SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Alfadanga
|
|
1
|
GFRIDP-II/F/17-18/VR-HR/501
|
Improvement by HBB on Digholbana Beribadh to Nodir Ghat road via Kala Member house road (DPP Name: Digholbana H/O Sona Mia to river ghat road) from Ch: 0.00- 686.00m under Alfadanga Upazila, Dist. Faridpur
|
0.6860
|
24.794
|
‡gmvm© Avi †K †UªWvm©, †evqvjgvix, dwi`cyi|
|
24.794
|
07/11/2018
|
06/06/2019
|
10
|
10/02/2019
|
|
|
2
|
GFRIDP-II/F/17-18/VR-BR/454
|
Improvement of Gopalpur GC- Bakjuri Kheyaghat Pucca road- Panail bazar Chapulia GPS road from Ch: 2000.00 – 2800.00m by BC under Alfadanga Upazila, Dist. Faridpur
|
0.8000
|
44.798
|
‡gmvm© Gm we †UªWvm©, eªvþbKv›`v, m`i, dwi`cyi|
|
44.798
|
17/05/2018
|
16/12/2018
|
70
|
10/02/2019
|
|
|
3
|
GFRIDP-II/F/16-17/VR-BR/423
|
Improvement of Titurkandi Kobad House - Komortia Motin Mollah House road from Ch: 00.00m -1000.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
1.0000
|
56.748
|
‡gmvm© Kvgiæj G›UvicÖvBR, fvsMv iv¯Ívi †gvo, dwi`cyi|
|
56.748
|
10/04/2017
|
30/05/2018
|
65
|
10/02/2019
|
28 w`‡bi †bvwUk †`qv n‡q‡Q|
|
|
4
|
GFRIDP-II/F/16-17/VR-SR/422
|
Construction of Double Vent (2x4.30x4.30m road way 3.66) RCC Box Culvert on Barankhola via Panipara H/O Salim Miah road at Ch: 1500.00m (Jangalia Khal) Buraich Union under Alfadanga Upazila, Dist. Faridpur.
|
|
0.000
|
|
0.000
|
|
|
0
|
10/02/2019
|
wcAvBI Awdm KZ…©K D° ¯â€™v‡b KvjfvU©wU wbg©vY Kiv n‡q‡Q| weavq ¯â€¹xgwU evwZj Kiv cÖ‡qvRb|
|
|
5
|
GFRIDP-II/F/16-17/VR-BR/421
|
Improvement of Kamargram Bridge- Mridhabari Bridge road from Ch: 1000.00m -1871.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
0.8710
|
40.491
|
‡gmvm© Kvgiæj G›UvicÖvBR, fvsMv iv¯Ívi †gvo, dwi`cyi|
|
40.491
|
10/04/2017
|
25/09/2017
|
0
|
10/02/2019
|
|
|
6
|
GFRIDP-II/F/16-17/VR-BR/420
|
Improvement of Mithapur- Jhatigram road from Ch: 1500.00m -4460.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
2.9600
|
163.993
|
gvmyg BwÄwbqvm©, Avjxcyi, dwi`cyi|
|
163.993
|
29/03/2017
|
27/09/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/F/16-17/VR-BR/419
|
Improvement of Berir Hat- Charjhama Khey Ghat via Porchim Chandradia (Dhuljuri Bridge- Jama Kheyghat) road from Ch: 1620.00m -3873.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
2.2500
|
120.376
|
gvmyg BwÄwbqvm©, Avjxcyi, dwi`cyi|
|
120.376
|
29/03/2017
|
27/09/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
8
|
GFRIDP-II/F/16-17/VR-BR/418
|
Improvement of Dighol- Bana road from Ch: 0.00m - 650.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
0.6500
|
39.990
|
‡gmvm© Kvgiæj G›UvicÖvBR, fvsMv iv¯Ívi †gvo, dwi`cyi|
|
39.990
|
10/04/2017
|
30/06/2018
|
100
|
10/02/2019
|
|
|
9
|
GFRIDP-II/ F /15-16/ VR-BR /404
|
Improvement by BC on Hidadanga Sluice Gate-Panipara H/O Basher Mia Jame Mosque road at Ch.:00.00m-1010.00m under Alfadanga Upazila, Dist. Faridpur.
|
1.0100
|
52.670
|
‡gmvm© RvbÅ“vZ †óvi, c~e©Lvevmcyi, dwi`cyi|
|
52.670
|
08/11/2016
|
07/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
10
|
GFRIDP-II/ F /15-16/ VR-BR /402
|
Improvement by BC on Kamargram High School (Kabir Mollah House)-Middle of Chandra Nurani Madrash ending point of Beriband road at Ch.:00.00m-500.00m under Alfadanga Upazila, Dist. Faridpur.
|
0.5000
|
23.688
|
‡gmvm© Zvmv G›UvicÖvBR, fvwUjÿxcyi, dwi`cyi|
|
23.688
|
08/11/2016
|
07/03/2017
|
100
|
10/02/2019
|
Final Bill paid, Sal: 1,97,271.00
|
|
11
|
GFRIDP-II/F/15-16/VR-SR/376
|
Construction of 39.00m long RCC girder Bridge on Barasia river road Through Krishnopur under Tagarbad union at Ch: 0.00m under Alfadanga Upazila, Dist. Faridpur
|
|
188.358
|
‡gvt †iRvDj Kwig, bMiKv›`v, dwi`cyi|
|
188.358
|
16/08/2017
|
30/11/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
12
|
GFRIDP-II/F/15-16/VR-BR/374
|
Improvement of Bakail Mazed house to Bakail Sosodhor Mondol house (Kamarbari Bridge BC road - Pagoler Astana BC road from Ch: 0.00 - 1230.00m by BC under Alfadanga Upazila, Dist. Faridpur
|
1.2300
|
69.807
|
†gmvm© Gg Gj †Nvl GÛ mÝ, †MvqvjRvUg, dwi`cyi|
|
69.807
|
28/04/2016
|
27/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
13
|
GFRIDP-II/F/14-15/VR-BR/319
|
Improvement of Alfadanga Dakbangla to Bhatiapara GC road from Ch. 0.00m- 330.00m by BC under Alfadanga Upazila, Dist. Faridpur.
|
0.3300
|
16.231
|
‡gmvm© BKevj GÛ eªv`vm©, Avjxcyi, dwi`cyi|
|
16.231
|
24/12/2015
|
23/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
14
|
GFRIDP-II/F/14-15/VR-HR/261
|
Improvement of Charkatlasur GPS- Pobonbag BC road via Mondir road from Ch. 00m- 1500m by HBB under Alfadanga Upazila, Dist. Faridpur.
|
1.5000
|
38.990
|
‡gmvm© wiqv GÛ mÝ, nv‡ovKvw›`, dwi`cyi|
|
38.990
|
11/08/2015
|
10/04/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
15
|
GFRIDP-II/ F/15-16/VR-BR/162
|
Improvement of Kamargram High school - Kuldhor Wapda Dam road from ch.0.00m-1000.00m by BC,
|
1.0000
|
17.938
|
mv‡ne m‡ivqvi, AvjvDwÏb Lvb moK, Avjxcyi, dwi`cyi|
|
17.938
|
10/11/2016
|
10/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
16
|
GFRIDP-II/10-11/VR-BR/41
|
Improvement of Barankula via Panipara (H/O Salim Miah) road from ch.0.00m-1000.00m by BC.
|
1.0000
|
35.577
|
Ms Molla Traders Faridpur
|
35.577
|
23/03/2011
|
23/06/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
17
|
GFRDIP-II/10-11/ VR-BR/13
|
Improvement of Panail Purbapara Jamemosque - Satbaria road from ch. 0.00m -1000m by BC .
|
1.0000
|
34.579
|
Md Siddiqur Rahman Faridpur
|
34.579
|
06/02/2011
|
05/05/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
18
|
GFRDIP-II/10-11/ VR-BR/11
|
Improvement of Panail post office - United Academy road from ch. 0.00m - 500m by BC.
|
0.5000
|
18.471
|
Md Sarfat Mia Faridpur
|
18.471
|
06/02/2011
|
05/04/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
2
|
Bhanga
|
|
1
|
GFRIDP-II/F/16-17/VR-HR (Maint)/49
|
Maintenance of Maligram to Nayan Bazar via Digholkanda road from Ch: 00.00m- 970.00m by HBB under Bhanga Upazila, Dist. Faridpur
|
0.9700
|
12.951
|
Ms Samia Enterprise
|
12.951
|
27/04/2017
|
05/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
2
|
GFRIDP-II/F/16-17/VR-BR (Maint)/48
|
Maintenance of Brammankanda to Nazirpur Khakanda RHD road from Ch: 00.00m- 1000.00m by BC under Bhanga Upazila, Dist. Faridpur
|
1.0000
|
16.318
|
Ms Iqbal & Brothers Faridpur
|
16.318
|
30/04/2017
|
29/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
3
|
GFRIDP-II/F/16-17/VR-BR (Maint)/47
|
Maintenance of Laxmipur Bazar (Bapari bari) to Laxmipur Embankment road from Ch: 00.00m- 620.00m by BC under Bhanga Upazila, Dist. Faridpur
|
0.6200
|
21.541
|
Johora Construction Faridpur
|
21.541
|
27/04/2017
|
16/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/16-17/VR-HR (Maint)/46
|
Maintenance of Tulshighata to Gongadhordi road from Ch: 00.00m- 2570.00m by HBB under Bhanga Upazila, Dist. Faridpur
|
2.5700
|
16.958
|
Ms Rasmoni cConstruction Faridpur
|
16.958
|
27/04/2017
|
16/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
5
|
GFRIDP-II/F/15-16/VR-BR (Maint)/45
|
Maintenance By BC on Balia- Manikdi bazar road from Ch. 00.00- 760.00m under Bhanga Upazila, Dist. Faridpur
|
0.7600
|
29.017
|
Md Rezaul Karim Faridpur
|
29.017
|
21/07/2016
|
19/02/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
6
|
GFRIDP-II/F/15-16/VR-BR (Maint)/44
|
Maintenance By BC on Balichara Fish Landing- Balichara Madrasha road from Ch. 00.00- 770.00m under Bhanga Upazila, Dist. Faridpur
|
0.7700
|
25.950
|
A K M Akramuzzam Faridpur
|
25.950
|
26/07/2016
|
24/02/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/F/15-16/VR-HR(Maint)/43
|
Maintenance By HBB on Kalamridha bazar- Jungal road from Ch: 1000.00- 3050.00m under Bhanga Upazila, Dist. Faridpur
|
2.0500
|
33.003
|
A K M Akramuzzam Faridpur
|
33.003
|
26/07/2016
|
24/02/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
8
|
GFRIDP-II/F/15-16/VR-HR (Maint) /21
|
Maintenance work by HBB on Abdullahbad-Boro Polli road from Ch: 00.00m-1170.00m under Bhanga Upazila, Dist. Faridpur.
|
1.1700
|
5.445
|
Ms Nahar Enterprise
|
5.445
|
19/04/2016
|
17/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
9
|
GFRIDP-II/F/15-16/VR-HR (Maint) /20
|
Maintenance work by HBB on Shekpura-Pollibera road from Ch: 00.00m-1300.00m under Bhanga Upazila, Dist. Faridpur.
|
1.3000
|
5.824
|
Ms Rajmoni Construction Faridpur
|
5.824
|
31/03/2016
|
29/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
10
|
GFRIDP-II/F/15-16/VR-HR (Maint) /19
|
Maintenance work by HBB on Shekpura-Abdullahbad road from Ch: 00.00m-1300.00m under Bhanga Upazila, Dist. Faridpur.
|
1.3000
|
26.203
|
Johora Construction Faridpur
|
26.203
|
30/03/2016
|
29/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
11
|
GFRIDP-II/F/15-16/VR-BR (Maint)/18
|
Maintenance work by BC on Sonamukhi-Chatlerpar (Kalamridha Kumar Bari-Vasra GPS) road from Ch: 00.00m-2460.00m under Bhanga Upazila, Dist. Faridpur.
|
2.4600
|
39.512
|
Ms Nustrot Enterprise Faridpur
|
39.512
|
30/03/2016
|
29/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
12
|
GFRIDP-II/F/18-19/VR-HR/511
|
Improvement by HBB on Chumurdi (Bablatola) to Chumurdi bazar road from Ch. 0.00- 1200.00m under Bhanga Upazila, Dist. Faridpur
|
1.2000
|
61.828
|
|
61.828
|
|
|
0
|
10/02/2019
|
Tender under process
|
|
13
|
GFRIDP-II/F/17-18/VR-SR/508
|
Const. of 42.00m long PC Girder Bridge at Ch. 120.00m over Fukurhati river on Majikanda- Pandubi FWC road under Bhanga Upazila, Dist. Faridpur
|
|
351.198
|
Rafia Construction Faridpur
|
351.198
|
02/07/2018
|
20/06/2019
|
50
|
10/02/2019
|
|
|
14
|
GFRIDP-II/F/17-18/VR-BR/499
|
Improvement by BC on Fukurhati- Hamirdi Busstand road (Hamirdi high school- Hamirdi Purbopara Madrasha Bridge via Babu Khondaker road) from Ch: 00.00- 1000.00m under Bhanga Upazila, Dist. Faridpur
|
1.0000
|
68.652
|
Md Atiar Rahman Faridpur
|
68.652
|
11/11/2018
|
25/04/2019
|
0
|
10/02/2019
|
|
|
15
|
GFRIDP-II/F/17-18/VR-HR/498
|
Improvement by HBB on Laskerdia – Shorifabad road from Ch: 2502.00- 2800.00m under Bhanga Upazila, Dist. Faridpur
|
0.2900
|
18.321
|
Md Atiar Rahman Faridpur
|
18.321
|
11/11/2018
|
25/01/2019
|
35
|
10/02/2019
|
|
|
16
|
GFRIDP-II/F/17-18/VR-SR/484
|
Construction of 39.00m long RCC Girder bridge at Ch: 3200.00m on Kalamridha bazar to Jangal road under Bhanga Upazila, Dist. Faridpur
|
|
342.495
|
Ms Anowara Construction Madaripur
|
342.495
|
13/06/2018
|
27/06/2018
|
65
|
10/02/2019
|
|
|
17
|
GFRIDP-II/F/17-18/VR-SR/466
|
Construction of 3-vent Box culvert (3x4.00x4.50m) on Pulia Bus Stand- Goaildia GCR road at Ch: 500.00m under Bhanga Upazila, Dist. Faridpur
|
|
33.683
|
Ms Samia Enterprise
|
33.683
|
17/04/2018
|
16/01/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
18
|
GFRIDP-II/F/17-18/VR-SR/461
|
Construction of 30.00m long RCC Girder Bridge at Ch: 2330.00m on Maligram to Mokarram Potti road under Bhanga Upazila, Dist. Faridpur
|
|
178.812
|
Md Imtiaz Asif Faridpur
|
178.812
|
15/08/2018
|
14/05/2019
|
30
|
10/02/2019
|
|
|
19
|
GFRIDP-II/F/16-17/VR-HR/435
|
Improvement of Pulia to Chandra Bazar road from Ch: 1000.00m- 2095.00m by HBB under Bhanga Upazila, Dist. Faridpur
|
1.0950
|
42.528
|
Md Alauddin Enterprise Faridpur
|
42.528
|
19/10/2017
|
18/07/2018
|
100
|
10/02/2019
|
Final bill paid
|
|
20
|
GFRIDP-II/F/16-17/VR-HR/431
|
Improvement of Hazrakanda to Rajeshawadi via Molla para road from Ch: 00.00m to 1024.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0240
|
39.073
|
Md Atiar Rahman Faridpur
|
39.073
|
17/04/2017
|
16/10/2017
|
100
|
10/02/2019
|
28 w`‡bi †bvwUk †`qv n‡q‡Q|
|
|
21
|
GFRIDP-II/F/16-17/VR-HR/430
|
Improvement of Jandi Rail way Embankment road from Ch: 00.00m to 1085.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0850
|
40.979
|
Md Atiar Rahman Faridpur
|
40.979
|
17/04/2017
|
16/10/2017
|
100
|
10/02/2019
|
Final Bill Paid
|
|
22
|
GFRIDP-II/F/16-17/VR-HR/429
|
Improvement of Loskordia to Sharifabad road from Ch: 1480.00m to 2502.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0200
|
46.218
|
Md Atiar Rahman Faridpur
|
46.218
|
17/04/2017
|
16/10/2017
|
100
|
10/02/2019
|
Final Bill Paid
|
|
23
|
GFRIDP-II/F/16-17/VR-HR/425
|
Improvement of Goaldi Khandaker Bari Mosjid - H/O Raleb Mia- Goaldi Rob Member Bari road (Pulia Bus stand -Goaldi GC road) from Ch: 00.00m - 954.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.9540
|
36.294
|
Md Atiar Rahman Faridpur
|
36.294
|
29/03/2017
|
27/09/2017
|
100
|
10/02/2019
|
Final bill paid
|
|
24
|
GFRIDP-II/F/16-17/VR-BR/424
|
Improvement of Tulshighata- Manikdah UP road from Ch: 1000.00m - 1767.00m by BC under Bhanga Upazila, Dist. Faridpur
|
0.7670
|
38.957
|
Shah Md Istiak Arif Faridpur
|
38.957
|
06/04/2017
|
05/10/2017
|
100
|
10/02/2019
|
Sal. Tk. 2,40,892.00 Final Bill paid
|
|
25
|
GFRIDP-II/F/15-16/VR-HR/407
|
Improvement of Kalamridha Bazar to Jangal Road from Ch: 0.00- 1000.00m by BC under Bhanga Upazila, Dist. Faridpur
|
1.0000
|
65.459
|
A K M Akramuzzam Faridpur
|
65.459
|
26/07/2016
|
25/03/2017
|
100
|
10/02/2019
|
|
|
26
|
GFRIDP-II/ F /15-16/ GC /401
|
Development of Lochongonj Bazar under Bhanga Upazila, Dist. Faridpur .
|
|
40.780
|
Ms Tasa Enterprise Faridpur
|
40.780
|
16/10/2016
|
15/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
27
|
GFRIDP-II/ F /15-16/ GC /400
|
Development of Shimul Bazar under Bhanga Upazila, Dist. Faridpur .
|
|
28.255
|
Ms Jannat Store Faridpur
|
28.255
|
16/10/2016
|
15/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
28
|
GFRIDP-II/ F /15-16/ GC /399
|
Development of Pathrail Dighirpar Bazar under Bhanga Upazila, Dist. Faridpur .
|
|
35.737
|
Ms Jannat Store Faridpur
|
35.737
|
16/10/2016
|
15/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
29
|
GFRIDP-II/ F /15-16/ VR-SR /398
|
Construction of 2 Vent-4.50x4.50m RCC Box Culvert over Khal on Attra Vasra Bridge-Vasta road at Ch: 150.00m under Bhanga Upazila, Dist. Faridpur
|
|
23.380
|
A K M Akramuzzam Faridpur
|
23.380
|
01/10/2016
|
29/09/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
30
|
GFRIDP-II/ F /15-16/ VR-SR /397
|
Construction of 2 Vent-4.50x4.50m RCC Box Culvert over Khal on Hazrakanda-Rajeswardi via Molla Para road at Ch: 232.00m under Bhanga Upazila, Dist. Faridpur
|
|
23.151
|
Golam Munsur Nannu Faridpur
|
23.151
|
10/10/2016
|
28/03/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
31
|
GFRIDP-II/ F /15-16/ VR-SR /396
|
Construction of 2 Vent-4.50x4.50m RCC Box Culvert over Khal on Hazrakanda-Rajeswardi via Molla Para road at Ch: 827.00m under Bhanga Upazila, Dist. Faridpur.
|
|
23.358
|
Seik Abdul Jalil Faridpur
|
23.358
|
21/07/2016
|
18/03/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
32
|
GFRIDP-II/ F /15-16/ VR-HR /395
|
Improvement by HBB on Vasra Mosque-Asrayon Prokolpo via Nayakanda road at Ch.:1950.00m-2800.00m under Bhanga Upazila, Dist. Faridpur
|
0.8500
|
29.977
|
A K M Akramuzzam Faridpur
|
29.977
|
30/10/2016
|
29/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
33
|
GFRIDP-II/F/15-16/VR-BR/394
|
Improvement by BC on Bakpura Bazar- H/O Yusuf Matubber via Bakpura GPS road from Ch: 00.00m- 1700.00m under Bhanga Upazila, Dist. Faridpur
|
1.7000
|
98.232
|
A K M Akramuzzam Faridpur
|
98.232
|
02/08/2016
|
|
100
|
10/02/2019
|
Final Bill paid
|
|
34
|
GFRIDP-II/F/15-16/VR-HR/368
|
Improvement of Lochongonj bazar - Kawlibera UP road from Ch: 0.00m -900.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.9000
|
25.899
|
Johara Construction Faridpur
|
25.899
|
26/04/2016
|
25/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
35
|
GFRIDP-II/F/15-16/VR-HR/367
|
Improvement of Bakpura - Barra road from Ch: 0.00m -1000.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0000
|
35.533
|
Ms Alauddin Enterpris Faridpur
|
35.533
|
28/04/2016
|
27/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
36
|
GFRIDP-II/F/15-16/VR-HR/366
|
Improvement of Tulshi ghata to Gangadhardi road from Ch: 2570.00m -3200.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.6300
|
19.079
|
Johara Construction Faridpur
|
19.079
|
26/04/2016
|
25/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
37
|
GFRIDP-II/F/15-16/VR-HR/364
|
Improvement of Maligram Nayan bazar- Dighalkanda road from Ch: 1000.00m -1800.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.8000
|
23.925
|
Md Rezaul Karim Faridpur
|
23.925
|
20/04/2016
|
19/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
38
|
GFRIDP-II/F/17-18/VR-SR/363
|
Construction of 2x4.5x4.5m RCC Box Culvert at Ch: 1470.00m over khal on Maligram Nayan bazar Dighalkanda road under Bhanga Upazila, Dist. Faridpur.
|
|
31.287
|
|
31.287
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
39
|
GFRIDP-II/F/15-16/VR-HR/362
|
Improvement of Chara Vita - Abdullabad near Amzad Chowkider Mor road from Ch: 1000.00m - 2000.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0000
|
42.318
|
Md Rezaul Karim Faridpur
|
42.318
|
20/04/2016
|
17/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
40
|
GFRIDP-II/F/14-15/VR-SR/320
|
Const. of 2x4.50x4.50 RCC Box culvert over khal at ch. 90m on Sawther Shaha Fakirbari- Shajahan Khalifar bari under Bhanga Upazila, Dist. Faridpur
|
|
24.547
|
Ms Kamrul Enterprise Faridpur
|
24.547
|
26/10/2016
|
24/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
41
|
GFRIDP-II/F/14-15/VR-HR/303
|
Improvement of Dolkunddi- Dewra road from Ch. 00.00m- 1467.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.4670
|
50.299
|
Ms Bulbul Enterprise Faridpur
|
50.299
|
14/12/2015
|
13/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
42
|
GFRIDP-II/F/14-15/VR-HR/301
|
Improvement of Vasra Mosque- Asraon Prokolpo via Naiakanda road from Ch. 690.00m- 1710.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0200
|
33.001
|
Om Enterprise Faridpur
|
33.001
|
14/12/2015
|
13/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
43
|
GFRIDP-II/F/14-15/VR-BR/227
|
Improvement of Atadi- Kawlebera road from ch. 2810- 3780m by BC (Remaining work) under Bhanga Upazila, Dist. Faridpur
|
0.9700
|
33.996
|
A K M Akramuzzam Faridpur
|
33.996
|
17/06/2015
|
08/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
44
|
GFRIDP-II/F/14-15/VR-BR/219
|
Improvement of Brahmnpara - Patrail road by BC from Ch.2180m - 3550m under Bhanga Upazila,Faridpur. Road ID No. 329104018,(Remaining Work)
|
1.3700
|
29.121
|
Setu Contruction Faripdpur
|
29.121
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
45
|
GFRIDP-II/F/14-15/VR-BR/218
|
Improvement of Brahmnpara - Patrail road by BC from Ch.800m - 2180m under Bhanga Upazila,Faridpur. Road ID No. 329104018,(Remaining Work)
|
1.3800
|
35.872
|
Shahana Enterprise Faridpur
|
35.872
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
46
|
GFRIDP-II/F/14-15/VR-BR/211
|
Improvement of road Atadi - Kawlibera from Ch.00m - 1027m by BC under Bhanga Upazila, Faridpur. Road ID No. 329104031, (Remaining Work ).
|
1.0270
|
23.847
|
md Billal Hossain Faridpur
|
23.847
|
28/05/2015
|
26/12/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
47
|
GFRIDP-II/ F/13-14/VR-SR/179
|
Const. of 15.00m long RCC Girder Brigde on Paranpur (Balihati – Baisroshi road) – Khatra GPS via Munshi Bari road (Baisroshi- Lochongonj bazaar via Khatra GPS via Munshi Bari road) at ch. 1215.00m under Bhanga Upazila, Dist. Faridpur.
|
|
48.727
|
Ms Akash Enterprise Faridpur
|
48.727
|
19/01/2014
|
18/07/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
48
|
GFRIDP-II/ F/12-13/VR-HR/161
|
Improvement of Uttor Brahmankanda- Nazirpur road from ch. 1290.00m- 2300.00m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0100
|
28.600
|
Ms Rafia Construction Faridpur
|
28.600
|
29/09/2013
|
28/12/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
49
|
GFRIDP-II/F/ 11-12/VR-BR/132
|
Improvement of Brahmn para – Pathrail Road from Ch. 800.00m-2180.00m By BC & Const. of 3.00mX3.00m RCC Single Vent Box Culvert At Ch 1610m under Bhanga Upazila, Dist. Faridpur.
|
1.3800
|
54.935
|
Ms Mazumdar Faridpur
|
54.935
|
24/06/2012
|
23/04/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
50
|
GFRIDP-II/10-11/VR-HR/48
|
Improvement of West Bakpura BC road - Near the H/O N.H Khandaker up to Beel Chatal road (Nurullagonj UP West Bakpura Puucca road - H/O N.H Khandaker, Near the shop of Ensanuddin) from ch. 0.00m - 940m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.9400
|
21.180
|
Ms Tanim Enterprise Faridpur
|
21.180
|
15/02/2012
|
14/06/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
51
|
GFRIDP-II/10-11/VR-HR/47
|
Improvement of Paranpur (Baliahati- 22 Rosi road) - Khatra GPS via Munshibari road (22 Rosi - Lowchongonj bazar road from Paranpur-Khatra GPS via Khatra Munshibari road) from ch. 0.00m - 1215m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.2150
|
31.329
|
Ms Bristi Enterprise Faridpur
|
31.329
|
13/12/2011
|
12/04/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
52
|
GFRIDP-II/10-11/VR-HR/28
|
Improvement of Brammonkanda - Mashewardi road from ch. 2610m-3360m by HBB under Bhanga Upazila, Dist. Faridpur.
|
0.7500
|
22.360
|
Ms Sams Enterprise Faridpur
|
22.360
|
15/02/2012
|
14/06/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
53
|
GFRIDP-II/10-11/VR-HR/27
|
Improvement of Brammonkanda - Mashewardi road from ch. 1610m-2610m by HBB under Bhanga Upazila, Dist. Faridpur.
|
1.0000
|
27.788
|
md Nasir Uddin Faridpur
|
27.788
|
15/02/2012
|
14/06/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
54
|
GFRIDP-II/10-11/VR-HR/26
|
Improvement of Maligram - Noyan bazar road from ch. 2000m-3000m by HBB .
|
1.0000
|
31.117
|
Ms Mazumdar Faridpur
|
31.117
|
06/05/2014
|
05/09/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
3
|
Boalmari
|
|
1
|
GFRIDP-II/F/16-17/VR-HR (Maint)/60
|
Maintenance of Khorsuti Primary school to Khorsuti Bottola road from Ch: 00.00m- 980.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
0.9800
|
6.559
|
Ms Mridha Enterprise Faridpur
|
6.559
|
09/05/2017
|
08/11/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
2
|
GFRIDP-II/F/16-17/VR-BR (Maint)/59
|
Maintenance of Kamargram (Gunboha) to Dorihorihornagar via Chapuldanga Primary school road from Ch: 650.00m- 2150.00m by BC under Boalmari Upazila, Dist. Faridpur
|
1.5000
|
24.215
|
Ms Kamrul Islam Faridpur
|
24.215
|
11/05/2017
|
20/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
3
|
GFRIDP-II/F/16-17/VR-BR (Maint)/58
|
Maintenance of Thakurpur to Satoir road from Ch: 2780.00m- 4280.00m by BC under Boalmari Upazila, Dist. Faridpur
|
1.5000
|
14.988
|
Ms Rukeya Enterprise Faridpur
|
14.988
|
27/04/2017
|
15/10/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/16-17/VR-BR (Maint)/57
|
Maintenance of Babu Bazar to Durgapur road from Ch: 00.00m- 1998.00m by BC under Boalmari Upazila, Dist. Faridpur
|
1.9980
|
54.523
|
Ahmedia Basralay Faridpur
|
54.523
|
02/05/2017
|
01/11/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
5
|
GFRIDP-II/ F/15-16/VR-BR(Maint) /13
|
Maintenance work by BC on Shahasarial Bazar-Shahasarial Station road from Ch: 00.00m-1120.00m under Boalmari Upazila, Dist. Faridpur.
|
1.1200
|
28.199
|
Manir Hossain Faridpur
|
28.199
|
20/03/2016
|
19/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
6
|
GFRIDP-II/ F/15-16/VR-BR(Maint) /12
|
Maintenance work by BC on Mujurdia Ghat-Vatdi Bazar road from Ch: 00.00m-3000.00m under Boalmari Upazila, Dist. Faridpur.
|
3.0000
|
58.083
|
Ms Roy Enterprise Faridpur
|
58.083
|
22/03/2016
|
20/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/ F/15-16/VR-HR(Maint) /11
|
Maintenance work by HBB on More Clinic-Bondapasha via Kumrail Bottola road from Ch: 00.00m-1000.00m under Boalmari Upazila, Dist. Faridpur.
|
1.0000
|
8.869
|
Golam Munsur Nannu Faridpur
|
8.869
|
22/03/2016
|
21/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
8
|
GFRIDP-II/F/18-19/VR-BR/510
|
Remaining work by BC on Purba Vardi- Madhobpur road from Ch. 1925.00- 2250.00m under Boalmari Upazila, Dist. Faridpur
|
0.3250
|
10.110
|
|
10.110
|
|
|
0
|
10/02/2019
|
Tender under process
|
|
9
|
GFRIDP-II/F/17-18/VR-BR/490
|
Improvement of Kamdia Madrasha Mor (Tetulia) to Kadmi Mia bari road from Ch. 0.00m- 1000.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
1.0000
|
71.900
|
|
71.900
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
10
|
GFRIDP-II/F/17-18/VR-BR/489
|
Improvement of Dadpur to Ramnagar Embankment road from Ch. 0.00m- 2000.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
2.0000
|
128.639
|
|
128.639
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
11
|
GFRIDP-II/F/17-18/VR-BR/488
|
Improvement of Ajolbera Boroghat bazar to H/O Mojid Molla via H/O Khalil Patoari road from Ch. 0.00m- 900.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
0.9000
|
58.558
|
Md Lipu Enterprise Faridpur
|
58.558
|
03/10/2018
|
23/06/2019
|
10
|
10/02/2019
|
|
|
12
|
GFRIDP-II/F/17-18/VR-BR/487
|
Improvement of Aroakandi H/O Moslem Kazai to H/O Mozibor Sheikh via Dhopadanga Hasib Talukder road from Ch. 0.00m- 1000.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
1.0000
|
64.847
|
Md Lipu Enterprise Faridpur
|
64.847
|
03/10/2018
|
23/06/2019
|
60
|
10/02/2019
|
|
|
13
|
GFRIDP-II/F/17-18/VR-BR/486
|
Improvement of Charkandir Chator Primary school to H/O Lokman Mridha Mosque road from Ch. 0.00m- 1000.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
1.0000
|
64.890
|
Md Jakir Hossain Faridpur
|
64.890
|
05/11/2018
|
27/06/2019
|
0
|
10/02/2019
|
|
|
14
|
GFRIDP-II/F/17-18/VR-BR/485
|
Improvement of Taltola H/O Jamal Sheikh to Uttor Bahirdia H/O Rashad road from Ch. 0.00m- 800.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
0.8000
|
64.301
|
|
64.301
|
|
|
0
|
10/02/2019
|
Tender under process (New Rate)
|
|
15
|
GFRIDP-II/F /17-18/ VR-BR/472
|
Improvement by BC on Moyendia bazar to Saltha Boarder road from Ch: 00.00 - 560.00m under Boalmari Upazila, Dist. Faridpur
|
0.5600
|
15.522
|
|
15.522
|
|
|
0
|
10/02/2019
|
Eva. sent to H/Q
|
|
16
|
GFRIDP-II/F/17-18/VR-BR/471
|
Improvement by BC on Ramchandrapur bazar (St. from Bridge) to Rupapath UP road from Ch: 7118.00 - 8093.00m under Boalmari Upazila, Dist. Faridpur
|
0.9750
|
64.908
|
Md Jakir Hossain Faridpur
|
64.908
|
05/11/2018
|
27/06/2019
|
0
|
10/02/2019
|
|
|
17
|
GFRIDP-II/F/17-18/VR-BR/470
|
Improvement by BC on Dari Shasrail C&B to Shaikpara via Israfil house road from Ch: 00.00 - 1000.00m under Boalmari Upazila, Dist. Faridpur
|
1.0000
|
62.474
|
Setu Construction Faridpur
|
62.474
|
13/08/2018
|
25/04/2019
|
25
|
10/02/2019
|
|
|
18
|
GFRIDP-II/F/17-18/VR-BR/469
|
Improvement by BC on Shasrail rail station to Katagor H/O Rishi Kanto Master road from Ch: 00.00 - 750.00m under Boalmari Upazila, Dist. Faridpur
|
0.7500
|
49.185
|
Setu Construction Faridpur
|
49.185
|
13/08/2018
|
25/04/2019
|
20
|
10/02/2019
|
|
|
19
|
GFRIDP-II/F/17-18/BL-SR/467
|
Construction of Joynagar bazar Boat Landing Ramp (Ghatla) under Boalmari Upazila Dist. Faridpur
|
|
31.658
|
Zohara Construction Faridpur
|
31.658
|
13/08/2018
|
05/04/2019
|
0
|
10/02/2019
|
|
|
20
|
GFRIDP-II/F/17-18/VR-SR/462
|
Construction of 12.00m long RCC Girder Bridge at Ch: 2450.00m on Boyra Bamongati- Teljuri road under Boalmari Upazila, Dist. Faridpur
|
|
60.119
|
Zohara Construction Faridpur
|
60.119
|
13/08/2018
|
12/05/2019
|
0
|
10/02/2019
|
|
|
21
|
GFRIDP-II/F/17-18/GC-SR/451
|
Improvement of Madhobpur- Nagdi road from Ch. 0.00- 1000.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
1.0000
|
42.545
|
Ms Dipro Enterprise Faridpur
|
42.545
|
17/04/2018
|
16/11/2018
|
100
|
10/02/2019
|
Final Bill Paid
|
|
22
|
GFRIDP-II/F/17-18/GC-SR/450
|
Improvement of Chitter Bazar under Boalmari Upazila, Dist. Faridpur
|
|
22.117
|
Ms Lotus Enterprise Faridpur
|
22.117
|
27/06/2018
|
26/01/2009
|
100
|
10/02/2019
|
Final Bill Paid
|
|
23
|
GFRIDP-II/F/17-18/GC-SR/449
|
Improvement of Satoir Bazar under Boalmari Upazila, Dist. Faridpur
|
|
29.261
|
Ms Lotus Enterprise Faridpur
|
29.261
|
13/05/2018
|
25/10/2018
|
0
|
10/02/2019
|
Scheme drop proposal sent to H/Q (Due to land problem
|
|
24
|
GFRIDP-II/F/17-18/GC-SR/448
|
Improvement of Katagor Bazar under Boalmari Upazila, Dist. Faridpur
|
|
24.173
|
MS Raju & Brothers Faridpur
|
24.173
|
04/04/2018
|
03/11/2018
|
80
|
10/02/2019
|
|
|
25
|
GFRIDP-II/F/17-18/VR-SR/447
|
Const. of 2x4.30mx4.30m RCC Box Culvert on Uttar Bahirdia- Bangerswardi road at Ch: 1800.00m under Boalmari Upazila, Dist. Faridpur
|
|
27.305
|
Ms SB Traders Faridpur
|
27.305
|
14/11/2018
|
13/06/2019
|
40
|
10/02/2019
|
|
|
26
|
GFRIDP-II/F/17-18/VR-SR/446
|
Const. of 2x4.30mx4.30m RCC Box Culvert on Kadirdi (RHD near College) – Purba Bhartdi bazar road at Ch: 1450.00m under Boalmari Upazila, Dist. Faridpur
|
|
27.491
|
Zohara Construction Faridpur
|
27.491
|
24/05/2018
|
23/12/2018
|
0
|
10/02/2019
|
|
|
27
|
GFRIDP-II/F/17-18/VR-SR/445
|
Const. of 25.00m long RCC Girder Bridge on Arazi Paikhati- Kesrail road at Ch: 1000.00m under Boalmari Upazila, Dist. Faridpur
|
|
161.825
|
Sahana Enterprise Faridpur
|
161.825
|
24/05/2018
|
13/12/2018
|
80
|
10/02/2019
|
|
|
28
|
GFRIDP-II/F/17-18/BL-SR/444
|
Const. of Boat Landing Ramp (Ghatla) at Moyendia bazar under Boalmari Upazila, Dist. Faridpur
|
|
33.950
|
Zohara Construction Faridpur
|
33.950
|
24/05/2018
|
23/12/2018
|
0
|
10/02/2019
|
|
|
29
|
GFRIDP-II/F/16-17/VR-BR/440
|
Improvement of Dhopdanga road to House of Matin via Maszid Hazi (Dhopadanga Pacca road Monin Molla via Maszid to Hazi bari) road from Ch. 1150.00m- 1500.00m by BC under Boalmari Upazila, Dist. Faridpur
|
0.3500
|
21.578
|
Munir Hossain Faridpur
|
21.578
|
31/01/2018
|
29/08/2018
|
100
|
10/02/2019
|
|
|
30
|
GFRIDP-II/F/16-17/VR-HR/439
|
Improvement of Purbo Charborni H/O Nuru Mollah to West Charborni Beriba road from Ch. 0.00m- 600.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
0.6000
|
22.924
|
Ms Munshi Enterprise Faridpur
|
22.924
|
29/10/2017
|
28/07/2018
|
100
|
10/02/2019
|
Final bill paid
|
|
31
|
GFRIDP-II/F/16-17/VR-HR/438
|
Improvement of Shahrial Eidghah to Maitkumara School via Rai gate road from Ch. 0.00m - 1500.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
1.5000
|
52.896
|
Md Jakir Hossain Faridpur
|
52.896
|
07/06/2017
|
06/12/2017
|
100
|
10/02/2019
|
Final bill paid
|
|
32
|
GFRIDP-II/F/16-17/VR-HR/437
|
Improvement of Kolimaji to Katagor road from Ch. 0.00m - 1100.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
1.1000
|
40.373
|
Ms Al Amin Faridpur
|
40.373
|
06/02/2018
|
05/11/2018
|
100
|
10/02/2019
|
Sal: Tk. 3,49,718.00 Final bill paid
|
|
33
|
GFRIDP-II/F/16-17/VR-HR/436
|
Improvement of Durgapur to Durgapur UP Office road from Ch. 0.00m - 1000.00m by HBB under Boalmari Upazila, Dist. Faridpur
|
1.0000
|
37.208
|
Md Jakir Hossain Faridpur
|
37.208
|
28/09/2017
|
27/06/2018
|
100
|
10/02/2019
|
Final bill paid
|
|
34
|
GFRIDP-II/F/15-16/VR-BR/349
|
Improvement by BC on Boyra Bamongati - Teljuri road at Ch: 2570.00m- 3570.00m under Boalmari Upazila, Dist.Faridpur
|
1.0000
|
60.748
|
Ms Kamrul Islam Faridpur
|
60.748
|
10/03/2016
|
22/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
35
|
GFRIDP-II/F/15-16/VR-BR/348
|
Improvement by BC on Uttor Bahirdia- Bongesshordi bazar road at Ch: 3000.00m- 4332.00m under Boalmari Upazila, Dist.Faridpur
|
1.3320
|
76.863
|
Ms Nahar Enterprise Faridpur
|
76.863
|
20/04/2016
|
19/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
36
|
GFRIDP-II/F/15-16/VR-BR/347
|
Improvement by BC on Uttor Bahirdia- Bongesshordi bazar road at Ch: 1500.00m- 3000.00m under Boalmari Upazila, Dist.Faridpur
|
1.5000
|
86.548
|
Ms Mardern Construction Faridpur
|
86.548
|
25/02/2016
|
28/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
37
|
GFRIDP-II/F/15-16/VR-BR/346
|
Improvement by BC on Dhopadanga road H/O Motin via Mosque- Haji (Dhopadanga Pucca road Momin Mollar bari via Mosque Haji bari) road at Ch: 00.00m- 1150.00m under Boalmari Upazila, Dist.Faridpur
|
1.1500
|
68.905
|
Ma Enterprise Faridpur
|
68.905
|
10/03/2016
|
12/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
38
|
GFRIDP-II/F/15-16/VR-BR/345
|
Improvement by BC on Purbo Charborni - Parchim Charborni road at Ch: 600.00m- 1000.00m under Boalmari Upazila, Dist.Faridpur
|
0.4000
|
23.347
|
Shahana Ebnterprise Faridpur
|
23.347
|
10/03/2016
|
07/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
39
|
GFRIDP-II/F/15-16/VR-BR/344
|
Improvement by BC on Baikhir - Dhulpukuriya road at Ch: 1000.00m- 1850.00m under Boalmari Upazila, Dist.Faridpur
|
0.8500
|
50.542
|
Ms Samia Enterprise Faridpur
|
50.542
|
10/03/2016
|
07/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
40
|
GFRIDP-II/F/15-16/VR-BR/343
|
Improvement by BC on Kamargram (Gunbaha) - Darihorihornagar via Chapoldanga Pry. School road at Ch: 00.00m- 650.00m & 3150.00m - 3500.00m under Boalmari Upazila, Dist.Faridpur
|
1.0000
|
49.047
|
Golam Munsur Nannu
|
49.047
|
10/03/2016
|
07/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
41
|
GFRIDP-II/F/14-15/VR-BR/244
|
Improvement of Sahasrial- Jaigir Deyli road from Ch: 1700m- 3100m by BC under Boalmari Upazila, Dist. Faridpur, Road ID No: 329184048.
|
1.4000
|
81.817
|
Ms Bhai Bhai Traders Faridpur
|
81.817
|
12/07/2015
|
17/02/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
42
|
GFRIDP-II/F/ 11-12/VR-BR/137
|
Improvement of Satoir Bazar- Dadpur UP road from ch. 0.00m-2500.00m by BC under Boalmari Upazila, Dist. Faridpur.
|
2.5000
|
161.102
|
Ms SB Traders Faridpur
|
161.102
|
10/09/2012
|
09/09/2013
|
100
|
10/02/2019
|
P~ovÅ¡Í wej cwi‡kva| wefvMxq gvjvgv‡ji g~j¨ 33,27,352.00 UvKv|
|
|
43
|
GFRIDP-II//F /10-11/VR-BR/66
|
Improvement of Moyendia Bazar-Saltha Border road from ch. 0.00m-560.00m by BC .
|
0.5600
|
21.153
|
Ms Sayed & Brothers
|
21.153
|
22/04/2011
|
22/09/2011
|
100
|
10/02/2019
|
Pzw³ evwZj Kiv n‡q‡Q| c¨v‡KR bs 472 G Aby‡gv`b cvIqv wM‡q‡Q|
|
|
44
|
GFRIDP-II/10-11/VR-BR/43
|
Improvement of Sahasrail - jaighir Deyli (Dari Sahasrail - Deyli) road from ch.0.00m-1800.00m by BC.
|
1.8000
|
86.437
|
Ms Hakkani Faridpur
|
86.437
|
23/03/2011
|
23/08/2011
|
100
|
10/02/2019
|
P~ovÅ¡Í wej cwi‡kva| wefvMxq gv‡ji g~j¨ Uv: 4,42,082.00
|
|
45
|
GFRIDP-II/10-11/VR-BR/18
|
Improvement of Satoir R&H (Tohshil office) - H/O DS Azizur Rahman road from ch. 0.00m-550.00m by BC.
|
0.5500
|
18.184
|
Ms Mizanur Rahamn Faridpur
|
18.184
|
06/02/2011
|
05/04/2011
|
100
|
10/02/2019
|
P~ovÅ¡Í wej cwi‡kva| wefvMxq gvjvgvj 6,06,575.00
|
|
46
|
GFRIDP-II/10-11/VR-BR/16
|
Improvement of Bikhir- Dhulpukuria road from ch. 0.00m-1000.00m by BC.
|
1.0000
|
45.541
|
Ms Bhaharul Faridpur
|
45.541
|
16/02/2011
|
03/08/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
47
|
GFRIDP-II/10-11/VR-BR/14
|
Improvement of Kamargram (Gunbaha) - Darihorihornagar - Chapoldanga via Chapol Danga Primarimary school from ch. 650m-2150m by BC.
|
1.5000
|
65.728
|
F M Mustak Ahmed Faridpur
|
65.728
|
06/02/2011
|
06/06/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
4
|
Charbhadrasan
|
|
1
|
GFRIDP-II/F/17-18/VR-SR/506
|
Construction of 18.00m long RCC Girder Bridge over Taiker Bill at Ch: 1947.00m on Telidangi (H/O Tara Matubber) to Taiker Bill road under Charbhadrason Upazila, Dist. Faridpur
|
|
133.490
|
|
133.490
|
|
|
0
|
10/02/2019
|
Tender under process (New Rate)
|
|
2
|
GFRIDP-II/F/15-16/VR-BR/373
|
Improvement of Char Sultanpur (Shaher Mollah Dokan) - Sadarpur Boarder via H/O Ab. Kader Master road from Ch: 00.00- 580.00m by BC under Charbhadrason Upazila, Dist. Faridpur
|
0.5800
|
33.452
|
†Rvniv KbóªvKkb, eªvþbKv›`v, m`i, dwi`cyi|
|
33.452
|
26/04/2016
|
25/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
3
|
GFRIDP-II/F/15-16/VR-HR/372
|
Improvement of Embankment H/O Mongal Fakir- Boarder of Sadar (Aliabad) from Ch: 00.00- 2000.00m by HBB under Charbhadrason Upazila, Dist. Faridpur
|
2.0000
|
73.188
|
Gg Gg eªx·, m`icyi, dwi`cyi|
|
73.188
|
02/05/2016
|
31/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/15-16/VR-HR/370
|
Improvement of Charbhadrason- Sadarpur RHD (BS Dangi Jam-E- Mosque)- Jailkhana road from Ch: 00.00- 748.00m by HBB under Charbhadrason Upazila, Dist. Faridpur
|
0.7480
|
30.173
|
‡gmvm© †gvjøv GÛ eªv`vm©, Pif`ªvmb, dwi`cyi|
|
30.173
|
02/05/2016
|
31/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
5
|
GFRIDP-II/F/15-16/VR-HR/369
|
Improvement of Aminkhar Hat- Ukil Majhir Kole via Dead River road from Ch: 1000.00- 5150.00m by HBB under Charbhadrason Upazila, Dist. Faridpur.
|
4.1500
|
150.007
|
‡gmvm© iZb KbóªvKkb, KvbvBcyi, dwi`cyi|
|
150.007
|
02/02/2017
|
15/07/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
6
|
GFRIDP-II/F /10-11/VR-HR/55
|
Improvement of Aminkhar Hat – Ukel Majhir Kole road via Dead river road from ch. 0.00m-1000m by HBB
|
1.0000
|
23.614
|
†gmvm© mywß â€ UªWvm©, †MvqvjPvgU, dwi`cyi
|
23.614
|
18/10/2011
|
17/02/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/F /10-11/VR-BR/54
|
Improvement of Taledangi (H/O Tara Matubber) - Tyker Bell road from ch. 0.00m-1000m by BC.
|
1.0000
|
41.277
|
†gmvm© iwb G›UvicÖvBR, wewmK wkíbMix, ivRevox
|
41.277
|
18/03/2011
|
18/06/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
5
|
Faridpur-s
|
|
1
|
GFRIDP-II/F/15-16/VR-SR (Rehab)/04
|
Re-Construction of 30.05m Long RCC Girder Bridge on Kashobnagar RHD-Haquer Hat via Mongalkot road at Ch: 4150.00m under Sadar Upazila, Dist. Faridpur.
|
0.0350
|
115.283
|
Md Chowdhury & Co Faridpur
|
115.283
|
17/08/2016
|
28/02/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
2
|
GFRIDP-II/F/15-16/VR-BR (Maint)/03
|
Maintenance work by BC on Harukandi Bazar - Allalpur road from Ch: 0.00m -1500.00m under Sadar Upazila, Dist. Faridpur
|
1.5000
|
24.496
|
Md Zaman Tr4aders Faridpur
|
24.496
|
22/03/2016
|
21/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
3
|
GFRIDP-II/F/15-16/VR-BR (Maint)/02
|
Maintenance work by BC on Ulukanda Mor UZR- Saltha Boarder road from Ch: 0.00m -1000.00m under Sadar Upazila, Dist. Faridpur
|
1.0000
|
24.425
|
Md Nazrul Islam Faridpur
|
24.425
|
|
14/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/15-16/VR-BR (Maint)/01
|
Maintenance work by BC on Kashobnagar RHD- Haquer Hat via Mongol Coat bazar road from Ch: 0.00m - 2981.00m under Sadar Upazila, Dist. Faridpur
|
2.9800
|
79.912
|
Md Manir Hossain Faridpur
|
79.912
|
20/03/2016
|
25/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
5
|
GFRIDP-II/F/17-18/VR-HR/505
|
Improvement by HBB on Aruadangi H/O Sajad Matubber to Saltha Boarder H/O Durjun Bapari road (Sada part) from Ch: 0.00- 1290.00m under Sadar Upazila, Dist. Faridpur
|
1.2900
|
62.494
|
|
62.494
|
|
|
0
|
10/02/2019
|
Tender under process
|
|
6
|
GFRIDP-II/F/17-18/VR-BR/504
|
Improvement by BC on Goalkandi H/O Samsuddin BC road to RHD BC road by pass from Ch: 0.00- 1000.00m under Sadar Upazila, Dist. Faridpur
|
1.0000
|
68.272
|
Ms Abdul Jalil faridpur
|
68.272
|
28/05/2018
|
27/12/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/F/17-18/VR-BR/500
|
Improvement by BC on Komorpur (Hamid Molla road) H/O Nasir to Mondol Bari BC via Kumar river road from Ch: 00.00- 1350.00m under Sadar Upazila, Dist. Faridpur
|
1.3500
|
91.228
|
Ms Bhulbul Enterprise faridpur
|
91.228
|
18/06/2018
|
13/03/2019
|
100
|
10/02/2019
|
Final Bill Paid
|
|
8
|
GFRIDP-II/F/17-18/VR-BR/483
|
Improvement of Dhopakandi Jame Mosque to H/O Nazimuddin road from Ch. 0.00m- 750.00m by BC under Sadar Upazila, Dist. Faridpur.
|
0.7500
|
59.995
|
|
59.995
|
|
|
0
|
10/02/2019
|
Eva. sent to H/Q
|
|
9
|
GFRIDP-II/F/17-18/VR-BR/482
|
Improvement of Ramkhando UZR to Puradia high & Primary school road from Ch. 0.00m- 1200.00m by BC under Sadar Upazila, Dist. Faridpur.
|
1.2000
|
60.451
|
Ms Sajute Enterprise faridpur
|
60.451
|
05/11/2018
|
27/06/2019
|
30
|
10/02/2019
|
|
|
10
|
GFRIDP-II/F/17-18/VR-BR/481
|
Improvement of Vajondanga H/O Rokon BC road to BC road via A. Salam House road from Ch. 0.00m- 600.00m by BC under Sadar Upazila, Dist. Faridpur.
|
0.6000
|
39.963
|
|
39.963
|
|
|
0
|
10/02/2019
|
dropped
|
|
11
|
GFRIDP-II/F/17-18/VR-HR/480
|
Improvement of Kashamabad H/O Harun Matubber to Holudbaria Golamar Khal bridge road from Ch. 0.00m- 1000.00m by HBB under Sadar Upazila, Dist. Faridpur.
|
1.0000
|
42.404
|
Ms Mim Traders faridpur
|
42.404
|
07/11/2018
|
06/06/2019
|
35
|
10/02/2019
|
|
|
12
|
GFRIDP-II/F/17-18/VR-BR/479
|
Improvement of Noroshingodia H/O Alal Dhali to Malanga UNR H/O Abad Ali road from Ch. 0.00m- 1320.00m by BC under Sadar Upazila, Dist. Faridpur.
|
1.2300
|
86.563
|
Ms Lipu faridpur
|
86.563
|
08/11/2018
|
27/06/2018
|
30
|
10/02/2019
|
|
|
13
|
GFRIDP-II/F/17-18/VR-HR/478
|
Improvement of Golapbag Grabeyeard H/O Nannu Molla to Golartila UZR via Ansar Matubber Dangi road from Ch. 0.00m- 1420.00m by HBB under Sadar Upazila, Dist. Faridpur.
|
1.4200
|
66.837
|
Ms Prattasa faridpur
|
66.837
|
14/11/2018
|
17/06/2019
|
0
|
10/02/2019
|
|
|
14
|
GFRIDP-II/F/17-18/VR-BR/475
|
Improvement by BC Aliabad UPC to Sakiner bazar via Billmamudpur GPS road from at Ch: 2200.00 - 3850.00m under Sadar Upazila, Dist. Faridpur
|
1.6500
|
125.238
|
Ms Chowdhury faridpur
|
125.238
|
08/04/2018
|
27/02/2019
|
100
|
10/02/2019
|
|
|
15
|
GFRIDP-II/F /17-18/VR-HR/474
|
Improvement by HBB on Faridpur Muslim Mission Mosque to Komorpur High way connection road from at Ch: 0.00 - 1000.00m under Sadar Upazila, Dist. Faridpur
|
1.0000
|
45.112
|
Rezaul Construction faridpur
|
45.112
|
16/05/2018
|
15/12/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
16
|
GFRIDP-II/F/17-18/VR-SR/453
|
Construction of 36.00m RCC Girder Bridge over Kumar river on Voarkandi (Khulna) R&H to Dakhail Madrasha road at Ch: 730.00m under Sadar Upazila, Dist. Faridpur
|
0.0360
|
282.810
|
Azam Construction faridpur
|
282.810
|
06/02/2018
|
05/08/2019
|
90
|
10/02/2019
|
|
|
17
|
GFRIDP-II/F/17-18/VR-HR/452
|
Improvement of Shovarampur Sluice Gate to Tayeaba Madrasha (Bus stand) road from Ch: 0.00 – 780.00m by HBB under Sadar Upazila, Dist. Faridpur
|
0.7800
|
48.149
|
Shilpi Enterprise faridpur
|
48.149
|
11/04/2018
|
10/11/2018
|
100
|
10/02/2019
|
Final Bill Paid
|
|
18
|
GFRIDP-II/F/16-17/VR-BR/417
|
Improvement of Sadipur to Bilgozaria road from Ch: 1280.00m to 1820.00m by BC under Sadar Upazila, Dist. Faridpur
|
0.5400
|
37.377
|
Md Billal Hossain faridpur
|
37.377
|
09/11/2016
|
08/05/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
19
|
GFRIDP-II/F/16-17/VR-BR/416
|
Improvement of Kailuri Thakur bari to Tulagram Ashryan road from Ch: 00.00m to 1555.00m by BC under Sadar Upazila, Dist. Faridpur
|
1.5500
|
101.455
|
Md Billal Hossain faridpur
|
101.455
|
09/11/2016
|
08/05/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
20
|
GFRIDP-II/F/16-17/VR-HR/415
|
Improvement of Solakundu Taltola BC to Rashiknagar BC road from Ch: 00.00m to 1000.00m by HBB under Sadar Upazila, Dist. Faridpur
|
1.0000
|
42.750
|
Om Enterprise faridpur
|
42.750
|
22/11/2016
|
19/05/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
21
|
GFRIDP-II/F/15-16/VR-BR/409
|
Remaining work of Khirdir Biswasher Dangi- Tepakhola Lakpar road from Ch: 00.00m- 950.00m by BC under Sadar Upazila, Dist. Faridpur
|
0.9500
|
16.367
|
Manir Hossain faridpur
|
16.367
|
10/11/2016
|
10/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
22
|
GFRIDP-II/F/15-16/VR-BR/386
|
Improvement of RHD road to Dr. Quddus Mondol House road form Ch: 00.00m- 370.00m under Sadar Upazila, Dist. Faridpur
|
0.3700
|
28.095
|
Ms Sb Tradrs faridpur
|
28.095
|
21/06/2016
|
18/03/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
23
|
GFRIDP-II/F/15-16/VR-HR/385
|
Improvement by HBB on Adampur Embankment - Char Krishnapur Pry. School via Kumar River road form Ch:1400.00m- 2400.00m under Sadar Upazila, Dist. Faridpur
|
1.0000
|
45.711
|
Ms Kamrul Enterprise faridpur
|
45.711
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
24
|
GFRIDP-II/F/15-16/VR-HR/384
|
Improvement by HBB on Jomader dangi BC road - Chowdhury dangi road form Ch: 500.00m- 1350.00m under Sadar Upazila, Dist. Faridpur
|
0.8500
|
34.845
|
Ms Shilpi Enterprise faridpur
|
34.845
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
25
|
GFRIDP-II/F/15-16/VR-HR/383
|
Improvement by HBB on Vashan Char Salam Mondol Mor- Serajer Mor road form Ch: 00.00m- 1500.00m under Sadar Upazila, Dist. Faridpur
|
1.5000
|
54.090
|
Ms Chowdhury & Co. faridpur
|
54.090
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
26
|
GFRIDP-II/F/15-16/VR-HR/382
|
Improvement by HBB on Charbaludum Madrasha H/O Halim Bepari via Mominkhar hat road form Ch: 00.00m- 1500.00m under Sadar Upazila, Dist. Faridpur
|
1.5000
|
49.574
|
Ms Sahirul & Bothers faridpur
|
49.574
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
27
|
GFRIDP-II/F/15-16/VR-HR/381
|
Improvement by HBB on Kanaipur Jute Mill RHD - Roykali Jhukhola road form Ch: 00.00m- 1100.00m under Sadar Upazila, Dist. Faridpur
|
1.1000
|
39.519
|
Josna Construction faridpur
|
39.519
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
28
|
GFRIDP-II/F/15-16/VR-BR/380
|
Improvement by BC on Bhabanipur to Joydebpur Mouza road form Ch: 00.00m- 830.00m & Ch: 1300.00m to 2000.00m under Sadar Upazila, Dist. Faridpur
|
1.5300
|
98.033
|
Md Billal Hossain Faridpur
|
98.033
|
21/07/2016
|
13/06/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
29
|
GFRIDP-II/F/15-16/VR-BR/379
|
Improvement by BC on Doyarampur Pry. School BC road - Gandia Bazar road form Ch: 00.00m- 1700.00m under Sadar Upazila, Dist. Faridpur
|
1.7000
|
94.724
|
Masum Brothers Faridpur
|
94.724
|
21/07/2016
|
25/02/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
30
|
GFRIDP-II/F/15-16/VR-BR/378
|
Improvement by BC on Mohammadpur Bridge- Sonertek Bridge road form Ch: 00.00m- 800.00m under Sadar Upazila, Dist. Faridpur
|
0.8000
|
40.592
|
Md Iqbal & Brothers Faridpur
|
40.592
|
05/05/2016
|
04/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
31
|
GFRIDP-II/F/15-16/VR-BR/377
|
Improvement by BC on Gobindopur Village- Majchar Korpur Village road form Ch: 00.00m- 700.00m & CH: 2262.00m- 3062.00m under Sadar Upazila, Dist. Faridpur
|
0.7000
|
97.095
|
Md Shaheb Sarwer Faridpur
|
97.095
|
21/07/2016
|
28/06/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
32
|
GFRIDP-II/F/15-16/VR-HR/359
|
Improvement of Tambulkhana Saw Mill to Digir Chala road from Ch: 0.00- 1500.00m by HBB & Const. of U-Type Culvert at Ch. 503.00m & 673.00m on same road under Sadar Upazila, Dist. Faridpur
|
1.5000
|
57.713
|
Md Nasir uddin Faridpur
|
57.713
|
28/04/2016
|
27/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
33
|
GFRIDP-II/F/15-16/VR-BR/358
|
Improvement of Sholakundu Bottala to Kanaipur Chungir Mor Pucca road via Kobi Jasimuddin school road from Ch: 0.00- 2300.00m by BC & Const. of U-Type Culvert at Ch. 717.00m & 1010m on same road under Sadar Upazila, Dist. Faridpur
|
2.3000
|
145.302
|
Sahajahan Al Raj Faridpur
|
145.302
|
28/04/2016
|
27/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
34
|
GFRIDP-II/F/15-16/VR-BR/357
|
Improvement of Bodorpur-Saltha road to Kaulipara village road from Ch: 0.00- 1600.00m by BC under Sadar Upazila, Dist. Faridpur
|
1.6000
|
96.952
|
Ms Tasa Enterprise Faridpur
|
96.952
|
28/04/2016
|
17/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
35
|
GFRIDP-II/F/15-16/VR-BR/356
|
Improvement of Tapakhola Bus stand to Bhubanashor river sluice gate road from Ch: 0.00- 950.00m by BC under Sadar Upazila, Dist. Faridpur
|
0.9500
|
57.823
|
Ms Faisal Contruction Faridpur
|
57.823
|
19/04/2016
|
18/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
36
|
GFRIDP-II/F/15-16/VR-HR/355
|
Improvement of Khalil Mondol Hat to Dahhin Char Madhabdia road from Ch: 862.00- 1962.00m by HBB under Sadar Upazila, Dist. Faridpur
|
1.1000
|
41.915
|
Helal Enterprise Faridpur
|
41.915
|
19/04/2016
|
18/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
37
|
GFRIDP-II/F/15-16/VR-HR/354
|
Improvement of Hoglakandi Village to Trimohani road from Ch: 100.00- 1600.00m by HBB under Sadar Upazila, Dist. Faridpur
|
1.5000
|
53.714
|
Ratan Contruction Faridpur
|
53.714
|
09/06/2016
|
07/02/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
38
|
GFRIDP-II/F/15-16/VR-BR/353
|
Improvement of RHD C&B Ghat to Tufani Fakir Dangi road from Ch: 1000.00- 1800.00m by BC under Sadar Upazila, Dist. Faridpur
|
0.8000
|
54.750
|
Saleh & Brother Faridpur
|
54.750
|
03/04/2016
|
02/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
39
|
GFRIDP-II/F/15-16/VR-BR/352
|
Improvement of Yesin dangi to Mominkhat Hat via Tuheen Chairman Bari school road from Ch: 500.00- 1600.00m by BC under Sadar Upazila, Dist. Faridpur
|
1.1000
|
74.631
|
Ms Taiba Faridpur
|
74.631
|
03/04/2016
|
02/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
40
|
GFRIDP-II/F/15-16/VR-BR/350
|
Improvement of Mollikpur BC to Chilarkandi road from Ch: 0.00- 1000.00m by BC under Sadar Upazila, Dist. Faridpur
|
1.0000
|
66.955
|
Ms Nazul Islam Faridpur
|
66.955
|
18/04/2016
|
27/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
41
|
GFRIDP-II/F/15-16/VR-SR/342
|
Construction of 60.00m long RCC Girder Bridge on Durgapur Kheya ghat- Chandpur village road at ch. 00.00m under Sadar Upazila, Dist. Faridpur.
|
0.0600
|
383.000
|
Ms Rafia Construction Faridpur
|
383.000
|
08/06/2016
|
20/08/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
42
|
GFRIDP-II/F/15-16/VR-SR/341
|
Construction of 33.00m long RCC Girder Bridge on Sadipur village to Sadipur high school road at ch. 700.00m under Sadar Upazila, Dist. Faridpur.
|
0.0300
|
218.000
|
Ms Billal Faridpur
|
218.000
|
18/04/2016
|
17/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
43
|
GFRIDP-II/F/15-16/VR-HR/340
|
Improvement of Hathat bazar Beri Bandh to Khalashi Durgapur road from Ch. 1000.00m to 3000.00m by HBB under Sadar Upazila, Dist. Faridpur.
|
2.0000
|
84.256
|
Ms Rasel Khan Rubel Faridpur
|
84.256
|
10/03/2016
|
02/09/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
44
|
GFRIDP-II/F/15-16/VR-HR/339
|
Improvement of Decreer char Barokhada to Goalamdo Border road from Ch. 00.00m to 1000.00m by HBB under Sadar Upazila, Dist. Faridpur.
|
1.0000
|
39.641
|
Ms Nayeem Enterprise Faridpur
|
39.641
|
02/02/2016
|
30/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
45
|
GFRIDP-II/F/15-16/VR-HR/338
|
Improvement of Durgapur Embankment to Laxmidesher Hat to Decreer char Barokhada road from Ch. 00.00m to 1000.00m by HBB under Sadar Upazila, Dist. Faridpur.
|
1.0000
|
39.547
|
Ms Lipu Construction Faridpur
|
39.547
|
28/01/2016
|
26/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
46
|
GFRIDP-II/F/15-16/VR-BR/337
|
Improvement of Durgapur Embankment to Laxmidesher Hat road from Ch. 00.00m to 1000.00m by BC under Sadar Upazila, Dist. Faridpur.
|
1.0000
|
49.176
|
Ms Rafia Construction Faridpur
|
49.176
|
28/01/2016
|
27/05/2016
|
100
|
10/02/2019
|
Sal: 3,72,693.00 Final Bill paid
|
|
47
|
GFRIDP-II/F/15-16/VR-BR/336
|
Improvement of Fatepur to Borokhada village road from Ch. 00.00m to 800.00m by BC under Sadar Upazila, Dist. Faridpur.
|
0.8000
|
53.181
|
Ms Rafia Construction Faridpur
|
53.181
|
28/01/2016
|
27/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
48
|
GFRIDP-II/F/15-16/VR-BR/335
|
Improvement of Ishangopalpur to Gendia bazar road from Ch. 00.00m to 1500.00m by BC under Sadar Upazila, Dist. Faridpur.
|
1.5000
|
86.258
|
Sree Nath Faridpur
|
86.258
|
08/02/2016
|
07/08/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
49
|
GFRIDP-II/F/15-16/VR-BR/334
|
Improvement of Dhuldi Rajapur BRAC (R&H) bazar road to Khorsed Molla Mosque road from Ch. 500.00m to 1000.00m by BC under Sadar Upazila, Dist. Faridpur.
|
0.5000
|
38.788
|
Ms Sajute Enterprise Faridpur
|
38.788
|
28/01/2016
|
27/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
50
|
GFRIDP-II/F/14-15/VR-SR/325
|
Const. of 30.00m long RCC Girder Bridge on Ezadurgapur Village to Nobomollik bazar road at ch: 1210.00m under Sadar Upazila, Dist. Faridpur.
|
0.0300
|
143.886
|
Ms SB Construction Faridpur
|
143.886
|
28/04/2016
|
03/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
51
|
GFRIDP-II/F/14-15/VR-SR/226
|
Construction of 4*4.50m*5.00m RCC Boxculvert on Khalil Mondolerhat ( United School) – Momin khar Hat at Ch.1004m under Sadar Upazila, Faridpur, Road ID No. 329475013,
|
0.0004
|
42.182
|
Ms Rafia Construction Faridpur
|
42.182
|
02/06/2015
|
24/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
52
|
GFRIDP-II/ F/13-14/VR-SR/183
|
Construction of 4x4.50mx5.00m RCC box culvert over khal on Izadurgapur village to Nobomollik bazar road at Ch. 1250.00m under Sadar Upazila, Dist. Faridpur.
|
0.0045
|
0.000
|
|
0.000
|
|
|
0
|
10/02/2019
|
Cancel
|
|
53
|
GFRIDP-II/ F/13-14/VR-HR/175
|
Improvement of Lashkorkandi Primary school- Bilnalia road from ch. 1200.00m- 2000.00m by HBB under Sadar Upazila, Dist. Faridpur,
|
0.8000
|
27.970
|
Ms Alauddin Faridpur
|
27.970
|
19/01/2014
|
18/04/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
54
|
GFRIDP-II/ F/13-14/VR-HR/174
|
Improvement of Hothat bazar Berry bandh – Khalashi Durgapur road from ch. 0.00m- 1000.00m by HBB under Sadar Upazila, Dist. Faridpur,
|
1.0000
|
36.940
|
Md. Billal Hossain Faridpur
|
36.940
|
22/01/2014
|
21/04/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
55
|
GFRIDP-II/ F/13-14/VR-HR/173
|
Improvement of Khalil Mondolerhat- Mominkharhat road from ch. 0.00m- 1000.00m by HBB under Sadar Upazila, Dist. Faridpur
|
1.0000
|
33.778
|
Ms Shehab Construction Faridpur
|
33.778
|
19/01/2014
|
18/04/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
56
|
GFRIDP-II/F/ 11-12/VR-BR/141
|
Improvement of Gongabordi R&H- Hat Gobindapur road from ch. 00.00m-2000.00m by BC under Sadar Upazila, Dist. Faridpur.
|
2.0000
|
108.220
|
Md. Billal Hossain Faridpur
|
108.220
|
16/09/2012
|
15/09/2013
|
100
|
10/02/2019
|
P~ovÅ¡Í wej cwi‡kva| wefvMxq gvjvgvj 5,49,700.00
|
|
57
|
GFRIDP-II/F/ 11-12/VR-BR/135
|
Maintenance of Kanaipur UP Office – Gerda UP (Mrigi Tatultala) road from ch. 0.00m-366.00m by BC under Sadar Upazila, Dist. Faridpur.
|
0.3660
|
39.834
|
Ms Hanif Enterprise Faridpur
|
39.834
|
24/06/2012
|
23/01/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
58
|
GFRIDP-II/F/ 11-12/VR-BR/130
|
Improvement of Nikhurdi bazar H/O Hasem Chowkider- Dhuldi H/O Younus Mollah via H/O Sattar road from Ch. 00.00m- 1000.00m by BC under Sadar Upazila, Dist. Faridpur.
|
1.0000
|
55.142
|
Ms Lotus Enterprise Faridpur
|
55.142
|
24/05/2012
|
23/03/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
59
|
GFRIDP/F/ 11-12/VR-BL/102
|
Const. of Boat landing/ Ramp at Kumar river near Charkamlapur Jameya Korania Darul Ulum Madrasha and Yeatim khana under Sadar Upazila, Dist. Faridpur
|
|
23.180
|
Om Enterprise Faridpur
|
23.180
|
30/01/2012
|
29/07/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
60
|
GFRIDP-II/F/ 11-12/VR-BR/94
|
(a) Improvement of Krishnanagar UP Bahirdia bazar- Mollikpur bazar via Krishnanagar Up Office from ch. 10300.00m- 11300.00m by BC (b) Machchor UP Shibrampur R&H - Kalilpur GC- Chouddahat Kalimondir road from ch. 0.00m- 300.00m by BC under Sadar Upazila, D
|
1.3000
|
45.688
|
Md Billal Hossan Faridpur
|
45.688
|
22/01/2012
|
28/06/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
61
|
GFRIDP-II/F/ 11-12/VR-BR/89
|
Improvement of (a) Bhuarkandai R&H (Eidgha Mart) to Bhuarkandai Dakhil Madrasha road from ch. 0.00m to 880.00m by BC under Sadar Upazila, Dist. Faridpur & (b) Const. of double vent pipe culvert on Bhuarkandai R&H (Eidgha Mart) to Bhuarkandai Dakhil Madra
|
0.8800
|
32.082
|
Ms Suply House Faridpur
|
32.082
|
10/01/2012
|
27/06/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
62
|
GFRIDP-II//F /10-11/VR-BL/69
|
Construction of Boat land Ram at Bakudha Hat
|
|
0.000
|
|
0.000
|
|
|
0
|
10/02/2019
|
Dropped
|
|
63
|
GFRIDP-II/F /10-11/VR-BR/52
|
Improvement of Badarpur Saltha GC-Morarida Primary School via Bonagram High School road from ch. 1400m-2250m by BC.
|
0.8500
|
37.741
|
Ms Khan Enterprise Faridpur
|
37.741
|
18/03/2011
|
30/09/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
64
|
GFRIDP-II/F /10-11/VR-BR/51
|
Improvement of Badarpur Saltha GC-Morarida Primary School via Bonagram High School road from ch. 0.00m-1400m by BC.
|
1.4000
|
63.999
|
Ms Iqbal & Brothers, Faridpur
|
63.999
|
07/04/2011
|
07/09/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
65
|
GFRIDP-II/10-11/VR-BR/46
|
Improvement of Momin Khar Hat - Daulatdia via Uttor Decreerchar from ch. 1500m-3000m by BC.
|
1.5000
|
68.297
|
ASM Mahabubur Faridpur
|
68.297
|
19/03/2011
|
30/12/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
66
|
GFRIDPII/10-11/VR-BR/45
|
Improvement of Momin Khar Hat - Daulatdia via Uttor Decreerchar from ch. 0.00m-1500m by BC.
|
1.5000
|
70.836
|
Ssraboni Construction Faridpur
|
70.836
|
23/03/2011
|
30/12/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
67
|
GFRIDP-II/10-11/VR-HR/38
|
Improvement of Badarpur-Saltha road Tambulkhana Moulavi bari - Kakiluddin Sheikh Estate road from ch. 0.00m - 1000.00 m by HBB.
|
1.0000
|
19.883
|
Saheb Sarwar Faridpur
|
19.883
|
05/06/2011
|
15/01/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
68
|
GFRIDP-II/10-11/VR-HR/37
|
Improvement of Badarpur-Saltha road (Madhur bari) - Samespur Pucca (Shop of Javad) road from ch. 0.00m - 1100.00 m by HBB
|
1.1000
|
21.341
|
ASM Mahabubur Faridpur
|
21.341
|
20/03/2011
|
20/05/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
69
|
GFRIDP-II/10-11/VR-BR/35
|
Improvement of Ramkantapur Primary school - Ronkail high school BC road via H/O Belayat Fakir road from ch. 0.00m-1000.00m by BC.
|
1.0000
|
37.298
|
Ms Iqbal & Brothers, Faridpur
|
37.298
|
27/04/2011
|
07/09/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
70
|
GFRIDP-II/10-11/VR-SR/34
|
Construction of 1x4.00mx4.00m RCC Box culvert on Mominkhar hat - Doulatdia (via Uttor Deccer Char) road at ch. 3700.00m
|
0.0040
|
16.628
|
Md. Anwarul Islam, Faridpur
|
16.628
|
23/03/2011
|
30/12/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
71
|
GFRIDP-II/10-11/VR-SR/33
|
Construction of 1x4.00mx4.00m RCC Box culvert on Mominkhar hat - Doulatdia (via Uttor Deccer Char) road at ch. 3200.00m .
|
0.0400
|
12.897
|
Golam Munsue Nannu, Faridpur
|
12.897
|
23/03/2011
|
29/07/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
72
|
GFRDIP-II/10-11/ VR-BR/04
|
Improvement of West Khabashpur - Pierpur road via Harukandi from ch. 2450m-3450m by BC.
|
1.0000
|
47.050
|
Ms Nayeem Enterprise, Faridpur
|
47.050
|
04/02/2011
|
03/06/2011
|
100
|
10/02/2019
|
|
|
73
|
GFRIDP-II/F/ 10-11/VR-SR/01
|
Construction of Double Vent 2x4.30mx4.30m RCC Box culvert on Tambulkhana Sarder bari - Kujurdia via Kasnail Primary school over Teakhali Khal at ch. 2200.00m under sadar Upazila, District : Faridpur.
|
0.0080
|
18.114
|
MS Chowdhury Enterprise Saltha Faridpur
|
18.114
|
24/10/2010
|
24/02/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
6
|
Madhukhali
|
|
1
|
GFRIDP-II/F/17-18/VR-HR/497
|
Improvement of H/O Abdul Gaffar & Shajahan Molla to Bottola road (Digholia Gopaldi GCCR road Gobindopur Bot Total road- Khondamakrail New Bridge road) from Ch. 00.00m- 1000.00m by HBB under Madhukhali Upazila, Dist. Faridpur.
|
1.0000
|
38.349
|
‡Mvjvg gbmyi bvbœy, gayLvjx, dwi`cyi|
|
38.349
|
14/11/2018
|
25/04/2019
|
0
|
10/02/2019
|
|
|
2
|
GFRIDP-II/F/17-18/VR-BR/496
|
Improvement of Rajdhorpur Dhaka- Kulna R&H to Rajdhorpur new mosque road from Ch. 00.00m- 370.00m by BC under Madhukhali Upazila, Dist. Faridpur.
|
0.3700
|
24.934
|
‡gmvm© Awf G›UvicÖvBR, gayLvjx, dwi`cyi|
|
24.934
|
14/11/2018
|
25/04/2019
|
0
|
10/02/2019
|
|
|
3
|
GFRIDP-II/F/17-18/VR-BR/495
|
Improvement of Ramdia (Gorstan) to Chandana river road from Ch. 00.00m- 800.00m by BC under Madhukhali Upazila, Dist. Faridpur.
|
0.8000
|
55.590
|
‡Mvjvg gbmyi bvbœy, gayLvjx, dwi`cyi|
|
55.590
|
14/11/2018
|
25/04/2019
|
0
|
10/02/2019
|
|
|
4
|
GFRIDP-II/F/17-18/VR-HR/494
|
Improvement of Ujandia – Uttar Arpara road (Katakhali road) road from Ch. 00.00m- 500.00m by HBB under Madhukhali Upazila, Dist. Faridpur.
|
0.5000
|
20.173
|
‡gmvm© Awf G›UvicÖvBR, gayLvjx, dwi`cyi|
|
20.173
|
14/11/2018
|
28/01/2019
|
0
|
10/02/2019
|
|
|
5
|
GFRIDP-II/F/17-18/BL-SR/477
|
Construction of Boat Landing Ramp over Barashia River (NearAfjal Mondal House) under Madhukhali Upazila, Dist. Faridpur
|
|
23.433
|
‡gmvm© byi G›UvicÖvBR, _vbv †ivW, dwi`cyi|
|
23.433
|
27/08/2018
|
26/03/2019
|
0
|
10/02/2019
|
|
|
6
|
GFRIDP-II/F/17-18/VR-BR/476
|
Remaining work of Atapur RHD- Chandpur (Mitain Regulator) road from Ch. 500.00m- 1500.00m by BC under Madhukhali Upazila, Dist. Faridpur
|
1.0000
|
26.416
|
|
26.416
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
7
|
GFRIDP-II/F/17-18/VR-BR/458
|
Improvement Arkandi RHD to Bhusna GPS road from Ch: 0.00- 1546.00m by BC under Madhukhali Upazila, Dist. Faridpur
|
1.5500
|
101.573
|
‡gmvm Gm we †UªWvm©, eªvþbKv›`v, m`i, dwi`cyi|
|
101.573
|
17/05/2018
|
17/02/2019
|
65
|
10/02/2019
|
|
|
8
|
GFRIDP-II/F/16-17/VR-BR/443
|
Improvement of Megchami Union Sardar para Bottola to Khidirer Bottola (Eidgha Math) road from Ch: 0.00 to 1450.00m by BC under Madhukhali Upazila, Dist. Faridpur
|
1.4500
|
104.875
|
‡gvt †iRvDj Kwig, bMiKv›`v, dwi`cyi|
|
104.875
|
16/10/2017
|
30/06/2018
|
100
|
10/02/2019
|
Final bill paid
|
|
9
|
GFRIDP-II/F/16-17/VR-HR/414
|
Improvement of Dumain bazar – Rajdhorpur via Vellakandi road from Ch: 2400.00m to 3900.00m by HBB under Madhukhali Upazila, Dist. Faridpur
|
1.5000
|
49.582
|
‡gmvm© †Mv‡ìb G›UvicÖvBR, gayLvjx, dwi`cyi|
|
49.582
|
05/02/2017
|
04/08/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
10
|
GFRIDP-II/F/16-17/VR-HR/413
|
Improvement of Bonomalidia Digilia Gopaldi road from Ch: 1000.00m to 3573.00m by HBB under Madhukhali Upazila, Dist. Faridpur
|
2.5700
|
93.923
|
Gg ingvb GÛ G¨v‡mvwm‡qUm, gayLvjx, dwi`cyi|
|
93.923
|
22/11/2016
|
19/05/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
11
|
GFRIDP-II/F/16-17/VR-BR/412
|
Improvement of Omer Ali UZR (Near H/O Manik Molla) to H/O Tajuddin Sheikh via new mosque H/O of Mohishpur road from Ch: 0.00m to 1000.00m by BC under Madhukhali Upazila, Dist. Faridpur
|
1.0000
|
63.762
|
‡Mvjvg gbmyi bvbœy, gayLvjx, dwi`cyi|
|
63.762
|
19/12/2016
|
05/06/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
12
|
GFRIDP-II/F/15-16/VR-BR/410
|
Remaining Work of Bagat R&H (Madrasha)- Crockdi Hat road from Ch. 1670.00m- 4370.00m by BC under Madhukhali Upazila, Dist. Faridpur
|
2.7000
|
18.924
|
‡Mvjvg gbmyi bvbœy, gayLvjx, dwi`cyi|
|
18.924
|
10/11/2016
|
10/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
13
|
GFRIDP-II/F/14-15/VR-HR/324
|
Improvement of Gazna Bazar to Belerswardi UZR road from Ch: 4610.00m to 5610.00m by HBB under Madhukhali Upazila, Dist.: Faridpur.
|
1.0000
|
36.986
|
‡gmvm© wkgyj G›UvicÖvBR, gayLvjx, dwi`cyi|
|
36.986
|
24/12/2015
|
23/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
14
|
GFRIDP-II/F/14-15/VR-HR/323
|
Improvement of Ujandia to Katakhali pucca road (H/O Motleb Biswas to Motiur Rahman house) from Ch: 1580.00m to 2780.00m by HBB under Madhukhali Upazila, Dist.: Faridpur.
|
1.2000
|
35.948
|
‡Mvjvg gbmyi bvbœy, gayLvjx, dwi`cyi|
|
35.948
|
20/12/2015
|
19/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
15
|
GFRIDP-II/F/14-15/VR-BR/322
|
Improvement of Arpara RHD East block Mosque via Bhaturia road from Ch: 00.00m to 1160.00m by BC under Madhukhali Upazila, Dist.: Faridpur.
|
1.1600
|
65.195
|
Gg ingvb GÛ G¨v‡mvwm‡qUm, gayLvjx, dwi`cyi|
|
65.195
|
24/12/2015
|
23/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
16
|
GFRIDP-II/F/14-15/VR-BR/321
|
Improvement of Biraldia Bazar (UZR)- Norkona A. Rahman Junior School road from Ch. 1050m- 2150m by BC under Madhukhali Upazila, Dist. Faridpur.
|
1.1000
|
65.984
|
‡gmvm© Rvwn` GÛ eªv`vm©, KvbvBcyi, dwi`cyi|
|
65.984
|
19/11/2015
|
18/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
17
|
GFRIDP-II/F/14-15/VR-HR/266
|
Improvement of Achintala via Utholi Amdanga Mosque road from Ch. 1000-1660m by HBB under Madhukhali Upazila,Dist. Faridpur
|
0.6600
|
22.800
|
‡gmvm© wiqv GÛ mÝ, nv‡ovKvw›`, dwi`cyi|
|
22.800
|
08/09/2015
|
07/04/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
18
|
GFRIDP-II/F/14-15/VR-BR/265
|
Improvement of Megchami Mridhar Hat-H/O Harun khan via Post Office road from Ch. 00-1000m by BC & Construction of 600mm dia RCC Pipe Culvert at Ch. 587 & 750m same road under Madhukhali Upazila,Dist. Faridpur
|
1.0000
|
56.902
|
‡gmvm© wjcy G›UvicÖvBR, KvbvBcyi, dwi`cyi|
|
56.902
|
02/09/2015
|
01/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
19
|
GFRIDP-II/F/14-15/VR-BR/234
|
Improvement of Boykanthapur shop of Belal-Bonder shonkorpur Dakhil Madrasa road from Ch. 00-1500m by BC under Modhukhali Upazila,Dist. Faridpur.
|
1.5000
|
84.915
|
†gmvm© wkgyj G›UvicÖvBR, g_yLvjx, dwi`cyi|
|
84.915
|
03/06/2015
|
31/12/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
20
|
GFRIDP-II/F/14-15/VR-HR/225
|
Improvement of Ramkantapur GPS - Jamalpur GC road by HBB from Ch.00m - 1000m under Modhukhali Upazila, Faridpur,Road ID No. 329564006.
|
1.0000
|
35.249
|
‡gmvm© e„wó G›UvicÖBR, Avjxcyi, dwi`cyi|
|
35.249
|
07/06/2015
|
|
100
|
10/02/2019
|
Final Bill paid
|
|
21
|
GFRIDP-II/F/14-15/VR-HR/224
|
Improvement of Madhupur Village Kajoldar bari side - Sardarpara Gopinathpur Meghchami UP road by HBB from Ch.1000m - 2000m under Modhukhali Upazila, Faridpur.
|
|
0.000
|
|
0.000
|
|
|
0
|
10/02/2019
|
GBP we we ¯â€¹xgwU ms‡kvab c~e©K wfAvi-weAvi/283 wnmv‡e cyb: Aby‡gv`b n‡q‡Q|
|
|
22
|
GFRIDP-II/F/14-15/VR-HR/223
|
Improvement of Digholia - Bonomalidia via Damordi road by HBBfrom Ch.5540m - 6540m under Modhukhali Upazila, Faridpur,Road ID No. 329564034.
|
1.0000
|
33.909
|
‡gv: wejvj †nv‡mb, nv‡ovKvw›`, dwi`cyi|
|
33.909
|
28/05/2015
|
26/12/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
23
|
GFRIDP-II/F/14-15/VR-HR/220
|
Improvement of Gazna Bazar - Beleswardi Khalilpur UZR road by HBB from Ch.00m - 1000m under Modhukhali Upazila, Faridpur,Road ID No. 329564033.
|
1.0000
|
34.225
|
‡gmvm© Gm we †UªWvm©, eªvþbKv›`v, m`icy, dwi`cyi|
|
34.225
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
24
|
GFRIDP-II/F/14-15/VR-BR/207
|
Improvement of Dhaka-Khulna R&H Bander Bus Stand – Purba Charbagat road (H/O Dr. Mohsin) from ch. 00m- 1750m by BC (Remaining work) under Madhukhali Upazila, Faridpur.
|
1.7500
|
39.997
|
Gg ingvb GÛ G¨v‡mvwm‡qUm, gayLvjx, dwi`cyi|
|
39.997
|
04/06/2015
|
03/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
25
|
GFRIDP-II/F/ 11-12/VR-BR/127
|
Improvement of Atapur R&H- Chandpur (Mitain Regulator) road from Ch. 4500.00m- 6100.00m by BC under Madhukhali Upazila, Dist. Faridpur.
|
1.6000
|
83.414
|
Avwgb †nv‡mb, Avjxcyi, dwi`cyi|
|
83.414
|
24/05/2012
|
23/03/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
26
|
GFRIDP-II/F/ 11-12/VR-BR/126
|
Improvement of Atapur R&H- Chandpur (Mitain Regulator) road from Ch. 3500.00m- 4500.00m by BC under Madhukhali Upazila, Dist. Faridpur.
|
1.0000
|
52.407
|
‡gmvm© Gg ingvb GÛ G¨v‡mvwm‡qUm, gayLvjx, dwi`cyi|
|
52.407
|
24/05/2012
|
23/02/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
27
|
GFRIDP-II/F/ 11-12/VR-BR/120
|
Improvement of Atapur R&H- Chandpur (Mitain Regulator) road from Ch. 500.00m- 1500.00m by BC under Madhukhali Upazila, Dist. Faridpur.
|
1.0000
|
51.940
|
†gmvm© wjcy G›UvicÖvBR, KvbvBcyi, dwi`cyi|
|
51.940
|
24/05/2012
|
23/02/2013
|
100
|
10/02/2019
|
Pzw³ evwZj Kiv n‡q‡Q| c¨v‡KR bs 476 G Aby‡gv`b cvIqv wM‡q‡Q|
|
|
28
|
GFRIDP-II/10-11/VR-BR/23
|
Improvement of Dhaka Khulna R&H Bandor Busstand - Purbo char bagat H/O Dr. Md. Mohosin Hossain road from ch. 0.00m-1750.00m by BC .
|
1.7500
|
73.464
|
†gmvm© nvwbd G›UvicÖvBR †ókb †ivW, dwi`cyi
|
73.464
|
20/02/2011
|
20/07/2011
|
100
|
10/02/2019
|
evwZjK…Z Kv‡Ri cÖv°jb Aby‡gv`b cvIqv wM‡q‡Q| (c¨v: bs wRGdAvBAviwWwc-2/Gd/14-15/wfAvi-weAvi/207
|
|
29
|
GFRIDP-II/10-11/VR-BR/22
|
Improvement of Makrail Mirpara Mosque -Pubail Khal road from ch. 0.00m-408.00m by BC.
|
0.4080
|
18.568
|
†gmvm© kixd Kbt gayLvjx, dwi`cyi
|
18.568
|
06/02/2011
|
03/04/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
30
|
GFRIDP-II/10-11/VR-BR/21
|
Improvement of Dumain (Mosque) - Samadhinagar road from ch. 0.00m-1000.00m by BC.
|
1.0000
|
43.046
|
†gmvm© kvnRvjvj †UªWvm©, gv¸iv
|
43.046
|
13/02/2011
|
13/06/2011
|
100
|
10/02/2019
|
Pzw³ evwZj| Aewkó Kv‡Ri cÖv°jb 251 ¯§viKg~‡j Aby‡gv`b cvIqv †M‡Q|
|
|
31
|
GFRIDP-II/10-11/VR-BR/20
|
Improvement of Makrail bazar -Kamaldia Bazar road from ch. 1200.00m-2788.00m = 1560m (Effective length) by BC.
|
1.5880
|
68.478
|
†gvt bvwmi DwÏb Lvb _vbv †ivW, dwi`cyi
|
68.478
|
06/02/2011
|
05/06/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
32
|
GFRIDP-II/10-11/VR-BR/19
|
Improvement of Bagat R&H (Madrasha) - Korokdi hat road from ch. 170.00m-1670.00m by BC.
|
1.5000
|
65.022
|
†gmvm© Gd Avi Kbt cwðg Avjxcyi, dwi`cyi|
|
65.022
|
29/01/2011
|
15/03/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
7
|
Nagarkanda
|
|
1
|
GFRIDP-II/F/17-18/VR-BR (Maint)/77
|
Maintenance of Sagoldi GPS- Khuduria Khal via H/O Khaleque Talukder road from Ch: 0.00- 800.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
0.8000
|
12.939
|
Ms Rukeya Traders Faridpur
|
12.939
|
17/05/2018
|
16/12/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
2
|
GFRIDP-II/F/17-18/VR-BR (Maint)/76
|
Maintenance of Kalibari (R&H) - Babur Kaichail road from Ch: 0.00- 3100.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
3.1000
|
99.611
|
Ms Rezaul Karim Faridpur
|
99.611
|
03/05/2018
|
02/02/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
3
|
GFRIDP-II/F/17-18/VR-BR (Maint)/75
|
Maintenance of Rasulpur Natun bazar - Chapkhondo road from Ch: 1030.00- 2730.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
1.7000
|
31.783
|
Sha Ali Traders Faridpur
|
31.783
|
24/05/2018
|
23/12/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/18-19/VR-BR (Maint)/74
|
Maintenance of Mirkhali UZR- Konagram (Chotomahila) via Pagolpara road from Ch: 0.00- 1800.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
1.8000
|
41.080
|
|
41.080
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
5
|
GFRIDP-II/F/16-17/VR-BR (Maint)/51
|
Maintenance of Jamtola - Debinagar road from Ch: 1500.00m- 3660.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
2.1000
|
26.327
|
Ms Eaqub Ali Faridpur
|
26.327
|
17/09/2017
|
30/05/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
6
|
GFRIDP-II/F/16-17/VR-BR (Maint)/50
|
Maintenance of Maniknagar –Debinagar GPS road from Ch: 00.00m- 1700.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
1.7000
|
17.284
|
Ms Eaqub Ali Faridpur
|
17.284
|
09/05/2017
|
08/11/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
7
|
GFRIDP-II/F/15-16/VR-BR(Maint) /17
|
Maintenance work by BC on Delbaria UZR-Paschim Kajuli Village road from Ch: 00.00m-1000.00m under Nagarkanda Upazila, Dist. Faridpur.
|
1.0000
|
16.365
|
Ms Lipu Enterprise Faridpur
|
16.365
|
30/03/2016
|
29/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
8
|
GFRIDP-II/ F/15-16/VR-BR(Maint) /16
|
Maintenance work by BC on Jamtala (RHD)-Debinagar (Ramnagar UPHQ) road from Ch: 00.00m-1500.00m under Nagarkanda Upazila, Dist. Faridpur.
|
1.5000
|
15.155
|
Ms Raj Enterprise Faridpur
|
15.155
|
30/03/2016
|
29/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
9
|
GFRIDP-II/F/17-18/VR-HR/493
|
Improvement of Debinagar pucca road (Chowkider bari)- Chaker bari (UZR) via Chottobill road from Ch. 00.00m- 1150.00m by HBB under Nagarkanda Upazila, Dist. Faridpur.
|
1.1500
|
43.408
|
Ms Mandal Enterprise Faridpur
|
43.408
|
09/07/2018
|
08/02/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
10
|
GFRIDP-II/F/17-18/VR-HR/492
|
Improvement of Jamtola Bridge to Debinagar via Vojerdangi road from Ch. 1000.00m- 1875.00m by HBB under Nagarkanda Upazila, Dist. Faridpur.
|
0.8750
|
48.782
|
Ms Mandal Enterprise Faridpur
|
48.782
|
09/07/2018
|
08/02/2019
|
100
|
10/02/2019
|
|
|
11
|
GFRIDP-II/F/17-18/VR-BR/491
|
Improvement of Babur Kaichail Bridge to Babur Kaichail school road from Ch. 0.00m- 1020.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
1.0200
|
75.019
|
Ms Prattasa Enterprise Faridpur
|
75.019
|
17/07/2018
|
14/04/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
12
|
GFRIDP-II/F/17-18/BR-HR/460
|
Improvement of Krishnardangi Shaha para (Khitish Pattonder House) to Shaymal Saha House road from Ch: 00.00- 285.00m by HBB under Nagarkanda Upazila, Dist. Faridpur
|
0.2850
|
21.927
|
A S M Rafiqul Alam Faridpur
|
21.927
|
16/10/2018
|
15/05/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
13
|
GFRIDP-II/F/17-18/BR-HR/459
|
Improvement of Chandhat GC to Gozaria Village road from Ch: 843.00- 1450.00m by HBB under Nagarkanda Upazila, Dist. Faridpur
|
0.6070
|
24.239
|
Ms Rukeya Enterprise Faridpur
|
24.239
|
03/10/2018
|
02/05/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
14
|
GFRIDP-II/F/17-18/BR-BR/457
|
Improvement of Baneshwordi West para - Baneshwordi Eastpara road from Ch: 1250.00- 2150.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
0.9000
|
55.089
|
Ms Prattasa Enterprise Faridpur
|
55.089
|
07/11/2018
|
25/06/2019
|
100
|
10/02/2019
|
Final Bill paid
|
|
15
|
GFRIDP-II/F/17-18/BR-BR/456
|
Improvement of Ashfordi Chowrasta - Batikamari bazar road from Ch: 3400.00- 4290.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
0.8900
|
54.051
|
|
54.051
|
|
|
0
|
10/02/2019
|
Eva. sent to H/Q
|
|
16
|
GFRIDP-II/F/16-17/VR-HR/434
|
Improvement of Nagarkanda College (UZR)- Delbaria UZR road (Nagarkanda College- Kodalia Shahinagar Union Parishad road) from Ch: 2100m- 3060m by HBB under Nagarkanda Upazila, Dist. Faridpur
|
0.9600
|
39.277
|
Ms S A Enterprise Faridpur
|
39.277
|
19/06/2017
|
18/03/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
17
|
GFRIDP-II/F/16-17/VR-SR/432
|
Construction of 85.00m long RCC Girder Bridge over Kumar river on Baneswordi High School to Mukunda Potty GPS under Nagarkanda Upazila, Dist. Faridpur
|
0.0850
|
468.949
|
Ms Azam Construction Faridpur
|
468.949
|
18/05/2017
|
16/05/2019
|
100
|
10/02/2019
|
|
|
18
|
GFRIDP-II/F/16-17/VR-HR/427
|
Improvement of Ramnagar UZR- Gopalpur Khal via H/O Wahab Munshi road from Ch: 00.00m - 1200.00m by HBB under Nagarkanda Upazila, Dist.Faridpur.
|
1.2000
|
41.225
|
Shihab Construction Faridpur
|
41.225
|
15/06/2017
|
14/12/2017
|
100
|
10/02/2019
|
Final bill paid
|
|
19
|
GFRIDP-II/F/16-17/VR-HR/426
|
Improvement of Rosulpur Nutan bazar - Chapkhando road from Ch: 2736.00m - 3790.00m by HBB under Nagarkanda Upazila, Dist.Faridpur.
|
1.0540
|
52.402
|
Ms JAHID & BROTHERS Faridpur
|
52.402
|
28/03/2017
|
26/09/2017
|
100
|
10/02/2019
|
Final bill paid
|
|
20
|
GFRIDP-II/F/15-16/VR-BR/408
|
Improvement of Sutarkanda GPS- Bishow road from Ch: 0.00- 1000.00m by BC under Nagarkanda Upazila, Dist. Faridpur
|
1.0000
|
62.000
|
Md Manower Hossain Faridpur
|
62.000
|
26/07/2016
|
20/03/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
21
|
GFRIDP-II/ F /15-16/ VR-BR /403
|
Improvement by BC on Delbaria UZR –Iswardi UZR road at Ch. 2600.00m-3815.00m under Nagarkanda Upazila, Dist. Faridpur
|
1.2100
|
76.092
|
Ms Green Construction Faridpur
|
76.092
|
30/10/2016
|
29/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
22
|
GFRIDP-II/F/15-16/VR-SR/393
|
Construction of 33.00m long RCC Girder Bridge on Nikhorhati bridge - Kuburdi Boarder road at Ch: 4300.00m under Nagarkanda Upazila, Dist. Faridpur
|
0.0330
|
145.958
|
Ms SB Traders Faridpur
|
145.958
|
06/10/2016
|
17/09/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
23
|
GFRIDP-II/F/15-16/VR-SR/392
|
Construction of 75.00m RCC Girder Bridge on Bilnalia high school to Biswas dangi (Nagarkanda Boarder) road at Ch: 10.00m under Nagarkanda Upazila, Dist. Faridpur
|
0.0750
|
424.852
|
Ms SB Traders Faridpur
|
424.852
|
26/07/2016
|
25/12/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
24
|
GFRIDP-II/F/15-16/VR-BR/360
|
Improvement of Sutarkandi Bridge - Kaichail Madrasha road from Ch: 1000- 2200.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
1.2000
|
78.612
|
Saleh & Bothers Faridpur
|
78.612
|
25/04/2016
|
24/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
25
|
GFRIDP-II/F/14-15/VR-BR/318
|
Improvement of Jungurdi GPS- Kharapara road from Ch. 0.00m- 513.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
0.5130
|
26.075
|
Sayeda Jahanara Enterprise Faridpur
|
26.075
|
21/12/2015
|
20/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
26
|
GFRIDP-II/F/14-15/VR-BR/316
|
Improvement of Bhabukdia R&H- Dangi Bangalkanda road from Ch. 00.00m- 1000.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
1.0000
|
60.582
|
Ms Samia Enterprise Faridpur
|
60.582
|
13/12/2015
|
11/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
27
|
GFRIDP-II/F/14-15/VR-BR/315
|
Improvement of Masujan to Bhabukdia Bus stand via Kheya road from Ch. 4050.00m- 5050.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
1.0000
|
60.050
|
Ms K s Enterprise Faridpur
|
60.050
|
14/12/2015
|
12/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
28
|
GFRIDP-II/F/14-15/VR-SR/246
|
Construction of 1x4.00mx4.00m RCC Box Culvert on Rasulpur Nutun Bazar - Chapkhanda road at Ch: 3500m under Nagarkanda Upazila, Dist. Faridpur.
|
0.0040
|
11.209
|
Ms SB Traders Faridpur
|
11.209
|
12/07/2015
|
17/02/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
29
|
GFRIDP-II/F/14-15/VR-BR/245
|
Improvement of Rasulpur Nutun bazar Chapkhanda road from Ch: 2730m- 3830m by BC under Nagarkanda Upazila, Dist. Faridpur, Road ID No. 329624025.
|
|
0.000
|
|
0.000
|
|
|
0
|
10/02/2019
|
Cancel
|
|
30
|
GFRIDP-II/F/14-15/VR-BR/215
|
Improvement of road Rashulpur Bazar - Chapkhondo - Gaharpur Mosjid via h/o Hafiz Master from Ch.00m- 380m by BC under Nagarkanda Upazila, Faridpur, Road ID- 329625243.
|
0.3800
|
17.987
|
Om Enterprise Faridpur
|
17.987
|
03/06/2015
|
31/12/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
31
|
GFRIDP-II/F/14-15/VR-HR/214
|
Improvement of road Nabarun Club - Binakdia via UP office ( Jungurdi Purba para Graveyard - Paschim para Eidgah) from Ch.800m- 1600m by HBB under Nagarkanda Upazila,Faridpur, Road ID- 329625143.
|
0.8000
|
24.662
|
Ms Shahna Enterprise Faridpur
|
24.662
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
32
|
GFRIDP-II/F/14-15/VR-HR/213
|
Improvement of road Jamtola Bridge - Debinagar via Vozerdangi from Ch.00m- 1000m by HBB under Nagarkanda Upazila, Faridpur, Road ID- 329624109.
|
1.0000
|
37.969
|
Ms JAHID & BROTHERS Faridpur
|
37.969
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
33
|
GFRIDP-II/F/14-15/VR-BR/212
|
Improvement of road Dofa GPS - Baushkhali from Ch.00m- 500m by BC under Nagarkanda Upazila, Faridpur, Road ID- .
|
0.5000
|
29.104
|
Ms SB Traders Faridpur
|
29.104
|
04/06/2015
|
02/01/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
34
|
GFRIDP-II/F/14-15/ VR-SR/190
|
Const. of 2x4.00mx4.00m RCC box culvert at ch. 70.00m on Anu Chairman house pucca road to Mir bari pucca road under Nagarkanda Upazila, Dist. Faridpur.
|
|
15.930
|
Ms Construction Faridpur
|
15.930
|
10/11/2014
|
09/04/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
35
|
GFRIDP-II/ F/12-13/VR-HR/156
|
Improvement of Baneswardi Westpara- Baneswardi Eastpara road from ch. 3300.00m- 4500.00m by HBB under Nagarkanda Upazila, Dist. Faridpur.
|
1.2000
|
36.689
|
Ms Abu Sayed ead Faridpur
|
36.689
|
29/09/2013
|
28/01/2014
|
100
|
10/02/2019
|
Final Bill paid
|
|
36
|
GFRIDP-II/F/ 11-12/VR-BR/131
|
Improvement of Choto Mohila Bazar – Rail Line Road from ch. 0.00m-780.00m by BC under Nagarkanda Upazila, Dist. Faridpur .
|
0.7800
|
55.777
|
Ms Goga Tred Faridpur
|
55.777
|
12/06/2012
|
11/04/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
37
|
GFRIDP-II/F/ 11-12/VR-BR/128
|
Improvement of Sakpaldia Triemohona- Rasulpur (Shaw Mill) road from Ch. 00.00m- 3000.00m by BC under Nagarkanda Upazila, Dist. Faridpur.
|
3.0000
|
168.394
|
Md Saleh & Brothers Faridpur
|
168.394
|
24/05/2012
|
23/05/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
38
|
GFRIDP-II/F/ 11-12/VR-HR/104
|
Improvement of Baneswardi West para- East para road from ch. 2644.00m- 3300.00m by HBB under Nagarkanda Upazila, Dist. Faridpur.
|
0.6560
|
38.986
|
Md Samia Enterprise Faridpur
|
38.986
|
06/03/2012
|
05/07/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
39
|
GFRIDP-II//F /10-11/VR-HR/70
|
Improvement of Talma R&H – Chowshara UZR road from ch. 800.00m-2300.00m by HBB.
|
1.5000
|
32.106
|
F M Mosat Ahmed Faridpur
|
32.106
|
15/11/2011
|
15/05/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
40
|
GFRIDP-II/F /10-11/VR-BR/53
|
Improvement of Sakpaldia Clinic – Sakpaldia Trimohona road via kalibari bridge – Sakpaldia H/O Owhab Talukder from ch. 0.00m-150m by BC.
|
0.1500
|
6.535
|
Ms Ruma Faridpur
|
6.535
|
25/05/2012
|
24/07/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
41
|
GFRIDP-II/10-11/VR-BR/39
|
Improvement of Mirkhali UZR - Kunagram (Choto Mohila Road) via Pagolpara road from ch. 0.00m-1800.00m by BC.
|
1.8000
|
77.432
|
Ms Chistia Faridpur
|
77.432
|
23/03/2011
|
23/12/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
42
|
GFRIDP-II/10-11/VR-BR/10
|
Improvement of Jamtola - Dabinagar road from ch. 0.00m-1500m by BC.
|
1.5000
|
63.723
|
Md Nasiruddin Faridpur
|
63.723
|
06/02/2011
|
05/06/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
43
|
GFRIDP-II/10-11/VR-HR/09
|
Improvement of Baneshowerdi Westpara - Eastpara road from ch. 0.00m-1000m by HBB
|
1.0000
|
27.500
|
Urmi Traders Faridpur
|
27.500
|
27/02/2012
|
26/05/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
44
|
GFRIDP-II/10-11/VR-BR/07
|
Improvement of Rasulpur Natun bazar - Chapkhanda road from ch. 1000m-2730m by BC
|
1.7300
|
74.335
|
sraboni Construction Faridpur
|
74.335
|
20/02/2011
|
30/12/2011
|
100
|
10/02/2019
|
Final Bill paid
|
|
|
8
|
Saltha
|
|
1
|
GFRIDP-II/F/ 18-19/VR-BR(Maint)/83
|
Maintenance of Khardia H/O Amanot Sikder to Baliaghat road from Ch. 0.00- 750.00m under Saltha Upazila, Dist. Faridpur
|
0.7500
|
8.521
|
|
8.521
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
2
|
GFRIDP-II/F/18-19/VR-BR (Maint)/82
|
Maintenance of Fulbaria UZR – Pichnail village road from Ch. 00.00m- 2350.00m by BC under Saltha Upazila, Dist. Faridpur [Road Id No: 329855016 Old 329854134 New)
|
2.3500
|
37.139
|
|
37.139
|
|
|
0
|
10/02/2019
|
Re-tender under process
|
|
3
|
GFRIDP-II/F/17-18/VR-HR (Maint)/79
|
Maintenance of Rabgerdia UZR - Notkhola GPS road from Ch: 0.00- 720.00m by HBB under Saltha Upazila, Dist. Faridpur
|
0.7200
|
9.228
|
Ms Rukeya Traders Faridpur
|
9.228
|
17/05/2018
|
16/12/2018
|
100
|
10/02/2019
|
Final Bill paid
|
|
4
|
GFRIDP-II/F/17-18/VR-BR/509
|
Improvement of Borokhardia Miapara to Borokhardia Alfu mor road from Ch: 0.00- 800.00m by BC under Saltha Upazila, Dist. Faridpur
|
0.8000
|
61.904
|
|
61.904
|
|
|
0
|
10/02/2019
|
Eva. sent to H/Q
|
|
5
|
GFRIDP-II/F /17-18/VR-SR/473
|
Construction of 1x4.00x4.00m RCC Box Culvert on Majhardia bazar bridge to Majhadia village UZR road at Ch: 1178.00m under Saltha Upazila, Dist. Faridpur
|
|
13.930
|
Ms Nsat Enterprise Faridpur
|
13.930
|
05/11/2018
|
04/05/2019
|
0
|
10/02/2019
|
|
|
6
|
GFRIDP-II/F/17-18/VR-SR/463
|
Construction of 3x4.00x4.50m RCC box culvert at Ch: 1450.00m on Chaltatola RHD to Tegatia Madrasha via Kanair GPS under Saltha Upazila, Dist. Faridpur
|
|
28.639
|
Ms Bonna Traders Faridpur
|
28.639
|
23/04/2018
|
10/10/2018
|
95
|
10/02/2019
|
|
|
7
|
GFRIDP-II/F/15-16/VR-SR/391
|
Construction of 4.00x4.00m 3 vent RCC Box culvert on Nokulhati Bazar- Mohipaldia (Pachpakhia) via Boalia bazar road at Ch: 1150.00m under Saltha Upazila, Dist. Faridpur
|
|
28.927
|
Ms Ratan Contruction faridpur
|
28.927
|
04/05/2016
|
03/11/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
8
|
GFRIDP-II/F/15-16/VR-BR/389
|
Improvement of Dafa GPS- Bouskhali Bazar road form Ch: 1000.00m- 2500.00m by BC under Saltha Upazila, Dist. Faridpur
|
1.5000
|
96.799
|
Ms SB Treders Faridpur
|
96.799
|
15/11/2016
|
02/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
9
|
GFRIDP-II/F/15-16/VR-HR/388
|
Improvement of Sosan Ghat RHD- Rahutpara (Embankment) via Lahorpara road form Ch: 2350.00m- 3350.00m by HBB under Saltha Upazila, Dist. Faridpur
|
1.0000
|
39.270
|
Ms SB Treders Faridpur
|
39.270
|
15/11/2016
|
02/04/2017
|
100
|
10/02/2019
|
Final Bill paid
|
|
10
|
GFRIDP-II/F/15-16/VR-HR/387
|
Improvement of Saltha GC- Cilarkandi Mosjid via Pochabudda road form Ch: 00.00m- 1230.00m by HBB under Saltha Upazila, Dist. Faridpur
|
1.2300
|
49.410
|
Ms JAHID & BROPTHERS Faridpur
|
49.410
|
04/05/2016
|
01/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
11
|
GFRIDP-II/F/15-16/VR-HR/333
|
Improvement of Majhardi GPS to Porchimpara Community Primary school road from ch: 00.00m to 1000.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
1.0000
|
37.300
|
Ms SB Treders Faridpur
|
37.300
|
02/06/2016
|
01/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
12
|
GFRIDP-II/F/15-16/VR-HR/332
|
Improvement of Joykali UNR (Deghi) -Joykali boarder (H/O Younus Dorji) via Joykali GPS road from ch: 00.00m to 1500.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
1.5000
|
59.092
|
Ms Bristi Enterprise Faridpur
|
59.092
|
28/01/2016
|
27/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
13
|
GFRIDP-II/F/15-16/VR-HR/331
|
Improvement of Saltha Eidgha - Bahirdia UNR road from ch: 580.00m to 2080.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
1.5000
|
58.259
|
Ms JAHID & BROPTHERS Faridpur
|
58.259
|
04/02/2016
|
03/06/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
14
|
GFRIDP-II/F/15-16/VR-HR/330
|
Improvement of Kamaidia Baushkhali road - Kamaidia school via Rajnagar road from ch: 00.00m to 1500.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
1.5000
|
62.968
|
Ms Azam Construction Faridpur
|
62.968
|
15/03/2016
|
14/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
15
|
GFRIDP-II/F/15-16/VR-HR/329
|
Improvement of Khardia HBB road to H/O Tuku Thakur road from ch: 00.00m to 600.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
0.6000
|
22.542
|
SB Traders Faridpur
|
22.542
|
02/06/2016
|
01/10/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
16
|
GFRIDP-II/F/15-16/VR-HR/328
|
Improvement of Majhardia bazar Bridge- Majhardia village (Gocchugram) road from ch: 1670.00m to 2350.00m by HBB under Saltha Upazila, Dist. Faridpur.
|
0.6800
|
24.978
|
Ms Alauddin Enterpris Faridpur
|
24.978
|
15/03/2016
|
14/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
17
|
GFRIDP-II/F/15-16/VR-BR/327
|
Improvement of Gotti UZR- Gotti High school road via Mokul Mia's house road from ch: 00.00m to 620.00m by BC under Saltha Upazila, Dist. Faridpur.
|
0.6200
|
30.521
|
Ms Green Construction Faridpur
|
30.521
|
03/02/2016
|
01/07/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
18
|
GFRIDP-II/F/14-15/VR-HR/297
|
Improvement of Kagdia Bazar- Bill Kazuli Danga via Batagram road from Ch. 00.00m- 1000.00m by HBB under Saltha Upazila, Faridpur.
|
1.0000
|
33.141
|
Ms Dewan Enterprise Faridpur
|
33.141
|
20/12/2015
|
19/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
19
|
GFRIDP-II/F/14-15/VR-HR/296
|
Improvement of 1) Kakdia Dewali Kanda via Bishnudia road from Ch. 1000.00m- 1500.00m & 2) Majardia U.P Office- Muratia Village road from Ch. 1000.00m -1500.00m by HBB under Saltha Upazila, Faridpur.
|
1.0000
|
32.709
|
md Billal Hossain Faridpur
|
32.709
|
13/12/2015
|
12/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
20
|
GFRIDP-II/F/14-15/VR-HR/295
|
Improvement of Kagdi Bazar - Bangril via Kagdi Bazar (Kagdi Bazar-Sonapur Hanif Fakir house via Bangril Community Clinic) road from Ch. 00.00m- 1000.00m by HBB under Saltha Upazila, Faridpur.
|
1.0000
|
33.128
|
Ms k s Enterprise Faridpur
|
33.128
|
20/12/2015
|
19/05/2016
|
100
|
10/02/2019
|
Final Bill paid
|
|
21
|
GFRIDP-II/F/14-15/VR-BR/294
|
Improvement of Amanot Shikder Bari- Balur ghat via Lakhu Miar Bari road from Ch. 750.00m- 1250.00m by BC under Saltha Upazila, Faridpur.
|
0.5000
|
28.945
|
Ms Saleh Brothers Faridpur
|
28.945
|
13/11/2015
|
12/06/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
22
|
GFRIDP-II/F/14-15/VR-HR/209
|
Improvement of road Saltha GC ( Kundubar moor ) - Saltha h/o Mosque Mohiuddin Molla from Ch. 00m - 920m by HBB under Saltha Upazila,Faridpur
|
0.9200
|
32.309
|
Ms Riya & Sons Faridpur
|
32.309
|
23/04/2015
|
07/09/2015
|
100
|
10/02/2019
|
Final Bill paid
|
|
23
|
GFRIDP-II/F/ 11-12/VR-BR/136
|
(A) Improvement of Mirkandi Pucca road- H/O Jalil Molla via Mirkandi Mosque road from ch. 00m- 410m by BC under Saltha Upazila, Dist. Faridpur & (B) Improvement of Mirkandi Pucca road- H/O Jalil Molla to Mirkandi old Mosque road from ch. 00m- 260m by BC u
|
0.4100
|
36.640
|
Ms Lipu Enterprise Faridpur
|
36.640
|
24/06/2012
|
23/01/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
24
|
GFRIDP-II/F/ 11-12/VR-HR/113
|
Improvement of Bahirdia Madrasha- Bolivordia Boarder, Bolivordia Community school road (Ch. 0.00m- 2500.00m) by HBB under Saltha Upazila, Dist. Faridpur.
|
2.5000
|
73.059
|
Ms Golden San Enterprise Faridpur
|
73.059
|
15/10/2012
|
14/08/2013
|
100
|
10/02/2019
|
Final Bill paid
|
|
25
|
GFRIDP-II/10-11/VR-HR/24
|
Improvement of Kagdi bazar- Azalpotti from ch. 0.00m-2100.00m by HBB
|
2.1000
|
54.692
|
A S Mahabubur Rahman Faridpur
|
54.692
|
06/02/2011
|
22/02/2012
|
100
|
10/02/2019
|
Final Bill paid
|
|
26
|
GFRDIP-II/10-11/ VR-BR/05
|
Improvement of Rasulpur GC - Kadamtoli Bazar road from ch. 500.00m -2500m by BC .
|
2.0000
|
88.352
|
Md Imtiaz Asif Faridpur
|
88.352
|
04/02/2011
|
03/07/2011
|
100
|
10/02/2019
|
|
|
|
Total :
|
296.1059 (Km)
|
16688.01 (Lac)
|
16688.01 (Lac)
|
|
|
|
|
|
|
|