Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Charfassion
1 DIRIP/Bhl/ Chrf/VR/SL-55(05)/13-14/ W-92 Construction of 60.00m Long RCC girder Bridge on the road of Kashemgonj to east side of Madraj Beribadh road at Ch: 14+640km over Thalakhali Khal (ID No. 509254076) Structure Works = 01 No. (60.00m) (at Ch: 14640m.) charfession 337.764 Unas Al mamun 337.764 20/01/2014 19/01/2015 100 27/06/2019 On going
2 DIRIP/Bhl/ Chrf/ UNR/SL-49(04)/13-14/W-60 Imp. of Madraj Beribadh-West side Tetulia river road. (ID: 509253056). BC Road Works = 0.980km, (Ch.: 12+250km - 13+230km) Structure Works = 05 Nos (11.00m) under Charfession. 0.9800 830.439 M/s Rubal Enterprise 830.439 29/01/2014 28/07/2014 100 27/06/2019 FBP
3 DIRIP/Bhl/Chrf/VR/SL-51(04)/13-14/W-90 C40 BC Road Works = 1.910km, (Ch.: 5+440km - 74+350km) Structure Works = 08 Nos (14.25m) under Charfession. 1.9100 142.676 Mohiuddin Ahamed 142.676 29/01/2014 20/10/2015 100 27/06/2019
4 DIRIP/Bhl/Chrf/VR/SL-52(04)/13-14/W-91 Imp. of Charfokira Beribadh to Osmangornj Uniion border road. (ID: 589254874) BC Road Works = 4.360km, (Ch.: 7+500km - 8+100km, 28+670km-31+230km & 31+830km-33+030km) Structure Works = 09 Nos (6.75m)under Charfession 4.3600 285.949 Unas Al mamun 285.949 20/01/2014 20/10/2015 100 27/06/2019 FBP
5 Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-55(06)/16-17/W-212 Const. of 63.00 m long RCC Girder bridge on Kashemgonj to East side of Madraj beri bandh road. At Ch. 13410 m ID. 509254076. (Total(Approach) Length=0.100 km) 63.0000 352.930 M/s. Unus-al-Mamun, Charfashion, Bhola 352.930 25/01/2018 24/01/2019 65 13/05/2019  
6 DIRIP/BHL/Chrf/UNR/SL-49(08)/16-17/W-211 Construction of 25.00 m long PC Girder Bridge on Madraj Beribadh-west side of Tetulia river road at Ch. 16285 m ID. 509253056. (Total(Approach) Length=0.100 km) 0.1000 191.030 M/S Friends Corpo.Ukil Para roadBhola 191.030 25/01/2018 21/01/2019 70 13/05/2019  
7 DIRIP/BHL/Char/VR/SL-53/15-16W-171 Improvement of Nurabad to east Border of Madraj Union Road from Ch: 20+600km to 21+275 km (Rd. ID: 509254075) 0.6750 40.423 Md. Unas Al Mamun 40.423 30/05/2016 24/11/2016 75 11/04/2019
8 DIRIP/BHL/Chrf/VR/SL-50(05)/15-16/W-142 (RW) Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 21+650km - 24+000km & 24+660km - 25+310km). ID. 509254072 (Total Length=3.00km) 3.0000 194.650 M/S Poly Engineering, Corporation,10,Parara road,Barisal 194.650 07/12/2016 08/05/2018 100 11/04/2019  
9 DIRIP/BHL/Chrf/VR/SL-56(05)/16-17/W-213 Const. of 30.00 m long PC Girder bridge on Aminabad Boyati Khal Bridge to east side of Madraj Beri badh Road.At ch. 16050 m. (ID:509254028). (Total(Approach) Length=0.100 km) 30.0000 253.460 M/s. Unus-al-Mamun, Charfashion, Bhola 253.460 25/01/2018 24/01/2019 80 08/04/2019  
10 DIRIP/BHL/Chrf/UNR/SL-49(06)/16-17/W-193 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.15+490km - 17+330km & 18+150km - 20+070 km). ID. 509253056. (Total Length=3.705km) 3.7050 302.170 M/S Jashim Const.ChorfashonBhola 302.170 29/05/2017 28/05/2018 70 11/03/2019  
11 DIRIP/Bhl/Chrf/VR/SL-55(01)/12-13/ W-34 Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 3.390km. (Ch.: 0+00km to 3+390km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 12 Nos (17.25m). under Charfession upazila. 3.3900 259.750 M/s. Bokshi Enterprise 259.750 28/03/2013 27/09/2014 100 10/03/2019 FBP
12 Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-56(04)/16-17/W-198 Imp.Of Aminabad Boyati Khal Bridge to east side of Madraj Beri bandh Road (ID:509254028). Part A:Pucca (BC) road Works=2.335km (Ch.14+550 km to 16+885 km ) Part B:Rehabilitation Works = Nil Part C Structure Works =6 nos (10.50m) (Total Length=2.199 km) 2.3350 168.790 M/s. Bokshi Ent. Charfashon, Bhola 168.790 29/05/2017 28/05/2018 100 10/03/2019  
13 Upazila: Charfashion DIRIP/BHL/Chrf/ VR/SL-52(05)/16-17/W-197 Imp. of Chorfakira Beribadh to Osmangonj Union borde road. ID. 509254074. at ch. 33+030km-34+251km, (Total Length=1.221km) 1.2210 94.230 M/S. Saimum Traders, Charfashion, Bhola 94.230 29/05/2017 28/05/2018 100 20/12/2018  
14 Upazila: Charfashion DIRIP/BHL/Chrf/ VR/SL-51(06)/16-17/W-196 Imp. of Samraj to Char Kalmi west border road at ch. 4+190km-5+440km (ID:509254073). (Total Length=1.250 km) 1.2500 94.120 M/S Khan Traders,Charfashion, Bhola Bhola 94.120 29/05/2017 28/05/2018 100 20/12/2018  
15 DIRIP/BHL/Chrf/ VR/SL-50(06)/16-17/W-195 Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 23+310km - 26+000km. ID. 509254072 (Total Length=0.690km) 0.6900 39.990 M/s. Saimun Traders, Charfashion, Bhola 39.990 29/05/2017 06/06/2018 100 20/12/2018  
16 DIRIP/BHL/Chrf/ VR/SL-50(04)/13-14/W-87 Imp.of Aslampur UP border to Osmangonj Beribandh road at ch.5+220km-7+770km, 7+920km-8+630km &17+750km-18+150km . (ID:509254072). (Total Length=3.660km) 3.6600 281.430 M/s. Jasim Const. Thanaroad, Charfashion, Bhola 281.430 09/03/2014 29/11/2015 100 20/12/2018  
17 DIRIP/BHL/Chrf/ VR/SL-50(01)/12-13/W-06 Imp.of Aslampur UP border to Osmangonj Beribadh road ((ID:509254072). Part A:Pucca (BC) Road Works = (Ch. 14+370 to 15+370 km) = 1.00km (Total Length=1.00km) 1.0000 63.710 M/S Jashim Const. Thana road Chorfashon Bhola 63.710 19/02/2013 23/10/2014 100 20/12/2018  
18 DIRIP/BHL/Chrf/ UNR/SL-49(07)/16-17/W-194 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.20+070-22+870 km). ID. 509253056. (Total Length=2.800km) 2.8000 160.850 M/s. Bokshi Ent. Chorfashon, Bhola 160.850 29/05/2017 28/05/2018 100 20/12/2018  
19 DIRIP/BHL/Chrf/ UNR/SL-49(05)/15-16/W-140 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.9+000km - 10+670km & 13+230km - 14+690 km). ID. 509253056. (Total Length=3.130km) 3.1300 221.440 M/s. Sayem Enterprise 221.440 27/10/2015 03/05/2016 100 20/12/2018  
20 Tree Plantation (1) Char Fakira bari Bandh Osmangong Union Barder Road at Ch. 8200-16250m (2) Kashemgong East side of Madraj Bari Bandh road at ch. 00-3390m Cherfessain 8.530 8.530 15/10/2014 20/10/2014 100 10/03/2017 FBP
21 DIRIP/BHL/Chrf/VR/SL-53(03)/15-16/W-141 Improvement of Nurabad to east Side of Madraj union road ID.509254075 (Part-A: BC Works=5.009km, Ch: 11+522km to 11+910km & 13+400km to 13+518km, 15+100km to 18+203km and 19+200km to 20+600km) Part-C: Structure Work=1 nos (9.00m). under Charfession upazila. 5.0090 395.626 Md. Unas Al Mamun 395.626 28/10/2015 27/10/2016 100 10/03/2017 FBP
22 DIRIP/BHL/Charf/VR/SL-51(05)/13-14/W-95 Improvement of Samraj to CharKalmi West Border Road From Ch (12+6250-14+465) including 06 m Structures 1.8400 129.425 M/s Jashim Const. 129.425 22/04/2014 10/09/2014 100 10/03/2017 FBP
23 DIRIP/Bhl/ Chrf/ VR/SL-50(04)/13-14/ W-87, Imp. of Aslampur UP border to Osmangonj Beribadh road ID: 509254072. BC Road Works = 3.66 km, (Ch.: 5+220km - 7+770km, 7+920km-8+630km & 17+750km- 18+150km). Structure Works = 17 Nos. (15.75m) under Charfession Upazila. 3.6600 281.432 M/s Jashim Const. 281.432 29/11/2015 29/11/2015 100 10/03/2017 FBP
24 DIRIP/Bhl/ Chrf/UNR/SL-54(03)/13-14/W-89 Imp. of Hajarigonj Beribadh to North side of Aslampur road (Ch: 0+000km- 4+120km) ID: 509253057.BC Road Works = 4.120 km, (Ch.: 0+000km - 4+120km). Structure Works = 15 Nos. & 28.50m. under Charfession 4.1200 328.852 Unas Al mamun 328.852 09/03/2014 06/03/2015 100 10/03/2017 FBP
25 DIRIP/Bhl/Chrf/VR/SL-53(02)/13-14/W-78 Imp. of Nurabad to East border to Madraj Union road (ID. 509254075) Part A: BC Road Works = 4+450km., (Ch.: 0+000km – 4+450km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (4.50) under Charfession upazila. 4.4500 287.410 Unas Al mamun 287.410 04/12/2013 03/08/2014 100 10/03/2017
26 DIRIP/Bhl/Chrf/VR/SL-50(03)/13-14/W-77 Imp. of Aslampur UP border road to Osmangonj Beribandh road (ID. 509254072)Part A: BC Road Works = 3+960km., (Ch.: 8+670km - 11+250km, 15+370km- 16+190km & 17+190km – 17+750km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 08 Nos (31.50m) under Charfession upazila. 3.9000 302.436 M/s Jerin & Co. 302.436 23/01/2014 10/09/2014 100 10/03/2017 FBP
27 DIRIP/Bhl/Chrf/VR/SL-51(03)/13-14/ W-76 Imp. of Samraj to Char Kalmi west border road (ID. 509254073)Part A: BC Road Works = 0.96 km, (Ch.: 1+000km - 1+366km & 2+366 km- 2+960 km). Part B: Rehabilitation Woks = .charfession 0.9600 611.784 M/s Mawa Construction 611.784 01/12/2013 05/06/2015 100 10/03/2017 FBP
28 DIRIP/Bhl/Chrf/VR/SL-55(04)/12-13/W-72 Imp. of Kashemgonj to east side of Madraj Beribadh road (ID. 509254076) Part A: BC Road Works = 3+855km., (Ch.: 11+420km - 15+275km). Part B: Rehabilitation Woks = Nil Part C: Structure Works =05 Nos 3.8550 259.394 M/s Quired Enterprise 259.394 18/11/2013 26/10/2015 100 10/03/2017 FBP
29 DIRIP/Bhl/Chrf/VR/SL-56(03)/12-13/W-66 , Imp. of Aminabad-Boyatir Khal Bridge to East side of Madraj Beribadh road (ID. 509254028) Part A: BC Road Works = 1.820km, (Ch.: 11+130km - 12+330km & 13+930 km- 14+550km). 1.8200 125.021 Md. Iqbal Hossain 125.021 26/11/2013 25/12/2015 100 10/03/2017 FBP
30 DIRIP/Bhl/Chrf/UNR/SL-49(03)/12-13/W-64 "Imp. of Madraj Beribadh-west side Tetulia river road. ID 509253056. Part A: BC Road Works = 0.820km. (Ch.: 17+330km – 18+150km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 05Nos. (44.30m) under Charfession " 0.8200 356.447 M/s Friends Corporation 356.447 19/09/2013 31/12/2014 100 10/03/2017 FBP
31 DIRIP/Bhl/Chrf/VR/SL-55(03)/12-13/W-63 Imp. of Kashemgonj-East Side of Madraj Beribadh road (ID: 509254076) Part A: BC Road Works = 3.985km. (Ch.: 3+390km – 5+800km & 9+845km-11+420km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 15 Nos. (52.50m).Charfession 3.9850 355.771 Unas Al mamun 355.771 19/09/2013 18/03/2015 100 10/03/2017 FBP
32 DIRIP/Bhl/Chrf/VR/SL-52(03)/12-13/W-62 "Imp. of Charfikira Beribadh to Osmangonj Union Border road (ID. 509254074) Part A: BC Road Works = 6.120km. (Ch.: 1+380km - 7+500km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = Nil. " 6.1200 355.103 Unas Al mamun 355.103 19/09/2013 18/03/2015 100 10/03/2017
33 DIRIP/Bhl/Chrf/VR/SL-51(02)/12-13/ W-61 " Imp. of Shamraj to Char Kalmi west Border road (ID. 509254073) Part A: BC Road Works = 4.300km. (Ch.: 8+350km - 12+650km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 13 Nos (34.50m) under Charfession upazila. " 4.3000 358.275 358.275 19/09/2013 18/03/2015 100 10/03/2017 FBP
34 DIRIP/Bhl/Chrf/UNR/SL-54(02)/12-13/W-59 Imp. of Hazarigonj Beribadh to north side of Aslampur road (ID. 509253057) Part A: BC Road Works = 5.065km. (Ch.: 10+750km - 11+800km, 12+750km – 15+350km & 16+485-17+ 900km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (18m) under Charfession upazila. 5.0650 354.745 Md. Iqbal Hossain 354.745 08/09/2013 20/05/2015 100 10/03/2017 FBP
35 DIRIP/Bhl/Chrf/UNR/SL-49(02)/12-13/W-58 Imp. of Madraj Beribadh to west side Tetuli river road (ID. 509253056) Part A: BC Road Works = 4.520km. (Ch.: 3+000km - 5+420km & 6+900-9+000km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 18 Nos (32.25m) under Charfession 4.5200 350.541 "M/s. Jashim Construction Charfession, Bhola" 350.541 19/09/2013 18/03/2015 100 10/03/2017 FBP
36 DIRIP/Bhl/Chrf/VR/SL-56(02)/12-13/W-50 Imp. of Aminabad Boyati Khal bridge to east side of Madraj Beribadh road. (ID. 509254028), Part A: BC Road Works = 3.942km., (Ch.: 2+740km to 5+143km & 5+541 km-7+080km)., Part B: Rehabilitation Woks = Nil.Part C: Structure Works = 17.00 Nos (33.75m) under Charfession upazila. 3.9420 316.899 Unas Al mamun 316.899 05/08/2013 15/03/2015 100 10/03/2017 FBP
37 DIRIP/Bhl/Chrf/VR/SL-50(02)/12-13/W-49 Imp. of Aslampur UP border to Osmangonj Beribadh road (ID. 509254072), Part A: BC Road Works = 4.120km., (Ch.: 0+000km to 4+120km)., Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (12.75m) under Charfession upazila. 4.1200 283.762 M/s. Bokshi Enterprise 283.762 05/08/2013 15/01/2014 100 10/03/2017 FBP
38 DIRIP/Bhl/Chrf/VR/SL-55(02)/12-13/ W-38 Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 1.88 km. (Ch.: 7+970km to 9+845km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 6 Nos (11.75m) (at Ch: 8+037km, 8+292km, 8+460km, 8+615km, 9+252km & 9+442km), under Charfession upazila. 1.8800 147.780 "M/s. Jashim Construction Charfession, Bhola" 147.780 28/03/2013 15/03/2015 100 10/03/2017 FBP
39 DIRIP/Bhl/Chrf/VR/SL-52(02)/12-13/W-33 Imp. of Char Fakira beri badh to Osmangonj Union Border road. (ID: 509254074): Part A: BC Road Works = 5.530km. (Ch.: 8+200 to 11+250km, 12+ 240km to 14+720km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 19 Nos (15.00m). under Charfession upazila. 5.5300 40.120 "Md. Eunus-Al Mamun Charfession, Bhola" 40.120 24/03/2013 16/01/2014 100 10/03/2017 FBP
40 DIRIP/Bhl/Chrf/VR/SL-56(01)/12-13/ W-15 Imp. of Aminabad Boyati khal bridge to eas side of Madraj Beribadh road. (ID: 509254028), (1) Part A: Pucca (BC) Road Work = 1.530 km. [Ch. 0+00 (Avwgbvev` eqvwZi Lvj eªx‡Ri `wÿY w`K n‡Z) to 1+530 km (Pid¨vkb †`vjvinvU wRwm †ivW ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 06 Nos (17.25m) (At Ch: 0+ 00, 0+345, 0+550, 1+010, 1+077 & 1+434 km). 1.5300 133.390 "M/s. Al-Amin Traders, Daulatkhan, Bhola" 133.390 24/02/2013 01/12/2013 100 10/03/2017 FBP
41 DIRIP/Bhl/Chrf/VR/SL-52(01)/12-13/ W-14 (1) Part A: Pucca (BC) Road Work = 1.250 km. [Ch. 15+000 (wgVz †Pqvig¨v‡bi evoxi wbKU n‡Z) to 16+250 km (eqvwZi Lvj ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 05 Nos (14.25m) (At Ch: 15+780, 16+035 & 16+250 km). 1.2500 113.120 "M/s. Bokshi Enterprise Charfession, Bhola" 113.120 03/03/2013 20/04/2013 100 10/03/2017 FBP
42 DIRIP/Bhl/Chrf/VR/SL-53(01)/12-13/ W-13 Imp. Nurabad to east Border of Madraj union road. (ID: 509254075), (1) Part A: Pucca (BC) Road Work = 1.022 km. [Ch. 7+500 (Iqv`y` wgqvi evoxi wbKU n‡Z) to 8+522 km (Xvwj nv‡Ui cwðg w`K ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 04 Nos (4.50m) (At Ch: 7+794, 7+914, 8+064 & 8+289 km). 1.0220 6760145.000 M/s. Jashim Const. Thana road, Charfession, Bhola. 6760145.000 11/04/2013 11/10/2013 100 10/03/2017 FBP
43 DIRIP/Bhl/Chrf/VR/SL-51(01)/12-13/ W-09 Imp. of Shamraj to Char kalmi west border road. (ID: 509254073) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (bKwZ evoxi nvjU gmwR‡`i DËi cvk n‡Z) to 1+00 km (Rvnv½xi `yevB evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+153 & 0+820km). 1.0000 6485554.000 M/s. Eunus Al-Mamun, Thana road, Bhola. 6485554.000 19/02/2013 31/03/2015 100 10/03/2017 FBP
44 DIRIP/Bhl/Chrf/UNR/SL-49(01)/12-13/ W-08 Imp. of Madraj Baribadh to west side Tatulia river road. (ID: 509253056) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (c~e© wgqvRvbcyi RNGPS `t cvk¦©) to 1+00 km (mvBdzj Bmjvg gywÝi evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+ 380 & 0+563 km). 1.0000 6761510.000 Md. Mohashin Nagor, Dhonia, Bhola 6761510.000 10/03/2013 08/10/2013 100 10/03/2017 FBP
45 DIRIP/Bhl/Chrf/UNR/SL-54(01)/12-13/ W-07 Imp. of Hajarigonj Beribadh to North side of Aslampur road. (ID: 509253057), (1) Part A: Pucca (BC) Road Work = 1.000 km. [Ch. 4+200 (wgwR evoxi wbKU n‡Z) to 5+200 km (e„nËi ewikvj cÖK‡íi m¤úvw`Z cvKv iv¯Ív ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil. 1.0000 6064469.000 "M/s. Bengal Traders Thanaroad, Charfession, Bhola. 6064469.000 16/04/2013 15/10/2013 100 10/03/2017 FBP
46 DIRIP/Bhl/Chrf/VR/SL-50(01)/12-13/ W-06 Imp. of Aslampur UP border to Osmangonj Beribadh road. (ID: 509254072) (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 14+370 (ImgvbMÄ BDwcÕi mvg‡b cvKv iv¯Ív n‡Z) to 15+370 km (cv‡Uvqvixi evox ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil. 1.0000 6371467.000 M/s. Jashim Const. Thana road, Charfession, Bhola. 6371467.000 19/02/2013 23/10/2014 100 10/03/2017 FBP
Total : 204.9040 (Km) 32453356.66 (Lac) 32453356.66 (Lac)