Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Amtali
1 Upazila: AmtaliDIRIP/BRG/Amt/UZR/SL-15(02)/15-16/W-138 Part A: Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) ch. 2+000 km to 2+750 km. ID. 504092010 0.7500 538.890 Md. Abul Kalam Azad. Natun Bazar, Patuakhali 538.890 17/12/2015 03/12/2017 94 13/05/2019  
2 Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(04)/15-16/W-153 Const. of 40.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Mahiskata RHD-Gulishakhali UP via Yunus Khan College) at ch. 1+500 km. ID. 504094052 (Total (HBB)Length=0.097 km) 40.0000 255.300 M/S.AAC & PC (JV),BB Road,Barguna 255.300 20/12/2015 11/03/2016 100 11/04/2019  
3 Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(05)/16-17/W-215 Const. of 30.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch. 9.00m, ID. 504094052 (Total (HBB)Length=0.033 km) 30.0000 202.470 M M Builders & Engineers Ltd - M/S Tanvir Ahmed (JV), Gulshan, Dhaka 202.470 07/02/2018 30/06/2018 90 11/04/2019  
4 Upazila:Amtali DIRIP/BRG/Amt/UNR/SL-15(04)/15-16/W-152 Const. of 18.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh) at ch 4+480 km. ID. 504093006 18.0000 132.510 M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal. 132.510 20/12/2015 30/05/2017 100 20/12/2018  
5 Upazila: Amtali DIRIP/BRG/Amt/UZR/SL-15(03)/15-16/W-151 Const. of 50.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bandh-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) at ch. 2+924 km. ID. 504092010 50.0000 386.650 M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal. 386.650 10/12/2015 31/05/2017 100 20/12/2018  
6   Part C: Rehab. work of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh). ch. 3+100 km to 4+100 km, 4+100km - 6+000km & 6+000km - 6+500km. ID. 504093006 Salvaged Tk. 2,65,309.00 (Total Length=7.561 km) 3.4000 0.000   0.000 100 20/12/2018  
7 Upazila: Amtali DIRIP/BRG/Amt/UZR/SL-15(01)/12-13/W-45 Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road at ch. 00-2000m. ID. 504092010 (Total Length=2.000 km) 2.0000 181.740 Md. Abul Kalam Azad. Azad Bhaban, Patuakhali 181.740 03/06/2013 31/03/2016 100 20/12/2018  
8 Upazila: Amtali DIRIP/BRG/Amt/VR/SL-14(03)/15-16/W-139 Part A: Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Khakdon Chawrasta to Kakua UP via Purba Chunakhali GPS) ch.0+000 km to 0+700 km & 3+700km - 6+190km. ID. 504094070 Salvaged Tk. 9,63,702.00 3.5200 247.020 Md. Shahidul Islam, Amtali, Barguna 247.020 17/12/2015 31/05/2018 100 20/12/2018  
9 Upazila: Amtali DIRIP/BRG/Amt/VR/SL-14(02)/12-13/W-46 Imp. of Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch.1700-3700m. ID. 504094052 & ID. 504094070 (Total Length=2.000 km) 2.0000 134.740 Md. Golamkibria 134.740 20/06/2013 30/06/2015 100 20/12/2018  
10 Upazila: Amtali DIRIP/BRG/AMT /VR/SL-14(01)/12-13/W-16 Imp.of Gulishakhali UP-Yunus Ali Khan College-Mahishkata RHD to Khakdon School road ID: 504094052 & 504094070 [(Khakdon Chowrasta to Kukua UP via Purba Chunakhali GPS road (Purba Kewabunia RHD-Roy bala Chowrasta via Akbaria Dakhil Madrasha) road by BC (ID No-504094070)] Part A:Pucca (BC) Road Works= 1.00km (Ch. 0+700 to 1+700 km) Part B:Rehabilitation Works= Nil Part C:Structure Works = 04- Nos, 3.475m (Total Length=1.000 km) 1.0000 68.310 M/S GM IKFA Ent Amtoly Borguna 68.310 15/01/2013 15/03/2015 100 20/12/2018  
Total : 150.6700 (Km) 2147.63 (Lac) 2147.63 (Lac)