1
|
RpCC2-11
|
Construction of Bus Terminal at Bodorganj road Rangpur.
|
|
2868.637
|
PMPL-KSA JV
|
2868.637
|
06/09/2018
|
19/09/2018
|
0
|
07/02/2019
|
|
|
2
|
RpCC2-04
|
Construction of 4 nos production tube-well (PTW), 3 nos overhead tank including pump and 50km distribution line in different places of Rangpur City Corporation
|
50.0000
|
1882.661
|
M/S MT & SS Construction
|
1882.661
|
03/09/2018
|
13/09/2019
|
0
|
07/02/2019
|
|
|
3
|
RpCC2-02
|
Replacement of 12.50km Old Asbestos/ MS Water Supply Pipe line from Medical Moure to Mahigonj and Construction of 6 nos production tube-well (PTW) including pump house, pump and 32.0 km distribution line at different places of Rangpur City Corporations.
|
44.5000
|
1506.223
|
FSL-TCEL JV
|
1506.223
|
06/09/2018
|
19/09/2019
|
0
|
07/02/2019
|
|
|
4
|
RpCC2-25
|
a)Contruction of drain beside Nilkantha road.(Ch 0- 2.1 km.)
b)Contruction of drain starting from behind of Kotwali thana to Mulatol Madrasha. (Ch 0- 0.7 km.)
c)Contruction of drain beside Babukha Shantipara (Hindupara) road side drain.(Ch 0- 1.0 km.)
d)Contruction of drain beside Dhopapotty road & Beltola road.(Ch 0- 0.8 km)
|
2.5020
|
590.900
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
590.900
|
21/03/2018
|
31/03/2019
|
0
|
07/02/2019
|
|
|
5
|
RpCC2-24
|
a)Contruction of drain from Satgara Mistrypara road. (Ch 0- 2.1 km.)
b)Contruction of drain beside Nisbetgonj road.(Ch 0- 2.2 km.)
c)Contruction of drain Beside Salema Khatun road. Ch 0- 1.2 km.)
|
5.0740
|
954.400
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
954.400
|
21/03/2018
|
31/03/2019
|
0
|
07/02/2019
|
|
|
6
|
RpCC2-23
|
a)Contruction of drain from Satgara H/O Shaheen to Satgara Madrasa. (Ch 0- 2100 m.)
b)Contruction of drain from Purba Vogi H/O Shahider to Nengrar more. (Ch 0- 3.61m.)
|
4.3210
|
756.447
|
Shamsurjaman& Shajahan Ali( JV)
|
756.447
|
20/06/2017
|
23/08/2018
|
0
|
07/02/2019
|
|
|
7
|
RpCC2-22
|
a) Contruction of drain (RCC/Brick/Pipe) besideIslambug internal road. (Ch 0- 2693mm.)
b) Contruction of drain (RCC/Brick/Pipe) from Satgara Kamil Madrasa to MP Checkpost.(Ch 0- 2027m)
|
2.8970
|
817.940
|
Md.Khairul Kabir Rana
|
817.940
|
10/10/2017
|
09/10/2018
|
0
|
07/02/2019
|
|
|
8
|
RpCC2-21
|
a)Contructiont of drain (RCC/Brick/Pipe) from Modern more Dimond Hotel to R.K road Shutki Godown.(Ch 0- 1230 m.)
b)Contruction of drain (RCC/Brick/Pipe) from Dhap 4 storied Mosque to Lakuthi more to Checkpost to Lalkuthi School.(Ch 0- 1133m.)
c)Contruction of drain (RCC/Brick/Pipe) from Dhap Police Fari to Sena auditorium & link Ridom clinic & H/O Ratan.(Ch 0- 995 m.)
|
3.2580
|
516.207
|
SA & ME (JV)
|
516.207
|
20/07/2017
|
19/07/2018
|
0
|
07/02/2019
|
|
|
9
|
RpCC2-20
|
a)Contruction of drain from Lalbag to Darshan more & Link Ch 0- 3.00 km. b)Contruction of drain (RCC/Brick/Pipe) from central Bus stand to Barobari hat road.( Ch 0- 4.0 km)
|
9.1020
|
1234.847
|
Kobir Hossain
|
1234.847
|
11/04/2017
|
15/06/2018
|
0
|
07/02/2019
|
|
|
10
|
RpCC2-19
|
a) Contruction of drain (RCC/Brick/Pipe) beside Keranipara Kakina Kuthi road.(Ch 0- 815 m.)
b) Contruction of drain (RCC/Brick/Pipe) from Burirhat road Pakar matha to East side of Shakati Bridge.(Ch 0- 589 m.)
c) Contruction of drain (RCC/Brick/Pipe) from old Desh Clinic to Gonganath road.(Ch 0- 583 m.)
|
4.2900
|
533.889
|
Khan &Sons and M/S enterprise Ltd Jv
|
533.889
|
11/03/2017
|
15/06/2018
|
0
|
07/02/2019
|
|
|
11
|
RpCC2-18
|
a) Contruction of drain (RCC/Brick/Pipe) from Textile more to Nisbetgonj Mosque Ghaghot River.( Ch 0-2800 m.)
b) Contruction of drain (RCC/Brick/Pipe) from 2 no MP Checkpost to Misbetgonj road via H/O sujit.(Ch 0- 1200 m.)
c) Contruction of drain (RCC/Brick/Pipe) beside Dewanbari road.(Ch 0- 2622 m.)
|
6.6220
|
1282.854
|
Kobir Hossain
|
1282.854
|
11/03/2017
|
15/06/2018
|
0
|
07/02/2019
|
|
|
12
|
RpCC2-17
|
Contruction of drain (RCC/Brick/Pipe) from Central Bus Terminal to Ghaghot River.( Ch 0- 3170m)
|
3.1700
|
869.700
|
Alamgir Jahan
|
869.700
|
30/03/2017
|
11/08/2018
|
0
|
07/02/2019
|
|
|
13
|
RpCC2-16
|
a) Contruction of drain (RCC/Brick/Pipe) from Kellabond Mosque to Uttam School via Juenalist Mounul Islam & link Shop of Azam. (Ch 0- 1633 m.)
b) Contruction of drain (RCC/Brick/Pipe) from Hazipara more to BDR drain via ex Councillor Nur mohammad House & link Aftab School.( Ch 0- 1260m.)
|
4.1730
|
542.017
|
Abul Hossain
|
542.017
|
30/03/2017
|
23/08/2018
|
0
|
07/02/2019
|
|
|
14
|
RpCC2-15
|
a) Contruction of drain (RCC/Brick/Pipe) from H/O Moti to Chowrapara Fuel Station to Kellabond Sluice Gate via CO bazar & Connecting Drain back side of Upazilla Office(Ch 0- 2160 m.)
b) Contruction of drain (RCC/Brick/Pipe) from H/O ex Councillor Nurul Haque to BCIC road & beside BCIC road & Link.( Ch 0- 809 m.)
|
4.6050
|
768.506
|
Khairul-Ujjal-Rej(JV)
|
768.506
|
03/04/2017
|
30/08/2018
|
0
|
07/02/2019
|
|
|
15
|
RpCC2-14
|
Construction of 25 m span Bridge over K.D canal at Angur Mia.
|
|
294.106
|
Alamgir Jahan
|
294.106
|
30/03/2017
|
09/08/2018
|
0
|
07/02/2019
|
|
|
16
|
RpCC2-12
|
a) Improvement of Charcit house road bylane Ch 0-647m.
b) Improvement of road from Betpotty to kamarpara to Abohway office & Link. ch0.0-2900m
c) Rehabilitation and widenning of Dhap old Desh Clinic to Gonganath road by BC. Ch 0-576m.
d) Rehabilitation and widenning of Jummapara Fokir Mohammad road by BC. Ch 0-946m.
e) Rehabilitation and widenning of Jummapara Mosque to Jummapara Pakar Matha road by BC. Ch 0-1080m.
|
8.0290
|
421.225
|
Md. Ayub Hossain
|
421.225
|
26/09/2017
|
25/09/2018
|
0
|
07/02/2019
|
|
|
17
|
RpCC2-10
|
b)Improvement of road by BC from H/O azizer Driver to Shop of Babu. Ch 0- 827m.
c)Improvement of Monoharpur road & bylane by BC. Ch 0- 1342m. d)Improvement of Darshan road bylane from Bothtola to Gofurer Bazzar to H/O Ashraf to H/O Mokhless Ch 0-3745m
e)Rehabitation of Bhurarghat road by BC.Ch 0- 1778m.
|
7.6920
|
691.680
|
SMAH-JC-GME(JV)
|
691.680
|
26/09/2017
|
25/09/2018
|
0
|
07/02/2019
|
|
|
18
|
RpCC2-09
|
a) Improvementt of benglar para road from chadcuty halipad up to benglar para.ch0-2.955km.b) Improvement of shahapara road from girls schoolmore up to chilmon H/O Anamul Islam & link Road. ch 0.0-1708m c)Improvement of Bara Bazar road & bylane.Ch 0- 2795.0 m
|
7.4580
|
792.247
|
M.Shahjahan Ali
|
792.247
|
20/06/2017
|
19/06/2018
|
0
|
07/02/2019
|
|
|
19
|
RpCC2-08
|
a)Improvementt of road from Vatiatary road Mohabbat Kha Govt. Primary School to Fulamer more..Ch 0- 2174m
b) Improvement of road from Uttamkuthi road Tapodhan UP road to Chilmon Chowrasta Bazar..Ch 0- 1166 m.
c) Improvementtof road from Chandkuthi road to Hazir Bazar via Bodhukamla..Ch 0- 2741 m.
d)Improvementt of road from Mohabbat kha School to Ful Amartol..Ch 0- 1675 m
|
7.7560
|
872.030
|
M. Shajahan Ali
|
872.030
|
20/06/2017
|
19/06/2018
|
0
|
07/02/2019
|
|
|
20
|
RpCC2-07
|
a)Improvement of Chandkuthi road from H/O Bidhu master to shop of Lablu ch00.0-1105 & Chandkuthi halipad site Mohabbadkha H/O Advocate ch00.0-1564m b)Improvement of Topadhan UP road by lane Shakpara road Horirammol Boksha GPS ch00.00-2182.Topadhan Mobbatkha school shakpara ch00.0-1721m. Chowrahat shakpara ch00.0-1638m
|
8.2100
|
967.899
|
M/S Shohid Brothers.
|
967.899
|
20/06/2017
|
29/07/2018
|
0
|
07/02/2019
|
|
|
21
|
RpCC2-06
|
Improvement of road by RCC from Harail to Burail. Ch 0- 1483m.
|
1.4900
|
220.213
|
S.M Shafiqul Alam
|
220.213
|
20/07/2017
|
19/07/2018
|
0
|
07/02/2019
|
|
|
22
|
RpCC2-05
|
Improvement of road by BC from Benughat to 2 no ward Pucca road. Ch 0- 8247 m
|
8.2470
|
1303.689
|
M/S Shohid Brothers
|
1303.689
|
24/06/2017
|
17/11/2018
|
0
|
07/02/2019
|
|
|
23
|
RpCC2-03
|
a)Improvement of road by BC from Burirhat road to Monohar road.Ch 0- 2.9 km.
b)Improvementof road by BC from Burirhat road Kellbond Kachari to H/O Azizer.Ch 0- 1.3 km.
c)Improvement of road by BC from Bala Komor Saraker par to Kaiagoli School more. Ch 0- 1.90 km.
d)Improvement of road By Muktizandha H/O Abdul Gofur to Barogharia Dakhil Madrasha. e)Improvement of road By Burirhat Muntu Mill Bazzar to Goalu H/O Kader Chairman . f)Improvement of road Rangpur-Dinajpur road to Uttam East para Baytul Aman Jame Mosque.
g)Improvement of road Madha Oviram H/O Jamal to Oviram Central Jame Mosque.
|
11.7100
|
1303.683
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
1303.683
|
28/02/2018
|
10/03/2019
|
0
|
07/02/2019
|
|
|
24
|
RpCC2-01
|
a) Improvementof road By BC from Ranachandi Sheikhpara to Hazir Hat. Ch 0- 1602m, link-1 ch0.0-956m & link-2 ch0.0-653m
b) Improvementof road by BC from South side of Uttam Boshunia Jame Mosque to H/O Alam to Bashunia para 2nd Jame Mosque to H/O Nurul Hazi to H/O yasin.Ch 0- 939m.
d) Rehabilitation of kutir para road from G.L roy road to Mondal para road.ch.00-905m, link-1 ch00.0-490m. e) Rehabilition of gorapir mazar road to Robertsongong(IRP) choo-1041m, link-1 352m. f)Rehabilitation of Mouvhasa (Mobaser) road. ch0.0-1342 m, link-1 ch.00-674m , link-2 ch.00-297m. g)Improvement of road Moladevpur to robertsongong connection road ch.o-698m
|
10.2970
|
837.950
|
Md. Khairul Kabir Rana
|
837.950
|
10/10/2017
|
10/09/2018
|
0
|
07/02/2019
|
|