1
|
SP99005/Rajvilla Shilok Khal Rubber Dam Project
|
Re-excavition of shilak Khal-320m Repair of Return Wall, & CC bolck -. Construction of RCC open Irrigation Canal. Construction of one store room. Construction of 3 nos small size pump house. Construction of 1 nos Sanitary Latrine. Construction of Irrigation Canal (A-A1=600m & B-B1= 250m. Total Length= 850m) & Maintenance of Rubber Dam (Silt removal, block setting etc) 2023-24
|
|
144.135
|
S. Ananta Bikash Tripura
|
144.135
|
22/03/2020
|
16/03/2021
|
100
|
13/08/2024
|
Completed
|
|
2
|
SP62055/Raicha Khal Subproject
|
Re-excavation of Raicha Khal (Ch.1+200 to Ch. 7+150 km) Const. of 6 Nos. Ref. lined Section on Raicha Khal, SP Identification Signboard 2 Nos. and Indication Post 2 Nos. Const. of Raicha Khal WRS-1 (4V-1.50m X 1.00m) at Ch. 0+870 Km On Raicha Khal (Part: A) Const. of Raicha Khal WRS-2 (4V-1.50m X 1.00m) at Ch. 2+920 Km On Raicha Khal ( Part B:) Const. of Raicha Khal WRS-3 (3V-1.50m X 1.00m) at Ch. 4+635Km On Raicha Khal ( Part C:) Const. of Raicha Khal WRS-4 (3V-1.50m X 1.00m) Ch. 5+735 Km On Raicha Khal ( Part D:) Const. of WMCA office (12.0mx6.0m) at Raicha Khl Sub-Project (Part: E)
|
|
487.734
|
OTM
|
487.734
|
12/10/2023
|
|
60
|
13/08/2024
|
Ongoing
|
|
3
|
SP62032/Ramda Khal Subproject
|
Ramda Khal Re-excavation (Ch-1+600km to 4+800km) Ref. Lined Section 3 Nos. On 1 Khal, SP Identf. Signboard (2 nos.) and Identf. Post 2 Nos. Construction of Ramda Khal. WRS (3v-1.50mx2.50m) at Ch. 3+450m of Khal Construction of WMCA office
|
|
302.264
|
Mahia Enterprise & Ratan sen Tanchangya (JV)
|
302.264
|
11/01/2023
|
|
0
|
13/08/2024
|
Ongoing
|