SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Anwara
|
|
1
|
GCP-3/Ctg/WD-194
|
Development of Shouth Sholkata S.J Nijam High School Road by BC at ch: 00-655m.
|
0.6550
|
57.160
|
|
57.160
|
|
|
0
|
21/01/2021
|
NOA Issued
|
|
2
|
GCP-3/Ctg/WDS-210
|
Development of Saodagar Dighi Road (Noldia GPS School Connecting Road by HBB at ch: 00-570m.
|
0.5700
|
42.940
|
|
42.940
|
|
|
0
|
21/01/2021
|
NOA Issued
|
|
3
|
GCP-3/Ctg/WD-215
|
Improvement of keyagar-Chatary Road by BC at ch: 0+550-1+550km.
|
1.0000
|
92.510
|
|
92.510
|
|
10/06/2021
|
0
|
21/01/2021
|
|
|
4
|
GCP-3/Ctg/WD-204
|
Development of Sarddar Para Road by BC at ch: 0+118-0+760km.
|
|
87.800
|
|
87.800
|
|
22/05/2021
|
0
|
21/01/2021
|
|
|
5
|
GCP-3/Ctg/WDS-198
|
Development of Bairage Pilot Road (Mohadebpur Government Primary School Connecting Road) by HBB at ch: 00-665m.
|
0.6650
|
39.100
|
|
39.100
|
|
07/03/2021
|
0
|
21/01/2021
|
|
|
6
|
GCP-3/Ctg/WDS-197
|
Development of East Gohira Government Primary School Connecting Road by HBB at ch: 00-230m.
|
0.2300
|
19.230
|
|
19.230
|
|
16/02/2021
|
0
|
21/01/2021
|
|
|
7
|
GCP-3/Ctg/WD-201
|
Construction of Bazar Sheed at Wahed Ali Bazar.
|
|
39.710
|
|
39.710
|
|
08/05/2021
|
0
|
21/01/2021
|
|
|
8
|
GCP-3/Ctg/WD-196
|
Development of Shilalia Jiori Fultoli R&H-Surat Bibi (Jan Ali Chowdhury Road) by BC at ch: 2500-2970m.
|
0.4700
|
44.510
|
|
44.510
|
|
07/04/2021
|
0
|
21/01/2021
|
|
|
9
|
GCP-3/Ctg/WD-195
|
Development of Shilalia Road (Barkal Bridge-Tisori Silalia Manurkhain Bazar Road) by BC at ch: 1000-1825m.
|
0.8250
|
81.470
|
|
81.470
|
|
07/04/2021
|
0
|
21/01/2021
|
|
|
10
|
GCP-3/Ctg/WD-121
|
Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC at. Ch: 5+220-5+930km.
|
0.7100
|
60.410
|
|
60.410
|
|
24/01/2021
|
40
|
21/01/2021
|
|
|
11
|
GCP-3/ctg/WDS-190
|
Development of Poroikora Churushila GPS Connecting Road by HBB
|
0.1400
|
12.320
|
M/S. H M FOUNDATION
|
12.320
|
|
16/12/2020
|
0
|
20/01/2021
|
|
|
12
|
GCP-3/ctg/WDS-189
|
Development of Banker Nurul Islam Chy Road (Ali Muddin Dovash GPS Connecting Road) by HBB
|
0.2330
|
9.760
|
M/S. M A S K CONSTRUCTION
|
9.760
|
|
|
0
|
20/01/2021
|
NOA ISSUED
|
|
13
|
GCP-3/ctg/WD-162
|
Develoment of Anowara R&H-Barakhain UP office Road via Badamtoki Bazar Road by BC
|
1.7800
|
167.110
|
M/S A ALI CHOWDHURY
|
167.110
|
|
09/03/2021
|
0
|
20/01/2021
|
|
|
14
|
GCP-3/ctg/WDS-181
|
Development of Cenamoti Government Primary School Connecting Road by HBB
|
0.9300
|
55.830
|
M/S. DOT ENTERPRISE
|
55.830
|
|
08/12/2020
|
30
|
20/01/2021
|
|
|
15
|
GCP-3/ctg/WDS-180
|
Development of West Raypor Government Primary School Connecting Road by HBB
|
1.0000
|
61.200
|
M/S. ALFI ENTERPRISE
|
61.200
|
|
03/11/2020
|
0
|
20/01/2021
|
|
|
16
|
GCP-3/ctg/WD-163
|
Develoment of Guzara Bazar-Haildhar UPC Road by BC
|
0.6650
|
75.670
|
M/S. RIDWANUL HOQUE & BROTHERS
|
75.670
|
|
04/12/2020
|
65
|
20/01/2021
|
|
|
17
|
GCP-3/ctg/WD-155
|
Development of Moina Gazi Road by BC
|
1.8900
|
190.590
|
M/S. SHAH JABBARIA CONSTRUCTION & CO.
|
190.590
|
|
12/11/2020
|
10
|
20/01/2021
|
|
|
18
|
GCP-3/ctg/WM-31
|
Maintenance of Pirkhain R&H-River Ghat via Haildhar UPC Road (Abdul Majid Chowdhury Road).
Maintenance of Anoara R&H Road-Khashama R&H Road.
|
1.9680
|
63.650
|
M/S. RIDWANUL HOQUE & BROTHERS
|
63.650
|
|
08/08/2020
|
5
|
20/01/2021
|
|
|
19
|
GCP-3/ctg/WD-115
|
A) Development of Kunir Bill Road by BC.
B) Development of Heti Khayin-Borkal Ghat Road (Basiruzzaman Road) by BC
|
1.8000
|
170.550
|
M/S. AZAD ENTERPRISE
|
170.550
|
|
21/01/2021
|
60
|
20/01/2021
|
|
|
20
|
GCP-3/ctg/WM-25
|
A) Maintenance of Barashat Gobadia Connecting Road by BC.
B) Maintenance of Anwara R&H-Barakhain UP Office Road via Badamtoli Bazar Road by BC .
C) Maintenance of Ayer Mongal R&H-Anner Ali Shikder Hat Road by BC
|
3.5500
|
101.030
|
M/S. Jashim & Brothers
|
101.030
|
|
04/01/2020
|
65
|
20/01/2021
|
|
|
21
|
GCP-3/Ctg/WD-96
|
Development of Anwara Joikali GC-Barakhain UP Office Road by BC
|
0.9600
|
100.890
|
M/S. Saired Enterprise
|
100.890
|
|
21/03/2020
|
70
|
20/01/2021
|
|
|
22
|
GCP-3/ctg/WD-43
|
Guzara-Tesury Rd
|
1.2150
|
109.940
|
M/s Jashim &Brothers
|
109.940
|
|
30/04/2020
|
70
|
20/01/2021
|
|
|
23
|
GCP-3/ctg/WD-159
|
Develoment of Shilaigora R&H-Sayed Kuchaiya Barkal PAB Road by BC
|
0.9150
|
85.040
|
M/S. ABDUS SABUR
|
85.040
|
|
05/10/2020
|
10
|
20/01/2021
|
|
|
24
|
GCP-3/Ctg/WD-61
|
A) Improvement of Lal Mohammad (Lal Mohoti) Road
B) Improvement of Boirag-Guapanchak Road
|
2.6250
|
191.960
|
M/s Al kutub & Brothers
|
191.960
|
|
25/01/2020
|
100
|
20/01/2021
|
final bill submit
|
|
25
|
GCP-3/ctg/WD-09
|
Pirkhain R&H-River Ghat via Haildhar UPC Rd.(Abdul Majid Chowdhury Rd).
|
1.5800
|
134.120
|
M/s SairedEntrrprise
|
134.120
|
|
20/10/2019
|
100
|
20/01/2021
|
final bill submited.
|
|
26
|
GCP-3/ctg/WM-27
|
Maintenance of Jiouria Fultoli R&H-Surut Bibe (Jan Ali Chowdhury Road) by BC
|
2.5000
|
59.990
|
M/S. Rima Construction
|
59.990
|
|
04/01/2020
|
100
|
20/01/2021
|
final bill paid
|
|
27
|
GCP-3/Ctg/WD-53
|
Improvement of Goni Shah Road
|
0.7920
|
61.790
|
M/S. Jashim & Brothers
|
61.790
|
|
20/08/2019
|
100
|
20/01/2021
|
|
|
28
|
GCP-3/ctg/WD-44
|
North Malghar Jame Mosque Road inc. link portion
|
0.2550
|
42.880
|
M/s Azad Entrrprise
|
42.880
|
|
14/06/2019
|
100
|
20/01/2021
|
final bill paid
|
|
29
|
GCP-3/ctg/WD-10
|
Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC
|
0.7100
|
60.410
|
M/S. ALIM & BROTHERS
|
60.410
|
|
23/06/2020
|
30
|
20/01/2021
|
|
|
|
2
|
Banskhali
|
|
1
|
GCP-3/ctg/WM-17
|
A) Maintenance of Boilgon Siraj Miah Road by BC.
B) Maintenance of Kotpara-Katharia-Bagmaara to Haliapara Road by BC
|
1.6400
|
44.720
|
M/S. H H Enterprise
|
44.720
|
|
06/09/2019
|
100
|
12/07/2026
|
final bill paid
|
|
2
|
GCP-3/Ctg/WD-85
|
A)Development of Baharchara Foyz Ullah Master Road by HBB.
B)Development of Shadanpur P.U.H.S to Karim Bazar Road by HBB
|
1.4000
|
74.770
|
M/S. Romena Enterprise
|
74.770
|
|
09/11/2019
|
100
|
12/07/2026
|
final bill paid.
|
|
3
|
GCP-3/Ctg/WD-90
|
Development of kadam Rasul-Pramasia bazar Road (Baro Moulana Rd) by BC
|
1.8800
|
90.240
|
M/S. B C H Internationa
|
90.240
|
|
10/04/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
4
|
GCP-3/ctg/WD-129
|
Development of Shekerkhil Somadia Bahamoni Road by HBB
|
1.0000
|
63.340
|
M/S. H M FOUNDATION
|
63.340
|
|
22/07/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
5
|
GCP-3/ctg/WD-128
|
Development of Chamble Dhala Road to Shimana Road by HBB at Ch: 950-1950m; Upazila: Banskhali, District: Chattogram.
|
1.0000
|
52.230
|
|
52.230
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
6
|
GCP-3/Ctg/WM-07
|
A)Maintenance of Kalipur Emtazul Hoque Chy Road (Kamal Iskey Mostafa Road)
B)Maintenance of Banigram Union Land office to Shonkho River Road via Monayam Sha Bazar (Indra Narayon Road)
|
1.8470
|
90.410
|
M/s. Salma Enterprise.
|
90.410
|
|
09/05/2019
|
100
|
12/07/2026
|
Final Bill Paid
|
|
7
|
GCP-3/ctg/WD-187
|
Development of Jaldi Mia hat-Napora Bazar via Chambol UP Office Road (Chambol Badshahee Road) by HBB
|
1.0240
|
107.300
|
M/S. ROBEL & BROTHERS
|
107.300
|
|
23/01/2021
|
100
|
12/07/2026
|
Final Bill Paid
|
|
8
|
GCP-3/ctg/WD-254
|
Development of Dungra-Raichata Road by BC & RCC at Ch: 1000-1600m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 48832.00) (ID No-415084037).
|
0.6000
|
38.730
|
|
38.730
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
9
|
GCP-3/ctg/WDS-277
|
Development of ABC Road-Banigram Shadhonpur High School Banigram by HBB at Ch: 00-480m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 51027.00) (ID No-415085276).
|
0.4800
|
40.570
|
|
40.570
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
10
|
GCP-3/ctg/WD-178
|
Development of Katharia Raziullah Munshi Road from Ch: 00-975m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1623019.00) (ID No-415085125).
|
0.9750
|
129.260
|
|
129.260
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
11
|
GCP-3/ctg/WD-259
|
Development of Chowdhury Hat to Kadam Rasul Bazar Road by BC at Ch: 00-1340m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1679660.00) (ID No-415084089).
|
1.3400
|
107.220
|
|
107.220
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
12
|
GCP-3/ctg/WD-396
|
Development of Old Ferri Ghat (RHD) to Rampur DC Road (Pukuria Dewanji Road) by HBB at Ch: 3740-4000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 33066.00) (ID No-415084032).
|
0.2600
|
20.030
|
|
20.030
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
13
|
GCP-3/ctg/WD-395
|
Improvement of Chandpur Centerpara Road by BC at Ch: 00-1150m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 838580.00) (ID No-415085019).
|
1.1500
|
112.990
|
|
112.990
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
14
|
GCP-3/ctg/WD-394
|
Development of Dungra Raichata Road by BC at Ch: 2980-3450m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 753800.00) (ID No-415084037).
|
0.4700
|
52.560
|
|
52.560
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
15
|
GCP-3/ctg/WM-81
|
Maintenance of Hajigao Adam Road by BC at Ch: 00-655m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 32292.00) (ID No-415085001).
|
0.6550
|
67.640
|
|
67.640
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
16
|
GCP-3/ctg/SWM-71(R)
|
Maintenance of Time Bazar to Monkir Char Natun Bazar Road by BC at Ch: 00-4830m; Upazila: Banskhali, District: Chattogram.
|
4.8300
|
304.530
|
|
304.530
|
|
|
75
|
12/07/2026
|
|
|
17
|
GCP-3/ctg/WD-397
|
Development of Chowdhury Hat to Kadam Rasul Bazar Road (Bibi Chowdhury Road) by BC at Ch: 1340-2540m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 861610.00) (ID No-415084089).
|
1.2000
|
131.420
|
|
131.420
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
18
|
GCP-3/ctg/WD-480
|
Development of Chonua Laskar Maolavipara Road by HBB at Ch: 00-700m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 124813.00) (ID No-415085225).
|
0.7000
|
88.950
|
|
88.950
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
19
|
GCP-3/ctg/WD-468
|
Development of East Manik Pathan Road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 56187.00) (ID No-415085094).
|
1.0000
|
119.450
|
|
119.450
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
20
|
GCP-3/ctg/WD-479
|
Development of Chmble Deputighona Road by BC at Ch 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 88664.00) (ID No-415084060).
|
1.0000
|
109.680
|
|
109.680
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
21
|
GCP-3/ctg/WD-440
|
Development of Saral Bazar-Beri Bandth via DC Bari Road by Uni-Block at Ch: 00-1250m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 3355069.00) (ID No-415084127).
|
1.2500
|
192.070
|
|
192.070
|
|
|
100
|
12/07/2026
|
Final Bill Paid
|
|
22
|
GCP-3/ctg/WM-87
|
Maintenance of Chonua DC Road by BC at Ch: 00-500m; Upazila: Banskhali, District: Chattogram
|
0.5000
|
38.320
|
|
38.320
|
|
|
100
|
12/07/2026
|
Final bill submitted
|
|
23
|
GCP-3/ctg/WD-393
|
Development of Katabi Jame Mosjid Road by BC at Ch: 00-860m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 461759.00) (ID No-415084067).
|
0.8600
|
54.510
|
|
54.510
|
|
|
100
|
12/07/2026
|
Contact Cancel, J.M Done.
|
|
24
|
GCP-3/ctg/WD-418
|
Development of Chunua Majeda Begom Road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1657957.00) (ID No- 415084064).
|
1.0000
|
143.440
|
|
143.440
|
|
|
100
|
12/07/2026
|
|
|
25
|
GCP-3/ctg/WD-276
|
Improvement of Arabsha Bazar GC-Ishwar Babur Hat GC Road via Bashirullah Miazi Hat Chonua, Gondamara, Saral, Shadhanpur UP (Moulana Ashraf Ali Road) by BC at Ch: 00-4160m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 3534608.00) (ID No-415082009).
|
4.1600
|
586.550
|
|
586.550
|
|
|
55
|
12/07/2026
|
Contact Cancel, J.M Under Process.
|
|
26
|
GCP-3/ctg/WD-300
|
Development of Time Bazar-Gondamara Road to Chambol Dhala Road (Moulana Salim Uddin Road) by HBB at Ch: 00-2275m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 414762.00) (ID No-415085183).
|
2.2750
|
184.750
|
|
184.750
|
|
|
45
|
12/07/2026
|
|
|
27
|
GCP-3/ctg/WD-301
|
Development of Puichory Habban Ali Road-Jangle Napora GPS (Muktijodha Fafidul Alam) Road by BC at Ch: 00-1170m; Upazila: Banskhali, District: Chattogram
|
1.1700
|
104.500
|
|
104.500
|
|
|
55
|
12/07/2026
|
|
|
28
|
GCP-3/ctg/WD-472
|
Development of Boilchari Dhala road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 975086.00) (ID No-415084049).
|
1.0000
|
113.610
|
|
113.610
|
|
|
70
|
12/07/2026
|
|
|
29
|
GCP-3/ctg/WD-473
|
Development of Monsuria Bazar to Silku[ UP Offoce Road by BC at Ch: 1500-2145m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 103366.00) (ID No-415083012).
|
0.6450
|
89.150
|
|
89.150
|
|
|
60
|
12/07/2026
|
|
|
30
|
GCP-3/ctg/WD-478
|
Development of Banglabazar to Bamar Chara Road via Sikdarer Dhokan (Banglabazar Dhala) Road by BC at Ch: 2200-3200m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 2116367.00) (ID No-415084055).
|
1.0000
|
112.180
|
|
112.180
|
|
|
70
|
12/07/2026
|
|
|
31
|
GCP-3/ctg/WD-481
|
Development of Middle Katharia-Bagmara-Banskhala Road by BC at Ch: 1330-2340m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 911101.00) (ID No-415084068).
|
1.0100
|
109.950
|
|
109.950
|
|
|
0
|
12/07/2026
|
|
|
32
|
GCP-3/ctg/WD-498
|
Development of Banglabazar to Bamer Chora Road via Sikderer Dhokan (Banglabazar Dhala) Road by BC at Ch: 3200-4200m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1426388.00) (Road ID No-415084055).
|
1.0000
|
112.490
|
|
112.490
|
|
|
65
|
12/07/2026
|
|
|
33
|
GCP-3/ctg/WD-502
|
Development of Bangla Bazar-Khat Khali Road (Shohid Bodiul Alom Road) by BC at Ch: 1500-2300m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 961672.00) (Road ID No-415084092).
|
0.8000
|
89.080
|
|
89.080
|
|
|
10
|
12/07/2026
|
|
|
34
|
GCP-3/ctg/WD-509
|
Development of Kadam Rasul Pramasia Bazar Road (Baro Moulana Rd) by BC at Ch: 1600-2300m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 668402.00) (Road ID No-415084090).
|
0.7000
|
80.890
|
|
80.890
|
|
|
10
|
12/07/2026
|
|
|
|
3
|
Boalkhali
|
|
1
|
GCP-3/Ctg/WDS-183
|
Development of Ahalla Dorbar Sharif (R&H-Santir hat Beyai Bazar (Champa Naryan Road) Road by BC (Allaha Utter vurshie School Connecting Road) at ch: 1+685-2+125km.
|
0.4400
|
48.360
|
|
48.360
|
|
04/04/2021
|
30
|
21/01/2021
|
|
|
2
|
GCP-3/Ctg/WD-130
|
Construction of 2-Vent 4.00m x 4.00m RCC Box Culvert at Shakpura Chawdhury R&H-Lalarhat GC Road at Ch: 165m.
|
|
49.620
|
M/S. Abrar Trading
|
49.620
|
|
03/11/2020
|
100
|
21/01/2021
|
Final Bill Paid
|
|
3
|
GCP-3/Ctg/WD-89
|
Development of Munar Mar Mosjid Road by BC at ch0+000-0+635km.
|
0.6350
|
81.600
|
M/S. Didarul Alam
|
81.600
|
|
20/01/2020
|
100
|
21/01/2021
|
Final Bill Paid
|
|
4
|
GCP-3/ctg/WDS-184
|
Development of Asadia Govt. Primary School Road by HBB (Allaha Asadia GPS School Connecting Road)
|
1.0000
|
65.760
|
M/S. DIPU KANTI PAUL
|
65.760
|
|
02/12/2020
|
40
|
20/01/2021
|
|
|
5
|
GCP-3/ctg/WD-169
|
Develoment of Shakpura High School Road by BC
|
0.8600
|
94.820
|
M/S. ABRAR TRADING
|
94.820
|
|
15/01/2021
|
15
|
20/01/2021
|
|
|
6
|
GCP-3/ctg/WD-111
|
B) Development of Fultol-Kanungo Para (R&H) Road (Oli Bekari)-Lalarhat GC Road by BC
|
2.2610
|
307.690
|
M/S. YAKUB & BROTHERS
|
307.690
|
|
07/02/2021
|
25
|
20/01/2021
|
|
|
7
|
GCP-3/ctg/WD-136
|
Development of Munshi Bari Road by BC
|
0.9020
|
104.870
|
M/S. ABDUL SALAM
|
104.870
|
|
23/08/2020
|
50
|
20/01/2021
|
|
|
8
|
GCP-3/ctg/WD-134
|
Development of Fakirhat Bazar
|
|
58.050
|
M/S JEMU ENTERPRISE
|
58.050
|
|
21/08/2020
|
20
|
20/01/2021
|
|
|
9
|
GCP-3/ctg/WD-114
|
A) Development of Purba Gomdandi UP-Murad Munshir Hat GC Road (Ramesh Sil Road) by BC
B) Development of Amuchia UP-Golok Kanun Bazar (LM) Road (Kanongo Para Post office Road) by BC
|
2.2350
|
217.920
|
TOWAKKUL ENTERPRISE - FORAK AHMED & SONS(JV)
|
217.920
|
|
13/01/2021
|
70
|
20/01/2021
|
|
|
10
|
GCP-3/ctg/WD-94
|
Development of Ahamudur Rahman Road by BC
|
1.4000
|
142.310
|
TOWAKKUL ENTERPRISE -KGN ENTERPRISE (JV)
|
142.310
|
|
12/09/2020
|
50
|
20/01/2021
|
|
|
11
|
GCP-3/ctg/WD-131
|
Development of Akubdandi Syed Abdur Nur Road by BC
|
0.9600
|
85.220
|
M/S. A S ENTERPRISE
|
85.220
|
|
22/07/2020
|
65
|
20/01/2021
|
|
|
12
|
GCP-3/ctg/WD-119
|
Development of Master Abul Kalam Azad Road by BC
|
1.2000
|
113.160
|
M/S. SOLAIMAN STORE
|
113.160
|
|
18/08/2020
|
65
|
20/01/2021
|
|
|
13
|
GCP-3/ctg/WD-118
|
Development of Miapara-Nazir Dhighir Par Road (Fazal Fakir Road) by BC
|
1.2750
|
113.750
|
M/S. SOLAIMAN STORE
|
113.750
|
|
21/07/2020
|
75
|
20/01/2021
|
|
|
14
|
GCP-3/ctg/WD-42
|
Development of Sreepur Kharandwip UP-Kerani Hat(LM) Road (Okil Baidda Road ) by BC .
Development of Kharandwip Sufi Nurul Haq Jame Mosque Road by BC .
Development of Master Bazar Road by BC.
Development of Purba Dhorolla khali Bari Road by BC .
Development of Kaliar hat GC-Keranihat (LM) Road (Kalachad Thakur Road) by BC
|
4.2570
|
423.570
|
M/S A ALI CHOWDHURY
|
423.570
|
|
24/07/2020
|
75
|
20/01/2021
|
|
|
15
|
GCP-3/Ctg/WD-84
|
Development of Shaheed Younus Road
|
1.3550
|
131.040
|
M/S. Forak Ahmed
|
131.040
|
|
11/01/2020
|
70
|
20/01/2021
|
|
|
16
|
GCP-3/ctg/WD-37
|
E.Gpomdandi UP - Hazir Hat (LM) Godown Road,(Janata Circular Road).
|
1.5700
|
147.480
|
M/s Azad Entrrprise
|
147.480
|
|
27/02/2020
|
100
|
20/01/2021
|
final bill
|
|
17
|
GCP-3/Ctg/WM-8
|
A) Maintenance of Kanungopara R&H Bura Mosque- Tajghar (Dhalghat D.C Road)
B)Maintenance of Ahalla Sadar para road
|
2.2310
|
84.580
|
M/s Sarkar Enterprise
|
84.580
|
|
29/07/2019
|
100
|
20/01/2021
|
final bill
|
|
18
|
GCP-3/ctg/WD-28
|
Hamidia madrasha Road.
|
1.0000
|
89.640
|
M/s Abdul Salam
|
89.640
|
|
13/06/2019
|
100
|
20/01/2021
|
final bill paid
|
|
|
4
|
Chandanish
|
|
1
|
GCP-3/Ctg/WM-20
|
Maintenance of West Satbaria Natun Maszid Osman Fakir (RHD to RHD) Road
|
0.9100
|
30.670
|
M/S. Islam & Sons
|
30.670
|
|
14/08/2019
|
100
|
12/07/2026
|
final bill paid
|
|
2
|
GCP-3/ctg/WM-19
|
A) Maintenance of South-Purboo Hasimpur M.K high School-Shikderpara Road by BC.
B) Maintenance of Bolar Taluk (RHD) to South Gashbaria GPS (UZR) Road by BC
|
1.3100
|
28.600
|
M/S. Sarkar Enterprise
|
28.600
|
|
11/08/2019
|
100
|
12/07/2026
|
final bill paid
|
|
3
|
GCP-3/ctg/WD-32
|
Muradabad-Uttar Kanchan Nogor road.
|
2.5900
|
126.210
|
M/s AzadEntrrprise
|
126.210
|
|
15/10/2019
|
100
|
12/07/2026
|
final bill paid
|
|
4
|
GCP-3/Ctg/WD-49
|
Improvement of Mohajan Gata to Barma Kalirhat (Al-Haz Ali Ahammed) Road by BC
|
1.4520
|
141.170
|
M/S. A B & Sons
|
141.170
|
|
29/12/2019
|
100
|
12/07/2026
|
final bill
|
|
5
|
GCP-3/Ctg/WDS-141
|
A) Improvement of Mohammadpur (Ashab Sobhan) Govt. Primary School Connecting Road by HBB .
B) Improvement of Madhay Kanaimandary Govt. Primary School Connecting Road by HBB .
C) Improvement of Madhay Hasimpur Govt. Primary School Connecting Road by HBB .
D) Improvement of North Madhay Kanaimandary Govt. Primary School Connecting Road by HBB
|
1.0100
|
21.670
|
M/S. KHUNDAKAR ENTERPRISE
|
21.670
|
|
02/08/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
6
|
GCP-3/ctg/WD-192
|
Development of Dohazari Chagachor DC Road by HBB at Ch: 445-895m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 189409.00) (ID No-415185098).
|
0.4500
|
27.080
|
|
27.080
|
|
25/01/2021
|
100
|
12/07/2026
|
Final Bill Paid
|
|
7
|
GCP-3/Ctg/WDS-142
|
A) Improvement of Diakul Govt. Primary School Connecting Road by HBB.
B) B) Improvement of Maddam Maradabad Govt. Primary School Connecting Road by HBB .
C) Improvement of East Jamirjuri Amitab Govt. Primary School Connecting Road by HBB .
D) Improvement of South Diakul K.M Govt. Primary School Connecting Road by HBB.
|
0.3200
|
13.890
|
M/S. ISLAM TRADERS
|
13.890
|
|
24/07/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
8
|
GCP-3/Ctg/WDS-140
|
A) Improvement of Paschim harala Schindraw Sikder Govt. Primary School Connecting Road by HBB .
) Improvement of Paschim harala Nabi Kulsum Govt. Primary School Connecting Road by HBB .
C) Improvement of Uttar Jamirjuri Govt. Primary School Connecting Road by HBB
|
0.5600
|
28.390
|
M/S. SALEH NUR CONSTRUCTION
|
28.390
|
|
04/08/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
9
|
GCP-3/Ctg/WDS-143
|
A) Improvement of Samukchari Govt. Primary School Connecting Road by HBB .
B) Improvement of Paschim Dhopachari Govt. Primary School Connecting Road by HBB .
C) Improvement of Tapaaban Anath Asram Govt. Primary School Connecting Road by HBB .
|
0.6000
|
28.740
|
M/S. GARIN ENTERPRISE
|
28.740
|
|
23/07/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
10
|
GCP-3/Ctg/WDS-144
|
A) Improvement of Haji Mohammad Khalil Badiuzzaman Govt. Primary School Connecting Road by HBB .
B) Improvement of Dhakkin Jafrabad Govt. Primary School Connecting Road by HBB.
C) Improvement of Basarat Nagor Govt. Primary School Connecting Road by HBB .
D) Improvement of Gachbaria Banikpara Govt. Primary School Connecting Road by HBB .
E) Improvement of Patandondy Uzir Ali Govt. Primary School Connecting Road by HBB .
F) Improvement of Hasandondy Govt. Primary School Connecting Road by HBB.
|
0.7700
|
36.250
|
M/S. JANASHEBA ENTERPRISE
|
36.250
|
|
27/08/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
11
|
GCP-3/ctg/WD-54
|
Joara Kulalpara Road
|
1.1280
|
96.260
|
M/s M JConstruction
|
96.260
|
|
30/05/2021
|
100
|
12/07/2026
|
Final Bill Paid
|
|
12
|
GCP-3/Ctg/WM-33
|
Maintenance of Suchia GPS & Suchia Ram Krishna High School to Pathandandi Sree Sree Krishna via Mohajan Gate Road (Al- Haz Ali Ahmmed) Road by BC
|
0.7800
|
18.950
|
M/S. ISLAM & SONS
|
18.950
|
|
31/08/2020
|
100
|
12/07/2026
|
Final Bill Paid
|
|
13
|
GCP-3/ctg/WD-191
|
Development of Hathi Khola Road (Dohazari) Road by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 426483.00) (ID No-415185006).
|
1.0000
|
89.740
|
|
89.740
|
|
05/08/2021
|
100
|
12/07/2026
|
Final Bill Paid
|
|
14
|
GCP-3/ctg/WM-052
|
Maintenance of Kanchanabad UP to Patiya Tea Garden Road by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 125082.00) (ID No-415184011).
|
1.0000
|
41.790
|
|
41.790
|
|
01/09/2022
|
100
|
12/07/2026
|
Final Bill Paid
|
|
15
|
GCP-3/ctg/WD-193
|
Development of Uttor Joara Maijpara Road by HBB at CH: 535-860m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 164834.00) (ID No-415185080).
|
0.3250
|
15.170
|
|
15.170
|
|
17/04/2022
|
100
|
12/07/2026
|
Final Bill Paid
|
|
16
|
GCP-3/Ctg/WD-151
|
Construction of 22.00m Long RCC Girder Bridge on Boroma College Dhameerhat-GC to Moulavi Bazar (RHD) Road
|
|
260.960
|
M/S. ABSAR CONSTRION
|
260.960
|
|
28/06/2022
|
100
|
12/07/2026
|
Final Bill Paid
|
|
17
|
GCP-3/Ctg/WD-55
|
Improvement of Chandanish Upazila H/Q (Nayahat) Bailtali-Kodarhat GC road by BC.
Improvement of Chandanish Upazila H/Q (Hospital) Churamoni (Al-Haj- Momtaz Oli) Sattarhat G.C Road by BC .
Improvement of Vogabanhat (RHD) to Koderhat GC via Ashraf Mohari Hat Bogerteg Road by BC
|
6.3000
|
808.490
|
M/S. MOSTAFA & H E (JV)
|
808.490
|
|
05/12/2022
|
100
|
09/07/2026
|
Final Bill Paid
|
|
18
|
GCP-3/ctg/WM-053
|
Maintenance of Joara UP-Kanchanabad UP-Station (Mohammedpur-Fatenagor) (RHD) road by BC at Ch: 00-1940m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 295680.00) (ID No-415183002).
|
1.9400
|
73.870
|
|
73.870
|
|
25/01/2023
|
100
|
09/07/2026
|
Final Bill Paid
|
|
19
|
GCP-3/Ctg/WD-56
|
Improvement of Boroma Collage Dhameerhat GC to Moulavi Bazar (RHD) Road by BC
Improvement of Fakir hat to Jamtal Bazar via Sha Alam Dohan Road (J.M Sen Road) by BC
Improvement of Badurpara (RHD) Munsif Bazar Chamudaria Bazar via Joara Bani GPS (RHD) Road Link by BC
|
3.2730
|
386.530
|
M/S SHAH JABBARIA CONSTRUCTION-J S ENTERPRISE (JV)
|
386.530
|
|
07/06/2022
|
100
|
09/07/2026
|
Final Bill Paid
|
|
20
|
GCP-3/ctg/WDS-441
|
Improvement of Kaderiya Madrasha to Khondakar Para (Hazrat Kaimuddin Fakir Road) by HBB at Ch: 00-500m; Upazila: Chandanaish, District: Chattogram (ID No-415185060).
|
0.5000
|
32.760
|
|
32.760
|
|
30/05/2024
|
100
|
09/07/2026
|
Final Bill Paid
|
|
21
|
GCP-3/ctg/WM-26
|
A) Maintenance of Dohajari G.C - Chagachar-Khagaria-Bhor Bazar G.C Road by BC
B) Maintenance of Hasimpur Jamirjuri Eidpukuria Road (Dohajari GC Connecting Road by BC
|
3.7600
|
50.600
|
M/S. Islam & Sons
|
50.600
|
|
04/01/2020
|
100
|
09/07/2026
|
|
|
22
|
GCP-3/ctg/WD-420
|
Improvement of Kanaimadari (In Front H/O Mr Sahab Mia Member) Barkal Road by BC at Ch: 00-740m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk.1260854.00) (ID No-415185043).
|
0.7400
|
96.390
|
|
96.390
|
|
05/09/2024
|
100
|
09/07/2026
|
Final Bill Paid
|
|
23
|
GCP-3/ctg/WD-343
|
Improvement of Dohajari GC-Chagachor-Khagaria-Bhor Bazar GC Road at Ch: 2256-3120m; Upazila: Chandanaish, District: Chattogram (ID No-415182003).
|
0.8640
|
85.290
|
|
85.290
|
|
02/01/2025
|
100
|
09/07/2026
|
Final Bill Paid
|
|
24
|
GCP-3/ctg/WD-350
|
Improvement of Vai-Khalifa Para-Baripara-Karillya Mura Road (Moklasur Rahman Chowdhury Road) by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 1677645.00) (ID No-415185093).
|
1.0000
|
112.700
|
|
112.700
|
|
28/02/2025
|
100
|
09/07/2026
|
Final Bill Paid
|
|
25
|
GCP-3/ctg/SWD-225R
|
Construction of 24.00m Long RCC Girder Bridge Over Haonkhali Khal Barkol Shahid Rafique Road at ch: 1635m; Upazila: Chandanish, District: Chattogram
|
|
100.720
|
|
100.720
|
|
26/06/2025
|
100
|
09/07/2026
|
Final Bill Paid
|
|
26
|
GCP-3/ctg/SWD-490
|
Improvement of Pachim Bailtali Charati Road by BC at Ch. 00-1000m; Upazila: Chandanaish, District: Chattogram.
|
1.0000
|
132.050
|
|
132.050
|
|
16/10/2025
|
100
|
09/07/2026
|
Final Bill Paid
|
|
27
|
GCP-3/ctg/SWD-225
|
Construction of 24.00m Long RCC Girder Bridge Over Haonkhali Khal Barkol Shahid Rafique Road at Ch: 1635m; Upazila: Chandanaish, District: Chattogram (ID No-415184051).
|
|
107.130
|
|
107.130
|
|
05/10/2023
|
100
|
09/07/2026
|
Contact Cancel, Payment Setelled.
|
|
28
|
GCP-3/ctg/WM-72
|
Maintenance of Dohajari GC-Chagachar-Khagaria-Bhor Bazar GC Road by BC at Ch: 00-2256m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 493484.00) (ID No-415182003).
|
2.2560
|
45.900
|
|
45.900
|
|
02/01/2023
|
100
|
09/07/2026
|
Contact Cancel, J.M Done.
|
|
29
|
GCP-3/ctg/SWD-469
|
Improvement of Advocate Foijur Rahman House-Dweep Para to Bailtoli UP Road by BC at Ch: 00-700m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 1092620.00) (ID No-415185166).
|
0.7000
|
100.190
|
|
100.190
|
|
30/04/2026
|
75
|
09/07/2026
|
|
|
30
|
GCP-3/Ctg/WDS-139
|
Improvement of Sanowara Farm Govt. Primary School Connecting Road by HBB
|
1.0000
|
57.350
|
A.M.P. ENTERPRISE
|
57.350
|
|
05/08/2020
|
0
|
20/01/2021
|
|
|
|
5
|
Fatikchari
|
|
1
|
SWD-429
|
lelang hadi badsha awolia road
|
1.0000
|
112.040
|
|
112.040
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
2
|
WD-369
|
gohira heakow road to dharog ali talukder road
|
0.7650
|
96.600
|
|
96.600
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
3
|
WD-319
|
saira beel road
|
0.7500
|
139.880
|
|
139.880
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
4
|
WD-483
|
samitirhat kulal para road
|
0.6300
|
70.570
|
|
70.570
|
|
|
100
|
08/07/2026
|
|
|
5
|
WD-439
|
roshangiri up hq to nanupur up hq road
|
2.0000
|
281.160
|
|
281.160
|
|
|
100
|
08/07/2026
|
|
|
6
|
SWD-474
|
damapur central road
|
1.5500
|
164.690
|
|
164.690
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
7
|
WDS-410
|
jangal dantmara govt pri school
|
1.5000
|
123.280
|
|
123.280
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
8
|
SWD-362
|
samitirhat arbania road
|
1.0000
|
111.060
|
|
111.060
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
9
|
WD-449
|
moulana zamiruddin shah road
|
1.0500
|
144.540
|
|
144.540
|
|
|
100
|
08/07/2026
|
|
|
10
|
WD-328
|
mannania road by bc
|
1.1550
|
198.660
|
|
198.660
|
|
|
100
|
08/07/2026
|
|
|
11
|
SWD-306
|
lelang up ananda bazar
|
1.4200
|
216.200
|
|
216.200
|
|
|
100
|
08/07/2026
|
|
|
12
|
WD-327
|
kepaitanagar abul fazal ba road
|
1.2700
|
228.360
|
|
228.360
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
13
|
WD-364
|
tofail ahmed road
|
1.5950
|
200.050
|
|
200.050
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
14
|
WM-89
|
roadwidening of sundarpur munshi abdur rashid road
|
0.9800
|
83.740
|
|
83.740
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
15
|
WD-477
|
lelang kumarpara road
|
1.0000
|
110.510
|
|
110.510
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
16
|
SWD-382
|
suabil up hq to shovonchari bangla bazar
|
0.8500
|
85.280
|
|
85.280
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
17
|
WD-374
|
saintirhat motor road
|
1.0000
|
97.420
|
|
97.420
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
18
|
WD-296
|
muktijuddha rafique uddin road
|
1.8000
|
200.430
|
|
200.430
|
|
|
100
|
08/07/2026
|
final bill paid
|
|
19
|
GCP-3/Ctg/WD-51
|
Improvement of Kazirhat G.C to Lalar Hat (RHD) Road via Barobil Nayahat Road
|
1.9820
|
226.310
|
M/s Rfiqul Moula
|
226.310
|
|
31/12/2020
|
100
|
07/07/2026
|
cancel
|
|
20
|
SWD-290
|
sarker hat to shovonchari bangla bazar road
|
2.0000
|
271.940
|
|
271.940
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
21
|
SWD-384
|
bagan bazar ander manik road
|
0.5250
|
85.190
|
|
85.190
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
22
|
WM-70
|
upazila to H/Q to lakhshmichari upazila
|
4.7600
|
311.590
|
|
311.590
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
23
|
WD-368
|
lelang kumarpara road
|
1.0000
|
118.500
|
|
118.500
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
24
|
WD-317
|
lelang upc to charaliahat bazar road via shainnashirhat
|
0.7500
|
126.880
|
|
126.880
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
25
|
GCP-3/Ctg/WD-135
|
Development of Bagan Bazar UP-Natun Bazar Road by BC
|
1.0000
|
110.890
|
M/S SAIFUL & BROTHERS
|
110.890
|
|
23/08/2020
|
100
|
07/07/2026
|
final bill paid
|
|
26
|
WDS-233
|
uttar roshangiri gps connecting road
|
0.5000
|
30.300
|
|
30.300
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
27
|
WD-66
|
south nichintapur road
|
1.3300
|
130.830
|
|
130.830
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
28
|
WDS-234
|
dharmapur sayed para gps connecting road
|
0.3000
|
19.510
|
|
19.510
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
29
|
GCP-3/Ctg/WD-186
|
Improvement of Nanupur UPC to Dowlat Munshir Hat Bazar Road (Nanupur-Khiram Road) Road by BC at ch: 6+262-8+262km.
|
2.0000
|
176.420
|
|
176.420
|
|
|
0
|
20/01/2021
|
Tender under process
|
|
30
|
GCP-3/Ctg/WD-158
|
Improvement of Narayanhat RHD to Garitaana Bazar Road by BC at ch: 1+000-3+050km.
|
2.0500
|
256.790
|
|
256.790
|
|
|
0
|
20/01/2021
|
TENDER PROCESS
|
|
31
|
GCP-3/Ctg/WM-13
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar at ch: 0+000-4+760km.
|
4.7600
|
335.010
|
|
335.010
|
|
|
0
|
20/01/2021
|
TENDER UNDER PROCESS
|
|
32
|
GCP-3/Ctg/WD-202
|
Development of Sejuar Khan Road by BC at ch: 780-2190m.
|
|
120.270
|
|
120.270
|
|
22/06/2021
|
0
|
20/01/2021
|
|
|
33
|
GCP-3/Ctg/WD-100
|
Improvement of Lelang UPC to Charaliahat Bazar Road via Shainnashirhat & Lelang Neyhat (Gopal Gatta Road) by BC at ch: 1+900-5+100km.
|
3.2000
|
349.080
|
|
349.080
|
|
29/08/2021
|
15
|
20/01/2021
|
|
|
34
|
GCP-3/Ctg/WD-66
|
Improvement of South Nichintapur Road by BC at ch: 0+000-1+330 km.
|
1.3300
|
130.840
|
|
130.840
|
|
26/04/2021
|
20
|
20/01/2021
|
|
|
35
|
GCP-3/Ctg/WD-200
|
Development of Lelang UPC-Kanchan Nagar UPC Road by BC at ch: 00-1862m.
|
1.8620
|
139.687
|
|
139.687
|
|
|
0
|
20/01/2021
|
|
|
36
|
GCP-3/Ctg/WM-04
|
A)Periodic Maintenance of Shantir hat Motor Road
B)Periodic Maintenance of Tofail Ahammed Road
|
5.3950
|
93.440
|
M/s. Mohsin & Brothers
|
93.440
|
|
28/02/2020
|
100
|
20/01/2021
|
|
|
37
|
GCP-3/Ctg/WM-14
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar
|
4.6600
|
230.140
|
|
230.140
|
|
|
0
|
20/01/2021
|
NOA Issued
|
|
38
|
GCP-3/Ctg/WD-27
|
Improvement of Samitirhat Azam Bari Idris Road
|
1.5000
|
153.700
|
|
153.700
|
|
03/09/2021
|
0
|
20/01/2021
|
|
|
39
|
GCP-3/Ctg/WD-185
|
Improvement of Kanchan Nagar Ajgar Bari to Ali Chowdhury Bari Road by BC
|
1.0000
|
97.390
|
M/S. SAMEER TRADERS
|
97.390
|
|
14/01/2021
|
0
|
20/01/2021
|
|
|
40
|
GCP-3/Ctg/WD-188
|
Improvement of Chumur Hat Bazar at Kanchannager UP.
|
|
47.480
|
M/S SARNALI ENTEPRISE
|
47.480
|
|
11/01/2021
|
0
|
20/01/2021
|
|
|
41
|
GCP-3/Ctg/WM-37
|
Periodic Maintenance of Sundarpur Munshi Abdur Rashied Road by BC
|
0.9800
|
16.450
|
M/S. SUKANNYA ENTERPRISE
|
16.450
|
|
07/11/2020
|
0
|
20/01/2021
|
|
|
42
|
GCP-3/Cox/WDS-167
|
Improvement of Dulaichari GPS (Heako-Dholiachari) Road by HBB
|
2.4500
|
116.040
|
M/S. F R CONSTRUCTION
|
116.040
|
|
12/12/2020
|
50
|
20/01/2021
|
|
|
43
|
GCP-3/Cox/WDS-166
|
Improvement of Chela Uzan GPS (Dantmara-Natun Para) Road by HBB
|
1.5000
|
72.900
|
M/S. KAZI ENTERPRISE
|
72.900
|
|
26/10/2020
|
10
|
20/01/2021
|
|
|
44
|
GCP-3/Cox/WDS-165
|
Improvement of Matin Nagar GPS (Chikonchara High School to Natun Bazar Road via Motion Nagar GPS) Road by HBB
|
2.3300
|
137.850
|
M/S. RAFIQ ENTERPRISE
|
137.850
|
|
12/12/2020
|
0
|
20/01/2021
|
|
|
45
|
GCP-3/Cox/WDS-168
|
Improvement of Baru Betua GPS (Barabetua-Sandip Para) Road by HBB
|
1.3250
|
62.140
|
M/S OMI & JARIN ENTERPRISE
|
62.140
|
|
28/09/2020
|
55
|
20/01/2021
|
|
|
46
|
GCP-3/Ctg/WDS-157
|
Improvement of Baromasia Talukder GPS Connecting Road by HBB
|
0.6750
|
35.740
|
M/S KARIM ENTERPRISE
|
35.740
|
|
01/10/2020
|
70
|
20/01/2021
|
|
|
47
|
GCP-3/Ctg/WD-149
|
Development of bhuzpur amtoli gps connecting road by hbb
|
1.6000
|
78.520
|
m/s n a trading & co.
|
78.520
|
|
05/09/2020
|
0
|
20/01/2021
|
|
|
48
|
GCP-3/Ctg/WD-15
|
Development of Harualchari Lalarhat Road via Santirhat Road
|
1.9890
|
246.690
|
M/S. EB & MN (JV)
|
246.690
|
|
02/10/2020
|
15
|
20/01/2021
|
|
|
49
|
GCP-3/Ctg/WD-65
|
A) Development of Kazirhat GC to Lalarhat Road via Barobil Noyahat by BC
B) Development of Haruaichari Latifa Bibi Road by HBB
|
3.8000
|
410.330
|
M/S ELIAS BROTHERS
|
410.330
|
|
21/11/2020
|
50
|
20/01/2021
|
|
|
50
|
GCP-3/Ctg/WD-108
|
Development Sundarpur UPC to Azam Chowdhury Nayahat Bazar Road by BC
|
1.0000
|
97.190
|
M/S J S Traders
|
97.190
|
|
12/10/2020
|
30
|
20/01/2021
|
|
|
51
|
GCP-3/Ctg/WD-95
|
Development of Narayanhat UPC to Heako GC Road via Maazan, Hasnabad & Nischinta By BC.
|
4.9000
|
483.090
|
M/S. MONIR AHMED
|
483.090
|
|
09/07/2020
|
25
|
19/01/2021
|
|
|
52
|
GCP-3/Ctg/WM-12
|
Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar
|
4.0400
|
379.040
|
M/S. Monir Ahmed
|
379.040
|
|
30/06/2020
|
45
|
19/01/2021
|
|
|
53
|
GCP-3/Ctg/WD-72
|
Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road)
|
1.8600
|
224.330
|
M/s Sharnali Enterprise
|
224.330
|
|
10/04/2020
|
100
|
19/01/2021
|
|
|
54
|
GCP-3/Ctg/WD-148
|
A) Development of adilpur GPS Connecting road by HBB.
B) Developmentof paschim bhuj pur gachuria GPS Connecting road.
|
1.1000
|
52.150
|
m/s s a minar & sons
|
52.150
|
|
01/09/2020
|
100
|
19/01/2021
|
|
|
55
|
GCP-3/ctg/WD-47
|
Chowmuhani to Karnafuly Tea Estate road
|
2.0000
|
149.060
|
M/s M A Construction
|
149.060
|
|
30/03/2020
|
100
|
19/01/2021
|
remaining 7.45 lac
|
|
56
|
GCP-3/ctg/WD-22
|
Paindong u.p H Q (Brindabonhat) to Kanchan Nagar U.p H .Q .Road via Kanchurhat
|
2.0610
|
171.210
|
M/s M A Construction
|
171.210
|
|
31/01/2020
|
100
|
19/01/2021
|
Remaining 38.56 lac
|
|
57
|
GCP-3/ctg/WD-26
|
Samitirhat Kulal Para Road
|
1.0000
|
85.970
|
M/s Masum Builders
|
85.970
|
|
28/02/2020
|
100
|
19/01/2021
|
|
|
58
|
GCP-3/ctg/WD-23
|
Dhurang Forest bit to Manikchari road Kanchannagar UP
|
1.0000
|
54.540
|
M/S S A Traders
|
54.540
|
|
06/06/2019
|
100
|
19/01/2021
|
final bill paid
|
|
59
|
GCP-3/ctg/WM-03
|
A) Mohammed Tokirhat GC
B)Jonner Baper Masjeed Road
|
2.2900
|
76.510
|
M/S Nafi Traders
|
76.510
|
|
05/08/2019
|
100
|
19/01/2021
|
|
|
|
6
|
Hathazari
|
|
1
|
GCP-3/Ctg/WM-41
|
Maintenance of Dr.Sanaullah (S.Madarsha) Road by BC at Ch: 00-810m.
|
0.8100
|
26.890
|
|
26.890
|
|
28/04/2021
|
0
|
20/01/2021
|
|
|
2
|
GCP-3/Ctg/WM-42
|
Maintenance of Azimpara (Hathazari) Road by BC at Ch: 00-800m.
|
0.8000
|
19.720
|
|
19.720
|
|
20/04/2021
|
0
|
20/01/2021
|
|
|
3
|
GCP-3/Ctg/WM-40
|
Maintenance of Dhalai Gumanmordon (Dhalai) Road by BC at Ch: 00-2000m.
|
2.0000
|
52.800
|
|
52.800
|
|
21/04/2021
|
0
|
20/01/2021
|
|
|
4
|
GCP-3/Ctg/WD-176
|
Construction of 31.00m Long RCC Variable Girder Bridge on Kazir Khil AB Road (Chipatoli) at Ch. 780.00m.
|
|
289.470
|
|
289.470
|
|
17/06/2021
|
10
|
20/01/2021
|
|
|
5
|
GCP-3/Ctg/WD-174
|
Construction of 24.00m Long RCC Inverted Girder Bridge on Alawol Road
|
|
223.360
|
Mohammad younus & brothers
|
223.360
|
|
15/05/2021
|
0
|
20/01/2021
|
|
|
6
|
GCP-3/Ctg/WM-30
|
A) Maintenance of Yousufia Road (Forhadabad) by BC
B) Maintenance of Chittagong Khagrachari Road to Brozrodam Road (Borzrodam Road) (Dhala) by BC
|
1.3600
|
34.450
|
M/S. GONI CONSTRUCTION
|
34.450
|
|
26/08/2020
|
5
|
20/01/2021
|
|
|
7
|
GCP-3/Ctg/WD-147
|
Improvement of Chand Gazi (Forhadabad) Road by BC
|
0.9100
|
74.570
|
M/S. B C H INTERNATIONAL
|
74.570
|
|
26/09/2020
|
2
|
20/01/2021
|
|
|
8
|
GCP-3/Ctg/WD-150
|
Development of Charia Noa Hat to Chipatali UP (Murad Road) (Mirzapur-Chipatoli) Road by BC
|
0.9690
|
83.570
|
M/S. AFNAN ENTERPRISE
|
83.570
|
|
24/08/2020
|
60
|
20/01/2021
|
|
|
9
|
GCP-3/Ctg/WM-32
|
Maintenance of Abdul Aziz Road (Chipatoli) by BC
|
0.2700
|
16.570
|
M/S ABSER & BROTHERS
|
16.570
|
|
04/08/2020
|
0
|
20/01/2021
|
|
|
10
|
GCP-3/ctg/WM-28
|
A) Maintenance of Hajee Safar Ali Road (Mirzapur) by BC
B) Maintenance of Atar Ali Road (Souty Madrasha Chikondondi) by BC
|
1.9000
|
43.330
|
M/S. Moriom Enterprise
|
43.330
|
|
19/01/2020
|
80
|
20/01/2021
|
|
|
11
|
GCP-3/Ctg/WD-40
|
A) Development of Latif Para Road (Fatehpur)
B) Development of Dorduara Board School Road (Gorduara)
|
1.2970
|
144.170
|
M/s Al kutub & Brothers
|
144.170
|
|
30/06/2020
|
80
|
20/01/2021
|
|
|
12
|
GCP-3/Ctg/WD-57
|
Construction of 33.00m long PC Girder Bridge at ch. 00m over Dulakhali Khal on Dulakhali road
|
0.3000
|
376.160
|
M/s. Chowdhury Enterprise and Consonance Engineering
|
376.160
|
|
06/02/2020
|
90
|
20/01/2021
|
|
|
13
|
GCP-3/Ctg/WM-16
|
A) Maintenance of Faizur Rahman Road(Chikondondi)
B) Maintenance of Asad Ali Road (Sikerpur)
|
1.7700
|
128.160
|
M/s. Hassan & Brothers
|
128.160
|
|
31/01/2020
|
95
|
20/01/2021
|
|
|
14
|
GCP-3/Ctg/WD-67
|
A) Improvement of Basuadhala Road
B) Improvement of Faiz Ahmed (D.C Connecting ) Road (North Madrasha) Road
C) Improvement of Amin Mazi Road (Nangolmora)
|
2.7700
|
263.010
|
M/s Akil Enterprise
|
263.010
|
|
29/11/2019
|
85
|
20/01/2021
|
|
|
15
|
GCP-3/Ctg/WD-34
|
Improvement of Siddiquia Road (Mekhol)
|
0.9920
|
103.690
|
M/s Alam Abser & Co.
|
103.690
|
|
28/02/2020
|
100
|
20/01/2021
|
|
|
16
|
GCP-3/Ctg/WD-78
|
Development of Kazi Khil Primary School Road (Chipatoli) road
|
0.7100
|
57.490
|
M/s Renassance Enterprise
|
57.490
|
|
15/08/2020
|
100
|
20/01/2021
|
|
|
17
|
GCP-3/Ctg/WD-76
|
Improvement of Aucha Mia Chowdhury Road (Buriri Char)
|
1.1700
|
88.780
|
M/s Akil Enterprise
|
88.780
|
|
31/01/2020
|
100
|
20/01/2021
|
|
|
|
7
|
Karnaphuli
|
|
1
|
GCP-3/ctg/WD-074
|
Improvement of CTG Cox's (RHD)-Karnafully River Road (College Bazar Road) by RCC at Ch: 00-1000m; Upazila: Karnafully, District: Chittagong.
|
1.0000
|
161.430
|
|
161.430
|
|
|
100
|
13/07/2026
|
Final Bill Paid
|
|
2
|
GCP-3/ctg/WD-206
|
Development of Juldha UP (Shamirpur of Marin Academy Road)-Dangarchar (Yasiner Ghat) Road by RCC at Ch: 6516-7716m; Upazila: Karnafully, District: Chattogram (ID No-415613009).
|
1.2000
|
200.180
|
|
200.180
|
|
|
100
|
13/07/2026
|
Final Bill Paid
|
|
3
|
GCP-3/ctg/WD-304
|
Improvement of Middle Sikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC at Ch: 985-1810m; Upazila: Karnafully, District: Chattogram (Salvage Materials Cost Tk. 721990.00) (ID No-415614031).
|
0.8190
|
214.590
|
|
214.590
|
|
|
100
|
13/07/2026
|
Final Bill Paid
|
|
4
|
GCP-3/ctg/WD-453
|
Development of 05 nos Ghat (5 no Ferry Ghat Road) (UNR Dabgar Char Mosque Navy 5 nos Ghat) (Navy Nirvik & Juldha Star Cement Factory) Road by BC at Ch 00-935m; Upazila: Karnafully, District: Chattogram (Salvage Materials Cost Tk. 469566.00) (ID No-415615208).
|
0.9350
|
147.410
|
|
147.410
|
|
|
100
|
13/07/2026
|
Final Bill Paid
|
|
5
|
GCP-3/ctg/WD-199
|
Development of Charlakha-Hospital Road (RHD Sultanul Aoulia-Ali Hossain Market-Goal Para-Piper Gora Bazar) Road by BC at Ch: 400-1950m & 2953-3403m; Upazila: Karnafully, District: Chattogram.
|
2.0000
|
202.730
|
|
202.730
|
|
|
72
|
13/07/2026
|
Contact Cancel, J.M Done
|
|
6
|
GCP-3/ctg/WD-303
|
Development of Iubbibi City Corporation College (RHD)-Pipergora Bazar Road (Issanagar Bir Muktijodha Siddique Ahmed Gandhi Road) (Lalmia Contractor Road) by RCC at Ch: 500-1410m; Upazila: Karnafully, District: Chattogram (ID No-415614034).
|
0.9080
|
167.220
|
|
167.220
|
|
|
70
|
13/07/2026
|
|
|
7
|
GCP-3/ctg/WD-461
|
Development of Juldha UP (Shamirpur of Merin Accademy Road)- Dangerchar (Yasiner Ghat) Road by BC at Ch: 7716-8826m; Upazila: Karnafully, District: Chattogram
|
1.1100
|
170.740
|
|
170.740
|
|
|
30
|
13/07/2026
|
|
|
8
|
GCP-3/ctg/WD-444
|
Development of Juldha UP (Shamirpur of Marin Academy Road)-Danger Char (Yasiner Ghat) Road by BC at Ch: 00-4760m; Upazila: Karnafully, District: Chattogram
|
4.7600
|
1032.600
|
|
1032.600
|
|
|
55
|
13/07/2026
|
|
|
9
|
GCP-3/Ctg/WD-120
|
Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC
|
1.0000
|
150.140
|
M/S. Nowrin and brothers
|
150.140
|
|
22/07/2020
|
70
|
20/01/2021
|
|
|
10
|
GCP-3/Ctg/WD-70
|
Improvement of Shainertek (RHD) Khowaznagar Moulabir Dokan Road (Saifuzzaman Chowdary Javad) Road
|
2.7000
|
404.410
|
Delta Engineers & Construction
|
404.410
|
|
28/02/2020
|
95
|
20/01/2021
|
|
|
11
|
GCP-3/Ctg/WD-69
|
Improvement of PAB(RHD)-UZR Ukil Badrul Haque khan Road (Shadek Ali khan Road)
|
1.9500
|
313.030
|
M/S. A Ali Chowdhury
|
313.030
|
|
15/03/2020
|
50
|
20/01/2021
|
|
|
12
|
GCP-3/Ctg/WD-71
|
A) Improvement of Miar Hat (RHD) –Deyang Hill Kaffco 6 no Pump Road from RHD#142 (Ukil Badrul Haque khan Road) by RCC
B) Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road) by RCC
|
1.2200
|
466.140
|
M/S. Nipa Enterprise
|
466.140
|
|
14/01/2020
|
70
|
20/01/2021
|
|
|
13
|
GCP-3/Ctg/WD-74
|
Improvement of CTG Cox’s (RHD)- Karnafully River Road (College Bazar Road)
|
1.0000
|
161.430
|
M/s. S K Traders
|
161.430
|
|
30/06/2020
|
85
|
20/01/2021
|
|
|
|
8
|
Lohagara
|
|
1
|
GCP-3/ctg/WM-22
|
A) Maintenance of Adhunagar GC & RHD-Barahatia Tin Pather Matha Road by BC
B) Maintenance of Lohagara Roshiderpara Road by BC
|
1.9200
|
42.900
|
M/S. Dipu kanti paul
|
42.900
|
|
02/10/2019
|
100
|
09/07/2026
|
final bill paid
|
|
2
|
GCP-3/ctg/WM-21
|
A) Maintenance of Amirabad UP-Kalauzan UP Road by BC.
B) Maintenance of Padua Hari Mondir Bara Para Road by BC
|
2.0540
|
40.840
|
M/S. Mahin Enterprise.
|
40.840
|
|
05/10/2019
|
100
|
09/07/2026
|
Final Bill Paid
|
|
3
|
GCP-3/Ctg/SWD-99
|
Development of Chunati Pantrisha Joynagar Narisha Road (Chambi Rabbar Dam Connecting Road) by HBB
|
1.3000
|
93.770
|
M/S. Abdur Sabur
|
93.770
|
|
06/01/2020
|
100
|
09/07/2026
|
final bill
|
|
4
|
GCP-3/Ctg/WD-45
|
Improvement of Niazertek Tonkabati Forest Office via Kanuram Bazar Road (Kalauzan Feeder Road)
|
3.7000
|
410.380
|
M/s Quashem Construction
|
410.380
|
|
12/02/2020
|
100
|
09/07/2026
|
Final Bill Paid
|
|
5
|
GCP-3/Ctg/WD-92
|
A) Improvement of Charamba UP Office-Shapeer Road by HBB .
B) Improvement of Charamba Bayer Para School Conecting Road by HBB
|
2.9100
|
216.580
|
M/S. UT MONG-SHAH JABBARIA (JV)
|
216.580
|
|
29/11/2020
|
100
|
09/07/2026
|
Final Bill Paid
|
|
6
|
GCP-3/ctg/WD-24
|
Improvement of Tewari Hat GC to Chramba Up Via Andhar Manik Rd.
|
1.0000
|
73.869
|
M/s Alam Entrrprise
|
73.869
|
|
30/11/2019
|
100
|
09/07/2026
|
Final Bill Paid
|
|
7
|
GCP-3/ctg/WM-054
|
Maintenance of Kalauzan Hindurhat-Kalauzan UP Road by BC at Ch: 00-2535m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 47847.00) (ID No-415473007).
|
2.5350
|
63.380
|
|
63.380
|
|
10/04/2022
|
100
|
09/07/2026
|
Final Bill Paid
|
|
8
|
GCP-3/Ctg/WD-113
|
Construction of 69.00m Long RCC Girder Bridge on Putibila Sufi Fakir GPS to Saraiya Rambila Road
|
|
454.290
|
MR. UT MONG
|
454.290
|
|
24/02/2022
|
100
|
09/07/2026
|
Final Bill Paid
|
|
9
|
GCP-3/ctg/WD-246
|
Development of Putibila Baddah Mondir Road by HBB at CH: 500-567m & 634-1200m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 93550.00) (ID No-415475011).
|
0.6330
|
33.980
|
|
33.980
|
|
17/04/2022
|
100
|
09/07/2026
|
Final Bill Paid
|
|
10
|
GCP-3/ctg/WD-239
|
a) Construction of 12.00m Long RCC Girder Bridge on Bahirchara Khal Adhunagar Rajghata Road at Ch: 1250m b) Construction of 15.00m Long RCC Girder Bridge on Bahirchara Khal Adhunagar Rajghata Road at Ch: 750m; Upazila: Lohagara, District: Chattogram (ID No-415474034).
|
|
205.910
|
|
205.910
|
|
01/06/2023
|
100
|
09/07/2026
|
Final Bill Paid
|
|
11
|
GCP-3/ctg/WD-332
|
Re-Construction of 1 vent 1x4.00mx4.00m RCC Box Culvert on Uttar Paschim Amirabad Tankabater Muk to Kiazu Para via Upazila H/Q, Darbesh Hat GC, Putibila UP & M Char Hat GC Road (Darbesh Hat DC Road); Upazila: Lohagara, District: Chattogram (ID No-415472001).
|
|
28.430
|
|
28.430
|
|
08/06/2023
|
100
|
09/07/2026
|
Final Bill Paid
|
|
12
|
GCP-3/Ctg/WD-29
|
A)Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC
B) Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC
C)Improvement of Dalu-Bridge-Fareengha Miar Bazar Road (Chunati-Fareengha Road) by BC.
D)Improvement of Adercher Rajghata-Tonnkaboty Road by HBB.
|
6.2000
|
503.080
|
U T Mong- Shah Jabbaria (JV)
|
503.080
|
|
28/06/2021
|
100
|
09/07/2026
|
Final Bill Paid
|
|
13
|
GCP-3/ctg/WD-245
|
Development of Barahatia Joor Pucaria Passar Para Road by Uni-Block at Ch: 00-863m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 1558880.00) (ID No-415474021).
|
0.8630
|
98.870
|
|
98.870
|
|
22/01/2024
|
100
|
09/07/2026
|
Final Bill Paid
|
|
14
|
GCP-3/ctg/WM-055
|
Maintenance of Amirabad RHD-Lohagara Union Road via Darbesh Hat GC Bazar by RCC & BC at Ch: 00-800m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 38080.00) (ID No-415473002).
|
0.8000
|
34.290
|
|
34.290
|
|
17/09/2023
|
100
|
08/07/2026
|
Contact Cancel, Payment Setelled.
|
|
15
|
GCP-3/ctg/WD-137
|
Development of Amirabad UP to Kalauzan UP Road by BC at Ch: 00-1000m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2338223.00)
|
1.0000
|
94.660
|
|
94.660
|
|
25/11/2021
|
100
|
08/07/2026
|
Contact Cancel, Payment setelled.
|
|
16
|
GCP-3/ctg/WD-308
|
Development of Barahatia Durlaberpara Gazi Kalu Mazar Road by Uni-Block at Ch: 00-750m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 330073.00) (ID No-415475245).
|
0.7500
|
92.130
|
|
92.130
|
|
14/12/2023
|
100
|
08/07/2026
|
Final Bill Paid
|
|
17
|
GCP-3/ctg/WD-333
|
Development of Hosen Bali Para to Bepari Para via Bhabanipur GPS Road by BC at Ch: 00-730m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 553263.00) (ID No-415475068).
|
0.7300
|
84.130
|
|
84.130
|
|
17/10/2024
|
100
|
08/07/2026
|
Final Bill Paid
|
|
18
|
GCP-3/ctg/WM-55(R)
|
Maintenance of Amirabad RHD-Lohagara Union Road via Darbesh Hat GC Bazar by RCC & BC at Ch: 248-800m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 102223.00)
|
0.5520
|
39.930
|
|
39.930
|
|
03/01/2025
|
100
|
08/07/2026
|
Final Bill Paid
|
|
19
|
GCP-3/Ctg/WD-58
|
A) Construction of 54.00m long RCC Girder Bridge on Chunati Chandha Barua Para Forest Bit Road over Dulu khal
B) Construction of 30.00m long RCC Girder Bridge on Chunati Union-Chunati Kathalia Para-Hindu Para road Near Jetabon Buddha Bihar Over Hatiar Khal
|
|
606.590
|
M/S. Noor Syndicate- Shah Jabbaria (JV)
|
606.590
|
|
30/08/2022
|
100
|
08/07/2026
|
Final Bill Paid
|
|
20
|
GCP-3/ctg/WD-137(R)
|
Development of Amirabad UP to Kalauzan UP Road by BC at Ch. 53-289m & 450-814m; Upazila: Lohagara, District: Chattogram (Road ID: 415473003)
|
0.6000
|
13.130
|
|
13.130
|
|
10/05/2025
|
100
|
08/07/2026
|
Final Bill Paid
|
|
21
|
GCP-3/ctg/WD-240
|
Improvement of Barahatia Eshatul Ullum Madrasha Road by BC at Ch: 1470-3100m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2550584.00) (ID No-415474028).
|
1.6300
|
173.740
|
|
173.740
|
|
25/01/2025
|
100
|
08/07/2026
|
Final Bill Paid
|
|
22
|
GCP-3/ctg/WD-476
|
A) Construction of 18.00m Long RCC Girder Bridge on Dalu Bridge to Ferenga Miar Bazar Road (Chunati Farrengha Rad) at Ch: 2663m B) Construction of 16.00m Long RCC Girder Bridge on Dalu Bridge to Ferenga Miar Bazar Road (Chunati Farrengha Rad) at Ch: 3068m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. .00) (ID No-415474040).
|
|
388.660
|
|
388.660
|
|
21/08/2025
|
100
|
08/07/2026
|
Final Bill Paid
|
|
23
|
GCP-3/ctg/WD-452
|
Improvement of Amirabad Banskali Road by BC at Ch: 00-1045m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2288087.00) (ID No-415475023).
|
1.0450
|
121.280
|
|
121.280
|
|
18/02/2025
|
45
|
08/07/2026
|
Contact Cancel.
|
|
24
|
-GCP-3/ctg/WD-496
|
Improvement of Barahatia Badaler Goda to Amir Baper Para Road by BC at Ch. 00-900m; Upazila: Lohagara, District: Chattogram (Road ID: 415475308) (Salvaged Materials Cost: Tk 1724033.00)
|
0.9000
|
109.790
|
|
109.790
|
|
31/12/2025
|
100
|
08/07/2026
|
|
|
25
|
GCP-3/Ctg/WD-132
|
Construction of 81.00m Long PSC Gerder Bridge on Niazertek to Tonkabati Forest Office via Kanuram Bazar Road
|
|
560.590
|
M/S. NOOR SYNDICATE
|
560.590
|
|
30/12/2023
|
95
|
08/07/2026
|
Contact Cancel
|
|
26
|
GCP-3/ctg/WD-280
|
Improvement of Barahatia Natun Miajii Para & Salir Baper Para Road by BC at Ch: 00-660m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 807604.00) (ID No-415475304).
|
0.6600
|
68.650
|
|
68.650
|
|
31/01/2024
|
75
|
08/07/2026
|
|
|
27
|
GCP-3/ctg/WD-331
|
Development of Borohatia Uttar Baruapara Ghonar Mukh Road by BC at Ch: 00-690m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 51869.00) (ID No-415474031).
|
0.6900
|
83.740
|
|
83.740
|
|
05/05/2025
|
40
|
08/07/2026
|
|
|
28
|
GCP-3/ctg/WD-451
|
Improvement of Putibila Sufi fakir GPS-Sariya Rambila Road by BC at Ch: 1148-2220m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 765452.00) (ID No-415473009).
|
1.0720
|
102.850
|
|
102.850
|
|
06/06/2025
|
75
|
08/07/2026
|
Contact Cancel.
|
|
29
|
GCP-3/ctg/WD-488
|
Improvement of Chunati UP to Satghar Chara Bridge Road by BC at Ch: 00-1370m. ID-415473014
|
1.3700
|
214.320
|
|
214.320
|
|
10/10/2025
|
30
|
08/07/2026
|
Contact Cancel.
|
|
30
|
GCP-3/ctg/WD-455
|
Improvement of Tewari Hat GC Charamba UP via Ander Manik Road by BC at Ch: 3050-5100m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 4392239.00) (ID No-415473005).
|
2.0500
|
318.560
|
|
318.560
|
|
21/12/2025
|
40
|
08/07/2026
|
|
|
|
9
|
Mirsharai
|
|
1
|
WD-360
|
abul basher chowdhury road by bc
|
1.0000
|
138.280
|
|
138.280
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
2
|
WM-77
|
widening and periodic maintenece of aburhat gc kcakhali up road
|
2.2500
|
143.270
|
|
143.270
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
3
|
353
|
purbo domkhali govt primary scholl connecting road
|
1.5000
|
70.640
|
|
70.640
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
4
|
WDS-357
|
mithanala govt primary school connecting road
|
0.7900
|
102.460
|
|
102.460
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
5
|
WM-78
|
widening and periodic maintenance of shekal tana digi to durgapur bazar road
|
2.4000
|
1800.850
|
|
1800.850
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
6
|
WD-305
|
khayachara up r&h to dharu bridge road
|
|
153.880
|
|
153.880
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
7
|
WDS-405
|
pashchim mayani hazi para govt pri. school
|
|
83.460
|
|
83.460
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
8
|
WD-292
|
dhost mohammad road
|
|
83.200
|
|
83.200
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
9
|
WDS-406
|
pashchim khayachori ni. govt primary school
|
|
112.230
|
|
112.230
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
10
|
WD-359
|
shaheed shanto road
|
|
42.710
|
|
42.710
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
11
|
WD-340
|
Ramendra mohan ukil road
|
|
138.910
|
|
138.910
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
12
|
WD-326
|
ramendra mohan ukil road
|
|
68.190
|
|
68.190
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
13
|
WDS-358
|
purbo durgapur govt school
|
0.3700
|
42.150
|
|
42.150
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
14
|
WDS-352
|
uttor talbariya govt. primary school
|
|
11.690
|
|
11.690
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
15
|
WD-336
|
Purba durgapur school
|
|
144.030
|
|
144.030
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
16
|
SWD-279
|
4x4m RCC
|
|
67.080
|
|
67.080
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
17
|
GCP-3/Ctg/WD-222
|
Development of Khayachara UP R&H to Duaru Bridge Road (Duaru Road) by BC at ch: 0+000-0+382km
|
0.3820
|
59.130
|
|
59.130
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
18
|
GCP-3/Ctg/WD-173
|
Development of Bamonsundar-daroger Hat GC to Abur Hat GC Road via Joulanpool Bazar (Bamonsundar-Bariakhali-Joulanpool Road & Joulanpol-Abu Hat Road) by BC at ch: 2+480-4+480km.
|
2.0000
|
269.920
|
|
269.920
|
|
09/09/2021
|
100
|
02/07/2026
|
final bill paid
|
|
19
|
GCP-3/Ctg/WD-209
|
Development of Katachara UP to Taytoia Bazar Road by BC at ch: 0+000-2+105m.
|
2.1050
|
306.950
|
|
306.950
|
|
|
100
|
02/07/2026
|
final bill paid
|
|
20
|
GCP-3/Ctg/WD-214
|
Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara (Abutorab-Shadur Hat Road) by BC at ch: 2+850-3+625km.
|
0.7750
|
113.850
|
|
113.850
|
|
04/05/2021
|
100
|
02/07/2026
|
final bill paid
|
|
21
|
GCP-3/Ctg/WD-177
|
Construction of 18.00m Long RCC Girder Bridge on Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC
|
|
190.080
|
THE NEW TRADE LINK
|
190.080
|
|
06/05/2021
|
100
|
02/07/2026
|
final bill paid
|
|
22
|
GCP-3/Ctg/WD-152
|
Construction of 20.00m Long RCC Girder Bridge on Kamaldaha-Dhamdama-Abutorab Bazar Road Wahedpur RHD to Moghadia UP Dhamdama Bazar
|
|
170.090
|
M/S SHAHJAHAN TRADE LINK (JV)
|
170.090
|
|
15/05/2021
|
100
|
02/07/2026
|
final bill paid
|
|
23
|
GCP-3/Ctg/WD-110
|
Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara Abutorab-Shadurhat Road) by BC
|
2.8500
|
296.370
|
THE NEW TRADE LINK
|
296.370
|
|
25/05/2021
|
100
|
02/07/2026
|
final bill paid
|
|
24
|
GCP-3/Ctg/WD-175
|
Development of Khurmawala Road (Ram Mondol-Bhuyan Taluk Rd) by BC
|
0.4700
|
63.910
|
M/S TASPIYA ENTERPRISE
|
63.910
|
|
10/12/2020
|
100
|
02/07/2026
|
final bill paid
|
|
25
|
GCP-3/Ctg/WD-171
|
Rehabilitation of Single Vent 5.00m x 5.00m RCC Box Culvert on Mogadia UP to Thakurhat Bazar road (Wasem Chowdhury Road)
|
|
53.370
|
M/S MAHABUB & CO.
|
53.370
|
|
03/12/2020
|
100
|
02/07/2026
|
final bill paid
|
|
26
|
GCP-3/Ctg/WD-154
|
Development of Murarypur R&H to Janardanpur High School Road (Muraypur-janardanpur High School Road) by BC
|
1.0000
|
101.340
|
M/S. ADIAN ENTERPRISE
|
101.340
|
|
05/10/2020
|
100
|
02/07/2026
|
final bill paid
|
|
27
|
GCP-3/Ctg/WD-153
|
Development of Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC
|
1.3220
|
149.180
|
M/S BITHI BUILDCOM
|
149.180
|
|
01/10/2020
|
100
|
02/07/2026
|
final bill paid
|
|
28
|
GCP-3/Ctg/WD-126
|
Development of Nazir Ahmed Road by BC
|
1.4500
|
126.230
|
M/S SHOHAG ENTEPRISE
|
126.230
|
|
15/12/2020
|
100
|
02/07/2026
|
final bill paid
|
|
29
|
GCP-3/Ctg/WD-104
|
Development of Jamal Dhakan R&H to Rail Line Road (Shah Sundar Mia road) by BC
|
1.1800
|
131.980
|
M/S. AKIF ENTERPRISE
|
131.980
|
|
22/09/2020
|
100
|
02/07/2026
|
final bill paid
|
|
30
|
GCP-3/Ctg/WD-75
|
A)Improvement of Saheed Zakir Hossain Road to Gul Chori Rahamatpur Road
B)Improvement of Ram Mainik Kar Road (Sarker Taluk Road)
|
2.0500
|
182.160
|
M/s. A S Chowdhury
|
182.160
|
|
29/01/2020
|
100
|
02/07/2026
|
final bill paid
|
|
31
|
GCP-3/ctg/WD-06
|
Nazar Ali Bhuyan Road
|
1.5000
|
164.770
|
M/S Sayeman Enterprise
|
164.770
|
|
06/03/2020
|
100
|
02/07/2026
|
final bill paid
|
|
32
|
GCP-3/ctg/WD-25
|
Hadi Fakirhat GC R&H to Shaher khali UP road via Bhuiyar Hat
|
1.9200
|
167.880
|
M/S Sayeman Enterprise
|
167.880
|
|
13/06/2019
|
100
|
07/06/2026
|
|
|
33
|
GCP-3/ctg/SWD-284
|
Improvement of Bangha Dokan Samsher Tila Road by BC at Ch: 00-1200m; Upazila: , District: Chattogram (ID No-415534252).
|
1.2000
|
109.730
|
Nabi Enterprise
|
109.730
|
|
18/05/2023
|
100
|
30/04/2024
|
Final Bill Paid
|
|
34
|
GCP-3/ctg/SWD-257
|
Improvement of Mia Bari Road (Takia Rd-Mithnala High School) by Uni-Block at Ch: 00-1000m; Upazila: Miresarai, District: Chattogram (ID No-415534264).
|
1.0000
|
118.070
|
M/S. Jahan Steel
|
118.070
|
|
25/01/2023
|
100
|
28/04/2024
|
Final Bill Paid
|
|
35
|
GCP-3/ctg/WM-69
|
Periodic Maintenance of Bamonsundor Darogar Hat GC to Bari Bundth R & H Road via Luddakhali (Luddakhali-Shahazi Bazar-Bamonsundor Darogar Hat Road) by BC at Ch: 1100-2189m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 111552.00) (ID No-415533015).
|
1.0890
|
56.460
|
Khan Construction
|
56.460
|
|
20/11/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
36
|
GCP-3/ctg/SWD-247
|
Improvement of Old Abutorab Darogar Hat Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415534391).
|
1.3000
|
154.440
|
M/S. Shajahan Construction
|
154.440
|
|
12/01/2023
|
100
|
28/04/2024
|
Final Bill Paid
|
|
37
|
GCP-3/ctg/SWD-249
|
Improvement of Sufia Mithanala Road to Abdul Wahab Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415535106).
|
1.3000
|
14328908.000
|
M/S. F R Traders
|
14328908.000
|
|
11/12/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
38
|
GCP-3/ctg/SWD-248
|
Improvement of Abdul Wahab to Darogapara Mazar Road (UP-11) by Uni-Block at Ch: 2000-3200m; Upazila: Miresarai, District: Chattogram (ID No-415534108).
|
1.2000
|
14648041.000
|
M/S. Kashem Enterprise
|
14648041.000
|
|
25/01/2023
|
100
|
28/04/2024
|
Final Bill Paid
|
|
39
|
GCP-3/Ctg/WD-127
|
A) Development of Kamal teli Road (Border road to Khaia Ghona) Road by BC
B) Development of Mithanala UP to Bhorer Bazar Road (St. Panter Pokur) by BC
|
2.4000
|
272.550
|
THE NEW TRADE
|
272.550
|
|
05/12/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
40
|
GCP-3/ctg/SWD-256
|
Improvement of Sofia Road to Shidik Munshi Road by Uni-Block at Ch: 00-900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 179200.00) (ID No-415535081).
|
0.9000
|
11387358.000
|
M/S. Ishaque & Brothers
|
11387358.000
|
|
25/10/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
41
|
GCP-3/ctg/WD-101
|
A) Development of Hamid Ullah Road by BC at Ch: 00-750m (ID No-415534024); Upazila: Mirsharai, District: Chattogram.
B) Development of Kali Bari Road (Old DT-Bishu Miah Via Kalibari) by BC at Ch: 00-975m (ID No-415535359); Upazila: Mirsharai, District: Chattogram.
C) Development of Uday Mahajan Road (Alinagar Border-Rezuudin Road) by BC at Ch: 00-650m (ID No-415534158); Upazila: Mirsharai, District: Chattogram.
|
2.3800
|
22490474.000
|
The New Trade Link
|
22490474.000
|
|
28/08/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
42
|
GCP-3/ctg/WM-68
|
Periodic Maintenance of Dhum UP to Osmanpur UP Road via Moulovi Bazar (Bangla Bazar-Osmanpur Road) by BC at Ch: 00-1900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 204557.00) (ID No-415533007).
|
1.9000
|
8069131.000
|
Razia Enterprise
|
8069131.000
|
|
15/09/2022
|
100
|
28/04/2024
|
Final Bill Paid
|
|
43
|
GCP-3/ctg/WD-02
|
Gozaria Bazar to samitire Hat Bazar (Shaheed Nashir Uddin Road) By BC.
|
1.5500
|
132.350
|
M/S Junayet Enterprise
|
132.350
|
|
29/05/2019
|
100
|
22/04/2024
|
final bill paid
|
|
44
|
GCP-3/Ctg/WD-107
|
Development of R&H Road to Kararhat Forest Road by HBB
|
1.0000
|
60.190
|
M/S K I BUILDERS
|
60.190
|
|
24/05/2020
|
100
|
20/01/2021
|
|
|
45
|
GCP-3/ctg/WD-46
|
Yousuf Ali Road
|
0.4200
|
46.960
|
M/S. A B Enterprise
|
46.960
|
|
29/11/2020
|
0
|
19/01/2021
|
|
|
46
|
GCP-3/Ctg/WD -83
|
Construction of 2vx4.00mx4.00m RCC Box culvert on Barayer Hat R&H to Aburhat GC via Santirhat GC (Santirhat-Abur Hat G.C Road) at ch:10+030km
|
|
48.150
|
M/S. Nafi Traders
|
48.150
|
|
16/01/2020
|
0
|
19/01/2021
|
to be cancelled.
|
|
47
|
GCP-3/Ctg/WD-59
|
A) Development of Seru Member Road.
B) Development of Mowlana Nazir Ahmed Road (Sattar Bhuiyan Bazar- Habibullah Road)
|
1.8300
|
201.270
|
M/s Junayet Enterprise
|
201.270
|
|
30/12/2020
|
100
|
19/01/2021
|
|
|
48
|
GCP-3/ctg/WD-12
|
Mayani UP to Annerderhat bazar Road via Maddam Mayani ( Abutorab- Annerderhat)
|
0.7000
|
63.080
|
M/S R.A Enterprise
|
63.080
|
|
10/02/2020
|
100
|
05/01/2021
|
|
|
49
|
GCP-3/ctg/WD-08
|
Mithanala UP - Esak Driver Hat road via Rahmatabad (Mithanala -Rahmatabad Central Road)
|
3.9000
|
319.900
|
The New Trade Link
|
319.900
|
|
30/05/2020
|
100
|
05/01/2021
|
Remaining= 56.72 lac
|
|
50
|
GCP-3/Ctg/WD-60
|
Development of Hazi Abdul Haque Road
|
1.1600
|
102.400
|
M/s Junayet Enterprise
|
102.400
|
|
10/01/2020
|
100
|
05/01/2021
|
remaining 7.46 lac
|
|
51
|
GCP-3/Ctg/WD-133
|
Development of Zorargong Rural Market.
|
|
52.610
|
MS/ MIRSARAI ENTERPRISE
|
52.610
|
|
03/09/2020
|
100
|
05/01/2021
|
final bill paid
|
|
52
|
GCP-3/Ctg/WD-105
|
Construction of 24.00m long RCC Girder Bridge on shaheed zakir hossain road (koila) at ch:2650m.
|
|
147.290
|
Kashem Traders & Tulitushi Enterprise JV
|
147.290
|
|
05/11/2020
|
100
|
05/01/2021
|
final bill paid
|
|
53
|
GCP-3/ctg/WD-50
|
Takia Road up to khal by bc.
|
1.4100
|
150.650
|
M/s. Dulal & sons
|
150.650
|
|
19/04/2020
|
100
|
05/01/2021
|
final bill paid
|
|
54
|
GCP-3/ctg/WM-29
|
A) Maintenance of DT Road-D.C Obaidullah Road (Sayed Ali/Arab ali Mistry Road) by BC.
B) Maintenance of Sayedpur Bundh Road (Sufia Road-Chandpur Road) by BC.
C) Maintenance of Rezauddin of Muhuri Road by BC.
|
2.4000
|
107.350
|
M/S. Shahjahan Construction
|
107.350
|
|
20/01/2020
|
100
|
05/01/2021
|
final bill submited
|
|
55
|
Gcp-3/ctg/WM-18
|
Maintenance of Abdul Gafur-Golam Rahman Munshi Road
|
0.7500
|
28.980
|
M/S. Miressarai Enterprise
|
28.980
|
|
10/08/2019
|
100
|
05/01/2021
|
final bill paid
|
|
56
|
GCP-3/ctg/WD-14
|
Kalu kazi Mollah Rd.
|
1.2000
|
95.440
|
M/S Sayeman Enterprise
|
95.440
|
|
12/05/2019
|
100
|
05/01/2021
|
Final bill paid.
|
|
57
|
GCP-3/ctg/WD-13
|
Moghadia UP to Bari Bundth R&H via Thakur hat, Mozumdarhat & Banglabazar(Abutorab-Hashem Nagar-Char sarat road)
|
0.4450
|
37.190
|
M/S Miressari Enterprise
|
37.190
|
|
29/05/2019
|
100
|
05/01/2021
|
final bill paid
|
|
58
|
GCP-3/Ctg/WM-11
|
Maintenance of Shaheed Shanto Road
|
0.4700
|
25.680
|
M/s. Haque Traders
|
25.680
|
|
24/05/2019
|
100
|
05/01/2021
|
final bill paid
|
|
59
|
GCP-3/ctg/WD-07
|
West Bariakhali-Cyclone Shelter Road (Eashak Driver Hat-Cyclone Shelter Road)
|
0.9600
|
84.620
|
M/S Onik Traders
|
84.620
|
|
18/04/2019
|
100
|
05/01/2021
|
final bill paid
|
|
60
|
GCP-3/ctg/WD-05
|
Sonapahar R&H to Zorargong Takar Hat R&H road (Jarif Mahammad Rd).
|
1.0000
|
126.180
|
M/S Nazim Traders
|
126.180
|
|
06/04/2019
|
100
|
05/01/2021
|
final bill paid
|
|
61
|
GCP-3/ctg/WD-04
|
Zorargong Bazar R&H to Rail line road (Fakir Astana road)
|
1.0700
|
79.500
|
M/S Mahin Associates
|
79.500
|
|
23/06/2019
|
100
|
05/01/2021
|
final bill paid
|
|
62
|
GCP-3/ctg/WD-03
|
Tarakatia Road
|
1.7000
|
156.590
|
M/S Junayet Enterprise
|
156.590
|
|
29/05/2019
|
100
|
05/01/2021
|
final bill paid
|
|
63
|
GCP-3/ctg/WD-01
|
Nizampur R&H to Shaherkhali R&H via Damdama Bazar and Bhorerhat GC (Oli Ahmed Abdur Rahman Road)
|
2.1000
|
281.410
|
The New Trade Link
|
281.410
|
|
07/04/2019
|
100
|
05/01/2021
|
Final bill paid
|
|
|
10
|
Patiya
|
|
1
|
GCP-3/Ctg/WD-87
|
Improvement of Kanchanabad UP (Chandanaish Upazila)-Shovandandi UP-Muralihat Road (Patiya Part)
|
1.0000
|
104.130
|
The Paramount International
|
104.130
|
|
25/06/2020
|
20
|
20/01/2021
|
|
|
2
|
GCP-3/Ctg/WDS-63
|
A) Development of Sargiya Prof. Pulin Dey Road
B) Development of kolagaon UP (RHD)-Sikalbhaha Ghat Road (Dwip Kalar Moral Lakhera Baruapara)
|
1.7900
|
103.310
|
M/s. Jabbaria Construction & Co.
|
103.310
|
|
23/01/2020
|
100
|
20/01/2021
|
|
|
3
|
GCP-3/Ctg/WDS-62
|
A) Improvement of Kartala (RHD)-Belkhain GPS via Acharjee Para Road (Kartala Balkhain Road)
B) Improvement of Kharana UP-Haidgaon Annanda Datta (RHD) Road (Rajghata Road)
C) Improvement of Karankhain Village Road
D)Improvement of Dhawardenga Kaliaish (Banga Mazi Road)
|
3.1000
|
181.920
|
M/s. Tahera Enterprise
|
181.920
|
|
21/01/2020
|
100
|
20/01/2021
|
final bill paid
|
|
4
|
GCP-3/Ctg/WDS-64
|
A) Improvement of Asia Bathua Village Road
B) Improvement of Paschim Azimpur Bogun Para Road
C) Improvement of Kalishahar Moitala Uttar Burishi Road
|
2.2500
|
117.770
|
M/s. J K Enterprise
|
117.770
|
|
14/08/2019
|
100
|
20/01/2021
|
final bill paid
|
|
|
11
|
Rangunia
|
|
1
|
GCP-3/Ctg/WD-98
|
A) Development of Sawnirvar Rangunia UP-TC Hat-Hosnsbad UP (Ram Mohan Sikder Road) at ch.1+529-3+104km. B) Improvement of Sayedul Haq Kabiraj Village Road by HBB at Ch: 0+000-1+003km.
|
2.5400
|
307.940
|
|
307.940
|
|
|
0
|
21/01/2021
|
Under Evaluation
|
|
2
|
GCP-3/Ctg/WD-97
|
Development of RHD Pattartila-Moulubir Tila-Kolompoti Bazar GC Road by BC (Rangunia Part) at ch.0+000-4+072km.
|
3.9280
|
481.480
|
|
481.480
|
|
|
0
|
21/01/2021
|
Tender Under Process
|
|
3
|
GCP-3/Ctg/WM-36
|
Periodic Maintenance of R&H Ghatcheek-Rajarhat GC-Ranirhat GC (Parua DC Road) by BC at ch: 7+000-14+130km.
|
7.1300
|
249.260
|
|
249.260
|
|
08/06/2021
|
0
|
21/01/2021
|
|
|
4
|
GCP-3/Ctg/WD-172
|
Improvement of Padua Rajar Hat-Kamalachari GPS-RHD Bridge Ghat (Khurushia Abdul Hamid Road) Road by BC at Ch: 0+000-4+000km.
|
4.0000
|
457.730
|
|
457.730
|
|
28/10/2021
|
0
|
21/01/2021
|
|
|
5
|
GCP-3/Ctg/WD-205
|
Development of Godown Bridge-Kalurghat Road (Muktijudddah Ali Akbor Road) by RCC at ch: 0+000-0+560km.
|
|
51.370
|
|
51.370
|
|
06/05/2021
|
0
|
21/01/2021
|
|
|
6
|
GCP-3/Ctg/WD-102
|
Development of RHD Shantinikaton Bazar Bommotar Nurul Ulum Madrasha-TC Hat (Korban ali Road & Nobo Chandra Road) by BC at ch: 1204-2765m.
|
1.4480
|
250.580
|
|
250.580
|
|
28/07/2021
|
10
|
21/01/2021
|
|
|
7
|
GCP-3/Ctg/WM-24
|
Maintenance of Padua Razar Hat-Horihor GPS-RHD Narissa Bottal (SDO Road) Road
|
2.6600
|
127.834
|
|
127.834
|
|
|
0
|
20/01/2021
|
reject.design change needed.
|
|
8
|
GCP-3/Ctg/WD-41
|
Development of Parua UP Office -Sonai chori Bazar (Rangunia Part)
|
1.6400
|
155.030
|
|
155.030
|
|
|
0
|
20/01/2021
|
tender notice under process
|
|
9
|
GCP-3/Ctg/WM-34
|
Periodic Maintenance of Dovashi Bazar GC-Kodala UP-Shilok UP-Sarfvata UP-RHD- Godown (Hazee Sayed Ali Road) Road by BC
|
6.3440
|
162.060
|
M/S. A ALI CHOWDHURY
|
162.060
|
|
12/02/2021
|
0
|
20/01/2021
|
|
|
10
|
GCP-3/Ctg/WM-38
|
Periodic Maintenance of Sawnirvar Rangunia UP-TC Hat-Hosnabad UP (Ram Mohansikder Road) Road by BC
|
1.5140
|
39.840
|
M/S. SHOHAG ENTERPRISE
|
39.840
|
|
15/02/2021
|
0
|
20/01/2021
|
|
|
11
|
GCP-3/Ctg/WD-31
|
Improvement of Sarafvata UP-Mirrerkhill Bazar (Hazee Asraf Ali Road) by BC
|
3.0300
|
316.460
|
A ALI -AKHI-AI AMIN (JV)
|
316.460
|
|
21/11/2020
|
65
|
20/01/2021
|
|
|
12
|
GCP-3/Ctg/WD-117
|
Development of Parastani Bile Road (Shilak Nazir Ahammed Road-Goas Tali Para) by HBB
|
1.0000
|
71.230
|
M/S. A S CHOWDHURY
|
71.230
|
|
24/07/2020
|
45
|
20/01/2021
|
|
|
13
|
GCP-3/Ctg/WD-109
|
Development of Pomra GPS-Kaidazam Market (Bachsah Road) by BC.
Development of Moriom Nagar RHD-Jaladas Para (Moriom Nagar Jaladas Para) Road by HBB
|
1.1800
|
125.630
|
M/S. SALEHA CONSRUCTION
|
125.630
|
|
07/11/2020
|
80
|
20/01/2021
|
|
|
14
|
GCP-3/Ctg/WD-88
|
Construction of 20m Long RCC Girder Bridge (Clear Traffic Width 5.50m) over Gochara Katakhali Khal on Pomra GPS-Kaidiazam Market (Bacha Shah Road)
|
|
175.460
|
M/S. SALEHA CONSRUCTION
|
175.460
|
|
24/07/2020
|
85
|
20/01/2021
|
|
|
15
|
GCP-3/Ctg/WM-15
|
Maintenance of RHD Shishutal-Ranirhat GC Road
|
3.2000
|
97.160
|
M/S. Creation Construction
|
97.160
|
|
05/03/2020
|
50
|
20/01/2021
|
|
|
16
|
GCP-3/Ctg/WM-01
|
A)Periodic Maintenance of RHD Brammon Ghat- Darikope High School-Chipchari Pekua Fruits Fram (Darikope Road)
B) Rehabilitation Dovashi Bazar GC-kodala UP-Shilok Up-Sarafvata Up- RHD Godown (Hazee Sayed Ali Road)
|
3.8650
|
99.270
|
M/s. Al-Amin
|
99.270
|
|
18/07/2019
|
50
|
20/01/2021
|
|
|
17
|
GCP-3/ctg/WD-11
|
Dovashi Bazar GC - Nischintapur - RHD Mogalerhat (From RHD #103)
|
2.2980
|
291.380
|
Dolly Construction
|
291.380
|
|
31/05/2020
|
55
|
20/01/2021
|
|
|
18
|
Gcp-3/ctg/WM-02
|
Periodic maintenance of RHD Rampgotirhat karnafully River Ghta.
|
0.7330
|
36.200
|
M/s Jahanara & sons
|
36.200
|
|
18/06/2019
|
100
|
20/01/2021
|
|
|
19
|
GCP-3/Ctg/WD-86
|
Improvement of Azimpir Road (Khurushia Darikope Road-Semipara)
|
1.2000
|
91.720
|
M/S. Afsana Enterprise
|
91.720
|
|
20/12/2019
|
100
|
20/01/2021
|
final bill paid
|
|
|
12
|
Raojan
|
|
1
|
GCP-3/Ctg/WD-221
|
Improvement of Moulana Sirajuddin road (Nazim Building to M.Farid ahammed Bari Road) by HBB at ch: 350-630m.
|
0.2800
|
13.810
|
|
13.810
|
|
|
0
|
21/01/2021
|
APP Send to pd.
|
|
2
|
GCP-3/Ctg/WD-125
|
Development of Kachu Khain Abdul Nabi Road (Noapara) by RCC at ch: 0+000-1+000km.
|
1.0000
|
148.520
|
|
148.520
|
|
|
0
|
21/01/2021
|
APP Send to pd.
|
|
3
|
GCP-3/Ctg/WD-218
|
Development of Vot Pukuria Hazrat Nojir Ahamed Shah Road-Shahid Jafar Road by HBB at ch: 732-1652km.
|
0.9200
|
74.870
|
|
74.870
|
|
|
0
|
21/01/2021
|
NOA Issued
|
|
4
|
GCP-3/Ctg/WD-217
|
Development of Chattogram-Kaptai (R&H) Road-Zia Bazar (LM) via Modon Jungle) Madunaghat Road (Modon Jungle) by RCC at ch: 560-1226m.
|
0.6660
|
106.640
|
|
106.640
|
|
|
0
|
21/01/2021
|
NOA Issued
|
|
5
|
GCP-3/Ctg/WD-216
|
Development of Rawali Road (UZR)-Oli Mia Hat LM. Bara Takur Para Road) by RCC at ch: 740-1409km.
|
0.6760
|
107.120
|
|
107.120
|
|
|
0
|
21/01/2021
|
NOA Issued
|
|
6
|
GCP-3/Ctg/WD-213
|
Construction of 1 x 3.50 x 3.50m RCC Box Culvert at Ch: 118.00m on Kulal para Road (Kodolpur UP)
|
|
31.250
|
|
31.250
|
|
|
0
|
20/01/2021
|
|
|
7
|
GCP-3/Ctg/WD-160
|
Improvement of Bagon Bhupesh Barua Bari Road by RCC at ch: 0+000-0+951km.
|
0.9510
|
175.930
|
|
175.930
|
|
04/07/2021
|
0
|
20/01/2021
|
|
|
8
|
GCP-3/Ctg/WD-123
|
Development of Bama Charan Road (East Guzra) by RCC
|
1.0000
|
157.180
|
M/S. BAIZID
|
157.180
|
|
30/12/2020
|
90
|
20/01/2021
|
|
|
9
|
GCP-3/Ctg/WD-124
|
Development of Nowapara Paloan Para Nurani Madrasha Road by RCC
|
0.7250
|
117.210
|
M/S. K ALAM TRADERS
|
117.210
|
|
27/12/2020
|
90
|
20/01/2021
|
|
|
10
|
GCP-3/Ctg/WD-106
|
Development of Dost Mohammed Road (UZR) Akber Sha (UNR) Road at Gonir Ghat (Md. Amir Road) by BC
|
0.5000
|
35.170
|
M/S TASPIYA ENTERPRISE
|
35.170
|
|
22/09/2020
|
70
|
20/01/2021
|
|
|
11
|
GCP-3/ctg/WD-16
|
Improvement of Shair Mohammad Road (Kadalpur)
|
0.4680
|
43.950
|
M/S. Benchmark Construction
|
43.950
|
|
22/07/2020
|
60
|
20/01/2021
|
|
|
12
|
GCP-3/Ctg/WD-103
|
Development of Samsher Para road (Kadalpur) by RCC.
Development of Kadalpur Feda Gazir Bari Road-Nurali Munsi Road by RCC
|
1.4100
|
213.870
|
M/S. KAHEM ENTERPRISE
|
213.870
|
|
04/08/2020
|
80
|
20/01/2021
|
|
|
13
|
GCP-3/Ctg/WD-79
|
A) Development of Raozan-Noapara Section-1 (R&H) at Chitiapara-Raozan-Noapara Sec-1(R&H) at kagotia Hat (LM) via Lalangara Para Road (Lalangara Para Road) by BC
B) Development of Shahid Jafar (R&H Road Brikka Bhanupur Bazar (LM) Road (Brindaban Para Road) by HBB
|
3.0000
|
235.950
|
M/S. Pubali Traders
|
235.950
|
|
30/12/2020
|
65
|
20/01/2021
|
|
|
14
|
GCP-3/Ctg/WD-39
|
A) Improvement of Gourisankar Hat GC Ramchandra Bazar RHD via New Roghunandan Road
B)Improvement of R.D Mphammadia Road Paharoli Dewanpur Pathan Pra Road
|
2.2010
|
349.280
|
M/s. I S Trading
|
349.280
|
|
25/03/2020
|
50
|
20/01/2021
|
|
|
15
|
GCP-3/ctg/WD-19
|
Shahid jafar Road (R&H) Dabua Rubber Garden via Hingola Mucha shah mazar (Dabua Rubber Gurden road)
|
1.0000
|
70.580
|
M/s ChowdhuryEnterprise,
|
70.580
|
|
24/10/2019
|
70
|
20/01/2021
|
|
|
16
|
GCP-3/Ctg/WD-161
|
Improvement of Noajishpur Dabua Road (Gohira heaco Road to Dabua Gonirghat Bridge) by RCC
|
0.8000
|
128.550
|
M/S. S M TRADING
|
128.550
|
|
15/01/2021
|
100
|
20/01/2021
|
|
|
17
|
GCP-3/Ctg/WD-68
|
A) Development of Chittagong-Rangamati (R&H) Road-Chikdair UP (Shaheb Bari Road)
B) Development of Saf Langa No-1 Road
|
1.9600
|
258.390
|
M/s. Riton Enterprise
|
258.390
|
|
05/04/2020
|
100
|
20/01/2021
|
|
|
18
|
GCP-3/ctg/WD-18
|
Amir para road (Hafez Bazlur Rahman Road to Amirpara
|
1.0400
|
140.250
|
M/s ShahJabbariaConstruction & Co
|
140.250
|
|
30/11/2019
|
100
|
20/01/2021
|
|
|
19
|
GCP-3/Ctg/WD-77
|
A) Development of Pachim Gahira Brick Field RHD-Mohammed Towkir hat GC (Raozan Part) by BC.
B)Development of Dost Mohammed (UZR) Hingula Musa Shah Majar & Bazar (LM) Riad (Kash Khali Dabua Hingolla Road) by HBB
C)Development of khan Bahadur Abdul Jabber Road-2 kagotia hat (LM) via Sonair Muk Road (West Binajuri Sonair Muk Road) by BC.
|
3.1500
|
282.190
|
M/S. Pubali Traders
|
282.190
|
|
30/12/2020
|
100
|
20/01/2021
|
|
|
20
|
GCP-3/Ctg/WM-23
|
Maintenance of Ramjan Ali Hat G.C – Noapara Pather hat (R&H) Road (Rouzan Noapara Sec-2)
|
5.0600
|
171.990
|
M/S. Shah Amanat Enterprise
|
171.990
|
|
10/08/2019
|
100
|
20/01/2021
|
final bill submited
|
|
21
|
GCP-3/ctg/WD-20
|
Kulal para road ( Kodolpur UP) (Amir Para)
|
0.8800
|
81.510
|
M/sM N Traders
|
81.510
|
|
25/03/2020
|
100
|
20/01/2021
|
|
|
22
|
GCP-3/ctg/WD-21
|
Improvement of Noapara Ovalong Road
|
2.1470
|
255.360
|
M/S. Iqbal & Brothers- Shah Amanat Enterprise (JV)
|
255.360
|
|
13/02/2020
|
100
|
20/01/2021
|
|
|
23
|
GCP-3/ctg/WD-33
|
A)Mozlish Bari Road (Via Naki
Miaji Bari)
B) Mobarak ali road.
|
1.5800
|
239.590
|
M/s Iqbal &Brothers
|
239.590
|
|
13/11/2019
|
100
|
20/01/2021
|
final bill.
|
|
24
|
GCP-3/ctg/WD-17
|
Kala Miah Road
|
1.3530
|
170.020
|
M/s S M Trading
|
170.020
|
|
06/06/2019
|
100
|
20/01/2021
|
final bill paid
|
|
|
13
|
Sandwip
|
|
1
|
WD-313
|
sontoshpur up to companigonj ghat road via dirgapar up and urichar up
|
1.7270
|
295.740
|
|
295.740
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
2
|
WM-73
|
musapur chowmuhoni bazar to mugdhara up amtoli bazar
|
2.3000
|
292.870
|
|
292.870
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
3
|
WD-312
|
a.freedom fighter akram khan dulal road b.ponditer hat and rhd road to embankment via kamala matibhanga road
|
2.0000
|
342.130
|
|
342.130
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
4
|
WD-437
|
palashirhat gc to embankment
|
1.3300
|
253.060
|
|
253.060
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
5
|
WD-438
|
palashirhat gc to embankment
|
0.3000
|
57.800
|
|
57.800
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
6
|
WD-242
|
a.musapur chowmuhani bazar to moghdara up amtoli bazar b.palisher hatb gc to embankment
|
1.4430
|
253.860
|
|
253.860
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
7
|
WD-243
|
a. chwmuhoni road to akbor hat via banir hat b.palashar bazar gc to sleber hat road via amtoli bazar & dhopergopart
|
1.4750
|
255.320
|
|
255.320
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
8
|
WD-311
|
embankment circular road via adarshapara gps and shiberhat gc
|
1.7300
|
303.890
|
|
303.890
|
|
|
100
|
07/07/2026
|
final bill paid
|
|
9
|
GCP-3/Ctg/WM-09
|
A)Maintenance of
Harish Pur Union Parishad-Salam Bazar Road
B)Maintenance of Embacment to Circular Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road)
|
1.4600
|
136.860
|
Md. Zakir hossain
|
136.860
|
|
15/09/2019
|
100
|
20/01/2021
|
final bill paid
|
|
10
|
GCP-3/Ctg/WD-145
|
Development of Chwmuhani Road (Pouroshava Market) to Akbor Hat via Banir Hat (Cross Road) Road by RCC
|
1.0000
|
170.200
|
M/S MOHSHIN & BROTHERS & M/S SAMIHA ENTERPRISE (JV)
|
170.200
|
|
26/11/2020
|
0
|
19/01/2021
|
|
|
11
|
GCP-3/Ctg/WD-146
|
Development of Harish pur Union Parishad-Salam Bazar Road by RCC
|
0.6000
|
101.850
|
M/S SANDWIP BUILDERS
|
101.850
|
|
08/09/2020
|
0
|
19/01/2021
|
|
|
12
|
GCP-3/Ctg/WD-80
|
A) Improvement of Ammanullah UP to Doamkhali ferry ghat via RHD Road (Doamkhali ferry ghat Road) by RCC
B) Improvement of Palashar Bazer GC to Sheber hat GC (RHD) Road via Amtoli Bazar & Janata bazar Road (Kamala & Dhopergopart Road) by RCC
|
2.7500
|
409.690
|
Mohammad younus & brothers
|
409.690
|
|
20/11/2020
|
50
|
19/01/2021
|
|
|
13
|
GCP-3/Ctg/WD-38
|
Improvement of Bangla Bazar to Tonasa Road (Mafiz Mikter road) by RCC.
Improvement of Bauria Harishpur Road (H/O) Moulovi Shamsul Huda ) to Banir hat ( Moulovi Shamsul Huda Road) by RC
Improvement of Harishpur Up to Embankment via Dwipallo GPS RHD Road (Modhya Bauria Road) by RCC
Improvement of Musapur Chowmuhani Bazar to Mogdhara up Amtoli bazar via Chowdhury bazar Maitbanga up (DB Road) by RCC
Improvement of Palisher Hat GC to Embacment (Palisher road) by RCC
Improvement of Sandwip Upazila Sontospur up to Companigong Ghat (Noakhali) Road via Dirgapur UP & urir char UP (Sandwip Char Elahi Connecting Road) by RCC
|
3.4200
|
324.190
|
M/S A. ALI CHOWDHURY
|
324.190
|
|
15/07/2020
|
90
|
19/01/2021
|
|
|
14
|
GCP-3/Ctg/WD-81
|
A) Improvement of Freedom Fighter Akram Khan Dulal Road (Mollah Road) by RCC
B) Improvement of Embakment to Circuler Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road) by RCC
C) Improvement of RHD Road (Malak Munshi Bazar) to Moulavi Bazar (Badalia Road) by RCC
|
2.2500
|
300.180
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
300.180
|
|
30/11/2020
|
100
|
19/01/2021
|
|
|
15
|
GCP-3/Ctg/WD-82
|
A) Improvement of Panditer Hat & RHD Road to Embnmkent via kamala maitbanga Road (Alam khushi Road) by RCC
B) Improvement of Banir hat (H/O Rafiq Compani) to Bosidia Road via RHD & Ershad Market (Gasua Bauris boarder) by RCC
|
1.2050
|
160.850
|
M/S. S R Enterprise
|
160.850
|
|
09/03/2020
|
100
|
19/01/2021
|
final bill submitted.
|
|
|
14
|
Satkania
|
|
1
|
GCP-3/ctg/WD-517
|
Development of Karaia Nagar Mahila Madrasa Road by BC & Uni-Block at Ch: 00-1000m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 939169.00) (Road ID No- 415825033).
|
1.0000
|
109.770
|
|
109.770
|
|
|
0
|
07/07/2026
|
Tender Under Evaluation
|
|
2
|
GCP-3/ctg/WD-510
|
Development of Chotta Hatiya Road by Uni-lock at Ch: 00-1020m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 163677.00) (Road ID No-415824044).
|
1.0200
|
163.410
|
|
163.410
|
|
30/04/2026
|
70
|
07/07/2026
|
|
|
3
|
GCP-3/ctg/WD-505
|
Improvement of Eochia UP-Jut Pokuria Bazar Road by Uni-Block at Ch: 1645-2895m; Upazila: Satkania, District: Chattogram (Road ID No-415823003).
|
1.2500
|
160.570
|
|
160.570
|
|
01/05/2026
|
55
|
07/07/2026
|
|
|
4
|
GCP-3/ctg/WD-425
|
Development Of Uttor Rampur Govt. Primary School-Maidda Para via Majer Para Road by BC at Ch: 00-430m; Upazilla : Satkania, District: Chattogram. (ID:415824210)
|
0.4300
|
44.870
|
|
44.870
|
|
03/07/2024
|
35
|
07/07/2026
|
Contact Cancel, J.M Under Process.
|
|
5
|
GCP-3/ctg/WD-349
|
Development of Freedom Fighetr M. Fazal Karim Chairman Road (Kaliais UPC-Dastider Hat) by BC at Ch: 3000-4920m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 3553887.00) (ID No-415823009).
|
1.9200
|
308.720
|
|
308.720
|
|
28/02/2026
|
85
|
07/07/2026
|
|
|
6
|
GCP-3/ctg/WD-263
|
Construction of 30.00m Long PSC Girder Bridge (Clear Traffic With-5.50m) on Kanchana UP-Monu Fakirhat Road at Ch: 1908m; Upazila: Satkania, District: Chattogram (ID No-415823002).
|
|
304.770
|
|
304.770
|
|
30/12/2024
|
100
|
07/07/2026
|
|
|
7
|
GCP-3/ctg/SWD-391
|
Improvement of Goribarjhil Laila Moksood Road by BC at Ch: 00-760m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 1464046.00) (ID No-415824157).
|
0.7600
|
101.020
|
|
101.020
|
|
30/05/2024
|
90
|
07/07/2026
|
Revised Est. Sent to HQ.
|
|
8
|
GCP-3/ctg/WD-238
|
Construction of 20.00m Long RCC Girder Bridge (Clear Traffic With-5.50m) on Khagoria Bhore Bazar GC-CTG Cox's Bazar (NHW) Road at Ch: 2028m; Upazila: Satkania, District: Chattogram (ID No-415822001).
|
|
195.180
|
|
195.180
|
|
28/02/2026
|
100
|
07/07/2026
|
|
|
9
|
GCP-3/Ctg/WM-10
|
Maintenance of Upazila Headquarter-Keranihat GC road
|
3.6580
|
218.440
|
M/s Md. Faruq
|
218.440
|
|
17/09/2019
|
100
|
06/07/2026
|
Final Bill Paid
|
|
10
|
GCP-3/ctg/WD-507
|
Development of Uttor Brammon Danga Uttor Para Road (Charati) by Uni-Block at Ch: 600-850m; Upazila: Satkania, District: Chattogram (Road ID No-415824179).
|
0.2500
|
39.750
|
|
39.750
|
|
12/03/2026
|
100
|
06/07/2026
|
Final Bill Paid
|
|
11
|
GCP-3/ctg/WM-067
|
Maintenance of Freedom Fighter M. Fazla Karim Chairman Road (Kaliaish UPC-Dastider Hat) by BC at Ch: 00-3000m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 394240.00) (ID No-415823009).
|
3.0000
|
325.780
|
|
325.780
|
|
28/12/2025
|
100
|
06/07/2026
|
Final Bill Paid
|
|
12
|
GCP-3/ctg/WD-436
|
Development of Uttor Brammon Danga Uttor Para Road (Charati) by RCC at Ch: 00-600m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 216145.00) (ID No-415824179).
|
0.6000
|
65.370
|
|
65.370
|
|
02/02/2025
|
100
|
06/07/2026
|
Final Bill Paid
|
|
13
|
GCP-3/ctg/WD-138
|
Development of Karani Hat GC-KG Road (RHD) near Demsha UPC Rozd by BC at Ch: 0+000-1+762km; Upazila: Satkania, District: Chattogram.
|
1.7620
|
283.510
|
|
283.510
|
|
08/04/2024
|
100
|
06/07/2026
|
Final Bill Paid
|
|
14
|
GCP-3/ctg/WD-348
|
Improvement of Samadia Pukur Bazar-Chib Bari School Road by BC at Ch: 1000-1365m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 754445.00) (ID No-415824048).
|
0.3650
|
31.590
|
|
31.590
|
|
25/04/2024
|
100
|
06/07/2026
|
Final Bill Paid
|
|
15
|
GCP-3/ctg/WD-285
|
Development of Fultala-Monufakir Hat Road by BC at Ch: 00-1500m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 2227210.00) (ID No-415824011).
|
1.5000
|
154.330
|
|
154.330
|
|
19/03/2024
|
100
|
06/07/2026
|
Final Bill Paid
|
|
16
|
GCP-3/ctg/WD-320
|
Development of Karani Hat GC-Khagoria Bhorbazar GC Road by BC at Ch: 3600-4960m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 2624257.00) (ID No-415822004).
|
1.3600
|
199.230
|
Makka Builders
|
199.230
|
|
30/01/2024
|
100
|
06/07/2026
|
Final Bill Paid
|
|
17
|
GCP-3/ctg/WD-291
|
Development of Freedom Fighter M. Fazal Karim Chairman Road (Kaliaish UPC-Dastider Hat) by BC at Ch: 7600-8600m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 1935596.00) (ID No-415823009).
|
3.0000
|
209.620
|
M/S Haque & Engineering
|
209.620
|
|
05/07/2023
|
100
|
06/07/2026
|
Final Bill Paid
|
|
18
|
GCP-3/ctg/WD-286
|
Development of Hasan Shah Road by BC at Ch: 00-1000m; Upazila: Satkania, District: Chattogram (ID No-415824027).
|
1.0000
|
170.150
|
M/S Shah Darbeshia Automobiles
|
170.150
|
|
25/09/2023
|
100
|
06/07/2026
|
Final Bill Paid
|
|
19
|
GCP-3/ctg/WM-49
|
Maintenance of Dewan Hat GC-Teyari Hat GC (Lohagara) Satkania Portion Road by BC at Ch: 4735-6196m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 232512.00) (ID No-415822006).
|
1.4610
|
113.580
|
M/S Yeamin Construction
|
113.580
|
|
30/10/2022
|
100
|
06/07/2026
|
Final Bill Paid.
|
|
20
|
GCP-3/Ctg/WD-48
|
Develoment of Sadaha UP-Dostidar Hat Road by BC
|
0.6980
|
100.590
|
M/S. MOHSHIN & BROTHERS
|
100.590
|
|
30/10/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
21
|
GCP-3/Ctg/WD-112
|
Development of Satkania U.P-Tayari Hat Bazar GC (Lohagora) Road from
|
0.9950
|
91.430
|
M/S. J K ENTERPRISE
|
91.430
|
|
25/07/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
22
|
GCP-3/Ctg/WD-122
|
Development of Bomang Hat GC-Mithadighi (RHD) via Sadaha UPC Road by BC .
|
2.0000
|
188.290
|
M/S. ABSAR CONSTRION
|
188.290
|
|
04/10/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
23
|
GCP-3/Ctg/WD-36
|
Developement of Gatiadanga -Deodighi-Mirjakhil Road (From RHD #146)
|
1.1930
|
152.830
|
M/S. ADS Builders
|
152.830
|
|
20/09/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
24
|
GCP-3/Ctg/WD-116
|
A) Development of Amilaish Char Para-Datta Ghat Road by BC .
B) Development of West Amilaish GPS-Khar Mosjid Road by HBB.
|
1.5490
|
125.800
|
S ANANTA BIKASH TRIPURA
|
125.800
|
|
06/10/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
25
|
GCP-3/Ctg/WM-39
|
Maintenance of Nalua-Satkania Road via Nalua Hadar Khal Bridge at 1.00km & Gatiadanga High School at Ch: 8.00km of Charati-Khoderhat-Noyahat-Bazalia (From RHD# 143) Road by BC at ch: 0-200m, 340-550 & 870-2500m. RCC at ch: 200-340m & 550-870m
|
2.4600
|
113.770
|
M/S BLUE BIRDS
|
113.770
|
|
02/03/2021
|
100
|
06/07/2026
|
Final Bill Paid
|
|
26
|
GCP-3/Ctg/WD-35
|
Development of Rampur Madrasha Shikder Para Road
|
0.7350
|
91.700
|
M/S. S M Yousuf Brothers
|
91.700
|
|
30/06/2020
|
100
|
06/07/2026
|
Final Bill Paid
|
|
27
|
GCP-3/Ctg/WD-52
|
Development of Madrasha-Sonakania Gravyeard Road
|
1.0550
|
93.270
|
M/s. Alam Enterprise
|
93.270
|
|
03/11/2020
|
100
|
06/07/2026
|
|
|
28
|
GCP-3/Ctg/WD-91
|
Development of Mirza Jabal Road by HBB
|
0.7320
|
43.040
|
M/S. M A S K Construction
|
43.040
|
|
21/12/2019
|
100
|
06/07/2026
|
Final Bill Paid
|
|
|
15
|
Sitakunda
|
|
1
|
WD-501
|
Siraj bhuiyan rhd south muradpur uzr habib road
|
1.0150
|
199.460
|
|
199.460
|
|
|
50
|
07/07/2026
|
|
|
2
|
SWDS-294R
|
islamic university chattogram internal road
|
0.2150
|
17.160
|
|
17.160
|
|
|
0
|
07/07/2026
|
cancel
|
|
3
|
WD-465
|
madhoy dari uzr habib road wdb embankment road
|
1.0000
|
112.210
|
|
112.210
|
|
|
65
|
07/07/2026
|
|
|
4
|
WD-464
|
mohanagar notun para road
|
1.1430
|
126.420
|
|
126.420
|
|
|
0
|
07/07/2026
|
cancel
|
|
5
|
WD-463
|
pashchim sayedpur antorkhali mirerhat toad
|
0.6760
|
76.010
|
|
76.010
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
6
|
WD-344
|
islamic university sitakunda and hathazari connecting road
|
1.2470
|
189.140
|
|
189.140
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
7
|
WD-445
|
janaullah sowdagor road
|
0.7750
|
97.150
|
|
97.150
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
8
|
WD-448
|
bogachator habib road dakkhin bogachator school road
|
0.7200
|
89.710
|
|
89.710
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
9
|
SWD-419
|
maza mazi para abul hossain jame mosque road
|
0.2250
|
21.230
|
|
21.230
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
10
|
WD-244
|
mirerhat hamidullah road
|
1.6000
|
142.410
|
|
142.410
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
11
|
SWD-298
|
islamic university road
|
0.7550
|
118.390
|
|
118.390
|
|
|
100
|
05/07/2026
|
final bill paid
|
|
12
|
GCP-3/Ctg/WD-73
|
Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC at ch: 0+000-1+400km.
|
2.0300
|
194.040
|
|
194.040
|
|
|
0
|
20/01/2021
|
Tender notice under process.
|
|
13
|
GCP-3/Ctg/WM-05
|
A)Maintenance of Modhya Bogachator Cyclone Shelter Road
B)Maintenance of Mirer Hat GC Road- Sandwip Ferry Ghat Road (Mirer Hat GC) Road
C)Maintenance of Zinnat Ali Road
|
4.4490
|
130.680
|
M/s Stapathi Design & Consultant
|
130.680
|
|
05/06/2019
|
100
|
20/01/2021
|
final bill paid
|
|
14
|
GCP-3/Ctg/WM-06
|
A)Maintenance of Mojid Mullah-Tofjolia Dhalipara Hasnabad road
B)Maintenance of Chotodarogerhat RHD-Sohasra Dhara Road
C)Maintenance of Mogpukira Road
|
3.7070
|
101.480
|
M/s. Hassan Motors
|
101.480
|
|
30/10/2020
|
100
|
20/01/2021
|
final bill paid
|
|
15
|
GCP-3/ctg/WD-30
|
Postim Sayed Pur Auntar khali - Mirer Hat Road.
|
0.9760
|
242.790
|
|
242.790
|
|
|
0
|
19/01/2021
|
টেন্ডার হয়নি।
|
|
16
|
GCP-3/Ctg/WD-182
|
Development of Uttor Bohachattor Oli Ahammed (Raja Miah Chdry) Road by BC
|
1.0000
|
97.220
|
M/S THREE STAR ENTERPRISE
|
97.220
|
|
27/12/2020
|
10
|
19/01/2021
|
|
|
17
|
GCP-3/Ctg/WD-156
|
Improvement of Bhatiary Sunsade Point RHD-Dhaka Chattogram Road RHD via BMA High School Road by BC
|
1.6600
|
397.240
|
M/S JEWEL ENTERPRISE
|
397.240
|
|
26/05/2021
|
0
|
19/01/2021
|
|
|
|
Total :
|
548.8870 (Km)
|
70982736.85 (Lac)
|
70982736.85 (Lac)
|
|
|
|
|
|
|
|