Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bheramara
1 SP15261/Satbaria-Dharampur DR & WCS Subproject Satbaria-Dharampur Khal Re-excavation(ch0.00-2400m) Ref. Lined Section 2 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) WMCA office, Placement of Pre-cost Rcc pipe infront of WMCA office Repair work of single vent Sluice gate -. 57.716 OTM 57.716 18/03/2021 30/09/2021 100 13/08/2024 Completed
2 SP13111/Bahirchar FCD Subproject Podda Nodir Embankment re-sectioning(ch.4260-6550m) Repair of Podda Nodir Embankments Regulator 49.886 LCS-10 49.886 28/03/2018 30/04/2017 100 13/08/2024 Completed
2 Khoksha
1 SP46279/Komorbogh-Raipur Ajail Subproject Ajail Khal Re-excavation(ch0.00-2500m) Raypur Khal Part 1 Re-excavation(ch0.00-0.830m) Raypur Khal Part 2 Re-excavation(ch0.00-1410m) Reference Lined Section On Ajail Khal, Raypur Khal P-1and Roypur Khal P-2 (4 Nos.) Identificat -2nos Hizlabat Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Raypur Branch Khal re-xcavation (Ch:0.00m - 800.00m) 2023-24 Ganeshpur Khal re-xcavation (Ch:0.00m - 500.00m) 2023-24 Azail Branch-1 Khal re-xcavation (Ch:0.00m - 1100.00m) 2023-24 Azail Branch-2 Khal re-xcavation (Ch:0.00m - 1200.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 54.185 LCS-3 54.185 14/03/2024 31/05/2024 95 13/08/2024 Ongoing
2 SP12029/Sirajpur Haor FCD Subproject Sirajpur Khal Re-excavation (Ch: 0.00 - 4400 m) Reference Lined Section (5 nos.) and SP Identification Signboard (2 nos.) 53.554 LCS 53.554 25/01/2023 30/05/2023 100 13/08/2024 Completed
3 Kumarkhali
1 SP62027/Sadarpur Baruria khal Subproject Re-excavation of Sadarpur baruria Khal (Ch-0+000km to 6+135km) Re-excavation of Chadpur beeler Khal (Ch-0+300km to 3+600km) Construction of WMCA office Ref. Lined Section 10 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) Construction of Baruria khal Box culvert (2v-3.50mx4.40m) atch.5+388km | 2023-24 147.965 OTM 147.965 31/05/2023 30/05/2023 60 13/08/2024 Finall Bill
Total : 0.0000 (Km) 363.31 (Lac) 363.31 (Lac)