Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Narayanganj-s
1 NCC-OI-3 Construction of Community Center and Playground of Paikpara near Rishipara in Ward 18 0.000   0.000 0 23/07/2026 Detailed Design is ongoing. A new site for the community center is selected. New place location: Dhono Kunda Water Pump attached land at ward no-8. (Siddirgonj Zone)
2 NCC-OI-2 Construction of Nabiganj Community Center and Restoration of Nabiganj water body in Ward 24. 0.000   0.000 0 23/07/2026 Detailed Design is ongoing. A new site for the community center is selected. New place location Pakpanjaton mosque front road attached opposite land at ward no.23 (Kadam Rasul Zone)
3 NCC-WS-3 Regeneration and Rehabilitation of Existing 12 Production Tube Well (PTW) at Ward- 10, 11, 12, 14, 17, 18, 20 & 22 in NCC 0.000   0.000 0 23/07/2026 The final list of 12 PTWs was sent by NCC to PMU. Site visit completed. Survey work is in progress. DED Ongoing.
4 NCC-WS-2 Installation of production tube well (PTW) at Ward-4 (Part), Ward-11, Ward-15, Ward-18, Ward-22 & Ward-23 in different zones under NCC 2138.126 Prime Engineering (Address: Ta 39/1, Gulshan Link Road, Middle Badda, Dhaka 1212) 2138.126 01/04/2026 30/09/2027 6 23/07/2026 Test boring 4 nos completed & soil Samples collected, 2 Nos Test boring running
5 NCC-WS-1 Installation of production Tube Well (PTW) at Ward-4 (Part), Ward-9, Ward-10, Ward-17, Ward 18, Ward-20, Ward-21, Ward-22 & Ward-25 in different Zones Under NCC 1532.263   1532.263 0 23/07/2026 Tender Opened on 13 April, 2026. Now under evaluation by NCC. Single tender dropping. Prime Engineering, Quoted Amount:165064036.086 Provisional sum=7398387.00,Total amount =172462423.086 12.553% above Salek solar power ltd. (Writ petition no. 2140 0f 2026 attached herewith)
6 NCC-SWM-2 Improvement landfill site in Alamin-Nagar 942.428 Turn (Address: Holding 6/1/A, 29 Ring Road, Shyamoli, Dhaka-1207) 942.428 01/04/2026 30/09/2027 6 23/07/2026 NoA Issued on 8th January, 2026, and the contract agreement was signed on 2nd March 2026. Labour shed completed. Mobilization on going.
7 NCC-SWM-1 Development of new landfill site in Jalkuri 5295.027   5295.027 0 23/07/2026 Sent to the Ministry of Land for land acquisition. PMU sent the Design, Drawing, and Cost Estimate to NCC for review and approval.
8 NCC-OI-1 Construction of Ali Ahmed Chunka Public Place and Playground 1761.239 FSL-SJC JV 1761.239 22/01/2025 09/07/2026 40 23/07/2026 1.78 nos pile (North side), 49 nos pile (South side), Total 127 nos pile casting completedfor Retaining wall. 2. Boundary wall ( North side) casting Upto grade beam completed =102m 3. Drain= 65.5m (E-W) 4. Drain 38.5m (N-S Direction) 5. Wash block, Top slab & Floor Casting completed 6. Water reserve & Septic tank completed 7. Pile integrity test. done. pile cap 17 nos completed 8. Padestrian bridge pile 18nos casting completed 9. Retaining wall pile cap 17 nos casting completed
9 NCC-D-2 Construction of RCC drain in West side of Bangabandhu road with footpath 2191.869 M/S Ali Enterprise & Al Amin Traders (JV) 2191.869 18/06/2024 24/06/2025 77 23/07/2026 Curve stone & Soucer drain setting on going RCC Box culvert by the railway (Deposit work money deposit) 1. Challan no- 2526-004571211511,date:2.4.2026,amount:1,18,41,875.44 2..Challan no- 2526-00486297731, date:19.4.2026,amount:54,02855.00 letter issued date: 22.4.2026
10 NCC-D-1 Construction of RCC drain in East side of Bangabandhu road with footpath Part A - i) Bangabandhu Road D-1 (Ch.0+000 to Ch.0+320 km) ii) Pressclub Road D-1 (Ch.0+920 km to Ch.1+045 km ) iii)Bangabandhu Road D-1 (Ch.0+320 to 0+345 km) iv) Amlapara Road D-1 (Ch.0+010 to 0+500 km ): Part B - i) Bangabandhu Road D-1 (Ch.0+345 to Ch.0+595 km) ii) Shayastakhan Road D-1 (Ch.0+016 to 0+400 km) iii) Bangabandhu Road D-1 (Ch.0+595 to Ch. 0+950 km) iv) Bangabandhu Road D-1 (Ch.1+010 to Ch.2+010 km) 1978.745 M/S Ripa Construction & Binoy Traders (JV) 1978.745 18/08/2024 10/02/2026 79 23/07/2026 Curve stone & Soucer drain setting is ongoing
Total : 0.0000 (Km) 15839.70 (Lac) 15839.70 (Lac)