Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Anwara
1 GCP-3/Ctg/WD-194 Development of Shouth Sholkata S.J Nijam High School Road by BC at ch: 00-655m. 0.6550 57.160 57.160 0 21/01/2021 NOA Issued
2 GCP-3/Ctg/WDS-210 Development of Saodagar Dighi Road (Noldia GPS School Connecting Road by HBB at ch: 00-570m. 0.5700 42.940 42.940 0 21/01/2021 NOA Issued
3 GCP-3/Ctg/WD-215 Improvement of keyagar-Chatary Road by BC at ch: 0+550-1+550km. 1.0000 92.510 92.510 10/06/2021 0 21/01/2021
4 GCP-3/Ctg/WD-204 Development of Sarddar Para Road by BC at ch: 0+118-0+760km. 87.800 87.800 22/05/2021 0 21/01/2021
5 GCP-3/Ctg/WDS-198 Development of Bairage Pilot Road (Mohadebpur Government Primary School Connecting Road) by HBB at ch: 00-665m. 0.6650 39.100 39.100 07/03/2021 0 21/01/2021
6 GCP-3/Ctg/WDS-197 Development of East Gohira Government Primary School Connecting Road by HBB at ch: 00-230m. 0.2300 19.230 19.230 16/02/2021 0 21/01/2021
7 GCP-3/Ctg/WD-201 Construction of Bazar Sheed at Wahed Ali Bazar. 39.710 39.710 08/05/2021 0 21/01/2021
8 GCP-3/Ctg/WD-196 Development of Shilalia Jiori Fultoli R&H-Surat Bibi (Jan Ali Chowdhury Road) by BC at ch: 2500-2970m. 0.4700 44.510 44.510 07/04/2021 0 21/01/2021
9 GCP-3/Ctg/WD-195 Development of Shilalia Road (Barkal Bridge-Tisori Silalia Manurkhain Bazar Road) by BC at ch: 1000-1825m. 0.8250 81.470 81.470 07/04/2021 0 21/01/2021
10 GCP-3/Ctg/WD-121 Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC at. Ch: 5+220-5+930km. 0.7100 60.410 60.410 24/01/2021 40 21/01/2021
11 GCP-3/ctg/WDS-190 Development of Poroikora Churushila GPS Connecting Road by HBB 0.1400 12.320 M/S. H M FOUNDATION 12.320 16/12/2020 0 20/01/2021
12 GCP-3/ctg/WDS-189 Development of Banker Nurul Islam Chy Road (Ali Muddin Dovash GPS Connecting Road) by HBB 0.2330 9.760 M/S. M A S K CONSTRUCTION 9.760 0 20/01/2021 NOA ISSUED
13 GCP-3/ctg/WD-162 Develoment of Anowara R&H-Barakhain UP office Road via Badamtoki Bazar Road by BC 1.7800 167.110 M/S A ALI CHOWDHURY 167.110 09/03/2021 0 20/01/2021
14 GCP-3/ctg/WDS-181 Development of Cenamoti Government Primary School Connecting Road by HBB 0.9300 55.830 M/S. DOT ENTERPRISE 55.830 08/12/2020 30 20/01/2021
15 GCP-3/ctg/WDS-180 Development of West Raypor Government Primary School Connecting Road by HBB 1.0000 61.200 M/S. ALFI ENTERPRISE 61.200 03/11/2020 0 20/01/2021
16 GCP-3/ctg/WD-163 Develoment of Guzara Bazar-Haildhar UPC Road by BC 0.6650 75.670 M/S. RIDWANUL HOQUE & BROTHERS 75.670 04/12/2020 65 20/01/2021
17 GCP-3/ctg/WD-155 Development of Moina Gazi Road by BC 1.8900 190.590 M/S. SHAH JABBARIA CONSTRUCTION & CO. 190.590 12/11/2020 10 20/01/2021
18 GCP-3/ctg/WM-31 Maintenance of Pirkhain R&H-River Ghat via Haildhar UPC Road (Abdul Majid Chowdhury Road). Maintenance of Anoara R&H Road-Khashama R&H Road. 1.9680 63.650 M/S. RIDWANUL HOQUE & BROTHERS 63.650 08/08/2020 5 20/01/2021
19 GCP-3/ctg/WD-115 A) Development of Kunir Bill Road by BC. B) Development of Heti Khayin-Borkal Ghat Road (Basiruzzaman Road) by BC 1.8000 170.550 M/S. AZAD ENTERPRISE 170.550 21/01/2021 60 20/01/2021
20 GCP-3/ctg/WM-25 A) Maintenance of Barashat Gobadia Connecting Road by BC. B) Maintenance of Anwara R&H-Barakhain UP Office Road via Badamtoli Bazar Road by BC . C) Maintenance of Ayer Mongal R&H-Anner Ali Shikder Hat Road by BC 3.5500 101.030 M/S. Jashim & Brothers 101.030 04/01/2020 65 20/01/2021
21 GCP-3/Ctg/WD-96 Development of Anwara Joikali GC-Barakhain UP Office Road by BC 0.9600 100.890 M/S. Saired Enterprise 100.890 21/03/2020 70 20/01/2021
22 GCP-3/ctg/WD-43 Guzara-Tesury Rd 1.2150 109.940 M/s Jashim &Brothers 109.940 30/04/2020 70 20/01/2021
23 GCP-3/ctg/WD-159 Develoment of Shilaigora R&H-Sayed Kuchaiya Barkal PAB Road by BC 0.9150 85.040 M/S. ABDUS SABUR 85.040 05/10/2020 10 20/01/2021
24 GCP-3/Ctg/WD-61 A) Improvement of Lal Mohammad (Lal Mohoti) Road B) Improvement of Boirag-Guapanchak Road 2.6250 191.960 M/s Al kutub & Brothers 191.960 25/01/2020 100 20/01/2021 final bill submit
25 GCP-3/ctg/WD-09 Pirkhain R&H-River Ghat via Haildhar UPC Rd.(Abdul Majid Chowdhury Rd). 1.5800 134.120 M/s SairedEntrrprise 134.120 20/10/2019 100 20/01/2021 final bill submited.
26 GCP-3/ctg/WM-27 Maintenance of Jiouria Fultoli R&H-Surut Bibe (Jan Ali Chowdhury Road) by BC 2.5000 59.990 M/S. Rima Construction 59.990 04/01/2020 100 20/01/2021 final bill paid
27 GCP-3/Ctg/WD-53 Improvement of Goni Shah Road 0.7920 61.790 M/S. Jashim & Brothers 61.790 20/08/2019 100 20/01/2021
28 GCP-3/ctg/WD-44 North Malghar Jame Mosque Road inc. link portion 0.2550 42.880 M/s Azad Entrrprise 42.880 14/06/2019 100 20/01/2021 final bill paid
29 GCP-3/ctg/WD-10 Development of Rustom hat Kanu Mazir Bazar-Burumchara UP Office via (Borumchara Hazari Road) Road by BC 0.7100 60.410 M/S. ALIM & BROTHERS 60.410 23/06/2020 30 20/01/2021
2 Banskhali
1 GCP-3/ctg/WM-17 A) Maintenance of Boilgon Siraj Miah Road by BC. B) Maintenance of Kotpara-Katharia-Bagmaara to Haliapara Road by BC 1.6400 44.720 M/S. H H Enterprise 44.720 06/09/2019 100 12/07/2026 final bill paid
2 GCP-3/Ctg/WD-85 A)Development of Baharchara Foyz Ullah Master Road by HBB. B)Development of Shadanpur P.U.H.S to Karim Bazar Road by HBB 1.4000 74.770 M/S. Romena Enterprise 74.770 09/11/2019 100 12/07/2026 final bill paid.
3 GCP-3/Ctg/WD-90 Development of kadam Rasul-Pramasia bazar Road (Baro Moulana Rd) by BC 1.8800 90.240 M/S. B C H Internationa 90.240 10/04/2020 100 12/07/2026 Final Bill Paid
4 GCP-3/ctg/WD-129 Development of Shekerkhil Somadia Bahamoni Road by HBB 1.0000 63.340 M/S. H M FOUNDATION 63.340 22/07/2020 100 12/07/2026 Final Bill Paid
5 GCP-3/ctg/WD-128 Development of Chamble Dhala Road to Shimana Road by HBB at Ch: 950-1950m; Upazila: Banskhali, District: Chattogram. 1.0000 52.230 52.230 100 12/07/2026 Final Bill Paid
6 GCP-3/Ctg/WM-07 A)Maintenance of Kalipur Emtazul Hoque Chy Road (Kamal Iskey Mostafa Road) B)Maintenance of Banigram Union Land office to Shonkho River Road via Monayam Sha Bazar (Indra Narayon Road) 1.8470 90.410 M/s. Salma Enterprise. 90.410 09/05/2019 100 12/07/2026 Final Bill Paid
7 GCP-3/ctg/WD-187 Development of Jaldi Mia hat-Napora Bazar via Chambol UP Office Road (Chambol Badshahee Road) by HBB 1.0240 107.300 M/S. ROBEL & BROTHERS 107.300 23/01/2021 100 12/07/2026 Final Bill Paid
8 GCP-3/ctg/WD-254 Development of Dungra-Raichata Road by BC & RCC at Ch: 1000-1600m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 48832.00) (ID No-415084037). 0.6000 38.730 38.730 100 12/07/2026 Final Bill Paid
9 GCP-3/ctg/WDS-277 Development of ABC Road-Banigram Shadhonpur High School Banigram by HBB at Ch: 00-480m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 51027.00) (ID No-415085276). 0.4800 40.570 40.570 100 12/07/2026 Final Bill Paid
10 GCP-3/ctg/WD-178 Development of Katharia Raziullah Munshi Road from Ch: 00-975m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1623019.00) (ID No-415085125). 0.9750 129.260 129.260 100 12/07/2026 Final Bill Paid
11 GCP-3/ctg/WD-259 Development of Chowdhury Hat to Kadam Rasul Bazar Road by BC at Ch: 00-1340m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1679660.00) (ID No-415084089). 1.3400 107.220 107.220 100 12/07/2026 Final Bill Paid
12 GCP-3/ctg/WD-396 Development of Old Ferri Ghat (RHD) to Rampur DC Road (Pukuria Dewanji Road) by HBB at Ch: 3740-4000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 33066.00) (ID No-415084032). 0.2600 20.030 20.030 100 12/07/2026 Final Bill Paid
13 GCP-3/ctg/WD-395 Improvement of Chandpur Centerpara Road by BC at Ch: 00-1150m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 838580.00) (ID No-415085019). 1.1500 112.990 112.990 100 12/07/2026 Final Bill Paid
14 GCP-3/ctg/WD-394 Development of Dungra Raichata Road by BC at Ch: 2980-3450m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 753800.00) (ID No-415084037). 0.4700 52.560 52.560 100 12/07/2026 Final Bill Paid
15 GCP-3/ctg/WM-81 Maintenance of Hajigao Adam Road by BC at Ch: 00-655m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 32292.00) (ID No-415085001). 0.6550 67.640 67.640 100 12/07/2026 Final Bill Paid
16 GCP-3/ctg/SWM-71(R) Maintenance of Time Bazar to Monkir Char Natun Bazar Road by BC at Ch: 00-4830m; Upazila: Banskhali, District: Chattogram. 4.8300 304.530 304.530 75 12/07/2026
17 GCP-3/ctg/WD-397 Development of Chowdhury Hat to Kadam Rasul Bazar Road (Bibi Chowdhury Road) by BC at Ch: 1340-2540m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 861610.00) (ID No-415084089). 1.2000 131.420 131.420 100 12/07/2026 Final Bill Paid
18 GCP-3/ctg/WD-480 Development of Chonua Laskar Maolavipara Road by HBB at Ch: 00-700m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 124813.00) (ID No-415085225). 0.7000 88.950 88.950 100 12/07/2026 Final Bill Paid
19 GCP-3/ctg/WD-468 Development of East Manik Pathan Road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 56187.00) (ID No-415085094). 1.0000 119.450 119.450 100 12/07/2026 Final Bill Paid
20 GCP-3/ctg/WD-479 Development of Chmble Deputighona Road by BC at Ch 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 88664.00) (ID No-415084060). 1.0000 109.680 109.680 100 12/07/2026 Final Bill Paid
21 GCP-3/ctg/WD-440 Development of Saral Bazar-Beri Bandth via DC Bari Road by Uni-Block at Ch: 00-1250m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 3355069.00) (ID No-415084127). 1.2500 192.070 192.070 100 12/07/2026 Final Bill Paid
22 GCP-3/ctg/WM-87 Maintenance of Chonua DC Road by BC at Ch: 00-500m; Upazila: Banskhali, District: Chattogram 0.5000 38.320 38.320 100 12/07/2026 Final bill submitted
23 GCP-3/ctg/WD-393 Development of Katabi Jame Mosjid Road by BC at Ch: 00-860m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 461759.00) (ID No-415084067). 0.8600 54.510 54.510 100 12/07/2026 Contact Cancel, J.M Done.
24 GCP-3/ctg/WD-418 Development of Chunua Majeda Begom Road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1657957.00) (ID No- 415084064). 1.0000 143.440 143.440 100 12/07/2026
25 GCP-3/ctg/WD-276 Improvement of Arabsha Bazar GC-Ishwar Babur Hat GC Road via Bashirullah Miazi Hat Chonua, Gondamara, Saral, Shadhanpur UP (Moulana Ashraf Ali Road) by BC at Ch: 00-4160m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 3534608.00) (ID No-415082009). 4.1600 586.550 586.550 55 12/07/2026 Contact Cancel, J.M Under Process.
26 GCP-3/ctg/WD-300 Development of Time Bazar-Gondamara Road to Chambol Dhala Road (Moulana Salim Uddin Road) by HBB at Ch: 00-2275m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 414762.00) (ID No-415085183). 2.2750 184.750 184.750 45 12/07/2026
27 GCP-3/ctg/WD-301 Development of Puichory Habban Ali Road-Jangle Napora GPS (Muktijodha Fafidul Alam) Road by BC at Ch: 00-1170m; Upazila: Banskhali, District: Chattogram 1.1700 104.500 104.500 55 12/07/2026
28 GCP-3/ctg/WD-472 Development of Boilchari Dhala road by BC at Ch: 00-1000m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 975086.00) (ID No-415084049). 1.0000 113.610 113.610 70 12/07/2026
29 GCP-3/ctg/WD-473 Development of Monsuria Bazar to Silku[ UP Offoce Road by BC at Ch: 1500-2145m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 103366.00) (ID No-415083012). 0.6450 89.150 89.150 60 12/07/2026
30 GCP-3/ctg/WD-478 Development of Banglabazar to Bamar Chara Road via Sikdarer Dhokan (Banglabazar Dhala) Road by BC at Ch: 2200-3200m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 2116367.00) (ID No-415084055). 1.0000 112.180 112.180 70 12/07/2026
31 GCP-3/ctg/WD-481 Development of Middle Katharia-Bagmara-Banskhala Road by BC at Ch: 1330-2340m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 911101.00) (ID No-415084068). 1.0100 109.950 109.950 0 12/07/2026
32 GCP-3/ctg/WD-498 Development of Banglabazar to Bamer Chora Road via Sikderer Dhokan (Banglabazar Dhala) Road by BC at Ch: 3200-4200m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 1426388.00) (Road ID No-415084055). 1.0000 112.490 112.490 65 12/07/2026
33 GCP-3/ctg/WD-502 Development of Bangla Bazar-Khat Khali Road (Shohid Bodiul Alom Road) by BC at Ch: 1500-2300m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 961672.00) (Road ID No-415084092). 0.8000 89.080 89.080 10 12/07/2026
34 GCP-3/ctg/WD-509 Development of Kadam Rasul Pramasia Bazar Road (Baro Moulana Rd) by BC at Ch: 1600-2300m; Upazila: Banskhali, District: Chattogram (Salvage Materials Cost Tk. 668402.00) (Road ID No-415084090). 0.7000 80.890 80.890 10 12/07/2026
3 Boalkhali
1 GCP-3/Ctg/WDS-183 Development of Ahalla Dorbar Sharif (R&H-Santir hat Beyai Bazar (Champa Naryan Road) Road by BC (Allaha Utter vurshie School Connecting Road) at ch: 1+685-2+125km. 0.4400 48.360 48.360 04/04/2021 30 21/01/2021
2 GCP-3/Ctg/WD-130 Construction of 2-Vent 4.00m x 4.00m RCC Box Culvert at Shakpura Chawdhury R&H-Lalarhat GC Road at Ch: 165m. 49.620 M/S. Abrar Trading 49.620 03/11/2020 100 21/01/2021 Final Bill Paid
3 GCP-3/Ctg/WD-89 Development of Munar Mar Mosjid Road by BC at ch0+000-0+635km. 0.6350 81.600 M/S. Didarul Alam 81.600 20/01/2020 100 21/01/2021 Final Bill Paid
4 GCP-3/ctg/WDS-184 Development of Asadia Govt. Primary School Road by HBB (Allaha Asadia GPS School Connecting Road) 1.0000 65.760 M/S. DIPU KANTI PAUL 65.760 02/12/2020 40 20/01/2021
5 GCP-3/ctg/WD-169 Develoment of Shakpura High School Road by BC 0.8600 94.820 M/S. ABRAR TRADING 94.820 15/01/2021 15 20/01/2021
6 GCP-3/ctg/WD-111 B) Development of Fultol-Kanungo Para (R&H) Road (Oli Bekari)-Lalarhat GC Road by BC 2.2610 307.690 M/S. YAKUB & BROTHERS 307.690 07/02/2021 25 20/01/2021
7 GCP-3/ctg/WD-136 Development of Munshi Bari Road by BC 0.9020 104.870 M/S. ABDUL SALAM 104.870 23/08/2020 50 20/01/2021
8 GCP-3/ctg/WD-134 Development of Fakirhat Bazar 58.050 M/S JEMU ENTERPRISE 58.050 21/08/2020 20 20/01/2021
9 GCP-3/ctg/WD-114 A) Development of Purba Gomdandi UP-Murad Munshir Hat GC Road (Ramesh Sil Road) by BC B) Development of Amuchia UP-Golok Kanun Bazar (LM) Road (Kanongo Para Post office Road) by BC 2.2350 217.920 TOWAKKUL ENTERPRISE - FORAK AHMED & SONS(JV) 217.920 13/01/2021 70 20/01/2021
10 GCP-3/ctg/WD-94 Development of Ahamudur Rahman Road by BC 1.4000 142.310 TOWAKKUL ENTERPRISE -KGN ENTERPRISE (JV) 142.310 12/09/2020 50 20/01/2021
11 GCP-3/ctg/WD-131 Development of Akubdandi Syed Abdur Nur Road by BC 0.9600 85.220 M/S. A S ENTERPRISE 85.220 22/07/2020 65 20/01/2021
12 GCP-3/ctg/WD-119 Development of Master Abul Kalam Azad Road by BC 1.2000 113.160 M/S. SOLAIMAN STORE 113.160 18/08/2020 65 20/01/2021
13 GCP-3/ctg/WD-118 Development of Miapara-Nazir Dhighir Par Road (Fazal Fakir Road) by BC 1.2750 113.750 M/S. SOLAIMAN STORE 113.750 21/07/2020 75 20/01/2021
14 GCP-3/ctg/WD-42 Development of Sreepur Kharandwip UP-Kerani Hat(LM) Road (Okil Baidda Road ) by BC . Development of Kharandwip Sufi Nurul Haq Jame Mosque Road by BC . Development of Master Bazar Road by BC. Development of Purba Dhorolla khali Bari Road by BC . Development of Kaliar hat GC-Keranihat (LM) Road (Kalachad Thakur Road) by BC 4.2570 423.570 M/S A ALI CHOWDHURY 423.570 24/07/2020 75 20/01/2021
15 GCP-3/Ctg/WD-84 Development of Shaheed Younus Road 1.3550 131.040 M/S. Forak Ahmed 131.040 11/01/2020 70 20/01/2021
16 GCP-3/ctg/WD-37 E.Gpomdandi UP - Hazir Hat (LM) Godown Road,(Janata Circular Road). 1.5700 147.480 M/s Azad Entrrprise 147.480 27/02/2020 100 20/01/2021 final bill
17 GCP-3/Ctg/WM-8 A) Maintenance of Kanungopara R&H Bura Mosque- Tajghar (Dhalghat D.C Road) B)Maintenance of Ahalla Sadar para road 2.2310 84.580 M/s Sarkar Enterprise 84.580 29/07/2019 100 20/01/2021 final bill
18 GCP-3/ctg/WD-28 Hamidia madrasha Road. 1.0000 89.640 M/s Abdul Salam 89.640 13/06/2019 100 20/01/2021 final bill paid
4 Chandanish
1 GCP-3/Ctg/WM-20 Maintenance of West Satbaria Natun Maszid Osman Fakir (RHD to RHD) Road 0.9100 30.670 M/S. Islam & Sons 30.670 14/08/2019 100 12/07/2026 final bill paid
2 GCP-3/ctg/WM-19 A) Maintenance of South-Purboo Hasimpur M.K high School-Shikderpara Road by BC. B) Maintenance of Bolar Taluk (RHD) to South Gashbaria GPS (UZR) Road by BC 1.3100 28.600 M/S. Sarkar Enterprise 28.600 11/08/2019 100 12/07/2026 final bill paid
3 GCP-3/ctg/WD-32 Muradabad-Uttar Kanchan Nogor road. 2.5900 126.210 M/s AzadEntrrprise 126.210 15/10/2019 100 12/07/2026 final bill paid
4 GCP-3/Ctg/WD-49 Improvement of Mohajan Gata to Barma Kalirhat (Al-Haz Ali Ahammed) Road by BC 1.4520 141.170 M/S. A B & Sons 141.170 29/12/2019 100 12/07/2026 final bill
5 GCP-3/Ctg/WDS-141 A) Improvement of Mohammadpur (Ashab Sobhan) Govt. Primary School Connecting Road by HBB . B) Improvement of Madhay Kanaimandary Govt. Primary School Connecting Road by HBB . C) Improvement of Madhay Hasimpur Govt. Primary School Connecting Road by HBB . D) Improvement of North Madhay Kanaimandary Govt. Primary School Connecting Road by HBB 1.0100 21.670 M/S. KHUNDAKAR ENTERPRISE 21.670 02/08/2020 100 12/07/2026 Final Bill Paid
6 GCP-3/ctg/WD-192 Development of Dohazari Chagachor DC Road by HBB at Ch: 445-895m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 189409.00) (ID No-415185098). 0.4500 27.080 27.080 25/01/2021 100 12/07/2026 Final Bill Paid
7 GCP-3/Ctg/WDS-142 A) Improvement of Diakul Govt. Primary School Connecting Road by HBB. B) B) Improvement of Maddam Maradabad Govt. Primary School Connecting Road by HBB . C) Improvement of East Jamirjuri Amitab Govt. Primary School Connecting Road by HBB . D) Improvement of South Diakul K.M Govt. Primary School Connecting Road by HBB. 0.3200 13.890 M/S. ISLAM TRADERS 13.890 24/07/2020 100 12/07/2026 Final Bill Paid
8 GCP-3/Ctg/WDS-140 A) Improvement of Paschim harala Schindraw Sikder Govt. Primary School Connecting Road by HBB . ) Improvement of Paschim harala Nabi Kulsum Govt. Primary School Connecting Road by HBB . C) Improvement of Uttar Jamirjuri Govt. Primary School Connecting Road by HBB 0.5600 28.390 M/S. SALEH NUR CONSTRUCTION 28.390 04/08/2020 100 12/07/2026 Final Bill Paid
9 GCP-3/Ctg/WDS-143 A) Improvement of Samukchari Govt. Primary School Connecting Road by HBB . B) Improvement of Paschim Dhopachari Govt. Primary School Connecting Road by HBB . C) Improvement of Tapaaban Anath Asram Govt. Primary School Connecting Road by HBB . 0.6000 28.740 M/S. GARIN ENTERPRISE 28.740 23/07/2020 100 12/07/2026 Final Bill Paid
10 GCP-3/Ctg/WDS-144 A) Improvement of Haji Mohammad Khalil Badiuzzaman Govt. Primary School Connecting Road by HBB . B) Improvement of Dhakkin Jafrabad Govt. Primary School Connecting Road by HBB. C) Improvement of Basarat Nagor Govt. Primary School Connecting Road by HBB . D) Improvement of Gachbaria Banikpara Govt. Primary School Connecting Road by HBB . E) Improvement of Patandondy Uzir Ali Govt. Primary School Connecting Road by HBB . F) Improvement of Hasandondy Govt. Primary School Connecting Road by HBB. 0.7700 36.250 M/S. JANASHEBA ENTERPRISE 36.250 27/08/2020 100 12/07/2026 Final Bill Paid
11 GCP-3/ctg/WD-54 Joara Kulalpara Road 1.1280 96.260 M/s M JConstruction 96.260 30/05/2021 100 12/07/2026 Final Bill Paid
12 GCP-3/Ctg/WM-33 Maintenance of Suchia GPS & Suchia Ram Krishna High School to Pathandandi Sree Sree Krishna via Mohajan Gate Road (Al- Haz Ali Ahmmed) Road by BC 0.7800 18.950 M/S. ISLAM & SONS 18.950 31/08/2020 100 12/07/2026 Final Bill Paid
13 GCP-3/ctg/WD-191 Development of Hathi Khola Road (Dohazari) Road by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 426483.00) (ID No-415185006). 1.0000 89.740 89.740 05/08/2021 100 12/07/2026 Final Bill Paid
14 GCP-3/ctg/WM-052 Maintenance of Kanchanabad UP to Patiya Tea Garden Road by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 125082.00) (ID No-415184011). 1.0000 41.790 41.790 01/09/2022 100 12/07/2026 Final Bill Paid
15 GCP-3/ctg/WD-193 Development of Uttor Joara Maijpara Road by HBB at CH: 535-860m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 164834.00) (ID No-415185080). 0.3250 15.170 15.170 17/04/2022 100 12/07/2026 Final Bill Paid
16 GCP-3/Ctg/WD-151 Construction of 22.00m Long RCC Girder Bridge on Boroma College Dhameerhat-GC to Moulavi Bazar (RHD) Road 260.960 M/S. ABSAR CONSTRION 260.960 28/06/2022 100 12/07/2026 Final Bill Paid
17 GCP-3/Ctg/WD-55 Improvement of Chandanish Upazila H/Q (Nayahat) Bailtali-Kodarhat GC road by BC. Improvement of Chandanish Upazila H/Q (Hospital) Churamoni (Al-Haj- Momtaz Oli) Sattarhat G.C Road by BC . Improvement of Vogabanhat (RHD) to Koderhat GC via Ashraf Mohari Hat Bogerteg Road by BC 6.3000 808.490 M/S. MOSTAFA & H E (JV) 808.490 05/12/2022 100 09/07/2026 Final Bill Paid
18 GCP-3/ctg/WM-053 Maintenance of Joara UP-Kanchanabad UP-Station (Mohammedpur-Fatenagor) (RHD) road by BC at Ch: 00-1940m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 295680.00) (ID No-415183002). 1.9400 73.870 73.870 25/01/2023 100 09/07/2026 Final Bill Paid
19 GCP-3/Ctg/WD-56 Improvement of Boroma Collage Dhameerhat GC to Moulavi Bazar (RHD) Road by BC Improvement of Fakir hat to Jamtal Bazar via Sha Alam Dohan Road (J.M Sen Road) by BC Improvement of Badurpara (RHD) Munsif Bazar Chamudaria Bazar via Joara Bani GPS (RHD) Road Link by BC 3.2730 386.530 M/S SHAH JABBARIA CONSTRUCTION-J S ENTERPRISE (JV) 386.530 07/06/2022 100 09/07/2026 Final Bill Paid
20 GCP-3/ctg/WDS-441 Improvement of Kaderiya Madrasha to Khondakar Para (Hazrat Kaimuddin Fakir Road) by HBB at Ch: 00-500m; Upazila: Chandanaish, District: Chattogram (ID No-415185060). 0.5000 32.760 32.760 30/05/2024 100 09/07/2026 Final Bill Paid
21 GCP-3/ctg/WM-26 A) Maintenance of Dohajari G.C - Chagachar-Khagaria-Bhor Bazar G.C Road by BC B) Maintenance of Hasimpur Jamirjuri Eidpukuria Road (Dohajari GC Connecting Road by BC 3.7600 50.600 M/S. Islam & Sons 50.600 04/01/2020 100 09/07/2026
22 GCP-3/ctg/WD-420 Improvement of Kanaimadari (In Front H/O Mr Sahab Mia Member) Barkal Road by BC at Ch: 00-740m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk.1260854.00) (ID No-415185043). 0.7400 96.390 96.390 05/09/2024 100 09/07/2026 Final Bill Paid
23 GCP-3/ctg/WD-343 Improvement of Dohajari GC-Chagachor-Khagaria-Bhor Bazar GC Road at Ch: 2256-3120m; Upazila: Chandanaish, District: Chattogram (ID No-415182003). 0.8640 85.290 85.290 02/01/2025 100 09/07/2026 Final Bill Paid
24 GCP-3/ctg/WD-350 Improvement of Vai-Khalifa Para-Baripara-Karillya Mura Road (Moklasur Rahman Chowdhury Road) by BC at Ch: 00-1000m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 1677645.00) (ID No-415185093). 1.0000 112.700 112.700 28/02/2025 100 09/07/2026 Final Bill Paid
25 GCP-3/ctg/SWD-225R Construction of 24.00m Long RCC Girder Bridge Over Haonkhali Khal Barkol Shahid Rafique Road at ch: 1635m; Upazila: Chandanish, District: Chattogram 100.720 100.720 26/06/2025 100 09/07/2026 Final Bill Paid
26 GCP-3/ctg/SWD-490 Improvement of Pachim Bailtali Charati Road by BC at Ch. 00-1000m; Upazila: Chandanaish, District: Chattogram. 1.0000 132.050 132.050 16/10/2025 100 09/07/2026 Final Bill Paid
27 GCP-3/ctg/SWD-225 Construction of 24.00m Long RCC Girder Bridge Over Haonkhali Khal Barkol Shahid Rafique Road at Ch: 1635m; Upazila: Chandanaish, District: Chattogram (ID No-415184051). 107.130 107.130 05/10/2023 100 09/07/2026 Contact Cancel, Payment Setelled.
28 GCP-3/ctg/WM-72 Maintenance of Dohajari GC-Chagachar-Khagaria-Bhor Bazar GC Road by BC at Ch: 00-2256m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 493484.00) (ID No-415182003). 2.2560 45.900 45.900 02/01/2023 100 09/07/2026 Contact Cancel, J.M Done.
29 GCP-3/ctg/SWD-469 Improvement of Advocate Foijur Rahman House-Dweep Para to Bailtoli UP Road by BC at Ch: 00-700m; Upazila: Chandanaish, District: Chattogram (Salvage Materials Cost Tk. 1092620.00) (ID No-415185166). 0.7000 100.190 100.190 30/04/2026 75 09/07/2026
30 GCP-3/Ctg/WDS-139 Improvement of Sanowara Farm Govt. Primary School Connecting Road by HBB 1.0000 57.350 A.M.P. ENTERPRISE 57.350 05/08/2020 0 20/01/2021
5 Fatikchari
1 SWD-429 lelang hadi badsha awolia road 1.0000 112.040 112.040 100 08/07/2026 final bill paid
2 WD-369 gohira heakow road to dharog ali talukder road 0.7650 96.600 96.600 100 08/07/2026 final bill paid
3 WD-319 saira beel road 0.7500 139.880 139.880 100 08/07/2026 final bill paid
4 WD-483 samitirhat kulal para road 0.6300 70.570 70.570 100 08/07/2026
5 WD-439 roshangiri up hq to nanupur up hq road 2.0000 281.160 281.160 100 08/07/2026
6 SWD-474 damapur central road 1.5500 164.690 164.690 100 08/07/2026 final bill paid
7 WDS-410 jangal dantmara govt pri school 1.5000 123.280 123.280 100 08/07/2026 final bill paid
8 SWD-362 samitirhat arbania road 1.0000 111.060 111.060 100 08/07/2026 final bill paid
9 WD-449 moulana zamiruddin shah road 1.0500 144.540 144.540 100 08/07/2026
10 WD-328 mannania road by bc 1.1550 198.660 198.660 100 08/07/2026
11 SWD-306 lelang up ananda bazar 1.4200 216.200 216.200 100 08/07/2026
12 WD-327 kepaitanagar abul fazal ba road 1.2700 228.360 228.360 100 08/07/2026 final bill paid
13 WD-364 tofail ahmed road 1.5950 200.050 200.050 100 08/07/2026 final bill paid
14 WM-89 roadwidening of sundarpur munshi abdur rashid road 0.9800 83.740 83.740 100 08/07/2026 final bill paid
15 WD-477 lelang kumarpara road 1.0000 110.510 110.510 100 08/07/2026 final bill paid
16 SWD-382 suabil up hq to shovonchari bangla bazar 0.8500 85.280 85.280 100 08/07/2026 final bill paid
17 WD-374 saintirhat motor road 1.0000 97.420 97.420 100 08/07/2026 final bill paid
18 WD-296 muktijuddha rafique uddin road 1.8000 200.430 200.430 100 08/07/2026 final bill paid
19 GCP-3/Ctg/WD-51 Improvement of Kazirhat G.C to Lalar Hat (RHD) Road via Barobil Nayahat Road 1.9820 226.310 M/s Rfiqul Moula 226.310 31/12/2020 100 07/07/2026 cancel
20 SWD-290 sarker hat to shovonchari bangla bazar road 2.0000 271.940 271.940 100 07/07/2026 final bill paid
21 SWD-384 bagan bazar ander manik road 0.5250 85.190 85.190 100 07/07/2026 final bill paid
22 WM-70 upazila to H/Q to lakhshmichari upazila 4.7600 311.590 311.590 100 07/07/2026 final bill paid
23 WD-368 lelang kumarpara road 1.0000 118.500 118.500 100 07/07/2026 final bill paid
24 WD-317 lelang upc to charaliahat bazar road via shainnashirhat 0.7500 126.880 126.880 100 07/07/2026 final bill paid
25 GCP-3/Ctg/WD-135 Development of Bagan Bazar UP-Natun Bazar Road by BC 1.0000 110.890 M/S SAIFUL & BROTHERS 110.890 23/08/2020 100 07/07/2026 final bill paid
26 WDS-233 uttar roshangiri gps connecting road 0.5000 30.300 30.300 100 07/07/2026 final bill paid
27 WD-66 south nichintapur road 1.3300 130.830 130.830 100 07/07/2026 final bill paid
28 WDS-234 dharmapur sayed para gps connecting road 0.3000 19.510 19.510 100 07/07/2026 final bill paid
29 GCP-3/Ctg/WD-186 Improvement of Nanupur UPC to Dowlat Munshir Hat Bazar Road (Nanupur-Khiram Road) Road by BC at ch: 6+262-8+262km. 2.0000 176.420 176.420 0 20/01/2021 Tender under process
30 GCP-3/Ctg/WD-158 Improvement of Narayanhat RHD to Garitaana Bazar Road by BC at ch: 1+000-3+050km. 2.0500 256.790 256.790 0 20/01/2021 TENDER PROCESS
31 GCP-3/Ctg/WM-13 Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar at ch: 0+000-4+760km. 4.7600 335.010 335.010 0 20/01/2021 TENDER UNDER PROCESS
32 GCP-3/Ctg/WD-202 Development of Sejuar Khan Road by BC at ch: 780-2190m. 120.270 120.270 22/06/2021 0 20/01/2021
33 GCP-3/Ctg/WD-100 Improvement of Lelang UPC to Charaliahat Bazar Road via Shainnashirhat & Lelang Neyhat (Gopal Gatta Road) by BC at ch: 1+900-5+100km. 3.2000 349.080 349.080 29/08/2021 15 20/01/2021
34 GCP-3/Ctg/WD-66 Improvement of South Nichintapur Road by BC at ch: 0+000-1+330 km. 1.3300 130.840 130.840 26/04/2021 20 20/01/2021
35 GCP-3/Ctg/WD-200 Development of Lelang UPC-Kanchan Nagar UPC Road by BC at ch: 00-1862m. 1.8620 139.687 139.687 0 20/01/2021
36 GCP-3/Ctg/WM-04 A)Periodic Maintenance of Shantir hat Motor Road B)Periodic Maintenance of Tofail Ahammed Road 5.3950 93.440 M/s. Mohsin & Brothers 93.440 28/02/2020 100 20/01/2021
37 GCP-3/Ctg/WM-14 Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar 4.6600 230.140 230.140 0 20/01/2021 NOA Issued
38 GCP-3/Ctg/WD-27 Improvement of Samitirhat Azam Bari Idris Road 1.5000 153.700 153.700 03/09/2021 0 20/01/2021
39 GCP-3/Ctg/WD-185 Improvement of Kanchan Nagar Ajgar Bari to Ali Chowdhury Bari Road by BC 1.0000 97.390 M/S. SAMEER TRADERS 97.390 14/01/2021 0 20/01/2021
40 GCP-3/Ctg/WD-188 Improvement of Chumur Hat Bazar at Kanchannager UP. 47.480 M/S SARNALI ENTEPRISE 47.480 11/01/2021 0 20/01/2021
41 GCP-3/Ctg/WM-37 Periodic Maintenance of Sundarpur Munshi Abdur Rashied Road by BC 0.9800 16.450 M/S. SUKANNYA ENTERPRISE 16.450 07/11/2020 0 20/01/2021
42 GCP-3/Cox/WDS-167 Improvement of Dulaichari GPS (Heako-Dholiachari) Road by HBB 2.4500 116.040 M/S. F R CONSTRUCTION 116.040 12/12/2020 50 20/01/2021
43 GCP-3/Cox/WDS-166 Improvement of Chela Uzan GPS (Dantmara-Natun Para) Road by HBB 1.5000 72.900 M/S. KAZI ENTERPRISE 72.900 26/10/2020 10 20/01/2021
44 GCP-3/Cox/WDS-165 Improvement of Matin Nagar GPS (Chikonchara High School to Natun Bazar Road via Motion Nagar GPS) Road by HBB 2.3300 137.850 M/S. RAFIQ ENTERPRISE 137.850 12/12/2020 0 20/01/2021
45 GCP-3/Cox/WDS-168 Improvement of Baru Betua GPS (Barabetua-Sandip Para) Road by HBB 1.3250 62.140 M/S OMI & JARIN ENTERPRISE 62.140 28/09/2020 55 20/01/2021
46 GCP-3/Ctg/WDS-157 Improvement of Baromasia Talukder GPS Connecting Road by HBB 0.6750 35.740 M/S KARIM ENTERPRISE 35.740 01/10/2020 70 20/01/2021
47 GCP-3/Ctg/WD-149 Development of bhuzpur amtoli gps connecting road by hbb 1.6000 78.520 m/s n a trading & co. 78.520 05/09/2020 0 20/01/2021
48 GCP-3/Ctg/WD-15 Development of Harualchari Lalarhat Road via Santirhat Road 1.9890 246.690 M/S. EB & MN (JV) 246.690 02/10/2020 15 20/01/2021
49 GCP-3/Ctg/WD-65 A) Development of Kazirhat GC to Lalarhat Road via Barobil Noyahat by BC B) Development of Haruaichari Latifa Bibi Road by HBB 3.8000 410.330 M/S ELIAS BROTHERS 410.330 21/11/2020 50 20/01/2021
50 GCP-3/Ctg/WD-108 Development Sundarpur UPC to Azam Chowdhury Nayahat Bazar Road by BC 1.0000 97.190 M/S J S Traders 97.190 12/10/2020 30 20/01/2021
51 GCP-3/Ctg/WD-95 Development of Narayanhat UPC to Heako GC Road via Maazan, Hasnabad & Nischinta By BC. 4.9000 483.090 M/S. MONIR AHMED 483.090 09/07/2020 25 19/01/2021
52 GCP-3/Ctg/WM-12 Maintenance of Fatikchari Upazila HQ to Lakshmichari Upazila HQ Road via kanchana Nagar Chamurhat Bazar 4.0400 379.040 M/S. Monir Ahmed 379.040 30/06/2020 45 19/01/2021
53 GCP-3/Ctg/WD-72 Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road) 1.8600 224.330 M/s Sharnali Enterprise 224.330 10/04/2020 100 19/01/2021
54 GCP-3/Ctg/WD-148 A) Development of adilpur GPS Connecting road by HBB. B) Developmentof paschim bhuj pur gachuria GPS Connecting road. 1.1000 52.150 m/s s a minar & sons 52.150 01/09/2020 100 19/01/2021
55 GCP-3/ctg/WD-47 Chowmuhani to Karnafuly Tea Estate road 2.0000 149.060 M/s M A Construction 149.060 30/03/2020 100 19/01/2021 remaining 7.45 lac
56 GCP-3/ctg/WD-22 Paindong u.p H Q (Brindabonhat) to Kanchan Nagar U.p H .Q .Road via Kanchurhat 2.0610 171.210 M/s M A Construction 171.210 31/01/2020 100 19/01/2021 Remaining 38.56 lac
57 GCP-3/ctg/WD-26 Samitirhat Kulal Para Road 1.0000 85.970 M/s Masum Builders 85.970 28/02/2020 100 19/01/2021
58 GCP-3/ctg/WD-23 Dhurang Forest bit to Manikchari road Kanchannagar UP 1.0000 54.540 M/S S A Traders 54.540 06/06/2019 100 19/01/2021 final bill paid
59 GCP-3/ctg/WM-03 A) Mohammed Tokirhat GC B)Jonner Baper Masjeed Road 2.2900 76.510 M/S Nafi Traders 76.510 05/08/2019 100 19/01/2021
6 Hathazari
1 GCP-3/Ctg/WM-41 Maintenance of Dr.Sanaullah (S.Madarsha) Road by BC at Ch: 00-810m. 0.8100 26.890 26.890 28/04/2021 0 20/01/2021
2 GCP-3/Ctg/WM-42 Maintenance of Azimpara (Hathazari) Road by BC at Ch: 00-800m. 0.8000 19.720 19.720 20/04/2021 0 20/01/2021
3 GCP-3/Ctg/WM-40 Maintenance of Dhalai Gumanmordon (Dhalai) Road by BC at Ch: 00-2000m. 2.0000 52.800 52.800 21/04/2021 0 20/01/2021
4 GCP-3/Ctg/WD-176 Construction of 31.00m Long RCC Variable Girder Bridge on Kazir Khil AB Road (Chipatoli) at Ch. 780.00m. 289.470 289.470 17/06/2021 10 20/01/2021
5 GCP-3/Ctg/WD-174 Construction of 24.00m Long RCC Inverted Girder Bridge on Alawol Road 223.360 Mohammad younus & brothers 223.360 15/05/2021 0 20/01/2021
6 GCP-3/Ctg/WM-30 A) Maintenance of Yousufia Road (Forhadabad) by BC B) Maintenance of Chittagong Khagrachari Road to Brozrodam Road (Borzrodam Road) (Dhala) by BC 1.3600 34.450 M/S. GONI CONSTRUCTION 34.450 26/08/2020 5 20/01/2021
7 GCP-3/Ctg/WD-147 Improvement of Chand Gazi (Forhadabad) Road by BC 0.9100 74.570 M/S. B C H INTERNATIONAL 74.570 26/09/2020 2 20/01/2021
8 GCP-3/Ctg/WD-150 Development of Charia Noa Hat to Chipatali UP (Murad Road) (Mirzapur-Chipatoli) Road by BC 0.9690 83.570 M/S. AFNAN ENTERPRISE 83.570 24/08/2020 60 20/01/2021
9 GCP-3/Ctg/WM-32 Maintenance of Abdul Aziz Road (Chipatoli) by BC 0.2700 16.570 M/S ABSER & BROTHERS 16.570 04/08/2020 0 20/01/2021
10 GCP-3/ctg/WM-28 A) Maintenance of Hajee Safar Ali Road (Mirzapur) by BC B) Maintenance of Atar Ali Road (Souty Madrasha Chikondondi) by BC 1.9000 43.330 M/S. Moriom Enterprise 43.330 19/01/2020 80 20/01/2021
11 GCP-3/Ctg/WD-40 A) Development of Latif Para Road (Fatehpur) B) Development of Dorduara Board School Road (Gorduara) 1.2970 144.170 M/s Al kutub & Brothers 144.170 30/06/2020 80 20/01/2021
12 GCP-3/Ctg/WD-57 Construction of 33.00m long PC Girder Bridge at ch. 00m over Dulakhali Khal on Dulakhali road 0.3000 376.160 M/s. Chowdhury Enterprise and Consonance Engineering 376.160 06/02/2020 90 20/01/2021
13 GCP-3/Ctg/WM-16 A) Maintenance of Faizur Rahman Road(Chikondondi) B) Maintenance of Asad Ali Road (Sikerpur) 1.7700 128.160 M/s. Hassan & Brothers 128.160 31/01/2020 95 20/01/2021
14 GCP-3/Ctg/WD-67 A) Improvement of Basuadhala Road B) Improvement of Faiz Ahmed (D.C Connecting ) Road (North Madrasha) Road C) Improvement of Amin Mazi Road (Nangolmora) 2.7700 263.010 M/s Akil Enterprise 263.010 29/11/2019 85 20/01/2021
15 GCP-3/Ctg/WD-34 Improvement of Siddiquia Road (Mekhol) 0.9920 103.690 M/s Alam Abser & Co. 103.690 28/02/2020 100 20/01/2021
16 GCP-3/Ctg/WD-78 Development of Kazi Khil Primary School Road (Chipatoli) road 0.7100 57.490 M/s Renassance Enterprise 57.490 15/08/2020 100 20/01/2021
17 GCP-3/Ctg/WD-76 Improvement of Aucha Mia Chowdhury Road (Buriri Char) 1.1700 88.780 M/s Akil Enterprise 88.780 31/01/2020 100 20/01/2021
7 Karnaphuli
1 GCP-3/ctg/WD-074 Improvement of CTG Cox's (RHD)-Karnafully River Road (College Bazar Road) by RCC at Ch: 00-1000m; Upazila: Karnafully, District: Chittagong. 1.0000 161.430 161.430 100 13/07/2026 Final Bill Paid
2 GCP-3/ctg/WD-206 Development of Juldha UP (Shamirpur of Marin Academy Road)-Dangarchar (Yasiner Ghat) Road by RCC at Ch: 6516-7716m; Upazila: Karnafully, District: Chattogram (ID No-415613009). 1.2000 200.180 200.180 100 13/07/2026 Final Bill Paid
3 GCP-3/ctg/WD-304 Improvement of Middle Sikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC at Ch: 985-1810m; Upazila: Karnafully, District: Chattogram (Salvage Materials Cost Tk. 721990.00) (ID No-415614031). 0.8190 214.590 214.590 100 13/07/2026 Final Bill Paid
4 GCP-3/ctg/WD-453 Development of 05 nos Ghat (5 no Ferry Ghat Road) (UNR Dabgar Char Mosque Navy 5 nos Ghat) (Navy Nirvik & Juldha Star Cement Factory) Road by BC at Ch 00-935m; Upazila: Karnafully, District: Chattogram (Salvage Materials Cost Tk. 469566.00) (ID No-415615208). 0.9350 147.410 147.410 100 13/07/2026 Final Bill Paid
5 GCP-3/ctg/WD-199 Development of Charlakha-Hospital Road (RHD Sultanul Aoulia-Ali Hossain Market-Goal Para-Piper Gora Bazar) Road by BC at Ch: 400-1950m & 2953-3403m; Upazila: Karnafully, District: Chattogram. 2.0000 202.730 202.730 72 13/07/2026 Contact Cancel, J.M Done
6 GCP-3/ctg/WD-303 Development of Iubbibi City Corporation College (RHD)-Pipergora Bazar Road (Issanagar Bir Muktijodha Siddique Ahmed Gandhi Road) (Lalmia Contractor Road) by RCC at Ch: 500-1410m; Upazila: Karnafully, District: Chattogram (ID No-415614034). 0.9080 167.220 167.220 70 13/07/2026
7 GCP-3/ctg/WD-461 Development of Juldha UP (Shamirpur of Merin Accademy Road)- Dangerchar (Yasiner Ghat) Road by BC at Ch: 7716-8826m; Upazila: Karnafully, District: Chattogram 1.1100 170.740 170.740 30 13/07/2026
8 GCP-3/ctg/WD-444 Development of Juldha UP (Shamirpur of Marin Academy Road)-Danger Char (Yasiner Ghat) Road by BC at Ch: 00-4760m; Upazila: Karnafully, District: Chattogram 4.7600 1032.600 1032.600 55 13/07/2026
9 GCP-3/Ctg/WD-120 Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC 1.0000 150.140 M/S. Nowrin and brothers 150.140 22/07/2020 70 20/01/2021
10 GCP-3/Ctg/WD-70 Improvement of Shainertek (RHD) Khowaznagar Moulabir Dokan Road (Saifuzzaman Chowdary Javad) Road 2.7000 404.410 Delta Engineers & Construction 404.410 28/02/2020 95 20/01/2021
11 GCP-3/Ctg/WD-69 Improvement of PAB(RHD)-UZR Ukil Badrul Haque khan Road (Shadek Ali khan Road) 1.9500 313.030 M/S. A Ali Chowdhury 313.030 15/03/2020 50 20/01/2021
12 GCP-3/Ctg/WD-71 A) Improvement of Miar Hat (RHD) –Deyang Hill Kaffco 6 no Pump Road from RHD#142 (Ukil Badrul Haque khan Road) by RCC B) Improvement of Barauthan UP-Jamtala Bazar Via PAB Road (Abdul Jalil Chowdary Road) by RCC 1.2200 466.140 M/S. Nipa Enterprise 466.140 14/01/2020 70 20/01/2021
13 GCP-3/Ctg/WD-74 Improvement of CTG Cox’s (RHD)- Karnafully River Road (College Bazar Road) 1.0000 161.430 M/s. S K Traders 161.430 30/06/2020 85 20/01/2021
8 Lohagara
1 GCP-3/ctg/WM-22 A) Maintenance of Adhunagar GC & RHD-Barahatia Tin Pather Matha Road by BC B) Maintenance of Lohagara Roshiderpara Road by BC 1.9200 42.900 M/S. Dipu kanti paul 42.900 02/10/2019 100 09/07/2026 final bill paid
2 GCP-3/ctg/WM-21 A) Maintenance of Amirabad UP-Kalauzan UP Road by BC. B) Maintenance of Padua Hari Mondir Bara Para Road by BC 2.0540 40.840 M/S. Mahin Enterprise. 40.840 05/10/2019 100 09/07/2026 Final Bill Paid
3 GCP-3/Ctg/SWD-99 Development of Chunati Pantrisha Joynagar Narisha Road (Chambi Rabbar Dam Connecting Road) by HBB 1.3000 93.770 M/S. Abdur Sabur 93.770 06/01/2020 100 09/07/2026 final bill
4 GCP-3/Ctg/WD-45 Improvement of Niazertek Tonkabati Forest Office via Kanuram Bazar Road (Kalauzan Feeder Road) 3.7000 410.380 M/s Quashem Construction 410.380 12/02/2020 100 09/07/2026 Final Bill Paid
5 GCP-3/Ctg/WD-92 A) Improvement of Charamba UP Office-Shapeer Road by HBB . B) Improvement of Charamba Bayer Para School Conecting Road by HBB 2.9100 216.580 M/S. UT MONG-SHAH JABBARIA (JV) 216.580 29/11/2020 100 09/07/2026 Final Bill Paid
6 GCP-3/ctg/WD-24 Improvement of Tewari Hat GC to Chramba Up Via Andhar Manik Rd. 1.0000 73.869 M/s Alam Entrrprise 73.869 30/11/2019 100 09/07/2026 Final Bill Paid
7 GCP-3/ctg/WM-054 Maintenance of Kalauzan Hindurhat-Kalauzan UP Road by BC at Ch: 00-2535m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 47847.00) (ID No-415473007). 2.5350 63.380 63.380 10/04/2022 100 09/07/2026 Final Bill Paid
8 GCP-3/Ctg/WD-113 Construction of 69.00m Long RCC Girder Bridge on Putibila Sufi Fakir GPS to Saraiya Rambila Road 454.290 MR. UT MONG 454.290 24/02/2022 100 09/07/2026 Final Bill Paid
9 GCP-3/ctg/WD-246 Development of Putibila Baddah Mondir Road by HBB at CH: 500-567m & 634-1200m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 93550.00) (ID No-415475011). 0.6330 33.980 33.980 17/04/2022 100 09/07/2026 Final Bill Paid
10 GCP-3/ctg/WD-239 a) Construction of 12.00m Long RCC Girder Bridge on Bahirchara Khal Adhunagar Rajghata Road at Ch: 1250m b) Construction of 15.00m Long RCC Girder Bridge on Bahirchara Khal Adhunagar Rajghata Road at Ch: 750m; Upazila: Lohagara, District: Chattogram (ID No-415474034). 205.910 205.910 01/06/2023 100 09/07/2026 Final Bill Paid
11 GCP-3/ctg/WD-332 Re-Construction of 1 vent 1x4.00mx4.00m RCC Box Culvert on Uttar Paschim Amirabad Tankabater Muk to Kiazu Para via Upazila H/Q, Darbesh Hat GC, Putibila UP & M Char Hat GC Road (Darbesh Hat DC Road); Upazila: Lohagara, District: Chattogram (ID No-415472001). 28.430 28.430 08/06/2023 100 09/07/2026 Final Bill Paid
12 GCP-3/Ctg/WD-29 A)Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC B) Improvement of Barahatia Manu Fakir hat RHD-Naya hat RHD via Upazila H/Q Darbesh hat GC Charamba UP Road by BC C)Improvement of Dalu-Bridge-Fareengha Miar Bazar Road (Chunati-Fareengha Road) by BC. D)Improvement of Adercher Rajghata-Tonnkaboty Road by HBB. 6.2000 503.080 U T Mong- Shah Jabbaria (JV) 503.080 28/06/2021 100 09/07/2026 Final Bill Paid
13 GCP-3/ctg/WD-245 Development of Barahatia Joor Pucaria Passar Para Road by Uni-Block at Ch: 00-863m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 1558880.00) (ID No-415474021). 0.8630 98.870 98.870 22/01/2024 100 09/07/2026 Final Bill Paid
14 GCP-3/ctg/WM-055 Maintenance of Amirabad RHD-Lohagara Union Road via Darbesh Hat GC Bazar by RCC & BC at Ch: 00-800m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 38080.00) (ID No-415473002). 0.8000 34.290 34.290 17/09/2023 100 08/07/2026 Contact Cancel, Payment Setelled.
15 GCP-3/ctg/WD-137 Development of Amirabad UP to Kalauzan UP Road by BC at Ch: 00-1000m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2338223.00) 1.0000 94.660 94.660 25/11/2021 100 08/07/2026 Contact Cancel, Payment setelled.
16 GCP-3/ctg/WD-308 Development of Barahatia Durlaberpara Gazi Kalu Mazar Road by Uni-Block at Ch: 00-750m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 330073.00) (ID No-415475245). 0.7500 92.130 92.130 14/12/2023 100 08/07/2026 Final Bill Paid
17 GCP-3/ctg/WD-333 Development of Hosen Bali Para to Bepari Para via Bhabanipur GPS Road by BC at Ch: 00-730m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 553263.00) (ID No-415475068). 0.7300 84.130 84.130 17/10/2024 100 08/07/2026 Final Bill Paid
18 GCP-3/ctg/WM-55(R) Maintenance of Amirabad RHD-Lohagara Union Road via Darbesh Hat GC Bazar by RCC & BC at Ch: 248-800m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 102223.00) 0.5520 39.930 39.930 03/01/2025 100 08/07/2026 Final Bill Paid
19 GCP-3/Ctg/WD-58 A) Construction of 54.00m long RCC Girder Bridge on Chunati Chandha Barua Para Forest Bit Road over Dulu khal B) Construction of 30.00m long RCC Girder Bridge on Chunati Union-Chunati Kathalia Para-Hindu Para road Near Jetabon Buddha Bihar Over Hatiar Khal 606.590 M/S. Noor Syndicate- Shah Jabbaria (JV) 606.590 30/08/2022 100 08/07/2026 Final Bill Paid
20 GCP-3/ctg/WD-137(R) Development of Amirabad UP to Kalauzan UP Road by BC at Ch. 53-289m & 450-814m; Upazila: Lohagara, District: Chattogram (Road ID: 415473003) 0.6000 13.130 13.130 10/05/2025 100 08/07/2026 Final Bill Paid
21 GCP-3/ctg/WD-240 Improvement of Barahatia Eshatul Ullum Madrasha Road by BC at Ch: 1470-3100m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2550584.00) (ID No-415474028). 1.6300 173.740 173.740 25/01/2025 100 08/07/2026 Final Bill Paid
22 GCP-3/ctg/WD-476 A) Construction of 18.00m Long RCC Girder Bridge on Dalu Bridge to Ferenga Miar Bazar Road (Chunati Farrengha Rad) at Ch: 2663m B) Construction of 16.00m Long RCC Girder Bridge on Dalu Bridge to Ferenga Miar Bazar Road (Chunati Farrengha Rad) at Ch: 3068m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. .00) (ID No-415474040). 388.660 388.660 21/08/2025 100 08/07/2026 Final Bill Paid
23 GCP-3/ctg/WD-452 Improvement of Amirabad Banskali Road by BC at Ch: 00-1045m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 2288087.00) (ID No-415475023). 1.0450 121.280 121.280 18/02/2025 45 08/07/2026 Contact Cancel.
24 -GCP-3/ctg/WD-496 Improvement of Barahatia Badaler Goda to Amir Baper Para Road by BC at Ch. 00-900m; Upazila: Lohagara, District: Chattogram (Road ID: 415475308) (Salvaged Materials Cost: Tk 1724033.00) 0.9000 109.790 109.790 31/12/2025 100 08/07/2026
25 GCP-3/Ctg/WD-132 Construction of 81.00m Long PSC Gerder Bridge on Niazertek to Tonkabati Forest Office via Kanuram Bazar Road 560.590 M/S. NOOR SYNDICATE 560.590 30/12/2023 95 08/07/2026 Contact Cancel
26 GCP-3/ctg/WD-280 Improvement of Barahatia Natun Miajii Para & Salir Baper Para Road by BC at Ch: 00-660m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 807604.00) (ID No-415475304). 0.6600 68.650 68.650 31/01/2024 75 08/07/2026
27 GCP-3/ctg/WD-331 Development of Borohatia Uttar Baruapara Ghonar Mukh Road by BC at Ch: 00-690m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 51869.00) (ID No-415474031). 0.6900 83.740 83.740 05/05/2025 40 08/07/2026
28 GCP-3/ctg/WD-451 Improvement of Putibila Sufi fakir GPS-Sariya Rambila Road by BC at Ch: 1148-2220m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 765452.00) (ID No-415473009). 1.0720 102.850 102.850 06/06/2025 75 08/07/2026 Contact Cancel.
29 GCP-3/ctg/WD-488 Improvement of Chunati UP to Satghar Chara Bridge Road by BC at Ch: 00-1370m. ID-415473014 1.3700 214.320 214.320 10/10/2025 30 08/07/2026 Contact Cancel.
30 GCP-3/ctg/WD-455 Improvement of Tewari Hat GC Charamba UP via Ander Manik Road by BC at Ch: 3050-5100m; Upazila: Lohagara, District: Chattogram (Salvage Materials Cost Tk. 4392239.00) (ID No-415473005). 2.0500 318.560 318.560 21/12/2025 40 08/07/2026
9 Mirsharai
1 WD-360 abul basher chowdhury road by bc 1.0000 138.280 138.280 100 05/07/2026 final bill paid
2 WM-77 widening and periodic maintenece of aburhat gc kcakhali up road 2.2500 143.270 143.270 100 05/07/2026 final bill paid
3 353 purbo domkhali govt primary scholl connecting road 1.5000 70.640 70.640 100 05/07/2026 final bill paid
4 WDS-357 mithanala govt primary school connecting road 0.7900 102.460 102.460 100 05/07/2026 final bill paid
5 WM-78 widening and periodic maintenance of shekal tana digi to durgapur bazar road 2.4000 1800.850 1800.850 100 05/07/2026 final bill paid
6 WD-305 khayachara up r&h to dharu bridge road 153.880 153.880 100 02/07/2026 final bill paid
7 WDS-405 pashchim mayani hazi para govt pri. school 83.460 83.460 100 02/07/2026 final bill paid
8 WD-292 dhost mohammad road 83.200 83.200 100 02/07/2026 final bill paid
9 WDS-406 pashchim khayachori ni. govt primary school 112.230 112.230 100 02/07/2026 final bill paid
10 WD-359 shaheed shanto road 42.710 42.710 100 02/07/2026 final bill paid
11 WD-340 Ramendra mohan ukil road 138.910 138.910 100 02/07/2026 final bill paid
12 WD-326 ramendra mohan ukil road 68.190 68.190 100 02/07/2026 final bill paid
13 WDS-358 purbo durgapur govt school 0.3700 42.150 42.150 100 02/07/2026 final bill paid
14 WDS-352 uttor talbariya govt. primary school 11.690 11.690 100 02/07/2026 final bill paid
15 WD-336 Purba durgapur school 144.030 144.030 100 02/07/2026 final bill paid
16 SWD-279 4x4m RCC 67.080 67.080 100 02/07/2026 final bill paid
17 GCP-3/Ctg/WD-222 Development of Khayachara UP R&H to Duaru Bridge Road (Duaru Road) by BC at ch: 0+000-0+382km 0.3820 59.130 59.130 100 02/07/2026 final bill paid
18 GCP-3/Ctg/WD-173 Development of Bamonsundar-daroger Hat GC to Abur Hat GC Road via Joulanpool Bazar (Bamonsundar-Bariakhali-Joulanpool Road & Joulanpol-Abu Hat Road) by BC at ch: 2+480-4+480km. 2.0000 269.920 269.920 09/09/2021 100 02/07/2026 final bill paid
19 GCP-3/Ctg/WD-209 Development of Katachara UP to Taytoia Bazar Road by BC at ch: 0+000-2+105m. 2.1050 306.950 306.950 100 02/07/2026 final bill paid
20 GCP-3/Ctg/WD-214 Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara (Abutorab-Shadur Hat Road) by BC at ch: 2+850-3+625km. 0.7750 113.850 113.850 04/05/2021 100 02/07/2026 final bill paid
21 GCP-3/Ctg/WD-177 Construction of 18.00m Long RCC Girder Bridge on Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC 190.080 THE NEW TRADE LINK 190.080 06/05/2021 100 02/07/2026 final bill paid
22 GCP-3/Ctg/WD-152 Construction of 20.00m Long RCC Girder Bridge on Kamaldaha-Dhamdama-Abutorab Bazar Road Wahedpur RHD to Moghadia UP Dhamdama Bazar 170.090 M/S SHAHJAHAN TRADE LINK (JV) 170.090 15/05/2021 100 02/07/2026 final bill paid
23 GCP-3/Ctg/WD-110 Development of Mogadia UP to Shadurhat Bazar Road via Dorgapara Abutorab-Shadurhat Road) by BC 2.8500 296.370 THE NEW TRADE LINK 296.370 25/05/2021 100 02/07/2026 final bill paid
24 GCP-3/Ctg/WD-175 Development of Khurmawala Road (Ram Mondol-Bhuyan Taluk Rd) by BC 0.4700 63.910 M/S TASPIYA ENTERPRISE 63.910 10/12/2020 100 02/07/2026 final bill paid
25 GCP-3/Ctg/WD-171 Rehabilitation of Single Vent 5.00m x 5.00m RCC Box Culvert on Mogadia UP to Thakurhat Bazar road (Wasem Chowdhury Road) 53.370 M/S MAHABUB & CO. 53.370 03/12/2020 100 02/07/2026 final bill paid
26 GCP-3/Ctg/WD-154 Development of Murarypur R&H to Janardanpur High School Road (Muraypur-janardanpur High School Road) by BC 1.0000 101.340 M/S. ADIAN ENTERPRISE 101.340 05/10/2020 100 02/07/2026 final bill paid
27 GCP-3/Ctg/WD-153 Development of Habildar Basa R&H to Amulia Ghat Bazar via Olinagar High School (Oli nagar Border Road) by BC 1.3220 149.180 M/S BITHI BUILDCOM 149.180 01/10/2020 100 02/07/2026 final bill paid
28 GCP-3/Ctg/WD-126 Development of Nazir Ahmed Road by BC 1.4500 126.230 M/S SHOHAG ENTEPRISE 126.230 15/12/2020 100 02/07/2026 final bill paid
29 GCP-3/Ctg/WD-104 Development of Jamal Dhakan R&H to Rail Line Road (Shah Sundar Mia road) by BC 1.1800 131.980 M/S. AKIF ENTERPRISE 131.980 22/09/2020 100 02/07/2026 final bill paid
30 GCP-3/Ctg/WD-75 A)Improvement of Saheed Zakir Hossain Road to Gul Chori Rahamatpur Road B)Improvement of Ram Mainik Kar Road (Sarker Taluk Road) 2.0500 182.160 M/s. A S Chowdhury 182.160 29/01/2020 100 02/07/2026 final bill paid
31 GCP-3/ctg/WD-06 Nazar Ali Bhuyan Road 1.5000 164.770 M/S Sayeman Enterprise 164.770 06/03/2020 100 02/07/2026 final bill paid
32 GCP-3/ctg/WD-25 Hadi Fakirhat GC R&H to Shaher khali UP road via Bhuiyar Hat 1.9200 167.880 M/S Sayeman Enterprise 167.880 13/06/2019 100 07/06/2026
33 GCP-3/ctg/SWD-284 Improvement of Bangha Dokan Samsher Tila Road by BC at Ch: 00-1200m; Upazila: , District: Chattogram (ID No-415534252). 1.2000 109.730 Nabi Enterprise 109.730 18/05/2023 100 30/04/2024 Final Bill Paid
34 GCP-3/ctg/SWD-257 Improvement of Mia Bari Road (Takia Rd-Mithnala High School) by Uni-Block at Ch: 00-1000m; Upazila: Miresarai, District: Chattogram (ID No-415534264). 1.0000 118.070 M/S. Jahan Steel 118.070 25/01/2023 100 28/04/2024 Final Bill Paid
35 GCP-3/ctg/WM-69 Periodic Maintenance of Bamonsundor Darogar Hat GC to Bari Bundth R & H Road via Luddakhali (Luddakhali-Shahazi Bazar-Bamonsundor Darogar Hat Road) by BC at Ch: 1100-2189m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 111552.00) (ID No-415533015). 1.0890 56.460 Khan Construction 56.460 20/11/2022 100 28/04/2024 Final Bill Paid
36 GCP-3/ctg/SWD-247 Improvement of Old Abutorab Darogar Hat Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415534391). 1.3000 154.440 M/S. Shajahan Construction 154.440 12/01/2023 100 28/04/2024 Final Bill Paid
37 GCP-3/ctg/SWD-249 Improvement of Sufia Mithanala Road to Abdul Wahab Road by Uni-Block at Ch: 00-1300m; Upazila: Miresarai, District: Chattogram (ID No-415535106). 1.3000 14328908.000 M/S. F R Traders 14328908.000 11/12/2022 100 28/04/2024 Final Bill Paid
38 GCP-3/ctg/SWD-248 Improvement of Abdul Wahab to Darogapara Mazar Road (UP-11) by Uni-Block at Ch: 2000-3200m; Upazila: Miresarai, District: Chattogram (ID No-415534108). 1.2000 14648041.000 M/S. Kashem Enterprise 14648041.000 25/01/2023 100 28/04/2024 Final Bill Paid
39 GCP-3/Ctg/WD-127 A) Development of Kamal teli Road (Border road to Khaia Ghona) Road by BC B) Development of Mithanala UP to Bhorer Bazar Road (St. Panter Pokur) by BC 2.4000 272.550 THE NEW TRADE 272.550 05/12/2022 100 28/04/2024 Final Bill Paid
40 GCP-3/ctg/SWD-256 Improvement of Sofia Road to Shidik Munshi Road by Uni-Block at Ch: 00-900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 179200.00) (ID No-415535081). 0.9000 11387358.000 M/S. Ishaque & Brothers 11387358.000 25/10/2022 100 28/04/2024 Final Bill Paid
41 GCP-3/ctg/WD-101 A) Development of Hamid Ullah Road by BC at Ch: 00-750m (ID No-415534024); Upazila: Mirsharai, District: Chattogram. B) Development of Kali Bari Road (Old DT-Bishu Miah Via Kalibari) by BC at Ch: 00-975m (ID No-415535359); Upazila: Mirsharai, District: Chattogram. C) Development of Uday Mahajan Road (Alinagar Border-Rezuudin Road) by BC at Ch: 00-650m (ID No-415534158); Upazila: Mirsharai, District: Chattogram. 2.3800 22490474.000 The New Trade Link 22490474.000 28/08/2022 100 28/04/2024 Final Bill Paid
42 GCP-3/ctg/WM-68 Periodic Maintenance of Dhum UP to Osmanpur UP Road via Moulovi Bazar (Bangla Bazar-Osmanpur Road) by BC at Ch: 00-1900m; Upazila: Miresarai, District: Chattogram (Salvage Materials Cost Tk. 204557.00) (ID No-415533007). 1.9000 8069131.000 Razia Enterprise 8069131.000 15/09/2022 100 28/04/2024 Final Bill Paid
43 GCP-3/ctg/WD-02 Gozaria Bazar to samitire Hat Bazar (Shaheed Nashir Uddin Road) By BC. 1.5500 132.350 M/S Junayet Enterprise 132.350 29/05/2019 100 22/04/2024 final bill paid
44 GCP-3/Ctg/WD-107 Development of R&H Road to Kararhat Forest Road by HBB 1.0000 60.190 M/S K I BUILDERS 60.190 24/05/2020 100 20/01/2021
45 GCP-3/ctg/WD-46 Yousuf Ali Road 0.4200 46.960 M/S. A B Enterprise 46.960 29/11/2020 0 19/01/2021
46 GCP-3/Ctg/WD -83 Construction of 2vx4.00mx4.00m RCC Box culvert on Barayer Hat R&H to Aburhat GC via Santirhat GC (Santirhat-Abur Hat G.C Road) at ch:10+030km 48.150 M/S. Nafi Traders 48.150 16/01/2020 0 19/01/2021 to be cancelled.
47 GCP-3/Ctg/WD-59 A) Development of Seru Member Road. B) Development of Mowlana Nazir Ahmed Road (Sattar Bhuiyan Bazar- Habibullah Road) 1.8300 201.270 M/s Junayet Enterprise 201.270 30/12/2020 100 19/01/2021
48 GCP-3/ctg/WD-12 Mayani UP to Annerderhat bazar Road via Maddam Mayani ( Abutorab- Annerderhat) 0.7000 63.080 M/S R.A Enterprise 63.080 10/02/2020 100 05/01/2021
49 GCP-3/ctg/WD-08 Mithanala UP - Esak Driver Hat road via Rahmatabad (Mithanala -Rahmatabad Central Road) 3.9000 319.900 The New Trade Link 319.900 30/05/2020 100 05/01/2021 Remaining= 56.72 lac
50 GCP-3/Ctg/WD-60 Development of Hazi Abdul Haque Road 1.1600 102.400 M/s Junayet Enterprise 102.400 10/01/2020 100 05/01/2021 remaining 7.46 lac
51 GCP-3/Ctg/WD-133 Development of Zorargong Rural Market. 52.610 MS/ MIRSARAI ENTERPRISE 52.610 03/09/2020 100 05/01/2021 final bill paid
52 GCP-3/Ctg/WD-105 Construction of 24.00m long RCC Girder Bridge on shaheed zakir hossain road (koila) at ch:2650m. 147.290 Kashem Traders & Tulitushi Enterprise JV 147.290 05/11/2020 100 05/01/2021 final bill paid
53 GCP-3/ctg/WD-50 Takia Road up to khal by bc. 1.4100 150.650 M/s. Dulal & sons 150.650 19/04/2020 100 05/01/2021 final bill paid
54 GCP-3/ctg/WM-29 A) Maintenance of DT Road-D.C Obaidullah Road (Sayed Ali/Arab ali Mistry Road) by BC. B) Maintenance of Sayedpur Bundh Road (Sufia Road-Chandpur Road) by BC. C) Maintenance of Rezauddin of Muhuri Road by BC. 2.4000 107.350 M/S. Shahjahan Construction 107.350 20/01/2020 100 05/01/2021 final bill submited
55 Gcp-3/ctg/WM-18 Maintenance of Abdul Gafur-Golam Rahman Munshi Road 0.7500 28.980 M/S. Miressarai Enterprise 28.980 10/08/2019 100 05/01/2021 final bill paid
56 GCP-3/ctg/WD-14 Kalu kazi Mollah Rd. 1.2000 95.440 M/S Sayeman Enterprise 95.440 12/05/2019 100 05/01/2021 Final bill paid.
57 GCP-3/ctg/WD-13 Moghadia UP to Bari Bundth R&H via Thakur hat, Mozumdarhat & Banglabazar(Abutorab-Hashem Nagar-Char sarat road) 0.4450 37.190 M/S Miressari Enterprise 37.190 29/05/2019 100 05/01/2021 final bill paid
58 GCP-3/Ctg/WM-11 Maintenance of Shaheed Shanto Road 0.4700 25.680 M/s. Haque Traders 25.680 24/05/2019 100 05/01/2021 final bill paid
59 GCP-3/ctg/WD-07 West Bariakhali-Cyclone Shelter Road (Eashak Driver Hat-Cyclone Shelter Road) 0.9600 84.620 M/S Onik Traders 84.620 18/04/2019 100 05/01/2021 final bill paid
60 GCP-3/ctg/WD-05 Sonapahar R&H to Zorargong Takar Hat R&H road (Jarif Mahammad Rd). 1.0000 126.180 M/S Nazim Traders 126.180 06/04/2019 100 05/01/2021 final bill paid
61 GCP-3/ctg/WD-04 Zorargong Bazar R&H to Rail line road (Fakir Astana road) 1.0700 79.500 M/S Mahin Associates 79.500 23/06/2019 100 05/01/2021 final bill paid
62 GCP-3/ctg/WD-03 Tarakatia Road 1.7000 156.590 M/S Junayet Enterprise 156.590 29/05/2019 100 05/01/2021 final bill paid
63 GCP-3/ctg/WD-01 Nizampur R&H to Shaherkhali R&H via Damdama Bazar and Bhorerhat GC (Oli Ahmed Abdur Rahman Road) 2.1000 281.410 The New Trade Link 281.410 07/04/2019 100 05/01/2021 Final bill paid
10 Patiya
1 GCP-3/Ctg/WD-87 Improvement of Kanchanabad UP (Chandanaish Upazila)-Shovandandi UP-Muralihat Road (Patiya Part) 1.0000 104.130 The Paramount International 104.130 25/06/2020 20 20/01/2021
2 GCP-3/Ctg/WDS-63 A) Development of Sargiya Prof. Pulin Dey Road B) Development of kolagaon UP (RHD)-Sikalbhaha Ghat Road (Dwip Kalar Moral Lakhera Baruapara) 1.7900 103.310 M/s. Jabbaria Construction & Co. 103.310 23/01/2020 100 20/01/2021
3 GCP-3/Ctg/WDS-62 A) Improvement of Kartala (RHD)-Belkhain GPS via Acharjee Para Road (Kartala Balkhain Road) B) Improvement of Kharana UP-Haidgaon Annanda Datta (RHD) Road (Rajghata Road) C) Improvement of Karankhain Village Road D)Improvement of Dhawardenga Kaliaish (Banga Mazi Road) 3.1000 181.920 M/s. Tahera Enterprise 181.920 21/01/2020 100 20/01/2021 final bill paid
4 GCP-3/Ctg/WDS-64 A) Improvement of Asia Bathua Village Road B) Improvement of Paschim Azimpur Bogun Para Road C) Improvement of Kalishahar Moitala Uttar Burishi Road 2.2500 117.770 M/s. J K Enterprise 117.770 14/08/2019 100 20/01/2021 final bill paid
11 Rangunia
1 GCP-3/Ctg/WD-98 A) Development of Sawnirvar Rangunia UP-TC Hat-Hosnsbad UP (Ram Mohan Sikder Road) at ch.1+529-3+104km. B) Improvement of Sayedul Haq Kabiraj Village Road by HBB at Ch: 0+000-1+003km. 2.5400 307.940 307.940 0 21/01/2021 Under Evaluation
2 GCP-3/Ctg/WD-97 Development of RHD Pattartila-Moulubir Tila-Kolompoti Bazar GC Road by BC (Rangunia Part) at ch.0+000-4+072km. 3.9280 481.480 481.480 0 21/01/2021 Tender Under Process
3 GCP-3/Ctg/WM-36 Periodic Maintenance of R&H Ghatcheek-Rajarhat GC-Ranirhat GC (Parua DC Road) by BC at ch: 7+000-14+130km. 7.1300 249.260 249.260 08/06/2021 0 21/01/2021
4 GCP-3/Ctg/WD-172 Improvement of Padua Rajar Hat-Kamalachari GPS-RHD Bridge Ghat (Khurushia Abdul Hamid Road) Road by BC at Ch: 0+000-4+000km. 4.0000 457.730 457.730 28/10/2021 0 21/01/2021
5 GCP-3/Ctg/WD-205 Development of Godown Bridge-Kalurghat Road (Muktijudddah Ali Akbor Road) by RCC at ch: 0+000-0+560km. 51.370 51.370 06/05/2021 0 21/01/2021
6 GCP-3/Ctg/WD-102 Development of RHD Shantinikaton Bazar Bommotar Nurul Ulum Madrasha-TC Hat (Korban ali Road & Nobo Chandra Road) by BC at ch: 1204-2765m. 1.4480 250.580 250.580 28/07/2021 10 21/01/2021
7 GCP-3/Ctg/WM-24 Maintenance of Padua Razar Hat-Horihor GPS-RHD Narissa Bottal (SDO Road) Road 2.6600 127.834 127.834 0 20/01/2021 reject.design change needed.
8 GCP-3/Ctg/WD-41 Development of Parua UP Office -Sonai chori Bazar (Rangunia Part) 1.6400 155.030 155.030 0 20/01/2021 tender notice under process
9 GCP-3/Ctg/WM-34 Periodic Maintenance of Dovashi Bazar GC-Kodala UP-Shilok UP-Sarfvata UP-RHD- Godown (Hazee Sayed Ali Road) Road by BC 6.3440 162.060 M/S. A ALI CHOWDHURY 162.060 12/02/2021 0 20/01/2021
10 GCP-3/Ctg/WM-38 Periodic Maintenance of Sawnirvar Rangunia UP-TC Hat-Hosnabad UP (Ram Mohansikder Road) Road by BC 1.5140 39.840 M/S. SHOHAG ENTERPRISE 39.840 15/02/2021 0 20/01/2021
11 GCP-3/Ctg/WD-31 Improvement of Sarafvata UP-Mirrerkhill Bazar (Hazee Asraf Ali Road) by BC 3.0300 316.460 A ALI -AKHI-AI AMIN (JV) 316.460 21/11/2020 65 20/01/2021
12 GCP-3/Ctg/WD-117 Development of Parastani Bile Road (Shilak Nazir Ahammed Road-Goas Tali Para) by HBB 1.0000 71.230 M/S. A S CHOWDHURY 71.230 24/07/2020 45 20/01/2021
13 GCP-3/Ctg/WD-109 Development of Pomra GPS-Kaidazam Market (Bachsah Road) by BC. Development of Moriom Nagar RHD-Jaladas Para (Moriom Nagar Jaladas Para) Road by HBB 1.1800 125.630 M/S. SALEHA CONSRUCTION 125.630 07/11/2020 80 20/01/2021
14 GCP-3/Ctg/WD-88 Construction of 20m Long RCC Girder Bridge (Clear Traffic Width 5.50m) over Gochara Katakhali Khal on Pomra GPS-Kaidiazam Market (Bacha Shah Road) 175.460 M/S. SALEHA CONSRUCTION 175.460 24/07/2020 85 20/01/2021
15 GCP-3/Ctg/WM-15 Maintenance of RHD Shishutal-Ranirhat GC Road 3.2000 97.160 M/S. Creation Construction 97.160 05/03/2020 50 20/01/2021
16 GCP-3/Ctg/WM-01 A)Periodic Maintenance of RHD Brammon Ghat- Darikope High School-Chipchari Pekua Fruits Fram (Darikope Road) B) Rehabilitation Dovashi Bazar GC-kodala UP-Shilok Up-Sarafvata Up- RHD Godown (Hazee Sayed Ali Road) 3.8650 99.270 M/s. Al-Amin 99.270 18/07/2019 50 20/01/2021
17 GCP-3/ctg/WD-11 Dovashi Bazar GC - Nischintapur - RHD Mogalerhat (From RHD #103) 2.2980 291.380 Dolly Construction 291.380 31/05/2020 55 20/01/2021
18 Gcp-3/ctg/WM-02 Periodic maintenance of RHD Rampgotirhat karnafully River Ghta. 0.7330 36.200 M/s Jahanara & sons 36.200 18/06/2019 100 20/01/2021
19 GCP-3/Ctg/WD-86 Improvement of Azimpir Road (Khurushia Darikope Road-Semipara) 1.2000 91.720 M/S. Afsana Enterprise 91.720 20/12/2019 100 20/01/2021 final bill paid
12 Raojan
1 GCP-3/Ctg/WD-221 Improvement of Moulana Sirajuddin road (Nazim Building to M.Farid ahammed Bari Road) by HBB at ch: 350-630m. 0.2800 13.810 13.810 0 21/01/2021 APP Send to pd.
2 GCP-3/Ctg/WD-125 Development of Kachu Khain Abdul Nabi Road (Noapara) by RCC at ch: 0+000-1+000km. 1.0000 148.520 148.520 0 21/01/2021 APP Send to pd.
3 GCP-3/Ctg/WD-218 Development of Vot Pukuria Hazrat Nojir Ahamed Shah Road-Shahid Jafar Road by HBB at ch: 732-1652km. 0.9200 74.870 74.870 0 21/01/2021 NOA Issued
4 GCP-3/Ctg/WD-217 Development of Chattogram-Kaptai (R&H) Road-Zia Bazar (LM) via Modon Jungle) Madunaghat Road (Modon Jungle) by RCC at ch: 560-1226m. 0.6660 106.640 106.640 0 21/01/2021 NOA Issued
5 GCP-3/Ctg/WD-216 Development of Rawali Road (UZR)-Oli Mia Hat LM. Bara Takur Para Road) by RCC at ch: 740-1409km. 0.6760 107.120 107.120 0 21/01/2021 NOA Issued
6 GCP-3/Ctg/WD-213 Construction of 1 x 3.50 x 3.50m RCC Box Culvert at Ch: 118.00m on Kulal para Road (Kodolpur UP) 31.250 31.250 0 20/01/2021
7 GCP-3/Ctg/WD-160 Improvement of Bagon Bhupesh Barua Bari Road by RCC at ch: 0+000-0+951km. 0.9510 175.930 175.930 04/07/2021 0 20/01/2021
8 GCP-3/Ctg/WD-123 Development of Bama Charan Road (East Guzra) by RCC 1.0000 157.180 M/S. BAIZID 157.180 30/12/2020 90 20/01/2021
9 GCP-3/Ctg/WD-124 Development of Nowapara Paloan Para Nurani Madrasha Road by RCC 0.7250 117.210 M/S. K ALAM TRADERS 117.210 27/12/2020 90 20/01/2021
10 GCP-3/Ctg/WD-106 Development of Dost Mohammed Road (UZR) Akber Sha (UNR) Road at Gonir Ghat (Md. Amir Road) by BC 0.5000 35.170 M/S TASPIYA ENTERPRISE 35.170 22/09/2020 70 20/01/2021
11 GCP-3/ctg/WD-16 Improvement of Shair Mohammad Road (Kadalpur) 0.4680 43.950 M/S. Benchmark Construction 43.950 22/07/2020 60 20/01/2021
12 GCP-3/Ctg/WD-103 Development of Samsher Para road (Kadalpur) by RCC. Development of Kadalpur Feda Gazir Bari Road-Nurali Munsi Road by RCC 1.4100 213.870 M/S. KAHEM ENTERPRISE 213.870 04/08/2020 80 20/01/2021
13 GCP-3/Ctg/WD-79 A) Development of Raozan-Noapara Section-1 (R&H) at Chitiapara-Raozan-Noapara Sec-1(R&H) at kagotia Hat (LM) via Lalangara Para Road (Lalangara Para Road) by BC B) Development of Shahid Jafar (R&H Road Brikka Bhanupur Bazar (LM) Road (Brindaban Para Road) by HBB 3.0000 235.950 M/S. Pubali Traders 235.950 30/12/2020 65 20/01/2021
14 GCP-3/Ctg/WD-39 A) Improvement of Gourisankar Hat GC Ramchandra Bazar RHD via New Roghunandan Road B)Improvement of R.D Mphammadia Road Paharoli Dewanpur Pathan Pra Road 2.2010 349.280 M/s. I S Trading 349.280 25/03/2020 50 20/01/2021
15 GCP-3/ctg/WD-19 Shahid jafar Road (R&H) Dabua Rubber Garden via Hingola Mucha shah mazar (Dabua Rubber Gurden road) 1.0000 70.580 M/s ChowdhuryEnterprise, 70.580 24/10/2019 70 20/01/2021
16 GCP-3/Ctg/WD-161 Improvement of Noajishpur Dabua Road (Gohira heaco Road to Dabua Gonirghat Bridge) by RCC 0.8000 128.550 M/S. S M TRADING 128.550 15/01/2021 100 20/01/2021
17 GCP-3/Ctg/WD-68 A) Development of Chittagong-Rangamati (R&H) Road-Chikdair UP (Shaheb Bari Road) B) Development of Saf Langa No-1 Road 1.9600 258.390 M/s. Riton Enterprise 258.390 05/04/2020 100 20/01/2021
18 GCP-3/ctg/WD-18 Amir para road (Hafez Bazlur Rahman Road to Amirpara 1.0400 140.250 M/s ShahJabbariaConstruction & Co 140.250 30/11/2019 100 20/01/2021
19 GCP-3/Ctg/WD-77 A) Development of Pachim Gahira Brick Field RHD-Mohammed Towkir hat GC (Raozan Part) by BC. B)Development of Dost Mohammed (UZR) Hingula Musa Shah Majar & Bazar (LM) Riad (Kash Khali Dabua Hingolla Road) by HBB C)Development of khan Bahadur Abdul Jabber Road-2 kagotia hat (LM) via Sonair Muk Road (West Binajuri Sonair Muk Road) by BC. 3.1500 282.190 M/S. Pubali Traders 282.190 30/12/2020 100 20/01/2021
20 GCP-3/Ctg/WM-23 Maintenance of Ramjan Ali Hat G.C – Noapara Pather hat (R&H) Road (Rouzan Noapara Sec-2) 5.0600 171.990 M/S. Shah Amanat Enterprise 171.990 10/08/2019 100 20/01/2021 final bill submited
21 GCP-3/ctg/WD-20 Kulal para road ( Kodolpur UP) (Amir Para) 0.8800 81.510 M/sM N Traders 81.510 25/03/2020 100 20/01/2021
22 GCP-3/ctg/WD-21 Improvement of Noapara Ovalong Road 2.1470 255.360 M/S. Iqbal & Brothers- Shah Amanat Enterprise (JV) 255.360 13/02/2020 100 20/01/2021
23 GCP-3/ctg/WD-33 A)Mozlish Bari Road (Via Naki Miaji Bari) B) Mobarak ali road. 1.5800 239.590 M/s Iqbal &Brothers 239.590 13/11/2019 100 20/01/2021 final bill.
24 GCP-3/ctg/WD-17 Kala Miah Road 1.3530 170.020 M/s S M Trading 170.020 06/06/2019 100 20/01/2021 final bill paid
13 Sandwip
1 WD-313 sontoshpur up to companigonj ghat road via dirgapar up and urichar up 1.7270 295.740 295.740 100 07/07/2026 final bill paid
2 WM-73 musapur chowmuhoni bazar to mugdhara up amtoli bazar 2.3000 292.870 292.870 100 07/07/2026 final bill paid
3 WD-312 a.freedom fighter akram khan dulal road b.ponditer hat and rhd road to embankment via kamala matibhanga road 2.0000 342.130 342.130 100 07/07/2026 final bill paid
4 WD-437 palashirhat gc to embankment 1.3300 253.060 253.060 100 07/07/2026 final bill paid
5 WD-438 palashirhat gc to embankment 0.3000 57.800 57.800 100 07/07/2026 final bill paid
6 WD-242 a.musapur chowmuhani bazar to moghdara up amtoli bazar b.palisher hatb gc to embankment 1.4430 253.860 253.860 100 07/07/2026 final bill paid
7 WD-243 a. chwmuhoni road to akbor hat via banir hat b.palashar bazar gc to sleber hat road via amtoli bazar & dhopergopart 1.4750 255.320 255.320 100 07/07/2026 final bill paid
8 WD-311 embankment circular road via adarshapara gps and shiberhat gc 1.7300 303.890 303.890 100 07/07/2026 final bill paid
9 GCP-3/Ctg/WM-09 A)Maintenance of Harish Pur Union Parishad-Salam Bazar Road B)Maintenance of Embacment to Circular Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road) 1.4600 136.860 Md. Zakir hossain 136.860 15/09/2019 100 20/01/2021 final bill paid
10 GCP-3/Ctg/WD-145 Development of Chwmuhani Road (Pouroshava Market) to Akbor Hat via Banir Hat (Cross Road) Road by RCC 1.0000 170.200 M/S MOHSHIN & BROTHERS & M/S SAMIHA ENTERPRISE (JV) 170.200 26/11/2020 0 19/01/2021
11 GCP-3/Ctg/WD-146 Development of Harish pur Union Parishad-Salam Bazar Road by RCC 0.6000 101.850 M/S SANDWIP BUILDERS 101.850 08/09/2020 0 19/01/2021
12 GCP-3/Ctg/WD-80 A) Improvement of Ammanullah UP to Doamkhali ferry ghat via RHD Road (Doamkhali ferry ghat Road) by RCC B) Improvement of Palashar Bazer GC to Sheber hat GC (RHD) Road via Amtoli Bazar & Janata bazar Road (Kamala & Dhopergopart Road) by RCC 2.7500 409.690 Mohammad younus & brothers 409.690 20/11/2020 50 19/01/2021
13 GCP-3/Ctg/WD-38 Improvement of Bangla Bazar to Tonasa Road (Mafiz Mikter road) by RCC. Improvement of Bauria Harishpur Road (H/O) Moulovi Shamsul Huda ) to Banir hat ( Moulovi Shamsul Huda Road) by RC Improvement of Harishpur Up to Embankment via Dwipallo GPS RHD Road (Modhya Bauria Road) by RCC Improvement of Musapur Chowmuhani Bazar to Mogdhara up Amtoli bazar via Chowdhury bazar Maitbanga up (DB Road) by RCC Improvement of Palisher Hat GC to Embacment (Palisher road) by RCC Improvement of Sandwip Upazila Sontospur up to Companigong Ghat (Noakhali) Road via Dirgapur UP & urir char UP (Sandwip Char Elahi Connecting Road) by RCC 3.4200 324.190 M/S A. ALI CHOWDHURY 324.190 15/07/2020 90 19/01/2021
14 GCP-3/Ctg/WD-81 A) Improvement of Freedom Fighter Akram Khan Dulal Road (Mollah Road) by RCC B) Improvement of Embakment to Circuler Road via Adarsho Para GPS & Shiberhat GC (Abul Khair Khan Satgoria Road) by RCC C) Improvement of RHD Road (Malak Munshi Bazar) to Moulavi Bazar (Badalia Road) by RCC 2.2500 300.180 Mohammed Eunus & Brothers (Pvt.) Ltd. 300.180 30/11/2020 100 19/01/2021
15 GCP-3/Ctg/WD-82 A) Improvement of Panditer Hat & RHD Road to Embnmkent via kamala maitbanga Road (Alam khushi Road) by RCC B) Improvement of Banir hat (H/O Rafiq Compani) to Bosidia Road via RHD & Ershad Market (Gasua Bauris boarder) by RCC 1.2050 160.850 M/S. S R Enterprise 160.850 09/03/2020 100 19/01/2021 final bill submitted.
14 Satkania
1 GCP-3/ctg/WD-517 Development of Karaia Nagar Mahila Madrasa Road by BC & Uni-Block at Ch: 00-1000m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 939169.00) (Road ID No- 415825033). 1.0000 109.770 109.770 0 07/07/2026 Tender Under Evaluation
2 GCP-3/ctg/WD-510 Development of Chotta Hatiya Road by Uni-lock at Ch: 00-1020m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 163677.00) (Road ID No-415824044). 1.0200 163.410 163.410 30/04/2026 70 07/07/2026
3 GCP-3/ctg/WD-505 Improvement of Eochia UP-Jut Pokuria Bazar Road by Uni-Block at Ch: 1645-2895m; Upazila: Satkania, District: Chattogram (Road ID No-415823003). 1.2500 160.570 160.570 01/05/2026 55 07/07/2026
4 GCP-3/ctg/WD-425 Development Of Uttor Rampur Govt. Primary School-Maidda Para via Majer Para Road by BC at Ch: 00-430m; Upazilla : Satkania, District: Chattogram. (ID:415824210) 0.4300 44.870 44.870 03/07/2024 35 07/07/2026 Contact Cancel, J.M Under Process.
5 GCP-3/ctg/WD-349 Development of Freedom Fighetr M. Fazal Karim Chairman Road (Kaliais UPC-Dastider Hat) by BC at Ch: 3000-4920m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 3553887.00) (ID No-415823009). 1.9200 308.720 308.720 28/02/2026 85 07/07/2026
6 GCP-3/ctg/WD-263 Construction of 30.00m Long PSC Girder Bridge (Clear Traffic With-5.50m) on Kanchana UP-Monu Fakirhat Road at Ch: 1908m; Upazila: Satkania, District: Chattogram (ID No-415823002). 304.770 304.770 30/12/2024 100 07/07/2026
7 GCP-3/ctg/SWD-391 Improvement of Goribarjhil Laila Moksood Road by BC at Ch: 00-760m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 1464046.00) (ID No-415824157). 0.7600 101.020 101.020 30/05/2024 90 07/07/2026 Revised Est. Sent to HQ.
8 GCP-3/ctg/WD-238 Construction of 20.00m Long RCC Girder Bridge (Clear Traffic With-5.50m) on Khagoria Bhore Bazar GC-CTG Cox's Bazar (NHW) Road at Ch: 2028m; Upazila: Satkania, District: Chattogram (ID No-415822001). 195.180 195.180 28/02/2026 100 07/07/2026
9 GCP-3/Ctg/WM-10 Maintenance of Upazila Headquarter-Keranihat GC road 3.6580 218.440 M/s Md. Faruq 218.440 17/09/2019 100 06/07/2026 Final Bill Paid
10 GCP-3/ctg/WD-507 Development of Uttor Brammon Danga Uttor Para Road (Charati) by Uni-Block at Ch: 600-850m; Upazila: Satkania, District: Chattogram (Road ID No-415824179). 0.2500 39.750 39.750 12/03/2026 100 06/07/2026 Final Bill Paid
11 GCP-3/ctg/WM-067 Maintenance of Freedom Fighter M. Fazla Karim Chairman Road (Kaliaish UPC-Dastider Hat) by BC at Ch: 00-3000m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 394240.00) (ID No-415823009). 3.0000 325.780 325.780 28/12/2025 100 06/07/2026 Final Bill Paid
12 GCP-3/ctg/WD-436 Development of Uttor Brammon Danga Uttor Para Road (Charati) by RCC at Ch: 00-600m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 216145.00) (ID No-415824179). 0.6000 65.370 65.370 02/02/2025 100 06/07/2026 Final Bill Paid
13 GCP-3/ctg/WD-138 Development of Karani Hat GC-KG Road (RHD) near Demsha UPC Rozd by BC at Ch: 0+000-1+762km; Upazila: Satkania, District: Chattogram. 1.7620 283.510 283.510 08/04/2024 100 06/07/2026 Final Bill Paid
14 GCP-3/ctg/WD-348 Improvement of Samadia Pukur Bazar-Chib Bari School Road by BC at Ch: 1000-1365m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 754445.00) (ID No-415824048). 0.3650 31.590 31.590 25/04/2024 100 06/07/2026 Final Bill Paid
15 GCP-3/ctg/WD-285 Development of Fultala-Monufakir Hat Road by BC at Ch: 00-1500m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 2227210.00) (ID No-415824011). 1.5000 154.330 154.330 19/03/2024 100 06/07/2026 Final Bill Paid
16 GCP-3/ctg/WD-320 Development of Karani Hat GC-Khagoria Bhorbazar GC Road by BC at Ch: 3600-4960m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 2624257.00) (ID No-415822004). 1.3600 199.230 Makka Builders 199.230 30/01/2024 100 06/07/2026 Final Bill Paid
17 GCP-3/ctg/WD-291 Development of Freedom Fighter M. Fazal Karim Chairman Road (Kaliaish UPC-Dastider Hat) by BC at Ch: 7600-8600m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 1935596.00) (ID No-415823009). 3.0000 209.620 M/S Haque & Engineering 209.620 05/07/2023 100 06/07/2026 Final Bill Paid
18 GCP-3/ctg/WD-286 Development of Hasan Shah Road by BC at Ch: 00-1000m; Upazila: Satkania, District: Chattogram (ID No-415824027). 1.0000 170.150 M/S Shah Darbeshia Automobiles 170.150 25/09/2023 100 06/07/2026 Final Bill Paid
19 GCP-3/ctg/WM-49 Maintenance of Dewan Hat GC-Teyari Hat GC (Lohagara) Satkania Portion Road by BC at Ch: 4735-6196m; Upazila: Satkania, District: Chattogram (Salvage Materials Cost Tk. 232512.00) (ID No-415822006). 1.4610 113.580 M/S Yeamin Construction 113.580 30/10/2022 100 06/07/2026 Final Bill Paid.
20 GCP-3/Ctg/WD-48 Develoment of Sadaha UP-Dostidar Hat Road by BC 0.6980 100.590 M/S. MOHSHIN & BROTHERS 100.590 30/10/2020 100 06/07/2026 Final Bill Paid
21 GCP-3/Ctg/WD-112 Development of Satkania U.P-Tayari Hat Bazar GC (Lohagora) Road from 0.9950 91.430 M/S. J K ENTERPRISE 91.430 25/07/2020 100 06/07/2026 Final Bill Paid
22 GCP-3/Ctg/WD-122 Development of Bomang Hat GC-Mithadighi (RHD) via Sadaha UPC Road by BC . 2.0000 188.290 M/S. ABSAR CONSTRION 188.290 04/10/2020 100 06/07/2026 Final Bill Paid
23 GCP-3/Ctg/WD-36 Developement of Gatiadanga -Deodighi-Mirjakhil Road (From RHD #146) 1.1930 152.830 M/S. ADS Builders 152.830 20/09/2020 100 06/07/2026 Final Bill Paid
24 GCP-3/Ctg/WD-116 A) Development of Amilaish Char Para-Datta Ghat Road by BC . B) Development of West Amilaish GPS-Khar Mosjid Road by HBB. 1.5490 125.800 S ANANTA BIKASH TRIPURA 125.800 06/10/2020 100 06/07/2026 Final Bill Paid
25 GCP-3/Ctg/WM-39 Maintenance of Nalua-Satkania Road via Nalua Hadar Khal Bridge at 1.00km & Gatiadanga High School at Ch: 8.00km of Charati-Khoderhat-Noyahat-Bazalia (From RHD# 143) Road by BC at ch: 0-200m, 340-550 & 870-2500m. RCC at ch: 200-340m & 550-870m 2.4600 113.770 M/S BLUE BIRDS 113.770 02/03/2021 100 06/07/2026 Final Bill Paid
26 GCP-3/Ctg/WD-35 Development of Rampur Madrasha Shikder Para Road 0.7350 91.700 M/S. S M Yousuf Brothers 91.700 30/06/2020 100 06/07/2026 Final Bill Paid
27 GCP-3/Ctg/WD-52 Development of Madrasha-Sonakania Gravyeard Road 1.0550 93.270 M/s. Alam Enterprise 93.270 03/11/2020 100 06/07/2026
28 GCP-3/Ctg/WD-91 Development of Mirza Jabal Road by HBB 0.7320 43.040 M/S. M A S K Construction 43.040 21/12/2019 100 06/07/2026 Final Bill Paid
15 Sitakunda
1 WD-501 Siraj bhuiyan rhd south muradpur uzr habib road 1.0150 199.460 199.460 50 07/07/2026
2 SWDS-294R islamic university chattogram internal road 0.2150 17.160 17.160 0 07/07/2026 cancel
3 WD-465 madhoy dari uzr habib road wdb embankment road 1.0000 112.210 112.210 65 07/07/2026
4 WD-464 mohanagar notun para road 1.1430 126.420 126.420 0 07/07/2026 cancel
5 WD-463 pashchim sayedpur antorkhali mirerhat toad 0.6760 76.010 76.010 100 05/07/2026 final bill paid
6 WD-344 islamic university sitakunda and hathazari connecting road 1.2470 189.140 189.140 100 05/07/2026 final bill paid
7 WD-445 janaullah sowdagor road 0.7750 97.150 97.150 100 05/07/2026 final bill paid
8 WD-448 bogachator habib road dakkhin bogachator school road 0.7200 89.710 89.710 100 05/07/2026 final bill paid
9 SWD-419 maza mazi para abul hossain jame mosque road 0.2250 21.230 21.230 100 05/07/2026 final bill paid
10 WD-244 mirerhat hamidullah road 1.6000 142.410 142.410 100 05/07/2026 final bill paid
11 SWD-298 islamic university road 0.7550 118.390 118.390 100 05/07/2026 final bill paid
12 GCP-3/Ctg/WD-73 Improvement of Middle Shikalbaha GPS-Kalarpool GPS Road (Wahidia Road) by RCC at ch: 0+000-1+400km. 2.0300 194.040 194.040 0 20/01/2021 Tender notice under process.
13 GCP-3/Ctg/WM-05 A)Maintenance of Modhya Bogachator Cyclone Shelter Road B)Maintenance of Mirer Hat GC Road- Sandwip Ferry Ghat Road (Mirer Hat GC) Road C)Maintenance of Zinnat Ali Road 4.4490 130.680 M/s Stapathi Design & Consultant 130.680 05/06/2019 100 20/01/2021 final bill paid
14 GCP-3/Ctg/WM-06 A)Maintenance of Mojid Mullah-Tofjolia Dhalipara Hasnabad road B)Maintenance of Chotodarogerhat RHD-Sohasra Dhara Road C)Maintenance of Mogpukira Road 3.7070 101.480 M/s. Hassan Motors 101.480 30/10/2020 100 20/01/2021 final bill paid
15 GCP-3/ctg/WD-30 Postim Sayed Pur Auntar khali - Mirer Hat Road. 0.9760 242.790 242.790 0 19/01/2021 টেন্ডার হয়নি।
16 GCP-3/Ctg/WD-182 Development of Uttor Bohachattor Oli Ahammed (Raja Miah Chdry) Road by BC 1.0000 97.220 M/S THREE STAR ENTERPRISE 97.220 27/12/2020 10 19/01/2021
17 GCP-3/Ctg/WD-156 Improvement of Bhatiary Sunsade Point RHD-Dhaka Chattogram Road RHD via BMA High School Road by BC 1.6600 397.240 M/S JEWEL ENTERPRISE 397.240 26/05/2021 0 19/01/2021
Total : 548.8870 (Km) 70982736.85 (Lac) 70982736.85 (Lac)