Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Amtali
1 UCRIP/2011-2012/W-12 UCRIP/2011-2012/W-12 (a). Improvement of Baulertabok UZR-Bagir Hat via Selvertali road by BC at Ch. 7000.00m to 7500.00m & (b). Improvement of said road at Ch. 7000.00m to 7500.00m by Earthen under Amtali Upazila, Barguna. (ID No-504093049) 0.5000 2534000.000 M/S. Khan Traders 2534000.000 20/04/2012 19/05/2013 0 18/07/2012  
2 UCRIP/2011-2012/W-09 UCRIP/2011-2012/W-09 (a). Improvement of road from Haldia UP-Haldia Hat Ramozi Bazar by BC at Ch. 1750.00m to 2250.00m & (b). Improvement of said road at Ch. 1750.00m to 2250.00m by Earthen under Amtali Upazila, Barguna. (ID No-504093025) 0.5000 2475000.000 Md. Shahidul Islam 2475000.000 20/04/2012 19/05/2013 0 18/07/2012  
3 UCRIP/2011-2012/W-02 UCRIP/2011-2012/W-02 (a). Improvement of Gulishakhali UP-Gulishakhali Bazar road by BC at Ch. 4000.00m to 4500.00m & (b). Improvement of said road at Ch. 4000.00m to 4500.00m by Earthen under Amtali Upazila, Barguna. (ID No-504092005) 0.5000 2525000.000 M/S. Jaynob Enterprise 2525000.000 20/04/2012 19/05/2013 0 18/07/2012  
4 UCRIP/2010-2011/W-40 UCRIP/2010-2011/W-40 Improvement of Arpangasia UP Office-Charokgasia Bazar road by BC at Ch. 2500.00m to 3500.00m & (b). Improvement of said road by Earthen at Ch. 2500.00m to 3500.00m under Amtali Upazila, Barguna. 1.0000 4331000.000 M/S. Shuvo Enterprise 4331000.000 01/06/2011 30/11/2011 65 18/07/2012  
5 UCRIP/2010-2011/W-38 UCRIP/2010-2011/W-38 Improvement of Amragasia-Gazipur GC via Kukua Hat road by BC at Ch. 5540.00m to 8000.00m & (b). Improvement of said road by Earthen at Ch. 5540.00m to 8000.00m under Amtali Upazila, Barguna. 2.4600 9357000.000 Md. Badol Khan 9357000.000 01/06/2011 30/11/2011 0 18/07/2012  
6 UCRIP/2010-2011/W-30 UCRIP/2010-2011/W-30 Improvement of Shakharia Bus-stant-UP Office (Atharogasia) via Hazar Taker Bandth road by BC at Ch. 4000.00m to 5000.00m & (b). Improvement of said road by Earthen at Ch. 4000.00m to 5000.00m under Amtali Upazila, Barguna. 1.0000 4423000.000 M/S. Janani Enterprise 4423000.000 07/07/2011 07/01/2012 0 18/07/2012  
7 UCRIP/2010-2011/W-29 UCRIP/2010-2011/W-29 Improvement of Kachupatra Bazar RHD-Bogi Bazar via Patoary Bari road by BC (Start from Bogi Bazar) & (b). Improvement of said road by Earthen under Amtali Upazila, Barguna. 4625000.000 M/S. Shuvo Enterprise 4625000.000 28/05/2011 28/10/2011 75 18/07/2012  
8 UCRIP/2010-2011/W-28 UCRIP/2010-2011/W-28 Improvement of Gulishakhali UP Office-Gulishakhali Bazar road by BC at Ch. 3000.00m to 4000.00m & (b). Improvement of said road by Earthen at Ch. 3000.00m to 4000.00m under Amtali Upazila, Barguna. 1.0000 4472000.000 M/S. Mithun Traders 4472000.000 08/05/2011 28/10/2011 40 18/07/2012  
9 UCRIP/2010-2011/W-25 UCRIP/2010-2011/W-25 Improvement of Gulishakhali UP Office-Kukua Hat via Chunakhali Bazar-Hazartaker Bandth road by BC at Ch. 0.00m to 1000.00m & (b). Improvement of said road at Ch. 0.00m to 1000.00m by Earthen under Amtali Upazila, Barguna. 1.0000 4445000.000 M/S. Khaja Construction 4445000.000 08/05/2011 28/10/2011 0 18/07/2012  
10 UCRIP/2010-2011/W-18 UCRIP/2010-2011/W-18 (a). Improvement of Taltali Bailly Bridge via Sawdagorpara Road via Harinbaria Madrasha road by carpeting at Ch. 2000.00m to 4000.00m & (b). Earth work on said road at Ch. 2000.00m to 4000.00m under Amtali Upazila, Barguna. 2.0000 8561000.000 Md. Humayun Kabir 8561000.000 25/02/2011 25/08/2011 60 18/07/2012  
11 UCRIP/2010-2011/W-02 UCRIP/2010-2011/W-02 (A). Improvement of Taltali Baily Bridge via Sawdagarpara road via Harinbaria Madr4asha Road at Ch. 0.00m to 2000.00m & (B). Improvement of Earth work on said road at Ch. 2500.00m to 4500.00m under Amtali Upazila, Barguna. 2.0000 8711000.000 M/S. Israt Enterprise 8711000.000 01/01/2011 30/12/2011 35 18/07/2012  
12 UCRIP/2010-2011/W-01 UCRIP/2010-2011/W-01 (A). Improvement of Amragasia-Gazipur GC via Kukua Hat Road at Ch. 540.00m to 3040.00m & (B). Improvement of Earth work on said road at Ch. 0.00m to 2500.00m under Amtali Upazila, Barguna. 2.5000 12225000.000 M/S. Israt Enterprise 12225000.000 01/01/2011 30/12/2011 0 18/07/2012  
2 Bamna
1 UCRIP/2011-2012/W-16 UCRIP/2011-2012/W-16 (a). Improvement of road from Dawatala UP-Dakkin Kakchira Bazar via Nabogram RPS by BC at Ch. 3000.00m to 4000.00m & (b). Improvement of said road at Ch. 3000.00m to 4000.00m by Earthen under Bamna Upazila, Barguna. (ID No 1.0000 4919000.000 M/S. Khan Traders (Raza Mia) 4919000.000 20/04/2012 19/05/2013 0 18/07/2012  
2 UCRIP/2011-2012/W-15 UCRIP/2011-2012/W-15 (a). Improvement of road from Gudighata Bazar-Ramna UP via Uttar Kakchira GPS by BC at Ch. 3000.00m to 3800.00m & (b). Improvement of said road at Ch. 3000.00m to 3800.00m by Earthen under Bamna Upazila, Barguna. (ID No-50 0.8000 4019000.000 M/S. L & M Construction 4019000.000 20/04/2012 19/05/2013 0 18/07/2012  
3 UCRIP/2011-2012/W-08 UCRIP/2011-2012/W-08 (a). Improvement of road from Katakhali Bazar-Chalavanga Darbar Sharif via Gudighata Bazar-Chalavanga Launchghat by BC at Ch. 0.00m to 930.00m & (b). Improvement of said road at Ch. 0.00m to 930.00m by Earthen under Bamna 0.9300 4602000.000 M/S. Rashadul Enterprise 4602000.000 20/04/2012 19/05/2013 0 18/07/2012  
4 UCRIP/2011-2012/W-06 UCRIP/2011-2012/W-06 (a). Improvement of Ramna UP-Gudighata Bazar via Dakkin Kakchira GPS road by BC at Ch. 0.00m to 1000.00m & (b). Improvement of said road at Ch. 0.00m to 1000.00m by Earthen under Bamna Upazila, Barguna. (ID No-504193006) 1.0000 5368000.000 M/S. Nurjahan Enterprise 5368000.000 20/04/2012 19/05/2013 0 18/07/2012  
5 UCRIP/2010-2011/W-36 UCRIP/2010-2011/W-36 Improvement of Ramna UP-Kholpatua GC via Golaghata GPS road by BC at Ch. 700.00m to 1700.00m & (b). Improvement of said road by Earthen at Ch. 700.00m to 1700.00m under Bamna Upazila, Barguna. 1.0000 4522000.000 M/S. Shekha Enterprise 4522000.000 01/06/2011 30/11/2011 0 18/07/2012  
6 UCRIP/2010-2011/W-35 UCRIP/2010-2011/W-35 Improvement of Bukabunia UP Head Quarter Amua GC via Laxmipura Madrasha via Chotto Jhadobpura-Wazid Mollik Bari road by BC at Ch. 1000.00m to 2000.00m & (b). Improvement of said road by Earthen at Ch. 1000.00m to 2000.00m under Bamna 1.0000 4566000.000 M/S. Shekha Enterprise 4566000.000 01/06/2011 30/11/2011 0 18/07/2012  
3 Barguna-s
1 UCRIP/2011-2012/W-10 UCRIP/2011-2012/W-10 (a). Improvement of road from Keorabunia UP-Kotbaria Bazar by BC at Ch. 3100.00m to 3600.00m & (b). Improvement of said road at Ch. 0.00m to 1500.00m by Earthen under Sadar Upazila, Barguna. (ID No-504283044) 0.5000 2571000.000 M/S. Noor-E-Jannat Construction 2571000.000 20/04/2012 19/05/2013 0 18/07/2012  
2 UCRIP/2011-2012/W-05 UCRIP/2011-2012/W-05 (a). Improvement of road from Burirchar UP-Hazirbigha-Kamrabad -Purakata Ferryghat by BC at Ch. 8300.00m to 8800.00m & (b). Improvement of said road at Ch. 8300.00m to 8800.00m by Earthen under Sadar Upazila, Barguna. (ID 0.5000 2636000.000 M/S. Raian Enterprise 2636000.000 20/04/2012 19/05/2013 0 18/07/2012  
3 UCRIP/2011-2012/W-04 UCRIP/2011-2012/W-04 Construction of 2.30mx2.30m Box Culvert on Aylapatakata UP-(Kadamtala)-Tulatala-Cotbaria Hat-Baikalin Hat road under Sadar Upazila, Barguna. (ID No-504283041) 2.3000 566000.000 M/S. R.S Busness Centre 566000.000 20/04/2012 19/05/2013 0 18/07/2012  
4 UCRIP/2010-2011/W-41 UCRIP/2010-2011/W-41 Improvement of Lemua Hat-Dakkin Lemua GPS-Dhalua UP Office road by BC at Ch. 2250.00m to 3250.00m & (b). Improvement of said road by Earthen at Ch. 2250.00m to 3250.00m under Sadar Upazila, Barguna. 1.0000 4575000.000 M/S. S.R.K Traders 4575000.000 01/06/2011 30/11/2011 96 18/07/2012  
5 UCRIP/2010-2011/W-39 UCRIP/2010-2011/W-39 Improvement of Potkakhali RHD-Nali GC road by BC at Ch. 7200.00m to 8200.00m & (b). Improvement of said road by Earthen at Ch. 7200.00m to 8200.00m under Sadar Upazila, Barguna. 1.0000 4373000.000 M/S. Ahsan Enterprise 4373000.000 01/06/2011 30/11/2011 65 18/07/2012  
6 UCRIP/2010-2011/W-27 UCRIP/2010-2011/W-27 Improvement of Barguna Sadar UP-Sujauddin Kheyaghat-4No. Keorabunia UP road via Andermanik & Dawatala road by BC at Ch. 1850.00m to 3350.00m, (b). Improvement of said road by Earthen at Ch. 1850.00m to 3350.00m & (c). Construction of 1.5000 6391000.000 Md. Golam Sarwar 6391000.000 20/09/2011 20/03/2012 25 18/07/2012  
7 UCRIP/2010-2011/W-17 UCRIP/2010-2011/W-17 (a). Improvement of Garjonbunia UP Office-Babugonj GC Road (WDB) by carpeting at Ch. 2000.00m to 3000.00m & (b).Improvement of Earth work on said road at Ch. 2000.00m-3000.00m under Sadar Upazila,Barguna. 1.0000 4044000.000 Md. Humayun Kabir 4044000.000 25/02/2011 25/08/2011 100 18/07/2012  
8 UCRIP/2010-2011/W-16 UCRIP/2010-2011/W-16 (a). Improvement of Barguna UP-Chander Hat-Dakkin Hawlibunia-Lemua Hat Road by BC at Ch. 3536.00m to 5536.00m & (b). Improvement of Earth work on said road at Ch. 3536m-5536m under Sadar Upazila, Barguna. 2.0000 9324000.000 Md. Golam Kibria 9324000.000 25/02/2011 25/08/2011 100 18/07/2012  
9 UCRIP/2010-2011/W-13 UCRIP/2010-2011/W-13 (a). Improvement of Nali GC-Abi Abdullah GPS-Raybhog Hat-Dhalua UP office Road by BC at Ch. 1000.00m to 1800.00m & (b). Improvement of Earth work on said road at Ch. 1000m- 1800m under Sadar Upazila, Barguna. 0.8000 3623000.000 M/S. Anwar Enterprise 3623000.000 25/02/2011 25/08/2011 50 18/07/2012  
10 UCRIP/2010-2011/W-10 UCRIP/2010-2011/W-10 (a). Improvement of Potkakhali-Nali GC Road by BC at Ch. 10200.00m to 11200.00m & (b). Improvement of Earth work on said road at Ch. 10200m- 11200m under Sadar Upazila, Barguna. 1.0000 4409000.000 M/S. Sattar Enterprise 4409000.000 15/01/2011 15/07/2011 80 18/07/2012  
4 Betagi
1 UCRIP/2011-2012/W-03 UCRIP/2011-2012/W-03 Construction of 2Nos. 3.00mx2.60m Box Culvert on Bibichini UP office-Shantir Hat Kristanpara-DC Hat road at Ch. 1190.00m & 1980.00m under Betagi Upazila, Barguna. (ID No-504473012) 0.7900 2357000.000 M/S. Kahinoor Construction 2357000.000 20/04/2012 19/05/2013 0 18/07/2012  
2 UCRIP/2010-2011/W-34 UCRIP/2010-2011/W-34 Improvement of Kazirabad UP Office-Kumrakhali Bazar road by BC at Ch. 2000.00m to 3000.00m & (b). Improvement of said road by Earthen at Ch. 2000.00m to 3000.00m under Betagi Upazila, Barguna. 1.0000 4424000.000 M/S. Ridi Enterprise 4424000.000 01/06/2011 30/11/2011 75 18/07/2012  
3 UCRIP/2010-2011/W-24 UCRIP/2010-2011/W-24 Improvement of Bibichini UP Office-Gariabunia-Shantir Hat road by BC at Ch. 1000.00m to 2500.00m & (b). Improvement of said road at Ch. 1000.00m to 2500.00m by Earthen under Betagi Upazila, Barguna. 1.5000 5941000.000 M/S. Kahinoor Construction 5941000.000 08/05/2011 28/10/2011 50 18/07/2012  
4 UCRIP/2010-2011/W-23 UCRIP/2010-2011/W-23 Improvement of Bibichini UP Office-Shantir Hat Khrintanpara-DC Hat road by BC at Ch. 2000.00m to 2800.00m & (b). Improvement of said road at Ch. 2000.00m to 2800.00m by Earthen under Betagi Upazila, Barguna. 0.8000 3690000.000 M/S. Sajib Enterprise 3690000.000 08/05/2011 28/10/2011 90 18/07/2012  
5 UCRIP/2010-2011/W-22 UCRIP/2010-2011/W-22 Improvement of Betagi UP Office-Laxmipura Bazar road by BC at Ch. 1100.00m to 1900.00m, (b). Improvement of said road at Ch. 1100.00m to 1900.00m by Earthen & (c). Construction of 1No. 3.00m x 3.00m Box Culvert on said 0.8000 5072000.000 M/S. Humayun Enterprise 5072000.000 08/05/2011 28/10/2011 100 18/07/2012  
6 UCRIP/2010-2011/W-21 UCRIP/2010-2011/W-21 Construction of 1No. 3.00m x 3.00m Box Culvert on Bibichini UP Office-Shantir Hat Khrintanpara-DC Hat road at Ch. 700.00m under Betagi Upazila, Barguna. 0.3000 1217000.000 M/S. Kahinoor Construction 1217000.000 08/05/2011 28/10/2011 100 18/07/2012  
7 UCRIP/2010-2011/W-20 UCRIP/2010-2011/W-20 Construction of 1No. 3.00m x 3.00m Box Culvert on Hosnabad UP-Kazir Hat GC (Kadamtala Extension Bayatibari South site of Talukder Bari-Kabil Akon Bandthghat) road at Ch. 520.00m under Betagi Upazila, Barguna. 0.3000 1217000.000 M/S. Humayun Enterprise 1217000.000 08/05/2011 28/10/2011 100 18/07/2012  
8 UCRIP/2010-2011/W-19 UCRIP/2010-2011/W-19 Construction of 1No. 4.00m x 4.00m Box Culvert on Betagi UP-Laxmipura Bazar via house of Humayun Kabir-Bashonda GPS-Amragasia Barerdon river road at Ch. 2000.00m under Betagi Upazila, Barguna. 0.4000 1709000.000 M/S. Khan Enterprise 1709000.000 08/05/2011 28/10/2011 100 18/07/2012  
9 UCRIP/2010-2011/W-06 UCRIP/2010-2011/W-06 (a). Improvement of Mokamia UP-Charkhali WAPDA Bazar via Mollar Hat (East site Road) Road by HBB at Ch. 2500.00m to 3385.00m & (b). Improvement of Earth work on said road at Ch. 2500.00m to 3885.00m under Betagi Upazila, Barguna. 1.3800 3100000.000 M/S. Humayun Enterprise 3100000.000 01/01/2011 30/06/2011 75 18/07/2012  
10 UCRIP/2010-2011/W-05 UCRIP/2010-2011/W-05 (a). Improvement of Badnikhali GC- Kazirabad GC Road by BC at Ch. 1000.00m to 1750.00m & (b). Improvement of Earth work on said road at Ch. 2000.00m to 2500.00m under Betagi Upazila, Barguna. 0.7500 3189000.000 M/S. Khan Enterprise 3189000.000 01/01/2011 30/06/2011 100 18/07/2012  
11 UCRIP/2010-2011/W-04 UCRIP/2010-2011/W-04 (a). Improvement of Kazirabad UP Office-Sharishanuri UP Office via Abdur Rob Mirdha house-Hashim Peada-Purba Kazirabad GPS & Dakhil Madrasha-Barguna-Betagi R&H Road by BC at Ch. 1000.00m to 2000.00m & (b). Improvement of Earth work o 1.0000 4285000.000 M/S. Humayun Enterprise 4285000.000 01/01/2011 30/06/2011 20 18/07/2012  
12 UCRIP/2010-2011/W-03 UCRIP/2010-2011/W-03 (a). Improvement of Betagi UP-Laxmipura Bazar via house of Humayun Kabir-Basonda GPS-Amragasia Barerdon river Road by BC at Ch. 2000.00m to 2500.00m, (b). Improvement of Earth work on said road at Ch. 2000.00m to 2500.00m & ( 0.5000 2720000.000 M/S. Kahinoor Construction 2720000.000 01/01/2011 30/06/2011 100 18/07/2012  
5 Patharghata
1 UCRIP/2011-2012/W-14 UCRIP/2011-2012/W-14 (a). Improvement of road from Patharghata-Tengra Bazar by BC at Ch. 0.00m to 1000.00m & (b). Improvement of said road at Ch. 0.00m to 1000.00m by Earthen under Patharghata Upazila, Barguna. (ID No-504853002) 1.0000 5216000.000 M/S. L. F Enterprise 5216000.000 20/04/2012 19/05/2013 0 18/07/2012  
2 UCRIP/2011-2012/W-13 UCRIP/2011-2012/W-13 (a). Improvement of road from Nachnapara Bazar-Dalwar-Keramot Bazar by BC at Ch. 0.00m to 1000.00m & (b). Improvement of said road at Ch. 0.00m to 1000.00m by Earthen under Patharghata Upazila, Barguna. (ID No-504853012) 1.0000 5082000.000 M/S. L & M Construction 5082000.000 20/04/2012 19/05/2013 0 18/07/2012  
3 UCRIP/2010-2011/W-33 UCRIP/2010-2011/W-33 Improvement of Nachnapara UP-Taluker Charduani via Napiter Kheyaghat via Dada Naty Bus-stant-Nachnapara Bazar road by BC at Ch. 1300.00m to 2300.00m & (b). Improvement of said road by Earthen at Ch. 1300.00m to 2300.00m under Patharg 1.0000 4321000.000 M/S. L & M Construction 4321000.000 01/06/2011 30/11/2011 100 18/07/2012  
4 UCRIP/2010-2011/W-09 UCRIP/2010-2011/W-09 (a). Improvement of Kathaltali UP-Shaptogram-Kathaltali Bazar via Burjugpur GPS Road by BC at Ch. 1000.00m to 1600.00m & (b). Improvement of Earth work on said road at Ch. 1000m-1600m under Patharghata Upazila, Barguna. 0.6000 2549000.000 M/S. Bul Bul Traders 2549000.000 01/01/2011 30/06/2011 100 18/07/2012  
Total : 44.9100 (Km) 195281000.00 (Lac) 195281000.00 (Lac)