SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Agailjhara
|
|
1
|
IRIDP-2/BRS/DW-184
|
Construction of 16.00m Bridge on Muktijodda Complex-Upazila H.Q via livestock office Road.at ch.12.0m ID NO 506025225
|
|
118.280
|
M/S Mother Engineering
|
118.280
|
|
11/03/2019
|
50
|
02/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-183
|
Construction of 16.00m Bridge on Sabikhar par Needs office-Nagarbari GPS-Paschim Sujankati Narayan Boiragir's house over Agailjhara Poiserhat khal at ch.1450m. ID NO 506025070 M/S
|
|
121.890
|
Mother Engineering
|
121.890
|
|
11/04/2019
|
40
|
02/04/2019
|
|
|
3
|
IRIDP-2/BRS/MW-144
|
Maintenance of Bagdha GC - Shatla GC via Khajuria road (Ch.500m - 2600m) ID NO 506022009
|
2.1000
|
59.640
|
M/S. Shafique Brothers
|
59.640
|
|
30/11/2018
|
100
|
31/03/2019
|
|
|
4
|
IRIDP-2/BRS/DW-77
|
Improvement Of Rajihar Post office - Bosubari.road .(Ch.00m - 300m)
|
0.3000
|
17.160
|
M/S. Yamin Traders
|
17.160
|
|
28/02/2018
|
100
|
31/03/2019
|
|
|
5
|
IRIDP-2/BRS/DW-76
|
Improvement Of Goila Guptar hat Road N/S - Uttar Shehepasha road ( Revinew office – goilabazar road).(Ch.00m - 1100m)
|
1.1000
|
56.920
|
M/S. Sharif Enterprise
|
56.920
|
|
30/05/2018
|
100
|
31/03/2019
|
|
|
6
|
IRIDP-2/BRS/DW-57
|
Improvement of Choddyamada Changutia Shihipasharoad,( Ch. 00m - 4567m) (b) Construction of 01 no 3.00mx3.0m culvert at ch.2421m on the same road. (c) Construction of 01 no 2x4.50mx4.50m culvert at ch.3120m on the same road.
|
4.5670
|
264.180
|
MSE-MYT (JV)
|
264.180
|
|
10/03/2018
|
100
|
31/03/2019
|
|
|
7
|
IRIDP-2/BRS/DW-5
|
Improvement of Road from Bagdha GC Amboula Paishar hat GC.00-2220m)
|
2.2200
|
153.850
|
M/S. Sharif Enterprise
|
153.850
|
07/02/2016
|
06/11/2016
|
100
|
23/12/2018
|
|
|
8
|
IRIDP-2/BRS/DW-4
|
a) Improvement of Road from Guptar hat- Jobsen Sehepasha High School road,( Ch. 1650-3500m) b) Improvement of Road from Nuremodina Mosque {Amjad Sarder's bari}-Jobsen GPS road, (Ch. 255-960m) (Guptar hat Jobsen via Uttar Shehepasha High School)
|
1.8500
|
120.860
|
M/S. Sharif Enterprise
|
120.860
|
11/02/2016
|
10/11/2016
|
100
|
23/12/2018
|
|
|
|
2
|
Babuganj
|
|
1
|
IRIDP-2/BRS/RDW-90
|
Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m)
|
|
193.840
|
|
193.840
|
|
|
0
|
03/04/2019
|
|
|
2
|
IRIDP-2/BRS/SDW-227
|
(a)Improvement Thakur Mallik-Sharikal .road (Ch.00m - 1000m) ID NO 506945017(b)Construction of 01no 3.0mx3.0m culvert at ch.969m on the same road.
|
1.0000
|
76.130
|
M/S. H.R Enterprise
|
76.130
|
|
27/11/2019
|
5
|
03/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-223
|
Improvement Madhabpasha Mozomderbari - Gudarha kheyaghat -Hadibashkathi road (Ch.500m - 1500m) ID NO 506034157
|
1.0000
|
39.500
|
M/S. Sohel Enterprise
|
39.500
|
|
27/08/2019
|
20
|
03/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-222
|
(a)Improvement of Madhabpasha Gojalia -Mollah Bari - Md.sobhan Mollik(Master)house- East Pangsha GPS.road (Ch.00m - 800m) ID NO 506035104(b)Construction of 02no 1.50mx1.50m culvert at ch.100m,642m on the same road.
|
0.8000
|
39.770
|
Md. Asadur Rahman
|
39.770
|
|
20/07/2019
|
20
|
03/04/2019
|
|
|
5
|
IRIDP-2/BRS/SDW-220
|
(a)Improvement of RHD Rafiqul Islam khan house - Pangsha Community clinic road (Ch.00m - 1225m) ID NO 506034150(b)Construction of 01no 0.625mx0.60m culvert at ch.805m on the same road.(c)Improvement of Gazalia club-7 Milles RHD.road (Ch.277m - 447m) ID NO 506034036
|
1.3950
|
93.740
|
M/S. Nipa Traders
|
93.740
|
|
02/04/2019
|
30
|
03/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-206
|
Improvement of RHD Agorpur - tangrakhali bridge road (Ch.00m - 800m) ID NO 506034041
|
0.8000
|
50.320
|
M/S.Ma Babar Doa Traders
|
50.320
|
|
25/01/2019
|
100
|
03/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-153
|
(a)Improvement of Chandpsa Sabuz chairman's house Madrasha - Alfaz master's house via Gazipur Bottola road (Ch.00m - 2650m) ID NO 506034112(b)Construction of 05no 1.0mx1.0m culvert at ch.90m,525m,700m,1350m&1610m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.285m on the same road.
|
2.6500
|
106.590
|
Md. Sirajul Islam Hanif
|
106.590
|
|
28/12/2018
|
100
|
03/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-93
|
Improvement of Agorpur UP – Silondia Bazar – Agorur GC road.(Ch.00m - 1830m)
|
1.8300
|
102.810
|
M/S. Faruk Enterprise
|
102.810
|
|
28/02/2018
|
100
|
03/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-92
|
Construction of 01no 3.60mx3.0m culvert at ch.1320m on Baherchar bazar – baherchar hospital link road infront of uttar baherchar Goni master's house (Baherchar bazar – baherchar hospital)
|
|
10.960
|
M/S. Md. Shamsul Alam
|
10.960
|
|
30/05/2017
|
100
|
03/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-91
|
Improvement of Lakutia-Babugonj road (Battola) to Maidaner hat via Secratery janab serajuddin house road (ch..00-254m & 1254m-2240m)
|
1.2400
|
70.820
|
Md. Sirajul Islam Hanif
|
70.820
|
|
09/12/2017
|
100
|
03/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-90
|
(a)Improvement of Darogerhat - Musuria senior Madrasha via Musuria Abason Project road (Ch.00m - 4450m)(b) Construction of 02no 2.0mx2.0m culvert at ch.512m & 2025m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.2138m &2755m on the same road.
|
4.4500
|
68.530
|
M/S. Talukder Enterprise
|
68.530
|
|
19/02/2019
|
100
|
03/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-9
|
(a) Improvement of road from Agorpur UP Office-House of Char Uttar Sabuj via Post Office Culvert, Aziz Master's house (Start Steel Bridge from Ch. 3682m Agorpur-Silondia road towards back ie. Chairman hat)(Thakur Mollik Kabirajbari-Post Office north side
|
1.8700
|
53.970
|
M/S. Atique Construction
|
53.970
|
21/02/2016
|
19/08/2016
|
100
|
23/12/2018
|
|
|
13
|
IRIDP-2/BRS/DW-8
|
(a) Improvement of road from Khodaboxsha Baherchar Adersho High School's from Pucca road to Suzon Ahamad's house by BC (Ch. 00-355m & Ch. 355-500m) (b) Construction of 01no 1.0mx1.0m culvert at ch.5m on the same road.
|
0.3550
|
21.410
|
M/S. Nazrul Enterprise
|
21.410
|
14/03/2016
|
13/08/2016
|
100
|
23/12/2018
|
|
|
14
|
IRIDP-2/BRS/DW-7
|
(a)Improvement of road Manikkathi RHD Mobarak Hossain Islamia Academy to Amir Mollik's house (Ch. 00-1000m ) (b) Construction of 01no 1.0mx1.0m culvert at ch.360m on the same road.
|
1.0000
|
46.210
|
Md. Shamsul Alam
|
46.210
|
10/03/2016
|
10/12/2016
|
100
|
23/12/2018
|
|
|
15
|
IRIDP-2/BRS/DW-6
|
(a) Improvement of road from Maddhy Kudrokathi Govt. Deghi west side (Bottola) to Sangramer Khal via Professar Golam Hossain house (Ch. 00m-1000m (Maddhy Kudrokathi Govt. Deghi west bank Rahamatpur-Mirgonj road attached Vetenary College) (b) Construction
|
1.0000
|
47.500
|
Md. Shamsul Alam
|
47.500
|
10/03/2016
|
10/12/2016
|
100
|
23/12/2018
|
|
|
|
3
|
Bakerganj
|
|
1
|
IRIDP-2/BRS/DW-99
|
Improvement of Shialghuni Bazar-DC Road-Foraji bari-Chunakhali High School-Kobai Bazar road (ch. 1400m-3400m)
|
2.0000
|
51.800
|
|
51.800
|
|
|
0
|
09/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-229
|
Improvement Nalua UP Office via Afalkati Clinic east char Gojalia regd pry school & Nabankhali Bazar to old Mallik Hat(afalkati Lunch Ghat)(Ch.1500m - 1960m) ID NO 506073039 Link. Aziz Mollah bari Panjegana Mosque to Dewli 110.0m
|
0.5700
|
24.890
|
Md. Anwar Hossain Howlader
|
24.890
|
|
18/07/2019
|
0
|
09/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-205
|
Improvement of Kalaskati UP Office(Bajar) - Laxmipasa Hat t via Kumar bari bridge, Ammtali ghat & Sadish Govt. Pry. School.road(Ch.800m - 1250m) ID NO 506073021 2,852,152.00 1-Aug-18 2,709,544.40 8-Feb-19
|
0.4500
|
28.520
|
M/S. R.S Construction
|
28.520
|
|
28/02/2019
|
45
|
09/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-204
|
(a)Improvement of Barisal - Patuakhali RHD - Baherchar GC Kalaskati Hat, Chairman Hat & Kastoganj road (Ch.11170m -11830m) ID NO 506072010(b)Construction of 01no 3.0mx3.0m culvert at ch.11450m on the same road.(c)Construction of 01no 1.00mx1.00m culvert at ch.11171m on the same road. 3,604,206.00 1-Aug-18 3,423,995.70 7-Feb-19
|
0.6600
|
36.040
|
M/S. Jabana Enterprise
|
36.040
|
|
07/02/2019
|
20
|
09/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-203
|
(a)Improvement of Niamoti pucca bridge - chanta nutan hat road (Ch.00m - 730m) ID NO 506075246(b)Construction of 01no 1.60mx1.60m culvert at ch.415m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.337m,710m on the same road.
|
0.7300
|
34.970
|
Progati Traders
|
34.970
|
|
01/02/2019
|
0
|
09/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-202
|
(a)Improvement of Boro Ragunathpur Ahamad's hat - chairman hat.road (Ch.00m - 800m) ID NO 506075301(b)Construction of 01no 0.90mx0.90m culvert at ch.630m on the same road.
|
0.8000
|
30.250
|
MS. Doel Enterprise
|
30.250
|
|
30/12/2018
|
80
|
09/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-199
|
Improvement of Dhaporkati High School - Kalu khan Bari via Khondoker Bari road (Ch.650m - 1300m) ID NO 506074161
|
0.6500
|
25.000
|
M/S. MA Enterprise
|
25.000
|
|
24/07/2018
|
90
|
09/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-195
|
Improvement of Kamarkhali GC - Chandramohon GC via Nahalganj Khaya Ghat.[Shingerkati (Barisal Sadar) - Kamarkhali Bazar Road (Bakerganj Upazila)road (Ch.00m - 450m) ID NO 506072013 2,871,637.00 23-Jul-18 2,728,055.15 30-Jan-19
|
0.4500
|
28.710
|
M/S. H.R Trading
|
28.710
|
|
30/01/2019
|
20
|
09/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-194
|
(a)Improvement of Kalaskati Khaya Ghat Haji Bari - Ghanddi Achram road (Ch.00m - 760m) ID NO 506075073(b)Construction of 01no 0.90mx0.90m culvert at ch.580m on the same road.
|
0.7600
|
29.990
|
M/S. Sikder Arian Enterprise
|
29.990
|
|
24/12/2018
|
70
|
09/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-192
|
(a)Improvement of Nalua UP Office via Kafilatala High school, Vumi Office - Simultala Bazar.(RHD)road (Ch.900m - 2000m) ID NO 506073048(b)Construction of 01no 2.0mx2.0m culvert at ch.1220m on the same road.
|
1.1000
|
40.060
|
M/S. Sayed Siddiquer Rahman
|
40.060
|
|
25/12/2018
|
0
|
09/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-191
|
(a)Improvement of Boalia GC (Bahadurpur Gho Hat) to Bakerganj-Neamati GCCR via Kusangal Hat,Syampur Hat,Botra hat,Kafila Hat & Moller Hat.road (Ch.7228m - 7495m) ID NO 506072011(b)Construction of 01no 3.0mx3.0m culvert at ch.7490m on the same road.
|
0.2670
|
20.010
|
M/S Mother Engineering
|
20.010
|
|
24/12/2018
|
60
|
09/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-190
|
(a)Improvement of Bander hat-Bhatshala Govt Pry. School via Principal Bari & Sowkath Sannamath Bari road (Ch.00m - 500m) ID NO 506074059(b)Construction of 01no 3.0mx3.0m culvert at ch.91m on the same road.(c)Construction of 02no 0.90mx0.90m culvert at ch.43m,302m on the same road.
|
0.5000
|
29.890
|
M/S. Akon Enterprise
|
29.890
|
|
18/12/2018
|
40
|
09/04/2019
|
|
|
13
|
IRIDP-2/BRS/SDW-185
|
(a)Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road (Ch.1120m - 2500m) ID NO 506074134(b)Construction of 04no 0.90mx0.90m culvert at ch.1610m,2020m,2090m,2420m on the same road.
|
1.3800
|
97.400
|
M/S. Mirza Enterprise
|
97.400
|
|
25/04/2019
|
65
|
09/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-53
|
(a)Improvement of Ruhul Amin road (Shibghata) to Nilgonj Khayaghat (Kalaskati UP Office (bazar) to Satraj Bazar via Vadarikati Govt. Pry. School, Garuria Bazar, Nilganj Hat , Krishnokati Hi & Goma Shibghata Culvert.) (ch.8435m – 9390m)
|
0.9550
|
52.860
|
M/S. Electro Globe
|
52.860
|
|
30/12/2017
|
60
|
09/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-31
|
Improvement of road from Dudal Senior Madrasha to Sarshi Police Fari via Satraj Bazar (Goma Hat {UZR} via Pilkhana GPS, West Dhudal Regd. Primary School Dhudal UP Office, Madal GPS, Chatra Hat & Sarshi GPS to Sharshi Police Camp) at Ch. 3850m-5400m.
|
1.5500
|
39.980
|
M/S. Esad & Emad Enterprise
|
39.980
|
|
02/04/2019
|
70
|
09/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-200
|
(a)Improvement of Krishnanagar bazar - Sonabaru high School via Jabed Khan Madrasa road (Ch.00m - 380m) ID NO 506074053(b)Construction of 01no 2.0mx2.0m culvert at ch.90m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.333mon the same road.
|
0.3800
|
20.270
|
M/S. Sohel Enterprise
|
20.270
|
|
28/02/2019
|
100
|
09/04/2019
|
|
|
17
|
IRIDP-2/BRS/DW-197
|
(a)Improvement of Halta UP Office (Kander Barir Foot Bridge)-Ranir Hat via Burir Hat, Caradi Satalite Regd. Pry. School & West Caradi Sikder Bari.road (Ch.00m - 900m) ID NO 506073026(b)Construction of 02no 1.60mx1.60m culvert at ch.540m,690m on the same road.(c)Construction of 01no 0.90mx0.90m culvert at ch.301mon the same road.
|
0.9000
|
41.210
|
M/S. Talukder Construction
|
41.210
|
|
13/01/2019
|
100
|
09/04/2019
|
|
|
18
|
IRIDP-2/BRS/DW-196
|
Improvement of East side of Nimtala station Alom khan police bari - Sarder bari bridge via Mollik bari, Abdur Rashid khan bari ,infornt of Fakirbari road (Ch.00m - 500m) ID NO 506075436
|
0.5000
|
20.390
|
MS Disha Enterprise
|
20.390
|
|
05/02/2019
|
100
|
09/04/2019
|
|
|
19
|
IRIDP-2/BRS/DW-104
|
(a)Improvement of Let.Abdul barek Sikdarbarir Infront GPS to faridpur bandar via jahngir sikdar Bari. (Mongolshi H/O Sorab Ali Khan via Faridpur Hat. to Howlader Bari (UJR) Near Janata bazar) road.(Ch.3900m - 4900m)(b)Construction of 01no 0.625mx0.90m culvert at ch.4540m on the same road.
|
1.0000
|
31.400
|
M/S. Hasan Construction
|
31.400
|
|
30/11/2018
|
100
|
09/04/2019
|
|
|
20
|
IRIDP-2/BRS/DW-32
|
Improvement of road from Char Darial Ferry Ghat Pucca Road to Char Darial Kheyaghat Bridge via Moti Mastarer Bari, Kamarkhali Bazar Motahar Mastarer Bari (Kamarkhali GC to Chandramohon GC via Nahalgonj Khayghat (Shingerkati {Barisal Sadar} to Kamarkhali Bazar Road {Bakergonj Upazila} at Ch. 3130m-3940m.
|
0.8100
|
42.150
|
M/S. Farid Uddin
|
42.150
|
|
19/11/2016
|
100
|
09/04/2019
|
|
|
21
|
IRIDP-2/BRS/DW-201
|
Improvement of Katadia Bus Stand - kanaipura Bajar via katadia Govt. Pry. School road(Ch.450m - 1120m) ID NO 506074134
|
0.6700
|
37.070
|
M/S. Sikder Arian Enterprise
|
37.070
|
|
03/01/2019
|
100
|
09/04/2019
|
|
|
22
|
IRIDP-2/BRS/DW-198
|
Improvement of Dhudhal madrasha - satraj bazar road (Ch.240m - 1500m) ID NO 506075331
|
1.2600
|
48.050
|
M/S. Sadia Enterprise
|
48.050
|
|
29/10/2018
|
100
|
09/04/2019
|
|
|
23
|
IRIDP-2/BRS/DW-193
|
Improvement of E / Side of Gholder Bari (RHD) Sakander Ali Howlader Bari - Charer Bari Via Montaj Mamber Bari road (Ch.150m - 650m) ID NO 506075314
|
0.5000
|
20.370
|
M/S Mother Engineering
|
20.370
|
|
08/01/2019
|
100
|
09/04/2019
|
|
|
24
|
IRIDP-2/BRS/DW-189
|
Improvement of N/ Side of Kamarkhali GC(Darial Dafader Bari) - Nababer Hat via Bishwas Bari road (Ch.00m - 780m) ID NO 506074202
|
0.7800
|
29.980
|
MS. Haque Traders
|
29.980
|
|
30/11/2018
|
100
|
09/04/2019
|
|
|
25
|
IRIDP-2/BRS/DW-188
|
(a)Improvement of Jerail Lunch Ghat - Bhatshala Lunch Ghat via Vosmahal Govt Pry. School road (Ch.657m - 1277m) ID NO 506074107(b)Construction of 01no 0.90mx0.90m culvert at ch.867m on the same road.
|
0.6200
|
25.150
|
M/S. Ferdousi Construction
|
25.150
|
|
30/12/2018
|
100
|
09/04/2019
|
|
|
26
|
IRIDP-2/BRS/MW-138
|
Maintenance of C&B road - Kaloskati Khayaghat via Munir Bari. (Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road (Ch.2300m - 4350m) ID NO 506073033
|
2.0500
|
52.880
|
Md. Mahafuz Khan
|
52.880
|
|
18/12/2018
|
100
|
09/04/2019
|
|
|
27
|
IRIDP-2/BRS/DW-137
|
Improvement of Krishnokati Jugi Bari Culvcert to Krishnokati High shool via Krishnokati Govt Pry. School,& Nijamkali Khal Foot Bridge.road (Ch.550m - 1480m) ID NO 506074128b)Construction of 01no 3.0mx3.0m culvert at ch.950m on the same road.c)Construction of 01no 1.60mx1.60m culvert at ch.790m on the same road.
|
0.9300
|
53.960
|
Md. Mahafuz Khan
|
53.960
|
|
24/10/2018
|
100
|
09/04/2019
|
|
|
28
|
IRIDP-2/BRS/DW-136
|
Improvement of North Side Nilganj Khaya Ghat to Char Goma Govt. Pry. School via Faruk Moller Bari (River Side Road)..road (Ch.00m - 1576m) ID NO 506074209
|
1.5760
|
54.830
|
M/S. Apu Enterprise
|
54.830
|
|
10/05/2018
|
100
|
09/04/2019
|
|
|
29
|
IRIDP-2/BRS/DW-135
|
Improvement of Holta UP Office (Bajar Bridge) to DKP Hat(Balykati Kalitara GPS) via Makimabad Bajar, Dhanshiri Baro Sikder Bari, & Balaikati govt. pry. Schoolroad (Ch.4625m - 5250m) ID NO 506073035
|
0.6250
|
30.240
|
M/S Amir Engineering corporation
|
30.240
|
|
19/04/2018
|
100
|
09/04/2019
|
|
|
30
|
IRIDP-2/BRS/DW-134
|
(a)Improvement of East Krishnonagar khondaker Bari RCC Foot Bridge (UZR) to Bothra Hat via Biharipur Mad rasa Road (Ch.00m - 1018m) ID NO 506074084(b)Construction of 01no 1.6mx1.6 m culvert at ch.793 on the same road.
|
1.0180
|
35.860
|
M/s. Lutfur Kabir
|
35.860
|
|
30/05/2018
|
100
|
09/04/2019
|
|
|
31
|
IRIDP-2/BRS/DW-133
|
Improvement of North Side of Darial Mia Bari to Bangla Bajar foot Bridge Via Char Darial Govt. Pry. School.road (Ch.1425m - 2750m) ID NO 506074033
|
1.3250
|
44.960
|
Md. Khair Hossain
|
44.960
|
|
24/04/2018
|
100
|
09/04/2019
|
|
|
32
|
IRIDP-2/BRS/DW-132
|
Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220
|
0.7200
|
38.940
|
M/S Oshin Enterprise
|
38.940
|
|
30/09/2018
|
100
|
09/04/2019
|
|
|
33
|
IRIDP-2/BRS/DW-132
|
Improvement of Parshibpur-katakhali road (Ch.500m - 1220m) ID NO 506075220
|
0.7200
|
38.940
|
M/S Oshin Enterprise
|
38.940
|
|
30/09/2018
|
100
|
08/04/2019
|
|
|
34
|
IRIDP-2/BRS/DW-131
|
(a) Improvement of Padrisibpurp U.P office - Bangla Bajar Sluice Get via Puiauta Junior High School. Road (Ch.5400m - 6200m) ID NO 506073007(b)Construction of 01no 3.0mx3.0 m culvert at ch.5538mon the same road.(c)Construction of 01no 2.0mx2.0 m culvert at ch.6045mon the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.5450m on the same road.
|
0.8000
|
45.240
|
M/S Amir Engineering corporation
|
45.240
|
|
13/01/2019
|
100
|
08/04/2019
|
|
|
35
|
IRIDP-2/BRS/DW-130
|
(a)Improvement of Masuakhali Khaya Ghat (UJR) – Moller hat via Masuakhali high School.road (Ch.00m – 850m) ID NO 506514211b)Construction of 01no 2.0mx2.0m culvert at ch.168m on the same road.
|
0.8500
|
37.040
|
M/S Nahid Enterprise
|
37.040
|
|
30/07/2018
|
100
|
08/04/2019
|
|
|
36
|
IRIDP-2/BRS/DW-129
|
Improvement of Sealghuni bazar - Kabai Hat via East shialguni Govt. Pry. .School, kastoganj Sluice Get, & Kabai Govt. Pry. School..road (Ch.1300m - 2300m) ID NO 506074079
|
1.0000
|
63.740
|
M/S. Abul Kalam Azad
|
63.740
|
|
05/05/2018
|
100
|
08/04/2019
|
|
|
37
|
IRIDP-2/BRS/DW-128
|
Improvement of Kabai UP office via Kabai Bazar (Islamia College) to Molla bari (Bazar RHHD).( Kabai union Islamia college via Hanua mortijan high school – Khodabox khati Ishaq member bari)road (Ch.00m - 2000m) ID NO 506073014
|
2.0000
|
67.270
|
M/s. Lutfur Kabir
|
67.270
|
|
30/03/2018
|
100
|
08/04/2019
|
|
|
38
|
IRIDP-2/BRS/DW-109
|
(a)Improvement of Ruhul Amin road – Shatar bazar via Kalikola, Sialguni kundar hat bridge road.(Ch.00m - 592m)(b)Construction of 01no 2x4.0mx4.0 m culvert at ch.141m on the same road.
|
0.5920
|
32.870
|
M/S. Nibir Traders
|
32.870
|
|
16/04/2017
|
100
|
08/04/2019
|
|
|
39
|
IRIDP-2/BRS/DW-108
|
(a)Improvement of Meur pucca road attached Salamer mill - Aziz mastarer bari. (Garuria Mayur(sawmill) to Dawli GPS(Dighirpar) road.(Ch.00m - 1260m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.625m & 1255m on the same road.
|
1.2600
|
42.490
|
M/S. Hasan Construction
|
42.490
|
|
26/09/2018
|
100
|
08/04/2019
|
|
|
40
|
IRIDP-2/BRS/DW-107
|
Improvement of Hiradhar Bazar - Dewli Azizul haque Mollar Bari via sarot sreetiGPS. (West Side of Dauli Jalil Khan Bari (UZR) via sharoth Shirity Govt. Pry. School. to Kharabad Makbul Sikder Bari.) road.(Ch.975m - 2140m)
|
1.1650
|
29.990
|
M/S. Sayed Siddiquer Rahman
|
29.990
|
|
15/06/2017
|
100
|
08/04/2019
|
|
|
41
|
IRIDP-2/BRS/DW-106
|
Improvement of Zirail Mojumdar Barir South side pucca road - Alauddin talukdarer bridge via madrasa atim khana,durgapasa zirail high school. (Bander Hat to Jirail Ajijia madrasa) road.(Ch.800m - 2300m)
|
1.5000
|
40.900
|
M/S. Hasan Construction
|
40.900
|
|
02/05/2018
|
100
|
08/04/2019
|
|
|
42
|
IRIDP-2/BRS/DW-105
|
Improvement of fridpur union vhumi office - hemayet ponditer bari via Khn barir zame mosque. (Faripur hat-kakorda road-east site & Rustom gaji.) road.(Ch.00m - 1400m)
|
1.4000
|
39.770
|
M/S. Hasan Construction
|
39.770
|
|
24/06/2018
|
100
|
08/04/2019
|
|
|
43
|
IRIDP-2/BRS/DW-103
|
Improvement of Garuria GPS to Dighir par GPS. (Khayrabad Makbul sikder Bari (Justice) to Garuria Govt. Pry. School Via Digir par Govt. Pry. School & lahajuddin howlader Barir Foot Bridge.)road.(Ch00m -1440m)
|
1.4400
|
39.960
|
M/S. Sayed Siddiquer Rahman
|
39.960
|
|
27/07/2018
|
100
|
08/04/2019
|
|
|
44
|
IRIDP-2/BRS/DW-102
|
(a)Improvement of Balai kati Uttampur kheya ghat – Abdur Rob mollar bari via DKP kheya ghat (Halta Board Govt. Pry. School to Khipaituler Hat.). road.(Ch.3711m - 5020m)(b)Construction of 01no 1.60mx1.60m culvert at ch.5006m on the same road.
|
1.3090
|
40.000
|
Anukul Chandra Sarkar
|
40.000
|
|
07/06/2018
|
100
|
08/04/2019
|
|
|
45
|
IRIDP-2/BRS/DW-101
|
(a)Improvement of C &B Bhanga pool – Khezura khalgora via md.Joynal Member & Jabbair sikder Bari.(Bharpasa UP Office (Atakati Vangar pool) RHD via Jaynal Member Bari,Jabatunnasa Govt. Pry. School to Samitty Ghar) road.(Ch.00m - 1712m)(b) Construction of 01no 3.0mx3.0m culvert at ch.1062m on the same road
|
1.7120
|
55.530
|
Md. Jamal Sarder
|
55.530
|
|
27/02/2018
|
100
|
08/04/2019
|
|
|
46
|
IRIDP-2/BRS/DW-100
|
(a)Improvement of Bhorpasha UP Office to Narangol Khayaghat via Dhudal mow bazar side very (Naragal Khaya Ghat Via Krishnokati Jalil Akon Bari.) (ch. 00-1280m)(b) Construction of 01no 1.0mx1.0m culvert at ch.256m on the same road
|
1.2800
|
38.180
|
M/S. Apu Enterprise
|
38.180
|
|
14/06/2017
|
100
|
08/04/2019
|
|
|
47
|
IRIDP-2/BRS/DW-98
|
Improvement of Beltola bridge - Bhabanipur Bazar via Aribaki GPS. (Rangashiree UP Office (Baltala Bridge) via Araibagi G. P.S, Bhabanipur G. P.S. School, Karitas Bridge & Gandu Master Bari to Durgapur Sluice Bazar.) road (Ch.00m - 1500m)
|
1.5000
|
39.430
|
M/S. Esad & Emad Enterprise
|
39.430
|
|
18/06/2017
|
100
|
08/04/2019
|
|
|
48
|
IRIDP-2/BRS/DW-33
|
Improvement of road from Banglabazar - Biharipur Hossainia Alim Madrasha via Abul Daroga Bari (East side of Bangla Bazar Box Culvert to Wapdder Khal Ghorar Bridge {Bothra} via Biharipur Madrasha) at Ch. 00m-775m.
|
0.7750
|
19.990
|
Md. Zakir Hossain Mia
|
19.990
|
|
30/11/2017
|
100
|
08/04/2019
|
|
|
49
|
IRIDP-2/BRS/DW-30
|
Improvement of Mokimabad Atahar Uddin Degree College - Dakhin Balalkati Kalitara GPS via Abdul Kader Howlader Bari (Halta UP Office {Bazar} to DKP Hat {Balaykati Kalitara GPS) via Makimabad Bazar, Dhanshiri Baro Sikder Bari, & Balaikati GPS at Ch. 3800m-4625m.
|
0.8250
|
37.760
|
M/S. Saad Construction
|
37.760
|
|
29/11/2016
|
100
|
08/04/2019
|
|
|
50
|
IRIDP-2/BRS/DW-29
|
(a)Improvement of road from Kabai Union Islamia College - Hanua Motizan High School via South way Isahak Member bari (Hanua UP Office Bridge to Sarder Bari Foot Bridge via Jainpuri Khanka Sarif Bari ) at Ch. 00m-710m b) Construction of 01no 1.60mx1.60m culvert at ch.210m on the same road.
|
0.7100
|
21.570
|
M/S. Esad & Emad Enterprise
|
21.570
|
|
26/06/2016
|
100
|
08/04/2019
|
|
|
51
|
IRIDP-2/BRS/DW-28
|
Improvement of road from Abu Sharif house - Bangla Bazar via Lal Sharif house (Kafila Makbul Mira Bari Girder Bridge to Kafila Bazar Saw Mill via Kafila Salehia Khatun Junior High School) at Ch. 00m-1380m.
|
1.3800
|
38.410
|
Md. Zakir Hossain Mia
|
38.410
|
|
28/07/2018
|
100
|
08/04/2019
|
|
|
52
|
IRIDP-2/BRS/DW-27
|
Improvement of road from Robipur D.C Road near Aziz Howlader Shop - Anondo Dhopa Bari (Ward No.02) ( Khairabad hat {Garuria UP Office} to Daporkati Bazar (Godown) via Nilganj Hat, Rabipur GPS (Pearpur Bridge) at Ch.6000m-7435m.
|
1.4350
|
36.940
|
M/S. Apu Enterprise
|
36.940
|
|
30/09/2016
|
100
|
08/04/2019
|
|
|
53
|
IRIDP-2/BRS/DW-26
|
(a)Improvement of road from Hasem Chairman Bari - Madariar par via Jahangir Khondokar Bari (East side of Hasem Chairman (old) Bari via Kadaria Madrasha, Saympur Kadaria Govt. Primary School, Ansan Member & Masum to Saympur Basabari Bridge) at Ch. 00m-1000m b) Construction of 01no 2.0mx2.0m culvert at ch.445m on the same road. c) Construction of 01no 1.60mx1.60m culvert at ch.880m on the same road.
|
1.0000
|
33.460
|
M/S. Farid Uddin
|
33.460
|
|
02/06/2018
|
100
|
08/04/2019
|
|
|
54
|
IRIDP-2/BRS/DW-25
|
(a)Improvement of road from Sattar Mridha Bari - Torab Ali Bhuyan Bari via Esahak Howlader Bari & Gazi Kalu Mosque at Ch. 00m-700m. b) Construction of 01no 4.0mx4.0m culvert at ch.660m on the same road.
|
0.7000
|
29.120
|
M/S. Farid Uddin
|
29.120
|
|
30/04/2018
|
100
|
08/04/2019
|
|
|
55
|
IRIDP-2/BRS/DW-24
|
Improvement of Ragunathpur Go-hat (Kajir hat) - Katuajhuri Khal, (506074246 Upazila Border) at Ch. 00m-400m.
|
0.4000
|
10.340
|
Md. Zakir Hossain Mia
|
10.340
|
|
22/08/2016
|
100
|
08/04/2019
|
|
|
56
|
IRIDP-2/BRS/DW-23
|
Improvement of road from back side of Nowroj Mia's house - Bangla Bazar via Durgapur GPS & Laxmighar (Padrisibpur UP Office to Bangla Bazar Sluice gate via Puiauta Junior High School) at Ch. 1867m-2817m
|
0.9500
|
24.550
|
Md. Zakir Hossain Mia
|
24.550
|
|
30/12/2017
|
100
|
08/04/2019
|
|
|
57
|
IRIDP-2/BRS/DW-22
|
Improvement of road from kanki Bazar Bridge - nurnagar Bazar via Amena Khatun Junior High School (Kanki Bazar to Middle Mahespur Hat via Durgapur & Nurnagar Hat) at Ch. 600m-1680m.
|
1.0800
|
29.970
|
M/S. Apu Enterprise
|
29.970
|
|
06/08/2016
|
100
|
08/04/2019
|
|
|
58
|
IRIDP-2/BRS/DW-21
|
(a)Improvement of road from C&B road - Kaloskati Khayghat road via monir bari (kaleshkati UP office (Vumi Office) - Kaligonj Bazar Bridge via Kalaskati Khayaghat Battala (RHD), Talukder Bari & Asmath Ali Khan (Chowdhury Bari) at Ch. 1450m-2179m b) Construction of 01no 3.0mx3.0m culvert at ch.1889m on the same road.
|
0.7290
|
26.540
|
M/S. Nibir Traders
|
26.540
|
|
06/08/2016
|
100
|
08/04/2019
|
|
|
59
|
IRIDP-2/BRS/DW-20
|
(a)Improvement of road from North Krishnokati GPS - Krishnokati High School via Chowdhuri bari - Siraj Khan Master Bari (Krishnokati Jugi Bari Culver to Krishnokati High School via Krishnokati GPS & Nijamkali Khal Foot Bridge at Ch. 729m-1889m b) Construction of 01no 1.0mx1.0m culvert at ch.828m on the same road.
|
1.1620
|
34.790
|
Md. Zakir Hossain Mia
|
34.790
|
|
28/02/2018
|
100
|
08/04/2019
|
|
|
|
4
|
Banaripara
|
|
1
|
IRIDP-2/BRS/DW-219
|
Improvement of Masrong RHD-Nazirpur Road via H/O Shaajahan Chokder Road .(Ch.820m - 1320m) ID NO 506104059
|
0.5000
|
31.920
|
M/S. Mitro & Co.
|
31.920
|
|
08/04/2019
|
60
|
03/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-218
|
(a)Improvement of Boro Chowlakati Talukder Bari Jam-E-Mosque-Jangalia H/S Road .(Ch.00m - 1060m) ID NO 506104081 and Link-250m(b)Construction of 02no 1.30mx1.30m culvert at ch.350m,850m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.545m on the same road.(d)Construction of 01no 4.50mx4.50m culvert at ch.3430m on Sayedkati UPC-Baisari Bazar Road.ID NO 5061043022
|
1.3100
|
102.890
|
M/S. Sagar Enterprise
|
102.890
|
|
11/09/2019
|
55
|
03/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-217
|
(a)Improvement of Udaykati union border - bokshobari jume masque - north tetla RNGPS Road .(Ch.00m - 850m) ID NO 506105089(b)Construction of 01no 0.625mx0.60m culvert at ch.346m on the same road.(c)Construction of 02no 1.0mx1.0m culvert at ch.605m,817m on the same road.(d)Construction of 02no 3.0mx3.0m culvert at ch.471m,854m on the same road.(e)Construction of 01no 4.0mx4.0m culvert at ch.290m on the same road.
|
0.8500
|
95.060
|
M/S. Ashraf Builders
|
95.060
|
|
23/07/2019
|
40
|
03/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-216
|
(a)Improvement of Baisari Dak Bangla-Kachua Madrasha Road .(Ch.1955m - 2765m) ID NO 506104033(b)Construction of 01no 0.625mx0.60m culvert at ch.2141m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.2294m on the same road.(d)Construction of 01no 2.0mx2.0m culvert at ch.2415m on the same road.
|
0.8100
|
64.050
|
M/S. Ma Babar Doa Traders
|
64.050
|
|
07/07/2019
|
50
|
03/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-182
|
(a)Improvement of Alta Sikderbari-Sanker Sikder House Via Norerkati road (Ch.1519m - 2244m) ID NO 506104027(b)Construction of 04no 4.0mx4.0m culvert at ch.221m,1223m,1710m,2234m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.1802m on the same road.(d)Construction of 04no 2.0mx2.0m culvert at ch.526m,593m,684m,1600m on the same road.(d)Construction of 03no 0.625mx0.60m culvert at ch.93m,100m,1112m on the same road.
|
0.7200
|
124.200
|
Md. Mahafuz Khan
|
124.200
|
|
23/04/2019
|
30
|
03/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-178
|
(a) Improvement of UZR(Nanduhar Bridge)-Udoykati UPC road (Ch.00m - 1400m) ID NO 506105084(b)Construction of 01no 3.0mx3.0m culvert at ch.188m on the same road.(c)Construction of 02no 2.0mx2.0m culvert at ch.366m, 520 on the same road.(d)Construction of 04no 0.625mx0.60m culvert at ch.586m,740m,825m,886m on the same road.
|
1.4000
|
103.440
|
M.M. Builders & Engineers LTD.
|
103.440
|
|
18/02/2019
|
60
|
03/04/2019
|
|
|
7
|
IRIDP-2/BRS/MW-176
|
(a) Maintenance of Bangla Bazar-Zirarkati road (Ch.872m - 3720m) ID NO 506104038(b)Construction of 05no 0.625mx0.60m culvert at ch.1608m,1760m, 1895m, 2240m,3224m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.2370m on the same road.
|
2.8480
|
69.530
|
M/S. Kohinoor Enterprise
|
69.530
|
|
08/11/2018
|
80
|
02/04/2019
|
|
|
8
|
IRIDP-2/BRS/SDW-160
|
(a) Improvement of Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyt Member, Goailbari Comunity school, H/O A Rob Chowkider BC road (Ch. 500m-1150m)b) Construction of 1No 2.00mx2.0m Culvert at Ch. 764 on the Same Road. c) Construction of 1No 1.0mmx1.0m Culvert at Ch. 811 on the Same Road. d) Improvement of Chakhar bazar-Kalir bazar Via Goterer bari road (Ch. 400m-900m)
|
1.1500
|
78.200
|
PTSL-MAITREE (PVT) LTD
|
78.200
|
|
28/11/2018
|
75
|
02/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-89
|
(a)Improvement of Masrong RHD - Alta Nesaria Madrasha road(Ch.00m - 1700m) (b) Construction of 01no 2.0mx2.0m culvert at ch.1400m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.1278m on the same road.(d)Construction of 01no 0.625mx0.60m culvert at ch.520m on the same road.
|
1.7000
|
113.870
|
M/S. Talukder Enterprise
|
113.870
|
|
28/08/2018
|
80
|
02/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-88
|
(a)Improvement of Elluhar UPC - Chander hat road(Ch.00m - 1321m) (b) Construction of 03no 3.0mx3.0m culvert at ch.200m,617m&754m on the same road.(c)Construction of 01no 1.0mx1.0m culvert at ch.520m on the same road. (d)Construction of 02no 0.625mx0.60m culvert at ch.450m&845m on the same road.
|
1.3210
|
102.820
|
M/S. M.T Builders
|
102.820
|
|
30/03/2019
|
75
|
02/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-87
|
(a)Improvement of Royarhat Bridge (East side) - Jhalokati Border Via Gava H/School road(Ch.00m - 1000m) (b) Construction of 03no 0.625mx0.60m culvert at ch.30m,300m&500m on the same road.
|
1.0000
|
61.550
|
M/S. Mitro & Co.
|
61.550
|
|
30/12/2018
|
80
|
02/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-175
|
(a)Improvement of Boro Baithsar GPS - Darikar Mohila Madrasha road (Ch.786m - 1255m) ID NO 506104048(b)Construction of 01no 0.625mx0.60m culvert at ch.1113m on the same road.
|
0.4690
|
30.020
|
M/S. Abul Kalam Azad
|
30.020
|
|
30/11/2018
|
100
|
02/04/2019
|
|
|
13
|
IRIDP-2/BRS/MW-177
|
(a) Maintenance of Baisari Dak Bangla-Kachua Madrasha. road (Ch.00m - 1955m) ID NO (b)Construction of 04no 0.625mx0.60m culvert at ch.42m,137m,1249m & 1730m on the same road. 506104033
|
1.9550
|
42.500
|
M/S Amir Engineering corporation
|
42.500
|
|
30/08/2018
|
100
|
02/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-14
|
Improvement of road from Khodaboxsha GPS to Paschim Chakhar GPS via H/O Aneyet Member, Goailbari Community School, H/O A Rob Chowkider BC Road (Ch. 752 m-1300 m)
|
0.5480
|
33.030
|
M/S. Esad & Emad Enterprise
|
33.030
|
10/04/2016
|
30/12/2016
|
100
|
23/12/2018
|
|
|
15
|
IRIDP-2/BRS/DW-13
|
Improvement of road from Laskarpur to Mirerhat via Uddan Madrasha (Proposed Ch.500m-1020m)
|
0.5200
|
29.820
|
M/S. Farid Uddin
|
29.820
|
14/04/2016
|
10/10/2017
|
100
|
23/12/2018
|
|
|
16
|
IRIDP-2/BRS/DW-12
|
(a) Improvement of road from Baisary UPC to Uttar Nazirpur Dhanhat Road (Dandowat to Baisari Dhakbanglo road via Bauser hat UP. (Proposed Ch. 00m-720m) (b) Construction of 01no 0.625mx0.6m culvert at ch.655m on the same road. (c) Construction of 01no 2.0m
|
0.7200
|
47.690
|
M/S. Esad & Emad Enterprise
|
47.690
|
10/04/2016
|
30/12/2017
|
100
|
23/12/2018
|
|
|
|
5
|
Barishal-s
|
|
1
|
IRIDP-2/BRS/DW-230
|
(a)Chandipur Achintala Mosque - Muktijoddah Ahsan Ali Bari Ch.603m - 980m) ID NO 506515211 & link towards khanbari185.0m, Muktijoddah Ahasan, Shajahan bari 152.0m(b)Construction of 01no 1.0mx1.0m culvert at ch.755m on the same road.
|
0.7140
|
52.190
|
|
52.190
|
|
|
0
|
08/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-228
|
(a)Improvement Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.3126m - 4610m) ID NO 506514013(b)Construction of 02no 1.60mx1.60m culvert at ch.3529m,3567m on the same road. 6,884,094.00 18-Feb-19 6,539,889.30
|
1.4840
|
68.840
|
M/S. Rahat Enterprise
|
68.840
|
|
25/11/2019
|
10
|
08/04/2019
|
|
|
3
|
IRIDP-2/BRS/SDW-207
|
(a)Improvement of Karnokati RR GPS - Abdul Sabur Khan Bari - Muktijoddah Abul Basharer Bari road (Ch.00m - 335m) ID NO 506515172(b)Construction of 01no 0.90mx0.90m culvert at ch.300m on the same road.
|
0.3350
|
26.130
|
M/S. Siam Enterprise
|
26.130
|
|
07/03/2019
|
0
|
08/04/2019
|
|
|
4
|
IRIDP-2/BRS/SDW-187
|
Improvement of Moulavir hat Dhopa Barir More-Shaheber hat Gabtala Via Biswash Bari. road (Ch.1150m-1700m) ID NO.506514155
|
0.5500
|
33.750
|
M/S. Ma Babar Doa Traders
|
33.750
|
|
03/01/2019
|
70
|
08/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-125
|
Improvement of Karapur Mira Bari Poll-Afjal Khan Bari Via Mia Khar Bari Mosque.road (Ch.00m - 564m) ID NO 506515089
|
0.5640
|
56.550
|
M/S. Mohiuddin Ahmed
|
56.550
|
|
30/05/2019
|
45
|
08/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-121
|
(a)Improvement of Veduria Lanch Ghat-Khorshed Chowkider Bari – East Veduria GPS road (Ch.1550m - 2000m) ID NO 506515054(b)Construction of 01no 1.6mx1.6 m culvert at ch.1775 on the same road.
|
0.4500
|
31.910
|
M/S. Santu Traders
|
31.910
|
|
05/12/2018
|
65
|
08/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-120
|
(a) Improvement of Karnokati Red Crecent to Karnokati Anowar Hossain Bari road (Ch.00m - 1275m) ID NO 506514079(b)Construction of 02no 1.6mx1.6 m culvert at ch.982m &1073mon the same road.
|
1.2750
|
77.870
|
M/S. Mohiuddin Ahmed
|
77.870
|
|
14/10/2018
|
70
|
08/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-119
|
Improvement of Kashipur Bakarir Poll - Purbo Billa Bari GPS - Mukondropotty GPS..road (Ch.00m – 1000m) ID NO 506514186
|
1.0000
|
59.160
|
M/S. Nupur Store
|
59.160
|
|
20/05/2018
|
55
|
08/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-112
|
(a)Improvement of Char Aicha Gazi Bari School-Ghoper hat (West Side).road (Ch.671m - 1671m)(b)Construction of 01no 3.0mx3.0 m culvert at ch.1384m on the same road.
|
1.0000
|
65.060
|
M/S. Rupali Construction
|
65.060
|
|
07/01/2018
|
70
|
08/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-111
|
(a)Improvement of Charkawa UP Officee -Charkaramji Asrayn Project Via Diner Pry. schoo,Ghoper Hat.road (Ch.00m - 1558m)(b)Construction of 01no 1.6mx1.6 m culvert at ch.805.0m on the same road.
|
1.5580
|
87.080
|
Orient Trading & Builders LTD.
|
87.080
|
|
15/10/2018
|
95
|
08/04/2019
|
|
|
11
|
IRIDP-2/BRS/SDW-59
|
(a)Improvement of Bisarad C&B – Barakandi C&B road via Patang Bipon doctor bari (Patang Sukhoronjon master bari Radha krishno seba asrom to sadu goaler bari)Road (Ch.3817m - 5100m) Asrom & Mondir link road 100.0m (b) Construction of 01 no 1.60mx1.60m culvert at ch.4811m on the same road.
|
1.3830
|
62.400
|
M/S. Auditi Enterprise
|
62.400
|
|
15/06/2017
|
15
|
08/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-51
|
Improvement of Charkaremji Mora Nadi - Charaicha Poler hat road (ch.1200m - 2630m)
|
1.4300
|
61.600
|
M/S. Electro Globe
|
61.600
|
|
30/12/2017
|
70
|
08/04/2019
|
|
|
13
|
IRIDP-2/BRS/DW-50
|
(a)Improvement of Chandpura Bairagi Bari R&H Durgapur hat Via Chandpur UP road (Ch.2500m-3500m) (b) Construction of 01no 1.00mx1.0m culvert at ch.3116m on the same road.
|
1.0000
|
56.230
|
M/S. Electro Globe
|
56.230
|
|
30/12/2017
|
70
|
08/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-49
|
(a)Improvement of Chandromohan UP Office-Veduria Lanchghat via Chandromohan GC.road (Ch.1850m-3075m)
|
1.2250
|
56.100
|
M/S. Electro Globe
|
56.100
|
|
30/12/2017
|
40
|
08/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-48
|
(a)Improvement of Bukhainagor GC-Charmonai Lanchghat road (Ch.00m-1000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.595 on the same road.
|
1.0000
|
56.760
|
M/S. Electro Globe
|
56.760
|
|
30/12/2017
|
75
|
08/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-47
|
(a)Improvement of Jagua Hogla H/S - Najor Ali Chaprashi Bari Via Mohammad Ali H/S road (ch.650m-1650m) (b) Construction of 01no 1.60mx1.60m culvert atch.1130 m on the same road.
|
1.0000
|
49.500
|
M/S. Electro Globe
|
49.500
|
|
30/12/2017
|
35
|
08/04/2019
|
|
|
17
|
IRIDP-2/BRS/DW-45
|
Improvement of Nehalganjhat - Baroikandi road (ch.00m-1100m)
|
1.1000
|
50.940
|
M/S. Electro Globe
|
50.940
|
|
30/12/2017
|
75
|
08/04/2019
|
|
|
18
|
IRIDP-2/BRS/DW-44
|
Improvement of Charbaria Gilatoli Kheyaghat – End of Natunchar Via Natunchar GPS road (Ch.0.00m-1600m) 6,991,508.00 20-Apr-16 5,133,816.96
|
1.6000
|
69.910
|
M/S. Electro Globe
|
69.910
|
|
30/12/2017
|
45
|
08/04/2019
|
|
|
19
|
IRIDP-2/BRS/DW-124
|
(a)Improvement of Taltoli Bazar-Lamchari hat road (Ch.5000m - 6700m) ID NO 506514139(b)Construction of 01no 2x4.0mx4.0m culvert at ch.5550m on the same road.(c)Construction of 03no 1.60mx1.60m culvert at ch.5565m,6203m&6688m on the same road.
|
1.7000
|
140.040
|
M/S. Mohiuddin Ahmed
|
140.040
|
|
15/01/2019
|
100
|
08/04/2019
|
|
|
20
|
IRIDP-2/BRS/DW-122
|
(a)Improvement of Raipasha H/S-kulakana Son Field Via Fakir Hat road (Ch.00m - 1310m) ID NO 506514003(b)Construction of 03no 2.0mx2.0 m culvert at ch.350m,598m&873m on the same road.(c)Construction of 02no 1.00mx1.00m culvert at ch.652m&798m on the same road. 10,226,139.04 10-Aug-17 9,203,525.12
|
1.3100
|
102.260
|
M/S. Mohiuddin Ahmed
|
102.260
|
|
28/02/2019
|
100
|
08/04/2019
|
|
|
21
|
IRIDP-2/BRS/DW-118
|
Improvement of Ramkati-Ramkati Bazar Via Panbaria Adarsha Gram & Panbaria Madrasha.road (Ch.1090m - 3126m) ID NO 506514013
|
2.0360
|
59.810
|
M/S. Rupali Construction
|
59.810
|
|
30/11/2018
|
100
|
08/04/2019
|
|
|
22
|
IRIDP-2/BRS/DW-117
|
Construction of 02no 1.6mx1.6 m culvert at ch.67.0m & 135m Jagua Sher-E-Bangla Hat-Jashim Uddin Talukder House.road
|
|
6.500
|
M/S. Santu Traders
|
6.500
|
|
30/05/2018
|
100
|
08/04/2019
|
|
|
23
|
IRIDP-2/BRS/DW-116
|
(a)Improvement of Chandpura Kerani Bari Pol-Chandpura Maksuda Member Bari River Side Via Mazid How. Hat road (Ch.00m - 1496m)(b)Construction of 02no 1.0mx1.0 m culvert at ch.300m&547m on the same road.(c)Construction of 02no 1.60mx1.0m culvert at ch.792m&1056m on the same road.
|
1.4960
|
93.480
|
Orient Trading & Builders LTD.
|
93.480
|
|
10/01/2019
|
100
|
08/04/2019
|
|
|
24
|
IRIDP-2/BRS/DW-115
|
(a)Improvement of Bousher Hat - Madha Karappur GPS road (Ch.00m - 1355m)(b)Construction of 02no 1.6mx1.6 m culvert at ch.804m &1130 on the same road.
|
1.3550
|
83.840
|
Orient Trading & Builders LTD.
|
83.840
|
|
30/11/2018
|
100
|
08/04/2019
|
|
|
25
|
IRIDP-2/BRS/DW-114
|
Improvement of Jagua Union Parishad - Karapur Steel Bridge - Bousherhat GC road (Ch.3766m - 4905m)
|
1.1390
|
59.250
|
M/S. Serajul Alam Sikder
|
59.250
|
|
11/03/2019
|
100
|
08/04/2019
|
|
|
26
|
IRIDP-2/BRS/MW-52
|
(a)Maintenance of Jagua Mollar Dokan - Amir Hossain house nearTaher Ali Bari-Panchgaon Bazar Road (Ch.00m - 2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1994 on the same road.
|
2.0000
|
37.810
|
M/S. Electro Globe
|
37.810
|
|
06/08/2016
|
100
|
08/04/2019
|
|
|
27
|
IRIDP-2/BRS/SDW-62
|
(a) Improvement of Taltali-Sayestabad Bazar Via West Char Aicha road (Ch.00m - 1000m) & Link road 120m.(b) Construction of 01no 2x4.0mx4.0m culvert at ch.10.0m on the same road.(c) Construction of 02no 1.60mx1.60m culvert at ch.750m & 995m on the same road.
|
1.1200
|
88.480
|
M/S. Khan Engineering Corporation
|
88.480
|
|
12/02/2018
|
100
|
07/04/2019
|
|
|
28
|
IRIDP-2/BRS/DW-60
|
(a)Improvement of Dharmadi molar bridge – Maydan khola via Katurakati Salam Khandojar house Road (Ch.500m - 1464m) Link. Mohila madrasha 180.0m, Darul Ulum madrasha 170.0m & Mosque 30.0m(b) Construction of 03no 1.60mx1.60m culvert at ch.684m,748m & 1224m on the same road.(c) Construction of 01no 0.375mx0.45m culvert at ch.938m on the same road. 7,085,057.00 Mir Jasim Uddin 31-Oct-16 5,313,517.01
|
1.3440
|
70.850
|
Mir Jasim Uddin
|
70.850
|
|
30/03/2018
|
100
|
07/04/2019
|
|
|
29
|
IRIDP-2/BRS/MW-58
|
(a)Maintenance of Uttar Karapur Sikder Bari Mosque -Hazi Bari Road (Ch.00m - 1495m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.501m on the same road.
|
1.4950
|
33.010
|
M/S. Auditi Enterprise
|
33.010
|
|
18/11/2018
|
100
|
07/04/2019
|
|
|
30
|
IRIDP-2/BRS/DW-46
|
(a)Improvement of Kashipur Six Mil0e-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road.
|
1.0000
|
65.380
|
Md. Shamsul Alam
|
65.380
|
|
30/03/2018
|
100
|
07/04/2019
|
|
|
31
|
IRIDP-2/BRS/MW-158
|
a) Maintenance of C & B Raintree tala (RHD) - Basher hat via Sholnahat road (Ch.2000m -4000m) ID NO 506514141.(b) Construction of 01no 2.0m x 2.0 m culvert at ch.2269m on the same road.(c) Construction of 01no 1.60 m x 1.60 m culvert at ch.3119m & 3486m on the same road.
|
2.0000
|
64.130
|
M/S. Khandaker Shahin Ahmed
|
64.130
|
|
15/11/2018
|
100
|
04/04/2019
|
|
|
32
|
IRIDP-2/BRS/MW-127
|
a) Maintenance of Taltoli Bazar-Lamchari hat road (Ch.2610m - 4000m) ID NO 506514139b)Construction of 01no 1.60mx1.60m culvert at ch.3645m on the same road.
|
1.3900
|
51.370
|
M/S. Mohiuddin Ahmed
|
51.370
|
|
15/12/2018
|
100
|
04/04/2019
|
|
|
33
|
IRIDP-2/BRS/MW-126
|
a) Maintenance of Textile-Lakutia Road via Amirgonj Bazar.road (Ch.4144m - 6314m) ID NO 506514138b) Construction of 01no 0.625mx0.60m culvert at ch.4622m on the same road.
|
2.1700
|
68.500
|
M/S. Mohiuddin Ahmed
|
68.500
|
|
15/11/2018
|
100
|
04/04/2019
|
|
|
34
|
IRIDP-2/BRS/DW-123
|
(a)Improvement of Gilatoli Mina brick field- Shahalom khan bari Road (Ch.00m - 584m) ID NO 506515504(b)Construction of 01no 1.6mx1.6 m culvert at ch.350 on the same road.
|
0.5800
|
34.950
|
M/S. Kohinoor Enterprise
|
34.950
|
|
15/06/2018
|
100
|
04/04/2019
|
|
|
35
|
IRIDP-2/BRS/DW-113
|
Improvement of Darmadi Rattron Holader Bari To 27No Word Via kalam khan Bari.road (Ch.00m – 490.0m) 2,470,035.00 24-May-17 2,470,035.00
|
0.4900
|
24.700
|
M/S. Khondokar Brothers
|
24.700
|
|
25/05/2018
|
100
|
04/04/2019
|
|
|
36
|
IRIDP-2/BRS/DW-110
|
(a)Improvement of Charkawa Karnokati Bhola Road Delowerer Bari - late Mazed Khan Bari via AL-Aksha Mosque.road (Ch.00m - 1052m) & Link road 90.0m(b)Construction of 02no 1.0mx1.0 m culvert at ch.203m &465m on the same road. 6,399,130.10 6-Mar-17 4,479,468.13
|
1.1420
|
63.990
|
M/S. Shuley Traders
|
63.990
|
|
30/12/2017
|
100
|
04/04/2019
|
|
|
37
|
IRIDP-2/BRS/DW-46
|
(a)Improvement of Kashipur Six Mile-Lakutia Babur hat road (ch.1000m-2000m) (b) Construction of 01 no 1.60mx1.60m culvert at ch.1675 on the same road.
|
1.0000
|
65.380
|
Md. Shamsul Alam
|
65.380
|
|
30/03/2018
|
100
|
04/04/2019
|
|
|
|
6
|
Gouranadi
|
|
1
|
IRIDP-2/BRS/DW-140
|
(a)Improvement of Chandrahar Bazar-Noapara GPS road (Ch.00m - 1700m) ID NO 506324118(b)Construction of 01no 0.625mx0.6 m culvert at ch.132 on the same road.
|
1.7000
|
102.660
|
Nojiron Corporation
|
102.660
|
|
07/01/2019
|
55
|
02/04/2019
|
|
|
2
|
IRIDP-2/BRS/SDW-157
|
Conastruction of 3x4.50mx5.0m culvert at ch:1410m on Donerkandi purbapara Kalimondir - Bisnowkarati Rice mill road.
|
|
28.440
|
Nojiron Corporation
|
28.440
|
|
20/04/2018
|
100
|
31/03/2019
|
|
|
3
|
IRIDP-2/BRS/DW-143
|
Improvement of Tara High School(NHW) - Tarakupi GPS via Abdul Hye Master House road (Ch.00m - 1000m) ID NO 506325038
|
1.0000
|
63.340
|
Nojiron Corporation
|
63.340
|
|
28/02/2019
|
100
|
31/03/2019
|
|
|
4
|
IRIDP-2/BRS/DW-141
|
Improvement of Illa Vanga - East Dumuria Govt Primary school Via Karikorpara road (Ch.00m – 1246m)
|
1.2460
|
87.880
|
Nojiron Corporation
|
87.880
|
|
30/11/2018
|
100
|
31/03/2019
|
|
|
5
|
IRIDP-2/BRS/DW-139
|
(a)Improvement of Salta Bazar-Vallukshi Bazar.road (Ch.00m - 1010m) ID NO 506324116b)Construction of 01no 0.625mx0.60m culvert at ch.508m on the same road.c)Construction of 01no 2x4.0mx4.0m culvert at ch.797m on the same road.
|
1.0100
|
76.600
|
Nojiron Corporation
|
76.600
|
|
14/02/2018
|
100
|
31/03/2019
|
|
|
6
|
IRIDP-2/BRS/DW-75
|
(a)Improvement Of Labutoli Bazar-Badarpur GC Road via Mir Kutub Shah Mazar (Mahilara Up office old Kasemabad (RHD)-Nalchira Bazar) Road (Ch.1750m - 3762m)(b) Construction of 01no 0.625mx0.60m culvert at ch.2756m on the same road.
|
2.0120
|
115.260
|
M/S. G.M. Construction
|
115.260
|
|
30/11/2018
|
100
|
31/03/2019
|
|
|
7
|
IRIDP-2/BRS/DW-74
|
(a)Improvement Of Bagar - DSB hat via Baghar GPS Road (Ch.00m - 1198m)(b) Maitenance of 01no. 14.00m Bridge at ch.1171m on the same road.
|
1.1980
|
72.550
|
M/S. Sharif Enterprise
|
72.550
|
|
28/07/2018
|
100
|
31/03/2019
|
|
|
8
|
IRIDP-2/BRS/DW-56
|
Improvement of Kalabariah RPS - Nalchira hospital via kutubshar mazar road (Ch. 00-1020m)
|
1.0200
|
58.310
|
M/S. Talukder Enterprise
|
58.310
|
|
13/04/2017
|
100
|
31/03/2019
|
|
|
9
|
IRIDP-2/BRS/DW-55
|
Improvement of North Magura Eidga – North Magura forkania madrasha. road(Ch.00-1300m.)
|
1.3000
|
79.080
|
M/S. Talukder Enterprise
|
79.080
|
|
19/05/2017
|
100
|
31/03/2019
|
|
|
10
|
IRIDP-2/BRS/DW-54
|
Improvement of Road Chandrahar bazar - Nalchira Bazar via Kali bari Bazar road (ch.00m-1850m)
|
1.8500
|
102.790
|
M/S. Feroj Alom
|
102.790
|
|
27/02/2018
|
100
|
31/03/2019
|
|
|
11
|
IRIDP-2/BRS/DW-3
|
Improvement of road from Satkabla to Gournadi Utter Chandsi GPS-Gournadi Bondor Via Utter palordi GPS (Ch. 00-1415m)
|
1.4100
|
88.660
|
M/S. Pizush Enterprise
|
88.660
|
21/02/2016
|
19/11/2016
|
100
|
23/12/2018
|
|
|
12
|
IRIDP-2/BRS/DW-2
|
(a) Improvement of road from Nalchira up office to Diasur bazar via Char Ramjanpur GPS (Ch.750-1750m.) (b) Construction of 01no 0.625mx0.0.60m culvert at ch.1305m on the same road.
|
1.0000
|
61.910
|
M/S. Pizush Enterprise
|
61.910
|
21/02/2016
|
19/11/2016
|
100
|
23/12/2018
|
|
|
13
|
IRIDP-2/BRS/DW-1
|
(a) Improvement of Road from Batazore GC to Laxmonkathi bazar via Dhakhin Pashim para.(Batazor GC to sholok bazar via jugikathi from ch.1013-2013m. (b) Construction of 02nos 0.625mx0.0.60m culvert at ch.1120m & 1455m on the same road.
|
1.0000
|
68.830
|
M/S. Pizush Enterprise
|
68.830
|
21/02/2016
|
19/11/2016
|
100
|
23/12/2018
|
|
|
|
7
|
Hizla
|
|
1
|
IRIDP-2/BRS/DW-181
|
(a) Improvement of Baherchar-Baushia Road (Ch.2700m - 3200m) ID NO 506365012(b)Construction of 02no 0.625mx0.60m culvert at ch.183m,435m on the same road.
|
0.5000
|
32.680
|
Md. Mahafuz Khan
|
32.680
|
|
23/10/2018
|
90
|
07/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-152
|
(a)Improvement of Moultala High School(RHD)-Kilerhat (UZR)Via Rezbi Khan Bari road (Ch.00m - 1700m) ID NO 506365006(b)Construction of 02no 0.625mx0.60m culvert at ch.337m&1155m on the same road.
|
1.7000
|
96.590
|
M/S. Dawn Corporation
|
96.590
|
|
04/07/2018
|
85
|
07/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-171
|
(a)Improvement of Harinathpur Farid Khonder Bari(UZR) -Veri Bandth (UZR) road (Ch.00m - 1110m) ID NO 506364022(b)Construction of 02no 0.625mx0.60m culvert at ch.520m & 835 on the same road.
|
1.1100
|
33.280
|
M/S Amir Engineering corporation
|
33.280
|
|
11/09/2018
|
100
|
04/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-168
|
(a)Improvement of Maulavir hut(UZR) Via Uttor Guabatia Gps- Kawria Bazer Dhanusikder hut road(UZR) road (Ch.00m - 2460m) ID NO 506364015(b)Construction of 02no 0.625mx0.60m culvert at ch.1110m & 2205m on the same road.
|
2.4600
|
134.230
|
M/S. Kohinoor Enterprise
|
134.230
|
|
30/01/2019
|
100
|
04/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-64
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.2545m - 6500m)
|
3.9550
|
109.520
|
M/S. Lutful Kabir
|
109.520
|
|
28/02/2019
|
100
|
04/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-63
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.400m - 995m) 1,559,755.00 29-Jan-17 1,472,567.23
|
0.5950
|
15.590
|
M/S. Apu Enterprise
|
15.590
|
|
30/03/2017
|
100
|
04/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-170
|
(a)Improvement of Goler Hat (RHD) Via Moddah Mashkata Ali Ahmed GPS - Bander Hat road (Ch.00m - 1945m) ID NO 506365062(b)Construction of 02no 0.625mx0.60m culvert at ch.595m & 1403 on the same road.
|
1.9450
|
62.230
|
M/S Amir Engineering corporation
|
62.230
|
|
20/05/2018
|
100
|
04/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-169
|
(a)Improvement of Kawria - Bandorhat road (Ch.00m - 2000m) ID NO 506365020(b)Construction of 01no 0.625mx0.60m culvert at ch.1090m on the same road. 7,897,069.46 26-Nov-17 7,107,362.51
|
2.0000
|
78.970
|
M/S Amir Engineering corporation
|
78.970
|
|
04/04/2018
|
100
|
04/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-151
|
Improvement of Barjalia UP office -Kaisma Bazar via Food Goudaun & College road (Ch.00m - 1010m) ID NO 506363003
|
1.0100
|
29.760
|
M/S Amir Engineering corporation
|
29.760
|
|
28/03/2018
|
100
|
04/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-68
|
Improvement Of Char Pattni vanga Jalil Bapary Bari via Reg Pry School (Ch.00m - 3000m)
|
3.0000
|
83.650
|
M/S. Lutful Kabir
|
83.650
|
|
21/01/2018
|
100
|
04/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-67
|
(a)Improvement Of Hizla Taker Bazar (Upazila H/Q)-Mehendigonj Upazila Road (Via Moddah Bawsia Gps) (Ch.628m-2692m)(b) Construction of 01no 4.0mx4.0m culvert at ch.1900m on the same road.
|
2.0640
|
74.800
|
Md. Sirajul Islam Hanif
|
74.800
|
|
30/12/2017
|
100
|
04/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-66
|
Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.7515m - 8705m)
|
1.1900
|
42.870
|
M/S. B.B International
|
42.870
|
|
30/03/2017
|
100
|
04/04/2019
|
|
|
13
|
IRIDP-2/BRS/DW-65
|
(a)Improvement Of Dhanushikder Hat Via Abupur Kheya Ghat - Memania Taker Hat Road (Ch.6605m - 7255m)(b) Construction of 01no 0.625mx0.60m culvert at ch.6630m on the same road. 2,048,814.00 1,934,287.40
|
0.6500
|
20.480
|
M/S. Apu Enterprise
|
20.480
|
|
30/05/2017
|
100
|
04/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-43
|
(a) Improvement of road from Khunna Hospital(RHD) via Kawmi Madrasha -Baherchar (UZR) (Ch.1500m-2693m.) (b) Construction of 01 no 3.0mX3.0m culvert at ch. 1546m on the same road. 4,732,192.00 3-Apr-16 3,188,158.46
|
1.1930
|
47.320
|
M/S. B B International
|
47.320
|
|
30/06/2016
|
100
|
04/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-42
|
Improvement of road from Bander Hat - Molovir Hat(Ch. 1600m-2957m.)
|
1.3700
|
47.670
|
M/S. B B International
|
47.670
|
|
09/10/2016
|
100
|
04/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-41
|
(a)Improvement of road from Abda Bazar-Kakuria Bazar (Ch. 00m-1000m.) (b) Construction of 01no 0.625mx0.9m culvert at ch.825m on the same road.
|
1.0000
|
36.800
|
M/S. Islam Brothers
|
36.800
|
|
06/08/2016
|
100
|
04/04/2019
|
|
|
|
8
|
Mehendiganj
|
|
1
|
IRIDP-2/BRS/DW-70
|
(a)Improvement Of Shonamukhi Mazikandi house – Kasem sir house bridge road .(Ch.00m - 702m)(b) Construction of 01no 2.0mx2.0m culvert at ch.304m on the same road.
|
0.7020
|
29.490
|
M/S. Lutful Kabir
|
29.490
|
|
30/10/2018
|
100
|
07/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-180
|
Improvement of Gabtoli Bazar-Posshim Bongga GPS Via Hurarhat,Adarsha Gram,Noli Bari road (Ch.300m - 3025m) ID NO 506625025
|
2.7250
|
73.810
|
M/S Mother Engineering
|
73.810
|
|
01/05/2019
|
30
|
07/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-179
|
Improvement of Char Ekkaria Uttarchar Brick Field (RAMB) – Hijla River Ghat Road (Ch.000m - 490m) ID NO 506625419
|
0.4900
|
29.980
|
M/S Amir Engineering corporation
|
29.980
|
|
05/10/2018
|
40
|
07/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-149
|
(a)Improvement of Mathertoly Bazar- Fokiraer pool Via keshipur High School Road(Ch.650m - 2500m) ID NO 506625345(b)Construction of 02no 0.625mx0.6 m culvert at ch.1500m&1700m on the same road.
|
1.8500
|
69.640
|
M/S. Hasan Construction
|
69.640
|
|
04/03/2018
|
15
|
07/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-146
|
Improvement of Biddanondopur UP-Dafaderhat (Baro Bridge) road (Ch.00m - 2100m) ID NO
|
2.1000
|
69.560
|
M/S. Hasan Construction
|
69.560
|
|
30/05/2018
|
60
|
07/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-145
|
Improvement of Noyakhali-Aligonj GC .road (Ch.800m - 1800m) ID NO 506625095
|
1.0000
|
36.300
|
M/S. Hasan Construction
|
36.300
|
|
04/03/2018
|
70
|
07/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-73
|
Improvement of Patnighata Bridge (Sadekpur) - Razzak kabiraz House via Akon house. .(Ch.00m - 940m)
|
0.9400
|
32.250
|
M/S. Lutful Kabir
|
32.250
|
|
19/10/2018
|
75
|
04/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-72
|
Improvement Of Vandarighata to Kashipur High school..(Ch.00m - 2275m) 8,692,121.00 15-Jan-17 7,382,654.46
|
2.2700
|
86.920
|
M/S. Hasan Construction
|
86.920
|
|
30/03/2019
|
80
|
04/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-71
|
Improvement Of Charhogla Shonamukhi Ukil bari – Pokki mai bari .(Ch.00m - 1360m)
|
1.3600
|
51.800
|
M/S. Hasan Construction
|
51.800
|
|
30/01/2019
|
95
|
04/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-38
|
(a)Improvement of road from Kasipur High School-Sahid Babul Sarok via Sree Hori Narawon Nath Bari ( Ch. 00m-1510m.) (b) Construction of 01no 0.625mx0.60m culvert at ch.973 m on the same road. 5,179,695.00 2-Mar-16 4,482,405.73
|
1.5100
|
51.790
|
M/S. Hasan Construction
|
51.790
|
|
20/04/2018
|
100
|
04/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-147
|
(a)Improvement of Lata UP (Gabtoli Bazar)-Bangla Bazar road (Ch.680m – 3441m) ID NO 506623002(b)Construction of 01no 0.625mx0.6 m culvert at ch.1089 on the same road.
|
2.7610
|
84.680
|
M/S Amir Engineering corporation
|
84.680
|
|
10/02/2019
|
100
|
04/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-69
|
(a)Improvement Of H/O Hanif Bepari - Bajidkha Kheyaghat via Char Bhouduba Jame -Mosque.(Ch.00m - 664m)
|
0.6640
|
17.470
|
M/S. Hasan Construction
|
17.470
|
|
30/08/2018
|
100
|
04/04/2019
|
|
|
13
|
IRIDP-2/BRS/DW-39
|
(a)Improvement of road from Darichar Khajuria Senior Madrasha-Orakul road via Gazirhat (Ch. 00m-1500m.) (b) Construction of 01no 1.50mx1.50m culvert at ch.100m on the same road. 4,689,777.00 2-Mar-16 4,036,562.21
|
1.5000
|
46.890
|
M/S. Hasan Construction
|
46.890
|
|
28/02/2019
|
100
|
04/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-35
|
(a)Improvement of road from Bangla Bazar to Notun Kasherhat via Lata UP (Gabtoli Bazar) to Hurar hat ( Ch. 580m-2080m.) b) Construction of 01no 2.0mx2.0m culvert at ch.874m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.1169m,1394m&1614m on the same road.
|
1.5000
|
55.900
|
M/S. Hasan Construction
|
55.900
|
|
28/11/2016
|
100
|
04/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-167
|
Improvement of Char hogla fridom fighter Sayed vhoya Bari - Nijamuddin Bepari Bari Road.(Ch.00m - 630m) ID NO 506625362
|
0.6300
|
18.730
|
M/S Amir Engineering corporation
|
18.730
|
|
30/09/2018
|
100
|
04/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-166
|
Improvement South Char Hogla GPS - North side Gopal sikder Bari via kalimondir, patarhat - kajirhat GC..road (Ch.00m - 576m) ID NO 506625360
|
0.5760
|
17.120
|
M/S Amir Engineering corporation
|
17.120
|
|
22/05/2018
|
100
|
04/04/2019
|
|
|
17
|
IRIDP-2/BRS/DW-165
|
(a)Improvement Dhakin Charhogla GPS-Moddo Charhogla Mosqueroad (Ch.00m - 1000m) ID NO 506625107(b)Construction of 01no 0.625mx0.60m culvert at ch.618m on the same road. 3,103,569.48 12-Nov-17 2,948,391.00
|
1.0000
|
31.030
|
M/S Amir Engineering corporation
|
31.030
|
|
30/07/2018
|
100
|
04/04/2019
|
|
|
18
|
IRIDP-2/BRS/DW-150
|
Improvement of Sikdererhat-H/O Khales Bhuiyan road (Ch.00m - 1370m) ID NO 506625054
|
1.3700
|
35.660
|
M/S. Lutful Kabir
|
35.660
|
|
30/05/2018
|
100
|
04/04/2019
|
|
|
19
|
IRIDP-2/BRS/DW-148
|
(a)Improvement of Lata UP (Gabtoli Bazar)- Notun Kasherhat via Hurar hat Road (Ch.2038m - 3840m) ID NO 506623019(b)Construction of 01no 0.625mx0.6 m culvert at ch.2501 on the same road. 5,855,712.13 4-Oct-17 5,270,140.91
|
1.8020
|
58.550
|
M/S Amir Engineering corporation
|
58.550
|
|
04/05/2018
|
100
|
04/04/2019
|
|
|
20
|
IRIDP-2/BRS/DW-61
|
Improvement of Muktijodda Mostafa Kamal H/S – Natun Bazar Road (Ch.00m - 800m) 2,529,605.00 2,440,309.12
|
0.8000
|
25.290
|
M/S. Talukder Enterprise
|
25.290
|
|
15/03/2017
|
100
|
04/04/2019
|
|
|
21
|
IRIDP-2/BRS/DW-40
|
Improvement of road from Jangalia RHD - Mainuddin Majhi Bari ( Ch. 00m-600m.)
|
0.6000
|
19.900
|
M/S. Hasan Construction
|
19.900
|
|
06/08/2016
|
100
|
04/04/2019
|
|
|
22
|
IRIDP-2/BRS/DW-37
|
(a)Improvement of road from Nasirkha Hat Khayaghat-Union Complex via Chilmari Sluice Gate (Ch. 00m-1870m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.832m,976m&1690 m on the same road.
|
1.8700
|
55.020
|
M/S. Hasan Construction
|
55.020
|
|
30/12/2017
|
100
|
03/04/2019
|
|
|
23
|
IRIDP-2/BRS/DW-36
|
(a)Improvement of Road from Alimabad UP (Majkajir char Bazar)-Sreepur Bazar via Gaguria Bazar, Mohisa Khayaghat (Ch. 1625m -3190m.) (b) Construction of 03nos 0.625mx0.60m culvert at ch.1835m,2323m & 3025m on the same road.
|
1.5650
|
56.970
|
M/S. Hasan Construction
|
56.970
|
|
30/11/2016
|
100
|
03/04/2019
|
|
|
24
|
IRIDP-2/BRS/DW-34
|
(a)Improvement of road from Andermanik UP - Bonikerhat Bazar via Ekkoterhat Bazar & Khunna Bazar ( Ch. 315m-4000m.) b) Construction of 01no 2.0mx2.0m culvert at ch.2772m on the same road. (c) Construction of 03nos 0.625mx0.60m culvert at ch.860m,2240m&2643m on the same road.
|
3.6850
|
102.400
|
M/S. Lutful Kabir
|
102.400
|
|
04/03/2017
|
100
|
03/04/2019
|
|
|
|
9
|
Muladi
|
|
1
|
IRIDP-2/BRS/DW-225
|
Improvement of Chilmari Kowsar Sader bari-M P hat via Rasid Khan bari(N-B).road (Ch.00m - 1724m) ID NO 506694031
|
1.7240
|
72.550
|
M/S. Rahat Enterprise
|
72.550
|
|
25/11/2019
|
20
|
03/04/2019
|
|
|
2
|
IRIDP-2/BRS/DW-224
|
Improvement of Muladi Barak Master bari-Char Laxmipur Borro Moaidan (M)road (Ch.370m - 770m) ID NO 506695045
|
0.4000
|
17.600
|
M/S. Momin Enterprise
|
17.600
|
|
17/07/2019
|
10
|
03/04/2019
|
|
|
3
|
IRIDP-2/BRS/DW-186
|
(a)Improvement of Charkalekha UP - Mirder hat G.C.Via Nomokanda-Ekotar hat.road (Ch.2000m - 3078m) ID NO 506693007(b)Construction of 01no 4.0mx4.0m culvert at ch.1750m on the same road.(c)Construction of 02no 1.30mx1.30m culvert at ch.2005m &2310 on the same road.
|
1.0780
|
78.790
|
M/S. Habib Sons
|
78.790
|
|
04/06/2019
|
30
|
03/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-162
|
(a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR .road (Ch.00m - 1350m) ID NO 506694095(b)Construction of 01no 1.30mx1.30m culvert at ch.400m on the same road.(c)Construction of 01no 3.0mx3.0m culvert at ch.500m on the same road.
|
1.3500
|
55.270
|
M/S Amir Engineering corporation
|
55.270
|
|
02/11/2018
|
90
|
03/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-154
|
(a)Improvement of Boalia Natun hat - West Boalia GPS - Taleb kari Moydan bridge (S).road (Ch.150m - 1150m) ID NO 506694028(b)Construction of 01no 1.3mx1.30m culvert at ch.480m on the same road.
|
1.0000
|
59.480
|
M/S. Serajul Alam Sikder
|
59.480
|
|
18/04/2019
|
70
|
03/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-96
|
Improvement of Safipur UP-Montazpur Bazar- Dorgabari –Uttar char Padda GPS – Bhoai bazar road.(Ch.00m - 1550m)
|
1.5500
|
89.270
|
M/S. Dhara Enterprise
|
89.270
|
|
30/10/2018
|
70
|
03/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-95
|
(a)Improvement of Talukder hat( khajurtala) - Safipur UP via Charkaleka UP baparir hat road.(Ch13850m -15050m)(b) Construction of 01no 4.0mx4.0m culvert at ch.14643.00m on the same road.
|
1.2000
|
81.670
|
M/S. Dhara Enterprise
|
81.670
|
|
30/11/2018
|
70
|
03/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-94
|
(a)Improvement of Kazir Char High School - Moddho Kazirchar Dakhil Madrasah at Kazir Char Union road.(Ch.00m - 1000m)(b)Construction of 01no 2.0mx2.0m culvert at ch.125m on the same road.
|
1.0000
|
62.590
|
M/S. Dhara Enterprise
|
62.590
|
|
30/10/2018
|
70
|
03/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-164
|
(a) Improvement of Laxmipur H/S -Near Bridge Kaitmara Registry School road (Ch.00m - 1000m) ID NO 506694030(b)Construction of 01no 1.30mx1.30m culvert at ch.380m on the same road.
|
1.0000
|
34.430
|
M/S Amir Engineering corporation
|
34.430
|
|
28/02/2019
|
100
|
03/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-161
|
Improvement of Talukdar(Khajurtala) Hat to Poyeaka Rastom Fokir bari via Ali Sikder bari bridge(G).road (Ch.1800m - 3500m) ID NO 506694016
|
1.7000
|
100.320
|
Orient Trading & Builders LTD.
|
100.320
|
|
28/02/2019
|
100
|
03/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-156
|
Improvement of Khasher Hat - Repotar Khan Kabir bari via Bangla bazar(M).road (Ch.3900m - 4410m) ID NO 506694003
|
0.5100
|
27.550
|
M/S. Monalisa
|
27.550
|
|
28/02/2019
|
100
|
03/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-155
|
(a)Improvement of Char Malia Beparir Hat - Kaetmara GPS - Sherajul haq Bhuyan bari Charkalekhan UP UNR road (Ch.1350m - 1950m) ID NO 506694095(b)Construction of 01no 4.0mx4.0m culvert at ch.1650m on the same road.
|
0.6000
|
45.670
|
Orient Trading & Builders LTD.
|
45.670
|
|
10/03/2019
|
100
|
03/04/2019
|
|
|
13
|
IRIDP-2/BRS/DW-163
|
Improvement of Yousaf Ali Khan bari-Sholaghar Tozom Ali bari (C). road (Ch.00m - 510m) ID NO 506695012
|
0.5100
|
16.230
|
Md. Khair Hossain
|
16.230
|
|
02/04/2018
|
100
|
03/04/2019
|
|
|
14
|
IRIDP-2/BRS/SDW-159
|
(a)Improvement of Jamdder bari - Akoter hat via Bahadurpur H/S (K).road (Ch.00m - 1300m) ID NO 506695025(b)Construction of 01no 2.0mx2.0m culvert at ch.2269m on the same road.
|
1.3000
|
88.220
|
Orient Trading & Builders LTD.
|
88.220
|
|
28/11/2018
|
100
|
03/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-97
|
(a)Improvement of Laxmipur high school – Dakkin Laxmipur Lanch ghat via Laxmipur Rahman master bari, Mordon hawladar bari mosque gate , community clinic, joybangla bazar road.(Ch.00m - 4500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.4500m on the same road.(a)Improvement of Mirdar hat GC-Nazirpur GCCR via Madrashar hat,Bangla Bazar road.(Ch.5580m - 6500m)(b) Construction of 01no 4.0mx4.0m culvert at ch.5580m on the same road.(c) Construction of 01no 2.0mx2.0m culvert at ch.6050m on the same road.
|
5.4200
|
291.610
|
M/S. Dhara Enterprise
|
291.610
|
|
28/08/2018
|
100
|
03/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-11
|
(a) Improvement of road from Talukder hat (Khajurtala) to Safipur UP via Charkalakhan UP-Beparirhat (Ch. 2850-5750m) (b) Construction of 01no 3.0mx3.0m culvert at ch.5112m on the same road. (c) Construction of 03nos 1.3mx1.3m culvert at ch. 3580m, 4050m &
|
2.9000
|
183.910
|
M/S. Alvi Construction
|
183.910
|
04/03/2016
|
02/12/2016
|
100
|
23/12/2018
|
|
|
17
|
IRIDP-2/BRS/DW-10
|
Improvement of road from Mirdar hat GC-Nazirpur GC via Madrashar hat, Bangla Bazar at Ch. 7500 - 10350 m (Starting Banimordan Hat -MP hat)
|
2.8500
|
113.630
|
M/S. Lutful Kabir
|
113.630
|
14/03/2016
|
13/12/2016
|
100
|
23/12/2018
|
|
|
|
10
|
Uzirpur
|
|
1
|
IRIDP-2/BRS/SDW-226
|
(a) Improvement Gazirpar Kader Market – Ohab Master House (Barakhota – Gazirpar) Road (Ch.00m - 600m) ID NO 506945017(b)Construction of 02no 0.625mx0.60m culvert at ch.205m,465m on the same road.
|
0.6000
|
47.590
|
M/S. Warisha Enterprise
|
47.590
|
|
24/08/2019
|
20
|
03/04/2019
|
|
|
2
|
IRIDP-2/BRS/SDW-221
|
a) Improvenment of Baherghat H/O Jahirul Master towards northroad (Ch.00m-480m) ID NO 506945287b) Construction of 01 no 3.0mx3.0m culvert at ch. 280m on the same road(b) Construction of 1no 0.625mx0.60m culvert at ch.195m on the same road.
|
0.4800
|
43.170
|
M/S. Mitro & Co.
|
43.170
|
|
29/04/2019
|
10
|
03/04/2019
|
|
|
3
|
IRIDP-2/BRS/MW-214
|
Maintenance of Uzirpur UZ HQ - Daserhat Kheyaghat - Narayanpur R&H road (Ch.00m - 1000m)
|
1.0000
|
33.950
|
M/S. Ferdousi Construction
|
33.950
|
|
16/02/2019
|
20
|
03/04/2019
|
|
|
4
|
IRIDP-2/BRS/DW-213
|
(a)Improvement of Ballabpur - H/O Rashid Molla- Bairkathi - Tatipara GPS Road .(Ch.500m - 1050m) ID NO 506945237(b)Construction of 01no 3.0mx3.0m culvert at ch.630m on the same road.
|
0.5500
|
44.610
|
M/S. Habib Sons
|
44.610
|
|
11/05/2019
|
0
|
03/04/2019
|
|
|
5
|
IRIDP-2/BRS/DW-212
|
(a)Improvement of Boharkati H/O Akkas Molla - Uzirpur Dhamura road Battola Steel bridge. Road .(Ch.00m - 640m) ID NO 506945203(b)Construction of 01no 0.625mx0.60m culvert at ch.425m on the same road.
|
0.6400
|
30.140
|
M/S. Sardar Trading
|
30.140
|
|
07/04/2019
|
0
|
03/04/2019
|
|
|
6
|
IRIDP-2/BRS/DW-211
|
Improvement of Otra Raster matha Bazar - Jugirkanda Gala Hat road (Ch.00m - 810m) ID NO 506945216
|
0.8100
|
48.290
|
M/S. Saira Enterprise
|
48.290
|
|
08/04/2019
|
30
|
03/04/2019
|
|
|
7
|
IRIDP-2/BRS/DW-210
|
Improvement of Satla GC (Akota Bazar) - Kandi R&H road (Ch.00m - 180m) ID NO 506942006
|
0.1800
|
15.330
|
M/S. Sadia Enterprise
|
15.330
|
|
03/04/2019
|
5
|
03/04/2019
|
|
|
8
|
IRIDP-2/BRS/DW-209
|
Improvement of Mulpain – Hostisundo road (Ch.1000m - 2013m) ID NO 506945243
|
1.0130
|
65.120
|
M/S. Sikder Construction
|
65.120
|
|
07/06/2019
|
0
|
03/04/2019
|
|
|
9
|
IRIDP-2/BRS/DW-208
|
(a)Improvement of Narayanpur-Nitayandi road (Ch.00m - 1000m) ID NO 506945039(b)Construction of 02no 0.625mx0.60m culvert at ch.250m,455m on the same road.
|
1.0000
|
71.760
|
M/S. Sardar Trading
|
71.760
|
|
11/07/2019
|
0
|
03/04/2019
|
|
|
10
|
IRIDP-2/BRS/DW-174
|
(a)Improvement of Goria Setla khola - Mugakathi Govt. Primary School road..(Ch.00m - 1020m) ID NO 506945261(b)Construction of 04no 0.625mx0.90m culvert at ch.103m,376m,580m &720m on the same road.(c)Construction of 01no 2.0mx2.0m culvert at ch.870m on the same road.
|
1.0200
|
79.420
|
M.M. Builders & Engineers LTD.
|
79.420
|
|
18/02/2019
|
40
|
02/04/2019
|
|
|
11
|
IRIDP-2/BRS/DW-173
|
(a)Improvement of Bamrail-Boharkati road (Ch.00m - 1000m) ID NO 506944026(b)Construction of 04no 0.625mx0.90m culvert at ch.205m,305m,870m &920m on the same road.(c)Construction of 01no 4.0mx4.0m culvert at ch.12m on the same road.
|
1.0000
|
82.530
|
M.M. Builders & Engineers LTD.
|
82.530
|
|
18/02/2019
|
80
|
02/04/2019
|
|
|
12
|
IRIDP-2/BRS/DW-172
|
(a) Improvement of Mulpain Thakurhat - Uttar Sakral GPS - Norshingha Munshibari bridge - Sukragoda - Hawladerbari bridge - Barakota UP( Daberkul chowmohoni road) Road (Ch.4250m - 4850m) ID NO 506944095(b)Construction of 02no 0.625mx0.60m culvert at ch.4315m,4720m on the same road.
|
0.6000
|
46.510
|
M/S. Kohinoor Enterprise
|
46.510
|
|
18/05/2019
|
60
|
02/04/2019
|
|
|
13
|
IRIDP-2/BRS/DW-86
|
(a)Improvement of Sikarpur RHD to mulpain Via Nurmohamad master house road.(Ch.00m - 1000m) link.150.0m(b) Construction of 03no 0.625mx0.60m culvert at ch.150m,340m&520m on the same road.
|
1.1500
|
56.830
|
M/S. Sharif Enterprise
|
56.830
|
|
04/12/2018
|
65
|
02/04/2019
|
|
|
14
|
IRIDP-2/BRS/DW-85
|
(a)Improvement of Gojendro Wapda bridge- Ramerkathi Bayddo bari mondir road.(Ch.00m - 517m)(b) Construction of 01no 4.0mx4.0m culvert at ch.00m on the same road.
|
0.5170
|
38.290
|
M/S. Mitro & Co.
|
38.290
|
|
28/02/2018
|
45
|
02/04/2019
|
|
|
15
|
IRIDP-2/BRS/DW-83
|
(a)Improvement of Sanuhar - Atipara road.(Ch.00m - 900m)(b) Construction of 02no 0.625mx0.60m culvert at ch.212 & 545m on the same road.
|
0.9000
|
45.990
|
M/S.Sharif Enterprise
|
45.990
|
|
30/03/2018
|
60
|
02/04/2019
|
|
|
16
|
IRIDP-2/BRS/DW-81
|
(a)Improvement of Agailjara Border (Datrabad) - Sholok Hazi M.A. Rashid Secondery School road.(Ch.00m - 650m)(b) Construction of 02no 0.625mx0.60m culvert at ch.115m& 330m on the same road. 2-Mar-17 2,854,591.82
|
0.6500
|
34.920
|
M/S. Sharif Enterprise
|
34.920
|
|
30/12/2018
|
60
|
02/04/2019
|
|
|
17
|
IRIDP-2/BRS/DW-80
|
(a)Improvement of Habibpur Talimul Quran madrasha - Habibpur Hindupara Sarbojanin kalimondir road (Ch.00m - 780m)(b) Construction of 01no 0.625mx0.60m culvert at ch.400m on the same road.
|
0.7800
|
42.990
|
M/S. Mitro & Co.
|
42.990
|
|
28/02/2018
|
75
|
02/04/2019
|
|
|
18
|
IRIDP-2/BRS/DW-18
|
Improvement of road from Uzirpur H/Q - Bamrail UP Office - Ghandeshor Bazar at Ch. 4120m-4720
|
0.6000
|
35.690
|
Md. Sirajul Islam Hanif
|
35.690
|
|
30/07/2018
|
65
|
02/04/2019
|
|
|
19
|
IRIDP-2/BRS/MW-215
|
Maintenance of Otra UP (Habibpur) - Munshirtaluk - Kuralia Bazar road (Ch.00m - 2068m) ID NO 506943003
|
2.0600
|
48.570
|
M/S. Ferdousi Construction
|
48.570
|
|
28/02/2019
|
100
|
02/04/2019
|
|
|
20
|
IRIDP-2/BRS/DW-84
|
(a)Improvement of Joysree bazar-Sattar Dhalir shop - Bharshakati Cyclone shelter road.(Ch.00m - 1050m)(b) Construction of 01no 0.625mx0.60m culvert at ch.809m on the same road.
|
1.0500
|
54.050
|
M/S. Talukder Enterprise
|
54.050
|
|
30/11/2018
|
100
|
02/04/2019
|
|
|
21
|
IRIDP-2/BRS/DW-82
|
(a)Improvement of Ideal College Panchagrame Ballobpur bridge - Bairkathi Jamtala school road.(Ch.00m - 500m)(b) Construction of 01no 0.625mx0.60m culvert at ch.330m on the same road.
|
0.5000
|
27.060
|
M/S. Sarfuddin Trading & Co
|
27.060
|
|
24/11/2018
|
100
|
02/04/2019
|
|
|
22
|
IRIDP-2/BRS/DW-79
|
(a)Improvement Chawdhury hat - Malikanda Madrasha via Uzirpur satla Battala road (Ch.00m - 680m)(b) Construction of 01no 0.625mx0.60m culvert at ch.580m on the same
|
0.6800
|
37.470
|
M/S. Mitro & Co.
|
37.470
|
|
30/03/2018
|
100
|
02/04/2019
|
|
|
23
|
IRIDP-2/BRS/DW-78
|
Improvement Of Dhamra GC (kacha Bazar) - Harta GC- Satla GC - Paisarhat GC Road (Ch.25950m - 27400m)
|
1.4500
|
90.320
|
M/S. Lutful Kabir
|
90.320
|
|
30/05/2018
|
100
|
02/04/2019
|
|
|
24
|
IRIDP-2/BRS/DW-19
|
(a) Improvement of road from Kuchiarpar Wabda-Jamirbari GPS Road (Kuchiarpar GCCR to North Kalvila Road) at Ch. 00m-500m (b) Construction of 01no 0.625mx0.60m culvert at ch.210m on the same road
|
0.5000
|
33.970
|
M/S. Talukder Enterprise
|
33.970
|
|
18/11/2016
|
100
|
02/04/2019
|
|
|
25
|
IRIDP-2/BRS/DW-17
|
Improvement of road from Dhamura GC-Satla GC via Ramerkathi-Muribari at Ch. 4930m-5430m.
|
0.5000
|
39.970
|
M/S. Mitro & Co.
|
39.970
|
|
30/03/2017
|
100
|
02/04/2019
|
|
|
26
|
IRIDP-2/BRS/DW-16
|
Improvement of road from Kalir Bazar GC-Barisal-dhaka NHW-GC School (Kalir Bazar GC-Barisal-Dhaka NHW, Shikerpur) at Ch. 1254m-1754m.
|
0.5000
|
37.070
|
M/S. Mitro & Co.
|
37.070
|
|
30/12/2016
|
100
|
02/04/2019
|
|
|
27
|
IRIDP-2/BRS/DW-15
|
(a) Improvement of road from Satla Bazar-Bagda Bazar Road (Satla H/S-Bagda Border) at Ch. 00m-539m. (b) Construction of 01no 4.0mx4.0m culvert at ch.5m on the same road.
|
0.5390
|
43.610
|
M/S. Sadman Builders
|
43.610
|
11/04/2016
|
30/12/2016
|
100
|
23/12/2018
|
|
|
|
Total :
|
275.0620 (Km)
|
13297.96 (Lac)
|
13297.96 (Lac)
|
|
|
|
|
|
|
|