
4 PEDP-III/CTG/2012-13/W2.1631 MADARSHA SONAKANIA School Additional Room 2993000.000 M/S A.R.M. Enterprise 2993000.000 03/05/2013 18/03/2014 90 22/09/2014  
5 PEDP-III/CTG/SAT/2012-13/W2.1976 KARIYA NAGAR School Additional Room 4069000.000 M/S S.M.Nurul Hoque 4069000.000 24/09/2013 23/09/2014 85 22/09/2014  
6 PEDP-III/CTG/SAT/2011-12/W2.0403 AZIM PUR School Additional Room 2993000.000 M/S Khaja Metal Egg 2993000.000 27/06/2012 27/09/2013 85 22/09/2014  
7 PEDP-III/CTG/SAT/2011-12/W2.1337 KERANI HAT School Additional Room 2385000.000 M/S Farhana & Brotyher's 2385000.000 10/09/2012 10/08/2013 100 22/09/2014  
8 PEDP-III/CTG/SAT/2011-12/W2.0402 ALI NAGAR SHAHEED JAMAL School Additional Room 2993000.000 M/S Khair & Sons 2993000.000 27/06/2012 27/09/2013 100 22/09/2014  
9 PEDP-III/CTG/SAT/2011-12/W2.0401 KHAGARIA MAJIDER PARA School Additional Room 4069000.000 M/S.M.N Supplyers 4069000.000 27/06/2012 27/09/2013 100 22/09/2014  
10 PEDP-III/CTG/SAT/2011-12/W1.0331 bagalia community School Reconstruction 5140000.000 M/S Blue Birds 5140000.000 27/06/2012 27/09/2013 80 22/09/2014  
14 Sitakunda
1 PEDP-III/CTG/SIT/2011-12/W3.0029 DAKKHIN GHORAMARA School Major Maintenance 223034.000 M/S Hossain & Brother's 223034.000 03/08/2012 17/01/2013 100 22/09/2014  
2 PEDP-III/CTG/SIT/2011-12/W2.0405 DOAZI PARA School Additional Room 2993000.000 M/S The Construction Tread 2993000.000 20/11/2012 20/11/2013 100 22/09/2014  
3 PEDP-III/CTG/SIT/2012-13/W2.1719 masterpara regi School Additional Room 4750000.000 M/S The Construction Tread 4750000.000 31/01/2013 31/01/2014 0 22/09/2014  
4 PEDP-III/CTG/SIT/2012-13/W1.0743 jahanabad community School Reconstruction 8305500.000 M/S Nipa Enterprise 8305500.000 24/03/2013 15/04/2014 10 22/09/2014  
5 PEDP-III/CTG/SIT/2012-13/W1.0744 MURAD PUR School Reconstruction 8305500.000 M/S Nipa Enterprise 8305500.000 24/03/2013 15/04/2014 70 22/09/2014  
6 PEDP-III/CTG/SIT/2012-13/W1.0742 hasna bad community School Reconstruction 8305500.000 M/S Maa Bilder's 8305500.000 07/04/2013 15/04/2014 20 22/09/2014  
Total : 0.0000 (Km) 461990124.00 (Lac) 461990124.00 (Lac)