Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Atghoria
1 SP43028/Sapdanga Khal Subproject Sapdanga Khal re-excavation (Ch:0.00 - 5050m) Const. of 05 Nos. Ref. lined Section on 1 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 28.457 LCS 28.457 27/11/2023 100 13/08/2024 Ongoing
2 Bera
1 SP62037/Dayarampur Gopselenda Khal Subproject Re-excavation of Dyarampur Khal (Ch. 0+000 to Ch. 0+430km), Const. of RCC Reference lined Section Doyarampur Khal (Ch.0+100km), SP Identification Sign board at a Suitable place and SP Indicatory Post at a Suitable place Construction of Doyarampur Gopsalenda Khal Regulator (2V-1.5m X 1.8m) 104.253 OTM 104.253 08/01/2023 81 13/08/2024 Ongoing
3 Chatmohar
1 SP14195/Kurulia Beel FCD Subproject Vadra sluicegate -Mosharaf Hossener Dip mechine porjonto(ch.00-2100m) 29.916 LCS 29.916 10/04/2018 31/05/2018 100 13/08/2024 Completed
4 Santhia
1 SP15255/Chinanary-Bhitapara DR & WCS Subproject Chinanary-Bhitapara khal re-excavation(ch.2200-3100m) Wire repair work -. 32.184 LCS 32.184 10/04/2018 31/05/2018 100 13/08/2024 Completed
5 Sujanagar
1 SP42027/Nuruddin Khal Subproject Re-excavation of Nuruddin Khal (ch0.00-2400m) Referenced line section (3nos.) and Bamboo bridge (3nos.) Tree Plantation (2400nos.) and Subproject Identification Signboard (2nos.) 48.550 LCS 48.550 26/01/2020 31/03/2020 100 13/08/2024 Completed
Total : 0.0000 (Km) 243.36 (Lac) 243.36 (Lac)