SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Charghat
1 SP14143/Barkatpur Baladiar DR Subproject Borkotpur-Baladia khal re-excavation(ch.1000-2300m) Referenced line section(2 Nos.) Bamboo bridge(2 Nos.) 23.944 LCS-7 23.944 08/04/2019 30/04/2019 100 13/08/2024 Completed
2 Godagari
1 SP25236/Baliaghata Subproejct Construction of RCC Pumping Platform near Mohananda River (1no), Small Size Pumping Platfrom (2nos.) Construction of RCC Over Head Tank near Ajram Pond. Re-Construction of 1-500mm dia UPVC Buried Pipe Lines, FF1 Line From Ch.(1343m to1483 m) Construction of 1-315mm UPVC Buried Pipe Line,NO line From Ch.(0.0 to 1550 m) Construction of 1-250mm dia UPVC Buried Pipe Branch Lines OP From Ch.(1550 m+1920 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines PP2 From Ch.(1920 m+2720 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines OQ From Ch.(1550 m+1870 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines QQ2 From Ch.(1870 m+2670 m) Non-Tender Items: 125mm Brick Work, Supplying, Fitting, Fixing MS grills 201.510 Borsa enter prize & Rithin Enter Prize 201.510 14/12/2020 10/10/2021 100 13/08/2024 Completed
2 SP25235/Kashimpur CAD Sub-project Re-Construction of 1-500mm dia UPVC Buried Pipe C-D-E-F Line From (Ch: 0.00m-1236.00m.) Construction of RCC Open Branch Canal BR-5 from (Ch: 0.00m-450.00m.) Project Identification Signboard. Const. of Laying 1-450mm dia Upvc Buried Pipe Branch Canal-1, line C-C4-1 from RCC Sump to Header Tank Near Asmail Land). Length= 1350m - 2023-24 Const. of Laying 1-250mm dia Upvc Buried Pipe Branch Line C4-C5 (Asmail Land to South side). Length= 300m - 2023-24 Const. of RCC Open Irrigation Canal Line C-D (0.50m X 0.50m) (South side of Existing RCC Sump). Length= 280m. & Sump Extension - 2023-24 243.254 OTM 243.254 25/04/2024 28/06/2022 50 13/08/2024 Ongoing
3 SP25227/Hatnabad Subproject Construction of RCC Irrigation Open Canal Line: B-B1 From Ch.0+000 km to 0+150 km Construction of RCC Irrigation Open Canal Line: C1-C2 From Ch.0+000 km to 0+110 km. Plastering & Bottom Patent Stone of Brick Main and Plastering & Bottom Patent Stone & Vertical Extension Brick Branch Canal Line: E-F from Ch.0+500 km to 685 km Construction of RCC Irrigation Open Canal Line: F-F1 From Ch.0+000 km to 0+150 km. Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G1 from Ch. 0+000 km to 0+700 km Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G2 from Ch. 0+000 km to 0+150 km Laying of 2-280mm Dia Upvc Buried Pipe Line: G-H from Ch. 0+000 km to 1+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H1 from Ch. 0+000 km to 0+500 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H2 from Ch. 0+000 km to 0+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H3 from Ch. 0+000 km to 0+380 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H4 from Ch. 0+000 km to 0+300 km Construction of Brick Header Tank ( 3.60m x 3.60 m x 2.10m ) near Mirdha Pond Construction of Rcc Pump Operating Platform (2-3.0m x 2.0m ) at Existing Header Tank & Mirdha Pond & (1-6.0m x 2.0m) at River Bank, 28 Nos Brick Name Plate, 2 Nos. SPISP & 2 Nos. SPIP. Laying of 1-280mm Dia uPVC Buried Pressure Pipe Line G-H from Ch. 0+000km to 1+650km - 2023-24 221.094 OTM 221.094 30/04/2024 16/01/2024 92 13/08/2024 Ongoing
4 SP12037/Dudhai-Bhanpur Khal WCS Subproject Dudhai - Bhanpur Khal Re-excavation (ch0.00-2500m) Reference Line Section (4nos) (ch 100m, 1200m, 1800m, 2400m), SP Identification signboard (2Nos.) 31.924 LCS 31.924 28/01/2021 10/04/2021 100 13/08/2024 Completed
3 Mohanpur
1 SP45198/Shutki Beel Subproject Const of Rem. works of (2v-1.50mx1.80m) Regulator at ch. 3600m of Khal, SP Identf. S.Board Construction of Remaining works of WMCA office - 30.729 M/S Rudro Enterprise 30.729 01/09/2022 02/03/2023 100 13/08/2024 Completed
4 Tanore
1 SP62031/Gurail Chalk Kazizia Subproject Gurail Chalk Kazizia Khal Re-excavation. (Ch-0+000km to 4+720km) Ref. Lined Section 05 Nos. On 1 Khal and SP Identf. Signboard (2 nos.) Construction of Gurail Chalk Kazizia Khal WRS-1 (3v-1.50mx2.00m) at Ch. 0+175m of Khal Construction of Gurail Chalk Kazizia Khal WRS-2 (2v-1.50mx1.80m) at Ch. 2+340m of Khal Construction of WMCA office 256.163 OTM 256.163 21/12/2022 30/04/2023 100 13/08/2024 Ongoing
2 SP23070/Banial-Elamdahi Khal Subproject Baniyal-Islamdahi Khal Re-excavation - Upstream (Ch0.00-3300m) Reference Line Section (4nos), Subproject Identification signboard (2nos.) and Provisional Sum, Baniyal-Ilamdahi Khal Re-excavation - Downstream (Ch.0+000 Km to 2+000 Km) 2022-23 Reference Line Section (3Nos), SP Identification signboard (2Nos.) and Demarcation Post (6Nos.) 2022-23 52.580 LCS 52.580 24/03/2024 30/04/2024 100 13/08/2024 Ongoing
3 SP22024/Hatisal Ghritakanchan Subproject Re-excavation of Hatishail Ghritakanchan Khal (Ch-0+00km to 3+500km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) 46.076 LCS 46.076 20/03/2022 24/04/2022 100 13/08/2024 Completed
4 SP15243/Bankeshor-Nabutala DR & WCS Subproject Re-Excavation of Bankeshor Nabutala Khal (Ch.0+000 Km to 2+500 Km) Const. of 03 Nos. Reference lined Section on 1 Khal, SP Identf. sign board 2 Nos., Demercation Post 10 Nos. and SP Indication Post 2 Nos. 52.687 LCS 52.687 23/03/2023 23/05/2023 100 13/08/2024 Completed
5 SP14179/Dhamdhum-Mohammadpur DR & WCS Subproject Re-excavation of Dhamdum-Mohammadpur Khal (Ch-2+850km to 6+350km) Reference Line Section (4nos) (ch 2900m, 3900m, 4900m, 5900m), SP Identification signboard & post (2Nos.) 46.384 LCS 46.384 01/01/2024 30/04/2024 100 13/08/2024 Ongoing
6 SP13095/Malbandha WCS Subproject Construction of WMCA office, Electificatiion works of WMCA office and Supply Office Furniture of WMCA office 22.028 OTM 22.028 28/05/2023 30 13/08/2024 Completed
Total : 0.0000 (Km) 1228.37 (Lac) 1228.37 (Lac)