SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Bagherpara
1 SP43063/Kuthurakandi Khal Subproject Re-Excavation of Kathurakandi Khal (Ch.0+000 Km to 0+400 Km) Const. of 1 No. Reference Lined on 1 Khal (Ch. 100m) SP Identification sign board 2 Nos., SP Indication Post 2 Nos., SP Demarcation Post and Repair of Kathurakandi Khal Regulator (2v-1.50mx1.80) 11.524 LCS-2 11.524 05/03/2023 30/04/2023 100 13/08/2024 Completed
2 Chowgacha
1 SP44074/Swarupdaha Dhunar Khal Subproject Dhunar Khal Re-excavation(ch0.00-970m) Maintainace of Sukra Khal Regultor, WMCA Office and Ref. Lined 2 On 1 Khals, Identf. Signboard (2 nos.), Tubewell, Toilet - 13.137 LCS-2 13.137 19/03/2021 29/04/2021 100 13/08/2024 Completed
3 Jashore-s
1 SP24144/Dolpur-Mukteshwary Khal Subproject Re-excavation of Dolpur Khal (Ch.0+000 Km to 1+075 Km) Re-excavation of Mukteshwary Khal (Ch.0+000 Km to 1+410 Km) Reference Lined section (6Nos. Dolpur-Ch: 100m,500m,1000m & Mukteshwary-Ch: 100m,700m,1400m) & SP Identification Sign Board & Post (2Nos.) 21.691 LCS-2 (430-1075)m 21.691 24/12/2023 66 13/08/2024 Ongoing
2 SP13079/Ichali WCS Subproject Maintenance to WMCA Office,Elec. Painting, 1 Toilet, 1 Urinal Works, 1 Tubewell and SP Sign board - Extension of RCC Irrigation Open Canal (550 m) Repairing and Maintenance of Hand Wheel Type Lifting Device of Pipe Sluice -. 32.727 OTM 32.727 01/02/2021 20/07/2021 100 13/08/2024 Completed
4 Jhikargacha
1 SP15281/Padma Beel FCD Subproject Repair and Maintenance of WMCA Office (Brick work, RCC, Plaster, Electrictal work etc.) Repair and Maintenance of Regulator (Size 1V-1.50mX1.80m.) Block, gate etc. Re-excavation of Padma Beel Khal (Ch.0+000 Km to 0+590 Km) Reference Lined section (1Nos. Padma beel khal-Ch:100m) & SP Identification Sign Board 9.659 M/S Asad Steel Plaza, Monirampur, Jashore. 9.659 24/12/2023 30/04/2024 100 13/08/2024 Completed
5 Keshabpur
1 SP12030/Baga Beel FCD Subproject Re-excavation of Baga Khal Ref. lined section (2 nos.), SP Identification Sign Board, Tree Plantation and Bamboo Bridge. Construction of WMCA office building 46.598 OTM 46.598 25/04/2022 25/03/2021 100 13/08/2024 Completed
Total : 0.0000 (Km) 135.34 (Lac) 135.34 (Lac)