|
1
|
KHAGRA/SADAR/VILL/W22
|
Improvement of Kamalchari (A.P.B.N) – Pora Bazar (Ultachari Road (Ch.1000m – 3000m);
|
2.0000
|
255.000
|
Mr. U T Mong
|
255.000
|
|
|
0
|
02/09/2020
|
|
|
2
|
KHAGRA/SADAR/UZR.UNR/W14
|
i) Improvement of Golabari Union H/Q (Upper Perachara)-Pora Bazar via Bhuachari & Cristian Para Road. (Ch.7+040km – 10+740km); Effective length=3700.00 m;
ID No: 446493001
ii) Improvement of Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura
|
6.3000
|
676.590
|
Mr Construction - Shamsul alam
|
676.590
|
|
|
10
|
02/09/2020
|
|
|
3
|
KHAGRA/SADAR/BRIDGE/W13
|
Construction of 96.00m long RCC Girder Bridge on Bichitola Bazar-Khagrachari Sadar HQ (Battali) Road. at ch.4+140km.
|
|
582.770
|
S. Ananta Bikash Tripura.
|
582.770
|
|
|
15
|
02/09/2020
|
|
|
4
|
KHAGRA/SADAR.DIGINALA/BRIDGE/W28
|
i) Construction of 40.00m long PSC Girder Bridge on Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura Road. (Sadar Part). at ch.10+950km; ID No: 446492002
ii) Construction of 69.06m long RCC Girder Bridge on Dighinala GC-Bhbonchara GC via Buddha
|
|
806.250
|
na
|
806.250
|
|
|
0
|
02/09/2020
|
Sadar & Diginala
|
|
5
|
KHGRA/SADAR.RAMGHAR/UZR/W12
|
i) Improvement of Khagrabill GC-Manikchari GC via Batnatali Bazar Road by HBB. (Ramgarh Part) (Ch.5+750km – 7+200km) & (Ch.7+550km – 7+800km); Effective length= 1700 m;
IDNo: 446802002
ii) Improvement of Kampara RHD-Khagrabill GC Road by HBB. (Ch
|
7.9420
|
710.690
|
S. Ananta Bikash Tripura.
|
710.690
|
|
|
95
|
02/09/2020
|
Sadar & Ramghar
|
|
6
|
KHAGRA/SADAR.DHIGI/UZR/W11
|
i) Improvement of Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura Road. (Sadar Part) (Ch.4+967km – 7+800km); Effective length= 2.833 m; ID No: 446492002
ii) Improvement of Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura Road. (Sadar Part
|
9.6800
|
1292.450
|
S. Ananta Bikash Tripura.
|
1292.450
|
|
|
20
|
02/09/2020
|
Sadar & Diginala
|