Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Chandpur-s
1 PEDP-III/CHD/ 2011-12/W1.0613 Re-Const. of Primary School including Furniture Supply of Puran Bazar Marchants Academy RNGPS 6072000.020 M/S. National Trade System 6072000.020 29/07/2012 29/07/2013 100 01/02/2017 Final bill paid
2 PEDP-III/CHD/ 2016-17/W2.2099 Construction of additional class room of K.G Primary school 6276000.000 Abdul Kader Bapari 6276000.000 07/02/2017 07/02/2018 0 01/02/2017
3 PEDP-III/CHD/2013-14/W2.2971 (a) Construction of Additional Room Including Furniture Supply for Sudia Community Primary School under Hazigonj Upazila District Chandpur, (b) Purba Shakhua Primary School under Chandpur Sadar Upazila District Chandpur, (c) Railway Secvengers Primary School under Chandpur Sadar Upazila District Chandpur 13321920.910 JV OF SM-MRL 13321920.910 23/04/2014 15/04/2015 100 26/08/2015
4 PEDP-III/CHD/SAD/2011-12/W3.0045 DAKHIN HAMANKARDI REGD. School Major Maintenance 262040.000 M/S SQ Trade International 262040.000 23/07/2012 30/01/2013 100 22/09/2014  
5 e-Tender/PEDP-III/CHD/SAD/2013-14/W7.084 Ext. & Renovation of Chandpur-SUEO School Upazila Education Office 1881007.000 Md. Monir Hossain 1881007.000 09/03/2014 17/09/2014 50 22/09/2014  
6 e-Tender/PEDP-III/CHD/SAD/2013-14/W2.2950 PURBO MADNA COMMUNITY School Additional Room 6279000.000 Abdul Kadir Bepari 6279000.000 03/02/2014 11/11/2014 80 22/09/2014  
7 e-Tender/PEDP-III/CHD/SAD/2013-14/W2.2949 COTRABAD COMMUNITY School Additional Room 3955000.000 JV Abdul Kadir Bepary & M/S Ripson Traders 3955000.000 03/02/2014 11/11/2014 20 22/09/2014  
8 PEDP-III/CHD/SAD/2011-12/W2.1354 ARAJI BALIA COMMUNITY School Additional Room 2091000.000 M/S Alam Enterprise 2091000.000 14/10/2012 19/10/2013 100 22/09/2014  
9 PEDP-III/CHD/SAD/2013-14/W2.2198 UTTAR GOBINDIA School Additional Room 2000000.000 M/S MF Corporation 2000000.000 21/05/2014 27/05/2015 30 22/09/2014  
10 PEDP-III/CHD/SAD/2011-12/W2.0449 SHAPLEZA School Additional Room 2993000.000 M/S Alamgir Gazi 2993000.000 17/06/2012 16/06/2012 100 22/09/2014  
11 PEDP-III/CHD/SAD/2011-12/W2.0448 SADULLA PUR School Additional Room 2993000.000 M/S Zahedul Islam Roman 2993000.000 21/06/2012 20/06/2013 100 22/09/2014  
12 PEDP-III/CHD/SAD/2011-12/W2.0447 DAKKHIN BALIA NORSHING PU School Additional Room 2993000.000 M/S Alamgir Gazi 2993000.000 17/06/2012 16/06/2013 100 22/09/2014  
13 PEDP-III/CHD/SAD/2011-12/W2.1277 BALASIA D.K. School Additional Room 1643000.000 Md. Alamgir Gazi 1643000.000 18/08/2012 19/05/2013 100 22/09/2014  
14 e-Tender/PEDP-III/CHD/SAD/2013-14/W2.2948 BALASIA M.B. KANDI School Additional Room 2000000.000 M/S Zahedul Islam Roman 2000000.000 13/04/2014 16/04/2014 0 22/09/2014  
15 e-Tender/PEDP-III/CHD/SAD/2013-14/W2.2947 CHAR FATEJONG PUR School Additional Room 4896000.000 M/S J V Abdul Kader & Ripon Traders 4896000.000 12/02/2014 19/02/2015 65 22/09/2014  
16 PEDP-III/CHD/SAD/2011-12/W2.1276 GHARUA School Additional Room 5186000.000 MD. Abdul Kader Bepary 5186000.000 18/06/2012 12/12/2013 100 22/09/2014  
17 PEDP-III/CHD/SAD/2012-13/W2.1994 UTTAR BALIA DAKKHIN School Additional Room 2793000.000 Md. Alamgir Gazi 2793000.000 19/02/2013 25/11/2013 100 22/09/2014  
18 e-Tender/PEDP-III/CHD/SAD/2013-14/W2.2946 KANUDI MANOHAR KANDI School Additional Room 2995000.000 M/S J V Abdul Kader & Ripon Traders 2995000.000 12/02/2014 19/02/2015 70 22/09/2014  
19 PEDP-III/CHD/2012-13/W2.1635 HASAN ALI MODEL School Additional Room 2743000.000 Abdul Kader Bepari 2743000.000 23/12/2012 09/09/2013 100 22/09/2014  
20 PEDP-III/CHD/SAD/2011-12/W1.0311 CHIRAR CHAR COMMUNITY School Reconstruction 5140000.000 M/S Ripon Traders 5140000.000 13/06/2012 12/09/2013 100 22/09/2014  
21 PEDP-III/CHD/SAD/2011-12/W1.0310 PACHCHIM JAFRABAD School Reconstruction 1643000.000 Md. Zahidul Islam 1643000.000 23/10/2012 30/01/2014 100 22/09/2014  
22 PEDP-III/CHD/SAD/2011-12/W1.0309 UTTAR SHAHATALI ZUBAIDA School Reconstruction 5140000.000 M/S Zakir Broathers 5140000.000 14/06/2012 14/09/2013 100 22/09/2014  
23 PEDP-III/CHD/2011-12/W1.0613 PURAN BAZAR MARCHANTS ACADEMY School Reconstruction 6072000.000 M/S National Trade Sys. 6072000.000 13/06/2012 30/08/2013 100 22/09/2014  
24 e-Tender/PEDP-III/CHD/2013-14/W13.28 Ext. & Renovation of Chandpur DPEO School District Education Office 2499999.000 Zahidul Islam Ruman 2499999.000 09/04/2014 10/06/2014 80 22/09/2014  
2 Faridganj
1 PEDP-III/CHD/FAR/2011-12/W3.0046 CHAR MANDARY School Major Maintenance 95170.000 M/S Veco Trade International 95170.000 05/08/2012 05/03/2013 100 22/09/2014  
2 PEDP-III/CHD/FAR/2011-12/W2.0967 SHAHEB GONJ School Additional Room 5186000.000 M/S Kasem & Brothers 5186000.000 20/06/2012 26/06/2013 100 22/09/2014  
3 PEDP-III/CHD/FAR/2011-12/W2.0196 PASCHIM BADAR PUR School Additional Room 3388000.000 Md. Zahedul Islam Roman 3388000.000 17/06/2012 21/06/2013 100 22/09/2014  
4 PEDP-III/CHD/FAR/2011-12/W2.1355 RUPSA BOYS School Additional Room 2361000.000 M/S Appolo Eng. Cons. Ltd. 2361000.000 09/10/2012 08/10/2013 100 22/09/2014  
5 PEDP-III/CHD/FAR/2012-13/W2.2100 RUPSA GIRL'S School Additional Room 2191000.000 M/S ShafiQ Enterprise 2191000.000 30/11/2013 20/04/2014 60 22/09/2014  
6 PEDP-III/CHD/FAR/2011-12/W2.0452 UTTAR CHAR BARALI School Additional Room 2993000.000 M/S Aziz & Brothers 2993000.000 17/06/2012 21/06/2013 100 22/09/2014  
7 PEDP-III/CHD/FAR/2011-12/W2.0451 PASCHIM BISHKATALI School Additional Room 2993000.000 M/S Shafiq Enterprise 2993000.000 17/06/2012 21/06/2013 100 22/09/2014  
8 PEDP-III/CHD/FAR/2012-13/W2.1996 PASCHIM SONTOSH PUR School Additional Room 5186000.000 M/S ShafiQ Enterprise 5186000.000 11/02/2014 07/11/2014 50 22/09/2014  
9 e-Tender/PEDP-III/CHD/FAR/2013-14/W2.2954 ISLAM GONJ School Additional Room 3955000.000 M/S Shah Jalal Mision 3955000.000 09/06/2014 09/03/2015 40 22/09/2014  
10 PEDP-III/CHD/FAR/2012-13/W2.1995 HANSHA School Additional Room 4069000.000 M/S Hitek Enterprise 4069000.000 24/11/2013 20/08/2014 30 22/09/2014  
11 PEDP-III/CHD/FAR/2011-12/W2.0966 PURBO HANSHA School Additional Room 5186000.000 M/S Khan Enterprise 5186000.000 20/06/2012 26/06/2013 100 22/09/2014  
12 e-Tender/PEDP-III/CHD/FAR/2013-14/W2.2953 UTTAR CHAR RAGOB RAY School Additional Room 3546000.000 M/S Aziz & Brothers 3546000.000 09/06/2014 30/11/2014 70 22/09/2014  
13 e-Tender/PEDP-III/CHD/FAR/2013-14/W2.2952 PROTYASHI School Additional Room 3281000.000 M/S Zia Enterprise 3281000.000 09/06/2014 11/03/2015 0 22/09/2014  
14 PEDP-III/CHD/FAR/2012-13/W2.1997 UTTAR CHAND PUR School Additional Room 2993000.000 M/S AliF Enterprise 2993000.000 31/01/2013 04/11/2013 100 22/09/2014  
15 e-Tender/PEDP-III/CHD/FAR/2013-14/W2.2951 PURBO DHANUA RPS School Additional Room 2995000.000 M/S Contemporary 2995000.000 09/06/2014 03/05/2015 30 22/09/2014  
16 PEDP-III/CHD/FAR/2011-12/W2.0965 ICHAPURA RPS School Additional Room 5186000.000 M/S Apollo En. Construction 5186000.000 27/06/2012 26/06/2013 100 22/09/2014  
17 PEDP-III/CHD/FAR/2012-13/W2.2152 GALLAK BAZAR School Additional Room 3955000.000 M/S Ma Moni Enterprise 3955000.000 30/11/2013 20/08/2014 80 22/09/2014  
18 PEDP-III/CHD/FAR/2011-12/W2.0450 UVARAMPUR School Additional Room 2993000.000 M/S Contemporary 2993000.000 17/06/2012 21/06/2013 100 22/09/2014  
19 PEDP-III/CHD/FAR/2011-12/W2.1356 MONTALA School Additional Room 2191000.000 M/S Kasem & Brothers 2191000.000 30/11/2013 20/08/2014 100 22/09/2014  
20 PEDP-III/CHD/FAR/2011-12/W1.0384 MADDHYA CHAR BARALI COMMUNITY School Reconstruction 5140000.000 M/S Kasem & Brothers 5140000.000 17/06/2012 15/09/2013 100 22/09/2014  
21 PEDP-III/CHD/FAR/2011-12/W1.0383 PASCHIM CHAND PUR School Reconstruction 5140000.000 M/S Apollo En. Construction 5140000.000 17/06/2012 30/12/2013 100 22/09/2014  
3 Haimchar
1 PEDP-III/CHD/HAI/2011-12/W2.1357 NAYANI LAXMEPUR School Additional Room 2385000.000 M/S Aziz Brothers 2385000.000 21/11/2012 29/11/2013 100 22/09/2014  
2 PEDP-III/CHD/HAI/2013-14/W2.3369 GAZIPUR School Additional Room 6279000.000 M/S Farida Enterprise 6279000.000 18/12/2013 18/09/2014 95 22/09/2014  
3 PEDP-III/CHD/HAI/2013-14/W2.3368 ISSAN BALA School Additional Room 3955000.000 M/S Aziz Brothers 3955000.000 18/12/2013 18/09/2014 55 22/09/2014  
4 PEDP-III/CHD/HAI/2011-12/W2.0453 UTTAR CHAR KORALIA School Additional Room 2993000.000 M/S Mahammad Ali Zinnah 2993000.000 14/03/2013 13/03/2014 100 22/09/2014  
5 PEDP-III/CHD/HAI/2011-12/W2.0968 NIL KAMOL School Additional Room 5186000.000 M/S Jasim & Brothers 5186000.000 31/07/2012 31/01/2013 100 22/09/2014  
6 PEDP-III/CHD/HAI/2011-12/W1.0312 UTTAR CHAR KORALIA SAHEBKANDI COMMUNITY School Reconstruction 5140000.000 M/S KE B (JV) 5140000.000 19/03/2014 20/06/2014 100 22/09/2014  
4 Haziganj
1 PEDP-III/CHD/ 2011-12/W2.1635 Construction of Additional room for Primary School (Urban) including Furniture Supply of (a) Hasan Ali Model Chandpur Sadar Upazila, (b) Koa Chandpur Under Kachua Upazila, c) Paschim Upalata Under Shahrasti Upazila 8121000.000 Abdul Kader Bapary 8121000.000 30/12/2012 30/12/2013 100 26/08/2015
2 PEDP-III/CHD/HAZ/2011-12/W3.0298 SUDIA COMMUNITY School Major Maintenance 212703.000 M/S Ahshan Habib Arun 212703.000 09/09/2012 14/03/2013 100 22/09/2014  
3 PEDP-III/CHD/HAZ/2011-12/W2.1358 MALIGAON School Additional Room 2385000.000 Md. Shah Jalal Mision 2385000.000 10/10/2012 10/10/2013 100 22/09/2014  
4 PEDP-III/CHD/HAZ/2011-12/W2.0047 MOSHA MURA School Additional Room 3388000.000 Md. Akbar Mridha 3388000.000 12/06/2012 11/06/2013 100 22/09/2014  
5 PEDP-III/CHD/HAZ/2011-12/W2.0455 KAKURTALA School Additional Room 2793000.000 M/S Sanim Enterprise 2793000.000 30/08/2012 29/08/2013 100 22/09/2014  
6 e-Tender/PEDP-III/CHD/2013-14/W2.2971 SUDIA COMMUNITY School Additional Room 4896000.000 JV Of SM-MRL 4896000.000 16/04/2014 25/04/2015 0 22/09/2014  
7 e-Tender/PEDP-III/CHD/HAZ/2013-14/W2.2958 GOPAL KHOR School Additional Room 4896000.000 M/S Mazumder Traders 4896000.000 29/01/2014 28/01/2015 60 22/09/2014  
8 e-Tender/PEDP-III/CHD/HAZ/2013-14/W2.2956 BELCHOW School Additional Room 2995000.000 Mizanur Rahman Liton 2995000.000 0 22/09/2014  
9 e-Tender/PEDP-III/CHD/HAZ/2013-14/W2.2957 PASCHIM HATILA RPS School Additional Room 3955000.000 M/S Ruhidas Bonik 3955000.000 26/01/2014 25/01/2015 10 22/09/2014  
10 PEDP-III/CHD/HAZ/2011-12/W2.0454 NOWHATA School Additional Room 4069000.000 M/S Ruhidas Bonik 4069000.000 10/06/2012 09/06/2013 100 22/09/2014  
11 e-Tender/PEDP-III/CHD/HAZ/2013-14/W2.2955 MOHESHPUR COMMUNITY School Additional Room 4896000.000 M/S Foysal Steel 4896000.000 13/03/2014 08/12/2014 45 22/09/2014  
12 PEDP-III/CHD/HAZ/2011-12/W1.0313 DAKKHIN OLIPUR School Reconstruction 5140000.000 M/S Ahshan Habib Khokon 5140000.000 13/06/2012 12/06/2013 100 22/09/2014  
5 Kachua
1 PEDP-III/CHD/KAC/2011-12/W3.0047 DARIA HAYATPUR RPS School Major Maintenance 170780.000 JV Habibur Rahman Traders & Tanim 170780.000 21/03/2013 30/09/2013 100 22/09/2014  
2 PEDP-III/CHD/KAC/2013-14/W7.054 Ext. & Renovation of KachuaUEO School Upazila Education Office 800165.000 M/S Hema Traders 800165.000 31/03/2014 07/10/2014 100 22/09/2014  
3 PEDP-III/CHD/KAC/2011-12/W2.0458 ATOMOR School Additional Room 2993000.000 M/S Appolo Eng. & Const. 2993000.000 27/11/2012 04/12/2013 100 22/09/2014  
4 PEDP-III/CHD/KAC/2011-12/W2.0457 KUTIYA LAKSHMIPUR School Additional Room 2993000.000 JV M.I Cons & Abdul Wadud 2993000.000 27/11/2012 04/12/2013 100 22/09/2014  
5 PEDP-III/CHD/KAC/2011-12/W2.0048 DABI PUR School Additional Room 3388000.000 JV Habibur Rah & Tanim Traders 3388000.000 27/11/2012 04/12/2013 90 22/09/2014  
6 PEDP-III/CHD/2012-13/W2.1635 KOA CHANDPUR School Additional Room 2993000.000 Abdul Kader Bepari 2993000.000 23/12/2012 09/09/2013 100 22/09/2014  
7 PEDP-III/CHD/KAC/2013-14/W2.2959 NISCHANTA PUR School Additional Room 3955000.000 JV RR & TT 3955000.000 27/02/2014 03/03/2015 0 22/09/2014  
8 PEDP-III/CHD/KAC/2011-12/W2.0456 BAYEK School Additional Room 2993000.000 JV Habibur Rah & Tanim Traders 2993000.000 27/11/2012 04/12/2013 100 22/09/2014  
9 PEDP-III/CHD/KAC/2012-13/W2.2153 SACHAR School Additional Room 6279000.000 JV M.I.Cons.& Abdul Wa JV M.I Cons.&Abdul Wadud 6279000.000 10/11/2013 29/09/2014 100 22/09/2014  
10 PEDP-III/CHD/KAC/2011-12/W1.0314 DHANIYA COMMUNITY School Reconstruction 5140000.000 JV Habibur Rah & Tanim Traders 5140000.000 27/11/2012 04/03/2014 100 22/09/2014  
6 Matlab (dakshin)
1 PEDP-III/CHD/MAT/2011-12/W3.0299 PASCHIM NAGDA RPS School Major Maintenance 295252.000 M/S Sumaiya Ent. 295252.000 25/09/2012 25/03/2013 100 22/09/2014  
2 PEDP-III/CHD/MAT/2011-12/W2.0459 DAKKHIN GHORA DHARI School Additional Room 3388000.000 M/S Sumaiya Enterprise 3388000.000 24/08/2012 01/08/2013 100 22/09/2014  
3 PEDP-III/CHD/MAT/2013-14/W2.2963 GHILATALI School Additional Room 4896000.000 M/S Mostafig Enterprise 4896000.000 0 22/09/2014  
4 PEDP-III/CHD/MAT/2011-12/W2.0969 KASHIM PUR School Additional Room 5186000.000 M/S Dewan Traders 5186000.000 24/08/2012 01/08/2013 100 22/09/2014  
5 PEDP-III/CHD/MAT/2013-14/W2.2962 CHARAT BHANGA School Additional Room 4896000.000 M/S Farida Ent 4896000.000 03/07/2014 04/05/2015 0 22/09/2014  
6 PEDP-III/CHD/MAT/2013-14/W2.2961 NALUA RPS School Additional Room 4896000.000 M/S Popy Enterprise 4896000.000 0 22/09/2014  
7 PEDP-III/CHD/MAT/2011-12/W1.0315 NATSHAL School Reconstruction 5140000.000 M/S Dewan Traders 5140000.000 24/08/2012 01/08/2013 100 22/09/2014  
7 Matlab (uttar)
1 PEDP-III/CHD/MAU/2011-12/W3.0048 DAKKHIN SARDAR KANDI School Major Maintenance 257529.000 M/S Khuku Enterprise 257529.000 06/08/2012 15/01/2013 100 22/09/2014  
2 PEDP-III/CHD/MAU/2012-13/W2.1998 TORKEY School Additional Room 2091000.000 M/S Nahar Tradeers 2091000.000 05/03/2014 15/08/2014 60 22/09/2014  
3 PEDP-III/CHD/MAU/2011-12/W2.0970 CHOTO HALDIA School Additional Room 5186000.000 M/S Khuku Enterprise 5186000.000 15/07/2012 24/06/2013 100 22/09/2014  
4 PEDP-III/CHD/MAU/2013-14/W2.2967 AMIN PUR School Additional Room 2765000.000 M/S Omi Enterprise 2765000.000 08/04/2014 21/03/2014 80 22/09/2014  
5 PEDP-III/CHD/MAU/2011-12/W2.0461 DAKKHIN SARDAR KANDI School Additional Room 2993000.000 M/S Khuku Enterprise 2993000.000 15/07/2012 24/06/2013 100 22/09/2014  
6 PEDP-III/CHD/MAU/2013-14/W2.2965 AMIYA PUR School Additional Room 2765000.000 M/S Sharif & Brothers 2765000.000 08/04/2014 21/03/2015 65 22/09/2014  
7 PEDP-III/CHD/MAU/2013-14/W2.2966 KHAGURIA School Additional Room 6279000.000 M/S Sumi Enterprise 6279000.000 08/04/2014 21/03/2015 40 22/09/2014  
8 PEDP-III/CHD/MAU/2011-12/W2.0460 NAOBHANGA RPS School Additional Room 4069000.000 M/S Kasem & Brothers & Nahar Traders (JV) 4069000.000 15/07/2012 24/06/2013 100 22/09/2014  
9 PEDP-III/CHD/MAU/2013-14/W2.2964 IMAM PUR UTTAR School Additional Room 2995000.000 M/S Khukhu Enterprise 2995000.000 05/03/2014 15/02/2015 65 22/09/2014  
10 PEDP-III/CHD/MAU/2011-12/W1.0318 FAILA KANDI School Reconstruction 5140000.000 M/S Jaman & Com. 5140000.000 15/07/2012 24/09/2013 100 22/09/2014  
11 PEDP-III/CHD/MAU/2011-12/W1.0317 BAHADUR PUR School Reconstruction 5140000.000 M/S Kasem & Brothers & Nahar Traders (JV) 5140000.000 15/07/2012 24/09/2013 100 22/09/2014  
12 PEDP-III/CHD/MAU/2011-12/W1.0316 PROBHATI SHISHU KANON School Reconstruction 5140000.000 M/S Techno HVAC System 5140000.000 15/07/2012 24/09/2013 100 22/09/2014  
8 Shahrasti
1 PEDP-III/CHD/SHA/2011-12/W3.0049 NAHARA School Major Maintenance 83827.000 M/S Dipti Enterprise 83827.000 22/08/2012 28/02/2013 100 22/09/2014  
2 PEDP-III/CHD/SHA/2013-14/W2.2970 PIR SAH SARIF COMMINITY School Additional Room 3955000.000 M/S Rabbi Traders 3955000.000 26/01/2014 29/12/2014 30 22/09/2014  
3 PEDP-III/CHD/SHA/2011-12/W2.1359 SEEMAIL School Additional Room 2191000.000 M/S Rabbi Traders 2191000.000 12/11/2012 12/11/2013 100 22/09/2014  
4 PEDP-III/CHD/2012-13/W2.1635 PASCHIM UPALATA School Additional Room 2385000.000 Abdul Kader Bepari 2385000.000 23/12/2012 09/09/2013 100 22/09/2014  
5 PEDP-III/CHD/SHA/2013-14/W2.2969 NIZMEHAR COMMUNITY School Additional Room 3955000.000 M/S Foysal Enterprise 3955000.000 26/01/2014 29/12/2014 25 22/09/2014  
6 PEDP-III/CHD/SHA/2013-14/W2.2968 SUAPARA School Additional Room 2995000.000 M/S Rakib Enterprise 2995000.000 26/01/2014 29/12/2014 0 22/09/2014  
7 PEDP-III/CHD/SHA/2011-12/W1.0319 BASHUPARA COMMUNITY School Reconstruction 5140000.000 M/S Zerin Enterprise 5140000.000 20/05/2012 20/05/2013 100 22/09/2014  
Total : 0.0000 (Km) 368503392.93 (Lac) 368503392.93 (Lac)