Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Babuganj
1 SP62052/Rakudia Subproject Re-excavation of Bangla Kata Khal (Ch. 0+000 to Ch. 1+460 km) Re-excavation of Kalir Bazar Khal (Ch. 0+000 to Ch. 0+400 km). Re-excavation of Mominuddir Khal (Ch. 0+000 to Ch. 0+705 km) Re-excavation of Mominuddir Br. Khal (Ch. 0+000 to Ch. 0+732 km). Re-excavation of Narayan Dasher Khal (Ch. 0+000 to Ch. 0+595m) Re-excavation of Nurdir Khal (Ch. 0+000 to Ch. 1+866m) Re-excavation of Rakudia Sluice Gate Khal (Ch. 0+000 to Ch. 1+625m) Re-excavation of Yasiner Khal (Ch. 0+000 to Ch. 0+880m) Const. of 11 Nos. Reference lined Section on 8 Khals, SP Identf. sign board 2 Nos., Demercation Post 48 Nos. and SP Indication Post 2 Nos. Const. of WMCA office (12.00mx6.00m) 131.085 M/S S H Enterprise 131.085 27/04/2023 31/05/2023 90 13/08/2024 Ongoing
2 SP62051/BaherChar Khudrakathi Subproject Re-excavation of Amtalir Khal (Ch. 0+000 to Ch. 1+630 km) Re-excavation of Moragangir Khal (Ch. 0+000 to Ch. 2+350 km). Re-excavation of Madartola Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Sadhukathi Khal (Ch. 0+000 to Ch. 1+200m). Re-excavation of Sadhukathi Br. Khal (Ch. 0+000 to Ch. 0+300m). Const. of 7 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 Nos., Demercation Post 12 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Moragangir Khal Const. of WMCA office (12.0mx6.0m) 164.061 M/S S H Enterprise 164.061 30/03/2023 31/05/2023 82 13/08/2024 Ongoing
3 SP45150/Chandpasha Subproject Re-excavation of Daria badh Khal (Ch: 0 m - 2200 m) Re-excavation of Kolatola Khal (Ch: 0 m - 1150 m) Re-excavation of Molla barir Khal (Ch: 0 m - 1050 m) Re-excavation of Napit barir Khal (Ch: 0 m - 900 m) Re-excavation of Khan bari hota Khal (Ch: 0 m - 700 m) Ref lined Section (13nos.) and SP Signboard (2nos.) 56.014 LCS 56.014 18/01/2021 30/04/2021 100 13/08/2024 Completed
4 SP44081/Thakur Mollik Subproject Re-excavation of Maniruddin Khal (Ch: 0.00 - 1170 m) Re-excavation of Char Hogal Patia Khal (Ch: 0.00 - 1340 m) Re-excavation of Padar Barir Khal (Ch: 0.00 - 700 m) Re-excavation of Sarishar Khal (Ch: 0.00 - 900 m) Re-excavation of Silandia Khal (Ch: 0.00 - 1570 m) Maintenance of WMCA Office, Ref Line Section (10 nos.) and SP Signboard (2 nos.) - 46.724 Shahin & Jahanara 46.724 01/12/2020 30/04/2021 100 13/08/2024 Completed
5 SP43043/Dehergati Subproject Vuter Khal Re-excavation (Ch: 0.00 - 4600 m) Mullar Khal Re-excavation (Ch: 0.00 - 2860 m) Reference Lined Section (8 nos.) + SP Identification Signboard (2 nos.) Purba Rabindranagar Khal re-xcavation (Ch:0.00m - 2540m) 2023-24 Kalibari Khal re-xcavation (Ch:0.00m - 1280m) 2023-24 Chairman Bari Khal re-xcavation (Ch:0.00m - 1260m) 2023-24 Nomarjhuri Khal re-xcavation (Ch:0.00m - 1880m) 2023-24 Daragabari Khal re-xcavation (Ch:0.00m - 1500m) 2023-24 Chairman Bari Branch Khal re-xcavation (Ch:0.00m - 1080m) 2023-24 Const. of 11 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.| 2023-24 113.751 LCS 113.751 25/03/2024 30/04/2024 79 13/08/2024 Ongoing
6 SP25314/Madhabpasa Subproject Uttar Lafadi khal re-excavation(ch.00-3500m) Birpasha khal re-excavation(ch.00-950m) Sultan master barir khal re-excavation(ch.00-2200m) Referenced line section(9 Nos.) Bamboo bridge(11 Nos.) Shibbari Khal re-xcavation (Ch:0.00m - 2760.00m) 2023-24 Badamtali Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Kashaghata Khal re-xcavation (Ch:0.00m - 1500.00m) 2023-24 Kalikhala Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 171.875 zayeda begum 171.875 31/03/2024 30/04/2024 79 13/08/2024 Ongoing
7 SP14200/Chandrapara FCD Subproject Chandrapara khal re-excavation(ch.00-3340m) Baka khal re-excavation(ch.00-1020m) Mushuria branch khal re-excavation(ch.00-990m) Referenced line section(5 Nos.) Chandrapara Embankment re-sectioning(ch.1300-2914m) 88.014 LCS parveen begum 88.014 02/04/2018 30/04/2019 100 13/08/2024 Completed
2 Bakerganj
1 SP61024/Boalia Bakhorkathi Subproject Re-excavation of Sonamukhi Khal (Ch-1+000km to 1+530km) Re-excavation of Jugibari Khal (Ch-1+000km to 1+500km) Re-excavation of Napitbari Khal (Ch-0+000km to 1+772km) Ref. Lined Section 2 Nos. On 3 Khals, And SP Identf. Signboard 2 Nos. Construction of Sonamukhi Khal Regulator (1V-1.50m X1.80m) at Ch. 0+145km of Khal Construction of Jugibari Khal Regulator (1V-1.50m X 1.80m) at Ch. 0+215km of Khal Construction of Napitbari Khal Regulator (1V-1.50 m X 1.50m) at Ch.0+450Km of Khal Construction of WMCA office 237.850 M/S Mohiuddin Ahmed 237.850 21/07/2022 30/04/2023 82 13/08/2024 Ongoing
2 SP44097/Dudhal Subproject Beg Barir Khal re-excavation (Ch:0.00-1500m) Jele Barir Khal re-excavation (Ch:0.00-1100m) Gani Hawladar Barir Khal re-excavation (Ch:0.00-500m) Hawladar Barir Khal re-excavation (Ch:0.00-370m) Const. of 04 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Indication Post 2 Nos. Dudhal Embankment re-sectioning (Ch:0.00 - 3750m) 2020-23 79.419 LCS 79.419 03/04/2024 30/04/2024 96 13/08/2024 Ongoing
3 SP24133/Padrishibpur Subproject Mollar Danga Branch Khal Re-excavation(ch0.00-2200m) Sundor Khali Khal Re-excavation(ch0.00-1900m) Andar Manik Khal Re-excavation(ch0.00-1320m) Sundor Khali Brach Khal Re-excavation(ch0.00-525m) Referenced Line Section(10nos), Subproject Identification signboard (2nos.) Construction of WMCA Building (Semi pacca) 81.119 LCS 81.119 21/01/2021 30/04/2021 100 13/08/2024 Completed
4 SP15294/Kabai FCD Subproject Kathalbari Khal re-xcavation (Ch:0.00m - 1250m) Hariram Khal re-xcavation (Ch:0.00m - 5930m) Kabai Embankment re-sectioning(ch: 9.720 - 11170m) Const. of 09 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 74.755 LCS 74.755 24/04/2024 31/05/2024 62 13/08/2024 Ongoing
5 SP14123/Niamati FCD Subproject Rehabilitation of Niamati Khal Regulator at ch.310m Embankment Rehabilitation of Matiadubi Khal Regulator at ch.5800m Embankment Rehabilitation of Tengrakhali Khal Regulator at ch.6300m Embankment Rehabilitation of Samaddar Khal Regulator at ch.36600m Embankment. 32.285 OTM 32.285 16/01/2024 15/07/2024 0 13/08/2024 Ongoing
3 Banaripara
1 SP44125/Chakhar Subproject Re-exacavation of Chakhar Bazar khal (Ch-0+00km to 2+950km) Re-exacavation of Pashchim Chakhar Khal (Ch-0+000km to 1+00km) Re-exacavation of Chakhar College khal (Ch-0+000km to 0+580km) Re-exacavation of Doctor Barir khal (Ch-0+000km to 0+350km) Re-exacavation of U P khal (Ch-0+000km to 0+400km) Ref. Lined Section 08 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building 64.099 S H Enterprise 64.099 10/02/2022 30/04/2022 83 13/08/2024 Ongoing
2 SP22041/Jambudwip Subproject Re-excavation of Machrang Khal (Ch: 0.00 - 2230 m) Re-excavation of Rajjakpur Khal (Ch: 0.00 - 2180 m) Re-excavation of NapitBarir Khal (Ch: 0.00 - 1330 m) Re-excavation of Union Parishad Khal (Ch: 0.00 - 750 m) and Provisional Sum. Reference Lined Section (10 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Office (Semi pacca) 79.693 LCS SOROYAR HOSSEN 79.693 21/01/2021 31/12/2020 100 13/08/2024 Ongoing
3 SP22020/Kachua Subproject Re-excavation of Baishari khal (Ch: 0.00 - 2540 m) Re-excavation of Kachua khal (Ch: 0.00 - 1320 m) Re-excavation of Kachua Branch khal (Ch: 0.00 - 500 m) Re-excavation of Sabuj Biplob khal (Ch: 0.00 - 1670 m) and Provisional Sum. Reference Lined Section (7 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Building (Semi pacca) 83.447 LCS omor ali 83.447 21/01/2021 30/04/2020 100 13/08/2024 Completed
4 Barishal-s
1 SP62056/Tungi Baria Subproject Memania Khal Re-Excavation from Ch. 0+900km to Ch. 7+168km with 1 Nos Fish Sanctury Ch.9m 1+700km) Kumar Barir Khal Re-Excavation from Ch. 0+200km to Ch. 4+038km Kanai Pura Khal Re-Excavation from Ch. 0+000km to Ch. 0+761km Const. of 13 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Const. of WMCA office 128.693 OTM 128.693 0 13/08/2024 Ongoing
2 SP61002/Char Icha Subproject Re-excavation of Mora Nadi (Ch. 2+200Km to 5+850Km) Re-excavation of Mukshiganjer Khal (Ch. 0+000Km to 2+670Km) Re-excavation of Chand Kati Khal (Ch. 0+000Km to 0+570Km) Re-excavation of Char Icha Varanir Khal (Ch. 0+000Km to 1+030Km) Re-excavation of Jiler Khal (Ch. 0+000Km to 2+100Km) Re-excavation of Jiler Branch-1 Khal (Ch. 0+000Km to 0+660Km) Re-excavation of Jiler Branch-2 Khal (Ch. 0+000Km to 1+475Km) Re-excavation of Karna Kati Khal (Ch. 0+900Km to 2+160Km) Construction of Reference Lined sections ( 14 Nos. ), Provisional Sum Construction of Bamboo bridge (14 Nos. ), Sub-Project Identification Signboard Construction of WMCA Building (Semi pacca) 152.522 S H Enterprise 152.522 19/06/2022 30/04/2022 100 13/08/2024 Completed
3 SP44111/Kasipur Subproject Tulatala Khal re-excavation (Ch:0.00 - 1950m) Sharshi Khal re-excavation (Ch:0.00 - 1600m) Sharshi Branch Khal re-excavation (Ch:0.00 - 1170m) Magorpara Khal re-excavation (Ch:0.00 - 1330m) Const. of 09 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 54.347 LCS 54.347 16/03/2024 30/04/2024 50 13/08/2024 Ongoing
5 Gouranadi
1 SP61006/Hosnabad Subproject Re-exacavation of Kurir Char Khal (Ch-0+000km to 3+300km) Re-exacavation of Paschim Kurir Char Khal (Ch 0+000km to 3+310km) Re-exacavation of Miar Char khal (Ch-0+800km to 3+000km) Re-exacavation of Miar Char Branch khal (Ch 0+000km to 1+900km) Construction of 10 Nos. Reference Lined sections and SP idenf. SB 2 No. Construction of WMCA office building. 151.705 Mother Engineering 151.705 17/05/2022 30/04/2022 100 13/08/2024 Completed
2 SP15308/Nalchira FCD Subproject Gorangal khal re-excavation(ch.00-6200m) Referenced line section(6 Nos.) Bamboo bridge (6 Nos.) WMCA Office 130.659 M/S Mega Ripa Enterprise 130.659 14/07/2019 30/04/2019 100 13/08/2024 Completed
3 SP15307/Sarikal FCD Subproject Char sarikal khal re-excavation(ch.00-1600m) Maddha Hasnabad khal re-excavation(ch.00-1400m) Patur khal re-excavation(ch.00-1600m) Referenced line section(5 Nos.) Bamboo bridge(3 Nos.) Embankment re-sectioning(ch.00-1200m) WMCA office & Irrigation Canal Hasnabad Khal re-xcavation (Ch:2500.00m - 3300.00m) 2023-24 Nalgura AB Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 173.441 OTM 173.441 20/11/2018 30/04/2024 92 13/08/2024 Ongoing
4 SP15306/Mahilara FCD Subproject Lebutoli khal re-excavation(ch.00-3500m) Mahilara embankment re-sectioning(ch.6600-10900m) Referenced line section(4 Nos.) Bamboo Bridge(3 Nos.) Sharifabad Khal re-xcavation (Ch:0.00m - 2450m) 2023-24 Char Diyashur Khal re-xcavation (Ch:0.00m - 1600m) 2023-24 Ramzanpur Khal re-xcavation (Ch:0.00m - 1950m) 2023-24 Ramzanpur Branch Khal re-xcavation (Ch:0.00m - 800m) 2023-24 Const. of 04 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office 185.715 Sorowar Sarder 185.715 31/03/2019 30/04/2024 50 13/08/2024 Ongoing
6 Mehendiganj
1 SP61017/Kazirhat Subproject Re-Sectioning of Kazirhat Embankment (ch.0+000km to 3+600km) Re-excavation of Kazirhat Khal (Ch-1+000km to 2+400km) Re-excavation of Kazirhat Branch-1 Khal (Ch-0+000km to 1+850km) Re-excavation of Kazirhat Branch-2 Khal (Ch-0+000km to 1+500km) Re-excavation of Kazirhat Branch-3 Khal (Ch-0+200km to 1+825km) Re-excavation of Kazirhat Branch-4 Khal (Ch-0+000km to 1+585km) Re-excavation of Kataltali khal (Ch-2+800km to 4+620km) Re-excavation of Kataltali Branch khal (Ch-0+000km to 0+600km) Re-excavation of Masjid bari khal (Ch-0+000km to 2+175km) (Ch-0+000km to 0+600km) Re-excavation of Munshi bari khal (Ch-0+000km to 0+600km) Ref. Lined Section 16 Nos. On 9 Khals And SP Identf. Signboard (2 nos.) Construction of WMCA office building 136.539 S H Enterprise 136.539 28/04/2022 30/04/2022 100 13/08/2024 Completed
2 SP44136/Paschim Cheyam Takta Shayem Takta Khal re-xcavation (Ch:0.00m - 2130m) Paschim Shayem Takta Khal re-xcavation (Ch:0.00m - 2200m) Jahir Uddin Khal re-xcavation (Ch:0.00m - 1930m) Const. of 09Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 49.989 LCS 49.989 0 13/08/2024 Ongoing
3 SP14171/Khajuria FCD Subproject Char khajuria khal re-excavation(ch.00-2600m) Tulatoli khal re-excavation(ch.00-2300m) Majer khal re-excavation(ch.00-1700m) Referenced line section(6 Nos.) Bamboo bridge(1 Nos.) Embankment re-sectioning(ch.00-3200m) WMCA Office 142.454 selim 142.454 22/11/2018 30/04/2019 100 13/08/2024 Completed
4 SP13040/Chilmari FCD Subproject Naktir Khal Re-excavation (Ch: 0 - 1700 m) Beparir Khal Re-excavation (Ch: 0 - 1800 m) Khal Bunia Khal Re-excavation (Ch: 0 - 1300 m) Chilmari Embankment Re-sectioning(1500m) Refferenced line section (6 Nos.) WMCA Office and Others 114.494 salma akter 114.494 07/08/2019 30/04/2019 100 13/08/2024 Completed
7 Muladi
1 SP62049/Kurir Char Miar Char Subproject Re-excavation of Kadamtalar Khal (Ch. 0+100 to Ch. 2+410 km) Re-excavation of Khokon Master Bari Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Mostofa Bari Khal (Ch. 0+000 to Ch. 0+780 km) Re-excavation of Natachora Khal (Ch. 0+000 to Ch. 1+652m) Re-excavation of Natachora Br.1 Khal (Ch. 0+000 to Ch. 0+400m) Re-excavation of Natachora Br.2 Khal (Ch. 0+000 to Ch. 0+400m) Const. of 07 Nos Reference lined Section 6 Khals, SP Identf. sign board 2 Nos., Demercation Post 22 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Kadamtalar khal Const. of WMCA office (12.0mx6.0m) 161.303 M/S Amir Engineering Corporation 161.303 29/03/2023 31/05/2023 100 13/08/2024 Completed
2 SP25313/Char Batamara & Shafipur Subproject Re-excavation of Boalia khal (Ch. 0.00 - 4600 m) Re-excavation of Boalia branch khal (Ch. 0.00 - 900 m) Reference Lined Section (7nos.), Bamboo bridge (4nos.), SP Signboard (2nos.) Maintenance of office. 88.614 md.siddikul 88.614 12/02/2020 30/04/2020 100 13/08/2024 Completed
3 SP15274/Sreemoti FCD Subproject Re-excavation of Goloi Bhanga Khal (Ch 0 - 5150m) Re-excavation of Chardumuri tola Khal (Ch 0 - 1375m) Reference line section (3 nos.) Basher Shako (7 nos.) 56.484 yasmin begum 56.484 04/03/2019 30/04/2019 100 13/08/2024 Completed
4 SP14196/Toyka FCD Subproject Re-excavation of Purba silimpur khal (Ch. 0.00 - 1620 m) Re-excavation of Sajir khal (Ch. 0.00 - 500 m) Re-sectioning of Toika embankment (Ch. 5900 - 9000 m) Refence lined section (4nos.) and SP identification Signboard (2nos.) 73.692 LCS tofajjel hossen 73.692 12/02/2020 30/04/2020 100 13/08/2024 Completed
5 SP13073/Kazir Char DR Subproject Construction of WMCA Building (Semi pacca). Re-excavation of Boroier khal-1 (Ch: 0.00 - 1130 m) Re-excavation of Boroier khal-2 (Ch: 0.00 - 1050 m) Re-excavation of Pangashia branch khal (Ch: 0.00 - 1130 m) Re-excavation of Haolader barir branch khal (Ch: 0.00 - 1600 m) Reference lined section (9nos.) and Subproject Identification signboard (2nos.) 88.555 LCS sowkat hossen 88.555 21/01/2021 30/04/2020 83 13/08/2024 Ongoing
Total : 0.0000 (Km) 3393.40 (Lac) 3393.40 (Lac)