SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Bakerganj
|
|
1
|
BDIRWSP/BAR/BAK/DW-12
|
Widening & Strengthening of Bakergonj-Gobindopur Hat. [From RHD Bakerganj-Gobindopur via Rabipur, Shialguni, Kakorda, Vathshala Kalisuri road at Ch. 5590-17248m including 05 Nos. 4.00mx4.00m RCC Box Culvert at 6562m, 7933m, 9041m, 15050m & 16158m under Bakerganj Upazila, District-Barishal. Road ID No: 506072002. Salvage Materials Cost Tk. 4846796.00
|
11.6580
|
2417.060
|
EFTE.ETCL (PVT.) LIMITED-M/S. Amir Engineering Corporation (JV), Horinpala, Bhandaria, Pirojpur & College Row, Barisal, Bangladesh
|
2417.060
|
|
|
0
|
18/11/2024
|
|
|
|
2
|
Banaripara
|
|
1
|
BDIRWSP/BAR/BAN/DW-02
|
Widening & Strengthening of (Danduat) RHD via Bangla Bazar, Aower Hat.-Harta GC road at Ch. 0.00-5000m including 01 No. 1.00mx1.00m RCC Box Culvert at ch. 1008m and 02 Nos. 2.00mx2.00m RCC Box Culvert at ch. 1338m & 7734m and 03 Nos. 1-vent 3.00mx3.00m RCC Box Culvert at ch. 757m, 1700m & 4830m and 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 2350m under Banaripara Upazila, District-Barishal. Road ID No: 506102003. Salvage Materials Cost Tk. 6024928.00
|
5.0000
|
1741.920
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
1741.920
|
|
|
0
|
11/11/2024
|
|
|
2
|
BDIRWSP/BAR/BAN/DW-01
|
Widening & Strengthening of Chowmohona GC via Biserkandi, Umarerper, Baitakghata, Wazedia- RHD (Baisari) road at Ch. 6407-15746m and RCC Road-100m (Ch. 12614-12714m wazidia bazar) including 01 No. 1-vent 4.00mx4.00m RCC Box Culvert at ch. 15634m and 03 Nos. 1.00mx1.00m RCC Box Culvert at ch. 7480m, 10878m & 13274m and 01 No. Double vent 4.00mx4.00m RCC Box Culvert at ch. 15739m under Banaripara Upazila, District-Barishal. Road ID No: 506102001. Salvage Materials Cost Tk. 20504124.00
|
9.3390
|
2518.420
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
2518.420
|
|
|
0
|
11/11/2024
|
|
|
|
3
|
Barishal-s
|
|
1
|
BDIRWSP/BAR/SAD/DW-13
|
Widening & Strengthening of Charkawa Karnokati to Ranirhat via Napter hat , Char Aicha Poler hat road at Ch. 3941 - 8036m & 180m RCC Road including 02 Nos. 2.00m x 2.00m RCC Box Culvert at Ch. 4135m & 4357m under Sadar Upazila, District : Barishal. [Salvage Materials Cost Tk. 1008277] [Road ID No. 506512005].
|
4.0950
|
770.350
|
M/S Dhara Enterprise-MS Upakul ConstructionJV, Baptist Mission Road, Barisal
|
770.350
|
|
|
0
|
30/01/2025
|
|
|
2
|
BDIRWSP/BAR/SAD/DW-14
|
Part 1 : Construction for the vertical Extension of Office Building of Additional Chief Engineer, Barishal Division, LGED, Barishal. Part 2 : Construction for the vertical Extension of Office Building cum Dormitory Bhaban of Executive Engineer, LGED, Barishal. [Package No : BDIRWSP/BAR/SAD/DW- 14]
|
|
1094.450
|
M/S. Amir Engineering Corporation, College Row, Barisal, Bangladesh
|
1094.450
|
|
|
0
|
18/11/2024
|
|
|
|
4
|
Mehendiganj
|
|
1
|
BDIRWSP/BAR/MEH/DW-08
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 10000-14700m and 150m RCC Road (Gabtoli Bazar portion Ch. 12273-12423m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1846750.00
|
4.7000
|
977.700
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
977.700
|
|
|
0
|
18/11/2024
|
|
|
2
|
BDIRWSP/BAR/MEH/DW-07
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 5200-10000m and 100m RCC Road (Banghata Bazar portion Ch. 5200-5300m) under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1865023.00
|
4.8000
|
943.310
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
943.310
|
|
|
0
|
11/11/2024
|
|
|
3
|
BDIRWSP/BAR/MEH/DW-06
|
Widening & Strengthening of Shaestabad GC (Barisal Sadar)- Hizla Upzila HQ Via Gazirhat, Kazirhat GC, Miarhat & Ekkoterhat road at Ch. 300-5200m and 235m RCC Road (Dafader Bazar portion Ch. 3150-3385m & 50m RCC Road (Banghata Bazar portion Ch. 5150-5200m) including 01 No. 2.00mx2.00m RCC Box Culvert at 668m under Mehendiganj Upazila, District-barishal. Road ID No: 506622008. Salvage Materials Cost Tk. 1908322.00
|
2.2000
|
1083.610
|
M/S. Kohinoor Enterprise, Dadpur Lodge, Kawnia 1st Lane, Barishal Sadar, Barishal
|
1083.610
|
|
|
0
|
11/11/2024
|
|
|
4
|
BDIRWSP/BAR/MEH/DW-10
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 3000-5600m including 03 No. 2.00mx2.00m RCC Box Culvert at3155m, 3922m & 4655m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 4948400.00
|
2.6000
|
787.120
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
787.120
|
|
|
0
|
11/11/2024
|
|
|
5
|
BDIRWSP/BAR/MEH/DW-09
|
Widening & Strengthening of Ulania GC-Aliganj GC Road (Mehendigonj part) road at Ch. 0.00-3000m including 01 No. 4.00mx4.00m RCC Box Culvert at 2412m under Mehendiganj Upazila, District-barishal. Road ID No: 506622007. Salvage Materials Cost Tk. 6468993.00
|
3.0000
|
892.960
|
M/S. Amir Engineering Corporation College Row, Barisal, Bangladesh
|
892.960
|
|
|
0
|
11/11/2024
|
|
|
|
5
|
Muladi
|
|
1
|
BDIRWSP/BAR/MUL/DW-11
|
Widening & Strengthening of Muladi GC- Talukder Hat- Bashtala Bazar- Mirdar Hat upto Muladi Boarder road at Ch. 5640-9840m including 03 Nos. Double Vent- 4.00mx4.00m RCC Box Culvert at 7200m, 8250m & 9120m and 02 Nos. Single Vent- 3.00mx3.00m RCC Box Culvert at 5700m & 6700m and 01 No. Single Vent- 4.00mx4.00m RCC Box Culvert at 6000m under Muladi Upazila, District-barishal. Road ID No: 506692001. Salvage Materials Cost Tk. 1055990.00
|
4.2000
|
1111.480
|
Mohammed Eunus & Brothers (Pvt.) Ltd. Fortune Mall (7th Fl.), Baizid Bostami Road, Nasirabad, Panchlaish, Chattogram
|
1111.480
|
|
|
0
|
18/11/2024
|
|
|
|
6
|
Uzirpur
|
|
1
|
BDIRWSP/BAR/UZI/DW- 15
|
Widening & Strengthening of Dhamura GC (Post Office) - Sholak Bazar - Batajore R & H road at Ch. 0.00m - 3620m including 06 Nos. 0.900m x 0.900m RCC Box Culvert at Ch.885m, 1395m, 1947m, 3385m , 3483m & 3770m and 05 Nos. 2.00m x 2.00m RCC Box Culvert at Ch.123m, 743m, 1620m, 2014m & 3303m and 1 No.2-vent 4.00m x 4.00m RCC Box Culvert at Ch.2411m under Uzirpur Upazila, District : Barishal. [Salvage Materials Cost Tk. 2980155.00] [Road ID No. 506942005].
|
3.6200
|
1299.710
|
Barendra Construction Ltd. H-146, Shaheb Bazar, Ghoramara; Boalia PS; Rajshahi
|
1299.710
|
|
|
0
|
30/01/2025
|
|
|
2
|
BDIRWSP/BAR/UZI/DW-05
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 15000-22965m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 1897465.00
|
7.9650
|
1884.660
|
M. M. Builders & Engineers Ltd-M/S. Amir Engineering Corporation (JV)
|
1884.660
|
|
|
0
|
11/11/2024
|
|
|
3
|
BDIRWSP/BAR/UZI/DW-04
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 8000-15000m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 2324241.00
|
7.0000
|
1498.430
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1498.430
|
|
|
0
|
11/11/2024
|
|
|
4
|
BDIRWSP/BAR/UZI/DW-03
|
Widening & Strengthening of Sanuhar R& H -Dhamura GC- Jalla- Satla GC Road at Ch. 0.00-8000m including 06 Nos. 0.900mx0.900m Drainage Culvert at Ch. 735m, 1210m, 3080m, 5800m, 6581m & 7950m and 01 No. 2.00mx2.00m RCC Box Culvert at Ch. 6764m under Uzirpur Upazila, District-Barishal. Road ID No: 506942003. Salvage Materials Cost Tk. 3040750.00
|
8.0000
|
1764.440
|
EFTE.ETCL (PVT.) LIMITED Horinpala, Bhandaria, Pirojpur
|
1764.440
|
|
|
0
|
11/11/2024
|
|
|
|
Total :
|
78.1770 (Km)
|
20785.62 (Lac)
|
20785.62 (Lac)
|
|
|
|
|
|
|
|