Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Amtali
1 e-Tender/PEDP-III/BRN/AMT/2013-14/W2.3560 SONAUTA BOARD School Additional Room 7426000.000 Antora Trading JVC 7426000.000 03/07/2014 0 22/09/2014  
2 PEDP-III/BRN/AMT/2011-12/W2.0003 UTTAR PURBO TEPURA School Additional Room 4069000.000 Jahanara Islam 4069000.000 01/06/2012 30/05/2013 95 22/09/2014  
3 PEDP-III/BRN/AMT/2011-12/W2.0002 GHAT KHALI School Additional Room 4069000.000 M/S Amina Traders 4069000.000 01/06/2012 30/05/2013 100 22/09/2014  
4 PEDP-III/BRN/AMT/2011-12/W2.0326 CHAORA CHALITA BUNIA School Additional Room 2993000.000 Rezaul Karim Shahjada 2993000.000 12/02/2012 09/02/2014 100 22/09/2014  
5 PEDP-III/BRN/AMT/2012-13/W2.1754 AMTALI A.K. HIGH ATTACHED School Additional Room 2743000.000   2743000.000 10/03/2013 09/03/2014 0 22/09/2014  
6 e-Tender/PEDP-III/BRN/AMT/2013-14/W2.3557 VAILABUNIA School Additional Room 8976000.000 M/S AL- Mamun Enter 8976000.000 03/07/2014 0 22/09/2014  
7 e-Tender/PEDP-III/BRN/AMT/2013-14/W2.3556 DAKKHIN PURBO RAOGHA School Additional Room 6595000.000 M/S Mohiuddin Ahmed 6595000.000 03/07/2014 0 22/09/2014  
8 e-Tender/PEDP-III/BRN/AMT/2013-14/W2.3555 PURBO ATHARA GACHIA School Additional Room 8371000.000 M/S AL- Mamun Enterprise 8371000.000 03/07/2014 0 22/09/2014  
9 PEDP-III/BRN/AMT/2013-14/W2.2223 MADHYA KRISNA NAGAR School Additional Room 5810000.000 Gazi Mojammel Hoque 5810000.000 13/02/2014 12/02/2015 45 22/09/2014  
10 e-Tender/PEDP-III/BRN/AMT/2013-14/W2.3554 UTTOR PURBO KUKUA School Additional Room 6595000.000 M/S Atom Enterprise 6595000.000 03/07/2014 0 22/09/2014  
11 PEDP-III/BRN/AMT/2013-14/W2.2222 PRUBO HARIMRITUNJOY School Additional Room 5810000.000 MD.Rajaul karim Shazada 5810000.000 13/02/2014 12/02/2015 50 22/09/2014  
12 PEDP-III/BRN/AMT/2011-12/W2.0001 UTTAR CHANAKHALI School Additional Room 4069000.000 M/S. G M Igfa Enterprise 4069000.000 01/06/2012 30/05/2013 100 22/09/2014  
13 PEDP-III/BRN/2011-12/W1.0602 AMTALI M U HIGH ATTACHED School Reconstruction 6072000.000 M/S. G M Igfa Enterprise 6072000.000 12/07/2012 07/08/2013 100 22/09/2014  
2 Bamna
1 PEDP-III/BRN/TAL/2013-14/W2.2225 PASCHIM SHARIK KHALI School Additional Room 5810000.000 Abul Kalam Azad 5810000.000 20/03/2014 20/03/2015 40 22/09/2014  
2 PEDP-III/BRN/BAM/2012-13/W2.0189 BARA BHAIJORA School Additional Room 3388000.000 Md. Nur-E Alam Sikder 3388000.000 25/07/2012 24/07/2013 100 22/09/2014  
3 PEDP-III/BRN/BAM/2012-13/W2.0899 PASCHIM HOGALPATI School Additional Room 8305500.000 MS Nazrul slam 8305500.000 05/02/2013 12/02/2014 100 22/09/2014  
4 PEDP-III/BRN/BAM/2012-13/W2.0898 BEBAGIAKHALI School Additional Room 8305500.000   8305500.000 05/02/2013 12/02/2014 100 22/09/2014  
5 PEDP-III/BRN/BAM/2012-13/W2.0897 JOY NAGAR School Additional Room 8305500.000 MS Akon Traders 8305500.000 05/02/2013 12/02/2014 100 22/09/2014  
6 PEDP-III/BRN/BAM/2012-13/W2.1756 BATAJOR ADARSHA School Additional Room 8915500.000 Md. Nur-E-Alam Sikder 8915500.000 14/05/2013 20/05/2014 100 22/09/2014  
7 PEDP-III/BRN/BAM/2012-13/W2.0188 BUKABUNIA School Additional Room 3388000.000 Md. Nazrul Islam 3388000.000 25/07/2012 24/07/2013 100 22/09/2014  
8 PEDP-III/BRN/BAM/2012-13/W2.0896 CHATTA TALESHOR School Additional Room 9515500.000 M S BL Construction 9515500.000 05/02/2013 12/02/2014 100 22/09/2014  
9 PEDP-III/BRN/BAM/2012-13/W2.1757 PASCHIM LAKKHIPURA School Additional Room 8915500.000 M/S Mamata Enterprise 8915500.000 14/05/2013 20/05/2014 100 22/09/2014  
3 Barguna-s
1 PEDP-III/BRN/SAD/2011-12/W2.0328 PARIR KHAL School Additional Room 2993000.000 M/S Afsar & Co. 2993000.000 14/08/2012 21/08/2013 100 22/09/2014  
2 PEDP-III/BRN/SAD/2012-13/W2.1773 CHAR PARA School Additional Room 8305500.000 Md. Golam Sarwar 8305500.000 15/05/2013 14/05/2014 100 22/09/2014  
3 PEDP-III/BRN/SAD/2012-13/W2.1777 MANASHA TALI School Additional Room 8305500.000 M/S S T & AAC (JB) 8305500.000 15/05/2013 14/05/2014 80 22/09/2014  
4 e-Tender/PEDP-III/BRN/SAD/2013-14/W2.3389 AMTALA School Additional Room 3281000.000 Antira Sun JVC Ltd 3281000.000 12/04/2014 07/01/2015 0 22/09/2014  
5 PEDP-III/BRN/SAD/2012-13/W2.1771 URBUNIA School Additional Room 8305500.000 M/S Khukon Traders 8305500.000 31/05/2013 30/05/2014 80 22/09/2014  
6 PEDP-III/BRN/SAD/2012-13/W2.1779 NIMTOLY MAITHA School Additional Room 8305500.000 M/S Zafur Hossain & M/S Khan Enter. (JB) 8305500.000 28/05/2013 27/05/2014 80 22/09/2014  
7 PEDP-III/BRN/SAD/2012-13/W2.1778 PAJRA BHANGA School Additional Room 8305500.000 M/S Promi Traders & M K T (JB) 8305500.000 30/05/2013 29/05/2014 55 22/09/2014  
8 PEDP-III/BRN/SAD/2012-13/W2.1780 RAY VOG A.A.KHAN School Additional Room 8305500.000 M/S Khokon Traders 8305500.000 28/05/2013 27/05/2014 50 22/09/2014  
9 PEDP-III/BRN/SAD/2012-13/W2.1775 KADAMTALA School Additional Room 4750000.000 Md. Humaun Kabir & mithun Traders (JB) 4750000.000 30/05/2013 29/05/2014 55 22/09/2014  
10 PEDP-III/BRN/SAD/2012-13/W2.1781 LEMUA KHAJURA School Additional Room 8305500.000 M/S Arif & Asif 8305500.000 02/03/2013 01/03/2014 70 22/09/2014  
11 PEDP-III/BRN/SAD/2012-13/W2.1782 UTTAR FULDHALUA School Additional Room 8305500.000 NAC RNKPT (JV) 8305500.000 02/03/2013 01/03/2014 90 22/09/2014  
12 PEDP-III/BRN/SAD/2012-13/W2.1783 DALVANGA MAZKHAL School Additional Room 8305500.000 M/S JK Enter. & Khan Traders (JV) 8305500.000 07/03/2013 06/03/2014 20 22/09/2014  
13 PEDP-III/BRN/SAD/2011-12/W2.1312 MANIK KHALI SONBUNIA School Additional Room 2091000.000 M/S Afsar & Co 2091000.000 22/09/2013 21/09/2014 80 22/09/2014  
14 PEDP-III/BRN/SAD/2012-13/W2.1774 CHHOTA LABAN GOLA School Additional Room 8305500.000 ma & co_mme)jv 8305500.000 07/06/2013 06/06/2014 40 22/09/2014  
15 PEDP-III/BRN/SAD/2012-13/W2.1763 AYLA CHARAK GACHIA School Additional Room 8305500.000 M/S Afsar & Co. 8305500.000 18/07/2013 17/07/2014 85 22/09/2014  
16 PEDP-III/BRN/SAD/2011-12/W2.0327 KEORA BUNIA School Additional Room 2993000.000 M/S. M N Construction 2993000.000 22/08/2012 21/08/2013 100 22/09/2014  
17 PEDP-III/BRN/SAD/2012-13/W2.1760 PATAKATA School Additional Room 8305500.000 M/s Rudra Enterprise 8305500.000 18/07/2013 17/07/2014 70 22/09/2014  
18 PEDP-III/BRN/SAD/2012-13/W2.1761 POLGHATA PAKURGACHIA School Additional Room 8305500.000 M/S M.N construction & R.S Busness centre (JV) 8305500.000 28/03/2013 27/03/2014 70 22/09/2014  
19 PEDP-III/BRN/SAD/2012-13/W2.1762 AYLA PATA KATA School Additional Room 8305500.000 M/S Farhan Enterprise 8305500.000 22/07/2013 21/07/2014 75 22/09/2014  
20 PEDP-III/BRN/SAD/2012-13/W2.1764 PASCHIM ANGARPARA School Additional Room 8305500.000 M/S Sarmin Construction 8305500.000 18/07/2013 16/07/2014 65 22/09/2014  
21 PEDP-III/BRN/SAD/2012-13/W2.1765 AYLA HIGH ATTACHED School Additional Room 8305500.000 Md. Nizam Uddin 8305500.000 18/07/2013 17/07/2014 50 22/09/2014  
22 PEDP-III/BRN/SAD/2012-13/W2.1766 PASCHIM CHATTA GOURICHANNA School Additional Room 8305500.000 M/S J.K. Enterprise 8305500.000 18/06/2013 17/06/2014 20 22/09/2014  
23 PEDP-III/BRN/SAD/2012-13/W2.1772 KALAIMUDAFAT School Additional Room 8305500.000 M/s Lion Conust. & ML Conust.(JB) 8305500.000 15/05/2013 14/05/2014 95 22/09/2014  
24 PEDP-III/BRN/SAD/2012-13/W2.1767 BARA GOURI CHANNA School Additional Room 8305500.000 M/S Payra & Bosir Uddin (JV) 8305500.000 25/03/2013 24/03/2014 95 22/09/2014  
25 PEDP-III/BRN/SAD/2012-13/W2.1758 PURBO DHUPATI School Additional Room 8305500.000 M/S Azad Traders 8305500.000 23/07/2013 22/07/2014 85 22/09/2014  
26 PEDP-III/BRN/SAD/2012-13/W2.1769 MADHYA KUJMRAKHALI S K RAY School Additional Room 8305500.000 M/S BL & J C Conust. (JB) 8305500.000 31/05/2013 30/05/2014 75 22/09/2014  
27 PEDP-III/BRN/SAD/2012-13/W2.1776 DAKKHIN TETUL BARIA School Additional Room 5120000.000 M/S Mithun Traders 5120000.000 19/05/2013 18/05/2014 55 22/09/2014  
28 PEDP-III/BRN/SAD/2012-13/W2.1770 DEMA School Additional Room 8305500.000 Md. Nizamuddin 8305500.000 31/05/2013 30/05/2014 80 22/09/2014  
29 PEDP-III/BRN/SAD/2012-13/W1.0796 BALIA TALI C T School Reconstruction 8305500.000 NNC & RSBC (JV) 8305500.000 07/03/2013 06/03/2014 70 22/09/2014  
30 PEDP-III/BRN/SAD/2012-13/W1.0799 PARBATI KALTALA School Reconstruction 8305500.000 M/S Afsar & Co 8305500.000 07/03/2013 06/03/2014 40 22/09/2014  
31 PEDP-III/BRN/SAD/2012-13/W1.0797 DAKKHIN FULDHALUA School Reconstruction 8305500.000 M/S Hossain & Brothers 8305500.000 02/03/2013 01/03/2014 65 22/09/2014  
32 PEDP-III/BRN/SAD/2012-13/W1.0798 DAKKHIN PURBO ADABARIA School Reconstruction 8305500.000 M/S Afsar & Co 8305500.000 22/09/2013 21/09/2014 85 22/09/2014  
33 PEDP-III/BRN/SAD/2012-13/W1.0801 UTTAR SHINGRABUNIA School Reconstruction 8305500.000 M/S Bosiruddin 8305500.000 07/03/2013 06/03/2014 96 22/09/2014  
34 PEDP-III/BRN/SAD/2012-13/W1.0800 PURBO GHATBARIA School Reconstruction 8305500.000 M/S Liton Traders 8305500.000 07/03/2013 01/03/2014 96 22/09/2014  
35 PEDP-III/BRN/2012-13/W13.21 Ext. & Renovation of Barguna DPEO School District Education Office 1646420.000 M/S Putul Construction 1646420.000 05/05/2013 30/10/2013 100 22/09/2014  
4 Betagi
1 PEDP-III/BRN/BET/2011-12/W3.0001 KAJIRABAD PANCHAYETER HAT School Major Maintenance 289860.000 M/S H.S Engineers 289860.000 12/08/2012 11/02/2013 100 22/09/2014  
2 PEDP-III/BRN/BET/2012-13/W2.1786 UTTAR BETMORE School Additional Room 5480000.000 ACC & HE (JV) 5480000.000 06/09/2013 14/03/2014 45 22/09/2014  
3 PEDP-III/BRN/BET/2012-13/W2.1787 ALIABAD School Additional Room 8875500.000 Abul Kalam Azad 8875500.000 06/09/2013 14/06/2014 55 22/09/2014  
4 PEDP-III/BRN/BET/2013-14/W2.3563 DAKKHIN SHARISAMURI ADARSHA School Additional Room 8976000.000 M/S Siam enterprise 8976000.000 15/05/2014 14/05/2015 0 22/09/2014  
5 PEDP-III/BRN/BET/2012-13/W2.1784 VHORA KALIKABARI School Additional Room 8305500.000 M/S Afsar & Co. 8305500.000 06/09/2013 14/06/2014 55 22/09/2014  
6 PEDP-III/BRN/BET/2011-12/W2.1313 UTTAR KAZIRABAD School Additional Room 4750000.000 M/S Atom Enterprise 4750000.000 09/03/2014 14/03/2015 0 22/09/2014  
7 PEDP-III/BRN/BET/2013-14/W2.3390 PURBO KAUNIA School Additional Room 2765000.000 M/S Kamal Enterprise 2765000.000 15/05/2014 14/05/2015 5 22/09/2014  
8 PEDP-III/BRN/BET/2012-13/W2.1785 PASCHIM HOSNABAD School Additional Room 8305500.000 MLF & MKE (JV) 8305500.000 06/09/2013 14/06/2014 100 22/09/2014  
9 PEDP-III/BRN/BET/2012-13/W2.1793 SOPKHALI DONMANIK CHATRA School Additional Room 9455500.000 M/S Kohinur Construction 9455500.000 16/06/2016 21/06/2014 25 22/09/2014  
10 PEDP-III/BRN/BET/2012-13/W2.1789 UTTAR KISMAT KARUNA School Additional Room 9455500.000 M/S Humayun Enterprise 9455500.000 13/06/2013 14/06/2014 20 22/09/2014  
11 PEDP-III/BRN/BET/2012-13/W2.1788 BHOLANATH PUR School Additional Room 5300000.000 M/S Humayun Enterprise 5300000.000 13/06/2013 14/03/2014 45 22/09/2014  
12 PEDP-III/BRN/BET/2012-13/W2.1791 JHILBUNIA School Additional Room 8875500.000 M/S Kohinur Construction 8875500.000 13/06/2013 14/06/2014 55 22/09/2014  
13 PEDP-III/BRN/BET/2012-13/W2.1792 UTTAR BHOLANATHPUR School Additional Room 9455500.000 M/S Khan Enterprise 9455500.000 16/06/2016 21/06/2014 55 22/09/2014  
14 PEDP-III/BRN/BET/2013-14/W2.3562 PASCHIM BIBICHINI No 2 School Additional Room 7426000.000 M/S Humaun Enterprise 7426000.000 15/05/2014 14/05/2015 0 22/09/2014  
15 PEDP-III/BRN/BET/2011-12/W1.0713 UTTAR SHARISHA MURI School Reconstruction 9455500.000 M/S Khan Enterprise 9455500.000 05/06/2013 10/06/2014 40 22/09/2014  
16 PEDP-III/BRN/BET/2011-12/W1.0712 AYLA CHANDKHALI School Reconstruction 8305500.000 M/S Kohinur Construction 8305500.000 03/06/2013 08/06/2014 45 22/09/2014  
17 PEDP-III/BRN/BET/2011-12/W1.0711 DAKKHIN KARUNA School Reconstruction 8305500.000 M/S Humayun Enterprise 8305500.000 05/06/2013 10/06/2014 25 22/09/2014  
18 PEDP-III/BRN/BET/2011-12/W1.0710 KADAMTALA School Reconstruction 9455500.000 M/S Khan Enterprise 9455500.000 03/06/2013 08/06/2014 40 22/09/2014  
19 PEDP-III/BRN/BET/2011-12/W1.0709 UTTAR JHOPKHALI School Reconstruction 9455500.000 FEL & HE (JV) 9455500.000 03/06/2013 08/06/2014 60 22/09/2014  
5 Patharghata
1 PEDP-III/BRN/PAT/2011-12/W2.1314 DAKKHIN PURBO KALIPUR School Additional Room 2091000.000 M/S Rupali Conust. 2091000.000 22/08/2012 08/10/2013 60 22/09/2014  
2 PEDP-III/BRN/PAT/2013-14/W2.3564 UTTAR KATHALTALI School Additional Room 6835000.000 M/S Kaidur Rahman 6835000.000 07/05/2014 14/05/2015 45 22/09/2014  
3 PEDP-III/BRN/PAT/2013-14/W2.2227 JALIAGHATA FAKIRER HAT School Additional Room 1643000.000 M/S Anu Enterprise 1643000.000 0 22/09/2014  
4 PEDP-III/BRN/PAT/2012-13/W2.1794 SAIKAT GUSSAGRAM School Additional Room 8305500.000 M/S Zaman & Brothers 8305500.000 24/12/2012 24/12/2013 90 22/09/2014  
5 PEDP-III/BRN/PAT/2011-12/W2.0329 LEMUA School Additional Room 2993000.000 M/S. Nahar Costruction 2993000.000 22/08/2012 24/04/2013 95 22/09/2014  
6 PEDP-III/BRN/PAT/2012-13/W1.0803 PURBO LAKURTALA School Reconstruction 9515500.000 Md. Kaybur Rahman (Monju) 9515500.000 24/12/2012 24/12/2013 100 22/09/2014  
7 PEDP-III/BRN/PAT/2012-13/W1.0802 MADHYA GANPARA School Reconstruction 8915500.000 Md. Kaybur Rahman (Monju) 8915500.000 24/12/2012 24/12/2013 100 22/09/2014  
Total : 0.0000 (Km) 576866780.00 (Lac) 576866780.00 (Lac)