1
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(03)/16-17/W-208
|
Const.of Protective Work on Kumira–Sagordari – Trimohoni –Rajgonj -Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road by two lane . At ch. 43.952km to 44+138km (ID.287902003). (Total (Protactive Work) Length=0.186 km)
|
0.1860
|
23.990
|
M/S Boshu Traders, Tala , Satkhira
|
23.990
|
29/06/2017
|
30/03/2018
|
100
|
20/12/2018
|
|
|
2
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(02)/15-16/W-155
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003).
i) BC road work =3.000 km
(Ch. 43+296 km – 46+296 km)
ii) Structure = 3 Nos (1.85 m) (Total Length=3.000 km)
|
3.0000
|
299.000
|
Md. Iqbal Jamaddar, Polashpole, Satkhira
|
299.000
|
25/01/2016
|
28/02/2017
|
100
|
20/12/2018
|
|
|
3
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(01)/13-14/W-102
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003).
i) Imp. & Widening work by BC=2.014km
(Ch. 46+296 km – 48+310 km) & Widening of single lane road into two lane by earth work = 5.500km. (Ch. 42+810km – 48+310km).
ii) Const. & Widening Work of Structure = 1 No (1.00 m) At ch. 48973.00m. (Total Length=2.014km)
|
2.0140
|
242.950
|
Sk. Shirazul Haque, Labsha, Satkhira
|
242.950
|
20/11/2014
|
22/06/2015
|
100
|
20/12/2018
|
|