Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Anwara
1 GCHDP-WD-VZR-CHT-ANOW- EX-16/20 Beelpur Chunapara ( Alhaz Nagu Mia Road) By RCC at Ch.00-120m. 0.000 M/S. Quashem Construction 0.000 80 02/01/2019  
2 GCHDP-WD-VZR-CHT-ANOW -18/16 Gobadia Chaltatoli Road By BC Ch: 2210-3000m. 0.5500 56.000 M/S. Shah Ali Roza Steel Corporation 56.000 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-ANOW -18/14 East Haildhar Rezaul Karim Chowdhury Road By RCC at ch. 00-550m. 28.000   28.000 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-ANOW -18/12 Borumchara Ukil Bari Road By BC at ch. 120-540m. 56.000   56.000 0 02/01/2019  
5 GCHDP-WD-VZR-CHT-ANOW -18/08 Shadad Khan Road By RCC at ch. 00-550m. 0.8500 56.000   56.000 0 02/01/2019  
6 GCHDP-WD-VZR-CHT-ANOW -18/04 Hazrat Samad Shah Road By BC at Ch.00-850m. 0.8500 56.000   56.000 0 02/01/2019  
7 GCHDP-WD-VZR-CHT-ANOW -18/02 Late-Aktaruzzaman Chy. Road ( Roipur chunnapara) Road By BC ( Annar Ali Shikder Bazar-Joidder Hat Road) at ch. 00-850m. 216.330   216.330 0 02/01/2019  
8 GCHDP-WD-VZR-CHT-ANOW-STR -18/15 Construction of 32.00m Long P.C Girder Bridge on Singhara Keya Ghar Road at Ch.2600m. 0.7850 56.000 M/S. Tahira Enterprise 56.000 0 02/01/2019  
9 GCHDP-WD-VZR-CHT-ANOW-16/19 Ramkrisna Ashram (Krisnokumar Sucharu Praba Road) Road By Bc at Ch. 00m-785m) 1.3650 59.000 M/S Saired Enterprise 59.000 12/06/2017 19/10/2017 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-ANOW-16/06 Khaskama Anowara College Cnnenting (Kaskhama College Road) Road By HBB & BC at Ch.1135-1780m & 1780m -2500m 0.2550 16.500 M/S. Jashim & Brothers 16.500 30/11/2017 07/04/2018 100 02/01/2019  
11 GCHDP-WD- VZR –CHT-ANOW -16/17 Chanamoti Boddho Mondir to Master Bari Road By BC at Ch: 00-255m.. 217.770 M/S. Sufia Enterprise 217.770 20/11/2017 27/03/2018 0 02/01/2019  
12 GCHDP-WD-VZR-CHT-ANOW–STR-17/07 Construction of 37.00m Long RCC Girder Bridge on Kainpura- Bakhine Road at Ch: 02+650Km. 0.7800 56.000 M/S. Yousuf Construction 56.000 11/06/2017 18/12/2018 65 02/01/2019  
13 GCHDP-WD-VZR-CHT-ANOW-16/06 Kainpura-Bakhine Road By RCC at Ch. 720m-1500m. 0.8000 59.000 M/S. Milton Traders 59.000 26/02/2017 05/07/2017 70 02/01/2019  
14 GCHDP-WD-VZR-CHT-ANOW -16/09 Tangarpod-Lala nagar Bazar Road By BC at Ch: 1450m-2250m. 1.0000 59.000 M/S.Saired Enterprise 59.000 08/06/2016 15/12/2016 100 02/01/2019  
15 GCHDP-WD-VZR-CHT-ANOW -16/10 Borkol Bridge-Tisori Silalia mamurkhain Bazar Road By BC at Ch . 00-1000m. 0.000 M/S.The Engineers Suydicate. 0.000 05/05/2016 15/04/2017 100 02/01/2019  
16 GCHDP-WD-UNR-CHT-ANOW -18/05 Barasat UP Office-Parkibazar Road (Amir Hossain Dobashi Road) By BC at Ch. 2145-3000m. 0.6900 84.500   84.500 0 02/01/2019  
17 GCHDP-WD-UNR-CHT-ANOW -18/04 Anowara - Dhanpura Road (Hazi Abdul Zalil Road) By BC at Ch.990-1680m. 0.9600 56.000   56.000 0 02/01/2019  
18 GCHDP-WD-UNR-CHT-ANOW -16/02 Rustom Hat-Kanu Mazir Bazar Via Borumchari UP Office (Borumchara Hazari Road) Road By Bc at Ch. 4260m-5220m) 1.4400 84.000 M/S. Abdus Sabur 84.000 20/02/2017 27/06/2017 70 02/01/2019  
19 GCHDP-WD-UNR-CHT-ANOW -16/03 Haildhar UP Office-Hazir Hat Road (Hasan Ali Munsi Road) By BC at Ch. 1558m-2998m. 0.9000 80.000 M/S.A.Ali Chowdhury 80.000 09/05/2016 16/11/2016 100 02/01/2019  
20 GCHDP-WD-UNR-CHT-ANOW -16/01 Roypur Up office-Dovashi Bazar Road By BC Ch. 1150-2050m. 0.000 M/S.The Engineers Syndicate 0.000 05/05/2016 12/10/2016 70 02/01/2019  
21 GCHDP-WD-VZR–CHT-ANOW–MAIN-18/08 Chatary Bazar-School & Local Bazar (Abdul Aziz DC ) Road By Dende Carpeting at ch.600-1420m 0.5360 11.500 M/S. Abdus Sabur 11.500 70 02/01/2019  
22 GCHDP-WD-VZR–CHT-ANOW–MAIN-17/06 Billpur Road By Dense Carpeting at Ch. 00-536m 0.9300 16.100 M/S. Abddus Sabur 16.100 21/11/2017 28/02/2018 100 02/01/2019  
23 GCHDP-WD-VZR–CHT-ANOW–MAIN-18/05 Dattar Hat Road By Dende Carpeting at ch.00-930m 0.2350 16.100 M. S. Jashim & Brothers 16.100 100 02/01/2019  
24 GCHDP-WD-VZR–CHT-ANOW–MAIN-18/02 South Tailardip Beryvad Road (Sorkar Hat Cow Bazar-Bodi Alam) By Dense Carpeting at Ch. 00–235m. 0.5350 16.100 M/S. Kabir Enterprise 16.100 0 02/01/2019  
25 GCHDP-WD-VZR–CHT-ANOW–MAIN-17/07 Chunna Para Madrasa Road By Dense Carpeting at Ch. 00-535m. 0.8000 16.000 M/S. Jashim & Brothers 16.000 20/11/2017 27/02/2018 100 02/01/2019  
26 GCHDP-WD-FRB–CHT-ANOW –MAIN-17/04 Khaikhain- Chamuduria Hazrat Sha Ali Reza Rd(Morali Ghat- Chamuduria, Barkal Connectimg ) Raod By Dense Carpeting at Ch. 2200-3000m. 1.3070 34.000 M/S. Khaza Barib-E-Newaz® Enterprise 34.000 06/04/2017 13/08/2017 100 02/01/2019  
27 GCHDP-WD-VZR–CHT-ANOW –MAIN-16/09 Chatary Circular Road By Dense Carpeting at Ch. 310–1617m. 0.5500 46.000 M/S. Kalilm Trading 46.000 10/01/2017 17/05/2017 100 02/01/2019  
28 GCHDP-WD-VZR–CHT-ANOW–MAIN-18/03 Shilaigora R&H- Sayed Kuchaiya Barkal PAB Road (Borkal PAB Connecting Road) By Dense Carpeting at Ch. 00-550m. 1.6000 35.120 M/S. Hazrat Shah Safi Tayib Sha (R) & Brothers 35.120 0 02/01/2019  
29 GCHDP-WD-VZR–CHT-ANOW –MAIN-16/01 Hazigon Koton Mill Road (Bogon Shah (R.) Majar-Koton Mill). By dense Carpeting Ch. 00-1160 0.000 M/S. S.K.B Enterprise 0.000 15/01/2017 22/05/2017 100 02/01/2019  
2 Banskhali
1 GCHDP-WD-VZR-CHT- BANS -18/04 Jaliapara Puran Bazar- Monsuria Bazar- Shilkup UP office Link Road ( Middle Mankirchar Puran Bazar link Road) By HBB at Ch.00-730m. 1.0000 32.000 M/S. Janasheba Enterprise 32.000 0 02/01/2019  
2 GCHDP-WD-VZR –CHT-BANS -16/02 Asighar para Shaitgharpara Ailyar para Khalashipara Road By HBB at Ch: 500-1500m 1.0000 33.000 M/S.S.S Corporation 33.000 12/07/2017 19/11/2017 100 02/01/2019  
3 GCHDP-WD-VZR –CHT-BANS -16/03 Shilkup Izzatia Road By HBB at Ch: 00m-500m. 0.5000 50.000   50.000 0 02/01/2019  
4 GCHDP-WD-VZR–CHT-BANS-17/01 West Banshkhali High School to Karim Bazar Road By HBB at Ch. 10-50m & 1550-2010m. 0.000 M/S. Azad Enterprise 0.000 100 02/01/2019  
5 GCHDP-WD-UNR-CHT-BANS -18/02 Kalipur UP to Khankhanabad bazar (Gunagari-Khankhanabad Road) Road By BC at Ch.4950-5750m. 1.9200 60.850   60.850 0 02/01/2019  
6 GCHDP-WD-UNR –CHT-BANS -16/04 Napora bazar-Shaker khil UP office Road By HBB at Ch: 780-2700m 0.9790 31.450 M/S.Hakim & Brothers 31.450 20/07/2017 27/11/2017 80 02/01/2019  
7 GCHDP-WD-UNR –CHT-BANS -16/05 Chunoti Bazar-Basirullah Miazi Bazar-Mosharaf Miazi Bazar Upto Upokulio College Bari Bundh Road.(West Side of Jalkodor Khal) By HBB at Ch: 3696-4675m 0.8000 56.000 M/S.S.S Corporation 56.000 12/07/2017 19/11/2017 100 02/01/2019  
8 GCHDP-WD-UNR –CHT-BANS -16/03 Saral UP office-Shilkup UP office Road By BC at Ch: 4465m-5265m. 2.0000 113.000 M/S. Romena Enterprise 113.000 08/12/2016 15/04/2017 100 02/01/2019  
9 GCHDP-WD-UNR –CHT-BANSHKHALI -16/01 Pairang- Jaliaghata Road By BC at Ch. 00-1500m. 0.000 M/S.Ahnaf Associates 0.000 19/04/2016 15/06/2017 100 02/01/2019  
10 GCHDP-WD-FRB-CHT-BANS -17/02 Arabsha Bazar GC-Ishwar Babur Hat GC Road via Bashirullah Miazi Hat Chonua Gandamara Saral Shadonpur UP (Moulana Ashraf Ali Road) Road By BC at Ch. 4250-4960m. 418.530 M/S.S. S. Corporation 418.530 26/10/2017 02/04/2018 100 02/01/2019  
11 GCHDP-WD-FRB-CHT-BANS-STR-17/03 Construction of 36.00m Long PC Girder Bridge on Moulobi Bazar at Shekherkhil- Chanua Road over Jalkadar Khal at Ch. 5100m. 0.000 M/S. Nipa Enterprise-QC(JV) 0.000 08/08/2017 20/02/2019 65 02/01/2019  
12 GCHDP-WD-UNR–CHT-BANS –MAIN-16/01 Puichari UP to Khudukkhali Bazar(Prem bazar-Chanua Emb.) Road By Dense Carpeting at Ch. 00–1000m. 0.000 M/S. Hakim & Brothers 0.000 30/05/2017 06/10/2017 100 02/01/2019  
3 Boalkhali
1 GCHDP-WD-VZR–CHT-BOAL-17/08 Loghonat Kanongo Bridge- Master Bazar (Datta Chowdhury Road) Road By BC at Ch. 5000-5312m. 0.3120 22.500 M/S. Jannat Enterprise 22.500 0 02/01/2019  
2 GCHDP-WD-VZR–CHT-BOAL-17/07 Kanongopara R&H Bura Mosque-Tajghar Road ( Dhalghat D.C Road) By BC at Ch. 1300-1570m. 0.2700 14.000 M/S. Soliman Store 14.000 70 02/01/2019  
3 GCHDP-WD-VZR-CHT-BOAL-16/12 Siraj Fakir Road By HBB at Ch: 110-435m 0.3250 22.000 M/S. Jaker Hossen 22.000 26/04/2017 03/09/2017 100 02/01/2019  
4 GCHDP-WD-VZR-CHT-BOAL-16/10 Popadia Shahid Hasan Road By BC at Ch: 2006-2266m. 0.2600 22.000 M/S.Khair & Sons 22.000 02/11/2017 09/03/2018 100 02/01/2019  
5 GCHDP-WD-VZR-CHT-BOAL-16/09 Grameen Bank Road, Popiadia Road By BC at Ch: 1450-1730m. 0.2800 22.000 M/S Suriya Traders 22.000 22/05/2017 29/09/2017 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-BOAL-16/01 Shaid Sipahi Md.Nayeb Ali Road (Loson Mohajan Road) By HBB at Ch.00-800m. 0.8000 28.000 M/S.Goni Construction 28.000 22/01/2017 29/05/2017 50 02/01/2019  
7 GCHDP-WD-VZR-CHT-BOAL-16/19 Khitabchar Nabarun Sanga Road By BC at Ch: 00m-1015m. 1.0150 22.000 M/S. Sultana Enterprise. 22.000 06/10/2016 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-BOAL-16/18 Shahid Rustam Road By BC at Ch.700-1110m. 0.4100 22.000 M/S. Jannat Enterprise 22.000 12/07/2017 19/12/2017 100 02/01/2019  
9 GCHDP-WD-VZR-CHT-BOAL-16/17 Hazi Ahamed Miah Road By BC at Ch.900-1240m. 0.3400 14.000 M/S. Abrar Const. 14.000 19/12/2016 26/05/2017 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-BOAL-16/15 Kharandwip Babu Chinta Horon Day Road By HBB at Ch:00m-415m. 0.4150 16.000 M/S.Ali Store 16.000 22/02/2017 30/06/2017 100 02/01/2019  
11 GCHDP-WD-VZR-CHT-BOAL-16/14 Paschim Kharandwip Bura Mowlana Road By Bc at Ch:00m-310m. 0.3100 16.000 M/S. Well Enterprise 16.000 28/02/2017 07/07/2017 60 02/01/2019  
12 GCHDP-WD-VZR-CHT-BOAL-16/13 Jostiapura Golikishory Mondir Road By BC at Ch. 00-670m (ID No. 415124087) 0.6700 33.000 M/S. Shormin Enterprise 33.000 08/01/2017 15/05/2017 100 02/01/2019  
13 GCHDP-WD-VZR-CHT-BOAL-16/11 Bijan BiBi Madrasha Road By BC at Ch.00-350m. 0.3500 14.000 M/S. Towakkul Enterprise 14.000 26/12/2016 02/06/2017 100 02/01/2019  
14 GCHDP-WD-VZR-CHT-BOAL-16/06 Sreepur Muktizoddah Kamal Uddain Ahmed Road By BC at Ch.00-360m. 0.3600 22.000 M/S. Towakkul Ent. 22.000 26/12/2016 02/06/2017 60 02/01/2019  
15 GCHDP-WD-VZR-CHT-BOAL-16/04 Purba Dhorolla Kali Bari Road By BC at Ch: 00m-1160m. 1.1600 22.000 M/S. Shormin Enterprice 22.000 12/07/2016 19/01/2017 100 02/01/2019  
16 GCHDP-WD-VZR-CHT-BOAL-17/05 Jastiapura Fatarkhil Asryan Road By HBB at Ch. 633-1033m. 0.4000 14.000 M/S. KGN Enterprise 14.000 10/10/2017 17/03/2018 100 02/01/2019  
17 GCHDP-WD-VZR-CHT-BOAL-16/02 Maharram Nesa Road By BC at Ch.1000-1365m. 0.3650 28.000 M/S. Sultana Enterprise 28.000 15/12/2016 100 02/01/2019  
18 GCHDP-WD-UNR-CHT-BOAL-16/04 Chand Chowdhury Road Popadia Road By HBB at Ch: 1380-2015m 0.6350 42.000 M/S. Abdul Salam 42.000 04/07/2017 11/11/2017 100 02/01/2019  
19 GCHDP-WD-UNR-CHT-BOAL-16/05 Monir Ahmed Road By BC at Ch.3100-3525m. 0.4200 33.000 M/S. Alam Company 33.000 23/01/2017 30/06/2017 100 02/01/2019  
20 GCHDP-WD-UNR-CHT-BOAL-16/03 Amuchia Guccha gram Road By BC at Ch: 00m-1000m. 1.0000 51.000 Md. Sajia Trading 51.000 26/06/2016 03/01/2017 100 02/01/2019  
21 GCHDP-WD-UNR-CHT-BOAL-16/02 Kanungo Para Post Office Road By BC at Ch: 1150m-2350m. 1.2000 42.000 M/S.Jaker Hossen. 42.000 27/06/2016 04/01/2017 100 02/01/2019  
22 GCHDP-WD-UNR-CHT-BOAL-16/01 Shahed Dherandra Aminul Haque Chairman Road By BC at Ch.1800-2275m. 0.4750 28.000 M/S.Kaderia Enterprise 28.000 12/11/2017 19/04/2018 40 02/01/2019  
23 GCHDP-WD-FRB-CHT-BOAL-16/01 Fultol-Kanungo Para (R&H) - Lalarhat G.C Road By Bc at Ch. 00m-600m) 0.6000 72.000 M/S. TowaKKul Enterprise 72.000 18/05/2017 25/09/2017 100 02/01/2019  
24 GCHDP-WD-FRB–CHT-BOAL –MAIN-17/01 Ali Ahamed Commissioner Raod(From RHD#145)(Shakpura Murgir Firm-Nurullah Munsir Hat) By Dense Carpeting at Ch. 9100-10175m. 1.0750 42.000 M/S. Forak Ahmed & Sons 42.000 15/05/2017 22/09/2017 100 02/01/2019  
25 GCHDP-WD-UNR–CHT-BOAL–MAIN-17/02 ShakPura UP-Golokmunshir Hat (LM0-Pachim Gomdandi UP Road(ShakPura D.C Road) By Dense Carpeting at Ch. 1058-1880m. 0.8220 46.000 M/S. Forak Ahmed & Sons 46.000 19/06/2017 26/09/2017 100 02/01/2019  
26 GCHDP-WD-UNR-CHT-BOAL-MAIN16/01 Murad Munshihat –Chowdhury Hat-Via- Kadhurkhil UP Road (Chowdhury Hat D.C Road) By Dense Carpeting at Ch. 1520–4450m. 2.9300 46.000 M/S. Julda Brick Manufacturing 46.000 06/04/2017 13/08/2017 100 02/01/2019  
4 Chandanish
1 GCHDP-WD-VZR-CHT-CHAN-18/11 Fateh nagor Mohabodhi Road (Joara) By BC at Ch.00-500m. 0.6860 39.000   39.000 0 02/01/2019  
2 GCHDP-WD-VZR-CHT-CHAN-18/10 Hazarat VoiKhaja Road (Joara) Road By BC at Ch.00-686m. 28.000   28.000 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-CHAN-18/04 Chandanish upazila-Karanibari Nayapara-Idherampur Road By BC at Ch.00-811m. 0.7380 39.000   39.000 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-CHAN-18/03 East Zoara-Mahabub Market Nidhirampara Road By BC at Ch.930-1668m. 0.6580 21.360   21.360 0 02/01/2019  
5 GCHDP-WD-VZR-CHT-CHAN-16/19 Kashaipara-Jatarkul Road Chandanaish Pourashava Road By HBB at Ch. 317-975m 0.5100 33.000 M/S. Mans Traders 33.000 75 02/01/2019  
6 GCHDP-WD-VZR-CHT-CHAN -16/06 Pachim Alahabad Talukder Bari Road By BC at Ch: 00-510m. 0.5000 23.000 M/S.Nasir Enterprise 23.000 27/04/2017 03/09/2017 60 02/01/2019  
7 GCHDP-WD-VZR-CHT-CHAN -16/21 Abadatkhana to Sonaicharikul Road By HBB at Ch: 00-500m. 0.3760 28.000 S K B Enterprise 28.000 04/05/2017 11/09/2017 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-CHAN -16/09 Amitab Sen (Boroma) Road By Bc at Ch. 00m-375m. 0.6300 39.000 M/S. NiRman Sangstha 39.000 05/06/2017 12/10/2017 70 02/01/2019  
9 GCHDP-WD-VZR-CHT-CHAN -16/05 North Muraderbad-East Elahabad Road By BC at Ch: 00m-630m. 0.4000 28.000 M/S.S.M Yosuf Brothers. 28.000 18/05/2016 15/06/2017 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-CHAN -16/07 Kanchanabad H/S Road By BC at Ch: 290m-690m. 0.5500 39.000 M.J Construction 39.000 02/11/2017 09/03/2018 70 02/01/2019  
11 GCHDP-WD-VZR-CHT-CHAN -16/02 Soirapukur par to Chowdhury para Road By BC at Ch: 00m-550m. 1.5100 39.000 M/S.S.M Yousuf Brothers 39.000 18/05/2016 15/06/2017 100 02/01/2019  
12 GCHDP-WD-VZR-CHT-CHAN -16/01 Durlop Chowdhury Para Road By BC at Ch: 00m-1510m. 0.000 M/S.Shahjahan Chowdhury 0.000 24/05/2016 01/06/2017 100 02/01/2019  
13 GCHDP-WD-UNR-CHT-CHAN -18/07 Barkal UP-Treener Hat M.N.A.Shona Mia Chow. Road) Road By HBB at Ch.00-720m. 1.0000 33.500 Hasina Construction 33.500 0 02/01/2019  
14 GCHDP-WD-UNR-CHT-CHAN -18/05 Khan Hat GC - Hashimpur U. P Office Road By HBB at Ch.00-100m. 46.500 M S Nirman Sangstha 46.500 80 02/01/2019  
15 GCHDP-WD-UNR-CHT-CHAN -16/06 Simirkul-Bolar Pahar Panjagonar Mukh Dhopachari RHD Connecting Road By HBB at Ch: 220-680m. 0.9250 56.000 M/S. ARM Engineers 56.000 23/07/2017 30/11/2017 0 02/01/2019  
16 GCHDP-WD-UNR-CHT-CHAN -16/02 Kanchanabad-Station-Mohammapur-Fatanagor road By BC at Ch: 00m-925m. 384.830 M/S.S.M Yosuf Brothers 384.830 18/05/2016 15/06/2017 100 02/01/2019  
17 GCHDP-WD-UNR-CHT-CHAN-STR-17/01 Construction of 81.00m Long PC Girder Bridge Over Zero Book Chara on Vhomang hat GC- Diakul-Chringghata-Dhopachari-Monglarmokh-Rangunia Road at Ch. 13460m . 4.2200 178.000 AR-ALML JV 178.000 25 02/01/2019  
18 GCHDP-WD-UNR-CHT-CHAN -16/01 Diakul-Chiringghata-Dhopachari-Monglarmokh-Rangunia Road.(Dopachori Bazar mukh-Santirhat) By HBB at Ch: 8590m-12810m. 0.000 M/S.Mostafa & Son’s. 0.000 16/05/2016 08/10/2017 100 02/01/2019  
19 GCHDP-WD-UZR-CHT-CHAN -18/01 Chandanish Upazila HQ -Nayarhat-Bailtali-Kodarhat GC Road By BC at Ch: 1975-4099m. 0.000   0.000 0 02/01/2019  
20 GCHDP-WD-UNR–CHT-CHAN –MAIN-16/01 Diakul-Chringghata-Dhopachari-Monglarmokh-Rangunia Road By Dense Carpeting at Ch. 6500–7500m. 0.8200 21.860 M/S. S. m nirman sangstha 21.860 03/04/2017 10/08/2017 100 02/01/2019  
21 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/06 Omar Sultan road (Kanchanabad) Road By Dense Carpeting at Ch. 00–820m. 0.7400 16.940 M/S. Alam & Company 16.940 03/04/2017 10/08/2017 85 02/01/2019  
22 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/03 Muradabad-Uttar Kanchan Nogor Road By Dense Carpeting at Ch. 00–740m. 2.0000 22.910 S & S Trading 22.910 24/10/2017 28/02/2018 100 02/01/2019  
23 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/05 Badurpara Munsifbazar chamudaria Rd Road By Dense Carpeting at Ch. 00–2000m. 0.4000 8.980 M/S. Nirman Sangstha 8.980 24/05/2017 30/09/2017 100 02/01/2019  
24 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/07 Kashua Sayed Bazar to Maddham para-Purba para Connecting Road By Dense Carpeting at Ch. 00–400m. 0.7570 11.900 M/S. Alam & Company 11.900 21/03/2017 28/07/2017 100 02/01/2019  
25 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/02 South-Purboo Hasimpur M.K high school-Shikderpara Road By Dense Carpeting at Ch. 00–757m. 0.8100 14.000 M/S. Hazi M A Sidker Traders 14.000 25/04/2017 02/09/2017 100 02/01/2019  
26 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/04 Barkal Shahid Rafique Road By Dense Carpeting at Ch. 00–810m. 0.3300 6.300 M/S. Nirman Sangstha 6.300 08/05/2017 15/09/2017 100 02/01/2019  
27 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/08 Chagachar Barudkhana Rd (Dohazari) Road By Dense Carpeting at Ch. 265–595m. 1.0000 0.000 M S Nirman Sangstha 0.000 03/04/2017 10/08/2017 100 02/01/2019  
28 GCHDP-WD-VZR–CHT-CHAN –MAIN-16/01 Patiya Tea Garden Road By Dense Carpeting at Ch. 00–1000m. 1.0000 27.000 M/S. Jalil Builders 27.000 08/12/2016 15/04/2017 100 02/01/2019  
29 GCHDP-WD-FRB–CHT-CHAN –MAIN-17/01 Dohazari-Lalutia Raod By Dense Carpeting at Ch. 00-1000m 0.000 M S Nirman Sangstha 0.000 21/08/2017 28/12/2017 100 02/01/2019  
5 Fatikchari
1 GCHDP-WD-VZR-CHT-FATI-EX-18/29. Nazir Hat GC- Roshanggiri UP Road By BC. 1.4500 56.000   56.000 0 02/01/2019  
2 GCHDP-WD-VZR-CHT-FATI-EX-18/28. Bagan Bazar – Natun Tea-Garden Road By HBB. 2.2920 62.000   62.000 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-FATI-EX-18/27. Anandapur to Badurkhil Road By HBB at Ch.00-2292m. 1.6500 98.000   98.000 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-FATI-EX-18/26. Alhaz Rafiqual Anower Road( Samitirhat) By HBB at Ch.00-1650m. 0.4430 62.000   62.000 0 02/01/2019  
5 GCHDP-WD-VZR-CHT-FATI -18/20 Paindang Karam Sikdar Road By HBB at Ch: 366.40-810m..GCHDP-WD-VZR-CHT-FATI-EX-18/25 0.4370 16.750 M/S. Goni Construction 16.750 0 02/01/2019  
6 GCHDP-WD-VZR-CHT-FATI -18/10 Bagan Bazar Ander Manik Noydolang Road By HBB at Ch: 1127-1564m GCHDP-WD-VZR-CHT-FATI-EX-18/25 0.7000 16.500 M/S. Goni Construction 16.500 0 02/01/2019  
7 GCHDP-WD-VZR-CHT-FATI -17/08 Lelang Kanchannagar Road By HBB at Ch. 00-700m. 1.0650 26.800 M/S. Alif Enterprise 26.800 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-FATI -18/15(01) Samitirhat Mufti Garibullah Shah Road By HBB at Ch. 00-435m. 0.4350 52.080 M/S. S A Traders 52.080 0 02/01/2019  
9 GCHDP-WD-VZR-CHT-FATI -17/15 Samitirhat Mufti Garibullah Shah Road By HBB at Ch. 00-435m. 0.3150 16.750 M/S. Feroza Construction 16.750 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-FATI -17/01 Shah Golamur Rahman Road (Baba Bhandari Road From Lohar Pool-Shah Ahmed Ullah road connection) By HBB at Ch. 00-315m. 0.4150 16.000 M/S.Mohshin & Brothers 16.000 100 02/01/2019  
11 GCHDP-WD-VZR-CHT-FATI -17/22 Lelang U.P-Ananda Bazar Road (Lelang UP-Gopalghata Ananda Bazar) Road By HBB at Ch: 00-415m. 0.3700 16.000 M/S. Rubel Enterprise 16.000 06/09/2017 13/01/2018 100 02/01/2019  
12 GCHDP-WD-VZR-CHT-FATI-16/09 Shantirhat-Motor Road By BC at Ch. 1600-1970m. 0.5000 21.910 M/S. Shamali Enterprise 21.910 22/12/2016 29/04/2017 100 02/01/2019  
13 GCHDP-WD-VZR-CHT-FATI -16/05 Kanchannagar UP 3 no. Woard Pukurpara Kamarpara Hajee Road By HBB at Ch.00-500m 16.000 M/S. Feroza Constr. 16.000 09/02/2017 16/06/2017 100 02/01/2019  
14 GCHDP-WD-VZR-CHT-FATI-STR -16/21 2-Vent 3.00mx5.00m RCC Box Culvert on Kepaitnagar Abul Fazal BA Road (Baba Bandhari Khamar Khiram Khiram Cen. Road) at Ch:3235m. 0.5470 16.500 M/S. Dynamic International 16.500 14/08/2016 21/01/2017 100 02/01/2019  
15 GCHDP-WD-VZR-CHT-FATI -16/23 Poran Chowdhuri Road (Hatir pul to Fanaykhil) Road Road By HBB at Ch: 703m-1250m 0.5030 13.000 M/S.Feroja Construction 13.000 30/06/2016 07/11/2016 100 02/01/2019  
16 GCHDP-WD-VZR-CHT-FATI -16/11 Heako-Dhuliachari Road By HBB at Ch: 00m-503m. 0.5030 16.000 M/S. S. Haque & Sons Enterprise 16.000 23/06/2016 30/11/2016 100 02/01/2019  
17 GCHDP-WD-VZR-CHT-FATI -16/07 Narayanhat Bazar-Heako GC connecting road via Maazan tea Estate Hasnabad & Nichinta Road By HBB at Ch: 00m-503m. 16.000 M/S.Alam Abser & CO. 16.000 23/06/2016 30/10/2016 100 02/01/2019  
18 GCHDP-WD-VZR-CHT-FATI–STR-17/24 Construction of 32.00m Long PC Girder Bridge on Narayanhat-Mirsarai Govania Haldah vally Tea Garden connecting Road at Ch: 02+465Km. 0.5100 120.000 M/S. Quashem Construction 120.000 11/09/2017 30/12/2018 75 02/01/2019  
19 GCHDP-WD-VZR-CHT-FATI -16/24 Narayanhat-Mirsarai Govania Haldah vally Tea Garden connecting Road By HBB at Ch: 500m-1010m. 1.1780 16.000 M/S. A.Ali Chowdhury 16.000 19/07/2016 26/11/2016 100 02/01/2019  
20 GCHDP-WD-VZR –CHT-FATI -16/19 Harualchari Betuarjhil-Khamaripara Road By HBB at Ch: 00m-1178m. 0.9700 28.000 M/S.Monir Ahmed 28.000 20/04/2017 27/06/2017 100 02/01/2019  
21 GCHDP-WD-VZR-CHT-FATI -16/18 Khairaty para village Road By HBB at Ch: 360m-1330m. 0.4890 28.000 M/S.Alam Abser & CO. 28.000 23/06/2016 30/10/2016 100 02/01/2019  
22 GCHDP-WD-VZR-FATICKCHARI-15/13 Poschim Haidchakia Barua paraRoad By HBB at Ch. 640-840m,903-1005m,1143-1213m & 1313-1430m. 1.0900 26.550 M/S A.Ali Chowdhury 26.550 22/03/2016 29/07/2016 100 02/01/2019  
23 GCHDP-WD-VZR-FATICKCHARI-15/12 Purbo Haidchakia Barua para rod (Ch. 00m–500m) 37.680 M/S.M.R Construction 37.680 11/04/2016 18/08/2016 100 02/01/2019  
24 GCHDP-WD-UNR-CHT-FATI-EX-18/28 Mohammad Takirhat GC – Abdullahpur UP HQ Road By BC at Ch.00-370m. 2.0000 62.000   62.000 0 02/01/2019  
25 GCHDP-WD-UNR-CHT-FATI-EX-17/13 Paindong UP HQ Brindabon-Kanchannager UP HQ Road Via Kanchurhat Road By BC at Ch. 1007-3007m 107.870 M/S. Mohshin & Brothers 107.870 70 02/01/2019  
26 GCHDP-WD-UNR-CHT-FATI -18/04 Bagan Bazar U.P. HQ.to Natun Bazar Road By HBB at Ch: 5486-6900m.GCHDP-WD-VZR-CHT-FATI-EX-18/25 0.8000 58.000 M/S. Goni Construction 58.000 0 02/01/2019  
27 GCHDP-WD-UNR–CHT-FATI-17/06 Roshangiri U.P.HQ.to Nanupur U.P.HQ. Road By HBB at Ch. 00-800m. 1.2850 33.500 M/S. S. Hoque & Sons Enterprise 33.500 80 02/01/2019  
28 GCHDP-WD-UNR-CHT-FATI -17/02(01) Mohammed Tokirhat G.C - Samitirhat UP Office Road By HBB at Ch. 3130-3815m. 0.6850 89.110 M/S. Alif Enterprise 89.110 0 02/01/2019  
29 GCHDP-WD-UNR-CHT-FATI -17/02 Mohammed Tokirhat GC-Samitirhat UP Office Road By HBB at Ch. 3130-3815m 33.500 M/S. Jahangir Alam Traders 33.500 90 02/01/2019  
30 GCHDP-WD-UNR-CHT-FATI–STR-17/03 Construction of 32.00m Long PC Girder Bridge on Dantmara U.P.HQ.to Balutila Bazar via Ziltoli Bazar Road Over Balukhali Khal Road at Ch: 10+450Km. 0.5500 212.610 M/S. Quashem Construction 212.610 11/09/2017 26/02/2019 80 02/01/2019  
31 GCHDP-WD-UNR-CHT-FATI -17/08 Lelang U.P.HQ.-Charalia Hat Bazar Road via Shainnashir Hat & Lelang Nayhat (Gopal Gatta) Road By BC at Ch: 1350-1900m. 0.4800 33.000 M/S. Arif Enterprise 33.000 30/08/2017 06/01/2018 80 02/01/2019  
32 GCHDP-WD-UNR-CHT-FATI -16/09 Nazirhat G.C. to Fakirhat Road via Babunagar Madrasha (Shafiul Azam road) Road By BC at Ch.2390-2870m 1.0000 28.000 M/S. Sharnali Ente. 28.000 22/12/2016 29/04/2017 30 02/01/2019  
33 GCHDP-WD-UNR-CHT-FATI -16/10 Suabil U.P. HQ to Shovanchari Bangla Bazar Road By HBB Ch:1000m-2000m. 0.9570 33.500 M/S. Dynamic International 33.500 14/08/2016 21/01/2017 100 02/01/2019  
34 GCHDP-WD-UNR-CHT-FATI -16/12 Bibirhat GC- Kanchurhat Road Via North Rangmatia Natun Bazar Road By BC at Ch: 680m-1637m. 1.8000 56.000 M/S. S. Hoque & Sons Enterprise 56.000 17/10/2016 24/03/2017 100 02/01/2019  
35 GCHDP-WD-UNR –CHT-FATI -16/11 Haruachari U.p. H.Q to Lalarhat Road via Harualchari Hospital & Santirhat Road By HBB at Ch: 350m-2150m. 0.000 M/S. Elias Brothers 0.000 11/07/2016 18/11/2016 100 02/01/2019  
36 GCHDP-WD-FRB –CHT-FATI -17/01 Construction of 40.00m Long PC Girder Bridge on Barabil Kazirhat G.C to Lalar Hat (RHD) Road via Barabil Nayahat (Fatickchari Portion) at Ch: 8300m. 3.7700 268.350 SA-HB-JV 268.350 17/10/2017 24/01/2019 45 02/01/2019  
37 GCHDP-WD-FRB –CHT-FATI -16/01 Kazirhat G.C to Baro Darogarhat G.C. Road via Barabil Nayahat lalarhat Road By HBB at Ch: 5700m-9470m. 114.000 M/S.Hossan & Brothers 114.000 09/06/2016 16/12/2016 100 02/01/2019  
38 GCHDP-WD-VZR–CHT-FATI–MAIN-NEW -18/01 Hazrat Shah Ahmedullah Road By Dense Carpeting at Ch. 300–800m. 1.3000 11.340   11.340 0 02/01/2019  
39 GCHDP-WD-VZR-CHT-FATI-MAIN-18/02 Nanupur UPC-Dowlat Munshir Hat Road Nanupur-Khiram Road By Dense Carpeting at Ch.200-1500m 1.0000 23.000 M/S. Rubel Enterprise 23.000 0 02/01/2019  
40 GCHDP-WD-UNR–CHT-FATI –MAIN-16/01 Fatickchari Upazilla H .Q -Chamur Hat Road via Kanchan nagar UP. H.Q. Road By Dense Carpeting at Ch. 00–1000m. 23.000 M/S. Hordoy Kumar Chakma 23.000 08/02/2017 15/06/2017 100 02/01/2019  
6 Hathazari
1 GCHDP-WD-VZR-CHT- HATH-EX-18/59   0.2550 21.690   21.690 0 02/01/2019  
2 GCHDP-WD-VZR-CHT- HATH-EX-18/58 Moulana Abdul Karim Road By BC at Ch: 00-200m & 240-320m 0.5000 36.290   36.290 0 02/01/2019  
3 GCHDP-WD-VZR-CHT- HATH-EX-18/57 Baker Beel Mandakini (Forhadabad ) Road BC at Ch.920-1420m. 21.850 M/S. L. T Trading 21.850 0 02/01/2019  
4 GCHDP-WD-VZR-CHT- HATH-EX-17/56 Construction of 2X4.5mX 4.5m RCC Box Culvert on University Teachers Multi Co-Operative Society Road at Ch.40m. 25.000 M/S. M.N. Alam Brothers 25.000 100 02/01/2019  
5 GCHDP-WD-VZR-CHT- HATH-18/22 Kazi para Road (Mirjapur) Road By HBB at Ch.218-256m & 317-1145m. 28.000 M/S. Belal Builders 28.000 0 02/01/2019  
6 GCHDP-WD-VZR–CHT-HATH-18/41 Kazipara Road – Bongshal Road ( Shil Rejeswari Road) By BC at Ch. 00-1475m. 0.7300 25.000 M/S. Alif Enterprise 25.000 0 02/01/2019  
7 GCHDP-WD-VZR–CHT-HATH-18/28 Baitu Sharaf Adrasha Madrasha Road (Mirzapur) Road By HBB at Ch. 00-730m. 25.000 M/S. Nafi Traders 25.000 0 02/01/2019  
8 GCHDP-WD-VZR-CHT-HATH –18/02 Hajee Safar Ali (Mirjapur) Road By BC at Ch.2220-2870m. 25.000 M/S. N. B. Corporation 25.000 0 02/01/2019  
9 GCHDP-WD-VZR-CHT-HATH -17/18 Solaiman Chowdhury Road By HBB at Ch.00-550m. 0.6100 39.370 M/S. N. B. Corporation 39.370 0 02/01/2019  
10 GCHDP-WD-VZR–CHT-HATH-18/17 Fazu Meah (Dhali) Road By BC at Ch. 00-610m. 25.000   25.000 0 02/01/2019  
11 GCHDP-WD-VZR-CHT-HATH -18/42 Nur ullah chowdhry Road (Dhalai) By BC at Ch. 00-1360m.. 0.7500 25.000   25.000 0 02/01/2019  
12 GCHDP-WD-VZR-CHT- HATH-18/36 Momen Shah Road Mirjapur By HBB at Ch.00-750m. 0.7540 25.000 M/S. T.L Trading 25.000 0 02/01/2019  
13 GCHDP-WD-VZR-CHT-HATH -18/15 Zobra Fatepur Road. (Fate pur) By HBB at Ch. 924-1025m & 1062-1715m. 228.930 M/S. Haque & Brothers 228.930 0 02/01/2019  
14 GCHDP-WD-VZR-CHT-HATH–STR-18/12 Construction of 32.00m Long PC Girder Bridge on Middle Madrasha Link Road Over Madari Khal at Ch.1750m. 0.6700 0.000 M/S. Chowdhury Enterprise and Consonance Engineers & Builders (JV) 0.000 50 02/01/2019  
15 GCHDP-WD-VZR-CHT-HATH -17/12 Middle Madarsha Link Road (South Madrasha) By BC at Ch.1880-2550m. 25.000 M/S. N. B. Corporation 25.000 0 02/01/2019  
16 GCHDP-WD-VZR-CHT- HATH-18/04 Asraf Ali Munshi Road (Mirzapur) By HBB at Ch.1345-2045m 2.0000 25.000 M/S. Haque & Brothers 25.000 0 02/01/2019  
17 GCHDP-WD-VZR-CHT-HATH-17/23 B.A. Sultan Bari Road By HBB at Ch. 00-2000m. 25.000 M/S. Haque & Brothers 25.000 50 02/01/2019  
18 GCHDP-WD-VZR-CHT- HATH -17/48 Bachamia Sowdagor Road (N.Madrasa) By HBB Ch: 100m-610m. 25.000 M/S. Yakub & Brothers 25.000 90 02/01/2019  
19 GCHDP-WD-VZR-CHT- HATH -17/44 Lokmania Rd.(Mekhal Union) Road By HBB Ch: 00m-700m. 0.5480 36.000 M/S. Shahen Shah Bricks Field 36.000 100 02/01/2019  
20 GCHDP-WD-VZR-CHT- HATH -17/24 Mohammadpur Road By BC at Ch. 142-690m. 0.4340 24.970 M/S Hossain & Brothers 24.970 04/10/2017 11/04/2018 70 02/01/2019  
21 GCHDP-WD-VZR-CHT- HATH -18/32 Rashik Acharjee Road By RCC Ch: 10m-466m. 1.0000 28.000   28.000 0 02/01/2019  
22 GCHDP-WD-VZR-CHT- HATH -16/52 Jamtola Kulal Para Road By BC Ch: 00m-1000m. 1.0400 25.000 M/S. Shahen Shah Bricks Field 25.000 27/12/2016 03/05/2017 100 02/01/2019  
23 GCHDP-WD-VZR-CHT- HATH -16/37 Joganath Road (Mirzapur Union) Road By HBB Ch:00m-1040m. 0.3900 20.000 Mrs. Ifaque Traders 20.000 19/12/2016 26/04/2017 100 02/01/2019  
24 GCHDP-WD-VZR-CHT- HATH -16/35 Asraf Ali Munshi Road (Gumanmardan Union) Road By HBB Ch: 00m-390m. 0.8270 28.000 M/S.Sharnali Enterprise 28.000 06/11/2016 13/03/2017 100 02/01/2019  
25 GCHDP-WD-VZR-CHT-FATI -16/34 B.R khan Road (Mekhal) By BC at Ch: 00m-827m 0.7500 25.000 Mrs. Elius Enterprise. 25.000 01/11/2016 07/04/2017 100 02/01/2019  
26 GCHDP-WD-VZR-CHT-FATI -16/30 Sona Miah Road (S. Madrasha) By HBB at Ch: 100m-850m 25.000 M/S. Akhi International 25.000 31/01/2017 07/07/2017 100 02/01/2019  
27 GCHDP-WD-VZR-CHT-HATH -16/27 Jamshedia Road ( M. Madersha) By HBB at Ch: 00m-655m. 0.1800 5.500 M/S. Akhi International 5.500 31/01/2017 07/07/2017 100 02/01/2019  
28 GCHDP-WD-VZR-CHT- HATH -17/21(01) Hazi Ismaile Munshi (North Madarsha Union) Road By HBB Ch: 1000m-1180m. 1.0000 25.000 M/S. Akhi International 25.000 11/10/2017 18/04/2018 100 02/01/2019  
29 GCHDP-WD-VZR-CHT- HATH -16/21 Hazi Ismaile Munshi (North Madarsha Union) Road By HBB Ch: 00m-1000m. 0.7500 25.000 M/S. Akhi International. 25.000 11/07/2016 18/01/2017 100 02/01/2019  
30 GCHDP-WD-VZR-CHT- HATH -16/20 Mokbul Shah Road By HBB Ch: 00m-750m. 0.8500 36.000 M/S. Shahen Shah Bricks Field 36.000 27/12/2016 03/05/2017 100 02/01/2019  
31 GCHDP-WD-VZR-CHT- HATH -16/19 Yousfia (Forhadabad) Road By BC Ch:500m-1350m. 0.5000 28.000 M/S. Sharnali Enterprise 28.000 22/12/2016 29/04/2017 90 02/01/2019  
32 GCHDP-WD-VZR-CHT- HATH -16/14 Abdul Barik (Chikondondi Union) Charar Kul Road By BC Ch: 00m-500m. 0.1400 16.000 M/S. Ifaque Traders 16.000 16/01/2017 23/05/2017 100 02/01/2019  
33 GCHDP-WD-VZR-CHT-HATH-16/11 Kodal Bari Road (Gumanmordan) By BC at Ch: 113-116.5m,118.5-122.5m & 675-807m. 0.9200 25.000 M/S Shahen Ahah Bricks Field. 25.000 06/11/2016 13/04/2017 100 02/01/2019  
34 GCHDP-WD-VZR-CHT-HATH -16/08 Basua Dhala Road (Forhadabad Union) Road By HBB Ch:1230m-2150m. 1.2660 25.000 M/S. Sharnali Enter. 25.000 22/12/2016 29/04/2017 100 02/01/2019  
35 GCHDP-WD-VZR-CHT- HATH -16/07 Master Para Mudshuddi (Gumanmardan) Road By HBB Ch:534m-1800m. 0.9250 25.000 Mrs. Elius Enterprise. 25.000 01/11/2016 07/03/2017 100 02/01/2019  
36 GCHDP-WD-VZR-CHT-HATH -16/06 Katakhali Road (Gumanmordan) By HBB at Ch: 00m-925m 0.4800 23.000 Mrs. S.R Enterprise 23.000 09/11/2016 16/04/2017 100 02/01/2019  
37 GCHDP-WD-VZR-CHT- HATH -16/03 Asraf Ali Chowdhury (Dhalai Union) Road By HBB Ch:860m-1340m. 0.000 Mrs. Ifaque Traders 0.000 19/12/2016 26/04/2017 100 02/01/2019  
38 GCHDP-WD-UNR–CHT-HATH-18/06 Nazirhat Katcha Bazar - Mirzapur UP Road (Badshahi Road) By HBB at Ch. 4950-6500m. 1.2720 40.500 M/S. Amzad & Brothers 40.500 95 02/01/2019  
39 GCHDP-WD-UNR–CHT-HATH-17/05 Buripukur- Chipatoli Eidgha High School Road ( Hajee Yousf Road) By BC at Ch. 2508-3780m. 40.000 M/S. Haque & Brothers 40.000 80 02/01/2019  
40 GCHDP-WD-UNR-CHT- HATH -16/03 Noor Ahmed Chyowdhury Road By BC Ch:2933m-3800m. 0.7800 48.000 Mrs. Ifaque Traders 48.000 16/01/2017 23/07/2017 100 02/01/2019  
41 GCHDP-WD-UNR-CHT- HATH -16/01 Chand Gazi Road (Mekhel & Chipatoli Union) Road By BC Ch:970m-1750m. 0.000 M/S. Elius Enterprise 0.000 20/07/2017 27/01/2018 70 02/01/2019  
42 GCHDP-WD-FRB-CHT-HATH –STR-18/01 Construction of 36.00m Long PC With RCC Girder Bridge on Mufti Foizulla Road over Porag Pali Khal at Ch.4000m. 0.000 M/S. Chowdhury Enterprise and Consonance Engineers & Builders (JV) 0.000 0 02/01/2019  
43 GCHDP-WD-VZR–CHT-HATH–MAIN-EX- -18/12 Maintenance of Ala Miah Road Burichar By RCC at Ch. 252-744m 1.1100 34.500 M/S. Nafi Traders 34.500 0 02/01/2019  
44 GCHDP-WD-VZR–CHT-HATH–MAIN-18/01 Raza-Miah Road (Chikondondi) Road By BC at Ch. 00–1110m. 25.580 M/S. Diya Enterprise 25.580 25 02/01/2019  
45 GCHDP-WD-VZR–CHT-HATH–MAIN-17/10 Agriculture Research Institute Road (Hathazari Pourashava) By RCC at Ch.965- 1127m 0.8800 21.000 M/S. Iqbal Hossain 21.000 100 02/01/2019  
46 GCHDP-WD-VZR–CHT-HATH–MAIN-17/09 Kazi para Road By Dense Carpeting at Ch. 00-880m. 24.000 Mrs. Ifaque Traders 24.000 100 02/01/2019  
47 GCHDP-WD-FRB –CHT-HATH-MAIN -16/03 Rajamiah Chowdhury Road (Sarkarhat-Peshkarhat connecting Road) By Dense Carpeting at Ch. 00–4345m. 2.7000 38.090 M/S. M N Alam Brothers 38.090 28/12/2016 30/06/2017 100 02/01/2019  
7 Lohagara
1 GCHDP-WD-VZR-CHT-LOHA-EX-17/26 Islam Darogar Ghona – Haper Gath ( Start From Chandan Kata ) Road By HBB at Ch. 00-2100m. 0.2810 10.050 M/S. Quashem Construction 10.050 95 02/01/2019  
2 GCHDP-WD-VZR-CHT-LOHA -17/13 Purba Kalauzan Adarchar Road By HBB at Ch.00-281m. 0.1550 10.050 Kabir Ahmed 10.050 20 02/01/2019  
3 GCHDP-WD-VZR-CHT-LOHA -17/25 Kalauzan Khatibiya Road By HBB at Ch.56-143m & 550-618m. 0.3550 13.400 Kabir Ahmed 13.400 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-LOHA -17/20 Bamirnala to Hajee Golambari High School Road By HBB at Ch.00-355m. 0.2800 10.060 M/S. Alam Enterprise 10.060 20 02/01/2019  
5 GCHDP-WD-VZR-CHT-LOHA -17/23 Uzirvita Goda para Road By HBB at Ch.00-280m. 0.2400 16.320 Hasina Construction 16.320 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-LOHA -17/18 Lohagara Rashider Para Road By BC at Ch.00-240m. 0.3750 13.410 M/S. Alam Enterprise 13.410 0 02/01/2019  
7 GCHDP-WD-VZR-CHT-LOHA -17/16 Kalauzan AdharChar Road By HBB at Ch.00-375m. 0.5200 29.090 Kabir Ahmed 29.090 0 02/01/2019  
8 GCHDP-WD-VZR –CHT-LOHA-17/03 Boro Hatia Esataul Ulom Road By BC at CH.90-610m. 0.3190 13.000 M Raraman Trades 13.000 12/09/2017 19/02/2018 100 02/01/2019  
9 GCHDP-WD-VZR–CHT-LOHA-17/15 Chunati Shah Sufi GPS-Banshkhali Connecting Road By HBB at Ch. 635-954m. 0.3470 13.000 M/S. Alam Enterprise 13.000 100 02/01/2019  
10 GCHDP-WD-VZR–CHT-LOHA-17/07 Barahatia Ghonar Mour Road By HBB at Ch. 00-347m. 0.4600 22.000 M/S. Shah Jabbaria Construction & Co. 22.000 100 02/01/2019  
11 GCHDP-WD-VZR–CHT-LOHA-17/10 Lohagara Sarkar Para Road By BC at Ch. 00-460m. 0.4900 13.000 Kabir Ahmed 13.000 70 02/01/2019  
12 GCHDP-WD-VZR –CHT-LOHA-16/06 Chunati Moulana para Sayer Fakir Ghona Road By HBB at Ch: 00-490m. 0.4020 13.000 M/S. Dipu Kanti Paul. 13.000 100 02/01/2019  
13 GCHDP-WD-VZR –CHT-LOHA-16/12 Chunati Theker Dokan to Hadur Pahar Road By HBB at Ch: 170-572m. 43.820 M/S.Dipu Kanti Paul 43.820 07/06/2017 24/10/2017 100 02/01/2019  
14 GCHDP-WD-VZR –CHT-LOHA- STR-16/21 Construction of 4X4.50mX4.50m RCC Box Culvert on Shah Peer Road near Bhabanipur connecting Road over Thomthomkia Khal Road at Ch. 220m. 120.240 M/S. H.K.C Enterprise 120.240 06/07/2017 13/12/2017 100 02/01/2019  
15 GCHDP-WD-VZR-CHT-LOHA-STR -16/02 Construction of 27.00m Long RCC Girder Bridge Over Ratar Chara on Chunti Khairati Road at Ch: 1500m. 1.0000 23.000 M/S.Milton Traders 23.000 30/06/2016 07/07/2017 100 02/01/2019  
16 GCHDP-WD-VZR –CHT-LOHA-MAIN -16/01 Adhunagar Rajghata Road 0.3000 10.000 M/S.M Rahman Traders 10.000 22/05/2016 29/09/2016 100 02/01/2019  
17 GCHDP-WD-VZR-CHT-LOHA -16/24 Padua Hari Mandir Road By HBB at Ch. 2430 to 2730m. 0.5000 16.000 M/S.Dipu Kanti Paul 16.000 05/06/2016 12/10/2016 100 02/01/2019  
18 GCHDP-WD-VZR-CHT-LOHA -16/22 Putivila Boddho Mondir Road (Ch. 00 to 500m) 0.5000 16.000 M/S.Kabir Ahmed 16.000 18/05/2016 25/09/2016 100 02/01/2019  
19 GCHDP-WD-VZR-CHT-LOHA -16/19 Barahatia Harider Ghona Dakkin Para Jan Basu Bari Road By HBB at Ch: 00m-500m 0.4000 13.000 M/S. Md. Faruq 13.000 18/07/2016 25/11/2016 100 02/01/2019  
20 GCHDP-WD-VZR-CHT-LOHA -16/14 Kanuram Bazar Harina road (Ch. 962m-1362m) 0.5000 16.000 M/S.Dipu Kanti Paul 16.000 05/06/2016 12/10/2016 100 02/01/2019  
21 GCHDP-WD-VZR-CHT-LOHA -16/11 Darbesh hat Maijbilla Road By HBB at Ch: 3500m-4000m. 17.700 M/S.Alam Enterprise 17.700 29/05/2016 05/10/2016 100 02/01/2019  
22 GCHDP-WD-VZR –CHT-LOHA-18/09(01) Construction of 2-Vent 3.00mX3.00m RCC Box Culvert on Amirabad Kamar Dighi Road at Ch.1447m. 0.7440 40.000 M/S. Saired Enterprise 40.000 0 02/01/2019  
23 GCHDP-WD-VZR –CHT-LOHA-16/09 Amirabad Kamar Dighi Road By BC at Ch: 1108-1852m. 0.4000 13.000 M. Rahman Traders 13.000 24/05/2017 10/10/2017 100 02/01/2019  
24 GCHDP-WD-VZR-CHT-LOHA -16/08 Lohagara Lohar Dighi Connecting road (Ch: 500m-900m) 1.3200 28.000 M/S.M Rahman Traders 28.000 16/05/2016 23/09/2016 100 02/01/2019  
25 GCHDP-WD-VZR-CHT-LOHA -16/04 Adhunagar Harina Road By BC at Ch: 00-1320m. 1.6500 50.120 M/S Milton Traders 50.120 24/05/2017 30/11/2017 100 02/01/2019  
26 GCHDP-WD-VZR-CHT-LOHAGARA -16/01(01) Chunati Rosainga Ghona Forest Office Haper Ghata Road By HBB at Ch: 3000m-4650m) 3.0000 120.580 M/S. Md. Faruq 120.580 12/09/2017 19/02/2018 100 02/01/2019  
27 GCHDP-WD-VZR-CHT-LOHAGARA -16/01 Chunati Rosainga Ghona Forest Office Haper Ghata Road (Ch: 00m-3000m) 0.000 M/S. Nipa Enterprise 0.000 15/03/2016 22/07/2016 100 02/01/2019  
28 GCHDP-WD-CHT-LOHA -GC-17/01 Kanuram Bazar / Growth Center 50.000 M/S. Nazrul Construction 50.000 80 02/01/2019  
29 GCHDP-WD-CHT-LOHA -GC-17/02 Sener Hat Bazar / Growth Center. 0.6200 33.000 Mr. U. T. Mong 33.000 04/10/2017 11/04/2018 100 02/01/2019  
30 GCHDP-WD-UNR–CHT-LOHA-17/02 Lohardeghi & RHD Adhunagar Khan Hat GC (Adhunagar Aktaria Madrasa) Road By BC at Ch. 00-620m. 0.4590 28.000 M/S.Nissan Traders 28.000 80 02/01/2019  
31 GCHDP-WD-UNR-CHT-LOHA-16/01 Amirabad UP to Kalauzan UP Road By BC at Ch: 3836m-4295m. 0.000 M/S.Kashem Brothers. 0.000 06/06/2016 13/10/2016 100 02/01/2019  
32 GCHDP-WD-VZR–CHT-LOHA –MAIN-16/01 Adhunagar Rajghata RoadBy Dense Carpeting at Ch. 00–1000m. 1.5000 34.000 M. Rahman Traders 34.000 08/05/2016 22/05/2016 100 02/01/2019  
33 GCHDP-WD-VZR–CHT-LOHA –MAIN-16/02 Jangle Padua Road By Dense Carpeting at Ch. 00–1500m. 0.5680 27.000 M. Rahman Traders 27.000 23/01/2017 30/05/2017 100 02/01/2019  
34 GCHDP-WD-UNR-LOHA -MAIN-16/01 Shah Peer Road By Dense Carpeting at Ch. 2200–2768m. 3.4000 67.000 M/S. Md. Faruq 67.000 18/07/2016 25/11/2016 100 02/01/2019  
35 GCHDP-WD-FRB-LOHA -MAIN-16/01 Kalauzan Feeder Road By Dense Carpeting at Ch. Ch.00m-3400m 0.000 M/S.Friends Traders 0.000 19/04/2016 26/08/2016 100 02/01/2019  
8 Mirsharai
1 GCHDP-WD-VZR-CHT-MIRS-EX-17/68 Tukumia Mazar Road By BC at Ch. 00-480m. 0.7000 49.610 M/S. Bismillah Trading 49.610 02/11/2017 09/03/2018 50 02/01/2019  
2 GCHDP-WD-VZR-CHT-MIRS-EX-17/69 Jaypur Purba Joar Mosque Road By BC at Ch. 00-700m. 0.8000 61.960 M/S. Bismillah Trading 61.960 02/11/2017 09/03/2018 60 02/01/2019  
3 GCHDP-WD-VZR-CHT-MIRS -17/57 Kamar Ali Bazar-Tarakathia By BC at Ch. 00-800m. 0.8300 66.430 M/S. Hannan Construction 66.430 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-MIRS -17/08 Development of Shaheed Mahbub Alam Road By BC at Ch. 00-400m & 1670-2100m. 0.5500 50.790 M/S. Shatarupa Enterprise 50.790 30 02/01/2019  
5 GCHDP-WD-VZR-CHT-MIRS -17/41 Development of Jamal Dokan R&H – Rail Link Road (Shah sundar Mia Road) By BC at Ch. 00-550m. 0.6750 44.040 M/S. Mirsharai Enterprise 44.040 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-MIRS -17/21 Development of Mirsharai UZ HQ- Rail Line Road (Sah Shua Road) By BC at Ch. 700-1375m. 0.5100 39.170 M/S. Adian Enterprise 39.170 0 02/01/2019  
7 GCHDP-WD-VZR-CHT-MIRS -17/18 Development of Usha Gazi Road By BC at Ch. 1290-1800m. 39.000   39.000 0 02/01/2019  
8 GCHDP-WD-VZR-CHT-MIRS -18/16 Samitir hat-Domkhali Edgah Road By BC at Ch.00-850m. 0.4000 30.550   30.550 0 02/01/2019  
9 GCHDP-WD-VZR-CHT-MIRS -18/49 Naherpur Sultan Ahamed Road By BC at Ch.00-400m. 0.6500 50.850 M/S.Nizam Traders 50.850 15 02/01/2019  
10 GCHDP-WD-VZR-CHT-MIRS -18/50 Maddam Tal Baria Road By BC at Ch.800-1450m. 0.6000 46.440 M/S. Akif Enterprise 46.440 10 02/01/2019  
11 GCHDP-WD-VZR-CHT-MIRS -18/45 Muradpur Road (UP-4)By BC at Ch.2500-3100m. 0.5250 39.420 M/S.R. A Enterprise 39.420 0 02/01/2019  
12 GCHDP-WD-VZR-CHT-MIRS -18/37 Meherali pandit road (Tili pukur-Hinguli chara) By BC at Ch.00-525m. 0.7850 52.520 M/S. Nizam Traders 52.520 25 02/01/2019  
13 GCHDP-WD-VZR-CHT-MIRS -18/39 Lick Shab Road (Sheikh shab Road) By BC at Ch.00-785m. 1.1450 78.290 M/S. R.A Enterprise 78.290 0 02/01/2019  
14 GCHDP-WD-VZR-CHT-MIRS -18/28 Uttar Naharpur School (Zakir Hossain Road) Road By BC at Ch.00-1145m. 0.6000 51.480   51.480 0 02/01/2019  
15 GCHDP-WD-VZR-CHT-MIRS -18/47 Lalmia Saha-Abdullah Qari (Madha Muradpur-Abdus Sattar road) Road By BC at Ch.00-600m. 0.6100 38.280 M/S.R. A Enterprise 38.280 0 02/01/2019  
16 GCHDP-WD-VZR-CHT-MIRS -18/30 Ganak Chara Majar Road (UP-2) By BC at Ch.00-610m. 0.3250 24.970 M/S. Taspia Enterprise 24.970 10 02/01/2019  
17 GCHDP-WD-VZR-CHT-MIRS -18/62 Shaheed Shanto Road By BC at Ch.470-795m. 0.8750 56.140 M/S. Taspia Enterprise 56.140 17/05/2018 65 02/01/2019  
18 GCHDP-WD-VZR-CHT-MIRS -18/33 Sheikh Bahar ullah road (Ganakchara Dhumghat road to DT road) Road By BC at Ch.00-875m. 0.5900 39.290 M/S. Mirsharai Enterprise 39.290 70 02/01/2019  
19 GCHDP-WD-VZR-CHT-MIRS -18/43 Takia Road (upto Khal) Road By BC at Ch.00-590m. 39.500   39.500 0 02/01/2019  
20 GCHDP-WD-VZR-CHT-MIRS -17/48 Hadi Fakir Hat GC R&H – Bhuiya Para GPS (Baki Road ) Road By BC at CH.00-950m. 0.6000 39.810 M/S. R. A Enterprise 39.810 0 02/01/2019  
21 GCHDP-WD-VZR-CHT-MIRS -17/03 Union Central Road UP-3 (Bancharampur Road ) Road By BC at CH.00-600m. 0.6000 39.090 M/S. Arafat Steel & Engineering 39.090 65 02/01/2019  
22 GCHDP-WD-VZR-CHT-MIRS -17/13 Mokrem Ali Kala Gazi Anandarhat (Mokrem Ali Bridge-Bishu Miah Road ) Road By BC at CH.00-600m. 0.8500 56.000 M/S. Onik Traders 56.000 65 02/01/2019  
23 GCHDP-WD-VZR-CHT-MIRS -17/09 Khirodia Gonga Ram Road By BC at CH.00-850m. 0.6000 39.100 M/S. Akif Enterprise 39.100 100 02/01/2019  
24 GCHDP-WD-VZR-CHT-MIRS -17/22 Kachua Toshi Monshi Road By BC at CH.00-600m. 0.4600 28.240 M/S. Akif Enterprise 28.240 70 02/01/2019  
25 GCHDP-WD-VZR-CHT-MIRS-17/64 Hazi Sultan Ahamed Road (Darogarhat-Sattar Bhuyan Hat RD Bamonsundar) Road By BC at Ch. 00-460m. 354.290 M/S. Ahan Enterprise 354.290 100 02/01/2019  
26 GCHDP-WD-VZR-CHT-MIRS-STR-17/31 Construction of 75.00m Long PC Girder Bridge on Kaila Shaheed Jakir Hossan Road at Ch. 4070m. 180.260 M/S. Chowdhury Enterprise & The Trade Link JV. 180.260 50 02/01/2019  
27 GCHDP-WD-VZR-CHT-MIRS-STR-17/66 Construction of 20.00m Long RCC Girder Bridge on Moulovi Badiul Alam road ( Purbo Dom Khali School Road ) at Ch. 10m. 209.200 Consonance Eingineers & Builders 209.200 100 02/01/2019  
28 GCHDP-WD-VZR-CHT-MIRS-STR-17/67 Construction of 32.00m Long PC Girder Bridge on Hinguli Central Road ( Khil Hinguli School Road ) at Ch. 1500m. 430.120 M/S. Chowdhury Enterprise & The Trade Link JV. 430.120 80 02/01/2019  
29 GCHDP-WD-VZR-CHT-MIRS-STR-17/67 65 Construction of 81.00m Long PC Girder Bridge on Asad Ali Kari Road over Ichakhali khal at Ch. 2000m. 0.6200 39.550 AR-ALML JV 39.550 40 02/01/2019  
30 GCHDP-WD-VZR-CHT-MIRS -17/05 Zorargonj Project Road-Shahebpur Road (Kamar Ali chowdhury) By BC at Ch: 00-620m. 0.8500 33.490 M/S. Arafat Steel & Engineering 33.490 100 02/01/2019  
31 GCHDP-WD-VZR-CHT-MIRS -17/55 Shahid Sirajul Hoque Road By HBB at Ch: 00-850m. 0.9250 56.480 M/S. Dulal & Sons 56.480 100 02/01/2019  
32 GCHDP-WD-VZR-CHT-MIRS -17/07 Union Eastern circular Road By BC at Ch: 1425-2350m. 0.8000 56.000 M/S Mirsharai Enterprise 56.000 100 02/01/2019  
33 GCHDP-WD-VZR-CHT-MIRS -17/20 Shaheed Shakendar Ali Road By BC at Ch: 700-1500m 1.0600 56.000 M/S.Well Enterprise 56.000 04/07/2017 60 02/01/2019  
34 GCHDP-WD-VZR-CHT-MIRS -16/26 Joy Nagar (Aburhat-Bishu Miah Road) Road By BC at Ch. 00-1060m. 1.0000 56.000 M/S. Jonaet Enterprise 56.000 22/06/2017 29/12/2017 100 02/01/2019  
35 GCHDP-WD-VZR-CHT-MIRS -16/23 Hadi Musa Road By BC at Ch. 00-1000m. 0.6900 23.000 M/S. Akter Enterprise 23.000 31/10/2016 07/05/2017 60 02/01/2019  
36 GCHDP-WD-VZR-CHT-MIRS -16/63 Hazi Abdul Hoque Road By HBB at Ch. 00-690m. 1.5000 84.000 M/S Dulal & Sons. 84.000 13/11/2016 20/03/2017 100 02/01/2019  
37 GCHDP-WD-VZR-CHT-MIRS -16/06 Yusuf Ali Road By BC at Ch: 00m-1500m. 0.7500 53.710 M/S Akter Enterprise. 53.710 20/09/2006 27/05/2017 100 02/01/2019  
38 GCHDP-WD-VZR-CHT-MIRS -18/58 Kazirtaluk – Tingoria tola GPS Road (Moazzem Fakir Road) By BC at Ch.00-750m. 1.2000 53.000 M/S. Dulal & Sons 53.000 0 02/01/2019  
39 GCHDP-WD-VZR-CHT-MIRS -16/38 Kazir hat- Rammondol Road (Station Road) By BC at Ch.00-1200m 1.0000 56.000 M/S. R.A Enterprise 56.000 27/12/2016 30/06/2017 100 02/01/2019  
40 GCHDP-WD-VZR-CHT-MIRS -16/14 Mohalanka Baliadi Road By BC at Ch: 2040m-3040m. 0.000 M/S. Haque Traders 0.000 10/08/2016 17/02/2017 100 02/01/2019  
41 GCHDP-WD-UNR-CHT-MIRS -17/08 Osmanpur UP-Muhuri Gate Bazar Road( Jahabox-Banshkhali-Muhuri Gate Bazar Road) By BC at CH.900-1625m. 0.7000 56.490 M/S. Arafat Steel & Engineering 56.490 65 02/01/2019  
42 GCHDP-WD-UNR-CHT-MIRS-17/10 Bamansunder –Darogar Hat GC- Abur Hat GC Road Via Joulanpool Bazar ( Bamansunder-Bariayakhali-joulanpool Road & joulanpool-Abur Hat Road) road By BC at Ch. 1780-2480m. 0.8000 45.190   45.190 10 02/01/2019  
43 GCHDP-WD-UNR-CHT-MIRS -17/06 Moghadia UP- Bari Bundth R & H Via Thakur Hat Mozumdarhat & Banglabazar (Abutorab-Hashem Nagar-Char sarat Road) By BC at Ch. 7800-8500m. 141.680 M/S. Mirsharai Enterprise 141.680 65 02/01/2019  
44 GCHDP-WD-UNR-CHT-MIRS-STR-17/06 Construction of 20.00m Long RCC Girder Bridge on Moghadia UP- Bari Bundth R & H Via Thakur Hat Mozumdarhat & Banglabazar (Abutorab-Hashem Nagar-Char sarat Road) at Ch. 4250m. 0.3700 28.000 M/S.R A Enterprise. 28.000 09/08/2017 16/08/2018 0 02/01/2019  
45 GCHDP-WD-UNR-CHT-MIRS -17/02 Mayani UP- Annenderhat Bazar Road via Maddam Mayani (Abutorab Anander hat ) Road By BC at Ch. 750-1120m 1.0300 56.000 M/S.N.M Enterprise 56.000 03/10/2017 100 02/01/2019  
46 GCHDP-WD-UNR-CHT-MIRS -16/09 Ludha Khali Sahaji Bazar Bamonsunder Daroger Hat Road (Bamonsunder Daroger Hat GC to Bari Bundh R & H Road via Luddakhali) By BC at Ch:3016-4046 m 1.0000 56.000 M/S. Well Enterprise 56.000 08/01/2017 15/07/2017 100 02/01/2019  
47 GCHDP-WD-UNR-CHT-MIRS -16/03 Gash Baria Shaher khali Hospital Road via Bhuiyar Hat Road By BC at Ch: 1250m-2250m. 0.9840 56.000 M/S. Arafat Steel & Engineering 56.000 21/03/2017 29/09/2017 100 02/01/2019  
48 GCHDP-WD-UNR-CHT-MIRS -16/01 Gazaria-Haidkandi U.P Road (Oli Ahamed Abdur Rahman(Part-2) By BC at Ch.1400-2500m 0.000 M/S. Hoque Traders 0.000 20/12/2016 27/06/2017 100 02/01/2019  
49 GCHDP-WD-UZR-CHT-MIRS -EX-18/03 Bamansundar- Darogar Hat GC – Abur Hat GC Road via Joulanpool Bazar (Bamansundar-Bariayakhali- Joulanpool Road & Joulanpool- Abu Hat Road ) Road By BC at Ch.5870-7200m. 0.7000 56.490 M/S. Onik Traders 56.490 10 02/01/2019  
50 GCHDP-WD-FRB-CHT-MIRS-17/10 Bamansunder –Darogar Hat GC- Abur Hat GC Road Via Joulanpool Bazar ( Bamansunder-Bariayakhali-joulanpool Road & joulanpool-Abur Hat Road) road By BC at Ch. 1780-2480m. 2.7450 194.000 M/S. Onik Traders 194.000 30 02/01/2019  
51 GCHDP-WD-FRB-CHT-MIRS -16/02 Karer Hat UP to Santirhat GC Road By BC at Ch. 3780-6525m. 3.1500 270.000 M/S. Aradhana Enterprise 270.000 03/01/2017 10/09/2017 50 02/01/2019  
52 GCHDP-WD-FRB-CHT-MIRS -16/01 Abur Hat GC- Bamon Sundar Darogar Hat GC Road By BC at Ch: 700m-3850m. 0.000 Techbay International 0.000 05/06/2016 12/06/2017 35 02/01/2019  
53 GCHDP-WD-VZR–CHT-MIRS–MAIN-18/17 Maintenance of Shaheed Zakir Hossain Road Koila By Dense Carpeting at Ch.00-1000m. 1.2900 21.000   21.000 0 02/01/2019  
54 GCHDP-WD-VZR–CHT-MIRS–MAIN-18/20 Usha Gazi road By Dende Carpeting.at ch.00-1290m 21.000   21.000 0 02/01/2019  
55 GCHDP-WD-VZR–CHT-MIRS–MAIN-17/21 Chinki Astana station Road (RHD to Hill) By Dense Carpeting at Ch. 00-850m. 1.4000 27.990   27.990 0 02/01/2019  
56 GCHDP-WD-VZR–CHT-MIRS–MAIN-17/03 Choto Kamaldaha Patharia road By Dense Carpeting at Ch. 00-1400m. 1.5000 29.520 M/S. Hoq Traders 29.520 30/07/2017 06/10/2017 100 02/01/2019  
57 GCHDP-WD-VZR–CHT-PATI –MAIN-17/11 Dhawardenga Kaliaish Banga Maji Road By Dense Carpeting at Ch. 00-1500m. 0.9500 10.630   10.630 0 02/01/2019  
58 GCHDP-WD-VZR–CHT-PATI –MAIN-17/09 Sub -Register Bari Via Motaherul Islam Chowdury Bakhali Barua para Road By Seal Coat at Ch. 550-1500m. 1.3250 30.020   30.020 0 02/01/2019  
59 GCHDP-WD-VZR–CHT-MIRS–MAIN-17/16 Abdul Wahab – Dorgapara Mazar Road By Dense Carpeting at Ch. 325-1650m. 1.3500 37.000 M/S . Mirsharai Enterprise 37.000 06/07/2017 13/10/2017 100 02/01/2019  
60 GCHDP-WD-UNR–CHT-MIRS–MAIN-16/01 Mogadia UP to Bari Bundha R&H via Thakur Hat Mozumderhat & Bangla Bazar (Abotorab-Hashem Nagar-Char sarat Road) Road By Dense Carpeting at Ch. 1750–3100m. 55.000 M/S. Akif Enterprise 55.000 10/01/2017 17/05/2017 100 02/01/2019  
61 GCHDP-WD-FRB-MIRS -MAIN-16/01 Zorar Gonj Borburia Ghat Road By Dense Carpeting at Ch. 5100–5800m. 0.000 M/S well Enterprise 0.000 31/10/2016 07/03/2017 100 02/01/2019  
9 Patiya
1 GCHDP-WD-VZR-CHT-PATI -17/15 Jangalkhain Paschim Para Road By BC at Ch.00-500m. 0.8500 36.320   36.320 0 02/01/2019  
2 GCHDP-WD-VZR-CHT-PATI -17/08 Dhaighat Purnendu Dastider Road By HBB at Ch.1000-1850m. 1.0000 77.410 M/S. Alam Enterprise 77.410 70 02/01/2019  
3 GCHDP-WD-VZR-CHT-PATI -17/07 Alampur Issarkhain Uttar Samura Road By BC at Ch. 00-1000m. 0.7500 30.620 M/S. Shah Amir Construction 30.620 40 02/01/2019  
4 GCHDP-WD-VZR-CHT-PATI -17/04 Dhakhin Mozafarabad Road by HBB at Ch.00-750m. 0.9500 31.000 M/S. Mans Traders 31.000 20/11/2017 27/03/2018 90 02/01/2019  
5 GCHDP-WD-VZR-CHT-PATI -16/03 Kaliaish Suvandandi-Khankhanabad Road By HBB at Ch. 4700-5650m. 0.7500 25.000 M/S. Mans Traders 25.000 19/12/2016 26/05/2017 100 02/01/2019  
6 GCHDGCHDP-WD-VZR-CHT-PATI -16/06P-WD-VZR-CHT-PATI -16/02 Asia Younus Khalifa Road.(Ayub Ali Road) By HBB at Ch. 00-750m. 0.5150 25.000 A N J Corporation 25.000 02/11/2016 09/04/2017 100 02/01/2019  
7 GCHDP-WD-VZR-CHT-PATI -16/06 Pairul Chowdhury Bari Road By BC at Ch. 00-515m. 1.4400 25.000 A N J Corporation 25.000 02/11/2016 09/04/2017 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-PATI-17/01 Harinkhain Sayed Ahamad chowdhury Road.(Dr. Muslim Road),By HBB. 0.5000 16.520 M/S.Pavel Enterprise 16.520 30 02/01/2019  
9 GCHDP-WD-VZR-CHT-PATI-16/10 Haidgaon Sirajul Haque Talukder Road via Bashi Member Road By BC at Ch: 00m-500m. 0.5250 16.260 M/S. Kashem Brothers 16.260 28/06/2016 05/11/2016 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-PATI-16/09 Sirazul Islam Ayub Road By BC at Ch: 00m-530m 0.5000 28.000 M/S.Shah Gadi Trading. 28.000 18/07/2016 30/04/2017 100 02/01/2019  
11 GCHDP-WD-VZR-CHT-PATI-16/14 Shikal baha Char Hazari Road By Bc at Ch. 00m-500m. 0.4000 28.000 Mohammed Selim & Brothers 28.000 24/05/2017 30/09/2017 70 02/01/2019  
12 GCHDP-WD-VZR-CHT-PATI-16/12 Ichanagar-Khowaz Nagar Charpather Ghata (I.K.C) Road By Bc at Ch. 4500-4900m. 0.4000 28.000   28.000 0 02/01/2019  
13 GCHDP-WD-VZR-CHT-PATI-16/11 Charlaikha Hospital Road(Ali Hossen market-Goal para). Ch. 00-500m 0.7400 42.000 M/S. Nipa Enterprise 42.000 12/06/2017 19/10/2017 70 02/01/2019  
14 GCHDP-WD-VZR –CHT-PATIYA-16/16 Haidgaon Ziayar Para Hazi Bazlur Rahman Road By Bc at Ch. 0.00 - 740m. 0.5250 23.000 M/S. Shah Amir Construction 23.000 26/02/2017 05/07/2017 100 02/01/2019  
15 GCHDP-WD-VZR –CHT-PATIYA-16/17 Super Petrochemical Road By BC at Ch. 00 -525m) 1.6750 56.000 M/S.Mans Traders 56.000 30/03/2016 30/11/2017 100 02/01/2019  
16 GCHDP-WD-VZR –CHT-PATIYA-16/13 Alam Mazi Road (Ch. 00 - 1680m) 0.000 M/S.Tohid & Brothers 0.000 10/04/2016 17/04/2017 95 02/01/2019  
17 GCHDP-WD-UNR-CHT-PATI -16/04 Shae Godi Road by BC at Ch. 00-813m 0.8600 56.000 M/S. Shah Godi Trading 56.000 60 02/01/2019  
18 GCHDP-WD-UNR-CHT-PATI -16/03 Patiya Tagar Puni Road By BC at Ch. 5080-5940m. 1.9600 70.710 M/S. Azad Enterprise 70.710 26/12/2016 30/06/2017 100 02/01/2019  
19 GCHDP-WD-UNR-CHT-PATI-16/01 Haidgaon-Kelishahar Union Road.(Haidgaon shahid smrity Road By HBB at Ch: 00m-1965m. 0.7000 56.000 M/S. Mans Traders. 56.000 18/07/2016 25/01/2017 100 02/01/2019  
20 GCHDP-WD-UNR-CHT-PATI-16/02 Abdul Jalil Chowdhury Road By Bc at Ch. 3040-3740m. 0.000   0.000 0 02/01/2019  
21 GCHDP-WD-FRB-CHT-PATI-17/01 Monsartek (RHD)-Kantafakirhat GC via Kusumpura UP (Abbas sikder connecting Road)Road By BC at Ch. 6000-7200m. 90.000 M/S. Shah Godi Trading 90.000 65 02/01/2019  
22 GCHDP-WD-FRB –CHT-PATIYA - STR-16/04 Construction of 22.00m Long RCC Girder Bridge (Muslim Kjar Bridge) over Kerinja Khal on Bipin Behary Nandy Road at Ch. 3776m 0.8600 67.320 M/S. Shamim & Brothers 67.320 16/03/2017 23/03/2018 90 02/01/2019  
23 GCHDP-WD-FRB-CHT-PATI-16/03 Santir hat-Ziri Madrasha Maliara-Mohera Fakira Mosjid Road By BC at Ch: 5330m-6190m. 0.2550 33.000 M/S. ARM Engineers. 33.000 14/07/2016 21/01/2017 100 02/01/2019  
24 GCHDP-WD-FRB-CHT-PATI-16/02 Old Cox,s bazar Road(Kalar pool UP office-Fakirnir hat-Merin academy) (From RHD #132) (Ch. 9440m-9795m) 0.000 M/S. Mohammed Selim & Brothers 0.000 03/04/2017 10/08/2017 70 02/01/2019  
25 GCHDP-WD-UZR–CHT-PATI–MAIN-NEW -18/04 Saw Mill (RHD) – Bhattcharjee Hat GC ( Shekh Rasel Sreety) Road By Dense Carpeting at ch.00-1050m. 1.0000 10.020   10.020 0 02/01/2019  
26 GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/01 Maintenance of Chakrashala (RHD) - Olirhat Road By Seal Coat at Ch. 00 – 1000. 1.0500 14.000   14.000 0 02/01/2019  
27 GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/02 Rashal Sreetee Road By Dende Carpeting. 1.0000 14.000   14.000 0 02/01/2019  
28 GCHDP-WD-FRB–CHT-PATI–MAIN-EX-18/01 Chakrashala-Olirhat Road By Dende Carpeting. 2.2000 14.000 M/S. Maa Enterprise 14.000 0 02/01/2019  
29 GCHDP-WD-VZR–CHT-PATI–MAIN-18/08 Vatikhain Steel Bridge - Dhaourdenga Road (Faizur Rahman Chy Road) By Seal Coat at ch.00-2200m 14.000   14.000 0 02/01/2019  
30 GCHDP-WD-VZR–CHT-PATI–MAIN-18/01 Jiri Saider Madrasa (RHD) - Mansa Chowdhury Para Road ( Abdul Wazed Road) By Seal Coat at ch.2150-3500m 1.5000 29.520   29.520 0 02/01/2019  
31 GCHDP-WD-VZR–CHT-PATI –MAIN-17/11 Dhawardenga Kaliaish Banga Maji Road By Dense Carpeting at Ch. 00-1500m. 0.9500 10.640 M/S. Mans Traders. 10.640 08/08/2017 15/10/2017 50 02/01/2019  
32 GCHDP-WD-VZR–CHT-PATI –MAIN-17/09 Sub -Register Bari Via Motaherul Islam Chowdury Bakhali Barua para Road By Seal Coat at Ch. 550-1500m. 0.000 M/S.Niro Enterprise 0.000 21/08/2017 28/10/2017 0 02/01/2019  
10 Rangunia
1 GCHDP-WD-VZR-CHT-RANG -18/10 Nazu Meah Talukder Road By HBB at Ch.2520-3200m. 0.2500 16.740   16.740 0 02/01/2019  
2 GCHDP-WD-VZR-CHT-RANG -18/17 South Nischintapur Maddam Para Road ( St. South side of Nicchintapur Bazar) By HBB at Ch.00-250m. 0.2700 16.830 M/S. Ayub & Brothers 16.830 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-RANG -18/18 Parua D.C UZR – Sonaichari Khal (Sagor Road ) By HBB at Ch.00-270m. 0.5020 24.860 M/S. Nur Enterprise 24.860 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-RANG -18/20 Majumder Khil School - Pattali Road By HBB at Ch.178-680m. 0.6800 24.860 M/S. Nur Enterprise 24.860 70 02/01/2019  
5 GCHDP-WD-VZR-CHT-RANG -18/10` Nazu Meah Talukder Road By HBB at Ch.2520-3200m. 0.1320 16.060 Nur Enterprise 16.060 0 02/01/2019  
6 GCHDP-WD-VZR-CHT-RANG-17/21 Kalurghat Road-Hafez Sarif Road (Munsur Ali Road) Road By RCC at Ch. 00-132m. 0.1950 16.500 M/S. Nissan Traders 16.500 0 02/01/2019  
7 GCHDP-WD-VZR–CHT-RANG-17/11 Parua Sankar Road Start from Parua D.C. Road By HBB at Ch. 00-195m. 16.500 M/S. Ahamadia Traders 16.500 0 02/01/2019  
8 GCHDP-WD-VZR–CHT-RANG-17/16 Mozumder khill Durga Bari Connecting (Durgabari Road)Road By HBB at Ch. 180-530m. 0.2740 16.000 M/S. Ayub & Brothers 16.000 100 02/01/2019  
9 GCHDP-WD-VZR–CHT-RANG-17/05 Burir Dokan – Pomra Asrayan Prokolpo (Pomra Bomihin Road Burir Dokan Connecting Road.) Road By HBB at Ch. 425-470m,545-610m,665-690m & 725-864m. 0.3430 16.000 M/S. K. R Traders 16.000 100 02/01/2019  
10 GCHDP-WD-VZR –CHT-RANG-17/14 Hazee Para (Chandraghona) Road By HBB at Ch. 160-414m & 461-550m. 0.3000 28.000 M/S. Chowdhury Construction 28.000 100 02/01/2019  
11 GCHDP-WD-VZR –CHT-RANG-17/01 RHD Sistal –Sonargaon High School-Rafique Miahar Farm (Sonargaon Road) Road By BC at Ch. 1140-1440m. 172.760 M/S. Karnafully Traders 172.760 0 02/01/2019  
12 GCHDP-WD-VZR –CHT-RANG- STR-16/03 Construction of 24.00m Long RCC Girder Bridge over Kurmai Khal on Agunia Tea Garden Road at Ch. 1740m. 0.9000 24.000 M/S. Yousuf Construction 24.000 06/04/2017 13/04/2018 100 02/01/2019  
13 GCHDP-WD-VZR-CHT-RANG-17/09 Rafique Road By HBB at Ch: 1215-1265m & 1359-1699m. 0.7250 36.000 M/S. Jahanara & Sons 36.000 12/07/2017 19/11/2017 80 02/01/2019  
14 GCHDP-WD-VZR-CHT-RANG-16/22 Chowdhury Para - Banik Para Road By HBB at Ch. 00-725m. 0.4980 22.000 M/S. Alamgir Enterpr. 22.000 08/02/2017 15/06/2017 100 02/01/2019  
15 GCHDP-WD-VZR-CHT-RANG -16/15 Ranir Hat-Laingapara (Al-amin Para) Road By HBB at Ch. 00-5m, 38-138m & 345-736m. 0.7500 33.000 M/S. Abhi Enterprise 33.000 23/10/2016 02/03/2017 85 02/01/2019  
16 GCHDP-WD-VZR-CHT-RANG-16/07 Rawshania Tyabia Madrasha Road By HBB at Ch.00-750m 0.6600 36.000 M/S. Jahanara & Sons 36.000 19/12/2016 30/11/2017 100 02/01/2019  
17 GCHDP-WD-VZR-CHT-RANG-16/06 Nazru Para Road By BC Ch:745m-1405m. 0.000 Nur Ullah Enterprise 0.000 07/11/2006 14/03/2017 100 02/01/2019  
18 GCHDP-WD-UNR-CHT-RANG-17/01 Maiddah Parua (Parua UP HQ-Sonichari Bazar) Road By HBB at Ch: 1640-2459m. 0.000 M/S. Mahbub Enterprise 0.000 26/07/2017 02/12/2017 90 02/01/2019  
19 GCHDP-WD-FRB-CHT-RANG-STR-17/01(01) Construction of 20.00m Long RCC Girder Bridge Over Rai Khali Khal on Hazee Sayed Ali Road at Ch. 120m. 1.0200 124.000 M/S. Saleha Construction 124.000 29/11/2017 06/12/2018 40 02/01/2019  
20 GCHDP-WD-FRB-CHT-RANG-16/01 Hazee Sayed Ali (Sarafvhata) Road By BC at Ch. Ch.14000m-15020m & 20m bridge on Raikhaali Khal at Ch.120m. 0.000 M/S.Akhi International 0.000 19/04/2016 26/02/2017 80 02/01/2019  
21 GCHDP-WD-VZR–CHT-RANG–MAIN-18/01 Maintenance of RHD Santinication Bazar-Brommotar Nurul Uluam Madrasha-TC Hat ( Korban Ali Road ) Road By Dense Carpeting at ch.00-1200m 0.8350 0.000   0.000 0 02/01/2019  
22 GCHDP-WD-VZR–CHT-RANG–MAIN-17/04 Maintenance of South Nichintupur A. Salam Road By BC at Ch. 00-835m. 0.7800 7.000   7.000 0 02/01/2019  
23 GCHDP-WD-VZR–CHT-RANG–MAIN-17/07 North Noagown Road ( Jute Mill Gate-Maddha Nowagawn GPS ) By BC at Ch. 00-746m, 880-914m 0.7000 11.200   11.200 0 02/01/2019  
24 GCHDP-WD-VZR–CHT-RANG–MAIN-17/02 RHD Brammanghat-Daricupe High School-Chipchari Pekua Fruits Fram ( Daricupe Road ) Road By BC at Ch. 00-700m. 0.4830 14.000 M/S. Yakub & Brothers 14.000 100 02/01/2019  
25 GCHDP-WD-VZR–CHT-RANG –MAIN-16/06 Murad nagar East Road By BC at Ch. 1390–1873m. 1.0000 14.000 M/S. F. R Traders 14.000 15/05/2017 22/09/2017 100 02/01/2019  
26 GCHDP-WD-UNR–CHT-RANG–MAIN-16/01 Ram Mohan Sikder Road (Rangunia UP - Tarachan Hat).Road By Seal Coat at Ch. 00–1531m. 1.2300 11.000 Khaja Gorebay Newaz Enterprise 11.000 05/02/2017 12/06/2017 100 02/01/2019  
27 GCHDP-WD-VZR-RANG -MAIN-16/08 Magon road S. Rajanagar Road By Re-Seal at Ch.00-1226m 0.5700 7.730 M/S. Alamgir Enterprise 7.730 09/01/2017 16/05/2017 100 02/01/2019  
28 GCHDP-WD-VZR-RANG -MAIN-16/05 Sufipara Dargha Road By Re-Seal at Ch. 00-572m 0.9900 15.990 M/S. Nurullah Enterprise 15.990 10/01/2017 17/05/2017 90 02/01/2019  
29 GCHDP-WD-FRB-RANG -MAIN-16/01 Maintenance of Hazee Sayed Ali Road By Dence Carpation at Ch.3655-4640m 0.000 M/S. Akhi International 0.000 19/04/2016 26/02/2017 100 02/01/2019  
11 Raojan
1 GCHDP-WD-VZR-CHT- RAOZ-EX-18/143 Development of Kadalpur Alam Bari Road By RCC at Ch.00-271m. 1.0030 37.720 M/S. Fabiha Enterprise 37.720 03/06/2018 05/10/2018 100 02/01/2019  
2 GCHDP-WD-VZR-CHT- RAOZ-EX-18/142 Development of Kadalpur Parir Dighirpar Pachim Kadalpur Barua Para Road Parir Dighirpar Santo Babu Bari Road By RCC at Ch. 00-1003m. 0.3950 107.070 M/S. Erfan Enterprise 107.070 90 02/01/2019  
3 GCHDP-WD-VZR-CHT- RAOZ-EX-17/141 Paschim Baruapara Student Road By HBB at Ch.CH.00-395m. 0.4600 26.750 M/S. Salam & Brother’s 26.750 0 02/01/2019  
4 GCHDP/WD/ /VZR/ CHT-RAOZ -18/36 Yar Mohammad Chowdury Road By BC at Ch.00-460m. 0.6740 30.530   30.530 0 02/01/2019  
5 GCHDP/WD/ /VZR/ CHT-RAOZ -18/34 Shahid Eskander Bari Road By HBB at Ch.60-734m. 0.3500 23.730 M/S. Hoque & Brothers 23.730 80 02/01/2019  
6 GCHDP/WD/ /VZR/ CHT-RAOZ -18/78 Gohira Ismail Road By RCC at Ch.850-1200m. 0.2000 39.860 M/S.Sayem Trading 39.860 0 02/01/2019  
7 GCHDP/WD/ /VZR/ CHT-RAOZ -18/33 Kabir Ahmed Talukder (Gohira) Road by RCC at Ch.2200-2400m. 0.1370 14.780 M/S.S. M Trading 14.780 100 02/01/2019  
8 GCHDP/WD/ /VZR/ CHT-RAOZ -18/125 Shil Bari Road By HBB at Ch. 218-355m. 0.2000 5.910 M/S. K. Alam Traders 5.910 0 02/01/2019  
9 GCHDP/WD/ /VZR/ CHT-RAOZ-18/35 Mobarek khil Jame Mosque Road By RCC at Ch. 509-709m. 0.6740 14.650 M/S. Fabiha Enterprise 14.650 100 02/01/2019  
10 GCHDP-WD-VZR-RAOZ-17/34 Sahid Eskander Bari Road by HBB at Ch.60-734m. 0.2600 21.790   21.790 0 02/01/2019  
11 GCHDP-WD- VZR -RAOZ-17/27 Zinath Ali Munshi & Mohammed Ali Munshi road By HBB at Ch. 00-260m. 0.7000 8.800 M/S. S. M. Trading 8.800 07/12/2017 14/04/2018 100 02/01/2019  
12 GCHDP-WD-VZR-RAOZ-17/01 Development of Hafez Bazlur Rahman (R&H) near At Gowrisankar hat GC to Raojan Noapara Section-1 (R&H) via Ragunondon Hat (Rawali Road-1) By BC at Ch.4180-4880m. 0.2500 39.690   39.690 0 02/01/2019  
13 GCHDP-WD-VZR-RAOZ-17/83 Development of Pachim Gohira Azim Habilder Bari Road By BC at Ch. 00-250m. 0.3550 13.990 M/S Atik Traders 13.990 17/09/2017 24/01/2018 100 02/01/2019  
14 GCHDP-WD-VZR-RAOZ-17/43 Development of Noajishpur Yousuf Chowdury Road By HBB at Ch. 00-355m. 0.2630 12.030 M/S. M.R Construction 12.030 02/08/2017 09/12/2017 100 02/01/2019  
15 GCHDP-WD-VZR-RAOZ-17/ 57 Development of Binajuri Nobin Mohajan Road By HBB at Ch. 1009-1272m. 0.7500 9.040 M/S.Bizid Enterprise 9.040 09/08/2017 16/12/2017 100 02/01/2019  
16 GCHDP-WD-VZR-RAOZ-17/46 Development of Mina Akbar Road By RCC at Ch. 00-750m. 0.2200 39.890 M/S. S.M Trading. 39.890 03/08/2017 10/12/2017 100 02/01/2019  
17 GCHDP-WD-VZR-RAOZ-17/59 Development of Bankeem Chandra (Binajuri) Road By HBB at Ch. 00-220m. 0.3000 7.970 M/S. Iqbal & Brothers 7.970 21/08/2017 28/12/2017 100 02/01/2019  
18 GCHDP-WD-VZR-RAOZ-17/09 Nokul Moholder Bari to Noapara Section-1 Road By HBB at Ch. 500-800m. 0.3200 14.590 M/S. Samiun Enterprise 14.590 0 02/01/2019  
19 GCHDP-WD-VZR-RAOZ-17/ 50 Uttar Guzra Biswash Prymari School (East Guzra) Road By HBB at Ch. 00-320m. 0.2850 12.580 M/S. M. A Traders 12.580 22/08/2017 29/01/2018 100 02/01/2019  
20 GCHDP-WD-VZR-RAOZ-17/85 Mukbul Shah (Sultanpur Hazi Para) By HBB at Ch. 447-732m. 0.2390 10.520 M/S. M.R Construction 10.520 05/12/2017 12/04/2018 100 02/01/2019  
21 GCHDP-WD-VZR-RAOZ-17/47 Fatehnagor Abdullahpur Road By HBB at Ch. 00-239m. 0.2350 7.750 M/S. S.M Trading. 7.750 03/08/2017 10/12/2017 100 02/01/2019  
22 GCHDP-WD-VZR-RAOZ-17/28 Development of Fatanagor Ashad Ali Munshi Road By HBB at Ch. 00-235m. 0.3900 8.340 M/S. S. M. Trading 8.340 25/04/2018 02/09/2018 100 02/01/2019  
23 GCHDP-WD-VZR-RAOZ-17/45 Noajishpur Hazi Azizur Rahman Chowdury Road By HBB at Ch. 00-390m. 0.2480 12.850 M/S.M.R Construction. 12.850 28/08/2017 04/01/2018 100 02/01/2019  
24 GCHDP-WD-VZR-RAOZ-17/44 Abul Khayer Munshi Road By RCC at Ch. 00-248m. 0.4250 16.570 M/S. S. M. Trading 16.570 24/09/2017 28/02/2018 100 02/01/2019  
25 GCHDP-WD-VZR-RAOZ-17/80 Raojan Kulal Para Road By HBB at Ch. 00-425m. 0.3480 14.290 M/S. K. AlamTraders 14.290 07/09/2017 14/01/2018 100 02/01/2019  
26 GCHDP-WD-VZR-RAOZ-17/64 Edilpur Shakomoni Beheri (Binajuri) Road By HBB at Ch.612-960m. 0.3200 12.940 M/S. Pubali Traders 12.940 100 02/01/2019  
27 GCHDP-WD-VZR-RAOZ-17/74 Development of Jarul tala (Raojan Section-2 road-Lalangra road) Road By HBB at Ch. 00-320m. 0.3700 9.150 M/S. Mithila Associates 9.150 03/08/2017 10/12/2017 100 02/01/2019  
28 GCHDP-WD-VZR-RAOZ-17/91 Barub Kundu Road By HBB at Ch. 610-980m. 0.3000 12.000 M/S. Chowdhury Enterprise 12.000 29/01/2018 05/06/2018 100 02/01/2019  
29 GCHDP-WD-VZR-RAOZ-17/55 Kadalpur Jamader Bari Road By HBB at Ch. 00-300m. 0.3240 9.690 M/S. Salam & Brother's 9.690 26/09/2017 03/02/2018 100 02/01/2019  
30 GCHDP-WD-VZR-RAOZ-17/52 Kadalpur Kalakatar Para Road By HBB at Ch.00-324m. 0.3240 10.400 M/S. Salam & Brother's 10.400 21/09/2017 28/01/2018 100 02/01/2019  
31 GCHDP-WD-VZR-RAOZ-17/22 Kadalpur Alam Bari Road By HBB at Ch. 00-324m. 0.2800 10.370 M/S. Salam & Brother’s 10.370 26/09/2017 03/02/2018 0 02/01/2019  
32 GCHDP-WD-VZR-RAOZ-17/108 Noapara Surjan Sen Road By HBB at Ch.00-280m. 0.2700 9.100 M/S. Pubali Traders 9.100 06/09/2017 13/01/2018 100 02/01/2019  
33 GCHDP-WD-VZR-RAOZ-17/99 R.D Mohamadia Road-Pahartali Road By HBB at Ch. 00-270m. 0.3000 8.660 M/S. M. R. Construction 8.660 100 02/01/2019  
34 GCHDP-WD-VZR-RAOZ-17/98 Development of R.D (Ram Dulal) Road By HBB at Ch.550-850m. 0.2360 9.690   9.690 0 02/01/2019  
35 GCHDP-WD-VZR-RAOZ-17/19 Development of Kadalpur Miajan Hazi Bari Road By HBB at Ch. 14-250m. 0.2280 7.570 M/S. Salam & Brother’s 7.570 26/09/2017 03/02/2018 100 02/01/2019  
36 GCHDP-WD-VZR-RAOZ-17/18 Development of Mulla Miskin Shah Road By HBB at Ch. 492-720m. 0.4700 7.520 M/S. Salam & Brothers 7.520 08/08/2017 15/12/2017 100 02/01/2019  
37 GCHDP-WD-VZR-RAOZ-17/81 GCHDP-WD-VZR-RAOZ-17/18 ID No. 415745634 Development of Raojan Sultan Auliya Road By HBB at Ch. 1500-1970m, 0.7320 15.300 M/S.K. Alam Traders 15.300 09/08/2017 16/12/2017 100 02/01/2019  
38 GCHDP-WD-VZR-RAOZ-17/03 Development of Nazir Ahmed Road By HBB at Ch. 00-732m. 0.5000 23.750 M/S. M.R Construction 23.750 02/11/2017 09/03/2018 100 02/01/2019  
39 GCHDP-WD-VZR-RAOZ-17/10 Development of Chickdair Shaheb Bari road By 25mm Carpeting 2000-2500m. 0.2010 27.960 M/S.Bizid Enterprise 27.960 09/08/2017 16/12/2017 100 02/01/2019  
40 GCHDP-WD-VZR-CHT-RAOZ- 17/127 Forest Office Road By RCC at Ch: 00-201m. 25.480 M/S. Hoque & Brothers 25.480 07/08/2017 14/12/2017 100 02/01/2019  
41 GCHDP-WD-VZR-CHT-RAOZ-STR-17/65 Construction of 13.00m Long RCC Slab Bridge at Rangamati Road to West Raozan Near Pink City Khal at Ch.5m. 0.3000 95.170 M/S. Hoque & Brothers 95.170 07/08/2017 09/08/2018 100 02/01/2019  
42 GCHDP-WD-VZR-RAOZ-17/112 Braman Das Para Jala Kumare road by HBB Ch. 00-300m 0.3000 14.020 M/S. Fabiha Enterprise 14.020 06/07/2017 13/11/2017 100 02/01/2019  
43 GCHDP-WD-VZR-RAOZ-17/111 Baguan Guccy Das Para road by HBB Ch.00-300m. 0.4220 14.020 M/S. Fabiha Enterprise 14.020 06/07/2017 13/11/2017 100 02/01/2019  
44 GCHDP-WD-VZR-RAOZ-17/62 Binajuri Ganoshree Road By HBB Ch.334-756m 0.4900 14.020 M/S. Pubali Traders 14.020 28/06/2017 05/11/2017 100 02/01/2019  
45 GCHDP-WD-VZR-RAOZ-17/51 Kagatia Motsha Heasery road by HBB Ch. 00-490m 14.020 M/S Sayem Thate Enterprise 14.020 12/06/2017 19/10/2017 100 02/01/2019  
46 GCHDP-WD-VZR-RAOZ-17/30 Abdul Slam School Road From Mogdai Link Road/Mazar Gate From Rupcand Nager road Last Protion and Munshi Bari road By HBB at Ch. 00-250m, 00-165m & 00-337m. 0.3250 14.020 Sayma Thate Enterprise 14.020 28/06/2017 05/11/2017 100 02/01/2019  
47 GCHDP-WD-VZR-RAOZ-16/36 Ali Mohammad Chowdury road By HBB at Ch. 00-325m 0.4270 14.020 M/S. S. M Trading 14.020 22/05/2017 29/09/2017 100 02/01/2019  
48 GCHDP-WD-VZR-RAOZ-16/29 Moulana Abdul Jalil road /Parinibash bihar road and Muktijuddha Sunil borua road at Ch.50-477m 0.2000 10.330 Sayma Thate Enterprise 10.330 28/06/2017 05/11/2017 100 02/01/2019  
49 GCHDP-WD-VZR-RAOZ-16/133 Nayam Munshe bari road by RCC at Ch. 00-200m 0.1000 8.890 M/S M. A Traders 8.890 12/06/2017 19/10/2017 100 02/01/2019  
50 GCHDP-WD-VZR-RAOZ-16/26 Noajishpur north Fatanager road By RCC at Ch.510-610m 0.0980 7.780 M/S S. M. Trading 7.780 22/05/2017 29/09/2017 100 02/01/2019  
51 GCHDP-WD-VZR-RAOZ-16/129 Janata Bank and Mosque connecting (Santirdip South Sartta road) road by RCC at Ch.350-448m 0.1300 5.260 M/S. S. M Trading 5.260 11/05/2017 18/09/2017 100 02/01/2019  
52 GCHDP-WD-VZR-RAOZ-16/84 Hazi para Baro Mawlana road By RCC at Ch.00-78m & 579-631m 0.2450 8.480 M/S. Ramim & Brothers 8.480 25/04/2017 09/09/2017 100 02/01/2019  
53 GCHDP-WD-VZR-RAOZ-16/79 Pachim Gohira Buddha Behir (Santimoy Bihar) road by RCC at Ch.181-426m 0.5000 20.320 M/S Sayem Traders 20.320 12/06/2017 19/10/2017 100 02/01/2019  
54 GCHDP-WD-VZR-RAOZ-16/69 Chickdair Yeshain house road By RCC at Ch.00-500m 0.3350 31.400 M/S. Hasnain Syndicate. 31.400 16/08/2017 23/12/2017 100 02/01/2019  
55 GCHDP-WD-VZR-RAOZ-16/42 of Shahnager road by RCC Ch.00-85m & 670-920m 0.5400 22.710 M/S. Baizid Enterprise 22.710 04/05/2017 11/09/2017 100 02/01/2019  
56 GCHDP-WD-VZR-RAOZ-16/06 Noapara Patia para road (Majamdar bari) By RCC Ch.00-450m 0.8190 20.060 M/S. Nipa Enterprise 20.060 22/05/2017 29/09/2017 100 02/01/2019  
57 GCHDP-WD-VZR-RAOZ-16/05; Phartali R.D. Mohammada (Ram Dulal) road by RCC Ch. 2860-3679m 0.6550 54.310 M/S.I.S Trading 54.310 28/06/2017 05/11/2017 100 02/01/2019  
58 GCHDP-WD-VZR-RAOZ-16/02; Pachim Gahira Brick Field RHD-Mohammed Towkir hat GC (Ichapur road) By RCC at Ch. 340-995m. 0.2000 51.170 M/S. Fabiha Enterprise 51.170 03/05/2017 10/09/2017 100 02/01/2019  
59 GCHDP-WD-VZR-RAOZ-16/12 Keotia road By HBB at Ch.1000-1200m. 0.4800 5.300 M/S. K. Alam Traders 5.300 28/02/2017 07/07/2017 100 02/01/2019  
60 GCHDP-WD-VZR-RAOZ-16/58 Development of Binajuri Purna Chandra road By HBB at Ch.350-830m 0.2140 9.540 M/S. Pubali Traders 9.540 100 02/01/2019  
61 GCHDP-WD-VZR-RAOZ-16/139 Baguan Asarja Para oad by HBB at Ch. 00-214m 0.2920 6.010 M/S. Fabiha Enterprise 6.010 20/02/2017 30/11/2017 100 02/01/2019  
62 GCHDP-WD-VZR-RAOZ-16/118 Gohira Moha Kabi Nobin Sen Road By HBB at Ch. 120-412m 0.1920 6.690 M/S. J.A Enterprise 6.690 19/02/2017 26/06/2017 100 02/01/2019  
63 GCHDP-WD-VZR-RAOZ-16/113 Baguan Panchkhine Nath para road by HBB. Ch.00-192m 0.9530 4.380   4.380 0 02/01/2019  
64 GCHDP-WD-VZR-RAOZ-16/105 East Urkirchar Sawdagorpara Connecting (Mohahammed Taki, Al-Haz Najir Ahmed Bari) road By HBB at Ch.817-1770m 0.5000 28.900 M/S. Bizid Enterprise 28.900 16/08/2017 23/12/2017 100 02/01/2019  
65 GCHDP-WD-VZR-RAOZ-16/104 Sarker Para road (Samiuddin Matabor Mosque-Sujar para) By HBB at Ch.200-700m 0.5000 11.940   11.940 0 02/01/2019  
66 GCHDP-WD-VZR-RAOZ-16/101 Tita Gazi road (East Guzra Ander manik Rahamania) by HBB. Ch.135-635m 0.2850 12.730   12.730 0 02/01/2019  
67 GCHDP-WD-VZR-RAOZ-16/97 Pahartoli Shahadulla Kazibari road by HBB. Ch. 00-285m 0.2140 6.700 M/S. Salam & Brother's 6.700 22/03/2017 29/07/2017 100 02/01/2019  
68 GCHDP-WD-VZR-RAOZ-16/94 Raozan Mohammedpur Mohajan Bari Road by HBB at Ch. 00-94m & 246-366m 0.2520 5.500 M/S. M. R Cosntruction 5.500 08/02/2017 15/06/2017 100 02/01/2019  
69 GCHDP-WD-VZR-RAOZ-16/93 Moddha Chickdair Saymachran road by BC at Ch.975-1227m 0.4000 25.310   25.310 0 02/01/2019  
70 GCHDP-WD-VZR-RAOZ-16/89 Joynager Barua para Shashan road By HBB at Ch.00-400m 0.8000 10.400 M/S. K. Alam Traders 10.400 28/02/2017 07/07/2017 100 02/01/2019  
71 GCHDP-WD-VZR-RAOZ-16/88 Ali Hossain Fakir road By HBB at Ch.230-235m, 300-1060m & 1800-1835m 0.3600 24.880 Hazrat Shahjalal Brick Manufacturers 24.880 04/04/2017 11/08/2017 100 02/01/2019  
72 GCHDP-WD-VZR-RAOZ-16/87 Haladin Karagar bari road By HBB at Ch.500-860m 0.5500 9.990 M/S Iqbal & Brothers 9.990 29/05/2017 05/10/2017 100 02/01/2019  
73 GCHDP-WD-VZR-RAOZ-16/72 Dabua Dakkin Hingala Santi nagor road (East Guzra Hajir Pul road) By HBB at Ch. 00-550m. 0.3600 14.080 M/S. Munna Enterprise 14.080 22/03/2017 29/07/2017 60 02/01/2019  
74 GCHDP-WD-VZR-RAOZ-16/63 Binajuri Boddho Mandir road by HBB at Ch.00-360m 0.3900 8.530 M/S. Sayma Thate Enterprise 8.530 07/03/2017 14/07/2017 100 02/01/2019  
75 GCHDP-WD-VZR-RAOZ-16/60 Raozan Napara Section-1 (R&H) road at Chitaipara-Raozan-Noapara Section-1 (R&H) at Kagotia hat (KM) via Langara Para road (Lalangara para road) By HBB at Ch.2000-2390m 0.5800 7.970   7.970 0 02/01/2019  
76 GCHDP-WD-VZR-RAOZ-16/56 Samser para (Kadalpur) road by HBB at Ch.00-580m 0.4350 13.350 M/S. Salam & Brother's 13.350 22/03/2017 30/07/2017 100 02/01/2019  
77 GCHDP-WD-VZR-RAOZ-16/54 Kadalpur Bumor para road by HBB at Ch.100-535m 0.3000 10.050 M/S. Salam & Brother's 10.050 22/03/2017 30/07/2017 100 02/01/2019  
78 GCHDP-WD-VZR-RAOZ-16/53 Kadalpur Shieakdar para Kazi para road by HBB at Ch.150-450m 1.5400 7.590 M/S. Salam & Brother's 7.590 22/03/2017 30/07/2017 100 02/01/2019  
79 GCHDP-WD-VZR-RAOZ-16/49 East Guzra Shat Baria road by HBB at Ch.00-1540m 0.9500 38.030 M/S. Munna Enterprise 38.030 22/03/2017 29/07/2017 95 02/01/2019  
80 GCHDP-WD-VZR-RAOZ-16/48 Karim member (Hafazea Madrasha) road by HBB at Ch.00-950m 0.5200 24.540 M/S.Kashem Enterprise 24.540 10/04/2017 27/03/2018 100 02/01/2019  
81 GCHDP-WD-VZR-RAOZ-16/37 Raozan Rashidar para Chan mia road by HBB Ch.3480-4000m 0.4000 13.850 M/S. K. Alam Traders 13.850 28/02/2017 07/07/2017 100 02/01/2019  
82 GCHDP-WD-VZR-RAOZ-16/32 Mohash Pondit bari & Dr.Bola nath road by HBB Ch.00-240m & 00-160m 0.4390 8.170 M/S. S. M. Traders 8.170 16/02/2017 14/07/2017 100 02/01/2019  
83 GCHDP-WD-VZR-RAOZ-16/25 Lalangara Dost Mohamed (Binajuri) road by HBB Ch. 75-514m 0.1700 9.730   9.730 0 02/01/2019  
84 GCHDP-WD-VZR-RAOZ-16/23 Kadalpur Kala mia Baper bari road by HBB Ch.80-250m 0.3700 4.020 M/S. Salam & Brother's 4.020 16/03/2017 23/07/2017 100 02/01/2019  
85 GCHDP-WD-VZR-RAOZ-16/21 Kadalpur Dakkin Joynager Pachim barua para road by HBB Ch.490-860m 0.3620 8.640 M/S. Salam & Brother's 8.640 16/03/2017 23/07/2017 100 02/01/2019  
86 GCHDP-WD-VZR-RAOZ-16/17 Kagotia Abu Mia/Ahmad Sagir and Farikur Bari Road by HBB at Ch. 00-162m, 00-80m, 00-90m & 90-120m 0.4250 8.170 Sayma Thate Enterprise 8.170 05/03/2017 12/07/2017 100 02/01/2019  
87 GCHDP-WD-VZR-RAOZ-16/16 Development of Gulzar Para Village road/Kashem Nagar Road and Badsha Mia Bari Road by HBB at Ch. 00-100m, 00-100m, 00-30m, 00-60m, 60-260 & 00-36m 0.5000 10.300 Sayma Thate Enterprise 10.300 05/03/2017 12/07/2017 100 02/01/2019  
88 GCHDP-WD-VZR-RAOZ-16/11 Raozan Shab babi road by HBB Ch.2000-2500m 0.4000 13.370 M/S. K. Alam Traders 13.370 28/02/2017 07/07/2017 100 02/01/2019  
89 GCHDP-WD-VZR-RAOZ-16/04 Holadia Gada Moulavi road by HBB Ch.450-850m 0.3800 10.980 M/S. Iqbal & Brothers 10.980 16/02/2017 23/06/2017 100 02/01/2019  
90 GCHDP-WD-VZR-CHT- RAOZ -16/138 Sarkar para Mog Chitta last portion / Intaj Barii Road by HBB at Ch: 300m-630m & 00-50m. 0.5860 10.000 Sayma Trate Enterprise 10.000 18/07/2016 25/11/2017 100 02/01/2019  
91 GCHDP-WD-VZR-CHT-RAOZ-16/110 Baguan Nasim Jangle Road (Koye para-Shil para) by HBB at Ch. 2000-2586m. 0.2040 8.000 Mrs. Sabb Traders 8.000 26/10/2016 02/03/2017 100 02/01/2019  
92 GCHDP-WD-VZR-RAOZ-16/106 Moiskoran Hazrat Rostom Sha Rahmat Ulla road,Har para Road,Sakemder bari Road (Bajakhali Nath para, Joy nagor Road by HBB at Ch.00-132m,00-32m & 00-40m. 0.2000 6.000 M/S. M.A Traders 6.000 06/06/2017 13/10/2017 80 02/01/2019  
93 GCHDP-WD-VZR-CHT- RAOZ -16/96 Pahartali Sheakh para to Khan para Road By RCC at Ch: 00m-200m. 0.2000 8.000 M/S. Sonali Traders 8.000 24/07/2016 15/06/2017 100 02/01/2019  
94 GCHDP-WD-VZR-CHT- RAOZ -16/95 Pahartali Khan para Rroad By RCC at Ch: 00m-200m. 0.3000 8.000 M/S. Sonali Traders 8.000 24/07/2016 15/06/2017 100 02/01/2019  
95 GCHDP-WD-VZR-CHT- RAOZ -16/75 Kundeshari Ram Jiban Road By BC at Ch: 00m-300m. 0.0700 10.000 M/S. Suja Enterprise 10.000 16/10/2016 23/02/2017 100 02/01/2019  
96 GCHDP-WD-VZR-CHT- RAOZ -16/46 Mina Akbor Road(Damage Portion) By HBB at Ch. 500-570m. 0.7300 6.000 M/S. S. M Trading 6.000 18/12/2016 25/04/2017 100 02/01/2019  
97 GCHDP-WD-VZR-CHT-RAOZ -16/38 Raozan Hazi Morhom Nazmul Huda Chowdhury Road. By HBB at Ch. 00-210m, 245-315m & 315-450m. 0.2550 10.000 M/S Nahian Traders. 10.000 26/02/2017 100 02/01/2019  
98 GCHDP-WD-VZR-CHT- RAOZ -16/31 Kutia Batta para Road By HBB at Ch: 75m-330m. 1.0500 6.000 M/S.M.R Construction 6.000 30/06/2016 07/11/2016 100 02/01/2019  
99 GCHDP-WD-VZR-CHT-RAOZ-16/24 Khan Bahadur Abdul Jabbar-2 Kagatia Hat (LM) Via Sonair Muck (West Binajuri Sonair Muck) Road By HBB at Ch. 500-1550m. 0.3110 10.000 M/S Pubali Traders 10.000 03/11/2016 10/03/2017 100 02/01/2019  
100 GCHDP-WD-VZR-CHT- RAOZ -16/20 Kadalpur Battacharja para Road By HBB at Ch: 00m-311m. 0.3080 7.000 M/S. Iqbal & Brothers 7.000 19/07/2016 26/12/2016 100 02/01/2019  
101 GCHDP-WD-VZR-CHT- RAOZ-17/15 Raozan Rangamati Road – Pachim Raozan Road Near Pink City By RCC (Link) at Ch.CH.00-320m. 0.7300 28.070 M/S. Bostame Enterprise 28.070 19/02/2018 26/06/2018 100 02/01/2019  
102 GCHDP-WD-VZR-CHT-RAOZ-16/07 Madun Jungle Road (Noapara) By BC at Ch. 240-620m. 16.000 M/S. Suja Enterprise 16.000 17/10/2016 24/02/2017 100 02/01/2019  
103 GCHDP-WD-UNR-RAOZ-17/10 Development of Chittagong -Kaptai R&H road at Managazi to Baizzakhali Bazar LM at Urkirchar UP Office Road Minagazi Urkirchot By Danse Carpeting at Ch. 00-766m (ID No. 415743014) 0.3000 30.800 M/S. Fabiha Enterprise 30.800 07/05/2018 14/09/2018 80 02/01/2019  
104 GCHDP-WD-UNR-RAOZ-17/08 Development of Noapara Kachukine Road By BC at Ch. 2300-2600m. 0.8500 6.050 M/S. Pubali Traders 6.050 06/09/2017 13/01/2018 0 02/01/2019  
105 GCHDP-WD-UNR-CHT-RAOZ- 17/01 Chikdair UP office Maddya Pathanpara Kagatia Hat (R&H) via Kundasshari road By RCC at Ch. 4000-4440m & Ch. 4440-4850m (Kundasshari Road) By HBB. 1.3120 40.400 M/S. S. M. Trading 40.400 03/10/2017 10/02/2018 100 02/01/2019  
106 GCHDP-WD-UNR-CHT-RAOZ-16/09 Amir Hat G.C-Fatickchari Upazila Connect South Karim( via Holadia UP Office) Road By BC & HBB at Ch.2208-2350m & 5130-6300m. 0.8600 45.000 Mrs. Iqbal & Brothers. 45.000 23/10/2016 30/03/2017 100 02/01/2019  
107 GCHDP-WD-UNR-CHT-RAOZ-16/07 Gohira Fatickchari(R&H) Road to Ichapur(UZR) Road via Gohira Union Parisad Road By BC at Ch. 440-1300m. 1.1410 54.000 Mrs. Fabiha Enterprise. 54.000 17/10/2016 15/06/2017 100 02/01/2019  
108 GCHDP-WD-UNR-CHT-RAOZ-16/02 Section-3 Dabua/Chickdair Akbar Saha Road By BC at Ch. 4036-5177m. 56.000 M/S Aziz Monoara Enterprise 56.000 31/10/2016 07/04/2017 100 02/01/2019  
109 GCHDP-WD-VZR–CHT-RAOZ–MAIN-17/03 Abdul karim Road (Haludia UP) By RCC at Ch.600-700m & 750-1252m. 0.2860 21.150 M/S. Hazrat Shahjalal Bricks Manufactruer 21.150 20/09/2017 27/11/2017 100 02/01/2019  
110 GCHDP-WD-VZR–CHT-RAOZ–MAIN-17/07 A.K.M Fajlul Kabir Chowdhury Road By RCC at Ch. 00-226m & 00-60m. 0.6000 22.440 M/S. Hoque & Brothers 22.440 05/12/2017 12/02/2018 100 02/01/2019  
111 GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/08 Mohammed Zaman (Jonab Bibi) Road( Rawli Road to Ctg Kaoti Road) By Dense Carpeting at Ch. 00-600m. 1.1150 15.580 M/S. Munna Enterprise 15.580 17/08/2017 24/11/2017 100 02/01/2019  
112 GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/09 khan Bahadur Abdul Jabbor road-1 – Binajuri Sonair Muck Via Gohira Jamtol Road (khan Bahadur Abdul Jabbor road-2 )By Dense Carpeting at Ch. 00-1115m. 2.0000 29.970 The Paramount International 29.970 05/03/2018 12/06/2018 100 02/01/2019  
113 GCHDP-WD-VZR–CHT-RAOZ –MAIN-17/01 Chittagong – Rangamati (R&H) Road-Chikdair UP (Shaheb Bari Road) By Dense Carpeting at Ch. 00-2000m. 1.0000 43.010 M/S. Fabiha Enterprise 43.010 29/11/2017 06/03/2018 40 02/01/2019  
114 GCHDP-WD-FRB–CHT-RAOZ–MAIN-17/01 Gohira R&H Halda Ghat at Hatajari ( Khan Bahadur Abdul Jabbar Road-1)( From RHD#100) By RCC( Link) at Ch. 00-100m. 15.460   15.460 0 02/01/2019  
12 Sandwip
1 GCHDP-WD-VZR-CHT-SAND -16/07 Afsar Uddin Road By RCC at Ch. 475m-890m. 0.4150 22.000 M/S. Lucky Enterprise 22.000 12/06/2017 19/10/2017 100 02/01/2019  
2 GCHDP-WD-VZR-CHT-SAND -16/10 Bosidia Road By RCC at Ch. 1015m-1430m. 0.4150 22.000 M/S.Rasael and Brothers 22.000 28/02/2017 07/07/2017 100 02/01/2019  
3 GCHDP-WD-VZR-CHT-SAND -16/13 G.K & College Road By RCC at Ch. 00m-415m. 0.4150 22.000 M/S. Lucky Enterprise 22.000 12/06/2017 19/10/2017 100 02/01/2019  
4 GCHDP-WD-VZR-CHT-SAND -16/09 Bauria Cross Road By RCC at Ch. 2585m-3000m. 0.4100 22.000 M/S.Rasael and Brothers 22.000 100 02/01/2019  
5 GCHDP-WD-VZR-CHT-SAND -16/06 Kalapania Eidgha Road By RCC at Ch. 1000-1415m 0.4150 22.000 M/S.The Engineers Syndicate 22.000 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-SAND -16/19 Pachuya Road By RCC at Ch. Ch. 1200-1615m. 0.4100 22.000 M/S. Munna Enterprise 22.000 31/07/2017 07/01/2018 100 02/01/2019  
7 GCHDP-WD-VZR-CHT-SAND -16/18 Fakirnama Road By RCC at Ch. 00-410m 0.4150 22.000 M/S Shiblu & Brothers 22.000 03/11/2016 10/04/2017 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-SAND -16/16 Sikder Road By RCC at Ch. 00-415m. 0.4150 22.000 M/S Nazrul Islam & Brothers 22.000 19/10/2016 26/03/2017 100 02/01/2019  
9 GCHDP-WD-VZR-CHT-SAND -16/12 solaimanis Road By RCC at Ch. Ch. 1200-1615m 0.4100 22.000 M/S Globe Enterprise 22.000 31/01/1900 07/04/2017 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-SAND -16/03 Maitbanga-Mogdhara Ferrig Ghat Road By RCC at Ch. 1600-2010m. 0.6550 35.340 M/S Globe Enterprise. 35.340 31/10/2016 07/04/2017 0 02/01/2019  
11 GCHDP-WD-VZR-CHT-SAND -16/02 Gasua-Bauria Border Road (East Part upto Gasua Feri Ghat road Md. Zamalul Mowla Road) By RCC at Ch. 00-300m, 2317-2517m & 4645-4800m 0.4150 22.000 M/S.Fathema Construction 22.000 100 02/01/2019  
12 GCHDP-WD-VZR-CHT-SAND -16/17 Bagai Road By RCC at Ch: 200-615m. 0.4150 22.000 M/S. Akash Enterprise 22.000 19/07/2017 26/11/2017 100 02/01/2019  
13 GCHDP-WD-VZR-CHT-SAND -16/15 Cross Road By RCC at Ch: 3965-4380m. 0.4150 22.000 M/S.S.R Enterprise 22.000 29/05/2016 05/05/2017 100 02/01/2019  
14 GCHDP-WD-VZR-CHT-SAND -16/14 Gulataki (Gashua Sontospur Border M. Obaidur Haque MP Road) Road By RCC at Ch: 200-615m. 0.4150 22.000 M/S.The Engineers Syndicate. 22.000 05/05/2016 12/09/2016 100 02/01/2019  
15 GCHDP-WD-VZR-CHT-SAND -16/05 Omed Ali Road By RCC at Ch: 150-565m. 0.4150 22.000 M/S.Zakir Hossain 22.000 29/05/2016 05/10/2016 100 02/01/2019  
16 GCHDP-WD-VZR-CHT-SAND -16/04 Chanu Meah Hazi Road By RCC at Ch: 350-765m. 0.4250 28.890 M/S H.K Traders. 28.890 03/11/2016 10/03/2017 100 02/01/2019  
17 GCHDP-WD-VZR-CHT-SAND -17/01 Harispur UP to Embankment Via Dwipallo GPS RHD (Maddya Bauria Road) Road By RCC at Ch.1400-1825m. 0.000 M/S. Fatema Construction 0.000 100 02/01/2019  
18 GCHDP-WD-UNR-CHT-SAND -17/04 Embankment to Circular Road Via Adarsho Para GPS & Shiber Hat GC (Abul Khair Khan Satgaria Road) Road By RCC at Ch.4140-4970m. 0.7000 55.000 Md.Zakir Hossain 55.000 0 02/01/2019  
19 GCHDP-WD-UNR-CHT-SAND -16/01 Circular (Sarikati UP HQ – Bangla Bazar) Road By RCC at Ch.1000m-1700m. 0.8500 56.000 M/S.Lucky Enterprise 56.000 06/03/2017 13/07/2017 100 02/01/2019  
20 GCHDP-WD-UNR-CHT-SAND -16/03 Palishar Road By RCC at Ch. Ch. 00-850m. 0.000 M/S Globe Enterprise. 0.000 31/01/2016 04/04/2017 100 02/01/2019  
21 GCHDP-WD-VZR–CHT-SAND–MAIN-18/03 Choyakhali Ferry ghat To RHD road (H/O Moulana Emdad) Via Sholoshore Bazar. (Choyakhali Ferry ghat road ) Road By RCC at ch.150-850m,1150-1225m&1500-1700m. 0.7300 27.750 M/S. Nowrin & Brothers 27.750 0 02/01/2019  
22 GCHDP-WD-VZR–CHT-SAND–MAIN-18/02 CC Cenrer Road (H/O Moyna) To RHD Road (Dip Bandu Mustafizur Rahaman High School Road) By RCC at ch.150-450m,550-710m,900-950m,1100-1140m &2340-2520m. 0.7000 27.750 M/S. AT Enterprise 27.750 100 02/01/2019  
23 GCHDP-WD-VZR–CHT-SAND–MAIN-18/01 DB Road (Fokir Go Tematha) to Embamkment via Sheberhat G.C, Noahat (Pachuya Road) Road By RCC at Ch. 305–740m,1105-1170m&1500-1700m. 0.000 M/S. Abul Mohsin 0.000 0 02/01/2019  
13 Satkania
1 GCHDP-WD-VZR-CHT-SATK-STR –EX-18/10 Construction of 3-Vent 4.5X4.5m RCC Box Culvert of Isamoti Jugipara Road on Isamoti Khal at Ch: 975m. 0.5000 18.810 M/S. Shah Amanat Trading 18.810 0 02/01/2019  
2 GCHDP-WD-VZR-CHT- SATK-18/09 Freedom Fighter Jalil Box Road (Ali Ahmed Chowdhury Road) By HBB at Ch.00-500m. 0.5000 16.500 M/S. A. K Chowdhury Enterprise 16.500 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-SATK -18/07 Development of Dharmapur Alamgir Govt. Prymari School - Kundukul Sadu dokan Dharmapur Dabar Sharif road Fakirpara Khundu Khul road By HBB at Ch.165-665m. 0.6000 16.500 Makka Bilders 16.500 0 02/01/2019  
4 GCHDP-WD-VZR-CHT-SATK -18/06 Rampur Madrasha sikder para Road By HBB at Ch.00-600m. 0.8800 28.000 M/S. ADS Builders 28.000 100 02/01/2019  
5 GCHDP-WD-VZR-CHT-SATK -16/08 Azimpur Road By HBB at Ch. 00-880m) 0.5850 28.000 Md.Habibur Rahman. 28.000 08/11/2016 15/03/2017 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-SATK -16/05 Choto Hatya Engineer Zia Road By BC at Ch: 00m-219m & 294m-660m. 0.5810 28.000 M/S.Kashem Brothers 28.000 21/06/2016 28/10/2016 100 02/01/2019  
7 GCHDP-WD-VZR-CHT-SATK -16/04 Sha Monsuria Road By BC at Ch: 00m-581m 0.6260 16.000 M/S.Chowdhury International 16.000 13/07/2016 20/11/2016 100 02/01/2019  
8 GCHDP-WD-VZR-CHT-SATK -16/03 Khordo Keyochia Primary School Road By HBB at Ch: 30m-659m 0.6260 16.000 M/S.Rima Construction 16.000 25/05/2016 01/10/2016 100 02/01/2019  
9 GCHDP-WD-VZR-CHT-SATK -16/02 Bichinna Para Ukhiyan kul Road By HBB at Ch: 100m-726m. 0.6000 16.000 M/S.Rima Construction 16.000 25/05/2016 01/10/2016 100 02/01/2019  
10 GCHDP-WD-VZR-CHT-SATK -16/01 Kalipur Dhala Road.(Morhoum Allama Fazlullah) By HBB at Ch: 2020m-2620m. 0.000 M/S.Kashem Brothers 0.000 15/05/2016 22/09/2016 100 02/01/2019  
11     0.000   0.000 0 02/01/2019  
12 GCHDP-WD-UNR-CHT-SATK -16/12 Bomang Hat-Sodaha U.P Via Mahalia Road.(Md. Abul Hossain Chowdhury road) By HBB at Ch. 6448-7011m) 0.6340 33.000 Md.Habibur Rahman 33.000 08/11/2016 15/03/2017 100 02/01/2019  
13 GCHDP-WD-UNR-CHT-SATK -16/10 Sadha U.P-Shamadiapukur Bazar Road By BC at Ch. 443-1107m) 0.3650 20.000 Md.Chowdhury International 20.000 07/11/2016 14/03/2017 100 02/01/2019  
14 GCHDP-WD-UNR-CHT-SATK-16/05 Demsha U.P.-Gholar Ghat Via Jut Pokuri Bazar Road By HBB at Ch.1600-1965m 0.7260 25.000 M/S. Rima Construction 25.000 26/12/2016 02/05/2017 100 02/01/2019  
15 GCHDP-WD-UNR-CHT-SATK -16/15 Keochia U.P-Bajalia U.P Road By HBB at Ch:6015m-6650m & 7009-7100m. 0.7640 36.000 Md.Habibur Rahman. 36.000 08/11/2016 15/04/2017 100 02/01/2019  
16 GCHDP-WD-UNR-CHT-SATK -16/14 Sodaha U.P-Kaliaish U.P-Master Hat Via Keocia. Road By BC at Ch:00m-764m. 0.5000 16.000 Md.Rima Construction. 16.000 06/11/2016 13/04/2017 70 02/01/2019  
17 GCHDP-WD-UNR-CHT-SATK -16/17 Khagoria U.P.-Nur Markat Via Mather Khil Road By HBB at Ch: 00m-500m. 0.8580 23.000 M/S.Rima Construction 23.000 30/06/2016 07/11/2016 100 02/01/2019  
18 GCHDP-WD-UNR-CHT-SATK -16/11 Kanchana U.P.-Monu Fakir Hat Road By HBB at Ch: 630m-1488m. 0.5970 16.000 M/S.Shafi Enterprise 16.000 13/07/2016 20/11/2016 100 02/01/2019  
19 GCHDP-WD-UNR-CHT-SATK -16/02 Eochia U.P- Jut Pokuria Bazar Road By HBB at Ch: 00m-597m. 0.6050 25.000 M/S.Shafi Enterprise. 25.000 13/07/2016 20/11/2016 100 02/01/2019  
20 GCHDP-WD-UNR-CHT-SATK -16/01 Amilaish U.P-Kanchana U.P.Via Hilimili Road By HBB at Ch: 2435m-3040m. 0.000 M/S.Chowdhury International 0.000 10/05/2016 17/09/2016 100 02/01/2019  
21 GCHDP-WD-FRB-CHT-SATK -16/07 Nalua-Satkania Road via Nalua Hadar Khal Bridge at 1.0 Km & Gatiadanga High School (from Ch.8.0 Km of Charati-Khoderhat-Noyahat-Bazalia (From RHD #143) Road By BC at Ch: 4620m-6156m. 2.3600 200.000 M/S. The Engineering Syndicate 200.000 09/10/2016 16/08/2016 100 02/01/2019  
22 GCHDP-WD-FRB-CHT-SATK -16/05 Karani Hat GC-Khagoria Bhor Bazar GC. Road By BC at Ch: 00m-2360m. 1.1000 117.000 M/S.Tohid & Brothers 117.000 13/07/2016 20/11/2016 100 02/01/2019  
23 GCHDP-WD-FRB-CHT-SATK -16/03 Dewan Hat GC-Tayari Hat GC (Lohagora) Satkania Portion By BC at Ch: 6850m-7950m 0.6480 63.000 M/S.Alam Enterprise 63.000 13/07/2016 20/01/2017 100 02/01/2019  
24 GCHDP-WD-FRB-CHT-SATK -16/01 Gatiadanga-Deodighi-Mirzakhil Road. (From RHD #146) Road By BC at Ch: 7552m-8200m. 0.000 M/S.Blue Bird. 0.000 11/07/2016 18/01/2017 100 02/01/2019  
25 GCHDP-WD-VZR–CHT-SATK –MAIN-17/01 Ali Ahmed Paran Hori Road (Jafar Ahmed Chowdhury Road) By Dense Carpeting at Ch. 00-1230m. 2.0000 40.000 M/S. Suborna Enterprise 40.000 31/05/2017 07/09/2017 100 02/01/2019  
26 GCHDP-WD-FRB–CHT-SATK–MAIN-18/01 Charati-Khoderhat-Moulavir Dokan-Bazalia-Bomang Hat-Noya hat Road By Dense Carpeting at ch.21000-23000m 0.000 M. S. Nirman Sangstha 0.000 0 02/01/2019  
14 Sitakunda
1 GCHDP-WD-VZR-CHT-SITA-17/13. Development of South Sonaisory Road By HBB at Ch. 472-733m. 0.3500 13.400   13.400 0 02/01/2019  
2 GCHDP-WD-VZR-CHT-SITA-17/20. Development of Polouan Para Rad By HBB at Ch. 00-350m. 0.3250 10.420 M/S. Three Star Enterprise 10.420 0 02/01/2019  
3 GCHDP-WD-VZR-CHT-SITA-17/11. Development of Nurur Rahman By HBB at Ch. 00-325m. 0.1900 6.700 M/S. Joynal & Brothers 6.700 15/11/2017 20/03/2018 100 02/01/2019  
4 GCHDP-WD-VZR-CHT-SITA-17/08. Development of Niagazi road By HBB at Ch. 610-800m. 0.2320 7.660   7.660 0 02/01/2019  
5 GCHDP-WD-VZR-CHT-SITA-17/23. Development of Motiar Rhaman Sarang road By HBB at Ch. 00-232m. 0.5000 16.650 M/S. Joynal & Brothers 16.650 15/11/2017 22/03/2018 100 02/01/2019  
6 GCHDP-WD-VZR-CHT-SITA-17/22. Development of Markentail Bank road By HBB at Ch. 00-500m 0.4000 13.400   13.400 0 02/01/2019  
7 GCHDP-WD-VZR-CHT-SITA -18/07 Mahmudabad Road By HBB at Ch: 418-773m. 0.4000 13.400 M/S. Joynal & Brothers 13.400 0 02/01/2019  
8 GCHDP-WD-VZR-CHT-SITA -16/02 Tarun Samiti Road By HBB at Ch: 332-747m. 0.000 M/S Murad & Sons. 0.000 07/11/2016 15/05/2017 100 02/01/2019  
9 GCHDP-WD--CHT- SITH-GC-18/01 Mirer Hat / Growth Center. 26.000 M/S. Nahian Enterprise 26.000 0 02/01/2019  
10 GCHDP-WD-UZR-CHT- SITA-STR-18/02 Construction of 30.00m Long PC Girder Bridge on Habib Ahmed Chowdhury Road at Ch.26900m, . 100.000 M/S. Nipa Enterprise 100.000 0 02/01/2019  
11 GCHDP-WD-FRB –CHT-SITA-MAIN -16/02 Habib Ahamed Chowdhury Road By Dense Carpeting at Ch. 23850–27463m. 0.000 Md. Omar Faruk 0.000 18/05/2016 25/09/2016 100 02/01/2019  
Total : 301.6220 (Km) 17845.30 (Lac) 17845.30 (Lac)