SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Amtali
1 e-GP/CTEIP/2018-19/AMT/CM-01 Improvement of Amtali Central Cattle Market. 247.150 247.150 10/10/2019 30/05/2022 95 17/05/2022 Works Ongoing
2 e-GP/CTEIP/2018-19/AMT/BB-01 Construction of Bus Bay 479.917 479.917 20/02/2019 30/05/2020 98 17/05/2022 GOB Funded
3 e-GP/CTEIP/2017-18/AMT/BR-01 Construction of 2 nos RCC Long Girder Bridge at Amtali Pourashava, District: Amtali 29.0000 280.027 M/S Mohiuddin Ahmed 280.027 05/10/2018 10/10/2019 100 12/05/2022 Completed
4 e-GP/CTEIP/2017-18/AMT/RD-03 Improvement / Construction of Two (02) Nos Road Totaling 2.237 Km Flexible & Rigid Pavement with 06 Nos Box Culvert, 13 Nos Cross Pipe & 340.20m Protection work under Amtali Pourashava, Barguna. 2.2400 247.066 M/S Rupali Construction 247.066 05/10/2018 10/11/2019 100 12/05/2022  
5 e-GP/CTEIP/2017-18/AMT/MM-01 Construction of Multipurpose Market at Amtali Pourashava, District: Barguna 1.0000 258.077 M/S Mohiuddin Ahmed & M/s Deep Enterprise (JV) 258.077 05/10/2018 30/05/2022 100 12/05/2022  
6 e-GP/CTEIP/2014-15/AMT/WS-01 Construction of Two Production TW; One OHT, Pipeline (26.77 km Dristribution and Transmission; 4.4 km Replaced Pipeline, 1747 Service Connection and replaced 400 service connection); Two Pump House; Supply of O & M tools and Supply, fitting, fixing and co 33.5000 1262.273 M/S Zilani Traders-Noor & Co. (JV) 1262.273 17/01/2016 25/12/2020 100 12/05/2022 Completed
7 e-GP/CTEIP/2018-19/AMT/RD-05 Construction/ Improvement of 5 no. Road under Amtali Pourashava 4.8800 369.420 369.420 13/03/2020 12/06/2020 100 09/05/2022
8 e-GP/CTEIP/2017-18/AMT/BLS-01 Construction of 02 nos Boat Landing Station at Aamal Pal Swamill Ghat & Amtali Kat Market Ghat Under Amtali Pourashava 2.0000 151.588 Al Mamun Enterprise 151.588 25/10/2018 28/04/2020 100 09/05/2022 Works Ongoing
9 e-GP/CTEIP/2018-19/AMT/RD-04 Construction/ Improvement of 2 no. Road 376.015 376.015 26/02/2019 25/02/2020 100 04/04/2021 GOB Funded
10 e-GP/CTEIP/2014-15/AMT/RD-02 Improvement of 04 nos. road, totaling 4.531 km at Amtali Pourashava, District: Barguna 4.5300 466.857 Md. Mahfuz Khan 466.857 02/01/2016 28/03/2018 100 04/04/2021 Completed
11 e-GP/CTEIP/2016-17/AMT/PT-01 Construction of 3 nos Public Toilet at Amtali Pourashava, District: Barguna 3.0000 69.965 M/S Abul Kalam Azad 69.965 24/08/2017 23/02/2019 100 04/04/2021 Completed
12 e-GP/CTEIP/2014-15/AMT/DR-01 Construction of Drains and box culverts (1) RCC Drain- 680m (5 nos), (2) Construction of 4 nos RCC box culvert (3) Excavation & CC block lining (2 nos) under Amtali Pourashava; Upazilla- Amtali; District- Barguna 1.4980 328.985 Tohidul Basar Kabir 328.985 08/07/2015 31/03/2018 100 04/04/2021  
13 CTEIP/2014-15/AMT/CS-01 Contruction of 3 nos. Multipurpose Cyclone Shelters at (1) Amtali Bandar Hosainia Fajil Madrashaa ( Ward-04); (2) Suri kata Govt. primary School (Ward-07); and (3) Basugi Non-Govt, Primary School (Ward-08), under Amtali Pourashava, Upazila: Amtali, Distri 3.0000 1265.149 Abul Kalam Azad 1265.149 05/06/2015 10/04/2018 100 04/04/2021  
14 e-GP/CTEIP/2014-15/AMT/RD-01 Improvement of existing 4 nos roads, totaling 3.38 kms and 01 no road side drain, totaling 0.481 kms under Amtali Pourashava, District: Barguna 3.3800 371.681 M/S. Palli Store 371.681 01/10/2015 14/02/2018 100 04/04/2021 Completed
2 Barguna-s
1 e-GP/CTEIP/2018-19/BAR/RD-06 Improvement of 06 nos Road under Barguna Pourashava 2.9600 221.150 M/S FH Enterprise & M/S Islam & Co JV 221.150 27/01/2020 30/12/2021 100 17/05/2022 Works ongoing
2 e-GP/CTEIP/2018-19/BAR/RD-05 Improvement of 08 nos Road totalling-10.368km (2404m Rigid and 7964m Flexible Pavement) under Barguna Pourashava 8.5400 594.238 Md. Moinul Islam (Partner in-charge) FHE & Mahfug Khan ltd (JV) 594.238 14/08/2019 30/12/2021 100 17/05/2022 Works ongoing
3 e-Gp/CTEIP/2018-19/BAR/MM-01 Construction of Barguna Multipurpose Market at Barguna Pourashava (2-Storied Building with 5- storied Foundation ) 504.820 Md. Mahfuz Khan 504.820 06/03/2019 03/05/2022 100 17/05/2022
4 e-GP/CTEIP/2017-18/BAR/PT-01 Construction of 01 no Public Toilet at Barguna Pourashava 1.0000 35.307 M/S Khokon Traders 35.307 25/10/2018 24/04/2020 100 12/05/2022 Completed
5 e-GP/CTEIP/2017-18/BAR/BLS-01 Construction of Barguna Poura Super Market Boat Landing Station under Barguna Pourashava 1.0000 63.029 M/S Arif & Asif Construction and M/S FH Enterprise (JV) 63.029 09/09/2018 22/03/2020 100 12/05/2022 Completed
6 e-GP/CTEIP/2017-18/BAR/RD-03 Construction/ Improvement of 03 nos Roads at Barguna Pourashava, District: Barguna 1.6800 277.918 M/S Arif & Asif Construction and M/S FH Enterprise (JV) 277.918 06/06/2018 04/12/2019 100 12/05/2022  
7 e-GP/CTEIP/2017-18/BAR/WS-01 Construction of Two OHT, Pipeline 16.347 km (12.347 km Distribution line and 4.00 km Transmission Line) and 1000 nos water meter supply, fitting, fixing and commissioning of Electromechanical work at Barguna Pourashava, District: Barguna 16.3500 1525.290 M/S Zilani Traders 1525.290 07/09/2018 15/06/2021 100 12/05/2022  
8 e-GP/CTEIP/2017-18/BAR/IES-01 Construction of Integrated Landfill and Resource Recovery Facility at Barguna Pourashav, District: Barguna 1.0000 921.867 TURN 921.867 07/08/2018 30/09/2021 100 12/05/2022  
9 e-GP/CTEIP/2016-17/BAR/DR-02 Construction of 8 nos RCC drain (5534m) under Barguna Pourashava, Upazila: Barguna sadar, District: Barguna 3.8420 659.495 NT-AAC-NT JV 659.495 18/04/2017 17/10/2019 100 12/05/2022 Complete
10 e-GP/CTEIP/2015-16/BAR/DR-01 Re-excavation of 2 nos khal (2497m) and Rehabilitation of 2 nos khal (2660m) under Barguna Pourashava, Dist: Barguna 5.1570 347.827 Md. Eunus Al Mamun 347.827 24/07/2016 30/09/2019 100 12/05/2022  
11 e-GP/CTEIP/2015-16/BAR/CS-01 Construction of Cyclone Shelter at (a) Barguna Maitha Secondary School 9ward no-3) and Barguna Ideal cCollege (ward no-6) under Barguna Pourashava, Dist: Barguna 2.0000 734.865 M/S Rupali Constn. and amp SH Ent. (JV) 734.865 21/06/2016 30/09/2019 100 12/05/2022 Completed
12 e-GP/CTEIP/2016-17/BAR/RD-01 Improvement of 5 nos Roads, including road side drain in Barguna Pourashava, Dist: Barguna 4.4690 636.708 Md. Mahfuz Khan 636.708 13/02/2017 30/09/2019 100 12/05/2022 Completed
13 e-Gp/CTEIP/2018-19/BAR/BT-01 Construction of Barguna Bus Terminal (2 -storied Terminal building with 3-storied Foundation.) 1437.010 Md. Mahfuz Khan 1437.010 25/03/2019 24/09/2020 100 09/05/2022
14 e-GP/CTEIP/2019-20/BAR/LP-01 Improvement of Circuit House Lake & Circuit House Field in ward no.02 500.000 500.000 0 04/04/2021 DED Complete
15 e-GP/CTEIP/2016-17/BAR/BR-01 Construction of 1no RCC Bridge 22.0m and 2 nos RCC Box culvert in Barguna Pourashava, Dist: Barguna 22.0000 279.857 PSTL-Maitree (pvt) 279.857 18/04/2017 17/04/2019 100 04/04/2021 Completed
16 e-GP/CTEIP/2016-17/BAR/RD-02 Improvement of Road with side drain from Krock khal near Krock Primary School to Nur Hera Madrasha (ward no-4) in Barguna Pourashava, Dist: Barguna 1.2000 380.870 NT-AAC-NT JV 380.870 28/06/2017 27/06/2019 100 04/04/2021 Completed
Total : 159.2260 (Km) 15294.42 (Lac) 15294.42 (Lac)