1
|
JRRIDP/24/JSR/W-237
|
Improvement of Narendropur Abul Kalam Azad House - Narendropur Moni House Rd (Ch.00-1000m) by BC.
|
1.0000
|
100.710
|
M/S Prottay Enterprise Jashore
|
100.710
|
|
|
0
|
20/03/2024
|
|
|
2
|
JRRIDP/19/JSR/W-76 (R)
|
Remaining work of Fata Gollar More – Sheikhati Dokkhinpara Mosque Road (Ch.00-650m) by BC.
|
0.6500
|
35.260
|
M/S S R Enterprise Jashore
|
35.260
|
|
|
0
|
20/03/2024
|
|
|
3
|
JRRIDP/24/JSR/W-255
|
Improvement of Gaidh gasi-Joyanta Rd (Ch.00-1780m) by BC.
Improvement of Alomnagar-Mothbaria Road (Ch.00-1580m) by BC.
|
3.3600
|
316.070
|
|
316.070
|
|
|
0
|
18/03/2024
|
|
|
4
|
JRRIDP/24/JSR/W-254
|
Improvement of Halsha Kamar Moor-Halsha Mosque Rd (Ch.00-1290m) by BC.
Improvement of Sher Ali Moor-Doomdia Rd (Ch.2325-3210m) by BC.
Improvement of Kashimpur Hazi Moor-Khuzarhat Road (Ch.00-500m) by BC.
Improvement of Kholadanga vill. at Hadir house Joyenta Eidgha Road (Ch.00-780m) by BC.
|
3.4550
|
345.450
|
|
345.450
|
|
|
0
|
18/03/2024
|
|
|
5
|
JRRIDP/24/JSR/W-243
|
Improvement of Norendrapur-Norendrapur H/School Rd (Ch.00-1500m) by BC.
Improvement of Narendropur Teputala to Shakharigati Road (Ch.00-1600m) by BC.
Improvement of Kashimpur Bazar - Rahalapur Road (Ch.400-1000m) by BC.
|
3.7000
|
375.630
|
|
375.630
|
|
|
0
|
18/03/2024
|
|
|
6
|
JRRIDP/24/ JSR/W-242
|
Maintenance of Satiantola Bazar- (Fulbari More) Ichali UP via Suro, Kamergona Rd (Ch.2200-2900m & Ch.3300-5300m) under Jashore Sadar, Jashore.
|
2.7000
|
120.650
|
|
120.650
|
|
|
0
|
28/02/2024
|
|
|
7
|
JRRIDP/24/JSR/W-236
|
Re-Construction of 01 Nos Box culvert (Size 4.00mx5.00m) Single Vent on Bablatola Taxi Stand-Sarothi Mill Gabtola Rd at Ch.400m.
|
|
34.060
|
|
34.060
|
|
|
0
|
19/02/2024
|
|
|
8
|
JRRIDP/24/JSR/W-232
|
Improvement of Ambattala-Jagohati Rd (Ch.00-800m) by BC.
Improvement of Talbaria H/o Mithu sana - Dhanghata Bazar Road (Ch.500-1000m) by BC.
|
1.3000
|
123.090
|
|
123.090
|
|
|
0
|
19/02/2024
|
|
|
9
|
JRRIDP/23/JSR/W-224
|
Improvement of Abdulpur-Bagdanga Rd (Ch.00-400m) by BC.
Improvement of Dattapara Bazar-Amdabad School Rd (Ch.00-500m) by BC.
|
0.9000
|
90.680
|
|
90.680
|
|
|
0
|
03/10/2023
|
|
|
10
|
JRRIDP/22/JSR/W-187
|
Improvement of Lawjani Bazar-Deeara UP Office via Narangali Bazar Rd (Ch.2000-5915m) by BC.
|
3.9150
|
412.600
|
M/S Sarder International
|
412.600
|
|
|
0
|
24/09/2023
|
|
|
11
|
JRRIDP/23/ JSR/W-193
|
Improvement of Pulerhat - Arabpur UP (Mondalgati) Road (Ch.00-1200m) by BC.
|
1.2000
|
127.990
|
M/S Rejaul Karim
|
127.990
|
|
|
0
|
19/09/2023
|
|
|
12
|
JRRIDP/23/JSR/W-194
|
Improvement of Basundia Dolonghata Moor-Muthurapur Rd (Ch.00-500m) by BC.
Improvement of Natuapara Edgha- Bhagolpur road (Ch.00-1100m) by BC.
|
1.6000
|
157.300
|
M/S Ria Entp
|
157.300
|
|
|
0
|
19/09/2023
|
|
|
13
|
JRRIDP/23/JSR/W-195
|
Improvement of Vagulpur-Rasulpur Rd (Ch.00-1540m) by BC.
|
1.5400
|
151.000
|
Shathi Entp.
|
151.000
|
|
|
0
|
19/09/2023
|
|
|
14
|
JRRIDP/23/JSR/W-218
|
Improvement of Bagerhat Bazar-Ramnagar UP office Rd (Ch.00-840m & Ch.1260-2690m) by BC.
|
2.2400
|
252.430
|
|
252.430
|
|
|
0
|
12/09/2023
|
|
|
15
|
JRRIDP/23/JSR/W-136
|
Improvement of Haibatpur UP-Ambottola via Kamalpur, Shahabajpur Rd (Nischintapur Govt. Primary School Connecting Road) (Ch.00-690m) by BC
|
0.6900
|
63.900
|
|
63.900
|
|
|
0
|
05/09/2023
|
|
|
16
|
JRRIDP/23/JSR/W-215
|
Improvement of Haibatpur UP-Ambottola via Kamalpur, Shahabajpur Rd at (Ch.00-200m & Ch.6510-6710m) by RCC.
|
0.4000
|
74.840
|
|
74.840
|
|
|
0
|
03/09/2023
|
|
|
17
|
JRRIDP/23/JSR/W-214
|
Improvement of Arichpur Mistiribari-Gobindapur Road (Ch.1350-2000m) by BC.
Improvement of Isapur Village Road (Ch.00-800m) by BC.
Improvement of Faridpur to Jhaudia Road (Ch.00-800m) by BC.
|
2.2500
|
213.900
|
|
213.900
|
|
|
0
|
30/08/2023
|
|
|
18
|
JRRIDP/23/JSR/W-213
|
Improvement of Earanda Bazar-Alomnagor Rd (Ch.1000-1757m) by BC
Improvement of Ghurulia-Bora Gopalpur Rd (Ch.00-500m) by BC.
Improvement of Durgapur-Erendah Rd (Ch.1000-1540m) by BC.
|
1.7900
|
170.470
|
|
170.470
|
|
|
0
|
30/08/2023
|
|
|
19
|
JRRIDP/22/ JSR/W-185
|
Improvement of Vaina Shekhpara-Rajapur Rd (Ch.00-1415m) by BC.
Improvement of Baliaghat Mosque - Sayedpur Road (Ch.00-990m) by BC.
|
2.4000
|
2.320
|
M/S Biswajit const.
|
2.320
|
|
|
0
|
24/07/2023
|
|
|
20
|
JRRIDP/22/JSR/W-186
|
Improvement of Sannashi Bottola Bazar-Ramnagar UP office Rd (Ch.2630-4160m) by BC.
|
1.5300
|
160.360
|
|
160.360
|
|
|
0
|
04/06/2023
|
|
|
21
|
JRRIDP/22/JSR/W-180
|
Construction of 2.00mx2.00m RCC Box Culvert on Chowlia Gate-Sutighata Ramnagar UP Office Rd at Ch.1550m.
|
|
14.070
|
|
14.070
|
|
|
0
|
28/04/2023
|
|
|
22
|
JRRIDP/22/JSR/W-170
|
Construction of 72m RCC Bridge on Razarhat GC-Hamidpur RHD Road at Ch.90m over Bhairab River.
|
|
525.340
|
ICL PVT. LTD
|
525.340
|
|
|
0
|
22/03/2023
|
|
|
23
|
JRRIDP/21/ JSR/W-132
|
Pulerhat-Arabpur UP Office Rd (Ch.00-144m) by RCC.
|
0.1440
|
30.670
|
M/S Gazi Construction
|
30.670
|
15/12/2021
|
09/11/2022
|
100
|
09/01/2023
|
Final
|
|
24
|
JRRIDP/21/JSR/W-131
|
Rupdia GC-Dhakuria (Monirampur) GC Road (Ch.00-486m) by RCC.
|
0.4860
|
84.330
|
M/S Farque Construction
|
84.330
|
12/05/2021
|
09/08/2022
|
100
|
09/01/2023
|
|
|
25
|
JRRIDP/22/JSR/W-147
|
Construction of 2.00mx2.00mm RCC Box Culvert on Chanchra RHD-Rojgonj GC (Monirampur) Road at Ch.3732m.
Construction of 2.00mx2.00mm RCC Box Culvert on Chanchra UP office-Kuadah Bazar via Sarapol Road at Ch.7300m.
|
|
35.500
|
M/S Nargis Entp.
|
35.500
|
16/11/2022
|
15/05/2024
|
60
|
09/01/2023
|
|
|
26
|
JRRIDP/22/JSR/W-167
|
Improvement of Nowdagram-Shekhati Rd (Ch.00-1870m) by BC.
Improvement of Shekh Hati-Bahadurpur H/School Rd (Ch.1000-2000m) by BC.
|
2.8700
|
227.480
|
|
227.480
|
|
|
0
|
08/01/2023
|
|
|
27
|
JRRIDP/22/JSR/W-166
|
Improvement of Upashahor UP - Tail kup Bazar Rd. Via Kashimpur, Dighirpar Rd (Ch.1250-2480m) by BC.
Improvement of Noapara-Modhogram Rd (Ch.00-750m) by BC.
|
1.9800
|
154.320
|
|
154.320
|
|
|
0
|
08/01/2023
|
|
|
28
|
JRRIDP/22/JSR/W-149
|
Construction of 03 (Three) Storied Regional Training Center cum Laboratory Building at Jashore LGED Campus with 07 (Seven) Storied Foundation.
|
|
690.000
|
Khan-M3 JV
|
690.000
|
|
|
0
|
02/01/2023
|
|
|
29
|
JRRIDP/22/JSR/W-155
|
Construction of Karbala GPS-Dhaka Road via addin shishu Hospital Road (Ch.00-532m) by RCC.
|
0.5320
|
84.070
|
M/S Laily Entp
|
84.070
|
|
|
0
|
15/12/2022
|
|
|
30
|
JRRIDP/19/ JSR/W-94
|
Improvement of Harun’s Shop –Ambag Zam-e-Mosque in Pachimpara at Kashimpur Road (Ch.00-320m) by BC.
|
0.3200
|
29.310
|
M/S Rahim Furniture & Construction
|
29.310
|
29/09/2020
|
04/02/2021
|
100
|
24/11/2022
|
Final
|
|
31
|
JRRIDP/19/JSR/W-73
|
Improvement of Belarmath-Gobila Rd (Ch.00-1000m) by BC.
|
1.0000
|
85.750
|
M/S Biswajit Construction
|
85.750
|
25/03/2020
|
20/11/2020
|
100
|
24/11/2022
|
Final
|
|
32
|
JRRIDP/19/JSR/W-45
|
Jogohati-Komolapur Rd (Ch.00-1500m) by BC.
|
1.5000
|
119.050
|
Nishit Bosu
|
119.050
|
04/03/2020
|
05/11/2020
|
100
|
24/11/2022
|
Final
|
|
33
|
JRRIDP/18/JSR/W-18
|
Kashimpur UP - Enayetpur Road (Ch.00-1000m) by BC.
Jessore-Narail RHD at Fatepur GPS - Fatepur Bottala Via Tarafder Road (Ch.00-750m) by BC.
|
1.7500
|
136.220
|
Md. Harun or Rashid
|
136.220
|
30/07/2019
|
23/05/2020
|
100
|
24/11/2022
|
Final
|
|
34
|
JRRIDP/18/JSR/W-04
|
(a) Rudropur-Sarapole bazar Rd (Ch.00-545m & Ch.3100-3175m) by BC.
(b)Shekh Hati-Bahadurpur H/School Rd (Ch.00-1000m) by BC.
(c)Basundia Bottala-Jogonnathpur Keyaghat Rd (Ch.2540-3800m) by BC.
(d) Baolia Bazar-Daitola RHD Rd (Ch.00-750m) by BC.
|
3.6300
|
267.130
|
AR-MBC JV
|
267.130
|
28/07/2019
|
06/03/2020
|
100
|
24/11/2022
|
Final
|
|
35
|
JRRIDP/18/JSR/W-03
|
Narendrapur UP - Daitala Bazar Road (Ch.185-5100m) by BC.
|
4.9150
|
418.170
|
MJB-MLRE JV Jashore
|
418.170
|
23/05/2019
|
28/02/2020
|
100
|
24/11/2022
|
Final
|
|
36
|
JRRIDP/20/JSR/W-99
|
Repair & Renovation of LGED Bhaban, LGED Jashore.
|
|
50.000
|
M/S Shimul Entp.
|
50.000
|
18/05/2021
|
22/10/2021
|
65
|
24/11/2022
|
|
|
37
|
JRRIDP/18/JSR/W-15
|
Musefpur-Muthurapur Rd (Ch.1000-1950m) by BC.
Chanchara Kadar mia's Saw mill - Kholadanga Fertilizer Godown road (Ch.00-1065m) by BC
Bawlia-Kotobpur Rd (Ch.2700-3700m) by BC.
Durgapur-Erendah Rd (Ch.00-1000m) by BC.
Earanda Bazar-Alomnagor Rd (Ch.00-1000m) by BC
|
5.0100
|
402.500
|
M/S Bonantor Trading Corporation
|
402.500
|
08/08/2019
|
11/05/2020
|
100
|
16/11/2022
|
|
|
38
|
JRRIDP/22/JSR/W-158
|
Improvement of Belermath - Gobila School Road (Ch.380-1680m) by BC.
|
1.3000
|
108.470
|
|
108.470
|
|
|
0
|
15/11/2022
|
|
|
39
|
JRRIDP/21/JSR/W-130
|
Sheikhati Bazar (Nowapara UP Office)-Taragonj Bazar (R&H) Rd (Ch.540-1000m) by RCC.
|
0.5000
|
98.200
|
Faruk Construction
|
98.200
|
30/12/2021
|
26/09/2022
|
0
|
23/02/2022
|
|
|
40
|
JRRIDP/21/JSR/W-140
|
Improvement of Sannashi Bottola Bazar-Ramnagar UP office (Ch.00-1900m) by BC.
Khairrala Seed Office-Boalpur Rd (Ch.2800-4100m) by BC.
|
3.2000
|
26580715.000
|
M/S Hira Construction
|
26580715.000
|
|
|
0
|
23/02/2022
|
|
|
41
|
JRRIDP/21/ JSR/W-136
|
Construction of 81m PSC Girder Bridge on Basundia More RHD-Basundia GC Road at Ch.3220m over Bhairab River.
|
|
615.120
|
|
615.120
|
|
|
0
|
13/12/2021
|
|
|
42
|
JRRIDP/20/JSR/W-118
|
Improvement of Suradanaga More-Kashimpur (Rohelapur) Rd (Ch.500-1025m) by BC.
|
0.5250
|
47.650
|
M/S Sarder Entp
|
47.650
|
07/09/2021
|
05/05/2022
|
0
|
27/10/2021
|
|
|
43
|
JRRIDP/20/JSR/W-120
|
Construction of 72m RCC Bridge on Razarhat GC-Hamidpur RHD Road at Ch.90m over Bhairab River.
|
|
499.400
|
M/S Sarder International
|
499.400
|
|
|
0
|
27/10/2021
|
|
|
44
|
JRRIDP/20/JSR/W-119
|
Construction of 72m RCC Bridge on Cantonment Bazar- Kashimpur UP Office Via Dakatia Rd at Ch.250m over Bhairab River.
|
|
486.870
|
M/S Hazi Enterprise
|
486.870
|
|
|
0
|
27/10/2021
|
|
|
45
|
JRRIDP/20/JSR/W-121
|
Construction of 72m RCC Bridge on Rupdia GC-Satiantola RHD Road at Ch.6500m over Bhairab River.
|
0.5000
|
505.680
|
MSE-SARDER-International JV
|
505.680
|
|
|
0
|
27/10/2021
|
|
|
46
|
JRRIDP/20/ JSR/W-122
|
Construction of 72m RCC Bridge on Daitala Bazar RHD-Dearpara School Road at Ch.110m over Bhairab River.
|
|
469.930
|
Mozahar Enterprise JV
|
469.930
|
|
|
0
|
27/10/2021
|
|
|
47
|
JRRIDP/20/JSR/W-123
|
Improvement of Rupdia GC-Basundia Moor RHD via Shakarigati Road (Ch. 6012-9210m) by BC.
|
3.1980
|
359.680
|
M/S Monir Traders
|
359.680
|
|
|
0
|
27/10/2021
|
|
|
48
|
JRRIDP/19/ JSR/W-89
|
Improvement of Maddha Kachua - Natunhat road (Ch.250-682m) by BC.
Improvement of Kamargonna more - Ichali Purbarapara Rd (Ch.00-407m) by BC.
|
0.8390
|
65.230
|
M/S Amena Enterprise Sadar, Magura
|
65.230
|
13/08/2020
|
18/01/2021
|
45
|
07/09/2021
|
|
|
49
|
JRRIDP/19/ JSR/W-85
|
Improvement of Malonchi Cold Store-Arabpur UP office Rd (Ch.540-2263m) by BC.
|
1.7230
|
167.540
|
M/S Shariful Islam JV
|
167.540
|
25/11/2020
|
20/07/2021
|
25
|
07/09/2021
|
|
|
50
|
JRRIDP/19/JSR/W-63
|
Maintenance of Sujalpur UZR-Jashore Airport Road (Ch.00-838m) (Overlay).
|
0.8380
|
45.410
|
M/S Zim Enterprise
|
45.410
|
08/03/2020
|
11/10/2020
|
50
|
07/09/2021
|
|
|
51
|
JRRIDP/18/JSR/W-22
|
Kazipur School-Adv. Ishaques House Rd (Ch.00-500m) by BC.
Mothurapu Madrasha - Rohmatpur RHD Road (Ch.00-2175m) by BC.
|
2.6800
|
206.290
|
M/S Sariful Islam JV
|
206.290
|
27/08/2019
|
23/05/2020
|
70
|
07/09/2021
|
|
|
52
|
JRRIDP/18/JSR/W-23
|
Upashahor UP - Tail kup Bazar Rd. Via Kashimpur, Dighirpar Rd (Ch.6795-10500m) by BC
|
3.7050
|
318.880
|
M/S Shariful Islam JV
|
318.880
|
16/09/2019
|
16/06/2020
|
65
|
07/09/2021
|
|
|
53
|
JRRIDP/18/JSR/W-20
|
Basunsdia UP-Shebanandapur Kheyaghat (Sheikhati Bazar)Rd (Ch.00-4113m & Ch.4445-7060m) by BC.
|
6.7280
|
523.300
|
M/S Lipu Enterprise
|
523.300
|
04/09/2019
|
30/04/2020
|
40
|
07/09/2021
|
|
|
54
|
JRRIDP/19/ JSR/W-76
|
Improvement of Fatagollar More -Sheikhati Dokkinpara Jame Mosque Road (Ch.00-650m) by BC
|
0.6500
|
55.410
|
Md. Abdul Kuddus Jhenaidah
|
55.410
|
02/06/2020
|
04/02/2021
|
20
|
07/09/2021
|
|
|
55
|
JRRIDP/18/JSR/W-35
|
Cantonment Bazar- Kashimpur UP Office Via Dakatia Rd (Ch.00-4381m) by BC.
|
4.3810
|
361.380
|
M/S Sarder International
|
361.380
|
13/10/2019
|
16/07/2020
|
70
|
07/09/2021
|
|
|
56
|
JRRIDP/19/JSR/W-46
|
Kachua UP Office-Fatehpur UP Office Rd (Ch.1420-7504m) by BC.
|
6.0800
|
509.520
|
AR-MBC JV
|
509.520
|
15/04/2020
|
12/02/2021
|
60
|
07/09/2021
|
|
|
57
|
JRRIDP/18/JSR/W-19
|
Pulerhat-Arabpur UP Office Rd (Ch.00-2460m) by BC.
|
2.4600
|
225.310
|
M/S Bonantor Trading Corporation
|
225.310
|
19/08/2019
|
23/05/2020
|
100
|
07/09/2021
|
|
|
58
|
JRRIDP/18/JSR/W-17
|
Shakargati-Jointa Rd (Ch.00-3700m) by BC.
Ghurulia-Saliyat Rd (Ch.00-1224m & Ch.1394-1920m) by BC
|
5.4500
|
425.910
|
M/S Biswajit Construction
|
425.910
|
27/08/2019
|
23/05/2020
|
100
|
07/09/2021
|
|
|
59
|
JRRIDP/20/JSR/W-101
|
Improvement of Ichali UP (Bangda more) - Labutala Bazar via Rajapur (RHD) Road (Ch.4900-5400m) by BC
|
0.5000
|
42.500
|
Md. Robiul Islam
|
42.500
|
05/08/2021
|
01/01/2022
|
0
|
07/09/2021
|
|
|
60
|
JRRIDP/20/ JSR/W-106
|
Improvement of Chowlia Gate-Sutighata Ramnagar UP Office Rd (Ch.4255-5550m) by BC.
Improvement of Talbaria School-Kotobpur Rd (Ch. 900-1900m) by BC.
|
2.2950
|
186.030
|
|
186.030
|
|
|
0
|
10/06/2021
|
|
|
61
|
JRRIDP/19/JSR/W-62
|
Karbala GPS - Dhaka Road via Addin Shishu Hospital Road (Ch.00-540m) by BC
|
0.5400
|
37.640
|
M/S Zaman & Brothers Abhoynagar, Jashore.
|
37.640
|
19/01/2020
|
23/09/2020
|
70
|