Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Chakoria
1 WD-163 bm char betuarkul jahan gps baniar char road 1.2000 195.870 m/s faruk and bro. 195.870 24/01/2026 60 09/06/2026
2 WD-159 Kainkhali mosque road 0.9500 115.860 m/s ruma cons. boiddyaghona 115.860 30/03/2026 70 09/06/2026
3 SWD-139 harbung rhd rubber bagan road 3.5000 348.290 s ananta bikas tripura 348.290 30/05/2024 80 09/06/2026
4 WD-129 satdalia road 1.3000 116.690 m/s nayan cons. 116.690 30/05/2024 70 09/06/2026
5 WD-166 badorkhali fultala station syeda khurshid begum gps road 1.0000 21.720 nura zannat ent. 21.720 25/05/2026 100 09/06/2026 final bill paid
6 WD-165 bamu bilchari nandirbil(shoalok raster matha fadukhula bazar) road 1.5000 56.030 m/s asif ent. 56.030 25/05/2026 100 09/06/2026 final bill paid
7 WD-143 bamubil chari up fadukhola nandirbil road 1.5000 119.200 m/s rahim cons. 119.200 02/11/2024 100 09/06/2026 final bill paid
8 WD-147 maijghuna jaladaspara road 0.4520 53.120 m/s hosna ent. 53.120 31/12/2024 100 09/06/2026 final bill paid
9 WD-126 BM char up konakhali demushia up road 3.0450 284.420 chakaria development society 284.420 10/11/2023 100 09/06/2026 final bill paid
10 WD-153 shaharbill bazar batakhali bridge road 0.5000 95.700 m/s Allahr dan ent. 95.700 31/01/2025 100 09/06/2026 final bill paid
11 WD-141 Dulahazara gc-khutakhali gc road 2.0000 275.190 md eunus and bro. 275.190 16/10/2023 100 09/06/2026 final bill paid
12 WD-128 chiriga up buri pukur charan deep choyra khali road 0.9500 87.340 abdur rashid 87.340 15/10/2023 100 09/06/2026 Final bill paid
13 WD-127 puratakhali jakaria sorok rhd konakhali community center via bahula manik char gps road 1.0000 102.040 abdur rashid 102.040 13/09/2023 100 09/06/2026 Final bill paid
14 130 Betua bazar rhd to khil sadek to boroitoli bibirkhil road 0.7500 89.060 m/s nihal and araf bro. 89.060 15/10/2023 100 08/06/2026 Final bill
15 WD-87 Badorkhali up to dakkin matha fishery ghat via fultola bazar 1.2000 203.590 m/s shameem cons. 203.590 30/04/2022 100 08/06/2026 Final bill
16 WM-08 kakara up office to majherfari bazar road 2.6600 149.900 m/s asif ent. 149.900 07/11/2021 100 08/06/2026 Final bill
17 WM-14 badarkhali up office to dakkhin matha fishery ghat via fultola bazar road 2.5550 89.240 m/s m.a kalam ent. 89.240 12/06/2022 100 08/06/2026 Final bill
18 GCP-3/Cox/WD-05 Improvement of doluhazra-Malumghat RHD Road. Improvement of bamubil chari up-fadukhola-nandirbill road by bc. 2.7820 226.550 M/S. chakaria development socity 226.550 24/09/2020 100 08/06/2026 Final bill
19 GCP-3/Cox/WD-24 A) Improvement of Badarkhali IFAD Cyclone Shelter Connecting Road by BC at Ch:-00-2000m.B) Improvement of Surajpur Sohardo Somiti- Alimul Ulum Dakhil Madrasha via Public School Road by BC at Ch: 00-1200m.C) Improvement of Fashia Khali Adorso Islamia Madrasa-Fashiakhali Khondokardar para RNGPS Road by HBB at Ch: 00-783m.D) Improvement of Chiringa UP- chharakul-Fashiakali-Up Road by BC at ch: 00-1000m. 4.9900 379.020 M/S. chakaria development socity 379.020 10/08/2020 90 08/06/2026 Final bill
20 GCP-3/Cox/WD-15 Improvement of keyarbil nuton mosque keyarbil GPS Road by HBB at ch:00-660m. 0.6600 70.240 M/S. Shakila Traders 70.240 20/10/2019 100 08/06/2026 Final bill
21 GCP-3/Cox/WD-39 Development of Kakara-Lutoni Road by BC at ch: 0+000-1+025km. 1.0250 125.890 M/S. Asif enterprise 125.890 27/07/2020 100 08/06/2026 Final Bill Paid.
22 GCP-3/Cox/WD-40 Development of Majer Fari Tri Matha-Dokkin Karara GPS Road by BC at ch: 0+700-1+700km. 1.0000 96.260 M/S. Asif enterprise 96.260 27/07/2020 100 08/06/2026 Final Bill Paid.
2 Cox's bazar-s
1 WD-157 Rashid nagor rhd khuruskul gc via bharuakhali bazar road 6.6000 934.090 934.090 30 11/06/2026
2 WD-156 Bharuakhali j.t road 3.1200 446.480 446.480 65 11/06/2026
3 SWD-83 middle fsakhali road 1.7500 182.400 182.400 97 10/06/2026
4 GCP-3/Cox/WD-42 Improvement of Zilonja UP Office-Alirjahan Bazar Road via Ghat kulla Para Sonkhola Bazar Road by BC 3.0000 328.460 M/S Asad enterprise 328.460 23/12/2020 100 10/06/2026
5 WD-36 khurushkul up office to khurushkul gc road khurushkul dc road 1.5150 530.470 530.470 100 10/06/2026
6 WD-117 bhomria ghona road 1.0000 108.110 108.110 60 10/06/2026
7 WD-116 muslim bazar pokkhali high school via shikderpara road 1.0000 123.500 123.500 100 10/06/2026 final bill paid
8 GCP-3/cox/WD-02 Chander para Road 1.0000 83.230 M/s MensEnterprise 83.230 18/05/2019 100 10/06/2026 final bill paid
9 WD-152 bhomria ghona primary school 0.5000 77.200 77.200 100 10/06/2026 final bill paid
10 WDS-140 natun office bazar dulafakir mazar via napith khali pry school road 1.0000 128.780 128.780 100 10/06/2026 final bill paid
11 WD-98 gomatali road to charpara teakpara road 0.6800 71.140 71.140 100 10/06/2026 final bill paid
12 WD-80 shikderpara primary school road bir muktizoddh let sabde ullah road 0.7900 82.650 82.650 100 10/06/2026 final bill paid
13 GCP-3/Cox/WM-10 Maintenance of P.M Khali U.P office-Khurulia Bazar via Mohosini Para Bazar by BC at ch: 00-112m & 3297m-5636m. 1.1000 175.000 M/S. Sonia tukly enterprise 175.000 06/04/2020 100 10/06/2026 final bill paid
14 GCP-3/Cox/SWD-47 Development of Nutan office Bazar to Kylasher ghona hafzkhana Road (Shoid Refat Road-Moulovi Ali Ahmmod House) by RCC & BC at ch: 0+000-0+200km RCC & 0+201-1+007km BC 1.0070 109.060 AD-KNS (JV) 109.060 06/11/2020 100 10/06/2026 final bill paid
15 SWD-90 internal road at district h/q holiday more to nazirar teak sitikmohol bazar 1.0000 416.720 416.720 100 10/06/2026 final bill paid
16 GCP-3/Cox/WD-51 Improvement of Eidgoan UP office (School Gate)-Voimiriaghona Forest Office Bazar via Baditala Road by BC 2.1610 242.710 M/S Asad enterprise 242.710 06/05/2021 100 10/06/2026 final bill paid
17 GCP-3/Cox/WDS-58 Improvement of Munnu Para Road by BC 0.7690 80.460 M/S. COX BAY Construction 80.460 02/11/2020 100 10/06/2026 final bill paid
18 SWD-93 dula fakir mazar road by uni block 1.7500 65.870 65.870 100 10/06/2026 final bill paid
19 GCP-3/Cox/WDS-61 Improvement of Chonkhola Nayapara Road by HBB 1.3000 86.090 M/S O R & Sons 86.090 24/09/2020 100 10/06/2026 final bill paid
20 GCP-3/Cox/WDS-50 Improvement of Bow Bazar-Chaberpara Jame Mosque via Sikder Para Pry. School Road by BC 1.0000 93.280 M/S Hossain enterprise 93.280 15/10/2020 100 10/06/2026 final bill paid
21 GCP-3/Cox/SWD-49 Improvement of sikder para road to fashiakhali road by rcc. 0.9030 162.770 M/S Asad enterprise 162.770 23/07/2020 100 10/06/2026 final bill paid
22 GCP-3/Cox/WD-26 Improvement of Pokkhali UP Office – Palakata Bazar (Palakata-Mohanvila) Road by BC at ch: 1000-2900m. Improvement of Islamabad UP Office- Gazalia Bazar Road via East Yusuferkil Road 4.4800 374.170 M/S. Chakaria development socity 374.170 30/06/2022 100 10/06/2026 final bill paid
23 GCP-3/cox/WD-03 Islamabad U.P office to Islampur Bazar Road 2.0900 186.700 M/s Riad Construction 186.700 30/03/2020 100 10/06/2026 Final Bill Paid.
24 GCP-3/Cox/WDS-48 Improvement of Charag ghor Bazar-Rubber Dam via Pachim Jumchari Pry. School Road by BC 1.0000 97.370 M/S Ruma construction 97.370 06/09/2020 100 10/06/2026 final bill paid
25 GCP-3/Cox/WD-72 Construction of 54.00m Long RCC Slab Bridge on Eidgaon UP Office (School Gate-Voirighona Forest Office Bazar via Baditala Road) at Ch. 1350m. 337.140 M/S. Absar Construction 337.140 25/09/2021 100 10/06/2026 final bill paid
26 GCP-3/Cox/WD-17 Improvement of Eidgaon UP Office - Meherghona Forest office Bazar (Bonkim Bazar- Maijpara) road 2.1500 173.650 M.R.CO. 173.650 26/02/2020 100 10/06/2026 final bill paid
27 GCP-3/Cox/WDS-34 A) Development of Bharuakhali Ghona Para Road by BC. B) Development of Ghonarpara Aziz Shop to Darbesh Alir Shop via Motaher Hossain Road by BC 1.2000 99.990 M/S Chakaria development socity 99.990 31/08/2020 100 10/06/2026 Final Bill Paid
28 GCP-3/Cox/WD-36 Improvement of Khrushkul UP office to Khrushkul GC (Khrushkul DC Road) Road by BC Road 1.5150 530.470 M/S. Amzad traders 530.470 14/07/2020 70 03/01/2021
3 Kutubdia
1 WD-164 al hajj towfail ahmed house dhurung kacha road 0.9100 130.290 m/s ayesha cons. 130.290 30/03/2026 70 10/06/2026
2 WD-160 nusa shiraj road 112.220 m/s lija cons. 112.220 30/12/2025 90 10/06/2026
3 WDS-123 uttar kaiyerbill primary school to bindha para connecting road 0.9000 128.040 128.040 60 10/06/2026
4 WD-89R 1.cons of 153.25m rcc jetty at dhurang ghat on west side of kutubdia channel 2.cons of 153.25m rcc jetty at akber boli ghat on west side of kutubdia channel 676.720 676.720 90 10/06/2026
5 ZWD-89 1.cons of 153.25m rcc jetty at dhurang ghat on west side of kutubdia channel 2.cons of 153.25m rcc jetty at akber boli ghat on west side of kutubdia channel 2839.000 maq eng. ltd 2839.000 30/06/2026 100 10/06/2026 final bill paid
6 WD-158 bagkhali road by hbb 148.370 m/s m.mukter ahamed 148.370 21/05/2025 100 10/06/2026 final bill paid
7 WD-155 sadarghona bayangakata gps road 0.7400 143.640 m/s mymuna ent. 143.640 07/02/2025 100 10/06/2026 final bill paid
8 WD-148 shah alam shikder para road by hbb 0.5000 50.670 m/s rahim & sons 50.670 28/12/2024 100 10/06/2026 final bill paid
9 WD-149 Azam road(r & h darbarghat road via haider miazi para) by hbb 0.8400 67.210 m/s rupa cons. 67.210 28/12/2024 100 10/06/2026 final bill paid
10 WD-122 thanda chowkider road 1.8000 229.660 hasan ent. 229.660 02/12/2024 100 10/06/2026 final bill paid
11 121 hari shikder para road by bc 0.8400 89.380 m/s md nurul bashar 89.380 02/08/2023 100 10/06/2026 final bill paid
12 WD-95 dakkhin dhurang gc biwta jetty ghat banshkhali rhd via sator uddin ghat road by bc 0.9500 233.960 delta eng & cons. ltd 233.960 16/12/2022 100 10/06/2026 final bill paid
13 WD-96 dakkhin dhurang up kayer beel up via akber shah new light house road by bc 0.9150 122.410 opel ent. 122.410 11/12/2022 100 10/06/2026 final bill paid
14 GCP-3/Cox/WD-10 Dakkin Dhurung GC-BIWTA Jetty Ghate at Banskhsali RHD via Satar Uddin Ghat Road 1.4340 287.650 M/S. Nurul Bashar 287.650 15/06/2020 100 10/06/2026 final bill paid
15 GCP-3/Cox/WD-35 A) Development of Piller Para Road by BC at ch: 00-1315m.B) Development of Dhupi Para Road by BC at ch: 500-1850m. C) Development of Ali Chan Road by HBB at ch: 00-550m. 4.1150 348.200 Hasan enterprise 348.200 25/01/2021 100 10/06/2026 final bill paid
16 GCP-3/Cox/WD-18 A) Development of Jelepara Dhurung Kacha Road via Ayasrayan Prokolpo Road B) Development of Mosarraf Ali Bali Para Road C) Development of Kutubdia Azam Road (R&H)-Sanua UP at Banskhali via Samadia Ghat D) Development of Azam Road (R&H) Kalishaghona Road E) Development of Kazipara-Shahajer para Road via Rajakhali GPS Road District: Cox's Bazar. 5.1710 511.890 Hasan Enterprise Delta Engineers (JV) 511.890 03/01/2019 100 09/06/2026 final bill paid
17 GCP-3/Cox/WD-23 A) Development of Dhurung Bzar-Azam Road (R&H) (Dhurung Bazar Connecting Road) B) Construction of 1 Nos. 1.5m×1.50m RCC Box Culvert on Putinner Para- Nasir Para road 0.1200 28.610 M/s Kutubdia Agency 28.610 15/07/2019 100 09/06/2026 final bill paid
4 Moheskhali
1 WD-151 matarbari ujantia road by hbb 1.0000 119.070 m/s bijoy cons 119.070 27/08/2024 100 10/06/2026 final bill paid
2 WD-146 matarbari dhalghat road via mogdail bazar by hbb 1.2000 187.770 m/s nahar ent. 187.770 31/12/2024 100 10/06/2026 final bill paid
3 WD-110 Fakira ghona road 1.0500 158.100 m/s monir ent. 158.100 28/10/2023 100 09/06/2026 final bill paid
4 WD-150 thakurtala rakhaine para adinath mandir road 0.4800 55.790 m/s hkc ent. 55.790 28/08/2024 100 09/06/2026 final bill paid
5 WD-109 debangapara chowchala road 1.5000 173.180 m/s rupa cons 173.180 28/10/2023 100 09/06/2026 final bill paid
6 WD-77 cons of 65m long rcc girder bridge over gorakghata khal on gorakghata shaplapur janata bazar 624.550 ali chowdhury monir ahmed 624.550 30/06/2022 100 09/06/2026 final bill paid
7 WD-103 nutunbazar matarbari road 0.4300 100.320 m/s sohrawardi builders 100.320 28/12/2022 100 09/06/2026 final bill paid
8 GCP-3/Cox/WD-57 Improvement of Old Stemar Ghat Road by HBB at ch: 0+000-1+000km. 1.0000 93.340 Green Consruction 93.340 19/08/2020 100 09/06/2026 final bill paid
9 WD-102 matarbari high school to satghar road 0.5000 118.880 m/s helali ent. 118.880 12/10/2022 100 09/06/2026 final bill paid
10 GCP-3/Cox/WD-67 Improvement of Fakirakata-WAPDA Embankment Road by HBB at ch: 1140-3200m 2.0600 135.520 M/S. Ayub Construction 135.520 02/06/2021 100 09/06/2026 final bill paid
11 GCP-3/Cox/WDS-62 Improvement of chottomoheheskhali shipahipara pry school road. 0.6000 62.160 M/S. Faridul alam. 62.160 24/10/2020 100 09/06/2026 final bill paid
12 GCP-3/Cox/WD-55 Improvement of Moddya-Ghatibanga Road by HBB at ch: 0+000-1+000km. 1.0000 68.610 M/S. B N Enterprise 68.610 19/10/2020 100 09/06/2026 final bill paid
13 GCP-3/Cox/WD-54 Improvement of Debangapara-Monshir Dail Road by HBB at ch: 0+000-1+170km. 1.1700 94.640 M/S. H K C Enterprise 94.640 02/09/2020 100 09/06/2026 final bill paid
14 GCP-3/Cox/WD-14 (A) Improvement of Lal Mohammed Shikder para Road via Asrayan Prokolpo by HBB at ch. 4+762-5+550km. B) Improvement of Kutubjom Ideal High School Road by BC at ch. 0+000-0+775km 1.5700 106.660 M/S. Nahar enterprise 106.660 23/10/2019 100 09/06/2026 final bill paid.
15 GCP-3/cox/WD-07 Baniakata Road 1.0000 127.130 M/s Bazal &Brother's 127.130 05/05/2019 100 09/06/2026 final bill paid
16 GCP-3/Cox/WDS-41 Improvement of adinanath primary school to tali para road by HBB . 85.0000 76.910 M/S. Nurunnabi Traders 76.910 03/01/2021 100 09/06/2026 final bill paid
17 GCP-3/Cox/WDS-59 Improvement of hariar chara purbapara road by HBB 1.5000 94.780 M/S. Badsha meah construction. 94.780 19/08/2020 100 09/06/2026 final bill paid
18 GCP-3/Cox/WD-66 Improvement of Shipahirpara-South Nalbila Road by BC at ch: 00-500m. 0.5000 37.210 M/S. Udayan Construction 37.210 28/02/2021 100 09/06/2026 final bill paid
19 GCP-3/cox/WD-06 Nutun Bazar-Munshirdhail road. 0.9870 91.320 M/s Nahar Enterprise 91.320 04/05/2019 100 09/06/2026 final bill paid
20 GCP-3/Cox/WD-56 Improvement of Hoanok RHD-Hariarchara-Shaplapur Road by BC at ch: 0+460-1+400km. 0.9400 120.600 M/S. Ataur rahman 120.600 14/10/2020 100 09/06/2026
5 Pekua
1 WD-107 Cons of 20m long RCC girder bridge on charapara rhd-pabt via showdagorhat gc road 261.550 m/s nipa ent. 261.550 28/04/2023 100 08/06/2026 Final bill
2 WD-154 Uzantia hajee tazu mia road 0.6000 64.340 m/s r.r trading 64.340 31/01/2025 100 08/06/2026 Final bill
3 WD-112 matbar para to suta bapari para road 1.1950 120.510 m/s shameem cons. 120.510 02/08/2023 100 08/06/2026 Final bill
4 wm-16 maint of rajakhali mognama upakulia road 1.5130 189.780 m/s sahiat ent. 189.780 10/10/2022 100 08/06/2026 Final bill
5 GCP-3/Cox/WD-31 Development of Sundari Para-Raiba Par Para Road by HBB at ch: 00-1165m. Development of Rajakhali Arabshah Bazar-Amin Bazar Road by HBB at ch: 00-810m. Development of Uzantia Sabar Ahmad via Karirdia Bridge Road by HBB at ch: 1000-1800m. 2.7800 240.990 M/S. chakaria development socity 240.990 22/06/2022 100 08/06/2026 Final bill
6 94 road pavement mognama rhd mognama high school via binnagona abasonn road 1.0000 53.990 m/s saharia cons 53.990 27/08/2021 100 08/06/2026 Final bill
7 113 rajakhali arabsha bazar to amin bazar road 1.2000 74.230 m/s kader ent. 74.230 02/08/2023 100 08/06/2026 Final bill
8 GCP-3/cox/WM-15 maint.of pekua rhd to pabt via showdagorhat gc road 1.5770 135.590 m/s chairman cons 135.590 12/06/2022 100 08/06/2026 Final bill
9 GCP-3/cox/WM-12 maintenance of pekua bazar to pabt via maulavi bazar connecting road by bc 2.4000 61.330 ishaque and bro. 61.330 30/06/2022 100 08/06/2026 final bill
10 GCP-3/Cox/WM-02 A)Maintenance of Pekua RHD to PABT via Showdaghar hat GC road B)Maintenance of Pekua Bazar to PABT via Molovi Bazar Connecting Road 3.0000 82.170 M/S. hossain, br 82.170 17/09/2022 100 08/06/2026 final bill
11 GCP-3/Cox/WD-19 Development of PABT- Harinafari road 2.0000 130.570 M/S Tarek & Brothers 130.570 30/05/2020 80 08/06/2026 final bill
12 GCP-3/Cox/WD-46 Development of Mognama RHD via Mognama High School to Mognama UP Road by HBB at ch: 3+400-5+200km. 1.8000 160.200 M/S. M.M Traders 160.200 16/10/2020 100 08/06/2026
13 GCP-3/Cox/WDS-32 A) Development of Shakopara Bazar-Matamuhori River via Meharnama Pry. School Road by HBB at ch: 00-515m. B) Development of Hazirghona-Akamot Ali via Sabujpara Patanmatbar Para Road by HBB at ch:00-415m. C) Development of Mognama Kazir Bazar-Sudakhali Kalarpara via Non Govt. Pry. School Road by HBB at ch: 00-634m. D) Development of Uzantia Khan Bahadur Primary School Road by HBB at ch:00-880m. 2.5040 157.350 M/S. ABM Construction 157.350 18/04/2020 100 08/06/2026 final bill
14 GCP-3/cox/WD-01 Construction of (3.00+2.5) m Culvert on Mognama RHD via Mognama high school to Mognama UP Road 2.3800 107.870 M/s K R Builders 107.870 21/04/2019 100 08/06/2026 final bill paid
15 GCP-3/Cox/WD-27 Development of Sonali Bazar – Uzantia Cyclone Shelter Road 1.2130 119.020 M/S Jahangir Alam Sikder 119.020 29/08/2019 100 08/06/2026 final bill
16 GCP-3/Cox/WDS-33 Development of Tiotong Sonaichori Primary School Road by HBB at ch: 00-900m. 0.9000 46.220 M/S. Suchana Enterprise 46.220 18/07/2019 90 08/06/2026 final bill
17 GCP-3/Cox/WD- 16 Development of Pekua UP Office -Pekua Upazila Road 1.1300 150.540 M/S. Shameem Construction 150.540 20/10/2019 100 08/06/2026 final bill paid
18 GCP-3/Cox/WD-22 A) Development of Barbakia Bodamazir Ghona Road. B) Development of Taitong Barbakia Rajakhali Darbar Ghat Road 2.0000 154.830 M/S IQBAL AND BROTHERS 154.830 17/07/2019 100 08/06/2026 final bill paid
6 Ramu
1 GCP-3/Cox/WD-63 Development of Joarianala GC-Bengdeba Baisari GC Road by BC at ch: 0+300-1+300km. 1.0000 127.080 M/S. Bazal & Brothers 127.080 17/01/2021 100 11/06/2026
2 GCP-3/Cox/WDS-65 Development of Rajarkul-Sonai Chari (Ramcot School Connecting Road) Road by HBB at Ch: 00-2000m. 2.0000 108.410 M/S. SHAHARIAR ENTERPRISE 108.410 07/02/2021 100 11/06/2026
3 GCP-3/Cox/SWD-30 Development of North Khunia Palong Bala para Road (Arakan Road to Himchari Marine Drive via ATM Jafar Alam Maltidiscipline Academy Road) by BC 1.0000 105.090 M/S Monir ahmed 105.090 30/06/2020 100 11/06/2026
4 GCP-3/Cox/WDS-74 Development of Kachubania Road (Kachubania School Connecting Road) by HBB at Ch: 800-3800m. 3.0000 152.560 152.560 0 04/01/2021
5 GCP-3/Cox/WD-76 Development of Chakmarkul-Montergoda Road (PM Khali) Road by BC at ch: 1637-2800km. 1.1600 113.270 M/S. Lamon & Brothers 113.270 31/03/2021 10 04/01/2021
6 GCP-3/Cox/WDS-75 Development of Old Arakan Kalarpara (Kalarpara Primary School Connecting Road) by HBB at Ch: 2200-4000m. 1.8000 98.760 M/S. Ayesha Construction 98.760 28/04/2021 10 04/01/2021
7 GCP-3/Cox/WDS-71 Development of Chainda Purba Charakul to Bontala Asmar Gona-Napiter Para Road (Bontala School Connecting Road) by HBB at ch: 1100-2100m. 1.0000 61.050 M/S. PALAK BARUA APPO 61.050 08/01/2021 60 04/01/2021
8 GCP-3/Cox/WD-70 Development of Arakan Road-West Hamirpara Road by BC at ch: 00-700m. 0.7000 74.300 M/S KADER ENTERPRISE 74.300 01/04/2021 40 04/01/2021
9 GCP-3/Cox/WD-69 Development of Dohalerghona Road by BC at ch: 00-950m. 0.9500 103.120 M/S KADER ENTERPRISE 103.120 01/04/2021 0 04/01/2021
10 GCP-3/Cox/WD-68 Development of Dhulirchara Road by BC 0.7000 74.880 M/S COX BAY CONSTRUCTION 74.880 28/11/2020 60 04/01/2021
11 GCP-3/Cox/WD-60 Construction of 30.00m Long RCC Curve Girder Bridge on Sha Suza RHD to Uttar Bara Bill via Jumchari Bazar Road 243.650 M/S Asad enterprise 243.650 06/05/2021 45 03/01/2021
12 GCP-3/Cox/WD-45 Construction of 15m Long RCC Girder Bridge on Himchari Marine Drive-Mariccha GC Road 158.660 M/S Asad enterprise 158.660 23/02/2021 70 03/01/2021
13 GCP-3/Cox/WD-44 Construction of 12m Long RCC Girder Bridge on Panirchara (RHD) Khuruskul GC via Bharuakhali Road (Ramu Part) 139.540 M/S Asad enterprise 139.540 18/02/2021 45 03/01/2021
14 GCP-3/Cox/WD-11 Development of mamun mia bazar-mura para road by BC. 1.0000 122.410 M/S Palong traders 122.410 26/08/2020 95 03/01/2021
15 GCP-3/Cox/WD-13 (A) Development of Rabeta Hospital-Dhoapalong Road by BC. (B) Development of Dhoapalong-Goalia Palong Primary School Road by BC (C) Development of Naikhangchari Hazipara BDR Camp Road by BC (D) Development of Officer Char (RHD)-Lambari para-Techipul (RHD) Road by BC 3.9120 314.360 M/S Asad enterprise 314.360 04/09/2020 90 03/01/2021
16 GCP-3/Cox/WD-12 2Nos 1vent 1.30mx1.30m at ch.260m,3620m, 3nos 1vent 1.60mx1.60m at ch. 460m, 710m, 800m 2nos 1vent 2.00mx2.30m at ch. 1330m, 1580m, 1nos 2vent 2.60mx1.60m at ch. 2560m, 4nos 1vent 3.00x3.00m at ch. 2160m, 2460m, 5420m, 6000m 4nos 1vent 3.60mx2.00m at ch. 2320m, 3960m. 4070m, 4560m 1nos 1vent 2.00x4.00m at ch. 2040m, 2nos 1vent 4.00mx300m at ch. 1050m, 3760m, 2nos 1vent 4.00mx3.60m at ch. 1680m, 4260m, 2nos 2vent 4.00mx3.60m at ch. 5670m, 6200m RCC Box culvert From Ramu Cantonment Peripheri (Shield Gate- SSD Canteen) Road 452.690 J J Traders-QC (JV) 452.690 10/05/2020 60 03/01/2021
17 GCP-3/Cox/WDS-43 Development of Coner Para Jame Mosque to Mistry Para Primary School Road (Dakkin Chakmarkul School Connecting Road) by HBB. 0.8000 68.580 M/S Shahriar enterprise 68.580 30/06/2020 100 03/01/2021 Final Bill Paid.
7 Teknaf
1 GCP-3/cox/WDSN-100 Strenthning of teknaf bus station shamlapur road 10.0000 197720885.000 MAE-mee-azad const jv 197720885.000 19/05/2023 90 08/06/2026
2 GCP-3/Cox/WDSN-78 Strengthening of Teknaf Bus Station-Shamlapur road from Ch: 0+000km to 16+000km. 16.0000 3119.600 3119.600 0 04/01/2021
3 GCP-3/Cox/WD-38 Development of Teknaf Rajarchara Beach Road via Rajarchara GPS by BC 0.6500 75.830 M/S Junaid and Raiyan Enterprise 75.830 40 04/01/2021
4 GCP-3/Cox/WD-37 Improvement of Whykong Police Fari-Amtoli Roikkhong Bazar Road Via Forest office by BC Road 3.7100 420.790 M/S Dhiman Construction 420.790 19/12/2020 40 04/01/2021
8 Ukhiya
1 GCP-3/Cox/WD- 08 Improvement of Valukhali GC-Palong hakli UP office Road 1.2230 118.410 M.R.CO. 118.410 26/06/2020 60 20/01/2021
2 GCP-3/Cox/WDSN-14 Strengthening of Coat Bazar-Shaplapur GC Road via Sonarpara Monkhali Road at Ch: 00-14260. 14.2600 3177.620 M.M. BUILDERS & ENGINEERING LTD-M/S ASAD ENTERPRISE (JV) 3177.620 0 04/01/2021
3 GCP-3/Cox/WD-64 Improvement of Rotna Palong UP Office-Chakbaita Bazar via Goyalmara Road (Yusuf Ali Ratna Palong Kariabonia Road) by BC at ch: 5670-6670m. 1.0000 182.990 M/S. Bazal & Brothers 182.990 01/07/2021 20 04/01/2021
4 GCP-3/Cox/WD-53 Construction of 40.00m Long RCC Girder Bridge on Proposed Goalmara Chakbaita Bazar-Digilia Road (Hijolia Canal 193.000 M/S Noor Syndicate 193.000 09/06/2021 25 04/01/2021
5 GCP-3/Cox/WD-52 Construction of 18.00m Long RCC Girder Bridge on Moricha GC-Naikhonchari GC via Paglir Bil Natunpara Road 121.970 M/S Absar Construction 121.970 06/05/2021 40 04/01/2021
6 GCP-3/Cox/WM-07 Maintenance of Romkha-Sabek Romkha pry. School Road by BC Road 1.4950 45.560 M/S Manjurul mushed Quadery 45.560 14/11/2020 0 04/01/2021
7 GCP-3/Cox/WM-06 Maintenance of Kutupalog Purbapara Boddha Mondir Road by BC Road 1.1680 52.470 M/S Manjurul mushed Quadery 52.470 18/10/2020 0 04/01/2021
8 GCP-3/Cox/WM-05 Maintenance of Thainkhali Ramamater Bil Road 0.5060 19.160 M/S Tachin Construction 19.160 12/10/2020 15 04/01/2021
9 GCP-3/Cox/WD-28 Improvement of Moricha GC- Naikhonchari GC via Paglir bill Natunpara Road (Ukhiya part), by BC 3.9210 772.790 AC-UT (JV) 772.790 26/08/2020 80 04/01/2021
10 GCP-3/Cox/WDS-20 A) Improvement of Chepotkhali School Connecting Road by HBB B) Improvement of Ruppati School Connecting Road by HBB C) Improvement of Motherbonia School Connecting Road by HBB D) Improvement of Md. Shafir Bill School Connecting Road by HBB 1.4250 117.680 M/S. Alam and Brothers 117.680 12/09/2020 90 04/01/2021
11 GCP-3/Cox/WD-08 Improvement of valukhali GC-Palong khali up office road via Hatimozabazar by B at ch: 00-1223. 1.2230 118.410 M.R.CO 118.410 26/02/2020 60 04/01/2021
12 GCP-3/Cox/WD-09 Improvement of Ukhiya Darogabazar R&H Road via Hatimorzabazar 3.6000 297.180 M/S. Nipa Enterprise 297.180 03/02/2020 80 04/01/2021 remaining 81.53 lac
13 GCP-3/Cox/WM-01 Maintenance of Coat bazar Post office Road 0.9270 30.730 M/S Tachin Construction 30.730 12/10/2020 100 04/01/2021
14 GCP-3/Cox/WM-04 Maintenance of Nidania Bugrose Master House Road By BC 1.0170 22.980 M/S Sahiat enterprise 22.980 100 04/01/2021
15 GCP-3/Cox/WD-21 A) Improvement of Mariccha GC – Lambori Para via Gorirdip Road. B) Improvement of Romkha to Romhka pry. School Road. 2.0870 173.020 M.R.CO. 173.020 14/07/2019 100 04/01/2021
16 GCP-3/cox/WD-04 Ukhiya Darogabazar GC- Kutupalong R&H Road via Hatimura azaar. 2.7700 260.590 Nipa Enterprice 260.590 26/02/2020 100 04/01/2021
17 GCP-3/Cox/WD-25 Improvement of Rumkha Napithpara road 1.2000 116.580 M.R.CO. 116.580 15/08/2019 100 04/01/2021
18 GCP-3/Cox/WD-29 Improvement of Paglir bill Patabari Road . 1.0000 70.940 M/S M Mukter Ahamed 70.940 31/12/2019 100 04/01/2021 final bill paid
Total : 322.0170 (Km) 197753646.43 (Lac) 197753646.43 (Lac)