SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Harinakunda
1 SP44084/Shitly Khal Subproject Re-excavation of Hatar Khal Referenced line section (7nos.) Bamboo bridge (7nos, 84m) Tree Plantation (6200nos.) and Subproject Identification signboard (2nos.) 77.474 LCS-4 77.474 10/12/2019 29/12/2020 75 13/08/2024 Final Bill Paid
2 Jhenaidah-s
1 SP14204/Gorer Beel DR Subproject Re-excavation of Gorer Khal (Ch. 0+000 to Ch. 2+290 Km.) Reference lined section (3 nos.) and Bamboo Bridge (3 nos.) WMCA Office & others Tree Plantation (2294nos.) and Subproject Identification signboard (2nos.) 68.265 Liton Traders 68.265 28/03/2020 27/08/2020 75 13/08/2024 Final Bill Paid
2 SP12023/Baroikhali Khal FCD Subproject Protective Work on D/S Regulator Re-excavation of Baroikhali Khal (Ch: 0.00 - 1.2 km) and Provisional Sum. Reference Lined Section (2 nos.) and SP Identification Signboard (2 nos.) 18.237 OTM 18.237 20/02/2021 24/04/2022 100 13/08/2024 Completed
3 Kaliganj
1 SP24179/Tetul Beel - Uri Beela Subproject Re-excavation of Urir beel chalabora khal (Ch. 0.00-3400m) Reference Lined Section (4nos.) and Bamboo bridge (4nos.) Tree Plantation (3402nos.) and Subproject Identification Signboard (2nos.) 41.081 LCS-6 41.081 10/02/2020 17/10/2021 73 13/08/2024 Final Bill Paid
2 SP14198/Natopara Beel DR Subproject Re-Excavation of Baliakuna Khal(Ch.0+000 Km to 1+100 Km) Const. of 2 Nos. Reference lined Section on 1 Khal (Ch. 100m, 1100m), SP Identf. sign board 2 Nos., SP Indication Post 2 Nos. and Demarcation Post 08 Nos. Construction of WMCA office 37.063 M/S Khaja Enterprise Shohid Abdul Gofur Sarak Jhenaidah 37.063 28/02/2023 25/03/2024 100 13/08/2024 Completed
3 SP13048/Shirish Kath Khal FCD Subproject Re-excavation of Arua-Saloa (Shirishkath) khal (Ch. 3000m - 4025m) WMCA Office and Others SP Signboard and Referenced line section (1nos, ch=3400m) Shirishkath Khal re-excavation (Ch:0.00 - 3000m and 4025m - 6200m) - 2023-24 Const. SP Identf. sign board 6 Nos. and SP Area Indication Post 2 Nos - 2023-24 73.597 Mrs.Rupom Enterprize 73.597 29/02/2024 30/04/2021 99 13/08/2024 Running Bill
4 Kotchandpur
1 SP62054/Padmabeel Ghoramara Chatarbeel Khal Subproject Re-excavation of Padma Beel Ghoramara Chatar Beel Khal (Ch.0+000 to Ch. 2+450 km) Const. of 3 Nos. Reference lined Section on 1 Khal, SP Identf. Sign Board 2 Nos and SP Indication Post 2 Nos. Const. of Padma Beel WRS (4v-1.50m x 1.80m) Const. of WMCA office (12.0mx6.0m) 229.872 Shaikat Enterprise 229.872 20/09/2023 68 13/08/2024 Running Bill
5 Moheshpur
1 SP61004/Jadavpur Subproject Construction of Kultala Khal WRS at Ch-2+385 km WMCA Office and Others Re-excavation of Kultala khal (Ch: 0 - 7.6km) Re-excavation of Pathra Nalpattua khal (Ch: 0 - 4.82 km) Ref. lined section (13 Nos.) and SP Signboard (2 Nos.) RCC Drainage Pipe (16X2 Nos, 58.56m) 349.728 Natural-SE-JV. 349.728 20/02/2021 24/04/2022 100 13/08/2024 Completed
2 SP12024/Goalhuda Khal FCD Subproject Re-excavation of Goalhoda khal (Ch: 0.00 - 310 m) Re-sectioning of Goalhoda-Saratola Embankment (Ch: 50 - 2700 m) Ref. Lined (1no.), Goalhoda Regulator Maint, Bamboo bridge (1no.), SP signboard (2nos.) 56.700 LCS-8 56.700 23/03/2020 24/04/2022 100 13/08/2024 Completed
Total : 0.0000 (Km) 952.02 (Lac) 952.02 (Lac)