Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Kalaroa
1 SP13092/Sonai Khal FCD Subproject Re-excavation of Shialkhali Khal (Ch: 0 to 920 m) Ref. Line Section (1nos. Shialkhali-Ch:800m) and SP Identification Signboard & Post (2nos.) 17.777 LCS-3 17.777 28/12/2023 30/04/2024 100 13/08/2024 Ongoing
2 SP12015/Vorvoria Beel FCD Subproject WMCA Office building and others 17.153 NOTM 17.153 28/05/2018 26/04/2019 100 13/08/2024 Completed
2 Satkhira-s
1 SP61005/Dantbhanga Khal Subproject Dantbhanga Khal Regulator (5v-1.5m x 1.8m) at Ch-0+060km WMCA Office and Others Re-exacavation of Dantbhanga khal (Ch-0+000khm to 4+300km) Ref. lined section (5nos.), SP signboard 383.432 M.M. Builders & Eng. ltd., Gulshan-1 ,Dhaka 383.432 25/01/2022 100 13/08/2024 Completed
3 Tala
1 SP61001/Balia Bhangunkul Subproject Re-sectioning of Balia Bhangakul Embankment Re-excavation of Jona Khal Re-excavation of Dumuria Kheshra Khal Re-excavation of Madiar Khal Re-excavation of Amtala Khal Re-excavation of Shahzadpur-Purbachar Khal Re-excavation of Hazratala Khal Const. of Reference Lined Section Jona Khal Regulator (ch 0 + 425 k.m.) Madiar Khal Regulator (ch 3 + 725 k.m.) Shazadpur Khal Regulator (ch 6 + 155 k.m.) Shaltala Khal Pipe Calvert (ch 3 + 440 k.m.) Shazadpur Khal Pipe Calvert (ch 6 + 865 k.m.) Hazratala Pipe Sluich (ch 10 + 285 k.m.) Dumuria Shasan Ghat Pipe Sluice (ch 2 + 687 k.m.) WMCA Office & Others 466.094 PBL-AE-JV, Gulshan-2,Dhaka-1212 466.094 16/05/2018 30/05/2018 81 13/08/2024 Completed
2 SP15335/Jetua-Kanaidha FCD Subproject Repair & Maintainace of Kanaidia Duchar 1vent Regulator -. Repair & Maintainace of Jethua Ghar 2vent Regulator -. Repair & Maintainace of Kalaparia Khal 2vent Regulator -. Repair & Maintainace of Jethua Beel 2vent Regulator -. Construction of Baurar Khal Pipe Sluice 1vent. Construction of Baolar Ghat Pipe Sluice 1vent. Construction of Khaya Ghat Pipe Sluice 1vent. 19.351 Sk.Idrish Ali, Basatati, Bagerhat 19.351 07/11/2021 100 13/08/2024 Completed
Total : 0.0000 (Km) 903.81 (Lac) 903.81 (Lac)