Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bandarban-s
1 SP99005/Rajvilla Shilok Khal Rubber Dam Project Re-excavition of shilak Khal-320m Repair of Return Wall, & CC bolck -. Construction of RCC open Irrigation Canal. Construction of one store room. Construction of 3 nos small size pump house. Construction of 1 nos Sanitary Latrine. Construction of Irrigation Canal (A-A1=600m & B-B1= 250m. Total Length= 850m) & Maintenance of Rubber Dam (Silt removal, block setting etc) 2023-24 144.135 S. Ananta Bikash Tripura 144.135 22/03/2020 16/03/2021 100 13/08/2024 Completed
2 SP62055/Raicha Khal Subproject Re-excavation of Raicha Khal (Ch.1+200 to Ch. 7+150 km) Const. of 6 Nos. Ref. lined Section on Raicha Khal, SP Identification Signboard 2 Nos. and Indication Post 2 Nos. Const. of Raicha Khal WRS-1 (4V-1.50m X 1.00m) at Ch. 0+870 Km On Raicha Khal (Part: A) Const. of Raicha Khal WRS-2 (4V-1.50m X 1.00m) at Ch. 2+920 Km On Raicha Khal ( Part B:) Const. of Raicha Khal WRS-3 (3V-1.50m X 1.00m) at Ch. 4+635Km On Raicha Khal ( Part C:) Const. of Raicha Khal WRS-4 (3V-1.50m X 1.00m) Ch. 5+735 Km On Raicha Khal ( Part D:) Const. of WMCA office (12.0mx6.0m) at Raicha Khl Sub-Project (Part: E) 487.734 OTM 487.734 12/10/2023 60 13/08/2024 Ongoing
3 SP62032/Ramda Khal Subproject Ramda Khal Re-excavation (Ch-1+600km to 4+800km) Ref. Lined Section 3 Nos. On 1 Khal, SP Identf. Signboard (2 nos.) and Identf. Post 2 Nos. Construction of Ramda Khal. WRS (3v-1.50mx2.50m) at Ch. 3+450m of Khal Construction of WMCA office 302.264 Mahia Enterprise & Ratan sen Tanchangya (JV) 302.264 11/01/2023 0 13/08/2024 Ongoing
Total : 0.0000 (Km) 934.13 (Lac) 934.13 (Lac)