Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bhaluka
1 MGSP/BLK/2015-16/W-02 (a) Construction of RCC drain with footpath & street light (Both side of Bhaluka- Gafforgaon road) starting from Dhaka-Mymensing highway to eastern end of Bhaluka pourashava, Mymensingh. ( Total Length = 813.00 m). (b) Supplying, fitting & fixing of street light starting from Dhaka-Mymensingh highway to eastern end of Bhaluka pourashava. Ch.0+000 to 1+045m). 1.8580 18153562.000 N H Enterprise 18153562.000 11/12/2016 10/12/2017 30 27/09/2017  
2 MGSP/BLK/W-01 a) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Dhaka -Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.00-2150m) (Total Length: 2150m.) b) Construction of RCC Surface drain beside at the BC road starting from Dhaka –Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.800-875 & Ch. 1500-1575m) (Total Length: 150m.) c) Construction of RCC Retaining wall & Brick Guide wall beside at the BC road starting from Dhaka–Mymensingh highway near Bhaluka Degree College to Bhaluka Bazar via Bhanadabo moor, Upazila Health Complex & truma center. (Ch.1600-1680 Retaining wall & Ch. 700-850m Brick Guide wall) (Total Length: 230m.) d) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Dhaka -Mymensingh Highway near Russel Spening Mills to Labu Member house ward no-9. (Ch.00-570m) (Total Length: 570m.) e) Development of road with bituminous carpeting starting from Panch Rasta moor to S.R Office Ch. 00-440m, & 118m Link road (PDB Office road) at Bhaluka Bazar (Total Length: 600m.) f) Improvement of road with RCC casting starting from Bhaluka S.R Office road (Kitchen market moor) Kitchen market (Ch.00-190m) (Total Length: 190m.) g) Improvement of road by bituminous carpeting (With X-darin & Brick Palisading) starting from Bhaluka -Gafforgoan highway near Fire Service moor to Bhaluka -Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School . (Ch. 00-1800m) (Total Length: 1800m.) h) Construction Surface drain beside at the road starting from Bhaluka-Gafforgoan highway near Fire Service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School (Ch. 700-800m & Ch. 950-1200m) (Total Length: 350m.) i) Construction of RCC Retaining wall beside at the road starting from Bhaluka-Gafforgoan highway near Fire Service moor to Bhaluka-Berunia road via Bhaluka Fazil Madrasha & Purba Bhaluka Primary School (Ch. 840-900m) (Total Length: 60m.) 6.1000 48701006.000 M/S Niaz Traders 48701006.000 05/05/2015 16/07/2016 97 27/09/2017  
2 Trishal
1 MGSP/TRI/2015-16/W-02 (a) Construction of RCC Cover Slab on Existing Drain beside from Lalus Shop to Dhaka- Mymensingh Highway Road (Comissioner Road) Ch: 0.00-600 m with Drain (Nupur Chinema Hall Road) Ch : 0.00-112.00 m Under Trishal Pourashava, Mymensingh. (Total length of cover slab = 1048 m and drain = 112 m) 1.0480 6392603.000 Md. Jahangir Alam 6392603.000 15/09/2016 11/06/2017 93 27/09/2017  
2 MGSP/TRI/W-01 a) Construction of Commissioner road by Bitumenous carpeting from Mr Lalu's shop to Dhaka-Mymensingh highway at ward No-4,5,6 under Trishal Pourashava. (Ch 0+00-0+960 m). (Total Length: 960m) b) Construction of Both side RCC drain beside Commissioner road to Dhaka-Mymensingh highway.at ward No-4,5,6 under Trishal Pourashava (Ch 0+00-0+600 m). (Total Length: 1275m) c) Improvement of Fishary road by Bitumenous carpeting work at ward no-8 under Trishal Pourashava. (Ch 0+000-1+165 m). (Total Length: 1165m) d) Construction of Road side drain starting from Shamuddin road to Main road via Hindu polly Dhanikhola road by RCC (Ch 248.00-511.00m =263.00m, & Link Ch 00-291.00m=291.00m, By Link-1 Ch.00-89.00m=89.00m, By Link-2 Ch. 00-20.70m=20.70m) (Total Length: 663.70m) e) Improvement of road from Trishal Nazrul Museum to Fulbaria road by Bitumenous carpeting at ward No-01 under Trishal Pourashava. (Ch 0+00-0+800 m). (Total Length: 800m) 4.8637 47443434.000 UDC-SRS (JV) 47443434.000 29/03/2015 31/05/2016 100 27/09/2017 Completed
Total : 13.8697 (Km) 120690605.00 (Lac) 120690605.00 (Lac)