Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Khagrachari-s
1 SP61021/Jatindrapara Subproject Construction of Buried Pipe Network System. (Length-7294m) Construction of Header Tank Construction of WMCA office 307.531 Prime-Tripura 307.531 19/06/2022 90 13/08/2024 Ongoing
2 Mahalchari
1 SP61023/KayangGhat Subproject Re-excavation of Jaduganala Khal (Ch-0+000km to 3+200km) and Inspection Dyke (Ch-0+200km to 1+400km) Re-excavation of Jaduganala Branch-1 Khal (Ch-0+000km to 0+200km) Re-excavation of Jaduganala Branch-2 Khal (Ch-0+000km to 0+200km) Ref. Lined Section 5 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of Jaduganala Khal WRS (3V-1.50m X2.0m) at Ch.1380m of Khal Construction of Drainage Culvent-1 on Branch-2 (1V-2.50m X 3.50m) at Ch.0+025km of Khal Construction of WMCA office Construction of Drainage Culvent-2 on Field canal (1V-2.0m X 2.50m) at Ch.0+015Km of Khal 220.240 S. Ananta Bikas Tripura 220.240 30/05/2022 24/03/2024 100 13/08/2024 Completed
3 Panchari
1 SP99007/Chengi River Rubber Dam Project Re-excavation of the Changi River Sand Bar and Vegetative Bank Protection at U/S of Rubber Dam. Re-excavation of the Changi River Sand Bar and Vegetative Bank Protection at D/S of Rubber Dam. Construction of RCC Open Irrigation Canal Works (at 2 location @ 500m = 1000m) Repairing and Maintenance of East Side Rubber Bag Works (40m) -. Repairing and Maintenance of Railing and Wearing Course (0.00m-81.00m) -. Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+427 Km Const. of RCC Irrigation Canal of Jatirmoy Karbaripara from Ch.0+000 km to 0+274 Km Const. of RCC Irrigation Canal of Jatirmoy Karbaripara from Ch.0+000 km to 0+457 Km Const. of RCC Irri Cnl of Lilamohon Karbari-Shanti Ranjan Karbaripara from Ch. 0+000 km to 0+366 Km Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+274 Km Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+335 Km Const. of RCC Irri Cnl of Uttar Shantipur from Ch.0+00 km to 0+267 Km and Sply of One 20 HP Pump Mot 296.657 S. Ananta Bikas Tripura 296.657 10/08/2022 30/06/2021 100 13/08/2024 Completed
Total : 0.0000 (Km) 824.43 (Lac) 824.43 (Lac)