Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Austagram
1 PEDP-III/KSG/AUS/2011-12/W3.0154 Taherabagausia School Major Maintenance 193499.000 M/S Rafia Safa Enterprise 193499.000 29/07/2012 24/01/2013 100 22/09/2014  
2 PEDP-III/KSG/AUS/2011-12/W2.1467 South Adampur School Additional Room 2191000.000 M/S Priyanka enterprise 2191000.000 29/11/2012 29/11/2013 100 22/09/2014  
3 PEDP-III/KSG/AUS/2013-14/W2.2640 Baragi kandi School Additional Room 4896000.000 M/S.Shahidul Islam James 4896000.000 16/02/2014 12/11/2014 40 22/09/2014  
4 PEDP-III/KSG/AUS/2011-12/W2.1076 LAWRA School Additional Room 8498000.000 M/S.Shahidul Islam James 8498000.000 01/04/2014 30/06/2015 40 22/09/2014  
5 PEDP-III/KSG/AUS/2011-12/W2.0682 PUKUR PAR School Additional Room 2993000.000 M/S Priyanka enterprise 2993000.000 26/06/2012 21/06/2013 100 22/09/2014  
6 PEDP-III/KSG/AUS/2011-12/W2.1468 UTTOR HATI School Additional Room 2385000.000 M/S.Shahidul Islam James 2385000.000 29/11/2012 29/11/2013 100 22/09/2014  
7 PEDP-III/KSG/AUS/2013-14/W2.2639 BHATLA School Additional Room 2765000.000 M/S.Shahidul Islam James 2765000.000 16/02/2014 12/11/2014 30 22/09/2014  
8 PEDP-III/KSG/AUS/2011-12/W1.0108 ABDULLAPUR BADSHAPARA School Reconstruction 5140000.000 M/S Priyanka enterprise 5140000.000 25/06/2012 21/09/2013 100 22/09/2014  
9 PEDP-III/KSG/AUS/2011-12/W1.0107-A BRAHMM PURA School Reconstruction 8498000.000 M/S Priyanka enterprise 8498000.000 01/04/2014 30/06/2015 45 22/09/2014  
10 PEDP-III/KSG/AUS/2011-12/W1.0107 Dewgar purba para School Reconstruction 5140000.000 Nitul Enterprise 5140000.000 16/02/2014 10/02/2015 20 22/09/2014  
2 Bajitpur
1 PEDP-III/KSG/BAJ/2011-12/W3.0155 NANDINA BHAGOL PUR School Major Maintenance 204018.000 M/S, Marin Enterprise 204018.000 19/01/2012 20/07/2013 100 22/09/2014  
2 PEDP-III/KSG/BAJ/2011-12/W2.0124 West Kukrarai School Additional Room 4069000.000 M/S Shahin Enterprise 4069000.000 09/09/2012 08/09/2013 100 22/09/2014  
3 PEDP-III/KSG/BAJ/2013-14/W2.2189 KAILAG School Additional Room 6773000.000 M/S Ali Enterprise 6773000.000 16/03/2014 16/03/2015 0 22/09/2014  
4 PEDP-III/KSG/BAJ/2012-13/W2.2134 KUKRARAI School Additional Room 6773000.000 M/S Ali Enterprise 6773000.000 01/09/2013 31/08/2014 50 22/09/2014  
5 PEDP-III/KSG/BAJ/2011-12/W2.0686 SELIMAR KANDI School Additional Room 2993000.000 M/S Ali Enterprise 2993000.000 09/09/2012 10/05/2013 100 22/09/2014  
6 PEDP-III/KSG/2012-13/W2.1681 CHONDRO GRAM -62 School Additional Room 4449000.000 M/S.Nitul Enterprise 4449000.000 19/12/2012 25/09/2013 80 22/09/2014  
7 PEDP-III/KSG/BAJ/2012-13/W2.2081 UTTOR NILOKHI School Additional Room 2793000.000 M/S Ali Enterprise 2793000.000 11/03/2013 11/12/2013 100 22/09/2014  
8 PEDP-III/KSG/BAJ/2013-14/W2.2642 Joaria kalasuti Siddiqun Nesa School Additional Room 4896000.000 M/S Nitul Enterprise 4896000.000 16/03/2014 16/03/2015 30 22/09/2014  
9 PEDP-III/KSG/BAJ/2011-12/W2.0685 UTTOR SORAR CHAR School Additional Room 2993000.000 M/S J.N Enterprise 2993000.000 09/09/2012 08/09/2013 100 22/09/2014  
10 PEDP-III/KSG/BAJ/2011-12/W2.0123 LOUHOGAON School Additional Room 4069000.000 M/S Naj Engineer 4069000.000 09/09/2012 08/09/2013 100 22/09/2014  
11 PEDP-III/KSG/BAJ/2011-12/W2.0684 HILOCHIA School Additional Room 2993000.000 M/S Nitul Enterprise 2993000.000 20/08/2013 03/04/2014 100 22/09/2014  
12 PEDP-III/KSG/BAJ/2011-12/W2.0122 BAHER NOGOR School Additional Room 4069000.000 Zia Uddin Ahmed 4069000.000 09/09/2012 08/09/2013 100 22/09/2014  
13 PEDP-III/KSG/BAJ/2012-13/W2.1952 BAHER BALI School Additional Room 2793000.000 M/S Ali Enterprise 2793000.000 11/03/2013 10/12/2013 100 22/09/2014  
14 PEDP-III/KSG/BAJ/2011-12/W2.0683 PURA KANDA School Additional Room 2743000.000 Zia Uddin Ahmed 2743000.000 09/09/2012 08/09/2013 100 22/09/2014  
15 PEDP-III/KSG/BAJ/2013-14/W2.2641 AYNAR GOPH School Additional Room 3955000.000 M/S J.N Enterprise 3955000.000 16/03/2014 16/03/2015 0 22/09/2014  
3 Bhairab
1 PEDP-III/KSG/BHA/2011-12/W3.0156 MODDHYER CHAR PURBO School Major Maintenance 763201.000 M/S Nitul Enterprise 763201.000 18/09/2012 18/03/2013 100 22/09/2014  
2 PEDP-III/KSG/BHA/2011-12/W2.0126 Fari ragunath School Additional Room 3388000.000 M/S Mitu Construction 3388000.000 16/07/2012 15/07/2013 100 22/09/2014  
3 PEDP-III/KSG/2012-13/W2.1682 FATEMA ROMJAN School Additional Room 4449000.000 M/S.Mominul Haque 4449000.000 24/01/2013 23/01/2014 100 22/09/2014  
4 PEDP-III/KSG/BHA/2012-13/W2.2135 BHOBANI PUR School Additional Room 5316000.000 M/S. M. Rahman 5316000.000 0 22/09/2014  
5 PEDP-III/KSG/BHA/2012-13/W2.1954 MODDHYER CHAR PURBO School Additional Room 2793000.000 M/S Nitul Enterprise 2793000.000 06/03/2013 30/05/2014 100 22/09/2014  
6 PEDP-III/KSG/BHA/2011-12/W2.0688 SAGAYA School Additional Room 2993000.000 M/S Oritra Enterprise 2993000.000 16/07/2012 15/07/2013 100 22/09/2014  
7 PEDP-III/KSG/BHA/2011-12/W2.0687 MIRAR CHAR School Additional Room 2993000.000 M/S Naj Engg. 2993000.000 16/07/2012 15/07/2013 100 22/09/2014  
8 PEDP-III/KSG/BHA/2011-12/W2.0125 MANKDI PURBO KANDA School Additional Room 4069000.000 M/S, Nitul Enterprise 4069000.000 20/10/2013 19/07/2014 50 22/09/2014  
9 PEDP-III/KSG/BHA/2011-12/W1.0109 Shimul kandi Emamer Char School Reconstruction 5140000.000 M/S Nitul Enterprise 5140000.000 16/07/2012 15/10/2013 100 22/09/2014  
4 Hossainpur
1 PEDP-III/KSG/HOS/2011-12/W3.0157 ASHUTIA School Major Maintenance 104280.000 Md Saiful Islam 104280.000 29/07/2012 15/01/2013 100 22/09/2014  
2 PEDP-III/KSG/HOS/2011-12/W2.1470 Swalia School Additional Room 2361000.000 M/S Soma Enterprise 2361000.000 27/09/2012 25/09/2013 100 22/09/2014  
3 PEDP-III/KSG/HOS/2011-12/W2.0690 MODDHYO GOBINDO PUR School Additional Room 2993000.000 M/S Soma Enterprise 2993000.000 25/06/2012 02/07/2013 100 22/09/2014  
4 PEDP-III/KSG/HOS/2012-13/W2.1955 GOBINDO PUR School Additional Room 4069000.000 M/S Khan Enterprise 4069000.000 07/09/2012 07/09/2013 100 22/09/2014  
5 PEDP-III/KSG/HOS/2011-12/W2.0127 Dangri panan School Additional Room 4069000.000 M/S Sahab Uddin traders 4069000.000 28/06/2012 16/06/2013 100 22/09/2014  
6 PEDP-III/KSG/HOS/2011-12/W2.0689 HOLIMA School Additional Room 2993000.000 M/s Khan Enterprise 2993000.000 25/06/2012 02/07/2013 100 22/09/2014  
7 PEDP-III/KSG/HOS/2013-14/W2.2644 ROHIMPUR School Additional Room 2995000.000 M/S Sopna Traders 2995000.000 12/03/2014 13/12/2014 75 22/09/2014  
8 PEDP-III/KSG/2011-12/W1.0638 West Gobinda pur School Reconstruction 6072000.000 M/S Shahil Enterprise 6072000.000 27/06/2012 05/07/2013 100 22/09/2014  
5 Itna
1 PEDP-III/KSG/ITN/2011-12/W2.1471 Nuabari School Additional Room 2091000.000 M/S Vati Bangla 2091000.000 18/04/2013 17/04/2014 100 22/09/2014  
2 PEDP-III/KSG/ITN/2012-13/W2.1957 Modir Gown School Additional Room 2743000.000 M/s Siplu Traders 2743000.000 18/04/2013 17/01/2014 85 22/09/2014  
3 PEDP-III/KSG/ITN/2012-13/W2.1956 Itna Madhy Gram School Additional Room 2993000.000 M/S Ibrahim Con. 2993000.000 18/04/2013 17/01/2014 85 22/09/2014  
4 PEDP-III/KSG/ITN/2011-12/W2.1077 LAIM PASHA School Additional Room 5186000.000 M/S M.R Khan 5186000.000 24/06/2012 23/06/2013 100 22/09/2014  
6 Karimganj
1 PEDP-III/KSG/KAR/2011-12/W3.0158 UTTOR MONO SONTOSH School Major Maintenance 102000.000 M/S Luna Enterprise 102000.000 29/07/2012 06/08/2013 100 22/09/2014  
2 PEDP-III/KSG/KAR/2013-14/W2.2653 SINDRIP School Additional Room 3955000.000 Ibadul Haque 3955000.000 05/12/2013 04/12/2014 80 22/09/2014  
3 PEDP-III/KSG/KAR/2012-13/W2.1958 URDIGHI School Additional Room 2793000.000 M/S RAhman Enterprise 2793000.000 20/08/2013 20/04/2014 80 22/09/2014  
4 PEDP-III/KSG/KAR/2011-12/W2.0133 INDA School Additional Room 4069000.000 M/S Osman Goni 4069000.000 13/08/2012 15/07/2013 100 22/09/2014  
5 PEDP-III/KSG/KAR/2011-12/W2.0132 GUNODHOR School Additional Room 3388000.000 Ebadul Haque. 3388000.000 16/07/2012 15/07/2013 100 22/09/2014  
6 PEDP-III/KSG/KAR/2011-12/W2.1472 SHAGULI School Additional Room 2191000.000 M/S Challenger 2191000.000 13/08/2012 30/07/2012 100 22/09/2014  
7 PEDP-III/KSG/KAR/2013-14/W2.2652 SUTAR PARA School Additional Room 2765000.000 Ibadul Haque 2765000.000 05/12/2013 04/12/2014 85 22/09/2014  
8 PEDP-III/KSG/KAR/2011-12/W2.0131 SHAKUA School Additional Room 4069000.000 M/S Rafi Constraction 4069000.000 04/07/2012 25/06/2013 100 22/09/2014  
9 PEDP-III/KSG/KAR/2012-13/W2.2136 NIAMOT PUR School Additional Room 3955000.000 M/S Rafi Con. 3955000.000 28/07/2013 02/05/2014 80 22/09/2014  
10 PEDP-III/KSG/KAR/2011-12/W2.0130 Char Dehunda north par School Additional Room 4069000.000 M/S Osman Goni 4069000.000 11/07/2012 25/06/2013 100 22/09/2014  
11 PEDP-III/KSG/KAR/2011-12/W2.0129 Lakpur School Additional Room 4069000.000 Ebadul Haque 4069000.000 07/04/2012 07/04/2013 100 22/09/2014  
12 PEDP-III/KSG/KAR/2013-14/W2.2651 BORO KANDA School Additional Room 4896000.000 Ebadul Haque 4896000.000 19/02/2014 18/02/2015 0 22/09/2014  
13 PEDP-III/KSG/KAR/2011-12/W2.0692 HAIDHON KHALI School Additional Room 2793000.000 Ebadul Haque 2793000.000 04/07/2012 25/06/2013 100 22/09/2014  
14 PEDP-III/KSG/KAR/2011-12/W2.0128 PATHARIA PARA School Additional Room 4069000.000 M/S Sowket Builders 4069000.000 11/07/2012 25/06/2013 100 22/09/2014  
15 PEDP-III/KSG/KAR/2012-13/W2.1958-A PITUA School Additional Room 4069000.000 Nitul Enterprise 4069000.000 17/07/2013 16/04/2014 100 22/09/2014  
16 PEDP-III/KSG/KAR/2011-12/W1.0110 KURSHA KALI AMENA BEGUM School Reconstruction 5140000.000 M/S Rahaman Enterprise. 5140000.000 31/07/2012 15/10/2013 100 22/09/2014  
7 Katiadi
1 PEDP-III/KSG/KAT/2011-12/W2.0693 MUMURDIA School Additional Room 3388000.000 M/S Sapna Traders 3388000.000 01/07/2012 30/06/2013 100 22/09/2014  
2 PEDP-III/KSG/KAT/2011-12/W2.1473 CHANDPUR BORO BARI School Additional Room 2385000.000 M/S Siplu Traders 2385000.000 21/10/2012 14/03/2014 100 22/09/2014  
3 PEDP-III/KSG/KAT/2011-12/W2.1474 Magura nurhusan School Additional Room 2361000.000 M/S Voumik Traders 2361000.000 14/07/2013 14/03/2014 95 22/09/2014  
4 PEDP-III/KSG/KAT/2013-14/W2.2654 MOSUA NO.-1 School Additional Room 3546000.000 M/S Nitul Enterprise 3546000.000 12/03/2014 12/03/2015 0 22/09/2014  
5 PEDP-III/KSG/KAT/2011-12/W2.1474-A Utter mumurdia School Additional Room 3388000.000 M/S Nitul Enterprise 3388000.000 13/10/2013 12/07/2014 95 22/09/2014  
6 PEDP-III/KSG/KAT/2012-13/W2.1959 Purba Bhangnadi School Additional Room 2993000.000 M/S Rofikul Islam 2993000.000 14/07/2013 14/07/2014 100 22/09/2014  
7 PEDP-III/KSG/2012-13/W2.1683 BOALIA School Additional Room 2191000.000 M/S.Osmsn Goni 2191000.000 19/12/2012 25/12/2013 80 22/09/2014  
8 PEDP-III/KSG/KAT/2011-12/W1.0111 South Bhatta School Reconstruction 5140000.000 M/S J.N Enterprise 5140000.000 01/07/2012 30/06/2013 100 22/09/2014  
8 Kishoreganj-s
1 PEDP-III/KSG/SAD/2011-12/W3.0160 North Paravanga Higi Romgan School Major Maintenance 227743.000 M/S J.A Traders 227743.000 25/10/2012 24/04/2013 100 22/09/2014  
2 PEDP-III/KSG/SAD/2011-12/W2.1476 Manakarsha School Additional Room 2191000.000 M/S Bhowmgk Traders 2191000.000 31/10/2012 30/05/2014 100 22/09/2014  
3 PEDP-III/KSG/SAD/2011-12/W2.0694 MAHINANDA SHUKUR MAHMUD School Additional Room 2993000.000 M/S Sapna Traders 2993000.000 22/07/2012 30/05/2014 100 22/09/2014  
4 PEDP-III/KSG/SAD/2011-12/W2.0136 Abdus Sahed gazi Bandary School Additional Room 3388000.000 M/S Eunus & Brothers PVT LTD. 3388000.000 29/07/2012 28/07/2013 100 22/09/2014  
5 PEDP-III/KSG/SAD/2011-12/W2.0134 Hazi Fula Rahman School Additional Room 4069000.000 M/S Sharif & Babul Brothers 4069000.000 16/07/2012 16/07/2013 100 22/09/2014  
6 PEDP-III/KSG/SAD/2011-12/W2.1475 Akram Hossin School Additional Room 2361000.000 M/S Samim Cons. 2361000.000 04/11/2012 03/11/2013 100 22/09/2014  
7 e-Tender/PEDP-III/KSG/2013-14/W2.2680 D.L.LAHIREE School Additional Room 3546000.000 M/S, J A Traders 3546000.000 20/03/2014 15/12/2014 50 22/09/2014  
8 PEDP-III/KSG/SAD/2011-12/W2.0135 Makraund Abdul Rashid School Additional Room 3388000.000 M/S Eunus & Brothers PVT LTD. 3388000.000 29/07/2012 25/07/2013 100 22/09/2014  
9 PEDP-III/KSG/SAD/2011-12/W1.0114 Paschim mathia School Reconstruction 5140000.000 M/S Eunus & Brothers PVT LTD. 5140000.000 29/07/2012 26/07/2013 100 22/09/2014  
10 PEDP-III/KSG/SAD/2011-12/W1.0113 LAXMIGANJ School Reconstruction 5140000.000 M/S Babul Enterprise 5140000.000 16/07/2012 16/10/2013 100 22/09/2014  
11 PEDP-III/KSG/SAD/2011-12/W1.0112 Bogadia Mahatub uddin School Reconstruction 5140000.000 M/S Vati Bangla Enterprise 5140000.000 05/07/2012 30/05/2014 100 22/09/2014  
9 Kuliarchar
1 PEDP-III/KSG/KUL/2013-14/W2.2671 KOLA KUPA School Additional Room 3546000.000 M/S Naj Engineers 3546000.000 05/03/2014 04/03/2015 0 22/09/2014  
2 PEDP-III/KSG/KUL/2011-12/W2.0695 KANDI GRAM School Additional Room 2993000.000 M/S Samim Cons. 2993000.000 15/07/2012 15/09/2013 100 22/09/2014  
3 PEDP-III/KSG/KUL/2011-12/W2.0138 POSHCHIM BIR KASHIM NOGOR School Additional Room 4069000.000 MS Naz Engineers. 4069000.000 15/07/2012 20/06/2013 100 22/09/2014  
4 PEDP-III/KSG/KUL/2013-14/W2.2667 SALUA School Additional Room 4896000.000 M/S Mushfiqur Rahaman 4896000.000 05/03/2014 04/03/2015 5 22/09/2014  
5 PEDP-III/KSG/KUL/2013-14/W2.2666 KHAL KHARA KONAPARA School Additional Room 2995000.000 M/S Shamim Con. 2995000.000 05/03/2014 04/03/2015 15 22/09/2014  
6 PEDP-III/KSG/KUL/2013-14/W2.2665 RAMDI School Additional Room 3281000.000 M/S J.N Enterprise 3281000.000 05/03/2014 04/03/2015 5 22/09/2014  
7 PEDP-III/KSG/KUL/2013-14/W2.2663 POSHCHIM ABDULLA PUR School Additional Room 3546000.000 M/S Vhati Bangla Enterprise 3546000.000 05/03/2014 04/03/2015 0 22/09/2014  
8 PEDP-III/KSG/KUL/2011-12/W2.0137 Bathiar Kandi School Additional Room 3388000.000 M/S J.N Enterprise 3388000.000 15/07/2012 19/05/2013 100 22/09/2014  
9 PEDP-III/KSG/KUL/2013-14/W2.2660 BORO CHARA School Additional Room 3546000.000 M/S, Mahabub Alam 3546000.000 05/03/2014 04/03/2015 60 22/09/2014  
10 PEDP-III/KSG/KUL/2013-14/W2.2661 LUXMIPUR School Additional Room 6279000.000 M/S Naj Engin 6279000.000 05/03/2014 04/03/2015 40 22/09/2014  
10 Mithamoin
1 PEDP-III/KSG/MIT/2011-12/W3.0161 Jatrapur Dalargoy School Major Maintenance 454109.000 M/S Keya Enterprise 454109.000 23/07/2012 05/03/2013 100 22/09/2014  
2 PEDP-III/KSG/MIT/2011-12/W2.0696 DHAKI School Additional Room 2993000.000 M/S Ali Enterprise 2993000.000 05/09/2012 04/09/2013 100 22/09/2014  
11 Nikli
1 PEDP-III/KSG/NIK/2011-12/W2.0139 Purba para School Additional Room 4069000.000 M/S. Ali Enterprise 4069000.000 22/06/2014 22/06/2015 0 22/09/2014  
2 PEDP-III/KSG/NIK/2012-13/W2.2137 NIKLI MODEL School Additional Room 4896000.000 M/S Silpy Enterprise 4896000.000 18/11/2013 18/08/2014 30 22/09/2014  
3 PEDP-III/KSG/NIK/2011-12/W2.0697 CHHATIR CHAR School Additional Room 2743000.000 M/S Motiur Rahaman 2743000.000 27/08/2013 26/08/2014 90 22/09/2014  
4 PEDP-III/KSG/NIK/2013-14/W2.2676 Paschim kursha School Additional Room 3955000.000 M/S. J N Enterprise 3955000.000 19/03/2014 18/12/2014 0 22/09/2014  
12 Pakundia
1 PEDP-III/KSG/PAK/2011-12/W3.0162 Shriramdi purba para School Major Maintenance 299672.000 M/S.Famous Con. 299672.000 31/07/2012 24/01/2013 100 22/09/2014  
2 PEDP-III/KSG/PAK/2011-12/W2.0698 MIRZA PUR School Additional Room 2993000.000 M/S.Shiplu Traders 2993000.000 18/06/2012 15/04/2013 100 22/09/2014  
3 PEDP-III/KSG/PAK/2013-14/W2.2678 Narandi North Para School Additional Room 4896000.000 M/S Sakhaoat Builders 4896000.000 18/02/2014 18/06/2014 40 22/09/2014  
4 PEDP-III/KSG/PAK/2012-13/W2.1961 SHALONKA School Additional Room 5186000.000 M/S Shamim Con. 5186000.000 20/12/2012 20/09/2013 100 22/09/2014  
5 PEDP-III/KSG/PAK/2013-14/W2.2677 SONMANIA School Additional Room 6279000.000 M/S Samim Con. 6279000.000 18/02/2014 18/06/2014 40 22/09/2014  
6 PEDP-III/KSG/PAK/2011-12/W2.1477 KODALIA NO.-2 School Additional Room 2385000.000 M/S shahabuddin traders 2385000.000 03/01/2013 01/09/2013 100 22/09/2014  
7 PEDP-III/KSG/PAK/2011-12/W1.0115 BAHRAM KHAN PARA School Reconstruction 5140000.000 M/S Shahil Enterprise 5140000.000 18/06/2012 29/09/2013 100 22/09/2014  
8 PEDP-III/KSG/PAK/2012-13/W1.0737 TARAKANDI NO.-2 School Reconstruction 5140000.000 M/S Shamim Con. 5140000.000 21/12/2012 20/09/2013 100 22/09/2014  
13 Tarail
1 PEDP-III/KSG/TAR/2011-12/W3.0163 CHONG JAWAR School Major Maintenance 131920.000 M/S I.K Con. 131920.000 26/08/2012 26/03/2013 100 22/09/2014  
2 PEDP-III/KSG/TAR/2013-14/W2.2679 KOLLA BHADRA School Additional Room 3955000.000 Md. Rafikul Islam 3955000.000 15/01/2014 13/10/2014 80 22/09/2014  
3 PEDP-III/KSG/TAR/2011-12/W2.0141 Kazla Chak Para School Additional Room 3388000.000 Md. Rafikul Islam 3388000.000 15/01/2014 13/10/2014 60 22/09/2014  
4 PEDP-III/KSG/TAR/2012-13/W2.2082 Banail School Additional Room 2993000.000 Md. Rafikul Islam 2993000.000 04/03/2013 04/03/2014 100 22/09/2014  
5 PEDP-III/KSG/TAR/2011-12/W2.1478 SHAHBAG School Additional Room 2191000.000 Imtiaz Uddin Ahmed 2191000.000 01/11/2012 30/10/2013 100 22/09/2014  
6 PEDP-III/KSG/TAR/2011-12/W2.0699 DAMIHA School Additional Room 2743000.000 M/S Shiplu Traders 2743000.000 02/08/2012 08/02/2013 100 22/09/2014  
7 PEDP-III/KSG/TAR/2011-12/W1.0116 Akubpur School Reconstruction 5140000.000 M/S Challenger 5140000.000 05/07/2012 05/10/2013 100 22/09/2014  
Total : 0.0000 (Km) 399715442.00 (Lac) 399715442.00 (Lac)