Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Tala
1 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(03)/16-17/W-208 Const.of Protective Work on Kumira–Sagordari – Trimohoni –Rajgonj -Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road by two lane . At ch. 43.952km to 44+138km (ID.287902003). (Total (Protactive Work) Length=0.186 km) 0.1860 23.990 M/S Boshu Traders, Tala , Satkhira 23.990 29/06/2017 30/03/2018 100 20/12/2018  
2 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(02)/15-16/W-155 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003). i) BC road work =3.000 km (Ch. 43+296 km – 46+296 km) ii) Structure = 3 Nos (1.85 m) (Total Length=3.000 km) 3.0000 299.000 Md. Iqbal Jamaddar, Polashpole, Satkhira 299.000 25/01/2016 28/02/2017 100 20/12/2018  
3 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(01)/13-14/W-102 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003). i) Imp. & Widening work by BC=2.014km (Ch. 46+296 km – 48+310 km) & Widening of single lane road into two lane by earth work = 5.500km. (Ch. 42+810km – 48+310km). ii) Const. & Widening Work of Structure = 1 No (1.00 m) At ch. 48973.00m. (Total Length=2.014km) 2.0140 242.950 Sk. Shirazul Haque, Labsha, Satkhira 242.950 20/11/2014 22/06/2015 100 20/12/2018  
Total : 5.2000 (Km) 565.94 (Lac) 565.94 (Lac)