1
|
GCC-WS-1
|
Installation of Production Tube well and water distribution system in Zone 3.
|
|
772.696
|
|
772.696
|
|
|
0
|
23/07/2026
|
Tender Evaluation validity period expired. There is a probability of being retendered.
|
|
2
|
GCC-SWM-2
|
Improvement of collection, transportation and disposal site at Gazipur area of Gazipur City Corporation (GCC)
|
|
0.000
|
|
0.000
|
|
|
0
|
23/07/2026
|
Drawing, Design, and Cost Estimate submitted to PMU on 23 May 2026
|
|
3
|
GCC-D-4
|
RCC drains from Dhaka-Mymensingh road Chandana Chowrasta to Turag River
|
|
2153.895
|
|
2153.895
|
|
|
0
|
23/07/2026
|
Tender in Live!
|
|
4
|
GCC-WS-2
|
Installation of Production Tube well and water distribution system in Zone 7, Zone 8
|
|
3388.461
|
FSL-SJC-JV
|
3388.461
|
07/07/2025
|
11/11/2026
|
14
|
23/07/2026
|
Test boring was ongoing.
Previously, a case was filed. Later on 25/01/2026, it was dismissed from the High Court Division. Now, as soon as possible, the work will restart.
|
|
5
|
GCC-SWM-1
|
Improvement of collection, transportation and disposal site at Tongi area of Gazipur City Corporation (GCC).
|
|
220.269
|
|
220.269
|
|
|
0
|
23/07/2026
|
Under Tendering process.
|
|
6
|
GCC-RB-3
|
Construction of Kashimpur - Naojor Road
|
0.9080
|
2284.528
|
|
2284.528
|
|
|
0
|
23/07/2026
|
DED Ongoing, Drawing and cost estimate are anticipated to be submitted to PMU in 1st week of June 2026.
|
|
7
|
GCC-RB-2
|
Construction of Kashimpur - Naojor Connecting Bridge over Turag River
|
|
10980.547
|
|
10980.547
|
|
|
0
|
23/07/2026
|
Regarding Land Acquisition, the ULB obtained NOCs from the Gazipur Development Authority, the DOE, and the Department of Urban Development. Already sent the letter.
Tender Evaluation ongoing.
|
|
8
|
GCC-RB-1
|
Construction of Overpass near Joydebpur Railway Station
|
|
23699.282
|
|
23699.282
|
|
|
0
|
23/07/2026
|
Drawing, Design, and Cost estimate submitted to PMU on 30 Sep 2025. JICA review is completed, and A revised cost estimate is also completed.
There was a technical meeting on non-scheduled items on 12 May, 2026.
Land Acquisition Status (The land acquisition file is now in the DC office, awaiting a joint visit. NOC from the Roads & Highway Department, BRRI, and Bangladesh Railway is due.
|
|
9
|
GCC-D-3
|
Construction of RCC Drains
1) Inner Bari Road & Jhajhor Road to Bottola Road & Basura Road (North); i)Basura by-pass (Inner bari mor) to Pucca bridge of Inner Bari Road. (Ch.0+000 to 0+768 m). ii)Jhajhor by-pass (Jhajhor mor) to Pucca Bridge of Jhajhor Road. (Ch. 0+000 to 1+200 m).
2) From Jhajhor Bypass to Jhajhor Bypass (South); i)Morian by-pass to Morian Purbapara bridge (Ch.0+000 to 0+398 m) ii)Morian mor to Morian bridge (0+000 to 0+690 m).
|
|
1612.123
|
Al-ME JV
|
1612.123
|
12/09/2024
|
15/01/2026
|
83
|
23/07/2026
|
PCC Casting=2950m, Base Casting =2950m, wall casting=2950m, Top slab casting=2925m sub base=1500m
|
|
10
|
GCC-D-2
|
RCC drains from Mirrer Bazar to Nondibari Road (Across a railway)
i) Construction of Drain of Shikder Bari Road From Ch.0+000 km ~ 0+440 km ii) Construction of Drain of Kosaybari Road From Ch 0+000 km~ 0+320 km iii) Construction of Drain of Connecting road between Kosaybari road to Mirrer Bazar-Nondibari Road From Ch. 0+000 km ~ Ch. 0+380 km iv)Construction of Drain of Mirrer Bazar to Nondibari Road from Ch.0+340 km~ Ch.1+780 km
|
|
1551.093
|
M.N Enterprise
|
1551.093
|
05/12/2024
|
22/02/2026
|
81
|
23/07/2026
|
PCC Casting=2200m, Base Casting =2180m, wall casting=2150m, Top slab casting=2150m
|
|
11
|
GCC-D-1
|
Construction of RCC drain from Dhaka Mymensingh Highway to Turag River
i) Squibe road start from Dhaka Mymensingh Highway to Turag river from Ch.0+100 km to 1+882 km. ii)Link Connecting Safiuddin Road and College Road-College Road from Ch.0+000 km to 0+340 km. iii) Sultana Razia road start from Dhaka Mymensingh Highway to College Road Ch. 0+000 km to 0+316 km. iv) Link connecting Moktarbari road and Safiuddin Road-Safiuddin Road-Link connecting Safiuddin Road College Road-Link connecting College Road to Surtaranga road from Ch.0+000 km to 0+734 km. v) Surtaranga Road-Link connecting Surtaranga Road and Squibe road from Ch.0+000 km to 0+502 km.
|
|
4025.662
|
SEPL-SBL JV
|
4025.662
|
24/11/2025
|
09/02/2027
|
14
|
23/07/2026
|
PCC Casting=200m, Base Casting =150m, wall casting=150m, Top slab casting=140m
|