1
|
SP22005/Mongol Khal Subproject
|
Mongol khal re-excavation (Ch.00-4000m) Referenced line section (4 Nos.) Bamboo bridge 1 Nos. (20m) Mangal Khal re-xcavation (Ch:4.00m - 9850.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
163.271
|
LCS
|
163.271
|
14/03/2019
|
20/04/2019
|
96
|
13/08/2024
|
Ongoing
|
|
2
|
SP15315/Lodipur-Dhananjoy DR & WCS Subproject
|
Re-excavation of Mahmudpur Khal (Ch-0+000km to 4+200km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Mahmudpur Khal re-xcavation (Ch:0.00m - 5000.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
70.868
|
LCS
|
70.868
|
12/04/2022
|
31/05/2022
|
95
|
13/08/2024
|
Ongoing
|
|
3
|
SP15224/Ghukshi WCS Subproject
|
Const. of 07 Nos. Ref. lined Section on 1 Khal, SP Area Indication Post 2 Nos. and Demarcation Post 2 Nos. | 2023-24 Ref. lined (4 nos.), Bamboo bridge (2 nos.) and SP signboard (2 nos.) Ghukshi Khal re-excavation (Ch:3500.00m - 9500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 1 Khal, SP Area Indication Post 2 Nos. and Demarcation Post 2 Nos. 2023-24
|
|
122.788
|
LCS
|
122.788
|
07/01/2024
|
28/04/2024
|
100
|
13/08/2024
|
Ongoing
|
|
4
|
SP15222/Titukata Khal WCS Subproject
|
Re-excavation of Tutikhali khal (7700 m - 10800 m) Ref. lined Section (4 nos.) and SP Identification signboard (2 nos.) Tutikata Khal re-excavation (Ch.0.00-7650.00m) 2023-24 Const. of 9 Nos. Ref. lined Section on 1 Khal, SP Indication Post 2 and Demarcation Post. 40 Nos. - 2023-24
|
|
134.810
|
LCS
|
134.810
|
03/12/2023
|
25/04/2020
|
100
|
13/08/2024
|
Ongoing
|